An intelligent control system and method for mine main fan

By introducing a mine ventilation network simulation computing system and intelligent control system into the mine ventilation system, monitoring and adjusting the air volume and air pressure, the shortcomings of intelligent control of the main fan in the existing technology are solved, and the intelligent management and safety of the mine ventilation system are realized. promote.

CN114017090BActive Publication Date: 2024-12-03JIANGXI COPPER CO LTD YONGPING COPPER MINE +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202111218298.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-20
Publication Date
2024-12-03
Estimated Expiration
2041-10-20

AI Technical Summary

Technical Problem

The existing mine ventilation system fails to realize intelligent control of the main fan and cannot adjust the airflow parameters in real time according to the actual ventilation conditions of the underground, resulting in inconvenient management and difficult to detect and eliminate safety hazards in a timely manner.

Method used

An intelligent control system for the main fan of the mine is designed, including the mine ventilation network simulation computing system, sensors and the mine intelligent ventilation and control system. By monitoring the air volume, air pressure, temperature and toxic and harmful gas concentration, a mine ventilation network solution is established. The model calculates and adjusts the operating parameters of the main fan in real time to realize intelligent control of air volume and air pressure.

Benefits of technology

It realizes intelligent management of the mine ventilation system, provides risk warning and forecast functions, realizes unattended main fan, and improves the safety and ventilation effect of the underground operating environment.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present invention provides an intelligent control system for a mine main fan, including a mine ventilation three-dimensional simulation system, a sensor, a main fan and a mine intelligent ventilation control system; the present invention also provides an intelligent control method for a mine main fan, including the following steps: using the mine ventilation three-dimensional simulation system software to establish a mine ventilation network solution model; monitoring the operating parameters of the main fan and the wind flow parameters of the main ventilation lane, and timely transmitting the monitoring data to the mine intelligent ventilation control system, thereby realizing the real-time monitoring and display of the mine ventilation parameters such as air volume, wind pressure, and toxic and harmful gas concentration and temperature, and intuitively expressing the operating status of mine ventilation and main fans; the mine intelligent ventilation control system performs real-time calculations on the mine ventilation network according to the monitoring data and the mine ventilation network solution model. The present invention constructs a mine intelligent ventilation system to realize the intelligent operation of the mine ventilation system, and the real-time intelligent control of the main fan and auxiliary fan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of mine ventilation, and in particular to an intelligent control system and method for a mine main fan. Background Art

[0002] As one of the eight systems of underground mining, the mine ventilation system is an important guarantee for safe production in mine mining. The purpose of mine ventilation is to provide fresh air for underground workers and remove dust, toxic and harmful gases generated during mining operations, so as to create a good working environment for underground workers.

[0003] In recent years, with the rapid development of mining, the depth of mine mining has gradually increased, and the network structure of mine ventilation systems has become more and more complex. The use of manual means to solve complex ventilation networks can no longer keep up with the development of the industry. It is not only inconvenient to manage, but also difficult to discover and eliminate safety hazards in a timely manner.

[0004] With the in-depth research and discussion on mine ventilation, many computer simulation management systems have been developed at home and abroad, making the application of computers in mine production operations become common. Domestic and foreign scientific and technological personnel have achieved fruitful results in computer solution of mine ventilation network, realization of three-dimensional visualization of mine ventilation system, remote control of main fans, etc. However, at the same time, there are also deficiencies in real-time solution of ventilation network and intelligent control of main fan operation. At present, the solution of mine ventilation network has not been combined with the mine main fan and airflow parameter monitoring system, and it is impossible to automatically adjust the airflow parameters of the main ventilation tunnel by adjusting the operating conditions of the main fan according to the actual ventilation conditions underground, and the intelligent control of the main fan has not been realized.

[0005] Therefore, it is necessary to improve the existing technology. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide an efficient intelligent control system and method for a mine main fan.

[0007] In order to solve the above technical problems, the present invention provides an intelligent control system for a mine main fan, comprising a mine ventilation network simulation calculation system, a sensor, a main fan and a mine intelligent ventilation control system;

[0008] The sensors include wind speed, wind pressure, temperature, CO concentration and other sensors;

[0009] The mine ventilation network simulation calculation system is used to establish a mine ventilation network solution model;

[0010] The sensor is used to monitor parameters such as air volume, air pressure, concentration of toxic and harmful gases, and temperature at key locations underground;

[0011] The main fan is used for mine ventilation;

[0012] The mine intelligent ventilation control system is used to control the operation of the main fan.

[0013] Preferably, the mine ventilation network simulation computing system, sensors and main fans are all connected to the mine intelligent ventilation control system signals.

[0014] The present invention also provides an intelligent control method for a mine main fan, comprising the following steps:

[0015] Step 1), using the mine ventilation network simulation calculation system software to establish a mine ventilation network solution model;

[0016] Step 2) Monitor the operating parameters of the main fan and the airflow parameters of the main ventilation tunnel, and transmit the monitoring data to the mine intelligent ventilation control system in a timely manner, so as to realize the real-time monitoring and display of mine ventilation parameters - air volume, air pressure, concentration of toxic and harmful gases, and temperature, and intuitively express the operating status of mine ventilation and main fans;

[0017] Step 3), the mine intelligent ventilation control system performs real-time calculation of the mine ventilation network according to the monitoring data obtained in step 2 and the mine ventilation network solution model obtained in step 1;

[0018] According to the air volume, wind pressure, concentration of toxic and harmful gases, temperature and other parameters at key locations underground, the air intake of the mine and the air intake of the working area are predicted in real time based on the mine ventilation intelligent algorithm model, and the predicted value is obtained. The predicted value is analyzed and compared with the set value, and a decision is made whether to adjust the operating parameters of the main fan, the switch of the damper, etc., and its status indication is displayed; the decision instructions made by the mine intelligent ventilation control system are sent to the main fan and other control devices through the central control platform.

[0019] Preferably, in step 1:

[0020] The mine ventilation network simulation calculation system includes the mine ventilation network solution model, the natural wind pressure calculation model, and the main fan characteristic curve fitting model;

[0021] Analyze the characteristics of surface and underground temperature changes under different climatic conditions, and use the mine ventilation network simulation calculation system to establish a mine ventilation network solution model;

[0022] The experiment analyzes the law of how the operating conditions of the mine main fan change with temperature, and uses the mine ventilation network simulation calculation system to establish a natural wind pressure calculation model and a main fan characteristic curve fitting model.

[0023] Preferably, step 2 comprises the following steps:

[0024] 2.1) Install corresponding sensors on the ventilation tunnels that need to be sensed. The sensors monitor the average wind speed, wind pressure, temperature and CO concentration, etc., and send them to the mine intelligent ventilation control system;

[0025] 2.2) Monitor the average wind speed, wind pressure and other operating conditions of the main fan and send them to the mine intelligent ventilation control system;

[0026] The wind volume can be obtained from the average wind speed.

[0027] Preferably, in step 3:

[0028] The mine intelligent ventilation control system includes the following functions:

[0029] The main screen displays a three-dimensional diagram of the mine ventilation system, on which tunnel airflow parameters are marked;

[0030] The main screen displays the fan operating status;

[0031] Alarm system;

[0032] According to the sensed wind speed and wind pressure values, the air volume and wind pressure of the main fan are adjusted by controlling the operating frequency of the main fan motor.

[0033] Preferably, in step 3:

[0034] The set value is the threshold value of the air volume parameter of the underground working area set in advance in the mine intelligent ventilation control system; the mutual influence between multiple main fans is considered during the prediction; the required air volume at the underground shift change time is reasonably set in the mine ventilation intelligent control system;

[0035] When the predicted value is greater than the set value by 25%, the intelligent algorithm model of the mine ventilation system issues a command to lower the operating frequency of the main fan motor to achieve the effect of ventilation and energy saving; when the air volume entering the working area is less than the set value by 25%, the intelligent algorithm model of the mine ventilation system issues a command to appropriately increase the operating frequency of the main fan motor to ensure the ventilation effect of the underground working area.

[0036] Preferably, in step 3:

[0037] When the wind temperature monitored by the temperature sensor is greater than the warning temperature and less than or equal to the alarm temperature, and the CO concentration reaches the warning concentration, it is judged that a fire is about to occur and a fire warning is issued;

[0038] When the wind temperature monitored by the temperature sensor is greater than the alarm temperature, it is determined that a fire has occurred and a fire alarm is issued.

[0039] The technical advantages of the intelligent control system and method of a mine main fan of the present invention are:

[0040] 1. Build an intelligent mine ventilation system to realize the intelligent operation of the mine ventilation system and the real-time intelligent control of the main fan and auxiliary fan;

[0041] 2. Realize visual management of mine ventilation safety on the main control computer in the dispatching room and on mobile phones;

[0042] 3. Realize risk early warning and forecast;

[0043] 4. Realize unattended operation of main fan. DETAILED DESCRIPTION

[0044] The present invention is further described below in conjunction with specific embodiments, but the protection scope of the present invention is not limited thereto.

[0045] Embodiment 1, an intelligent control system for a mine main fan, comprising a mine ventilation network simulation computing system, a sensor, a main fan and a mine intelligent ventilation control system;

[0046] The main fan is installed at the wind tunnel at the return air shaft of the mine or at the return air stone door underground;

[0047] The mine ventilation network simulation computing system, sensors and main fans are all connected to the mine intelligent ventilation control system signal;

[0048] Sensors include wind speed, wind pressure, and temperature sensors;

[0049] The mine ventilation network simulation calculation system is used to establish a real-time solution model of the mine ventilation network, including a mine ventilation network solution model;

[0050] The sensor is used to monitor parameters such as air volume, air pressure, toxic and harmful gas concentration, temperature, etc. at key locations underground; toxic and harmful gas concentration includes CO concentration, etc.

[0051] The main fan is used for mine ventilation;

[0052] The mine intelligent ventilation control system is used to control the main fan;

[0053] An intelligent control system and method for a mine main fan, comprising the following steps:

[0054] Step 1), using the mine ventilation network simulation calculation system software to establish a mine ventilation network solution model;

[0055] The establishment of a real-time solution model for mine ventilation network mainly considers the following two points:

[0056] ① Time-varying law of natural wind pressure in mines. Using the mine ventilation network simulation calculation system, a real-time solution model of the mine ventilation network is established, and the characteristics of surface and underground air temperature changes under different climatic conditions are experimentally analyzed. The natural wind pressure calculation module in the mine ventilation network simulation calculation system software is used to study the influencing factors of the change of natural wind pressure in mines, revealing the time-varying law of natural wind pressure in mines with changes in surface air temperature in different seasons and during day and night.

[0057] The ventilation network includes characteristic parameters of tunnel branches (tunnel length, tunnel ventilation resistance coefficient and tunnel cross-sectional area), tunnel branch nodes, tunnel branch numbers, main fan characteristic curves, main fan locations and quantities, etc.

[0058] ② Main fan operating conditions under variable natural wind pressure. On the basis of revealing the time-varying law of natural wind pressure in mines, the law of changes in the operating conditions of the mine main fans with temperature is analyzed. According to the mine natural wind pressure values, main fan characteristic curves, mine ventilation resistance curves, etc. under different temperature conditions, a coupling relationship model of natural wind pressure and main fan wind pressure is established. The time-varying law of the operating conditions of the mine main fans with changes in natural wind pressure is studied, laying the foundation for the determination of intelligent control mechanisms.

[0059] The temperature and humidity of the air at the surface, the bottom of the air intake shaft, and the bottom of the air return shaft under different seasonal conditions are measured on site, the natural wind pressure is calculated, and the time-varying law of the natural wind pressure in the mine is revealed;

[0060] The specific steps include:

[0061] A mine ventilation network simulation calculation system model is established; the mine ventilation network simulation calculation system model can be used to perform ventilation network simulation and solution, and the ventilation network solution results (wind speed, air volume, wind pressure, ventilation resistance, wind flow direction) can be marked on a three-dimensional stereogram.

[0062] The mine ventilation network simulation calculation system model includes the mine ventilation network solution model, the natural wind pressure calculation model, and the main fan characteristic curve fitting model;

[0063] The prediction result of the mine ventilation network solution model is the prediction of the required air volume.

[0064] Step 2) Monitor the operating parameters of the main fan (air volume, air pressure, etc.) and the airflow parameters of the main ventilation tunnel (air volume, air pressure, temperature, CO concentration, etc.), and transmit the monitoring data to the mine intelligent ventilation control system in a timely manner, so as to realize the real-time monitoring and display of the mine airflow parameters - air volume, air pressure, toxic and harmful gas concentration, and temperature, and intuitively express the operating status of the mine ventilation and main fan.

[0065] The specific steps include:

[0066] 2.1) Install corresponding sensors on the ventilation tunnels that need to be sensed. The sensors monitor air volume, air pressure, temperature, CO concentration and average wind speed, etc., and send them to the mine intelligent ventilation control system;

[0067] Specifically: according to the layout of the mining area and the operation of the main and auxiliary fans, the wind speed, wind pressure, temperature and other sensors are reasonably set in the main and auxiliary fan rooms and main ventilation tunnels (the mine air intake and return shafts, the air intake and return tunnels in the working area, etc.), and the existing underground communication system (or newly installed optical fiber) is used to transmit the monitoring data to the mine intelligent ventilation control system;

[0068] 2.2) Monitor the average wind speed, wind pressure and other operating conditions of the main fan (main fan and auxiliary fan), and monitor the video surveillance of the main air door status; send it to the mine intelligent ventilation control system;

[0069] The wind volume can be obtained from the average wind speed.

[0070] Step 3), the mine intelligent ventilation control system performs real-time calculation of the mine ventilation network according to the monitoring data obtained in step 2 and the mine ventilation network solution model obtained in step 1;

[0071] According to the air volume, wind pressure, concentration of toxic and harmful gases, temperature and other parameters at key locations underground, the air intake of the mine and the air intake of the working area are predicted in real time based on the mine ventilation intelligent algorithm model, and the predicted value is obtained. The predicted value is analyzed and compared with the set value, and a decision is made whether to adjust the operating parameters of the main fan, the switch of the damper, etc., and its status indication is displayed; the decision instructions made by the mine intelligent ventilation control system are sent to the main fan and other control devices through the central control platform.

[0072] The wind speed, wind pressure, temperature, CO concentration, temperature and other data monitored by the sensors of wind speed, wind pressure, temperature, CO and other sensors reasonably set in the main fan room and main ventilation tunnels are used as actual monitoring values; the wind flow parameter values ​​entering the working area perceived (predicted) by the intelligent algorithm model of mine ventilation are used as predicted values;

[0073] The set value is the threshold value of the air volume parameter of the underground working area set in advance in the mine intelligent ventilation control system; the mutual influence between multiple main fans is considered during the prediction; the required air volume at the underground shift change time is reasonably set in the mine ventilation intelligent control system;

[0074] For the air volume setting value:

[0075] When the air volume entering the working area (i.e. the predicted value) is greater than the set value by 25%, the intelligent algorithm model of the mine ventilation system issues a command to lower the operating frequency of the main fan motor to achieve the effect of ventilation and energy saving; when the air volume entering the working area is less than the set value by 25%, the intelligent algorithm model of the mine ventilation system issues a command to appropriately increase the operating frequency of the main fan motor to ensure the ventilation effect of the underground working area.

[0076] In the actual production process, the required air volume of the underground operation area is designed according to the preliminary design document of the mine;

[0077] The required air volume for a mining operation area is 20m 3 / s, that is, when someone is working, the fresh air volume entering the working area should be no less than 20m 3 / s; During the shift change period underground, the fresh air volume entering the working area can be less than 20m 3 / s.

[0078] Several time periods are artificially set as unmanned operations or shift handover time periods underground, and the rest of the time periods are underground working hours; 15:00-17:00 and 0:00-2:00 in the morning every day can be used as underground shift handover time periods.

[0079] During underground working hours, when the predicted value of the average wind speed (i.e. the amount of fresh air entering the working area) is greater than 25m 3 / s or less than 15m 3 / s, the intelligent analysis and decision-making system issues a control command to adjust the operating parameters of the main fan; during the unmanned operation or shift change period, the operating frequency of the main fan motor is directly lowered to meet the 12m 3 / s of air volume is sufficient.

[0080] For CO concentration and temperature setpoints:

[0081] When the wind temperature monitored by the temperature sensor is greater than the warning temperature and less than or equal to the alarm temperature, and the CO concentration reaches the warning concentration, it is judged that a fire is about to occur and a fire warning is issued;

[0082] When the wind temperature monitored by the temperature sensor is greater than the alarm temperature, it is determined that a fire has occurred and a fire alarm is issued.

[0083] The mutual influence between multiple main fans (including auxiliary fans) is considered in the prediction; the air volume required for underground shift changes and different seasons is reasonably set in the mine ventilation intelligent control system. The air volume required in the operating area in different seasons is the set value.

[0084] The mine intelligent ventilation control system includes the following functions:

[0085] The main screen displays a three-dimensional diagram of the mine ventilation system (marking the main ventilation parameters, main fan, and damper switches);

[0086] The main screen displays the operating status of the main fan (air volume, air pressure, motor operation monitoring parameters (frequency, temperature, etc.));

[0087] The mine ventilation system stereogram shows the location of the operators and the total number of people underground;

[0088] Alarm system (main fan failure, disaster location and type);

[0089] According to the sensed wind speed and wind pressure values, the air volume and wind pressure of the main fan are adjusted by controlling the operating frequency of the main fan motor.

[0090] Finally, it should be noted that the above examples are only some specific embodiments of the present invention. Obviously, the present invention is not limited to the above embodiments, and there are many variations. All variations that can be directly derived or associated with the content disclosed by a person skilled in the art should be considered as the protection scope of the present invention.

Claims

1. An intelligent control method for a mine main fan, characterized in that: The following steps are involved: Step 1) Use the mine ventilation network simulation calculation system software to establish a mine ventilation network solution model; Step 2) Monitor the operating parameters of the main fan and the airflow parameters of the main ventilation tunnel, and transmit the monitoring data to the mine intelligent ventilation control system in a timely manner, so as to realize the real-time monitoring and display of mine ventilation parameters - air volume, air pressure, concentration of toxic and harmful gases, and temperature, and intuitively express the operating status of mine ventilation and main fans; Step 3), the mine intelligent ventilation control system performs real-time calculation of the mine ventilation network according to the monitoring data obtained in step 2 and the mine ventilation network solution model obtained in step 1; According to the air volume, air pressure, toxic and harmful gas concentration, and temperature parameters at key locations underground, the mine ventilation intelligent algorithm model is used to make real-time predictions of the mine air intake and the air intake of the working area to obtain the predicted value. Then, based on the predicted value and the set threshold analysis and comparison results, an intelligent decision is made whether to adjust the operating parameters of the main fan, the switch of the damper, and display its status indication; The decision instructions made by the mine intelligent ventilation control system are sent to the main fan control device through the central control platform; In step 1: The mine ventilation network simulation calculation system includes the mine ventilation network solution model, the natural wind pressure calculation model, and the main fan characteristic curve fitting model; Analyze the characteristics of surface and underground temperature changes under different climatic conditions, and use the mine ventilation network simulation calculation system to establish a mine ventilation network solution model; The experiment analyzes the law of the operation of the main fan in the mine with the change of temperature, and uses the mine ventilation network simulation calculation system to establish the natural wind pressure calculation model and the main fan characteristic curve fitting model; Step 2 includes the following steps: 2.1) Install corresponding sensors on the ventilation tunnels that need to be sensed. The sensors monitor the average wind speed, wind pressure, temperature and CO concentration, and send them to the mine intelligent ventilation control system; 2.2) Monitor the average wind speed and wind pressure of the main fan and send them to the mine intelligent ventilation control system; The wind volume can be obtained from the average wind speed; The mine intelligent ventilation control system includes the following functions: The main screen displays a three-dimensional diagram of the mine ventilation system, on which tunnel airflow parameters are marked; The main screen displays the fan operating status; Alarm system; According to the sensed wind speed and wind pressure values, the air volume and wind pressure of the main fan are adjusted by controlling the operating frequency of the main fan motor; In step 3: The set value is the threshold value of the air volume parameter of the underground working area set in advance in the mine intelligent ventilation control system; the mutual influence between multiple main fans is considered during the prediction; the required air volume at the underground shift change time is reasonably set in the mine ventilation intelligent control system; When the predicted value of the air volume entering the working area is greater than the set value by 25%, the intelligent algorithm model of the mine ventilation system issues a command to lower the operating frequency of the main fan motor to achieve the effect of ventilation energy saving; when the predicted value of the air volume entering the working area is less than the set value by 25%, the intelligent algorithm model of the mine ventilation system issues a command to appropriately increase the operating frequency of the main fan motor to ensure the ventilation effect of the underground working area; The intelligent control system of the mine main fan includes the mine ventilation network simulation computing system, sensors, main fans and mine intelligent ventilation control system; The main fan is installed at the wind tunnel at the return air shaft of the mine or at the return air stone door underground; The sensors include wind speed, wind pressure, temperature, and CO concentration sensors; The mine ventilation network simulation calculation system is used to establish a mine ventilation network solution model; The sensor is used to monitor the air volume, air pressure, concentration of toxic and harmful gases, and temperature parameters at key locations underground; The main fan is used for mine ventilation; The mine intelligent ventilation control system is used to control the operation of the main fan; The mine ventilation network simulation calculation system, sensors and main fans are all connected to the mine intelligent ventilation control system signals.

2. The intelligent control method for a mine main fan according to claim 1 is characterized in that: When the wind temperature monitored by the temperature sensor is greater than the warning temperature and less than the alarm temperature, and the CO concentration reaches the warning concentration, it is judged that a fire is about to occur and a fire warning is issued; When the wind temperature monitored by the temperature sensor is greater than the alarm temperature, it is determined that a fire has occurred and a fire alarm is issued.

Citation Information

Patent Citations

  • Intelligent control system for balance switching of wind pressure and wind quantity of mine ventilator

    CN108087317A

  • Intelligent decision making system for local ventilation in coal mine

    CN108868860A

  • Local ventilator remote switching and intelligent regulating and controlling device in coal mine and controlling method

    CN110067764A

  • Exhaust heat recovering device of upper-jetting type mine

    CN203657543U

  • Intelligent frequency-conversion energy-saving control device of main fan on ground of coal mine

    CN203756571U