Traffic data processing method and device, storage medium and electronic device
Through automated traffic data processing methods, link traffic is obtained, congested links are determined and scheduling policies are generated, which solves the problem of manual dependence in backbone network operations, achieves rapid congestion relief and stable transmission, and improves network access quality.
Patent Information
- Application Number
- CN202111326668.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-10
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-11-10
AI Technical Summary
In the operation and maintenance of existing backbone networks, manual experience is relied upon for scheduling when transmission is interrupted, resulting in low scheduling efficiency and reliance on manual decision-making, making it difficult to quickly respond to congestion situations.
By obtaining link traffic, determine congested links, and generate scheduling strategies based on traffic data, automatically selecting optimized paths to alleviate congestion, including second-level data collection, network topology analysis, traffic overlay calculations, and simulation testing to ensure the feasibility of the strategy and effectiveness.
It realizes automatic detection and alleviation of congestion, reduces packet loss, ensures access quality within the network, improves customer perception, and ensures stable transmission of traffic through fallback detection.
Smart Images

Figure CN114051001B_ABST
Abstract
Description
Background Art
[0002] When transmission interruptions occur during backbone network operation and maintenance, most existing scheduling methods use rules summarized from manual experience to conduct multi-directional analysis and rely on manual experience to select scheduling directions.
[0003] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention
[0004] The purpose of the present disclosure is to provide a flow data processing method, device, electronic device and storage medium to solve the problem of manual flow scheduling in related technologies.
[0005] Other features and advantages of the present disclosure will become apparent from the following detailed description, or may be learned in part by the practice of the present disclosure.
[0006] According to one aspect of the present disclosure, a traffic data processing method is provided, including: obtaining link traffic, and determining a congested link according to the link traffic; wherein the congested link includes a source node and a destination node; obtaining traffic data in the congested link, and determining one or more target traffic components to be scheduled according to the traffic data in the congested link, and generating a traffic scheduling strategy; wherein the traffic scheduling strategy includes a scheduling path for each target traffic component; and sending the traffic scheduling strategy to the source node so that the target traffic component is routed from the source node to the destination node according to the corresponding scheduling path.
[0007] In one embodiment of the present disclosure, link traffic is obtained, and congested links are determined based on the link traffic, including: collecting existing network data based on second-level capabilities; determining the link traffic of each link based on the network topology, link traffic data, and traffic flow direction data in the existing network data; calculating the link utilization of each link based on the link traffic of each link; and determining a link whose link utilization is higher than a utilization threshold as a congested link.
[0008] In one embodiment of the present disclosure, traffic data in a congested link is obtained, including: determining a device port corresponding to a source node, and obtaining port traffic data flowing out of the device port; the port traffic data includes: a source port of the port traffic, a next-hop port of the port traffic, and a port traffic value; and determining, from the port traffic data, the port traffic corresponding to the next-hop port and the destination node as the traffic data in the congested link.
[0009] In one embodiment of the present disclosure, a target traffic component to be scheduled is determined based on traffic data in a congested link, including: calculating the end-to-end traffic between network edges based on the source IP address, source port, destination IP address, destination port and protocol of the traffic data packet in the congested link; superimposing the end-to-end traffic between network edges through an IGP topology to obtain the traffic components in the congested link and the traffic values of each traffic component; determining the traffic proportion of each traffic component based on the traffic value of each traffic component, and sorting the traffic components in descending order of the traffic proportion to obtain a traffic component sequence; selecting the first N target traffic components to be scheduled from the traffic component sequence, so that the link utilization calculated based on the remaining traffic in the congested link except the target traffic component is lower than the utilization threshold.
[0010] In one embodiment of the present disclosure, a traffic scheduling strategy is generated, including: obtaining a set of candidate paths for a target traffic component; wherein the starting node of the path in the candidate path set is a source node, and the ending node is a destination node; selecting one or more paths in the candidate path set whose node change hop count is less than a hop count threshold as intermediate candidate paths; calculating the delay of each intermediate candidate path, and selecting the intermediate candidate path with the smallest delay as the scheduling path for the target traffic component in the traffic scheduling strategy.
[0011] In one embodiment of the present disclosure, before sending the traffic scheduling strategy to the source node, it also includes: obtaining the existing network traffic environment; performing a simulation test on the traffic scheduling strategy based on the existing network traffic environment, so as to send the traffic scheduling strategy to the source node after the simulation test passes.
[0012] In one embodiment of the present disclosure, after the traffic scheduling strategy is sent down to the source node, it also includes: monitoring the link traffic based on a preset frequency, and when it is detected that the link traffic meets any withdrawal condition, withdrawing the corresponding scheduling path in the traffic scheduling strategy.
[0013] In one embodiment of the present disclosure, the withdrawal conditions include: the target traffic component cannot be routed from the source node to the destination node according to the corresponding scheduling path; the traffic of the target traffic component from the source node to the destination node is 0; there is congestion in the scheduling path in the traffic scheduling strategy; and there is no congestion in the congested link.
[0014] According to another aspect of the present disclosure, a flow data processing device is provided, including: an acquisition module, used to acquire link flow, and determine a congested link according to the link flow; wherein the congested link includes a source node and a destination node; a strategy generation module, used to acquire flow data in the congested link, determine one or more target flow components to be scheduled according to the flow data in the congested link, and generate a flow scheduling strategy; wherein the flow scheduling strategy includes a scheduling path for each target flow component; and a sending module, used to send the flow scheduling strategy to the source node, so that the target flow component is routed from the source node to the destination node according to the corresponding scheduling path.
[0015] In one embodiment of the present disclosure, an acquisition module acquires link traffic and determines a congested link based on the link traffic, including: collecting existing network data based on second-level capabilities; determining the link traffic of each link based on the network topology, link traffic data, and traffic flow direction data in the existing network data; calculating the link utilization of each link based on the link traffic of each link; and determining a link whose link utilization is higher than a utilization threshold as a congested link.
[0016] In one embodiment of the present disclosure, a strategy module is generated to obtain traffic in a congested link, including: determining a device port corresponding to a source node, and obtaining port traffic data flowing out of the device port; the port traffic data includes: a source port of the port traffic, a next-hop port of the port traffic, and a port traffic value; and determining the port traffic corresponding to the next-hop port and the destination node from the port traffic data as traffic data in the congested link.
[0017] In one embodiment of the present disclosure, a strategy generation module determines a target traffic component to be scheduled based on traffic data in a congested link, including: calculating the end-to-end traffic between network edges based on the source IP address, source port, destination IP address, destination port and protocol of the traffic data packet in the congested link; superimposing the end-to-end traffic between network edges through an IGP topology to obtain the traffic components in the congested link and the traffic values of each traffic component; determining the traffic proportion of each traffic component based on the traffic value of each traffic component, and sorting the traffic components in descending order of the traffic proportion to obtain a traffic component sequence; selecting the first N target traffic components to be scheduled from the traffic component sequence, so that the link utilization calculated based on the remaining traffic in the congested link except the target traffic component is lower than the utilization threshold.
[0018] In one embodiment of the present disclosure, a generation strategy module generates a traffic scheduling strategy, including: obtaining a set of candidate paths for a target traffic component; wherein the starting node of the path in the candidate path set is a source node, and the ending node is a destination node; selecting one or more paths in the candidate path set whose node change hop count is less than a hop count threshold as intermediate candidate paths; calculating the delay of each intermediate candidate path, and selecting the intermediate candidate path with the smallest delay as the scheduling path for the target traffic component in the traffic scheduling strategy.
[0019] In one embodiment of the present disclosure, the traffic data processing device provided by the present disclosure also includes: a simulation test module. Before the sending module sends the traffic scheduling policy to the source node, the simulation test module is used to: obtain the existing network traffic environment; perform a simulation test on the traffic scheduling policy based on the existing network traffic environment, so as to send the traffic scheduling policy to the source node after the simulation test passes.
[0020] In one embodiment of the present disclosure, the traffic data processing device provided by the present disclosure also includes: a withdrawal module. After the sending module sends the traffic scheduling strategy to the source node, the withdrawal module is used to: monitor the link traffic based on a preset frequency, and when it is detected that the link traffic meets any withdrawal condition, withdraw the corresponding scheduling path in the traffic scheduling strategy.
[0021] In one embodiment of the present disclosure, the withdrawal conditions include: the target traffic component cannot be routed from the source node to the destination node according to the corresponding scheduling path; the traffic of the target traffic component from the source node to the destination node is 0; there is congestion in the scheduling path in the traffic scheduling strategy; and there is no congestion in the congested link.
[0022] According to another aspect of the present disclosure, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the above-mentioned flow data processing method is implemented.
[0023] According to another aspect of the present disclosure, there is provided an electronic device, comprising: a processor; and a memory for storing executable instructions of the processor; wherein the processor is configured to execute the above-mentioned traffic data processing method by executing the executable instructions.
[0024] The traffic data processing method provided by the embodiments of the present disclosure can automatically detect congested links and generate scheduling strategies to schedule traffic components in the congested links, thereby reducing packet loss caused by congestion.
[0025] Furthermore, the scheduling strategy generated in the traffic data processing method provided in the embodiment of the present disclosure can also select a scheduling path with fewer hops and shorter delays for the traffic components to be scheduled, thereby ensuring the access quality within the network and improving customer perception.
[0026] Furthermore, the traffic data processing method provided in the embodiment of the present disclosure can also perform simulation tests before issuing a scheduling strategy, thereby ensuring the feasibility of the strategy.
[0027] Furthermore, the traffic data processing method provided in the embodiment of the present disclosure can also perform a pullback detection after issuing a scheduling strategy, and provides a variety of pullback conditions to ensure stable transmission of traffic.
[0028] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The accompanying drawings herein are incorporated into the specification and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the specification are used to explain the principles of the present disclosure. Obviously, the accompanying drawings described below are only some embodiments of the present disclosure, and for ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work.
[0030] Figure 1 A schematic diagram showing an exemplary system architecture to which the flow data processing method according to an embodiment of the present disclosure can be applied;
[0031] Figure 2 A flow chart showing a method for processing flow data according to an embodiment of the present disclosure is shown;
[0032] Figure 3 A flow chart showing a congested link determination method in a flow data processing method according to an embodiment of the present disclosure is shown;
[0033] Figure 4 A flow chart showing a target flow component in a flow data processing method according to an embodiment of the present disclosure is shown;
[0034] Figure 5 A flow chart showing a scheduling path determination in a flow data processing method according to an embodiment of the present disclosure is shown;
[0035] Figure 6 A flow chart showing a method for processing flow data according to an embodiment of the present disclosure is shown;
[0036] Figure 7 A schematic diagram showing a flow data processing method according to an embodiment of the present disclosure is shown;
[0037] Figure 8 A schematic diagram showing a flow data processing method according to an embodiment of the present disclosure is shown;
[0038] Fig. 9 A block diagram showing a flow data processing device according to an embodiment of the present disclosure; and
[0039] Fig.10 A structural block diagram of a flow data processing computer device in an embodiment of the present disclosure is shown. DETAILED DESCRIPTION
[0040] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the disclosure will be more comprehensive and complete and to fully convey the concepts of the example embodiments to those skilled in the art. The described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
[0041] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor devices and / or microcontroller devices.
[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present disclosure, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0043] In view of the technical problems existing in the above-mentioned related technologies, the embodiments of the present disclosure provide a flow data processing method to solve at least one or all of the above-mentioned technical problems.
[0044] Figure 1 A schematic diagram showing an exemplary system architecture to which the flow data processing method according to an embodiment of the present disclosure can be applied; Figure 1 As shown:
[0045] The system architecture may include a server 101 and a network 102, the network 102 may be a backbone network, and the network 102 may include a routing node RT (Route Target). The network 102 is used to provide a medium for a communication link between the servers 101. The network 102 may include various connection types, such as wired, wireless communication links or optical fiber cables, etc.; Figure 1Only four routing nodes RT are shown as an example. According to actual needs, the network 102 may have any number of routing nodes RT. Figure 1 As shown, the network 102 includes routing nodes RT1021, RT1022, RT1023 and RT1024, wherein RT1021 can be connected to RT1022, RT1022 can be connected to RT1024, RT1021 can also be connected to RT1023, RT1023 can be connected to RT1024, and the connection between the routing nodes can be used for the transmission of traffic data.
[0046] Server 101 can be a server that provides various services. In some practical applications, server 101 can be a functional service node such as an RR (Round Robin) controller. For another example, in the method provided by the present disclosure, server 101 can obtain link traffic and determine a congested link based on the link traffic; wherein the congested link includes a source node and a destination node; server 101 can obtain traffic data in the congested link, determine one or more target traffic components to be scheduled based on the traffic data in the congested link, and generate a traffic scheduling strategy; wherein the traffic scheduling strategy includes a scheduling path for each target traffic component; server 101 can send the traffic scheduling strategy to the source node so that the target traffic component is routed from the source node to the destination node according to the corresponding scheduling path.
[0047] It should be understood that Figure 1 The number of routing nodes RT, networks and servers in the example is only for illustration, and the server 101 may be a physical server, a server cluster composed of multiple servers, or a cloud server. According to actual needs, any number of routing nodes RT, networks and servers may be provided.
[0048] Below, each step of the flow data processing method in the exemplary embodiment of the present disclosure will be described in more detail with reference to the accompanying drawings and embodiments.
[0049] Figure 2 A flow chart of a method for processing flow data according to an embodiment of the present disclosure is shown. The method provided by the embodiment of the present disclosure can be performed as follows: Figure 1 The process is executed in the server shown in the figure, but the present disclosure is not limited to this.
[0050] In the following examples, the server cluster 101 is used as the execution subject for example description.
[0051] like Figure 2 As shown, the flow data processing method provided by the embodiment of the present disclosure may include the following steps:
[0052] Step S201, obtain link traffic, and determine a congested link based on the link traffic; wherein the congested link includes a source node and a destination node; Step S203, obtain traffic data in the congested link, determine one or more target traffic components to be scheduled based on the traffic data in the congested link, and generate a traffic scheduling strategy; wherein the traffic scheduling strategy includes a scheduling path for each target traffic component; Step S205, send the traffic scheduling strategy to the source node so that the target traffic component is routed from the source node to the destination node according to the corresponding scheduling path.
[0053] First, the link traffic in the network can be obtained, and whether there is congestion can be determined based on the link traffic. When congestion occurs, the congested link can be determined, where the source node and the destination node can be adjacent nodes in the congested link. Then, the traffic data in the congested link can be obtained, and the target traffic component to be scheduled can be selected based on the traffic components and corresponding proportions in the traffic data. A new routing path can be determined for the target traffic component to generate an overall traffic scheduling strategy, and finally the traffic scheduling strategy can be sent to the source node of the congested link to transfer the target traffic component away from the source node and relieve the traffic pressure of the congested link.
[0054] Through the traffic data processing method provided by the embodiment of the present disclosure, a congested link can be automatically detected, and a scheduling strategy can be generated to schedule the traffic components in the congested link, thereby reducing the packet loss caused by congestion.
[0055] In some embodiments, link traffic is obtained, and congested links are determined based on the link traffic, including: collecting existing network data based on second-level capabilities; determining the link traffic of each link based on the network topology, link traffic data, and traffic flow direction data in the existing network data; calculating the link utilization of each link based on the link traffic of each link; and determining a link whose link utilization is higher than a utilization threshold as a congested link.
[0056] The capacity frequency can be specified in the second-level capacity, and the capacity frequency can be adjusted according to the actual production environment, such as collecting data every 30 seconds, every 10 seconds, or every 5 seconds; the higher the value of the first frequency, the closer the network traffic environment to the actual situation can be obtained. The utilization threshold can be adjusted according to the actual production environment, such as 75%, 80%, or 90%; the utilization threshold can be regarded as a trigger threshold for determining congestion, thereby automatically triggering the traffic data processing method in the present disclosure.
[0057] Figure 3 A flow chart of determining a congested link in a flow data processing method according to an embodiment of the present disclosure is shown; Figure 3 As shown, including:
[0058] Step S301, collect the existing network data based on the second-level capability; the existing network data can be SNMP traffic, and SNMP traffic can be collected periodically to detect link congestion. In some practical applications, the collection service can be used to collect a series of data such as network topology, link traffic / quality and traffic flow, and perceive network changes in minutes.
[0059] Step S303, determining the link flow of each link according to the network topology structure, link flow data, and flow direction data in the existing network data.
[0060] Step S305, calculating the link utilization of each link according to the link flow of each link; the link utilization may be an adjustable value such as 80% or 90%, etc., for determining whether there is congestion in the current network.
[0061] Step S307: determine the link whose link utilization is higher than the utilization threshold as a congested link; there may be more than one congested link.
[0062] In some embodiments, obtaining traffic data in a congested link includes: determining a device port corresponding to a source node, and obtaining port traffic data flowing out of the device port; the port traffic data includes: a source port of the port traffic, a next-hop port of the port traffic, and a port traffic value; and determining from the port traffic data the port traffic corresponding to the next-hop port and the destination node as the traffic data in the congested link.
[0063] Further, in some embodiments, the target traffic component to be scheduled is determined based on the traffic data in the congested link, including: calculating the end-to-end traffic between network edges based on the source IP address, source port, destination IP address, destination port and protocol of the traffic data packet in the congested link; superimposing the end-to-end traffic between network edges through the IGP topology to obtain the traffic components in the congested link, and the traffic value of each traffic component; determining the traffic proportion of each traffic component based on the traffic value of each traffic component, and sorting the traffic components in descending order of the traffic proportion to obtain a traffic component sequence; selecting the first N target traffic components to be scheduled from the traffic component sequence, so that the link utilization calculated based on the remaining traffic in the congested link except the target traffic component is lower than the utilization threshold.
[0064] It can automatically detect the traffic components carried in the congested direction, and generate a traffic scheduling strategy for modifying the next hop of the route of the target traffic component through automatic calculation, so as to divert the target traffic component away from the source node of the congested circuit according to the traffic scheduling strategy, thereby achieving the effect of alleviating congestion.
[0065] Among them, the selected N can be the number M of traffic components that are just adjusted away so that the congested link is no longer congested. The "number M of traffic components that are just adjusted away so that the congested link is no longer congested" has the following effect: when the first M traffic components in the traffic component sequence are adjusted away, the congested link is no longer congested, and when the first (M-1) traffic components in the traffic component sequence are adjusted away, the congested link is still congested, thereby achieving the effect of making the congested link no longer congested while adjusting the minimum number of traffic components, thereby alleviating congestion and saving computing resources.
[0066] Figure 4 A flow chart of determining a target flow component in a flow data processing method according to an embodiment of the present disclosure is shown. Figure 4 As shown, including:
[0067] Step S401, determine the device port corresponding to the source node, and obtain the port traffic data flowing out from the device port; the port traffic data includes: the source port of the port traffic, the next hop port of the port traffic, and the port traffic value;
[0068] Step S403: determine the port flow corresponding to the next hop port and the destination node from the port flow data as the flow data in the congested link.
[0069] Step S405, calculating the end-to-end traffic between network edges according to the source IP address, source port, destination IP address, destination port and protocol of the traffic data packet in the congested link; superimposing the end-to-end traffic between network edges through the IGP topology to obtain the traffic components in the congested link and the traffic value of each traffic component;
[0070] Step S407, determining the flow proportion of each flow component according to the flow value of each flow component, and sorting the flow components in descending order of flow proportion to obtain a flow component sequence;
[0071] Step S409, select the first N target traffic components to be scheduled from the traffic component sequence, so that the link utilization calculated based on the remaining traffic in the congested link except the target traffic components is lower than the utilization threshold; in some practical applications, the N value can be the number M of traffic components that just make the congested link no longer congested; in some other practical applications, N can also be greater than M.
[0072] In some embodiments, generating a traffic scheduling strategy includes: obtaining a set of candidate paths for a target traffic component; wherein the starting node of a path in the candidate path set is a source node, and the ending node is a destination node; selecting one or more paths from the candidate path set whose node change hop count is less than a hop count threshold as intermediate candidate paths; calculating the delay of each intermediate candidate path, and selecting the intermediate candidate path with the smallest delay as the scheduling path for the target traffic component in the traffic scheduling strategy.
[0073] The candidate path set of the target traffic component can be pre-set. The hop count threshold can be adjusted according to the actual application environment, such as 3, 4, etc. When it is set to 3, it can be regarded as that the hop count of the new routing path needs to be less than 3, that is, in the new routing path, in addition to the source node and the destination node, there can also be 0, 1, or 2 intermediate nodes. The scheduling path of the target traffic component selected by this embodiment can have the effect of fewer hops and less delay, thereby ensuring the quality of the traffic after scheduling.
[0074] Figure 5 A flow chart of determining a scheduling path in a flow data processing method according to an embodiment of the present disclosure is shown. Figure 5 As shown, including:
[0075] Step S501, obtaining a set of candidate paths of the target traffic component; wherein the starting node of the path in the set of candidate paths is the source node, and the ending node is the destination node;
[0076] Step S503, selecting one or more paths whose node change hop count is less than a hop count threshold from the candidate path set as intermediate candidate paths;
[0077] Step S505 , calculating the delay of each intermediate candidate path, and selecting the intermediate candidate path with the smallest delay as the scheduling path of the target traffic component in the traffic scheduling strategy.
[0078] In some embodiments, before sending the traffic scheduling strategy to the source node, it also includes: obtaining the existing network traffic environment; performing a simulation test on the traffic scheduling strategy based on the existing network traffic environment, so as to send the traffic scheduling strategy to the source node after the simulation test passes.
[0079] After generating the scheduling strategy, a simulation test can be performed to determine the feasibility of the scheduling strategy to avoid unnecessary resource consumption if the scheduling strategy is not feasible.
[0080] In some practical applications, the following methods can be used for testing: The SDN controller automatically triggers the test program, which mainly includes two parts: (1) Scheduling path test: trace from the source AS to the IP address of the destination AS, and display the path information associated with the traceIP throughout the process. (2) Service test: ping the IP address of the destination AS from the source AS. In this way, simulation tests are performed to determine the feasibility of the scheduling strategy.
[0081] In some embodiments, after the traffic scheduling strategy is sent down to the source node, it also includes: monitoring the link traffic based on a preset frequency, and when it is detected that the link traffic meets any withdrawal condition, withdrawing the corresponding scheduling path in the traffic scheduling strategy.
[0082] The preset frequency can be adjusted according to the actual production environment, such as monitoring once every 1 minute, or monitoring once every 3 minutes. The flow data processing method provided by the embodiment of the present disclosure can perform a pullback detection after issuing a scheduling strategy, and provides a variety of pullback conditions to timely pull back the scheduling strategy to ensure stable transmission of traffic.
[0083] Furthermore, in some embodiments, the fallback conditions include: (1) the target traffic component cannot be routed from the source node to the destination node according to the corresponding scheduling path; (2) the traffic of the target traffic component from the source node to the destination node is 0; (3) there is congestion in the scheduling path in the traffic scheduling strategy; and, (4) there is no congestion in the congested link.
[0084] The above-mentioned withdrawal condition (1) can be understood as: the scheduling path of the target traffic component is not smooth, and the target traffic component cannot reach the destination node. Therefore, it is necessary to stop the application of the scheduling path at this time. The scheduling path can be withdrawn to allow the target traffic component to reach the destination node through the congested link, or a new scheduling path can be determined for the target traffic component.
[0085] The above-mentioned withdrawal condition (2) can be understood as: the target traffic component is no longer needed from the source node to the destination node. At this time, the application of the scheduling path can be stopped and the scheduling path can be withdrawn.
[0086] The above-mentioned withdrawal condition (3) can be understood as: if congestion occurs in the scheduling path due to the introduction of the target traffic component, the scheduling path can be withdrawn to allow the target traffic component to reach the destination node through the congested link, or a new scheduling path can be determined for the target traffic component.
[0087] The above-mentioned withdrawal condition (4) can be understood as: if the target traffic component that has been transferred away is restored to the congested link for calculation and no congestion is generated, the scheduling path can be withdrawn so that the target traffic component can reach the destination node through the congested link.
[0088] Figure 6A flow chart of a method for processing flow data according to an embodiment of the present disclosure is shown. Figure 6 As shown, including:
[0089] Step S601, obtaining link traffic, and determining a congested link according to the link traffic; wherein the congested link includes a source node and a destination node;
[0090] Step S603, acquiring traffic data in the congested link, determining one or more target traffic components to be scheduled according to the traffic data in the congested link, and generating a traffic scheduling strategy; wherein the traffic scheduling strategy includes a scheduling path for each target traffic component;
[0091] Step S605, obtaining the existing network traffic environment; performing a simulation test on the traffic scheduling strategy based on the existing network traffic environment, and issuing the traffic scheduling strategy to the source node after the simulation test passes;
[0092] Step S607, sending a traffic scheduling strategy to the source node so that the target traffic component is routed from the source node to the destination node according to the corresponding scheduling path;
[0093] Step S609: monitor the link traffic based on a preset frequency, and when it is detected that the link traffic meets any withdrawal condition, perform withdrawal processing on the corresponding scheduling path in the traffic scheduling strategy.
[0094] The traffic data processing method proposed in the present disclosure can realize the full process closed loop of automatic discovery, analysis, scheduling and testing of traffic scheduling. The present disclosure can timely schedule the discovered congested circuits by real-time discovery in the backbone network circuits, thereby achieving the effect of alleviating congestion.
[0095] Figure 7 A schematic diagram of a flow data processing method according to an embodiment of the present disclosure is shown; Figure 7 As shown, the traffic data processing method in the present disclosure may include three service modules: a scheduling service, a collection service, and a control service. The functions of the three service modules may be as follows:
[0096] Scheduling service is used for the core of the scheduling system and is responsible for overall business process control such as monitoring, calculation, issuance, and verification.
[0097] The collection service is responsible for collecting a series of data such as network topology, link traffic / quality, and traffic flow direction, and sensing network changes in minutes.
[0098] Control service, used to control the routing direction of the selected target on the specified router through the RR reflection mechanism.
[0099] In some specific applications, the traffic monitoring algorithm can be scheduled in the process of determining the traffic composition. This is achieved by calculating the scheduled traffic of the effective strategy and then monitoring the traffic size in the strategy direction. The main principles are as follows:
[0100] (1) The effective policy is recorded as P (the current effective policy is determined based on the previous one being enabled);
[0101] (2) By calculating the traffic components scheduled by the source node SrcNode of strategy P, the scheduled traffic components to the destination province are recorded as FlowCom.
[0102] Among them, the calculation method of FlowCom is:
[0103] ① Obtain all device and port information on SrcNode, and obtain the maximum peak flow rate yesterday through the traffic composition from the node to the target network. ② Form target destination provinces according to different target networks, and merge target networks with the same scheduling nodes.
[0104] (3) After calculating FlowCom, the next-hop province is set according to the source province, destination province, and original IGP next-hop province in the policy to calculate the relay sub-province flow. The link flow on each sub-province path of the policy is marked as PtoPFlux. The specific algorithm is as follows:
[0105] ① Perform hop-by-hop calculation on the original path. If there are multiple paths for a certain hop, calculate the traffic of multiple paths and form the traffic value according to the starting province and destination province of each hop. ② Perform hop-by-hop calculation on the path after scheduling. If there are multiple paths for a certain hop, divide the bandwidth equally and form the traffic value according to the starting province and adjacent province of each hop. ③ Calculate all scheduling strategies and merge the traffic of each hop to form the total traffic.
[0106] In some practical applications, the scheduling principle in the traffic data processing method provided by the present disclosure may be:
[0107] Congestion discovery process: The network scheduling service detects link congestion based on periodically collected SNMP traffic. When the link utilization rate is higher than the configured alarm threshold, the automatic traffic scheduling process is automatically started. Policy calculation process: Automatically detect the traffic components carried in the congested direction, and generate a scheduling policy to modify the next hop of the selected traffic component through automatic calculation. Policy delivery process: The selected traffic component is moved away from the congested link to achieve the effect of alleviating congestion.
[0108] At the congestion point, the scheduling service will collect the traffic components here through NetFlow, and then calculate the best strategy to alleviate the congestion according to the size of each traffic component, the total delay of the candidate direction, and the hop-by-hop utilization. If there is an available strategy, you can first perform a simulation test: the SDN controller will try to send the policy to the scheduling point (i.e., the source node), and then verify whether the point to the target (i.e., the destination node) switches to a new path. If the simulation test passes, the policy will be sent down. After the sending is successful, the scheduling service can publish a notification of the scheduling result. After the policy is applied, a pullback detection can be performed: and continue to monitor global traffic changes to ensure that congestion is resolved, and when the global traffic meets any pullback condition, the corresponding scheduling path in the traffic scheduling strategy is pulled back.
[0109] In some practical applications, the scheduling business process in the traffic data processing method provided by the present disclosure may be:
[0110] ① When the traffic on the original path in the network increases, congestion is detected;
[0111] ② Sense congestion through collection services;
[0112] ③ The collection service reports the congestion to the scheduling service so that the scheduling service can determine the designated target component and calculate the simulated candidate path for the designated target component;
[0113] ④ The scheduling service sends the calculated simulation path to the device to be scheduled (i.e., source node) through the controller (i.e., RR+ controller);
[0114] ⑤ The designated target component switching path on the scheduling device (i.e., source node) reduces the flow of the original path and resolves congestion.
[0115] Figure 8 A schematic diagram of a flow data processing method according to an embodiment of the present disclosure is shown. Figure 8 As shown in the figure, after generating the scheduling strategy, you can first call the control service, use the controller (ie, RR+controller) to select the service device as the designated router, and then call the scheduling service to send the scheduling strategy to the designated router, and the designated router controls the target traffic component to be routed to the destination node through the corresponding scheduling path in the scheduling strategy. Figure 8 The original path is RT01-RT02-RT04, and the new path is RT01-RT03-RT04.
[0116] In some practical applications, the principle of automatic cancellation of the scheduling strategy in the traffic data processing method provided by the present disclosure may be:
[0117] The activation policy is monitored regularly and will be revoked if one of the following conditions is met:
[0118] (1) The specified traffic component cannot reach the destination address under the current policy.
[0119] (2) There is no longer any specified traffic component in the policy direction.
[0120] (3) The strategic direction creates new congestion due to the introduction of specific components.
[0121] (4) When the policy is carrying traffic normally, the restoration path and the change in the restored traffic are calculated. If the restored path does not cause new congestion from end to end on the backbone from the access device, it is considered to be revocable.
[0122] The flow data processing method provided by the present disclosure can achieve the following beneficial effects:
[0123] (1) Realize executable automatic traffic scheduling: The scheduling of similar patents is mainly customized in specific scenarios and requires manual policy deployment and scheduling. Each step needs to be completed in a distributed manner, and there is no full-process closed loop of automatic discovery, analysis, scheduling, and testing. This patent can timely schedule the discovered congested circuits by performing real-time discovery on the backbone network circuits.
[0124] (2) Strong versatility: For congestion scenarios in all directions of the backbone network topology, it is only necessary to determine the congestion trigger threshold (i.e., utilization threshold) and the scheduling target threshold (i.e., hop count threshold).
[0125] (3) High degree of automation: The method provided by the present disclosure does not require human intervention, and only requires running the program code of the algorithm regularly.
[0126] It should be noted that the above figures are only schematic illustrations of the processes included in the method according to an exemplary embodiment of the present invention, and are not intended to be limiting. It is easy to understand that the processes shown in the above figures do not indicate or limit the time sequence of these processes. In addition, it is also easy to understand that these processes can be performed synchronously or asynchronously, for example, in multiple modules.
[0127] Fig. 9 FIG. 1 is a block diagram of a flow data processing device 900 according to an embodiment of the present disclosure; Fig. 9 As shown, including:
[0128] According to another aspect of the present disclosure, a flow data processing device is provided, including: an acquisition module 901, used to acquire link flow, and determine a congested link according to the link flow; wherein the congested link includes a source node and a destination node, and the source node and the destination node are adjacent nodes in the congested link; a generation strategy module 902, used to acquire flow data in the congested link, determine one or more target flow components to be scheduled according to the flow data in the congested link, and generate a flow scheduling strategy; wherein the flow scheduling strategy includes a scheduling path for each target flow component; a sending module 903, used to send the flow scheduling strategy to the source node, so that the target flow component is routed from the source node to the destination node according to the corresponding scheduling path.
[0129] In some embodiments, an acquisition module acquires link traffic and determines a congested link based on the link traffic, including: collecting existing network data based on second-level capabilities; determining the link traffic of each link based on the network topology, link traffic data, and traffic flow direction data in the existing network data; calculating the link utilization of each link based on the link traffic of each link; and determining a link whose link utilization is higher than a utilization threshold as a congested link.
[0130] In some embodiments, a strategy module is generated to obtain traffic data in a congested link, including: determining a device port corresponding to a source node, and obtaining port traffic data flowing out of the device port; the port traffic data includes: a source port of the port traffic, a next-hop port of the port traffic, and a port traffic value; and determining the port traffic corresponding to the next-hop port and the destination node from the port traffic data as the traffic data in the congested link.
[0131] In some embodiments, a strategy generation module determines a target traffic component to be scheduled based on traffic data in a congested link, including: calculating the end-to-end traffic between network edges based on the source IP address, source port, destination IP address, destination port, and protocol of the traffic data packet in the congested link; superimposing the end-to-end traffic between network edges through an IGP topology to obtain the traffic components in the congested link, as well as the traffic values of each traffic component; determining the traffic proportion of each traffic component based on the traffic value of each traffic component, and sorting the traffic components in descending order of the traffic proportion to obtain a traffic component sequence; selecting the first N target traffic components to be scheduled from the traffic component sequence, so that the link utilization calculated based on the remaining traffic in the congested link except the target traffic component is lower than the utilization threshold.
[0132] In some embodiments, a generation strategy module generates a traffic scheduling strategy, including: obtaining a set of candidate paths for a target traffic component; wherein the starting node of the path in the candidate path set is a source node, and the ending node is a destination node; selecting one or more paths from the candidate path set whose node change hop count is less than a hop count threshold as intermediate candidate paths; calculating the delay of each intermediate candidate path, and selecting the intermediate candidate path with the smallest delay as the scheduling path for the target traffic component in the traffic scheduling strategy.
[0133] In some embodiments, the traffic data processing device provided by the present disclosure also includes: a simulation test module 904. Before the sending module sends the traffic scheduling strategy to the source node, the simulation test module is used to: obtain the existing network traffic environment; perform a simulation test on the traffic scheduling strategy based on the existing network traffic environment, so as to send the traffic scheduling strategy to the source node after the simulation test passes.
[0134] In some embodiments, the traffic data processing device provided by the present disclosure also includes: a withdrawal module 905. After the sending module sends the traffic scheduling strategy to the source node, the withdrawal module is used to: monitor the link traffic based on a preset frequency, and when it is detected that the link traffic meets any withdrawal condition, the corresponding scheduling path in the traffic scheduling strategy is withdrawn.
[0135] In some embodiments, the fallback conditions include: the target traffic component cannot be routed from the source node to the destination node according to the corresponding scheduling path; the traffic of the target traffic component from the source node to the destination node is 0; there is congestion in the scheduling path in the traffic scheduling strategy; and there is no congestion in the congested link.
[0136] It will be appreciated by those skilled in the art that various aspects of the present invention may be implemented as a system, method or program product. Therefore, various aspects of the present invention may be specifically implemented in the following forms, namely: a complete hardware implementation, a complete software implementation (including firmware, microcode, etc.), or a combination of hardware and software, which may be collectively referred to herein as a "circuit", "module" or "system".
[0137] Fig.10 The block diagram of a flow data processing computer device in the embodiment of the present disclosure is shown. It should be noted that the electronic device shown in the figure is only an example and should not bring any limitation to the function and scope of use of the embodiment of the present invention.
[0138] Refer to the following Fig.10 The electronic device 1000 according to this embodiment of the present invention will be described. Fig.10 The electronic device 1000 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.
[0139] like Fig.10 As shown, the electronic device 1000 is in the form of a general computing device. The components of the electronic device 1000 may include but are not limited to: the at least one processing unit 1010, the at least one storage unit 1020, and a bus 1030 connecting different system components (including the storage unit 1020 and the processing unit 1010).
[0140] The storage unit stores program codes, which can be executed by the processing unit 1010, so that the processing unit 1010 performs the steps according to various exemplary embodiments of the present invention described in the above “Exemplary Method” section of this specification. For example, the processing unit 1010 can perform the following steps: Figure 2 In step S201 shown in the figure, link traffic is obtained, and a congested link is determined according to the link traffic; wherein the congested link includes a source node and a destination node, and the source node and the destination node are adjacent nodes in the congested link; step S203, traffic data in the congested link is obtained, one or more target traffic components to be scheduled are determined according to the traffic data in the congested link, and a traffic scheduling strategy is generated; wherein the traffic scheduling strategy includes a scheduling path for each target traffic component; step S205, the traffic scheduling strategy is sent down to the source node, so that the target traffic component is routed from the source node to the destination node according to the corresponding scheduling path.
[0141] The storage unit 1020 may include a readable medium in the form of a volatile storage unit, such as a random access storage unit (RAM) 10201 and / or a cache storage unit 10202 , and may further include a read-only storage unit (ROM) 10203 .
[0142] The storage unit 1020 may also include a program / utility 10204 having a set (at least one) of program modules 10205, such program modules 10205 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.
[0143] Bus 1030 may represent one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.
[0144] The electronic device 1000 may also communicate with one or more external devices 1100 (e.g., keyboards, pointing devices, Bluetooth devices, etc.), may also communicate with one or more devices that enable a user to interact with the electronic device 1000, and / or may communicate with any device that enables the electronic device 1000 to communicate with one or more other computing devices (e.g., routers, modems, etc.). Such communication may be performed via an input / output (I / O) interface 1050. Furthermore, the electronic device 1000 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) via a network adapter 1060. As shown, the network adapter 1060 communicates with other modules of the electronic device 1000 via a bus 1030. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 1000, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.
[0145] Through the description of the above implementation, it is easy for those skilled in the art to understand that the example implementation described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the implementation of the present disclosure can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, including several instructions to enable a computing device (which can be a personal computer, a server, a terminal device, or a network device, etc.) to execute the method according to the implementation of the present disclosure.
[0146] In an exemplary embodiment of the present disclosure, a computer-readable storage medium is also provided, on which a program product capable of implementing the above method of the present specification is stored. In some possible implementations, various aspects of the present invention can also be implemented in the form of a program product, which includes a program code, and when the program product is run on a terminal device, the program code is used to enable the terminal device to execute the steps according to various exemplary embodiments of the present invention described in the above "Exemplary Method" section of the present specification.
[0147] The program product for implementing the above method according to the embodiment of the present invention may adopt a portable compact disk read-only memory (CD-ROM) and include program code, and may be run on a terminal device, such as a personal computer. However, the program product of the present invention is not limited thereto, and in this document, a readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, apparatus, or device.
[0148] The program product may use any combination of one or more readable media. The readable medium may be a readable signal medium or a readable storage medium. The readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0149] Computer readable signal media may include data signals propagated in baseband or as part of a carrier wave, in which readable program code is carried. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Readable signal media may also be any readable medium other than a readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.
[0150] The program code embodied on the readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wired, optical cable, RF, etc., or any suitable combination of the foregoing.
[0151] Program code for performing the operations of the present invention may be written in any combination of one or more programming languages, including object-oriented programming languages such as Java, C++, etc., and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server. In cases involving a remote computing device, the remote computing device may be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computing device (e.g., through the Internet using an Internet service provider).
[0152] It should be noted that, although several modules or units of the device for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiments of the present disclosure, the features and functions of two or more modules or units described above can be embodied in one module or unit. On the contrary, the features and functions of one module or unit described above can be further divided into multiple modules or units to be embodied.
[0153] In addition, although the steps of the method in the present disclosure are described in a specific order in the drawings, this does not require or imply that the steps must be performed in this specific order, or that all the steps shown must be performed to achieve the desired results. Additionally or alternatively, some steps may be omitted, multiple steps may be combined into one step, and / or one step may be decomposed into multiple steps, etc.
[0154] Through the description of the above implementation, it is easy for those skilled in the art to understand that the example implementation described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the implementation of the present disclosure can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, including several instructions to enable a computing device (which can be a personal computer, a server, a mobile terminal, or a network device, etc.) to execute the method according to the implementation of the present disclosure.
[0155] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present disclosure are indicated by the appended claims.
Claims
1. A flow data processing method, characterized in that: include: Acquire link traffic, and determine a congested link according to the link traffic; wherein the congested link includes a source node and a destination node; Acquire the traffic data in the congested link, determine one or more target traffic components to be scheduled according to the traffic data in the congested link, and generate a traffic scheduling strategy; wherein the traffic scheduling strategy includes a scheduling path for each target traffic component; Sending the traffic scheduling strategy to the source node so that the target traffic component is routed from the source node to the destination node according to a corresponding scheduling path; The generation of traffic scheduling strategy includes: Acquire a set of candidate paths of the target traffic component; wherein the starting node of the path in the set of candidate paths is the source node, and the ending node is the destination node; Select one or more paths whose node change hop count is less than a hop count threshold from the candidate path set as intermediate candidate paths; The delay of each intermediate candidate path is calculated, and the intermediate candidate path with the smallest delay is selected as the scheduling path of the target traffic component in the traffic scheduling strategy.
2. The method according to claim 1, characterized in that Acquiring link traffic, and determining a congested link according to the link traffic, including: Collect live network data based on second-level capabilities; Determine the link flow of each link according to the network topology structure, link flow data, and flow direction data in the existing network data; Calculating the link utilization of each link according to the link traffic of each link; A link whose link utilization is higher than a utilization threshold is determined as the congested link.
3. The method according to claim 1, characterized in that Obtaining traffic data in the congested link, including: Determine the device port corresponding to the source node, and obtain port traffic data flowing out from the device port; the port traffic data includes: the source port of the port traffic, the next hop port of the port traffic, and the port traffic value; The port flow rate corresponding to the next hop port and the destination node is determined from the port flow rate data as the flow rate data in the congested link.
4. The method according to claim 3, characterized in that Determining a target traffic component to be scheduled according to the traffic data in the congested link includes: The end-to-end traffic between network edges is calculated according to the source IP address, source port, destination IP address, destination port and protocol of the traffic data in the congested link; the end-to-end traffic between network edges is superimposed and calculated through the IGP topology to obtain the traffic components in the congested link and the traffic value of each traffic component; Determine the flow proportion of each flow component according to the flow value of each flow component, and sort the flow components in descending order of the flow proportion to obtain a flow component sequence; The first N target traffic components to be scheduled are selected from the traffic component sequence, so that the link utilization calculated according to the remaining traffic in the congested link except the target traffic components is lower than the utilization threshold.
5. The method according to claim 1, characterized in that Before sending the traffic scheduling strategy to the source node, the method further includes: Obtain the current network traffic environment; A simulation test is performed on the traffic scheduling strategy based on the existing network traffic environment, so that the traffic scheduling strategy is sent to the source node after the simulation test passes.
6. The method according to claim 1, characterized in that After sending the traffic scheduling strategy to the source node, the method further includes: The link traffic is monitored based on a preset frequency, and when it is detected that the link traffic meets any withdrawal condition, a corresponding scheduling path in the traffic scheduling strategy is withdrawn.
7. The method according to claim 6, characterized in that The withdrawal conditions include: The target traffic component cannot be routed from the source node to the destination node according to the corresponding scheduling path; From the source node to the destination node, the flow of the target flow component is 0; There is congestion in the scheduling path in the traffic scheduling strategy; and There is no congestion in the congested link.
8. A flow data processing device, characterized in that: include: An acquisition module, used to acquire link traffic and determine a congested link according to the link traffic; wherein the congested link includes a source node and a destination node; A strategy generation module, used to obtain the traffic data in the congested link, determine one or more target traffic components to be scheduled according to the traffic data in the congested link, and generate a traffic scheduling strategy; wherein the traffic scheduling strategy includes a scheduling path for each target traffic component; A sending module, used for sending the traffic scheduling strategy to the source node, so that the target traffic component is routed from the source node to the destination node according to the corresponding scheduling path; The generation strategy module generates a traffic scheduling strategy, including: Acquire a set of candidate paths of the target traffic component; wherein the starting node of the path in the set of candidate paths is the source node, and the ending node is the destination node; Select one or more paths whose node change hop count is less than a hop count threshold from the candidate path set as intermediate candidate paths; The delay of each intermediate candidate path is calculated, and the intermediate candidate path with the smallest delay is selected as the scheduling path of the target traffic component in the traffic scheduling strategy.
9. The device according to claim 8, characterized in that Also includes: A simulation test module, before the sending module sends the traffic scheduling policy to the source node, the simulation test module is used to: Obtain the current network traffic environment; A simulation test is performed on the traffic scheduling strategy based on the existing network traffic environment, so that the traffic scheduling strategy is sent to the source node after the simulation test passes.
10. The device according to claim 8, characterized in that Also includes: A withdrawal module, after the sending module sends the traffic scheduling policy to the source node, the withdrawal module is used to: The link traffic is monitored based on a preset frequency, and when it is detected that the link traffic meets any withdrawal condition, a corresponding scheduling path in the traffic scheduling strategy is withdrawn.
11. A computer-readable storage medium having a computer program stored thereon, wherein when the program is executed by a processor, the flow data processing method according to any one of claims 1 to 7 is implemented.
12. An electronic device, characterized in that: include: one or more processors; A storage device for storing one or more programs, when the one or more programs are executed by the one or more processors, enables the one or more processors to implement the flow data processing method according to any one of claims 1 to 7.
