Method, device, electronic device and storage medium for determining target area to which an electric meter belongs

By analyzing the voltage data and similarity of the meter, the station area to which the meter belongs is automatically determined, which solves the high cost and low efficiency problems of manual regular testing in the existing technology, and realizes high-precision station area division and power grid management.

CN114123190BActive Publication Date: 2024-11-08GUANGDONG POWER GRID CO LTD +1
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202111444146.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-30
Publication Date
2024-11-08
Estimated Expiration
2041-11-30

AI Technical Summary

Technical Problem

In the prior art, it is determined that the station area where the power meter belongs needs to be manually tested regularly, resulting in high construction costs, low efficiency, and the inability to update the station information in a timely manner, which has problems such as difficulty in investigation and large workload.

Method used

By obtaining the voltage data of multiple meters within the preset time, determining the voltage jump data and recording the moment when the threshold exceeds the threshold, calculating the similarity between each data jump set. If the meter group contains the station area identifier, it is determined as Target table area, realize high-precision table area division.

Benefits of technology

It improves the accuracy and convenience of the station area where the meter belongs, reduces the cost of manpower and material resources, realizes precise management of the power grid, and ensures the safe and stable operation of the distribution grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114123190B_ABST
    Figure CN114123190B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a method, device, electronic device and storage medium for determining the target substation to which an electric meter belongs. The method includes: obtaining a data group to be processed of multiple electric meters to be processed within a preset time length; for each data group to be processed, determining the voltage jump data at two adjacent moments in the current data group to be processed, and recording the jump moment when the voltage jump data is greater than the preset jump data threshold, and obtaining a data jump set corresponding to the current data group to be processed; determining the similarity between each data jump set, and determining the electric meter group belonging to the same substation according to the similarity; if the electric meter to be processed in the electric meter group includes an substation identification, the substation identification is used as the target substation of the electric meter group. The problem of high construction cost and low efficiency caused by the need for manual regular on-site determination of the substation to which the electric meter belongs in the prior art is solved, and high-precision substation division of the electric meter is achieved, so as to improve the accuracy and convenience of determining the substation to which the electric meter belongs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present invention relate to computer processing technology, and more particularly to a method, device, electronic device and storage medium for determining a target area to which an electric meter belongs. Background Art

[0002] In the power system, the area refers to the area covered by the power supply line of a transformer. In order to achieve accurate management of the power grid and enable the distribution network to operate safely and stably, the power department must clearly know the area information of each smart meter and distribution transformer and establish accurate area management files. However, since the construction and maintenance of residential power lines is a continuous process, there may be confusion in the power layout, irregular construction, a section of the line being covered underground, and changes in the line caused by community renovation and upgrading. These conditions are likely to cause confusion or changes in the area of ​​the meter, so it is necessary to correctly identify the area to which the meter belongs.

[0003] At present, the substation identification method in the prior art mainly determines the substation of each electric meter through a substation identification instrument. Although the substation identification instrument can accurately identify the substation, when checking the substation to which the electric meter belongs in the later stage, manual on-site testing is required, which requires continuous investment of large manpower and material resources, and cannot guarantee the timely update of the substation information after changes occur on site. There are problems such as difficulty in investigation and heavy workload. Summary of the invention

[0004] The embodiments of the present invention provide a method, device, electronic device and storage medium for determining the target area to which an electric meter belongs, so as to realize high-precision area division of the electric meter, improve the accuracy and convenience of determining the area to which the electric meter belongs, achieve precise management of the power grid, and enable the distribution network to operate safely and stably.

[0005] In a first aspect, an embodiment of the present invention provides a method for determining a target area to which an electric meter belongs, the method comprising:

[0006] Acquire a data group to be processed of a plurality of electric meters to be processed within a preset time period; wherein the data group to be processed includes voltage data at a plurality of discrete moments;

[0007] For each data group to be processed, determine the voltage jump data at two adjacent moments in the current data group to be processed, and record the jump moment when the voltage jump data is greater than a preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed;

[0008] Determine the similarity between each data jump set, and determine the electric meter group belonging to the same area according to the similarity; wherein the electric meter group includes a plurality of to-be-processed electric meters belonging to the same area;

[0009] If the to-be-processed electric meters in the electric meter group include an area identifier, the area identifier is used as the target area of ​​the electric meter group.

[0010] In a second aspect, an embodiment of the present invention further provides a device for determining a target area to which an electric meter belongs, the device comprising:

[0011] A module for acquiring a data group to be processed, used to acquire a data group to be processed of a plurality of electric meters to be processed within a preset time period; wherein the data group to be processed includes voltage data at a plurality of discrete moments;

[0012] A data jump set acquisition module is used to determine the voltage jump data at two adjacent moments in the current data group to be processed for each data group to be processed, and record the jump moment when the voltage jump data is greater than a preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed;

[0013] An electric meter group determination module, used to determine the similarity between each data jump set, and determine the electric meter group belonging to the same area according to the similarity; wherein the electric meter group includes a plurality of to-be-processed electric meters belonging to the same area;

[0014] The target area determination module is used for, if the to-be-processed electric meter in the electric meter group includes an area identifier, setting the area identifier as the target area of ​​the electric meter group.

[0015] In a third aspect, an embodiment of the present invention further provides an electronic device, the device comprising:

[0016] one or more processors;

[0017] a storage device for storing one or more programs,

[0018] When the one or more programs are executed by the one or more processors, the one or more processors implement the method for determining the target substation to which the electric meter belongs as described in any one of the embodiments of the present invention.

[0019] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a method for determining a target substation to which an electric meter belongs as described in any one of the embodiments of the present invention.

[0020] The technical solution of the embodiment of the present invention obtains the data group to be processed of multiple meters to be processed within a preset time length, determines the voltage jump data at two adjacent moments in the current data group to be processed, and records the jump moment when the voltage jump data is greater than the preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed; determines the similarity between each data jump set, and determines the meter group belonging to the same substation according to the similarity; if the meters to be processed in the meter group include substation identifications, the substation identifications are used as the target substations of the meter group, which solves the problem of high construction cost and low efficiency caused by the need for manual on-site regular visits to determine the substation to which the meter belongs in the prior art, and realizes high-precision substation division of the meter based on the moment when the voltage fluctuation amplitude of the meter exceeds the threshold, thereby obtaining the substation information corresponding to each meter, improving the accuracy and convenience of determining the substation to which the meter belongs, while avoiding the participation of manual or substation detection instruments, greatly reducing the cost of manpower and material resources, and achieving the technical effect of accurate management of the power grid and enabling the distribution network to operate safely and stably. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required to describe the embodiments. Obviously, the drawings introduced are only drawings of a part of the embodiments to be described in the present invention, rather than all the drawings. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 A flow chart of a method for determining a target area to which an electric meter belongs provided by the first embodiment of the present invention;

[0023] Figure 2 A schematic diagram of a method for determining a target area to which an electric meter belongs provided by a second embodiment of the present invention;

[0024] Figure 3 A structural block diagram of a device for determining a target area to which an electric meter belongs provided by a third embodiment of the present invention;

[0025] Figure 4 This is a schematic diagram of the structure of an electronic device provided in Embodiment 4 of the present invention. DETAILED DESCRIPTION

[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0027] Figure 1This is a flowchart of a method for determining a target area to which an electric meter belongs provided in Embodiment 1 of the present invention. This embodiment is applicable to the case of determining the area to which an electric meter belongs. This method can be executed by a device for determining a target area to which an electric meter belongs in an embodiment of the present invention. The device can be implemented in software and / or hardware. Optionally, it can be implemented by an electronic device, which can be a mobile terminal, a PC, or a server. The device can be configured in a computing device. The method for determining a target area to which an electric meter belongs provided in this embodiment specifically includes the following steps:

[0028] S110, obtaining a group of to-be-processed data of a plurality of to-be-processed electric meters within a preset time period.

[0029] Among them, the electric meter to be processed can be understood as the electric meter whose substation area needs to be determined. The data group to be processed refers to the data used to determine the substation area to which the electric meter belongs. It can be the electrical characteristic parameter data of the electric meter, such as voltage, current, power frequency, etc., or it can be the fluctuation data of voltage or current. The data group to be processed includes voltage data at multiple discrete moments. For example, a large number of discrete collection moments can be set in advance, and the data collected at each discrete collection moment can be used as the data group to be processed. The preset duration refers to the preset time used to retrieve the electric meter data. Optionally, the preset duration can be 30 hours or 100 hours. For example, in actual applications, the electrical characteristic parameters corresponding to each electric meter can be pre-stored in a database. When it is necessary to determine the substations to which electric meters A, B, and C belong, the interface can be used to retrieve the voltage, current, power frequency and other electrical characteristic parameters of electric meters A, B, and C in a preset time period from the database, respectively. Each electric meter and the corresponding electrical characteristic parameters can be used as a group of data to be processed. Accordingly, three groups of data to be processed corresponding to electric meters A, B, and C can be obtained, and these three groups of data to be processed can be used as a group of data to be processed. At this time, it can be considered that three groups of data to be processed have been obtained. Accordingly, groups of data to be processed corresponding to multiple electric meters to be processed within a preset time period can be obtained.

[0030] S120, for each data group to be processed, determine the voltage jump data at two adjacent moments in the current data group to be processed, and record the jump moment when the voltage jump data is greater than a preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed.

[0031] When it is necessary to determine the voltage jump data in each data group to be processed, the voltage jump data in any data group to be processed can be used as the voltage jump data in the current data group to be processed, so as to illustrate that one of the data groups to be processed is the current data group to be processed. Voltage jump data refers to the voltage fluctuation data of the electric meter, and the voltage fluctuation value at two adjacent moments can be used as the voltage jump data. The preset jump data threshold refers to the preset voltage fluctuation data threshold, which can be , or The transition moment can be understood as the moment when the voltage fluctuation amplitude exceeds the threshold. The data transition set may include multiple transition moments.

[0032] Specifically, the algorithm can be used to extract the voltage fluctuation amplitude between the current moment and the previous moment in the current data group to be processed, that is, the voltage jump data, and then the algorithm can be used to compare the voltage jump data with the preset jump data threshold. If the voltage jump data exceeds the preset jump data threshold, the current moment corresponding to the voltage jump data can be used as the jump moment in the data jump set. For example, the preset jump data threshold is , the voltage fluctuation amplitude at time 1 relative to the previous time 2 is ,at this time , time 1 can be used as the transition time. The function of recording voltage transition data can also be added to the electric meter. When it is necessary to identify the area to which the electric meter belongs, the interface can be used to retrieve the voltage transition data and the corresponding transition time in the electric meter. Accordingly, multiple transition times corresponding to the current data group to be processed can be obtained, that is, the data transition set.

[0033] It should be noted that the voltage jump data at two adjacent moments in the current data group to be processed is determined, and the jump moment when the voltage jump data is greater than the preset jump data threshold is recorded to obtain a data jump set corresponding to the current data group to be processed. The difference between the voltage value collected at the current moment and the voltage value at the previous moment can also be calculated. If the difference is greater than the preset jump data threshold, the current moment can be used as the jump moment.

[0034] It should also be noted that in order to provide a larger fluctuation voltage swing to improve the dynamic range, the preset jump data threshold may include a positive threshold and a negative threshold. Optionally, the positive threshold may be selected as a positive threshold according to the situation. The negative threshold can be selected as negative according to the situation. The preset jump data threshold value can also be determined by the technician according to the actual working situation.

[0035] Optionally, the voltage jump data at two adjacent moments in the current data group to be processed is determined, and the jump moment when the voltage jump data is greater than a preset jump data threshold is recorded to obtain a data jump set corresponding to the current data group to be processed, including: calculating the voltage difference between two adjacent moments as the voltage jump data; if the voltage jump data is not within the preset jump data threshold range, determining the latter moment of the two adjacent moments as the jump moment; and determining the data jump set of the current data group to be processed based on each jump moment.

[0036] It should be noted that, for the voltage values ​​corresponding to each moment in the current data group to be processed, the algorithm can be used to calculate the difference between the voltage value collected at the current moment and the voltage value at the previous moment, and the difference can be used as voltage jump data, and then the algorithm can be used to compare the difference with the preset jump data threshold. Optionally, the preset jump data threshold can be positive , can also be negative Furthermore, if the difference is greater than the positive threshold or less than the negative threshold, for example, the voltage jump data is negative , it means that the voltage jump data is not within the preset jump data threshold range, and the current moment can be recorded as the jump moment. At this time, the current moment is also the later moment of the two moments for comparison. Accordingly, multiple jump moments can be obtained, and these jump moments can be integrated and processed using algorithms to generate a data jump set. For example, the data jump set of meter A can be recorded as ,in, It can represent the first voltage jump moment in meter A. Can be an integer greater than or equal to 1.

[0037] Specifically, the voltage difference between two adjacent moments can be calculated by an algorithm, and then a plurality of voltage jump data can be obtained. The algorithm can be used to compare each voltage jump data with a preset jump data threshold. If the voltage jump data is not within the preset jump data threshold range, the latter moment of the two adjacent moments can be used as the jump moment. The algorithm can also be used to calculate the voltage difference between two adjacent moments in real time. If the voltage difference is not within the preset jump data threshold range, the latter moment of the two adjacent moments can be used as the jump moment. Accordingly, a plurality of jump moments can be obtained, and it can also be considered that a data jump set of the current data group to be processed is obtained. Accordingly, a plurality of data jump sets can also be obtained. In this way, based on the moment when the voltage jump data corresponding to each electric meter exceeds the threshold, that is, the jump moment, the area to which the electric meter belongs can be divided according to the set division standard, thereby improving the accuracy of determining the area to which the electric meter belongs.

[0038] S130: Determine the similarity between each data transition set, and determine the electric meter group belonging to the same substation according to the similarity.

[0039] The similarity can be used to characterize the similarity of the jump time. The meter group includes multiple to-be-processed meters belonging to the same area, that is, the multiple to-be-processed meters belonging to the same area can be regarded as one meter group.

[0040] In this embodiment, the similarity between each data transition set can be calculated. For example, an algorithm can be used to calculate the similarity between each two data transition sets. For example, the voltage fluctuation of meter A exceeds the threshold time set, that is, the data transition set is , the data transition set of meter B is ,in, and are all integers greater than or equal to 1. An algorithm can be used to calculate the number of consistent jump moments in the two sets, and then the degree of similarity between the two sets, that is, the similarity, can be calculated based on the number of consistent jump moments. Accordingly, the similarity between each two data jump sets can be calculated. Further, based on each similarity, a clustering algorithm can be used to cluster the data jump sets, and multiple cluster information can be obtained. Accordingly, the electric meters corresponding to the data jump sets in the same cluster can be classified as electric meters in the same substation, and accordingly, electric meter groups corresponding to multiple substations can be obtained.

[0041] It should be noted that, in order to improve the calculation efficiency and avoid the redundancy of calculation, when determining the similarity between each data jump set and determining the electric meter group belonging to the same substation according to the similarity, one of the data jump sets A can be used as the starting calculation standard for the calculation, and the similarity between the other data jump sets can be calculated respectively. After the similarity between the other data jump sets is calculated, it can be considered that the evaluation of the data jump set A is completed. It should also be noted that the similarity between each two data jump sets can also be calculated in parallel using a distributed algorithm.

[0042] Optionally, determining the similarity between each data jump set and determining the electric meter group belonging to the same substation based on the similarity includes: taking one of the data jump sets as a benchmark data jump set, and determining the similarity between the benchmark data jump set and each data jump set; after traversing each data jump set, classifying the data jump set whose similarity is greater than a preset similarity threshold and the benchmark data jump set into the same category, so as to obtain the electric meter group belonging to the same substation.

[0043] Among them, the reference data transition set can be understood as a starting data transition set when calculating the similarity between data transition sets. For example, data transition set A can be used as the reference data transition set, and the similarity between A and the remaining data transition sets can be calculated respectively. It should be noted that any data transition set in each data transition set can be processed as the reference data transition set, so that the similarity between every two data transition sets in each data transition set can be calculated, and it is ensured that the calculation is not repeated or omitted. The preset similarity threshold can be a preset similarity value. Optionally, the preset similarity threshold can be a positive number close to and less than 1, such as 0.95.

[0044] It should be noted that one of the data transition sets can be used as the benchmark data transition set, and then the algorithm can be used to calculate the similarity between the benchmark data transition set and the remaining data transition sets, and then the algorithm can be used to compare the similarity with the preset similarity threshold. If the similarity is greater than the preset similarity threshold, the data transition set corresponding to the similarity can be classified as the same as the benchmark data transition set, that is, the meters corresponding to the two data transition sets can be considered to belong to the same station area. For example, when the similarity between meter A and meter B is Greater than or equal to the preset similarity threshold When , it can be determined that meter A and meter B belong to the same substation, and the calculation formula can be as follows:

[0045] =

[0046] It should also be noted that the substation clustering device can also be used to perform a similarity calculation on the data jump set of every two meters, and repeat the cycle until all meters are evaluated and calculated at least once. Then, the algorithm can be used to integrate each meter group and the substation to which they belong and display it on the device.

[0047] Specifically, one of the data transition sets can be taken as the benchmark data transition set, and then an algorithm can be used to calculate the similarity between the benchmark data transition set and the remaining data transition sets. After traversing the remaining data transition sets, the data transition set and the benchmark data transition set whose similarity is greater than a preset similarity threshold can be classified into the same category, that is, the electric meters corresponding to the data transition set and the benchmark data transition set can be classified as the same substation, and accordingly, an electric meter group belonging to the same substation can be obtained.

[0048] It should be noted that in order to determine the similarity between the reference data transition set and each data transition set, the number of consistent jump moments in each two data transition sets can also be calculated. Accordingly, the similarity between the two data transition sets can be calculated based on the number of consistent jump moments.

[0049] Optionally, determining the similarity between the baseline data jump set and each data jump set includes: determining, for each data jump set, the intersection and union of the current data jump set and the baseline data jump set; and determining the similarity between the baseline jump data and the current jump data set based on the number of elements corresponding to the intersection and the number of elements corresponding to the union.

[0050] It should be noted that when it is necessary to determine the similarity between each data hop set and the benchmark data hop set, the determination of the similarity between any data hop set and the benchmark data hop set can be processed as the determination of the similarity between the current data hop set and the benchmark data hop set, so as to illustrate one of the data hop sets as the current data hop set.

[0051] Specifically, an algorithm can be used to calculate the intersection and union of the jump moments in the current data jump set and the reference data jump set, and then the corresponding similarity can be determined based on the intersection and union. For example, the data jump set A of the electric meter 1 is , the data transition set B of meter 2 is ,in, and are all integers greater than or equal to 1. The number of elements in set C after the intersection of set A and set B ; can remember The number of elements in set D after the union of set A and set B ; can remember is the similarity value of the area where meter 1 and meter 2 belong, . So that when calculating the similarity Afterwards, confirm Is it greater than or equal to the preset similarity threshold? ,like Greater than or equal to , it can be determined that meter 1 and meter 2 belong to the same substation.

[0052] S140: If the to-be-processed electric meters in the electric meter group include an area identifier, use the area identifier as a target area of ​​the electric meter group.

[0053] The area identifier can be understood as the unique identification information corresponding to the area, which can be a label or any information that can represent the unique identification of the area. Based on the area identifier marked in the meter, it can be determined which area the meter belongs to. The target area refers to the area information to which the meter belongs.

[0054] In this embodiment, an algorithm can be used to detect whether there is a preset area identifier for the meters to be processed in the meter group. If there is an area identifier, the area identifier can be used as the area identifier of the area to which each meter to be processed in the meter group belongs, that is, it can also be used as the target area of ​​the meter group.

[0055] Optionally, if the meter to be processed in the meter group includes an area identifier, the area identifier is used as the target area of ​​the meter group, including: if there is a meter to be processed in the meter group that includes an area identifier, the area identifier is used as the target area of ​​the meter group.

[0056] It should be noted that, if there is an unprocessed electric meter including an area identifier in the electric meter group, the area identifier can be used as the target area of ​​the electric meter group.

[0057] It should also be noted that if there is more than one meter to be processed in the meter group that includes an area identification, and the area identifications are different, it may mean that there are at least two meters to be processed in the meter group that may not belong to the same area. At this time, the array of processing arrays of the meters to be processed can be re-collected and the area corresponding to each meter to be processed can be re-determined.

[0058] It should also be noted that if there is no meter to be processed in the meter group that includes a substation identification, it can be said that it is impossible to determine to which substation each meter to be processed in the meter group belongs based on the substation identification. At this time, the array of pending meters to be processed can be re-collected to re-determine the substation corresponding to each meter to be processed.

[0059] Optionally, if there is at least one to-be-processed meter including an area identifier in the meter group, and the area identifiers are different, then the to-be-processed array of each to-be-processed meter in the meter group is re-collected; or, if there is no to-be-processed meter including an area identifier in the meter group, then the to-be-processed array of each to-be-processed meter in the meter group is re-collected; based on the re-collected to-be-processed array, the voltage jump data at two adjacent moments in the current to-be-processed data group is repeatedly determined, a data jump set is determined, and the target area is determined based on the data jump set.

[0060] Specifically, in order to improve the accuracy of determining the substation to which the electric meter belongs, an algorithm can be used to count the to-be-processed electric meters including substation identifications in the electric meter group. If the number of to-be-processed electric meters including substation identifications and different substation identifications in the electric meter group is greater than 1, the to-be-processed arrays of each to-be-processed electric meter in the electric meter group can be re-collected; if the number of to-be-processed electric meters including substation identifications in the electric meter group is 0, that is, there are no to-be-processed electric meters including substation identifications in the electric meter group, the to-be-processed arrays of each to-be-processed electric meter in the electric meter group can also be re-collected. Further, based on the re-collected to-be-processed array, the voltage jump data at two adjacent moments in the current to-be-processed data group can be repeatedly determined to determine the data jump set, so that the target substation of the electric meter group can be re-determined based on the data jump set.

[0061] It should be noted that in order to improve the convenience of determining the target area to which the meter belongs, a corresponding area identifier can be added in advance to a certain meter data to be processed in each area, so that the area information to which each meter to be processed belongs can be determined based on this technical solution.

[0062] Optionally, at least one to-be-processed electric meter belonging to each substation is determined in advance, and the to-be-processed electric meter is marked with a substation identification, so that after determining the similarity of each data jump set to determine the electric meter group belonging to the same substation, the target substation corresponding to each to-be-processed electric meter in the electric meter group is determined according to the substation identification in the electric meter group.

[0063] Specifically, an algorithm can be used to predetermine at least one to-be-processed electric meter in each substation, and then the algorithm can be used to mark each to-be-processed electric meter with a substation identification. For example, the to-be-processed electric meter can be assigned a corresponding substation identification to ensure that there is at least one to-be-processed electric meter containing the substation identification in each substation. Accordingly, after determining the similarity of each data jump set to determine the electric meter group belonging to the same substation, the target substation corresponding to each to-be-processed electric meter in the electric meter group can be determined according to the substation identification corresponding to the to-be-processed electric meter in the electric meter group.

[0064] The technical solution of the embodiment of the present invention obtains the data group to be processed of multiple meters to be processed within a preset time length, determines the voltage jump data at two adjacent moments in the current data group to be processed, and records the jump moment when the voltage jump data is greater than the preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed; determines the similarity between each data jump set, and determines the meter group belonging to the same substation according to the similarity; if the meters to be processed in the meter group include substation identifications, the substation identifications are used as the target substations of the meter group, which solves the problem of high construction cost and low efficiency caused by the need for manual on-site regular visits to determine the substation to which the meter belongs in the prior art, and realizes high-precision substation division of the meter based on the moment when the voltage fluctuation amplitude of the meter exceeds the threshold, thereby obtaining the substation information corresponding to each meter, improving the accuracy and convenience of determining the substation to which the meter belongs, while avoiding the participation of manual or substation detection instruments, greatly reducing the cost of manpower and material resources, and achieving the technical effect of accurate management of the power grid and enabling the distribution network to operate safely and stably.

[0065] Embodiment 2

[0066] As an alternative embodiment of the above embodiment, Figure 2 This is a schematic diagram of a method for determining a target area to which an electric meter belongs provided by Embodiment 2 of the present invention. For details, please refer to the following specific contents.

[0067] It should be noted that the functions of the electric meter can also be improved by adding a function to record the moment when the voltage fluctuation amplitude exceeds the threshold, and providing the data required to determine the substation to which the electric meter belongs, so that the substation identification device implemented based on this technical solution can quickly complete the substation division task and the substation identification task according to the data.

[0068] For example, Figure 2 As shown, after the task of determining the substation to which the meter belongs is issued, each meter uploads the data of the moment when the voltage fluctuation amplitude exceeds the threshold to the database, and the data of the moment when the voltage fluctuation amplitude exceeds the threshold can be used as a data jump set. It should be noted that the difference between the voltage value collected at the current moment and the voltage value at the previous moment can be calculated, and the difference can be compared with the threshold. If it is greater than the positive threshold or less than the negative threshold, the current moment is recorded as the moment when the voltage fluctuation amplitude exceeds the threshold. Optionally, the positive threshold can be selected as a positive threshold according to the situation. The negative threshold can be selected as negative according to the situation. .

[0069] Furthermore, the area identification device can use the interface to read the data jump set in the database, and then determine the similarity between the data jump sets, and determine the meter group belonging to the same area based on the similarity. For example, the voltage fluctuation of meter 1 exceeds the threshold time set A is , the voltage fluctuation of meter 2 exceeds the threshold time set B is ,in, It can be expressed as the moment when the first voltage fluctuation in the set exceeds the threshold. and are integers greater than or equal to 1.

[0070] Optional, you can remember The number of elements in set C after the intersection of set A and set B ;

[0071] Can remember The number of elements in set D after the union of set A and set B ;

[0072] Can remember is the similarity value of the area where meter 1 and meter 2 belong, .

[0073] Furthermore, when Greater than or equal to threshold hour( is a positive number close to and less than 1, such as 0.95), that is, it is determined that meter 1 and meter 2 belong to the same substation, that is:

[0074] =

[0075] Furthermore, the substation identification device can evaluate the substation area once for every two smart meters, and repeat the process until all meters are evaluated at least once. The substation area division results can be integrated and displayed on the device.

[0076] The technical solution of the embodiment of the present invention obtains the data group to be processed of multiple meters to be processed within a preset time length, determines the voltage jump data at two adjacent moments in the current data group to be processed, and records the jump moment when the voltage jump data is greater than the preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed; determines the similarity between each data jump set, and determines the meter group belonging to the same substation according to the similarity; if the meters to be processed in the meter group include substation identifications, the substation identifications are used as the target substations of the meter group, which solves the problem of high construction cost and low efficiency caused by the need for manual on-site regular visits to determine the substation to which the meter belongs in the prior art, and realizes high-precision substation division of the meter based on the moment when the voltage fluctuation amplitude of the meter exceeds the threshold, thereby obtaining the substation information corresponding to each meter, improving the accuracy and convenience of determining the substation to which the meter belongs, while avoiding the participation of manual or substation detection instruments, greatly reducing the cost of manpower and material resources, and achieving the technical effect of accurate management of the power grid and enabling the distribution network to operate safely and stably.

[0077] Embodiment 3

[0078] Figure 3 The fourth embodiment of the present invention provides a structural block diagram of a device for determining a target area to which an electric meter belongs. The device comprises: a to-be-processed data group acquisition module 310 , a data transition set acquisition module 320 , an electric meter group determination module 330 and a target area determination module 340 .

[0079] Among them, the module 310 for obtaining the data group to be processed is used to obtain the data group to be processed of multiple meters to be processed within a preset time length; wherein the data group to be processed includes voltage data at multiple discrete moments; the data jump set acquisition module 320 is used to determine the voltage jump data at two adjacent moments in the current data group to be processed for each data group to be processed, and record the jump moment when the voltage jump data is greater than the preset jump data threshold, to obtain the data jump set corresponding to the current data group to be processed; the meter group determination module 330 is used to determine the similarity between each data jump set, and determine the meter group belonging to the same substation according to the similarity; wherein the meter group includes multiple meters to be processed belonging to the same substation; the target substation determination module 340 is used to set the substation identifier as the target substation of the meter group if the meters to be processed in the meter group include a substation identifier.

[0080] The technical solution of the embodiment of the present invention obtains the data group to be processed of multiple meters to be processed within a preset time length, determines the voltage jump data at two adjacent moments in the current data group to be processed, and records the jump moment when the voltage jump data is greater than the preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed; determines the similarity between each data jump set, and determines the meter group belonging to the same substation according to the similarity; if the meters to be processed in the meter group include substation identifications, the substation identifications are used as the target substations of the meter group, which solves the problem of high construction cost and low efficiency caused by the need for manual on-site regular visits to determine the substation to which the meter belongs in the prior art, and realizes high-precision substation division of the meter based on the moment when the voltage fluctuation amplitude of the meter exceeds the threshold, thereby obtaining the substation information corresponding to each meter, improving the accuracy and convenience of determining the substation to which the meter belongs, while avoiding the participation of manual or substation detection instruments, greatly reducing the cost of manpower and material resources, and achieving the technical effect of accurate management of the power grid and enabling the distribution network to operate safely and stably.

[0081] On the basis of the above device, optionally, the data jump set acquisition module 320 includes a voltage jump data determination unit, a jump time determination unit and a data jump set determination unit.

[0082] A voltage jump data determination unit, used for calculating a voltage difference between two adjacent moments as the voltage jump data;

[0083] A jump time determination unit, configured to determine the later time of the two adjacent times as the jump time if the voltage jump data is not within the preset jump data threshold range;

[0084] The data transition set determining unit is used to determine the data transition set of the current data group to be processed based on each transition time.

[0085] On the basis of the above device, optionally, the meter group determination module 330 includes a similarity determination unit and an meter group acquisition unit.

[0086] a similarity determination unit, configured to determine the similarity between one of the data transition sets as a reference data transition set and each data transition set;

[0087] The electric meter group acquisition unit is used to traverse each data jump set, classify the data jump set with a similarity greater than a preset similarity threshold and the reference data jump set into the same category, and obtain the electric meter group belonging to the same substation.

[0088] Based on the above device, optionally, the similarity determination unit includes an intersection and union determination subunit and a similarity determination subunit.

[0089] An intersection and union determination subunit, used to determine, for each data hopping set, an intersection and a union of a current data hopping set and the reference data hopping set;

[0090] The similarity determination subunit is used to determine the similarity between the reference transition data and the current transition data set according to the number of elements corresponding to the intersection and the number of elements corresponding to the union.

[0091] On the basis of the above device, optionally, the target area determination module 340 includes a target area determination unit.

[0092] The target area determination unit is configured to use the area identifier as the target area of ​​the meter group if there is a to-be-processed meter including an area identifier in the meter group.

[0093] On the basis of the above device, optionally, the device further includes: a data re-acquisition module; wherein the data re-acquisition module includes a to-be-processed array re-acquisition unit and a data jump set re-acquisition unit.

[0094] a to-be-processed array re-collection unit, configured to re-collect the to-be-processed arrays of each to-be-processed electric meter in the electric meter group if there is at least one to-be-processed electric meter including an area identifier in the electric meter group, and the area identifiers are different; or

[0095] If there is no to-be-processed electric meter including the station area identifier in the electric meter group, re-collecting the to-be-processed array of each to-be-processed electric meter in the electric meter group;

[0096] The data jump set re-collection unit is used to repeatedly determine the voltage jump data of two adjacent moments in the current data group to be processed based on the re-collected data group to be processed, determine the data jump set, and determine the target station area based on the data jump set.

[0097] On the basis of the above device, optionally, the device further includes: a module for predetermining an electric meter to be processed.

[0098] The module for predetermining the meters to be processed is used to predetermine at least one meter to be processed belonging to each station, and mark the meter to be processed with the station area identification, so as to determine the meter group belonging to the same station area by determining the similarity of each data jump set, and then determine the target station area corresponding to each meter to be processed in the meter group according to the station area identification in the meter group.

[0099] The device for determining the target area to which an electric meter belongs provided by the embodiment of the present invention can execute the method for determining the target area to which an electric meter belongs provided by any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.

[0100] It is worth noting that the various units and modules included in the above-mentioned device are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the protection scope of the embodiments of the present invention.

[0101] Embodiment 4

[0102] Figure 4 A schematic diagram of the structure of an electronic device provided in Embodiment 4 of the present invention. Figure 4 A block diagram of an exemplary electronic device 40 suitable for implementing exemplary embodiments of the present invention is shown. Figure 4 The electronic device 40 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0103] like Figure 4As shown, the electronic device 40 is in the form of a general-purpose computing device. The components of the electronic device 60 may include, but are not limited to: one or more processors or processing units 401, a system memory 402, and a bus 403 connecting different system components (including the system memory 402 and the processing unit 401).

[0104] Bus 403 represents one or more of several types of bus structures, including a memory bus or memory controller, a peripheral bus, an accelerated graphics port, a processor or a local bus using any of a variety of bus structures. For example, these architectures include but are not limited to Industry Standard Architecture (ISA) bus, Micro Channel Architecture (MAC) bus, Enhanced ISA bus, Video Electronics Standards Association (VESA) local bus and Peripheral Component Interconnect (PCI) bus.

[0105] The electronic device 40 typically includes a variety of computer system readable media. These media can be any available media that can be accessed by the electronic device 40, including volatile and non-volatile media, removable and non-removable media.

[0106] System memory 402 may include computer system readable media in the form of volatile memory, such as random access memory (RAM) 404 and / or cache memory 405. Electronic device 40 may further include other removable / non-removable, volatile / non-volatile computer system storage media. By way of example only, storage system 406 may be used to read and write non-removable, non-volatile magnetic media ( Figure 4 not shown, usually called a "hard drive"). Although Figure 4 Not shown in the figure, a disk drive for reading and writing to a removable non-volatile disk (e.g., a "floppy disk"), and an optical disk drive for reading and writing to a removable non-volatile optical disk (e.g., a CD-ROM, a DVD-ROM, or other optical media) may be provided. In these cases, each drive may be connected to the bus 403 via one or more data medium interfaces. The system memory 402 may include at least one program product having a set (e.g., at least one) of program modules that are configured to perform the functions of the various embodiments of the present invention.

[0107] A program / utility 408 having a set (at least one) of program modules 407 may be stored, for example, in system memory 402, such program modules 407 including, but not limited to, an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment. Program modules 407 generally perform the functions and / or methods of the embodiments described herein.

[0108] The electronic device 40 may also communicate with one or more external devices 409 (e.g., keyboards, pointing devices, displays 410, etc.), may communicate with one or more devices that enable a user to interact with the electronic device 40, and / or may communicate with any device that enables the electronic device 40 to communicate with one or more other computing devices (e.g., a network card, a modem, etc.). Such communication may be performed via an input / output (I / O) interface 411. Furthermore, the electronic device 40 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) via a network adapter 412. As shown, the network adapter 412 communicates with other modules of the electronic device 40 via a bus 403. It should be understood that although Figure 4 Not shown, other hardware and / or software modules may be used in conjunction with the electronic device 40, including but not limited to microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems.

[0109] The processing unit 401 executes various functional applications and data processing by running the programs stored in the system memory 402, for example, implementing the method for determining the target area to which the electric meter belongs provided in the embodiment of the present invention.

[0110] Embodiment 5

[0111] Embodiment 5 of the present invention further provides a storage medium including computer executable instructions, wherein the computer executable instructions are used to execute a method for determining a target area to which an electric meter belongs when executed by a computer processor. The method includes:

[0112] Acquire a data group to be processed of a plurality of electric meters to be processed within a preset time period; wherein the data group to be processed includes voltage data at a plurality of discrete moments;

[0113] For each data group to be processed, determine the voltage jump data at two adjacent moments in the current data group to be processed, and record the jump moment when the voltage jump data is greater than a preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed;

[0114] Determine the similarity between each data jump set, and determine the electric meter group belonging to the same area according to the similarity; wherein the electric meter group includes a plurality of to-be-processed electric meters belonging to the same area;

[0115] If the to-be-processed electric meters in the electric meter group include an area identifier, the area identifier is used as the target area of ​​the electric meter group.

[0116] The computer storage medium of the embodiment of the present invention may adopt any combination of one or more computer-readable media. The computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination thereof. More specific examples (non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, device or device.

[0117] Computer-readable signal media may include data signals propagated in baseband or as part of a carrier wave, which carry computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than a computer-readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.

[0118] Program code embodied on a computer readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wireline, optical fiber cable, RF, etc., or any suitable combination of the foregoing.

[0119] Computer program code for performing the operation of the embodiments of the present invention may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0120] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A method for determining the target area to which an electric meter belongs. It is characterized in that include: Acquire a data group to be processed of a plurality of electric meters to be processed within a preset time period; wherein the data group to be processed includes voltage data at a plurality of discrete moments; For each data group to be processed, determine the voltage jump data at two adjacent moments in the current data group to be processed, and record the jump moment when the voltage jump data is greater than a preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed, wherein the preset jump data threshold includes a positive threshold and a negative threshold; Determine the similarity between each data jump set, and determine the electric meter group belonging to the same area according to the similarity; wherein the electric meter group includes a plurality of to-be-processed electric meters belonging to the same area; If the to-be-processed electric meter in the electric meter group includes an area identifier, the area identifier is used as the target area of ​​the electric meter group; The step of determining the voltage jump data at two adjacent moments in the current data group to be processed, and recording the jump moment when the voltage jump data is greater than a preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed, includes: Calculating the voltage difference between two adjacent moments as the voltage jump data; If the voltage jump data is not within the preset jump data threshold range, determining the later moment of the two adjacent moments as the jump moment; Based on each jump time, determine a data jump set of the current data group to be processed; The step of determining the similarity between the data transition sets and determining the group of electric meters belonging to the same substation according to the similarity includes: Taking one of the data hopping sets as a reference data hopping set, and determining the similarity between the reference data hopping set and each data hopping set; After traversing each data transition set, the data transition set with a similarity greater than a preset similarity threshold and the reference data transition set are classified into the same category to obtain an electric meter group belonging to the same substation area; The determining of the similarity between the reference data transition set and each data transition set includes: For each data hopping set, determining the intersection and union of the current data hopping set and the reference data hopping set; The similarity between the reference data transition set and the current data transition set is determined according to the number of elements corresponding to the intersection and the number of elements corresponding to the union.

2. The method according to claim 1, It is characterized in that If the to-be-processed electric meter in the electric meter group includes an area identifier, then using the area identifier as a target area of ​​the electric meter group includes: If there is an electric meter to be processed including an area identifier in the electric meter group, the area identifier is used as the target area of ​​the electric meter group.

3. The method according to claim 1, It is characterized in that Also includes: If there is at least one to-be-processed electric meter including an area identifier in the electric meter group, and the area identifiers are different, then re-collecting the to-be-processed arrays of each to-be-processed electric meter in the electric meter group; or, If there is no to-be-processed electric meter including the station area identifier in the electric meter group, re-collecting the to-be-processed array of each to-be-processed electric meter in the electric meter group; The voltage jump data at two adjacent moments in the current data group to be processed are repeatedly determined based on the re-collected data group to be processed, a data jump set is determined, and a target station area is determined based on the data jump set.

4. The method according to claim 1, It is characterized in that Also includes: At least one to-be-processed electric meter belonging to each substation is predetermined, and the to-be-processed electric meter is marked with a substation identification, so that after determining the similarity of each data jump set to determine the electric meter group belonging to the same substation, the target substation corresponding to each to-be-processed electric meter in the electric meter group is determined according to the substation identification in the electric meter group.

5. A device for determining the target area to which the electric meter belongs, It is characterized in that include: A module for acquiring a data group to be processed, used to acquire a data group to be processed of a plurality of electric meters to be processed within a preset time period; wherein the data group to be processed includes voltage data at a plurality of discrete moments; A data jump set acquisition module is used to determine the voltage jump data at two adjacent moments in the current data group to be processed for each data group to be processed, and record the jump moment when the voltage jump data is greater than a preset jump data threshold, to obtain a data jump set corresponding to the current data group to be processed, wherein the preset jump data threshold includes a positive threshold and a negative threshold; An electric meter group determination module, used to determine the similarity between each data jump set, and determine the electric meter group belonging to the same area according to the similarity; wherein the electric meter group includes a plurality of to-be-processed electric meters belonging to the same area; A target area determination module, configured to, if the to-be-processed electric meter in the electric meter group includes an area identifier, identify the area identifier as a target area of ​​the electric meter group; The data jump set acquisition module includes a voltage jump data determination unit, a jump time determination unit and a data jump set determination unit; The voltage jump data determining unit is used to calculate the voltage difference between two adjacent moments as the voltage jump data; The jump time determination unit is used to determine the later moment of the two adjacent moments as the jump time if the voltage jump data is not within the preset jump data threshold range; The data transition set determination unit is used to determine the data transition set of the current data group to be processed based on each transition time; Wherein, the electric meter group determination module includes a similarity determination unit and an electric meter group acquisition unit; a similarity determination unit, configured to determine the similarity between one of the data transition sets as a reference data transition set and each data transition set; An electric meter group acquisition unit is used to traverse each data transition set, classify the data transition set with a similarity greater than a preset similarity threshold and the reference data transition set into the same category, and obtain an electric meter group belonging to the same substation; Wherein, the similarity determination unit includes an intersection and union determination subunit and a similarity determination subunit; An intersection and union determination subunit, used to determine, for each data hopping set, an intersection and a union of a current data hopping set and the reference data hopping set; The similarity determination subunit is used to determine the similarity between the reference data transition set and the current data transition set according to the number of elements corresponding to the intersection and the number of elements corresponding to the union.

6. An electronic device, It is characterized in that The device comprises: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method for determining the target area to which the electric meter belongs as described in any one of claims 1 to 4.

7. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the program is executed by a processor, the method for determining the target area to which the electric meter belongs as described in any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Electric energy meter area identification method with high accuracy

    CN108805457A

  • Network node identification method and device

    CN109525338A

  • Calculation method for similarity of voltage curves considering influence of voltage adjustment measures

    CN109581130A

  • Transformer zone identification method and computer readable storage medium

    CN110212518A

  • Low-voltage power distribution network topology verification method

    CN111625991A