Production bottleneck prediction method based on incremental simple recurrent unit and dual attention

By adopting the production bottleneck prediction method of incremental simple cycle units and dual attention in complex discrete manufacturing workshops, the problems of inaccurate bottleneck prediction and poor timeliness in the existing technology are solved, and more efficient production decision support and workshop performance are achieved. analyze.

CN114154820BActive Publication Date: 2024-10-15NANJING UNIV OF AERONAUTICS & ASTRONAUTICS +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111384905.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-22
Publication Date
2024-10-15
Estimated Expiration
2041-11-22

AI Technical Summary

Technical Problem

Existing production bottleneck prediction methods are not effective in complex discrete manufacturing workshops, failing to effectively depict the real bottleneck situation, and the prediction model has poor timeliness, resulting in dynamic decision-making trigger delays and insufficient accuracy.

Method used

A production bottleneck prediction method based on incremental simple cyclic units and dual attention is adopted. By defining the comprehensive capabilities of the work station, a time series related data set is constructed, a dual-layer attention mechanism is used for feature extraction and model construction, and a sliding time window and Concept drift detection combines the sample value forgetting mechanism and transfer learning ideas to update the model to ensure model adaptability and timeliness.

Benefits of technology

It effectively improves the accuracy of production bottleneck prediction and the applicability of the model, ensures the timeliness and accuracy of workshop production decisions, and improves the intelligent production level of the manufacturing workshop.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114154820B_ABST
    Figure CN114154820B_ABST
Patent Text Reader

Abstract

The present invention discloses a production bottleneck prediction method based on incremental simple recurrent unit and dual attention, which redefines and quantifies the production bottleneck; adopts a simple recurrent unit network based on a dual-layer attention mechanism to extract features and complete the construction of a bottleneck prediction source model; triggers incremental update of source model parameters with the help of a sliding time window and a fast Hoefding concept detection method; selects the prediction model and appropriate newly added manufacturing data that are most suitable for the current data distribution in the model library, and sets different value weights for the data samples, and realizes incremental update of the prediction model through model-based transfer learning, and adopts an elimination mechanism to update the model library to ensure the timeliness of the model library. The present invention solves the problems of inaccurate bottleneck quantification in discrete manufacturing workshops, low accuracy of production bottleneck prediction models, and decreased fitness over time, inputs real-time manufacturing data into an incremental bottleneck prediction model, realizes online and accurate prediction of production bottlenecks, and provides a basis for triggering production decisions and evaluating the execution of production plans.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a production bottleneck prediction method, in particular to a production bottleneck prediction method based on incremental simple cycle unit and dual attention. Background Art

[0002] Faced with diverse customer demands and fierce market competition, manufacturing companies have put forward higher requirements for improving production efficiency, accelerating production rhythm and strengthening workshop management. Production bottleneck refers to the production unit that most seriously restricts the normal production of the workshop. Effectively identifying and predicting workshop production bottlenecks helps to monitor the actual production operation of the workshop, trigger production decisions in time and provide a reasonable basis for the formulation of decision-making plans, thereby improving workshop production efficiency and ensuring that production orders are delivered on time.

[0003] In complex discrete manufacturing workshops, the production process consists of a series of discontinuous production processes, which is more complex than serial production lines. Existing bottleneck quantification methods such as machine utilization, machine turning point, and machine active time are mostly applied to serial production lines, which are not enough to describe the real bottleneck situation in discrete manufacturing workshops. In traditional bottleneck prediction analysis, most of them use time series prediction methods, but do not consider the different effects of various features and states on the prediction target. As time goes by, the applicability of the prediction model continues to decline. Previous research methods have not involved the study of model timeliness.

[0004] In view of this, the present invention designs a production bottleneck prediction method based on incremental simple cyclic unit and dual attention mechanism which can be used by workshop production managers. It is of great significance for timely triggering production decisions, improving workshop production execution capabilities, and ensuring on-time delivery of orders. Summary of the invention

[0005] Purpose of the invention: The purpose of the present invention is to address the problems of low efficiency in converting production data into knowledge, untimely triggering of dynamic decisions, insufficient accuracy in production bottleneck prediction, and so on. A production bottleneck prediction method based on incremental simple cyclic units and dual attention is proposed.

[0006] Technical solution: The production bottleneck prediction method based on incremental simple cycle unit and dual attention described in the present invention comprises the following steps:

[0007] (1) The comprehensive capacity of a workstation is defined as the sum of the material supply capacity of the upstream workstation and the material demand capacity of the downstream workstation. The comprehensive capacity is used to quantify the degree of production bottleneck of each workstation in the discrete manufacturing workshop.

[0008] (2) Using work-in-process status information, machine tool status information, production task composition, and bottleneck status of each workstation as candidate features, a time series correlation dataset suitable for production bottleneck prediction is constructed;

[0009] (3) A simple recurrent unit network with a two-layer attention mechanism is used for feature extraction, and then several fully connected layers are connected to mine bottleneck knowledge in historical data to complete the construction of the bottleneck prediction source model;

[0010] (4) Use sliding time windows and the fast Hoefding concept drift detection method to detect concept drift in the data and trigger incremental updates of the source model in a timely manner;

[0011] (5) Select a data set with a suitable time window and use the sample value forgetting mechanism to assign different value weights to the samples, fully explore the bottleneck knowledge contained in the new data, and make the model better adapt to the new data distribution;

[0012] (6) Based on the data set selected in step (5) and the set value weights, the idea of ​​model-based transfer learning is adopted, and a competitive mechanism is used to select the source model for parameter updating from the model library. The source model parameters are then incrementally updated to obtain the latest target prediction model. An elimination mechanism is used to determine whether the source prediction model is outdated, and the prediction model library is updated based on this.

[0013] Furthermore, the implementation process of step (1) is as follows:

[0014] In order to cope with the different characteristics of manufacturing workshops and the different emphasis of different managers on the ability to respond to the material supply of upstream stations and the ability to respond to the material demand of downstream stations, a coordination factor is introduced to comprehensively and flexibly characterize the production bottleneck of discrete manufacturing workshops, which is specifically expressed as follows:

[0015]

[0016] in, It reflects the material supply capability of this station in response to the upstream station. It reflects the ability of this workstation to respond to the material demand of the downstream workstation. W represents the waiting time of the work-in-progress in the buffer area. w represents the waiting time of the work-in-progress in the buffer area of ​​other workstations after being processed by this workstation. α is the coordination factor.

[0017] Furthermore, the data set described in step (2) includes the following features:

[0018] Work-in-progress status information: the type of work-in-progress in the buffer and its waiting time, the type of work-in-progress in the buffer and its waiting time, the type of work-in-progress in processing and its processing time;

[0019] Machine tool status information: machine tool status, load, utilization, last fault type, and continuous processing time;

[0020] Production task composition: total production task composition, next production batch task composition, next production time interval;

[0021] Bottleneck value at historical moment: each workstation’s ability to respond to the material supply of upstream workstations and the ability to respond to the material demand of downstream workstations.

[0022] Furthermore, the implementation process of step (3) is as follows:

[0023] Since the input features and the states at different times have different influences on the prediction target, a fully connected layer is constructed to obtain the important factors of each feature, and the feature weights are multiplied by the features to make each feature play a different role in bottleneck prediction:

[0024] FW t =n*softmax(W f X t +b f )

[0025] Among them, FW represents the feature weight matrix, W f represents the connection weight, X t represents the data obtained after the time series samples at time t are averaged and pooled, b f represents bias, n represents the number of samples;

[0026] The state attention mechanism is used to fuse multiple outputs of simple recurrent units, fully explore the impact of each state information on the prediction target, and improve the accuracy of the prediction:

[0027] SW=softmax(H t T H t ,H t T H t-1 ,…,H t T H t-e )

[0028] Among them, SW represents the state weight matrix, H t It represents the information obtained after the state data at time t is extracted through simple cyclic unit features; finally, the constructed bottleneck prediction source model is added to the model library to provide a basis for subsequent model updates.

[0029] Furthermore, the implementation process of step (4) is as follows:

[0030] Set a fixed sliding time window length, calculate the mean absolute error between the source model prediction value and the true value within this time window, and calculate the concept drift threshold with the help of the Hoefding inequality:

[0031]

[0032] Among them, εd is the concept drift detection threshold, a i is the maximum prediction error of the sample block in the current time window, b i is the minimum prediction error of the sample block in the current time window, δ is the set confidence level, and n is the time window size; if the difference between the prediction error of the sample block in this time window and the minimum prediction error of the sample block in the historical time window is greater than the preset threshold, it is judged that the manufacturing data in this time window has undergone concept drift, indicating that the source prediction model cannot fit the distribution law of the current data, and it is urgent to trigger the incremental update of the model parameters to improve the fitness of the model.

[0033] Furthermore, the implementation process of step (5) is as follows:

[0034] The manufacturing data of the current time window and the past TL time windows are selected to update the source prediction model. When the model training converges, if the accuracy of the test sample in the current time window still does not meet the requirements, it means that the amount of data under the current distribution law is small, and there is no need to support the prediction model to explore its internal laws. It is necessary to wait for the manufacturing data of a time window and retrain the model until the test accuracy reaches the preset standard. At the same time, the application value of manufacturing data in different time windows is different. The sample forgetting factor DW is introduced to set the sample value weight, that is, for the manufacturing data in the previous time windows, its value loses DW times for each previous time window.

[0035] Furthermore, the step (6) is implemented as follows:

[0036] Taking the manufacturing data set selected in step (5) as input, the source model with the highest prediction accuracy is selected from the model library. If the prediction accuracy does not drift with the minimum prediction error of the historical time window sample block, the source model is used to predict the subsequent samples. Otherwise, the model-based transfer learning idea is adopted, and the sample value weight set in step (5) is introduced into the loss function. The selected source model parameters are iteratively updated through the Adam optimizer to obtain the target model that adapts to the current distribution. The distribution law of the current time window data block is fully explored, the comprehensive capacity of each workstation at a certain moment is accurately predicted, and the bottleneck unit of the workshop production process is determined; the target model is placed in the model library, and the difference between the prediction error of the selected source model for this time window data block and the minimum prediction error of this model for the historical time window data block is calculated. If no concept drift occurs, it means that the source model is outdated, and the source model is eliminated.

[0037] Beneficial effects: Compared with the prior art, the present invention has the following beneficial effects: 1. According to the characteristics of discrete manufacturing workshops and in combination with the relationship between supply and demand, the present invention redefines and quantifies the production bottleneck, comprehensively and effectively describes the manufacturing unit that most seriously restricts the normal production of the workshop, and provides a reliable basis for workshop performance analysis; 2. Compared with the existing methods, the present invention introduces feature attention mechanism and state attention mechanism in the simple recurrent unit network, which effectively improves the accuracy of the production bottleneck prediction model; 3. The applicability of the prediction model will decrease with the passage of time. The present invention adopts a concept detection method to trigger model update, selects appropriate data and sets sample value weights to support model update, uses a competition mechanism to select source models, implements model update based on the idea of ​​transfer learning, and adopts an elimination mechanism to update the model library, so as to ensure that the prediction model still has high prediction accuracy for the current data sample and the timeliness of the model library; 4. The present invention provides a basis for discrete manufacturing workshop status monitoring, performance analysis, and intelligent decision-making, which helps to improve the level of intelligent production in manufacturing workshops. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 is a flow chart of the present invention;

[0039] Figure 2 It is a schematic diagram of the incremental update process of the bottleneck prediction model based on transfer learning of the present invention. DETAILED DESCRIPTION

[0040] The present invention is further described in detail below with reference to the accompanying drawings.

[0041] The present invention proposes a production bottleneck prediction method based on incremental simple cycle units and dual attention. The manufacturing station is analogized to the middleman in the supply chain. It should respond to the material supply of the upstream station and the material demand of the downstream station in a timely manner. Combining these two factors, the comprehensive ability of the station is defined to describe the bottleneck degree of this station; the dual attention mechanism is used to distinguish the importance of different features and different states to the prediction target; the sliding time window and fast Hofting concept drift technology are introduced to trigger the dynamic update of the model in time; the application value of the production data of the manufacturing workshop is different, and the appropriate new data is selected and the sample weight is set. Based on this, the source model that is most suitable for the current distribution is selected from the model library through a competition mechanism, and then the model-based transfer learning is used to incrementally update the model parameters to ensure that the prediction model can accurately mine the knowledge contained in the current manufacturing data and enable the prediction model to always maintain a high prediction accuracy. The model library is updated through an elimination mechanism so that the prediction models in the model library always maintain a high applicability. Figure 1 As shown, the specific steps include:

[0042] Step 1: Define the comprehensive capacity of a workstation as the sum of the material supply capacity of the upstream workstation and the material demand capacity of the downstream workstation, and use the size of the comprehensive capacity to quantify the degree of production bottleneck of each workstation in the discrete manufacturing workshop.

[0043] In a discrete manufacturing workshop with many manufacturing links, discontinuous production processes and complex production processes, each workstation is regarded as an intermediate link in the entire production process. It is necessary to respond to the material supply of the upstream workstation in a timely manner and meet the material needs of the downstream workstation.

[0044] The comprehensive capacity of a workstation is the sum of the material supply capacity of the upstream workstation and the material demand capacity of the downstream workstation. In order to deal with the problem that different characteristics of manufacturing workshops and different managers have different emphasis on the two, a coordination factor is introduced to comprehensively and flexibly characterize the production bottleneck of discrete manufacturing workshops, which is specifically expressed as follows:

[0045]

[0046] in, It reflects the material supply capability of this station in response to the upstream station. It reflects the ability of this workstation to respond to the material demand of the downstream workstation. W represents the waiting time of the work-in-progress in the buffer area. w represents the waiting time of the work-in-progress in the buffer area of ​​other workstations after being processed by this workstation. α represents the coordination factor.

[0047] Step 2: Using the work-in-process status information, machine tool status information, production task composition and the bottleneck status of each workstation as candidate features, a time series correlation dataset suitable for production bottleneck prediction is constructed.

[0048] Work-in-progress status information WS: the type of work-in-progress in the buffer and its waiting time, the type of work-in-progress in the buffer and its waiting time, the type of work-in-progress in processing and its processing time.

[0049] Machine tool status information MS: machine tool status, load, utilization, last fault type, and continuous processing time

[0050] Production task composition PS: total production task composition, next production batch task composition, next production time interval

[0051] Bottleneck value IC at historical moments: each workstation’s ability to respond to the material supply of upstream workstations and its ability to respond to the material demand of downstream workstations.

[0052] According to the input characteristics of the simple recurrent unit, each training sample consists of data from e+1 moments, where the time interval difference between each data is △t. The specific representation is as follows:

[0053]

[0054] Among them, idata t represents the input sample at time t, i represents the workstation number, N represents the number of workstations, e represents the maximum time interval from this moment to the past, △t represents the set time interval, and the label of this sample is the bottleneck value of each workstation at time t+△T.

[0055] Step 3: Use the feature attention mechanism to weight the input features, and then input them into a simple recurrent unit to complete the temporal feature extraction. Introduce the state attention mechanism to evaluate the importance of the extracted state features, integrate the state features and input them into several layers of fully connected layers to obtain the production bottleneck prediction source model, and put it into the model library to achieve accurate prediction of production bottlenecks and form an initial model library.

[0056] The candidate feature set is input into a fully connected layer network, and after Softmax transformation, it is amplified n times to obtain the feature weight. The weight is multiplied by the corresponding feature to realize the feature attention mechanism and give full play to the role of important features. With the weighted features as input, a simple recurrent unit is constructed to mine the hidden time series information in the data, and the state attention mechanism is used to fuse the state information, which is input into several layers of fully connected layers. The gradient loss is calculated with the help of mean square error and L2 regularization to achieve accurate prediction of production bottlenecks. At the same time, the obtained prediction model is placed in the model library to form an initial model library.

[0057] Since the input features and the states at different times have different influences on the prediction target, a fully connected layer is constructed to obtain the important factors of each feature, and the feature weights and features are multiplied to make each feature play a different role in bottleneck prediction. The specific expression is as follows:

[0058] FW t =n*softmax(W f X t +b f )

[0059] Among them, FW represents the feature weight matrix, W f represents the connection weight, b f Indicates bias, X t represents the data obtained by averaging the features of the time series samples at time t, and n represents the number of samples. Similarly, the state attention mechanism is used to fuse multiple outputs of simple recurrent units to fully explore the impact of each state information on the prediction target and improve the accuracy of the prediction. The specific expression is as follows:

[0060] SW=softmax(H t T H t ,H t T H t-1,…,H t T H t-e )

[0061] Among them, SW represents the state weight matrix, H t It represents the information obtained after the state data at time t is extracted by simple cycle unit features. Finally, the trained prediction model is added to the model library to provide a basis for subsequent model updates.

[0062] Step 4: Use the sliding time window and fast Hoeffding concept drift detection method to discover the concept drift phenomenon in the data and trigger the incremental update of the source model in time.

[0063] Set a fixed sliding time window length, calculate the mean absolute error between the source model prediction value and the true value within this time window, and calculate the concept drift threshold with the help of the Hoefding inequality:

[0064]

[0065] Among them, εd is the concept drift detection threshold, a i is the maximum prediction error of the sample block in the current time window, b i is the minimum prediction error of the sample block in the current time window, δ is the set confidence level, and n is the time window size; if the difference between the prediction error of the sample block in this time window and the minimum prediction error of the sample block in the historical time window is greater than the preset threshold, it is judged that the manufacturing data in this time window has undergone concept drift, indicating that the source prediction model cannot fit the distribution law of the current data, and it is urgent to trigger the incremental update of the model parameters to improve the fitness of the model.

[0066] Step 5: Select a data set with a suitable time window, and use the sample value forgetting mechanism to assign different value weights to the samples, fully explore the bottleneck knowledge contained in the new data, and make the model better adapt to the new data distribution.

[0067] Select the manufacturing data of the current time window and the past TL time windows to update the source prediction model. When the model training converges, if the accuracy of the test sample in the current time window still does not meet the requirements, it means that the amount of data under the current distribution law is small, and it is not necessary to support the prediction model to mine its internal laws. It is necessary to wait for the manufacturing data of a time window and retrain the model until the test accuracy reaches the preset standard. At the same time, the application value of manufacturing data in different time windows is different. The sample forgetting factor DW is introduced to set the sample value weight, that is, for the manufacturing data in the previous time window, its value loses DW times for each previous time window.

[0068] The prediction model needs to learn the new knowledge implied in the new data while retaining the old knowledge in the historical data. The current time window data block and the previous TL time window data blocks are selected to update the model parameters. The closer the manufacturing data is to the current time window, the higher its value. The forgetting factor (for example, 0.95) is introduced. For each previous time window, the data value decreases by 0.95 times. The sample weight DW is calculated. The specific representation is as follows:

[0069] DW i =0.95 i i∈{0,1,2,…TL}

[0070] If it is detected that the prediction error of the updated prediction model for the test sample in the current time window is equal to λ min If the difference is greater than the threshold, it means that the model applicability has not been effectively improved. In other words, there are too few samples used to fit the current data distribution law. It is necessary to wait for a time window to obtain more data samples under this distribution and update the prediction model again so that the prediction model still has a high applicability to the manufacturing data under the current distribution.

[0071] Step 6: Based on the data set selected in step (5) and the set value weights, the idea of ​​model-based transfer learning is adopted, and a competitive mechanism is used to select the source model for parameter update from the model library. The source model parameters are then incrementally updated to obtain the latest target prediction model. An elimination mechanism is used to determine whether the source prediction model is outdated, and the prediction model library is updated based on this.

[0072] Select the source model that best suits the current distribution from the source models. If the concept drift does not occur relative to the minimum prediction error of the historical time window data block, use this model as the target model. Otherwise, based on the manufacturing data and sample value weight DW selected in step (5), migrate the weights and biases of the first several layers of the selected source prediction model to the target prediction model. Use iLoss (as shown in the following formula) and Adam optimizer to update the network parameters to obtain a production bottleneck prediction model suitable for the current data distribution, as shown in the following formula: Figure 2 As shown:

[0073]

[0074] Among them, TN represents the number of samples, represents the actual value of sample j, represents the predicted value of sample j, γ represents the L2 regularization coefficient, and W represents the network parameters.

[0075] The obtained prediction model is placed in the model library, and the difference between the prediction error of the source prediction model in this time window and the historical minimum prediction error of the source model is used to determine whether concept drift occurs. If so, it means that the distribution of the data in this time window is inconsistent with the historical data used to train this model, and the source model should be retained. If not, it means that the distribution of the two types of data is consistent, the source model and the target model have the same function, and the prediction accuracy of this source model is low, so the source model should be eliminated. Using the candidate feature set at the current moment as input, the production bottleneck of the workshop at a certain moment in the future can be obtained.

Claims

1. A production bottleneck prediction method based on incremental simple recurrent units and dual attention, characterized in that: The following steps are involved: (1) The comprehensive capacity of a workstation is defined as the sum of the material supply capacity of the upstream workstation and the material demand capacity of the downstream workstation. The comprehensive capacity is used to quantify the degree of production bottleneck of each workstation in the discrete manufacturing workshop. (2) Using work-in-process status information, machine tool status information, production task composition, and bottleneck status of each workstation as candidate features, a time series correlation dataset suitable for production bottleneck prediction is constructed; (3) A simple recurrent unit network with a two-layer attention mechanism is used for feature extraction, and then several fully connected layers are connected to mine bottleneck knowledge in historical data to complete the construction of the bottleneck prediction source model; (4) Use sliding time windows and the fast Hoefding concept drift detection method to detect concept drift in the data and trigger incremental updates of the source model in a timely manner; (5) Select a data set with a suitable time window and use the sample value forgetting mechanism to assign different value weights to the samples, fully explore the bottleneck knowledge contained in the new data, and make the model better adapt to the new data distribution; (6) Based on the data set selected in step (5) and the set value weights, the idea of ​​model-based transfer learning is adopted, and a competition mechanism is used to select a source model for parameter update from the model library. Then, the source model parameters are incrementally updated to obtain the latest target prediction model. An elimination mechanism is used to determine whether the source prediction model is outdated, and the prediction model library is updated based on this. The implementation process of step (3) is as follows: Since the input features and the states at different times have different influences on the prediction target, a fully connected layer is constructed to obtain the important factors of each feature, and the feature weights are multiplied by the features to make each feature play a different role in bottleneck prediction: FW t =n*softmax(W f X t +b f ) Among them, FW represents the feature weight matrix, W f represents the connection weight, X t represents the data obtained after the time series samples at time t are averaged and pooled, b f represents bias, n represents the number of samples; The state attention mechanism is used to fuse multiple outputs of simple recurrent units, fully explore the impact of each state information on the prediction target, and improve the accuracy of the prediction: SW=softmax(H t T H t ,H t T H t-1 ,…,H t T H t-e ) Among them, SW represents the state weight matrix, H t It represents the information obtained after the state data at time t is extracted by simple cycle unit features; finally, the constructed bottleneck prediction source model is added to the model library to provide a basis for subsequent model updates; The implementation process of step (4) is as follows: Set a fixed sliding time window length, calculate the mean absolute error between the source model prediction value and the true value within this time window, and calculate the concept drift threshold with the help of the Hoefding inequality: Among them, εd is the concept drift detection threshold, a i is the maximum prediction error of the sample block in the current time window, b i is the minimum prediction error of the sample block in the current time window, δ is the set confidence level, and n is the time window size; if the difference between the prediction error of the sample block in this time window and the minimum prediction error of the sample block in the historical time window is greater than the preset threshold, it is judged that the manufacturing data in this time window has undergone concept drift, indicating that the source prediction model cannot fit the distribution law of the current data, and it is urgent to trigger the incremental update of the model parameters to improve the fitness of the model; The implementation process of step (5) is as follows: The manufacturing data of the current time window and the past TL time windows are selected to update the source prediction model. When the model training converges, if the accuracy of the test sample in the current time window still does not meet the requirements, it means that the amount of data under the current distribution law is small, and there is no need to support the prediction model to explore its internal laws. It is necessary to wait for the manufacturing data of a time window and retrain the model until the test accuracy reaches the preset standard. At the same time, the application value of manufacturing data in different time windows is different. The sample forgetting factor DW is introduced to set the sample value weight, that is, for the manufacturing data in the previous time windows, its value loses DW times for each previous time window.

2. The production bottleneck prediction method based on incremental simple cycle unit and dual attention according to claim 1 is characterized in that: The implementation process of step (1) is as follows: In order to cope with the different characteristics of manufacturing workshops and the different emphasis of different managers on the ability to respond to the material supply of upstream stations and the ability to respond to the material demand of downstream stations, a coordination factor is introduced to comprehensively and flexibly characterize the production bottleneck of discrete manufacturing workshops, which is specifically expressed as follows: in, It reflects the material supply capability of this station in response to the upstream station. It reflects the ability of this workstation to respond to the material demand of the downstream workstation. W represents the waiting time of the work-in-progress in the buffer area. w represents the waiting time of the work-in-progress in the buffer area of ​​other workstations after being processed by this workstation. α is the coordination factor.

3. The production bottleneck prediction method based on incremental simple cycle unit and dual attention according to claim 1 is characterized in that: The data set described in step (2) includes the following features: Work-in-process status information: the type of work-in-process in the buffer and its waiting time, the type of work-in-process out of the buffer and its waiting time, and the type of work-in-process being processed and its processing time; Machine tool status information: machine tool status, load, utilization, last fault type and continuous processing time; Production task composition: total production task composition, next production batch task composition and next production time interval; Bottleneck value at historical moment: each workstation’s ability to respond to the material supply of upstream workstations and the ability to respond to the material demand of downstream workstations.

4. The production bottleneck prediction method based on incremental simple cycle unit and dual attention according to claim 1, characterized in that: The step (6) is implemented as follows: Taking the manufacturing data set selected in step (5) as input, the source model with the highest prediction accuracy is selected from the model library. If the prediction accuracy does not drift with the minimum prediction error of the historical time window sample block, the source model is used to predict the subsequent samples. Otherwise, the model-based transfer learning idea is adopted, and the sample value weight set in step (5) is introduced into the loss function. The selected source model parameters are iteratively updated through the Adam optimizer to obtain the target model that adapts to the current distribution. The distribution law of the current time window data block is fully explored, the comprehensive capacity of each workstation at a certain moment is accurately predicted, and the bottleneck unit of the workshop production process is determined; the target model is placed in the model library, and the difference between the prediction error of the selected source model for this time window data block and the minimum prediction error of this model for the historical time window data block is calculated. If no concept drift occurs, it means that the source model is outdated, and the source model is eliminated.