Advanced planning and scheduling method and system based on military intelligent equipment industry

By constructing an advanced planning and scheduling management platform in military manufacturing enterprises, the problems of low efficiency and unbalanced resource use of traditional production scheduling systems are solved, efficient production planning management and supply and demand balance are achieved, and the market competitiveness and market competitiveness of military industrial enterprises are improved. Operational efficiency.

CN114240168BActive Publication Date: 2024-10-29长沙智能制造研究总院有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111557699.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-17
Publication Date
2024-10-29
Estimated Expiration
2041-12-17

AI Technical Summary

Technical Problem

The traditional production scheduling system of existing military manufacturing enterprises has problems such as low efficiency, unreasonable planning, unbalanced resource use, and poor transparency. This results in large differences between the estimated production demand and actual demand, making it difficult to meet the market's strict requirements on delivery time and service quality. Demanding.

Method used

Adopt advanced planning and scheduling methods and systems based on the military intelligent equipment industry, and build a management platform to automatically manage production resources, combine product, order and resource information to group limited resource computer operations and optimize production to form high-quality production Plan, provide fully automatic/semi-automatic scheduling mode, support order removal, order insertion and plan adjustment.

Benefits of technology

It improves the speed and efficiency of production operations, shortens the cycle, increases production capacity, enhances market competitiveness, provides enterprises with the guarantee of refined production plans and material plans, and achieves a balance between supply and demand.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114240168B_ABST
    Figure CN114240168B_ABST
Patent Text Reader

Abstract

The present invention discloses a high-level planning and scheduling method and system based on the military intelligent equipment industry. By constructing a high-level planning and scheduling platform for the military intelligent equipment industry, the production resources of military enterprises are managed; receiving order production tasks, combining the current product information, order information and resource information of the military enterprise, verifying whether it is suitable for production scheduling under the current circumstances; if it is suitable for production scheduling under the current circumstances, further judging whether it is necessary to split the order; if it is not necessary to split the order, directly entering the production planning and scheduling link, according to the current capacity of the military enterprise, the formulated scheduling rules, the allocated materials, and the distributed resources, the computer operation grouping of limited resources, the computer planning and scheduling and the computer scheduling optimization operation are performed, and finally a high-quality production planning and scheduling result is formed. The present invention drives the entire production operation to operate faster and more efficiently; shortens the cycle, improves the production capacity; quickly responds to changes in the internal and external environment, and improves market competitiveness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of military intelligent equipment industry, and in particular discloses an advanced planning and scheduling method and system based on the military intelligent equipment industry. Background Art

[0002] In recent years, military manufacturing enterprises have faced various challenges. From the external environment alone, the market and the military have increasingly stringent quality control over the product development and production process, and have also put forward more stringent requirements on product delivery and service quality. In the context of market globalization, military-civilian integration, technology and industrial upgrading, the competition between domestic and foreign military enterprises, and between military enterprises and other state-owned and private enterprises around product technical and combat indicators, quality, cost, and delivery has further intensified. Under the same technical capabilities, product delivery has become an important factor restricting the success or failure of enterprises. With the increasing competition in the military market, the number of military products has increased, and customers have become more and more strict with the delivery of military products; how to use the least staff and the shortest time to make more types and more products has become a key issue for military enterprises to consider. Therefore, the efficiency and flexibility of product manufacturing scheduling have also become the focus of enterprises.

[0003] In order to adapt to the needs of rapid development, many military enterprises have or are implementing traditional production scheduling systems in terms of planning and production scheduling. However, the disconnect between product demand planning and production execution has led to increasingly prominent problems such as large discrepancies between military enterprises' capacity demand estimates and actual capacity, unreasonable demand and plan scheduling, and incoordination between planning and execution processes. Enterprises lack a systematic and complete platform to analyze and monitor such problems.

[0004] In addition, the traditional production scheduling system has the following problems:

[0005] 1) The traditional production scheduling system only records the production schedule and cannot perform automatic production scheduling. Enterprises need to schedule production manually and based on experience, which is time-consuming, laborious and inefficient.

[0006] 2) The traditional production scheduling system does not have advanced scheduling algorithms, and the scheduling process is unscientific, resulting in unreasonable process planning and poor executability.

[0007] 3) Traditional production scheduling systems do not have sufficient understanding of the use of production resources. After the production schedule is executed, it is easy for phenomena such as unbalanced production load and uneven equipment and personnel workload to occur.

[0008] 4) Traditional production scheduling systems have poor planning transparency and unpredictable delays often occur.

[0009] Therefore, the above-mentioned defects in the production scheduling system of existing military manufacturing enterprises are a technical problem that needs to be solved urgently. Summary of the invention

[0010] The present invention provides an advanced planning and scheduling method and system based on the military intelligent equipment industry, aiming to solve the above-mentioned defects in the existing production scheduling system.

[0011] One aspect of the present invention relates to an advanced planning and scheduling method based on the military intelligent equipment industry, comprising the following steps:

[0012] Build an advanced planning and scheduling platform for the military intelligent equipment industry to manage the production resources of military enterprises;

[0013] Receive production orders and combine the current product information, order information and resource information of military enterprises to determine whether production scheduling is suitable under the current circumstances;

[0014] If the current situation is suitable for production scheduling, further determine whether the order needs to be split;

[0015] If the order does not need to be split, it will directly enter the production planning and scheduling stage. According to the current production capacity, scheduling rules, allocated materials, and distribution resources of the military enterprise, the computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources will be carried out, and finally a high-quality production planning and scheduling result will be formed;

[0016] Determine whether the final production plan scheduling results need to be manually optimized;

[0017] If manual optimization is not required, the scheduling results can be directly visualized and pushed to various departments of the military-industrial enterprise for production arrangements.

[0018] Furthermore, the military intelligent equipment industry advanced planning and scheduling platform is provided with an advanced planning and scheduling model for the military intelligent equipment industry. The steps of constructing the advanced planning and scheduling platform for the military intelligent equipment industry include:

[0019] The advanced planning and scheduling model of the military intelligent equipment industry is composed of three parts: dimensions, capability elements and capability domains;

[0020] The advanced planning and scheduling model of the military intelligent equipment industry is developed from three dimensions: production materials management, advanced planning and scheduling, and scheduling visualization; among them, production materials management restricts the process and results of advanced planning and scheduling, and scheduling visualization is the display of advanced planning and scheduling results.

[0021] Furthermore, if the current situation is suitable for production scheduling, the step of further determining whether to split the order further includes:

[0022] If the order needs to be split, the order will be split based on the advanced planning and scheduling platform for the military intelligent equipment industry;

[0023] After the splitting operation is completed, the production planning and scheduling phase begins.

[0024] Furthermore, if the order does not need to be split, the production planning and scheduling phase is directly entered. According to the current capacity of the military enterprise, the established scheduling rules, the allocated materials, and the distribution resources, the computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources are performed. The steps of finally forming a high-quality production planning and scheduling result also include:

[0025] Determine whether there is an insertion order in the final production plan scheduling result;

[0026] If an order needs to be inserted, further determine whether rescheduling is required;

[0027] If rescheduling is required, the process will enter the production plan scheduling stage to reschedule the production plan; if rescheduling is not required, the process will enter the manual optimization scheduling stage to manually adjust and optimize the newly inserted orders.

[0028] Furthermore, if the order does not need to be split, the production planning and scheduling phase is directly entered. According to the current configured production capacity, established scheduling rules, allocated materials, and distributed resources of the military enterprise, computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources are performed to finally form a high-quality production planning and scheduling result. The production planning and scheduling result includes the planned quantity, which is calculated by the following formula:

[0029] JHS=XQS-KC-ZZP

[0030] Among them, JHS represents the planned quantity, XQS represents the required quantity, KC represents the total inventory quantity, and ZZP represents the work-in-progress quantity;

[0031] The production planning and scheduling results include the latest possible start time of the backward plan, which is calculated by the following formula:

[0032] ZCSJ=WCRQ-(ZBSJ+YXSJ+HCSJ)

[0033] Among them, ZCSJ represents the latest possible start time, WCRQ represents the completion date, ZBSJ represents the preparation time; YXSJ represents the running time, and HCSJ represents the conventional buffer conservative time;

[0034] The production plan scheduling results include the earliest possible start time of the positive schedule, which is calculated by the following formula:

[0035] ZZSJ=Max(KSRQ,KYRQ)

[0036] Among them, ZZSJ represents the earliest possible start time, KSRQ represents the service start date, and KYRQ represents the material availability date;

[0037] The production planning and scheduling results include the confirmed start time, which is calculated using the following formula:

[0038] JHSJ=Max(ZCSJ,ZZSJ)

[0039] Among them, JHSJ indicates the confirmed planned start time, ZZSJ indicates the earliest possible start time, and ZCSJ indicates the latest possible start time;

[0040] The production planning and scheduling results include the important ratio of the scheduling, which is calculated by the following formula:

[0041] ZYBL=(JQ-DQRQ) / GQ

[0042] Among them, ZYBL represents the important ratio of scheduling, JQ represents the delivery date, DQRQ represents the current date, and GQ represents the duration;

[0043] The production planning and scheduling results include the capacity that can be completed every day for work orders opened in parallel. The capacity that can be completed every day is calculated by the following formula:

[0044] MTCN=(KYRS*KYSJ*GCYL*CXXL / KDSL)*XLXS

[0045] Among them, MTCN represents the production capacity that can be completed every day, KYRS represents the number of available workers, KYSJ represents the available working time, GCYL represents the production efficiency of the factory, CXXL represents the work efficiency of the production line, KDSL represents the number of parallel orders, and XLXS represents the efficiency coefficient of the work order.

[0046] Another aspect of the present invention relates to an advanced planning and scheduling system based on the military intelligent equipment industry, comprising:

[0047] Construction module, used to build an advanced planning and scheduling platform for the military intelligent equipment industry and manage the production resources of military enterprises;

[0048] The verification module is used to receive order production tasks and determine whether the current situation is suitable for production scheduling based on the current product information, order information and resource information of the military enterprise;

[0049] The judgment module is used to further judge whether the order needs to be split if the current situation is suitable for production scheduling;

[0050] The first formation module is used to directly enter the production planning and scheduling link if there is no need to split the order. According to the current production capacity, formulated scheduling rules, allocated materials, and distributed resources of the military enterprise, computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources are carried out, and finally a high-quality production planning and scheduling result is formed;

[0051] The second forming module is used to determine whether the final production plan scheduling result needs to be manually optimized;

[0052] The visual operation module is used to directly perform visual operations on the scheduling results if manual optimization is not required, and push the visual operation results to various departments of military enterprises for production arrangements.

[0053] Furthermore, the building blocks include:

[0054] The constituent unit is used to form the advanced planning and scheduling model of the military intelligent equipment industry from three parts: dimensions, capability elements and capability domains;

[0055] The expansion unit is used to expand the advanced planning and scheduling model of the military intelligent equipment industry from three dimensions: production materials management, advanced planning and scheduling, and scheduling visualization; among them, production materials management restricts the process and results of advanced planning and scheduling, and scheduling visualization is the display of advanced planning and scheduling results.

[0056] Furthermore, the advanced planning and scheduling system based on the military intelligent equipment industry also includes:

[0057] The split operation module is used to split the order based on the advanced planning and scheduling platform of the military intelligent equipment industry if the order needs to be split;

[0058] The entry module is used to enter the production planning and scheduling phase after the splitting operation is completed.

[0059] Furthermore, the advanced planning and scheduling system based on the military intelligent equipment industry also includes:

[0060] The first determination module is used to determine whether there is an insertion order in the final production plan scheduling result;

[0061] The second determination module is used to further determine whether rescheduling is required if an order needs to be inserted;

[0062] The scheduling operation module is used to enter the production plan scheduling stage to reschedule the production plan if rescheduling is required; if rescheduling is not required, it enters the manual optimization scheduling stage to manually adjust and optimize the newly inserted orders.

[0063] Furthermore, the production planning and scheduling results include the planned quantity, which is calculated by the following formula:

[0064] JHS=XQS-KC-ZZP

[0065] Among them, JHS represents the planned quantity, XQS represents the required quantity, KC represents the total inventory quantity, and ZZP represents the work-in-progress quantity;

[0066] The production planning and scheduling results include the latest possible start time of the backward plan, which is calculated by the following formula:

[0067] ZCSJ=WCRQ-(ZBSJ+YXSJ+HCSJ)

[0068] Among them, ZCSJ represents the latest possible start time, WCRQ represents the completion date, ZBSJ represents the preparation time; YXSJ represents the running time, and HCSJ represents the conventional buffer conservative time;

[0069] The production plan scheduling results include the earliest possible start time of the positive schedule, which is calculated by the following formula:

[0070] ZZSJ=Max(KSRQ,KYRQ)

[0071] Among them, ZZSJ represents the earliest possible start time, KSRQ represents the service start date, and KYRQ represents the material availability date;

[0072] The production planning and scheduling results include the confirmed start time, which is calculated using the following formula:

[0073] JHSJ=Max(ZCSJ,ZZSJ)

[0074] Among them, JHSJ indicates the confirmed planned start time, ZZSJ indicates the earliest possible start time, and ZCSJ indicates the latest possible start time;

[0075] The production planning and scheduling results include the important ratio of the scheduling, which is calculated by the following formula:

[0076] ZYBL=(JQ-DQRQ) / GQ

[0077] Among them, ZYBL represents the important ratio of scheduling, JQ represents the delivery date, DQRQ represents the current date, and GQ represents the duration;

[0078] The production planning and scheduling results include the capacity that can be completed every day for work orders opened in parallel. The capacity that can be completed every day is calculated by the following formula:

[0079] MTCN=(KYRS*KYSJ*GCYL*CXXL / KDSL)*XLXS

[0080] Among them, MTCN represents the production capacity that can be completed every day, KYRS represents the number of available workers, KYSJ represents the available working time, GCYL represents the production efficiency of the factory, CXXL represents the work efficiency of the production line, KDSL represents the number of parallel orders, and XLXS represents the efficiency coefficient of the work order.

[0081] The beneficial effects achieved by the present invention are:

[0082] The present invention provides an advanced planning and scheduling method and system based on the military intelligent equipment industry. By constructing an advanced planning and scheduling platform for the military intelligent equipment industry, the production resources of military enterprises are managed; receiving order production tasks, combining the current product information, order information and resource information of the military enterprise, verifying whether the current situation is suitable for production scheduling; if the current situation is suitable for production scheduling, further judging whether it is necessary to split the order; if it is not necessary to split the order, directly entering the production planning and scheduling link, according to the current production capacity, the formulated scheduling rules, the allocated materials, and the distributed resources of the military enterprise, the computer operation grouping, computer planning and scheduling and computer scheduling optimization operations of limited resources are performed, and finally a high-quality production planning and scheduling result is formed; it is judged whether the final production planning and scheduling result needs to be manually optimized; if it does not need to be manually optimized, the scheduling result is directly visualized, and the visualized operation result is pushed to various departments of the military enterprise for production arrangement. The advanced planning and scheduling method and system based on the military intelligent equipment industry provided by the present invention requires military enterprises to establish APS (Advanced Planning and Scheduling, advanced planning and scheduling) planning as the core of the military enterprise planning and scheduling management platform, in conjunction with the traditional scheduling system, provides solid application functions to meet the company's intelligent command planning and scheduling center; drive the entire production operation to operate faster and more efficiently; shorten the cycle, improve production capacity; quickly respond to changes in the internal and external environment, improve market competitiveness, and lay a good foundation for the improvement of the company's overall profitability and the transformation of the overall operating model; based on the military intelligent equipment industry advanced planning and scheduling platform is suitable for enterprises in the military intelligent manufacturing industry. An advanced planning and scheduling tool platform based on supply chain management and constraint theory, the platform can be based on The production goals of military enterprises are combined with the overall supply and demand conditions of the enterprise to provide the enterprise with supply plans and demand plans. The plans provided can make the planning results more reasonable and executable, so that the enterprise can truly achieve the goal of supply and demand balance; the platform provides military enterprises with fully automatic / semi-automatic scheduling modes. Enterprises can easily schedule through the platform, and can also make timely changes and adjustments to the schedule according to actual conditions, and can better respond to the impact of problems such as inserting orders, changing orders, overdue orders, delivery date responses, personnel changes and unexpected equipment failures on the plan; it provides the most basic and core guarantee for enterprises to realize refined production planning and material planning. BRIEF DESCRIPTION OF THE DRAWINGS

[0083] Figure 1 A flowchart of the first embodiment of the advanced planning and scheduling method for military intelligent equipment industry provided by the present invention;

[0084] Figure 2 for Figure 1The military intelligent equipment industry advanced planning and scheduling platform shown in the figure is provided with a military intelligent equipment industry advanced planning and scheduling model, and a specific flow chart of an embodiment of step 1 of constructing the military intelligent equipment industry advanced planning and scheduling platform;

[0085] Figure 3 A flow chart of a second embodiment of the advanced planning and scheduling method for military intelligent equipment industry provided by the present invention;

[0086] Figure 4 A flowchart of a third embodiment of the advanced planning and scheduling method for military intelligent equipment industry provided by the present invention;

[0087] Figure 5 A functional block diagram of the first embodiment of the advanced planning and scheduling system for military intelligent equipment industry provided by the present invention;

[0088] Figure 6 for Figure 5 A functional module diagram of a building block 1 embodiment shown in FIG.

[0089] Figure 7 This is a functional block diagram of the second embodiment of the advanced planning and scheduling system for military intelligent equipment industry provided by the present invention;

[0090] Figure 8 This is a functional block diagram of the third embodiment of the advanced planning and scheduling system for the military intelligent equipment industry provided by the present invention.

[0091] Description of Figure Numbers:

[0092] 10. Construction module; 20. Verification module; 30. Judgment module; 40. First formation module; 50. Second formation module; 60. Visualization operation module; 11. Composition unit; 12. Expansion unit; 71. Split operation module; 72. Entry module; 81. First judgment module; 82. Second judgment module; 83. Scheduling operation module. DETAILED DESCRIPTION

[0093] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0094] like Figure 1 and Figure 2 As shown, the first embodiment of the present invention proposes an advanced planning and scheduling method based on the military intelligent equipment industry, comprising the following steps:

[0095] Step S100: construct an advanced planning and scheduling platform for the military intelligent equipment industry to manage the production resources of military enterprises.

[0096] Build an advanced planning and scheduling platform for the military intelligent equipment industry, and manage the products, processes, orders, inventory, equipment and other related production resources of military enterprises through the constructed advanced planning and scheduling platform for the military intelligent equipment industry.

[0097] Step S200: Receive the order production task, and determine whether it is suitable for production scheduling under the current circumstances based on the current product information, order information and resource information of the military enterprise.

[0098] Sign for order production tasks, receive order production task books, receive order production tasks, and combine the current product information, order information, and resource information of military enterprises to determine whether the current situation is suitable for production scheduling. The sources of order production task books include external imports, users adding on the platform, and MES / ERP and other information systems. Product information includes product status. Order information includes order production status. Resource information includes resource usage.

[0099] Step S300: If the current situation is suitable for production scheduling, further determine whether it is necessary to split the order.

[0100] Determine whether the production scheduling conditions are met. If not, the production scheduling task will be temporarily shelved and managed by the advanced planning and scheduling platform based on the military intelligent equipment industry, waiting for the right opportunity to schedule production. If the current situation is suitable for scheduling, further determine whether the order needs to be split.

[0101] Step S400: If the order does not need to be split, directly enter the production planning and scheduling stage. According to the current production capacity, established scheduling rules, allocated materials, and distributed resources of the military enterprise, perform computer operation grouping, computer planning and production scheduling, and computer scheduling optimization operations for limited resources, and finally form a high-quality production planning and scheduling result.

[0102] Based on the signed tasks and the current production status, determine whether the order needs to be split. If it needs to be split, the order will be split based on the advanced planning and scheduling platform of the military intelligent equipment industry, and then enter the production planning and scheduling stage; if it does not need to be split, it will directly enter the production planning and scheduling stage.

[0103] The production planning and scheduling results include the planned quantity, which is calculated using the following formula:

[0104] JHS=XQS-KC-ZZP (1)

[0105] In formula (1), JHS represents the planned quantity, XQS represents the required quantity, KC represents the total inventory quantity, and ZZP represents the work-in-progress quantity;

[0106] The production planning and scheduling results include the latest possible start time of the backward plan, which is calculated by the following formula:

[0107] ZCSJ=WCRQ-(ZBSJ+YXSJ+HCSJ) (2)

[0108] In formula (2), ZCSJ represents the latest possible start time, WCRQ represents the completion date, ZBSJ represents the preparation time, YXSJ represents the running time, and HCSJ represents the conventional buffer conservative time.

[0109] The production plan scheduling results include the earliest possible start time of the positive schedule, which is calculated by the following formula:

[0110] ZZSJ=Max(KSRQ,KYRQ) (3)

[0111] In formula (3), ZZSJ represents the earliest possible start time, KSRQ represents the service start date, and KYRQ represents the material availability date;

[0112] The production planning and scheduling results include the confirmed start time, which is calculated using the following formula:

[0113] JHSJ=Max(ZCSJ,ZZSJ) (4)

[0114] In formula (4), JHSJ represents the confirmed planned start time, ZZSJ represents the earliest possible start time, and ZCSJ represents the latest possible start time;

[0115] The production planning and scheduling results include the important ratio of the scheduling, which is calculated by the following formula:

[0116] ZYBL=(JQ-DQRQ) / GQ (5)

[0117] In formula (5), ZYBL represents the important ratio of scheduling, JQ represents the delivery date, DQRQ represents the current date, and GQ represents the construction period;

[0118] The production planning and scheduling results include the capacity that can be completed every day for work orders opened in parallel. The capacity that can be completed every day is calculated by the following formula:

[0119] MTCN=(KYRS*KYSJ*GCYL*CXXL / KDSL)*XLXS (6)

[0120] In formula (6), MTCN represents the capacity that can be completed every day, KYRS represents the number of available workers, KYSJ represents the available working time, GCYL represents the production efficiency of the factory, CXXL represents the work efficiency of the production line, KDSL represents the number of parallel orders, and XLXS represents the efficiency coefficient of the work order.

[0121] Step S500: determine whether the final production plan scheduling result needs to be manually optimized.

[0122] Display the current schedule based on the scheduling results to determine whether the final production plan scheduling results need to be manually optimized.

[0123] Step S600: If manual optimization is not required, the scheduling results are directly visualized and the visualization results are pushed to various departments of the military enterprise for production scheduling.

[0124] Determine whether manual optimization is needed for this scheduling result. If manual optimization is needed, perform manual intervention and perform minor optimization operations on the scheduling result. If manual optimization is not needed, you can directly generate visual results such as job grouping results, workstation / work order dispatching, workstation process / order process / resource Gantt chart for the scheduling result, and push them to various departments of the enterprise for production arrangement.

[0125] Compared with the prior art, the advanced planning and scheduling method based on the military intelligent equipment industry provided in this embodiment manages the production resources of military enterprises by constructing an advanced planning and scheduling platform for the military intelligent equipment industry; receives order production tasks, and combines the current product information, order information and resource information of the military enterprise to determine whether the current situation is suitable for production scheduling; if the current situation is suitable for production scheduling, further determines whether it is necessary to split the order; if it is not necessary to split the order, directly enters the production planning and scheduling link, and performs computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations on limited resources according to the current production capacity, formulated scheduling rules, allocated materials, and distributed resources of the military enterprise, and finally forms a high-quality production planning and scheduling result; determines whether the final production planning and scheduling result needs to be manually optimized; if manual optimization is not required, directly visualizes the scheduling result, and pushes the visualized operation result to various departments of the military enterprise for production arrangement. The advanced planning and scheduling method based on the military intelligent equipment industry provided in this embodiment requires military enterprises to establish a military enterprise planning and scheduling management platform with APS planning as the core, and cooperate with the traditional production scheduling system to provide solid application functions to meet the needs of the enterprise's intelligent command planning and scheduling center; drive the entire production operation to operate faster and more efficiently; shorten the cycle and increase production capacity; quickly respond to changes in the internal and external environment, improve market competitiveness, and lay a good foundation for improving the overall profitability of the enterprise and transforming the overall operation model; the advanced planning and scheduling platform based on the military intelligent equipment industry is an advanced planning and scheduling tool based on supply chain management and constraint theory suitable for enterprises in the military intelligent manufacturing industry. The platform can provide supply and demand plans for military enterprises based on their production goals and combined with their overall supply and demand conditions. The plans provided can make planning results more reasonable and executable, so that enterprises can truly achieve the goal of balancing supply and demand. The platform provides military enterprises with fully automatic / semi-automatic scheduling modes. Enterprises can easily schedule through the platform, and can also make timely changes and adjustments to the schedule based on actual conditions. It can better respond to the impact of problems such as inserting orders, changing orders, overdue orders, delivery date responses, personnel changes, and unexpected equipment failures on the plan; it provides the most basic and core guarantee for enterprises to achieve refined production planning and material planning.

[0126] Further, see Figure 2 , Figure 2 for Figure 1 The specific flow chart of step S100 of an embodiment is shown in FIG. 1 . In this embodiment, step S100 includes:

[0127] Step S110: The advanced planning and scheduling model for the military intelligent equipment industry is composed of three parts: dimensions, capability elements and capability domains.

[0128] The advanced planning and scheduling model based on the military intelligent equipment industry consists of three parts: dimensions, capability elements, and capability domains.

[0129] Step S120, develop the advanced planning and scheduling model of the military intelligent equipment industry from three dimensions: production materials management, advanced planning and scheduling, and scheduling visualization; among them, production materials management restricts the process and results of advanced planning and scheduling, and scheduling visualization is the display of advanced planning and scheduling results.

[0130] The dimensions include production materials management, advanced planning and scheduling, and scheduling visualization. Among them, production materials restrict the process and results of advanced planning and scheduling, while scheduling visualization is the display of advanced planning and scheduling results. The three are interdependent. Capability elements stipulate various aspects that restrict scheduling results, and capability domains stipulate various factors that restrict scheduling. Capability elements are composed of eight aspects: "product and process management + order and inventory management + resource management + planning parameter configuration + production planning and scheduling + scheduling results + scheduling optimization + visualization results", which are further decomposed into 32 capability domains. Product and process management includes three capability domains: product management, process management, manufacturing list management. Order and inventory management includes five capability domains: customer management, sales management, material management, order management, and inventory management. Resource management includes three capability domains: equipment resource management, workstation and personnel management, and shift management. Planning parameter configuration includes four capability domains: production capacity configuration, scheduling rules, material coordination, and resource distribution. Production planning and scheduling includes three capability domains: operation grouping, planning and scheduling, and scheduling optimization. Scheduling results include four capability domains: material input plan, order plan, workstation plan, and job grouping plan. Scheduling optimization includes four capability domains: distributed scheduling optimization, scheduling resource optimization, scheduling rule optimization, and artificial intelligence intervention. Visualization results include three capability domains: workstation process Gantt chart, order process Gantt chart, resource Gantt chart, workstation dispatching sheet, order dispatching sheet, and job grouping results.

[0131] Compared with the prior art, the advanced planning and scheduling method based on the military intelligent equipment industry provided in this embodiment is composed of three parts: dimensions, capability elements and capability domains to form an advanced planning and scheduling model for the military intelligent equipment industry; the advanced planning and scheduling model for the military intelligent equipment industry is developed from three dimensions: means of production management, advanced planning and scheduling, and scheduling visualization; among them, means of production management restricts the process and results of advanced planning and scheduling, and scheduling visualization is a display of the results of advanced planning and scheduling. The advanced planning and scheduling method based on the military intelligent equipment industry provided in this embodiment requires military enterprises to establish a military enterprise planning and scheduling management platform with APS planning as the core, and cooperate with traditional production scheduling systems to provide solid application functions to meet the needs of the enterprise's intelligent command planning and scheduling center; drive the entire production operation to operate faster and more efficiently; shorten the cycle and increase production capacity; quickly respond to changes in the internal and external environment, improve market competitiveness, and lay a good foundation for improving the overall profitability of the enterprise and transforming the overall operating model; the advanced planning and scheduling platform based on the military intelligent equipment industry is an advanced planning and scheduling tool based on supply chain management and constraint theory suitable for enterprises in the military intelligent manufacturing industry. The platform can provide supply and demand plans for military enterprises based on their production goals and combined with their overall supply and demand conditions. The plans provided can make planning results more reasonable and executable, so that enterprises can truly achieve the goal of balancing supply and demand. The platform provides military enterprises with fully automatic / semi-automatic scheduling modes. Enterprises can easily schedule through the platform, and can also make timely changes and adjustments to the schedule based on actual conditions. It can better respond to the impact of problems such as inserting orders, changing orders, overdue orders, delivery date responses, personnel changes, and unexpected equipment failures on the plan; it provides the most basic and core guarantee for enterprises to achieve refined production planning and material planning.

[0132] Preferably, see Figure 3 , Figure 3 The flowchart of the second embodiment of the advanced planning and scheduling method for the military intelligent equipment industry provided by the present invention is based on the first embodiment, and after step S300, it also includes:

[0133] Step S310: If the order needs to be split, the order is split based on the advanced planning and scheduling platform for the military intelligent equipment industry.

[0134] Based on the signed tasks and the current production status, determine whether the order needs to be split. If the order needs to be split, the order will be split based on the advanced planning and scheduling platform for the military intelligent equipment industry.

[0135] Step S320: After the splitting operation is completed, the production planning and scheduling phase is entered.

[0136] After the split operation is completed, the production planning and scheduling phase will be entered. Based on the advanced planning and scheduling platform of the military intelligent equipment industry, according to the current production capacity, scheduling rules, allocated materials, and distributed resources of the enterprise, computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources are carried out, and finally high-quality production planning and scheduling results are formed.

[0137] Compared with the prior art, the advanced planning and scheduling method based on the military intelligent equipment industry provided in this embodiment is composed of three parts: dimension, capability element and capability domain to form the advanced planning and scheduling model of the military intelligent equipment industry; the advanced planning and scheduling model of the military intelligent equipment industry is developed from three dimensions: production materials management, advanced planning and scheduling visualization; among them, production materials management restricts the process and results of advanced planning and scheduling, and scheduling visualization is the display of advanced planning and scheduling results. The advanced planning and scheduling method based on the military intelligent equipment industry provided in this embodiment requires military enterprises to establish a military enterprise planning and scheduling management platform with APS plan as the core, and cooperate with the traditional production scheduling system to provide solid application functions to meet the intelligent command planning and scheduling center of the enterprise; drive the entire production operation to operate faster and more efficiently; shorten the cycle and increase production capacity; quickly respond to changes in the internal and external environment, improve market competitiveness, and lay a good foundation for improving the overall profitability of the enterprise and transforming the overall operation model.

[0138] Further, see Figure 4 , Figure 4 The flowchart of the third embodiment of the advanced planning and scheduling method for the military intelligent equipment industry provided by the present invention is as follows. Based on the first embodiment, after step S400, the following steps are further included:

[0139] Step S410: Determine whether the final production plan scheduling result has any inserted orders.

[0140] Step S420: If an order needs to be inserted, further determine whether rescheduling is required.

[0141] Step S430: If rescheduling is required, the process enters the production plan scheduling stage to reschedule the production plan; if rescheduling is not required, the process enters the manual optimization scheduling stage to manually adjust and optimize the newly inserted order.

[0142] Compared with the prior art, the advanced planning and scheduling method based on the military intelligent equipment industry provided in this embodiment determines whether there is an inserted order in the final production plan scheduling result; if an inserted order is required, it further determines whether rescheduling is required; if rescheduling is required, it enters the production plan scheduling link to reschedule the production plan; if rescheduling is not required, it enters the manual optimization scheduling link to manually adjust and optimize the newly inserted order. The advanced planning and scheduling method based on the military intelligent equipment industry provided in this embodiment requires military enterprises to establish a military enterprise planning and scheduling management platform with APS planning as the core, and cooperate with the traditional production scheduling system to provide solid application functions to meet the needs of the enterprise's intelligent command planning and dispatching center; drive the entire production operation to operate faster and more efficiently; shorten the cycle and improve production capacity; quickly respond to changes in internal and external environments, improve market competitiveness, and lay a good foundation for improving the overall profitability of the enterprise and transforming the overall operating model; the platform provides military enterprises with fully automatic / semi-automatic scheduling modes, and enterprises can easily schedule through the platform, and can also make timely changes and adjustments to the schedule according to actual conditions, and can better respond to the impact of problems such as inserting orders, changing orders, overdue orders, delivery date responses, personnel changes and unexpected equipment failures on the plan; it provides the most basic and core guarantee for enterprises to achieve refined production planning and material planning.

[0143] like Figure 5 As shown, Figure 5 The functional block diagram of the first embodiment of the advanced planning and scheduling system based on the military intelligent equipment industry provided by the present invention, in this embodiment, the advanced planning and scheduling system based on the military intelligent equipment industry includes a construction module 10, a verification module 20, a judgment module 30, a first formation module 40, a second formation module 50 and a visual operation module 60, wherein the construction module 10 is used to construct an advanced planning and scheduling platform for the military intelligent equipment industry to manage the production resources of military enterprises; the verification module 20 is used to receive order production tasks, and combine the current product information, order information and resource information of the military enterprise to verify whether the current situation is suitable for production scheduling; the judgment module 30 is used to determine whether the current situation is suitable for production scheduling if the current situation is suitable for production scheduling. The first step is to determine whether it is necessary to split the order; the first forming module 40 is used to directly enter the production planning and scheduling link if it is not necessary to split the order, and perform computer operation grouping, computer planning and production scheduling, and computer scheduling optimization operations on limited resources according to the current production capacity, established scheduling rules, allocated materials, and distributed resources of the military enterprise, and finally form a high-quality production planning and scheduling result; the second forming module 50 is used to determine whether the final production planning and scheduling result needs to be manually optimized; the visualization operation module 60 is used to directly perform visualization operations on the scheduling results if it is not necessary to perform manual optimization, and push the visualization operation results to various departments of the military enterprise for production arrangements.

[0144] Construction module 10 constructs an advanced planning and scheduling platform for the military intelligent equipment industry, and manages the products, processes, orders, inventory, equipment and other related production resources of military enterprises through the constructed advanced planning and scheduling platform for the military intelligent equipment industry.

[0145] The verification module 20 signs for the order production task, receives the order production task book, receives the order production task, and verifies whether it is suitable for production scheduling under the current circumstances in combination with the current product information, order information and resource information of the military enterprise. The sources of the order production task book include external import, user addition on the platform, and push by information systems such as MES / ERP. Product information includes product status. Order information includes order production status. Resource information includes resource usage.

[0146] The judgment module 30 judges whether the production scheduling conditions are met. If it is not suitable for production scheduling, the production scheduling task is temporarily shelved and managed by the advanced planning and scheduling platform based on the military intelligent equipment industry, waiting for the right opportunity to schedule production. If the current situation is suitable for production scheduling, it is further judged whether it is necessary to split the order.

[0147] The first forming module 40 determines whether it is necessary to split the order based on the signed task and the current production status. If it is necessary to split the order, the order will be split based on the advanced planning and scheduling platform of the military intelligent equipment industry, and then enter the production planning and scheduling link; if it is not necessary to split the order, it will directly enter the production planning and scheduling link.

[0148] The production planning and scheduling results include the planned quantity, which is calculated using the following formula:

[0149] JHS=XQS-KC-ZZP (7)

[0150] In formula (7), JHS represents the planned quantity, XQS represents the required quantity, KC represents the total inventory quantity, and ZZP represents the work-in-progress quantity;

[0151] The production planning and scheduling results include the latest possible start time of the backward plan, which is calculated by the following formula:

[0152] ZCSJ=WCRQ-(ZBSJ+YXSJ+HCSJ) (8)

[0153] In formula (8), ZCSJ represents the latest possible start time, WCRQ represents the completion date, ZBSJ represents the preparation time; YXSJ represents the running time, and HCSJ represents the conventional buffer conservative time;

[0154] The production plan scheduling results include the earliest possible start time of the positive schedule, which is calculated by the following formula:

[0155] ZZSJ=Max(KSRQ,KYRQ) (9)

[0156] In formula (9), ZZSJ represents the earliest possible start time, KSRQ represents the service start date, and KYRQ represents the material availability date;

[0157] The production planning and scheduling results include the confirmed start time, which is calculated using the following formula:

[0158] JHSJ=Max(ZCSJ,ZZSJ) (10)

[0159] In formula (10), JHSJ represents the confirmed planned start time, ZZSJ represents the earliest possible start time, and ZCSJ represents the latest possible start time;

[0160] The production planning and scheduling results include the important ratio of the scheduling, which is calculated by the following formula:

[0161] ZYBL=(JQ-DQRQ) / GQ (11)

[0162] In formula (11), ZYBL represents the important ratio of scheduling, JQ represents the delivery date, DQRQ represents the current date, and GQ represents the construction period;

[0163] The production planning and scheduling results include the capacity that can be completed every day for work orders opened in parallel. The capacity that can be completed every day is calculated by the following formula:

[0164] MTCN=(KYRS*KYSJ*GCYL*CXXL / KDSL)*XLXS (12)

[0165] In formula (12), MTCN represents the capacity that can be completed per day, KYRS represents the number of available workers, KYSJ represents the available working time, GCYL represents the production efficiency of the factory, CXXL represents the work efficiency of the production line, KDSL represents the number of parallel orders, and XLXS represents the efficiency coefficient of the work order.

[0166] The second forming module 50 displays the current schedule according to the scheduling result, and determines whether the final production plan scheduling result needs to be manually optimized.

[0167] The visualization operation module 60 determines whether manual optimization is required for the current scheduling result. If manual optimization is required, manual intervention is performed to perform a small amount of optimization operations on the scheduling result. If manual optimization is not required, the scheduling result can be directly generated into a visualization result such as job grouping result, work station / work order dispatching order, work station process / order process / resource Gantt chart, etc., and pushed to various departments of the enterprise for production arrangement.

[0168] Compared with the prior art, the advanced planning and scheduling system based on the military intelligent equipment industry provided in this embodiment manages the production resources of military enterprises by constructing an advanced planning and scheduling platform for the military intelligent equipment industry; receives order production tasks, and combines the current product information, order information and resource information of the military enterprise to determine whether the current situation is suitable for production scheduling; if the current situation is suitable for production scheduling, further determines whether it is necessary to split the order; if it is not necessary to split the order, directly enters the production planning and scheduling link, and performs computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations on limited resources according to the current production capacity, formulated scheduling rules, allocated materials, and distributed resources of the military enterprise, and finally forms a high-quality production planning and scheduling result; determines whether the final production planning and scheduling result needs to be manually optimized; if manual optimization is not required, directly visualizes the scheduling result, and pushes the visualized operation result to various departments of the military enterprise for production arrangement. The advanced planning and scheduling system based on the military intelligent equipment industry provided in this embodiment requires military enterprises to establish a military enterprise planning and scheduling management platform with APS planning as the core, and cooperate with the traditional production scheduling system to provide solid application functions to meet the needs of the enterprise's intelligent command planning and scheduling center; drive the entire production operation to operate faster and more efficiently; shorten the cycle and increase production capacity; quickly respond to changes in the internal and external environment, improve market competitiveness, and lay a good foundation for improving the overall profitability of the enterprise and transforming the overall operating model; the advanced planning and scheduling platform based on the military intelligent equipment industry is an advanced planning and scheduling tool based on supply chain management and constraint theory suitable for enterprises in the military intelligent manufacturing industry. The platform can provide supply and demand plans for military enterprises based on their production goals and combined with their overall supply and demand conditions. The plans provided can make planning results more reasonable and executable, so that enterprises can truly achieve the goal of balancing supply and demand. The platform provides military enterprises with fully automatic / semi-automatic scheduling modes. Enterprises can easily schedule through the platform, and can also make timely changes and adjustments to the schedule based on actual conditions. It can better respond to the impact of problems such as inserting orders, changing orders, overdue orders, delivery date responses, personnel changes, and unexpected equipment failures on the plan; it provides the most basic and core guarantee for enterprises to achieve refined production planning and material planning.

[0169] Further, see Figure 6 , Figure 6 for Figure 5 The functional module diagram of the first embodiment of the building module shown in the figure, in this embodiment, the building module 10 includes a constituent unit 11 and an expansion unit 12, wherein the constituent unit 11 is used to constitute the advanced planning and scheduling model of the military intelligent equipment industry from three parts: dimensions, capability elements and capability domains; the expansion unit 12 is used to expand the advanced planning and scheduling model of the military intelligent equipment industry from three dimensions of production materials management, advanced planning and scheduling visualization; wherein, production materials management restricts the process and results of advanced planning and scheduling, and scheduling visualization is a display of the results of advanced planning and scheduling.

[0170] The advanced planning and scheduling model based on the military intelligent equipment industry consists of three parts: dimensions, capability elements, and capability domains.

[0171] The dimensions include production materials management, advanced planning and scheduling, and scheduling visualization. Among them, production materials restrict the process and results of advanced planning and scheduling, while scheduling visualization is the display of advanced planning and scheduling results. The three are interdependent. Capability elements stipulate various aspects that restrict scheduling results, and capability domains stipulate various factors that restrict scheduling. Capability elements are composed of eight aspects: "product and process management + order and inventory management + resource management + planning parameter configuration + production planning and scheduling + scheduling results + scheduling optimization + visualization results", which are further decomposed into 32 capability domains. Product and process management includes three capability domains: product management, process management, manufacturing list management. Order and inventory management includes five capability domains: customer management, sales management, material management, order management, and inventory management. Resource management includes three capability domains: equipment resource management, workstation and personnel management, and shift management. Planning parameter configuration includes four capability domains: production capacity configuration, scheduling rules, material coordination, and resource distribution. Production planning and scheduling includes three capability domains: operation grouping, planning and scheduling, and scheduling optimization. Scheduling results include four capability domains: material input plan, order plan, workstation plan, and job grouping plan. Scheduling optimization includes four capability domains: distributed scheduling optimization, scheduling resource optimization, scheduling rule optimization, and artificial intelligence intervention. Visualization results include three capability domains: workstation process Gantt chart, order process Gantt chart, resource Gantt chart, workstation dispatching sheet, order dispatching sheet, and job grouping results.

[0172] Compared with the prior art, the advanced planning and scheduling system based on the military intelligent equipment industry provided in this embodiment is composed of three parts: dimensions, capability elements and capability domains to form the advanced planning and scheduling model of the military intelligent equipment industry; the advanced planning and scheduling model of the military intelligent equipment industry is developed from three dimensions: means of production management, advanced planning and scheduling visualization; among which, means of production management restricts the process and results of advanced planning and scheduling, and scheduling visualization is a display of the results of advanced planning and scheduling. The advanced planning and scheduling system based on the military intelligent equipment industry provided in this embodiment requires military enterprises to establish a military enterprise planning and scheduling management platform with APS planning as the core, and cooperate with the traditional production scheduling system to provide solid application functions to meet the needs of the enterprise's intelligent command planning and scheduling center; drive the entire production operation to operate faster and more efficiently; shorten the cycle and increase production capacity; quickly respond to changes in the internal and external environment, improve market competitiveness, and lay a good foundation for improving the overall profitability of the enterprise and transforming the overall operating model; the advanced planning and scheduling platform based on the military intelligent equipment industry is an advanced planning and scheduling tool based on supply chain management and constraint theory suitable for enterprises in the military intelligent manufacturing industry. The platform can provide supply and demand plans for military enterprises based on their production goals and combined with their overall supply and demand conditions. The plans provided can make planning results more reasonable and executable, so that enterprises can truly achieve the goal of balancing supply and demand. The platform provides military enterprises with fully automatic / semi-automatic scheduling modes. Enterprises can easily schedule through the platform, and can also make timely changes and adjustments to the schedule based on actual conditions. It can better respond to the impact of problems such as inserting orders, changing orders, overdue orders, delivery date responses, personnel changes, and unexpected equipment failures on the plan; it provides the most basic and core guarantee for enterprises to achieve refined production planning and material planning.

[0173] Further, see Figure 7 , Figure 7 This is a functional block diagram of the second embodiment of the advanced planning and scheduling system for military intelligent equipment industry provided by the present invention. On the basis of the first embodiment, the advanced planning and scheduling system for military intelligent equipment industry also includes a splitting operation module 71 and an entry module 72, wherein the splitting operation module 71 is used to split the order based on the advanced planning and scheduling platform for military intelligent equipment industry if the order needs to be split; the entry module 72 is used to enter the production planning and scheduling link after the splitting operation is completed.

[0174] The splitting operation module 71 determines whether the order needs to be split according to the signed task and the current production status. If the order needs to be split, the order is split based on the advanced planning and scheduling platform of the military intelligent equipment industry.

[0175] After the splitting operation is completed in module 72, the production planning and scheduling phase is entered. Based on the advanced planning and scheduling platform of the military intelligent equipment industry, according to the current production capacity, scheduling rules, allocated materials, and distributed resources of the enterprise, computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources are carried out, and finally a high-quality production planning and scheduling result is formed.

[0176] Compared with the prior art, the advanced planning and scheduling system based on the military intelligent equipment industry provided in this embodiment is composed of three parts: dimension, capability element and capability domain to form the advanced planning and scheduling model of the military intelligent equipment industry; the advanced planning and scheduling model of the military intelligent equipment industry is developed from three dimensions: production materials management, advanced planning and scheduling and scheduling visualization; among them, production materials management restricts the process and results of advanced planning and scheduling, and scheduling visualization is the display of advanced planning and scheduling results. The advanced planning and scheduling system based on the military intelligent equipment industry provided in this embodiment requires military enterprises to establish a military enterprise planning and scheduling management platform with APS plan as the core, and cooperate with the traditional production scheduling system to provide solid application functions to meet the intelligent command planning and scheduling center of the enterprise; drive the entire production operation to operate faster and more efficiently; shorten the cycle and increase production capacity; quickly respond to changes in the internal and external environment, improve market competitiveness, and lay a good foundation for improving the overall profitability of the enterprise and transforming the overall operation model.

[0177] Preferably, see Figure 8 , Figure 8 The functional block diagram of the third embodiment of the advanced planning and scheduling system for military intelligent equipment industry provided by the present invention, on the basis of the first embodiment, the advanced planning and scheduling system for military intelligent equipment industry also includes a first determination module 81, a second determination module 82 and a scheduling operation module 83, wherein the first determination module 81 is used to determine whether there is an inserted order in the final production plan scheduling result; the second determination module 82 is used to further determine whether rescheduling is required if an inserted order is required; the scheduling operation module 83 is used to enter the production plan scheduling link and reschedule the production plan if rescheduling is required; if rescheduling is not required, enter the manual optimization scheduling link and manually adjust and optimize the newly inserted order.

[0178] Compared with the prior art, the advanced planning and scheduling system based on the military intelligent equipment industry provided by this embodiment determines whether there is an inserted order in the final production plan scheduling result; if an inserted order is required, it further determines whether rescheduling is required; if rescheduling is required, it enters the production plan scheduling link to reschedule the production plan; if rescheduling is not required, it enters the manual optimization scheduling link to manually adjust and optimize the newly inserted order. The advanced planning and scheduling system based on the military intelligent equipment industry provided in this embodiment requires military enterprises to establish a military enterprise planning and scheduling management platform with APS planning as the core, and cooperate with the traditional production scheduling system to provide solid application functions to meet the needs of the enterprise's intelligent command planning and dispatching center; drive the entire production operation to operate more quickly and efficiently; shorten the cycle and improve production capacity; quickly respond to changes in internal and external environments, improve market competitiveness, and lay a good foundation for improving the overall profitability of the enterprise and transforming the overall operating model; the platform provides military enterprises with fully automatic / semi-automatic scheduling modes, and enterprises can easily schedule through the platform, and can also make timely changes and adjustments to the schedule according to actual conditions, and can better respond to the impact of problems such as inserting orders, changing orders, overdue orders, delivery date responses, personnel changes and unexpected equipment failures on the plan; it provides the most basic and core guarantee for enterprises to realize refined production planning and material planning.

[0179] In summary, the advanced planning and scheduling method and system based on the military intelligent equipment industry provided in this embodiment have the following beneficial effects:

[0180] 1. Provide detailed process-level workshop operation plan

[0181] Based on the advanced planning and scheduling platform of the military intelligent equipment industry, while considering the constraints of personnel, workstations, materials, equipment, etc., a detailed process-level plan is generated, which is broken down into specific processes, time, equipment, etc., to facilitate the production arrangements of the production workshops of military enterprises: production leaders and team leaders can prepare for production according to the planned start time.

[0182] 2. Provides visible production scheduling solutions for suppliers

[0183] The advanced planning and scheduling platform based on the military intelligent equipment industry provides the associated results of workstations, work assignments, orders, and job groups, and provides Gantt charts of workstations, processes, orders, and resources, which fully display the planning results from different dimensions. It allows all departments of military enterprises to timely and intuitively understand the operation plan of the production workshop, the production plan of the order, and the capacity load of the equipment, so as to fully understand and control the production resources.

[0184] 3. Automatic emergency order insertion

[0185] When processing emergency orders based on the advanced planning and scheduling platform for the military intelligent equipment industry, the order priority can be modified directly on the platform. The platform will initiate the optimization strategy, quickly and automatically adjust and generate a new production schedule for production personnel.

[0186] 4. Provide convenient scheduling mode

[0187] Military enterprises can rely on the advanced planning and scheduling platform based on the military intelligent equipment industry for scheduling, which can fundamentally reduce the time for planning, reduce the workload of planners, and improve work efficiency. They can also conduct manual intervention and perform semi-automatic scheduling to make planning more timely and accurate, and plan adjustments more convenient.

[0188] 5. Accurately and reliably manage the company’s production materials

[0189] By balancing the capabilities of the advanced planning and scheduling platform for the military intelligent equipment industry, the company has completed the rational and balanced allocation of equipment resources, improved the accuracy and feasibility of production plans, and accurately and reliably managed basic information such as personnel, equipment, materials, and processes in the production process.

[0190] Although preferred embodiments of the present invention have been described, additional changes and modifications may be made to these embodiments by those skilled in the art once the basic inventive concepts are known. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. Obviously, those skilled in the art may make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. An advanced planning and scheduling method based on the military intelligent equipment industry, characterized in that: The following steps are involved: Build an advanced planning and scheduling platform for the military intelligent equipment industry to manage the production resources of military enterprises; Receive production orders and combine the current product information, order information and resource information of military enterprises to determine whether production scheduling is suitable under the current circumstances; If the current situation is suitable for production scheduling, further determine whether the order needs to be split; If the order does not need to be split, it will directly enter the production planning and scheduling stage. According to the current production capacity, scheduling rules, allocated materials, and distribution resources of the military enterprise, the computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources will be carried out, and finally a high-quality production planning and scheduling result will be formed; Determine whether the final production plan scheduling results need to be manually optimized; If manual optimization is not required, the scheduling results can be directly visualized and pushed to various departments of the military enterprise for production arrangements; If the order does not need to be split, the production planning and scheduling phase is directly entered. According to the current capacity of the military enterprise, the established scheduling rules, the allocated materials, and the distribution resources, the computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources are performed. The steps to finally form a high-quality production planning and scheduling result include: According to the signed tasks and the current production status, it is determined whether the order needs to be split. If it needs to be split, the order is split based on the advanced planning and scheduling platform of the military intelligent equipment industry, and then enters the production planning and scheduling link; if it does not need to be split, it directly enters the production planning and scheduling link; The production plan scheduling result includes the planned quantity, which is calculated by the following formula: JHS=XQS-KC-ZZP Among them, JHS represents the planned quantity, XQS represents the required quantity, KC represents the total inventory quantity, and ZZP represents the work-in-progress quantity; The production plan scheduling result includes the latest possible start time of the backward plan, and the latest possible start time is calculated by the following formula: ZCSJ=WCRQ-(ZBSJ+YXSJ+HCSJ) Among them, ZCSJ represents the latest possible start time, WCRQ represents the completion date, ZBSJ represents the preparation time; YXSJ represents the running time, and HCSJ represents the conventional buffer conservative time; The production plan scheduling result includes the earliest possible start time of the positive schedule, and the earliest possible start time is calculated by the following formula: ZZSJ=Max(KSRQ,KYRQ) Among them, ZZSJ represents the earliest possible start time, KSRQ represents the service start date, and KYRQ represents the material availability date; The production plan scheduling result includes a confirmed start time, which is calculated by the following formula: JHSJ=Max(ZCSJ,ZZSJ) Among them, JHSJ indicates the confirmed planned start time, ZZSJ indicates the earliest possible start time, and ZCSJ indicates the latest possible start time; The production plan scheduling result includes the important ratio of the scheduling, and the important ratio of the scheduling is calculated by the following formula: ZYBL=(JQ-DQRQ) / GQ Among them, ZYBL represents the important ratio of scheduling, JQ represents the delivery date, DQRQ represents the current date, and GQ represents the duration; The production plan scheduling result includes the possible daily capacity of the work orders opened in parallel, and the possible daily capacity is calculated by the following formula: MTCN=(KYRS*KYSJ*GCYL*CXXL / KDSL)*XLXS Among them, MTCN represents the production capacity that can be completed every day, KYRS represents the number of available workers, KYSJ represents the available working time, GCYL represents the production efficiency of the factory, CXXL represents the work efficiency of the production line, KDSL represents the number of parallel orders, and XLXS represents the efficiency coefficient of the work order.

2. The advanced planning and scheduling method based on the military intelligent equipment industry as claimed in claim 1 is characterized in that: The military intelligent equipment industry advanced planning and scheduling platform is provided with a military intelligent equipment industry advanced planning and scheduling model. The steps of constructing the military intelligent equipment industry advanced planning and scheduling platform include: The advanced planning and scheduling model of the military intelligent equipment industry is composed of three parts: dimensions, capability elements and capability domains; The advanced planning and scheduling model of the military intelligent equipment industry is developed from three dimensions: production materials management, advanced planning and scheduling, and scheduling visualization; among them, production materials management restricts the process and results of advanced planning and scheduling, and scheduling visualization is the display of advanced planning and scheduling results.

3. The advanced planning and scheduling method based on the military intelligent equipment industry as claimed in claim 1 is characterized in that: If the current situation is suitable for production scheduling, the step of further determining whether to split the order further includes: If the order needs to be split, the order will be split based on the advanced planning and scheduling platform for the military intelligent equipment industry; After the splitting operation is completed, the production planning and scheduling phase begins.

4. The advanced planning and scheduling method based on the military intelligent equipment industry as claimed in claim 1 is characterized in that: If the order does not need to be split, the production planning and scheduling phase is directly entered. According to the current capacity, scheduling rules, allocated materials, and distribution resources of the military enterprise, the computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources are performed. The steps of finally forming a high-quality production planning and scheduling result also include: Determine whether there is an insertion order in the final production plan scheduling result; If an order needs to be inserted, further determine whether rescheduling is required; If rescheduling is required, the process will enter the production plan scheduling stage to reschedule the production plan; if rescheduling is not required, the process will enter the manual optimization scheduling stage to manually adjust and optimize the newly inserted orders.

5. An advanced planning and scheduling system based on the military intelligent equipment industry, characterized in that: include: A construction module (10) is used to construct an advanced planning and scheduling platform for the military intelligent equipment industry to manage the production resources of military enterprises; The verification module (20) is used to receive the order production task and verify whether it is suitable for production scheduling under the current situation based on the current product information, order information and resource information of the military enterprise; A judgment module (30) is used to further judge whether it is necessary to split the order if the current situation is suitable for production scheduling; The first forming module (40) is used to directly enter the production planning and scheduling link if there is no need to split the order, and perform computer operation grouping, computer planning and scheduling, and computer scheduling optimization operations of limited resources according to the current configured production capacity, formulated scheduling rules, allocated materials, and distributed resources of the military enterprise, and finally form a high-quality production planning and scheduling result; The second forming module (50) is used to determine whether the final production plan scheduling result needs to be manually optimized; A visual operation module (60) is used to directly perform visual operations on the scheduling results if manual optimization is not required, and push the visual operation results to various departments of the military enterprise for production scheduling; The first forming module (40) is specifically used to determine whether it is necessary to split the order according to the signed task and the current production status. If it is necessary to split the order, the order is split based on the advanced planning and scheduling platform of the military intelligent equipment industry, and then enters the production planning and scheduling link; If there is no need to split the order, go directly to the production planning and scheduling stage; The production plan scheduling result includes the planned quantity, which is calculated by the following formula: JHS=XQS-KC-ZZP Among them, JHS represents the planned quantity, XQS represents the required quantity, KC represents the total inventory quantity, and ZZP represents the work-in-progress quantity; The production plan scheduling result includes the latest possible start time of the backward plan, and the latest possible start time is calculated by the following formula: ZCSJ=WCRQ-(ZBSJ+YXSJ+HCSJ) Among them, ZCSJ represents the latest possible start time, WCRQ represents the completion date, ZBSJ represents the preparation time; YXSJ represents the running time, and HCSJ represents the conventional buffer conservative time; The production plan scheduling result includes the earliest possible start time of the positive schedule, and the earliest possible start time is calculated by the following formula: ZZSJ=Max(KSRQ,KYRQ) Among them, ZZSJ represents the earliest possible start time, KSRQ represents the service start date, and KYRQ represents the material availability date; The production plan scheduling result includes a confirmed start time, which is calculated by the following formula: JHSJ=Max(ZCSJ,ZZSJ) Among them, JHSJ indicates the confirmed planned start time, ZZSJ indicates the earliest possible start time, and ZCSJ indicates the latest possible start time; The production plan scheduling result includes the important ratio of the scheduling, and the important ratio of the scheduling is calculated by the following formula: ZYBL=(JQ-DQRQ) / GQ Among them, ZYBL represents the important ratio of scheduling, JQ represents the delivery date, DQRQ represents the current date, and GQ represents the duration; The production plan scheduling result includes the possible daily capacity of the work orders opened in parallel, and the possible daily capacity is calculated by the following formula: MTCN=(KYRS*KYSJ*GCYL*CXXL / KDSL)*XLXS Among them, MTCN represents the production capacity that can be completed every day, KYRS represents the number of available workers, KYSJ represents the available working time, GCYL represents the production efficiency of the factory, CXXL represents the work efficiency of the production line, KDSL represents the number of parallel orders, and XLXS represents the efficiency coefficient of the work order.

6. The advanced planning and scheduling system based on military intelligent equipment industry as claimed in claim 5 is characterized in that: The building block (10) comprises: The constituent unit (11) is used to constitute the advanced planning and scheduling model of the military intelligent equipment industry by three parts: dimension, capability element and capability domain; The expansion unit (12) is used to expand the advanced planning and scheduling model of the military intelligent equipment industry from three dimensions: production materials management, advanced planning and scheduling, and scheduling visualization; among them, production materials management restricts the process and results of advanced planning and scheduling, and scheduling visualization is the display of the results of advanced planning and scheduling.

7. The advanced planning and scheduling system based on military intelligent equipment industry as claimed in claim 5 is characterized in that: The advanced planning and scheduling system based on the military intelligent equipment industry also includes: A splitting operation module (71) is used to split the order based on the advanced planning and scheduling platform for the military intelligent equipment industry if the order needs to be split; Enter module (72), which is used to enter the production planning and scheduling link after the splitting operation is completed.

8. The advanced planning and scheduling system based on military intelligent equipment industry as claimed in claim 5 is characterized in that: The advanced planning and scheduling system based on the military intelligent equipment industry also includes: A first determination module (81) is used to determine whether there is an insertion order in the final production plan scheduling result; A second determination module (82), used to further determine whether rescheduling is required if an order needs to be inserted; The scheduling operation module (83) is used to enter the production plan scheduling link and reschedule the production plan if rescheduling is required; if rescheduling is not required, enter the manual optimization scheduling link and manually adjust and optimize the newly inserted order.