Method for preparing nuclear waste sealing container

Through shot peening and decontamination and smelting technology, nuclear waste metal is treated, combined with negative pressure dust removal and sand mold casting, the problem that the nuclear waste storage container manufacturing process in the existing technology cannot meet the requirements of "viractive waste minimization", and the nuclear waste is realized Effectively reduce radiation and recycling.

CN114242298BActive Publication Date: 2024-12-03HUNAN NUCLEAR IND HONGHUA MASCH CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111426651.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-27
Publication Date
2024-12-03
Estimated Expiration
2041-11-27

AI Technical Summary

Technical Problem

The existing nuclear waste storage container manufacturing process cannot meet the "radioactive waste minimization" requirements proposed by the International Atomic Energy Agency, resulting in radioactive pollution and waste capacity increase.

Method used

The nuclear waste metal is treated with shot peening and smelting technology, and the stains and radioactive material layer on the metal surface are removed through the shot peening and decontamination device. The nuclear waste metal is then melted into liquid through the metal smelting and loading assembly, and the negative pressure dust collector is used. Radionuclides in the volatile gas are collected and finally cast through sand mold to form a sealed container.

Benefits of technology

It effectively reduces the radiation dose of nuclear waste metal, makes it meet the civil steel standards, realizes the recycling and reuse of nuclear waste, meets the requirements of "minimizing radioactive waste", and reduces radioactive pollution and waste capacity increase.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114242298B_ABST
    Figure CN114242298B_ABST
Patent Text Reader

Abstract

The method for preparing a nuclear waste storage container is applied to a nuclear waste storage container preparation system, which is used for preparing a nuclear waste storage container; the nuclear waste storage container preparation system includes a shot peening and decontamination device, a metal cutting machine, a metal shredder, a metal compression and baling machine, a metal smelting and feeding assembly, and a storage container preparation assembly. The steps for preparing a nuclear waste storage container are as follows: surface shot peening; fragmentation treatment; compression and baling; cold furnace feeding; metal smelting; preparing a nuclear waste storage container. The present invention uses nuclear waste metal as raw material, and through the two steps of shot peening and smelting, the radiation dose in the nuclear waste metal is greatly reduced, and then the various components of the nuclear waste storage container are cast by sand molds, and finally welded and assembled to form a nuclear waste storage container. Based on the above process, the recycling and reuse of nuclear waste metal is realized, which can fully meet the requirements of "minimizing radioactive waste".
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nuclear waste metal treatment, in particular to a method for preparing a nuclear waste sealing container. Background Art

[0002] With the rapid development of the nuclear industry, nuclear power plants and nuclear enterprises are generating more and more nuclear waste, mainly from the decommissioning of old equipment that has reached the end of its service life. These nuclear wastes are highly radioactive, with a half-life of thousands, tens of thousands or even hundreds of thousands of years. If they are disposed of carelessly, they will seriously pollute the environment and endanger human health.

[0003] The International Atomic Energy Agency has strict requirements for the treatment and disposal of nuclear waste. Nuclear waste metals with radiation doses exceeding the safety threshold cannot be treated and can only be permanently buried to ensure that the nuclear waste can be geologically sealed for tens or even hundreds of thousands of years without leakage.

[0004] Permanent deep burial disposal must solve two problems: 1. To safely and permanently seal the nuclear waste in a container and ensure that no radioactivity leaks out for tens of thousands of years. The container is usually a metal canister that can shield radiation. 2. To find a safe and permanent location to store the nuclear waste. The location is usually a nuclear waste disposal repository built in an ultra-thick underground granite layer.

[0005] The existing permanent deep burial disposal solution requires the manufacture of additional metal cans for nuclear waste. On the one hand, in order to ensure that no radioactivity leaks out for tens of thousands of years, the wall thickness of the metal can is designed to be very thick, and a lot of materials are required for its manufacture; on the other hand, after the metal cans have been used to hold nuclear waste, they will be contaminated by radioactivity and will produce a certain dose of radioactivity themselves, making them unable to be used for other purposes. This is equivalent to introducing new radioactive waste in the process of disposing of nuclear waste, resulting in waste expansion.

[0006] The concept of "radioactive waste minimization" was first proposed in the technical document "Radioactive Waste Minimization and Separation" published by the International Atomic Energy Agency in 1992. The "radioactive waste minimization" mentioned above is to reduce the amount and activity of radioactive waste to a reasonably achievable level, which can reduce the adverse impact of nuclear waste on the environment and reduce the cost of nuclear waste disposal by limiting the generation and spread of radioactive pollution and reducing the volume of nuclear waste storage. Obviously, the existing manufacturing process of metal cans for nuclear waste cannot meet the requirements of "radioactive waste minimization". Summary of the invention

[0007] The purpose of the present invention is to overcome the deficiencies of the prior art and to provide a nuclear waste storage container preparation system, which solves the problem that the existing manufacturing process of metal cans for containing nuclear waste cannot meet the requirement of "radioactive waste minimization".

[0008] The technical solution of the present invention is: a method for preparing a nuclear waste sealing container, which is applied to a system for preparing a nuclear waste sealing container, and is used for preparing a nuclear waste sealing container;

[0009] The nuclear waste storage container preparation system includes a shot peening decontamination device, a metal cutting machine, a metal shredder, a metal compression baler, a metal smelting and feeding assembly, and a storage container preparation assembly;

[0010] The shot peening decontamination device includes a spray gun, a sand and dust separator, a sand and dust collector, a steel ball cleaning machine, a steel ball repatriator, a dry ice supply device, a high-pressure air source and a negative pressure exhaust device;

[0011] A merging chamber, a steel ball injection channel and a steel ball recovery channel are provided inside the spray gun; the front end of the steel ball injection channel and the front end of the steel ball recovery channel are respectively connected to the rear end of the merging chamber, and the front end of the merging chamber, the rear end of the steel ball injection channel and the rear end of the steel ball recovery channel respectively form a shot peening operation port, a steel ball inlet A and a steel ball outlet A on the spray gun;

[0012] The sand and dust separator includes a screening bin, a recovery bin and a three-way joint which are arranged in sequence from top to bottom; a steel ball inlet B and a sand and dust outlet are respectively arranged on both sides of the upper end of the screening bin, and an air blast port A, a steel ball drop port and a steel ball outlet B are arranged at the lower end of the screening bin; the steel ball inlet B is connected with the steel ball outlet A of the spray gun through an air pipeline; an electric control valve A is arranged on the steel ball drop port; an electric control valve D is arranged on the steel ball outlet B; an opening facing the steel ball drop port A of the screening bin is arranged at the upper end of the recovery bin, a steel ball outlet C is arranged at the lower end of the recovery bin, and a negative pressure exhaust port and a steel ball repatriation port are arranged on the side wall of the recovery bin; a first port, a second port and a third port are arranged on the three-way joint, the first port is connected to the steel ball outlet C of the recovery bin, and the second port is connected with the steel ball inlet A of the spray gun through an air pipeline;

[0013] The sand and dust collector comprises a dust collecting bin and a filter element installed in the inner cavity of the dust collecting bin; the filter element divides the inner cavity of the dust collecting bin into an upper cavity and a lower cavity which are not connected to each other; a sand and dust inlet connected to the lower cavity and a post-filter air outlet connected to the upper cavity are arranged on the outer wall of the dust collecting bin; the sand and dust inlet is connected to the sand and dust outlet of the screening bin through an air pipeline;

[0014] The steel ball cleaning machine includes an outer cylinder, an inner cylinder, a bracket A, an electric push rod X and a motor; a steel ball outlet D, a dry ice inlet, an exhaust gas outlet and a steel ball inlet D are arranged at one end of the outer cylinder, and a machine shaft perforation and a slag discharge port are arranged at the center and the lower edge of the other end respectively, and an electric control valve B is arranged on the slag discharge port; a cover plate is rotatably connected to the steel ball outlet D of the outer cylinder, and the cover plate is rotated to open or close the steel ball outlet D; the exhaust gas outlet of the outer cylinder is connected to the sand and dust inlet of the dust collecting bin through an air pipeline; the steel ball inlet D of the outer cylinder is connected to the steel ball outlet B of the screening bin through a pipeline; an opening is arranged at one end of the inner cylinder, and an end plate is arranged at the other end, a cleaning cavity is arranged inside, and a hollow hole is arranged on the outer cylindrical surface; the inner cylinder can be rotatably installed inside the outer cylinder, and an annular cavity is formed between the inner cylinder and the outer cylinder, and the opening of the inner cylinder is directly opposite to and close to the outer cylinder The steel ball outlet D, dry ice inlet, exhaust gas outlet and steel ball inlet D of the outer cylinder are provided; the lower end of the bracket A is installed on the ground, and the upper end is hinged to the outer wall of the outer cylinder; the lower end of the electric push rod X is hingedly installed on the ground, and the upper end is hinged to the outer wall of the outer cylinder, which is used to drive the outer cylinder to rotate in a vertical plane around its hinge, so as to make the steel ball outlet D face obliquely upward or obliquely downward; when the steel ball outlet D faces obliquely upward, the cover plate fits with the steel ball outlet D to close the steel ball outlet D, and when the steel ball outlet D faces obliquely downward, the cover plate separates from the steel ball outlet D to open the steel ball outlet D; the motor is fixedly installed on one end surface of the outer cylinder, and its shaft extends into the inner part of the outer cylinder through the shaft through-hole, and is fixedly connected to the end plate of the inner cylinder, and the shaft of the motor rotates to drive the inner cylinder to rotate in a circle relative to the outer cylinder;

[0015] The steel ball repatriation device comprises a repatriation bin, a bracket B and an electric push rod Y; the repatriation bin is provided with a steel ball inlet E at the upper end and a steel ball outlet E at the lower end, and the steel ball inlet E of the repatriation bin is located directly below the steel ball outlet D of the outer cylinder; the lower end of the bracket B is fixedly mounted on the ground, and the upper end is hinged to the outer wall of the repatriation bin; the electric push rod Y is hingedly mounted on the ground at the lower end, and the upper end is hinged to the outer wall of the repatriation bin, and is used to drive the repatriation bin to rotate in a vertical plane around its hinge, so as to make the steel ball outlet E face obliquely upward or obliquely downward;

[0016] A dry ice storage chamber is provided inside the dry ice supply device, and a high-pressure air inlet, a dry ice feeding port and a dry ice outlet are provided on the outer wall of the dry ice supply device, which are connected to the dry ice storage chamber; the dry ice outlet is connected to the dry ice inlet of the steel ball cleaning machine through an air pipeline;

[0017] The high-pressure air source is used to output compressed air, and the high-pressure air source is connected to the blast port A of the screening bin, the third port of the three-way joint, and the high-pressure air inlet of the dry ice supply device through the air pipeline respectively;

[0018] The negative pressure exhaust device is used to provide negative pressure, and the negative pressure exhaust device is connected with the post-filter air outlet of the dust collecting bin and the negative pressure exhaust port of the recovery bin through the air pipeline respectively;

[0019] The metal compression baler includes a box body, an X-direction propulsion assembly, a Y-direction propulsion assembly, a top flip assembly and a discharge control assembly;

[0020] The box body is in the shape of a hollow rectangular parallelepiped, with a compression chamber provided therein, and an inlet and outlet connected to the compression chamber provided at the upper end thereof, and the four side walls thereof are respectively named as the first wall, the second wall, the third wall and the fourth wall in clockwise order, and the first wall is provided with a rectangular opening A connected to the compression chamber at the lower end adjacent to the second wall, and the fourth wall is provided with a rectangular opening B connected to the compression chamber at the lower end, and a corner notch is provided between the lower end of the third wall and the bottom wall of the box body, and the corner notch is formed by connecting a rectangular opening C provided on the third wall and a rectangular opening D provided on the bottom wall of the box body, and the rectangular opening C is directly opposite to the rectangular opening A;

[0021] The X-direction propulsion assembly includes an X-direction hydraulic cylinder and an X-direction push plate connected to the end of the piston rod of the X-direction hydraulic cylinder; the cylinder body of the X-direction hydraulic cylinder is fixedly mounted on the fourth wall of the box body and is located outside the compression chamber; the X-direction push plate is driven by the X-direction hydraulic cylinder to perform horizontal reciprocating linear movement, and then changes between being flush with the rectangular opening B and extending into the compression chamber, and the moving direction of the X-direction push plate is perpendicular to the second wall;

[0022] The Y-direction propulsion assembly includes a Y-direction hydraulic cylinder and a Y-direction push plate connected to the end of the piston rod of the Y-direction hydraulic cylinder; the cylinder body of the Y-direction hydraulic cylinder is fixedly mounted on the first wall of the box body and is located outside the compression chamber; the Y-direction push plate is driven by the Y-direction hydraulic cylinder to perform horizontal reciprocating linear movement, and then changes between being flush with the rectangular opening A and extending into the compression chamber, and the moving direction of the Y-direction push plate is parallel to the second wall;

[0023] The top flip assembly includes a rotating plate and a flip hydraulic cylinder; a fourth hinge is provided at one end of the rotating plate, and a fifth hinge is provided in the middle of the rotating plate; the cylinder body of the flip hydraulic cylinder is hinged at the upper end of the fourth wall, and the piston rod end of the flip hydraulic cylinder is hinged on the fifth hinge of the rotating plate, and the piston rod of the flip hydraulic cylinder is extended and retracted to drive the rotating plate to rotate in a vertical plane around the fourth hinge, thereby closing or opening the inlet and outlet of the box body;

[0024] The discharging control assembly includes a rotating shaft, a folding plate and a discharging hydraulic cylinder; the rotating shaft is arranged horizontally and movably installed at the upper end of the third wall and is arranged parallel to the third wall, the rotating shaft is fixedly connected to the upper end of plate A at one end, and the rotating shaft is hinged to the piston rod end of the discharging hydraulic cylinder at the other end; the folding plate is composed of plate A and plate B that are perpendicular to each other and connected at the side, the folding plate is arranged at the corner notch, and is fixedly connected to the rotating shaft at the upper end of plate A; the cylinder body of the discharging hydraulic cylinder is hinged at the lower end of the second wall, and the piston rod of the discharging hydraulic cylinder is extended and retracted to drive the rotating shaft to rotate, thereby driving the folding plate to rotate around the rotating shaft, so that the folding plate is converted between the gap filling state and the discharging state; when the folding plate is in the gap filling state, the surface of plate A located in the compression chamber is flush with the surface of the third wall located in the compression chamber, and the surface of plate B located in the compression chamber is flush with the surface of the bottom wall of the box located in the compression chamber; when the folding plate is in the discharging state, plate A tilts toward the outside of the compression chamber, and plate B tilts toward the upper end of the compression chamber;

[0025] The metal smelting feeding assembly includes a general frame, a vertical hoist, a smelting furnace assembly, a trolley assembly, a feeding docking mechanism, a negative pressure dust removal mechanism and a material conveying mechanism;

[0026] The main frame is provided with a first floor and a second floor from bottom to top, a first floor space is between the first floor and the second floor, a second floor space is located at the upper end of the second floor, and a connecting opening is provided on the second floor connecting the first floor space and the second floor space;

[0027] The vertical elevator is fixedly installed on the main frame and is located between the first-floor space and the second-floor space. The lower end of the vertical elevator is provided with a material inlet connected to the first-floor space, and the upper end is provided with a material outlet connected to the second-floor space.

[0028] The smelting furnace assembly includes a tilting platform, a smelting furnace and a tilting hydraulic cylinder; the tilting platform is hingedly installed at the connecting port of the second floor plate and rotates in a vertical plane around the hinge; a smelting chamber is arranged inside the smelting furnace, and a feeding port connected to the smelting chamber and a drainage trough connected to the feeding port are arranged at the upper end of the smelting furnace. The smelting furnace is fixedly connected to the tilting platform at the upper end of the outer wall, and is located at the connecting port of the second floor plate, and is located between the first floor space and the second floor space; the tilting hydraulic cylinder is arranged between the first floor plate and the smelting furnace, the lower end of which is hinged on the first floor plate, and the upper end is hinged to the lower surface of the tilting platform, which is used to drive the tilting platform to rotate around its hinge, thereby driving the smelting furnace to rotate, so that the smelting furnace is converted between the working state and the pouring state; the smelting furnace is in a vertical posture in the working state, and the feeding port is vertically facing upward; the smelting furnace is in an inclined posture in the pouring state, and the smelting liquid in the smelting furnace can be poured out through the feeding port and the drainage trough;

[0029] The trolley assembly includes guide rails, a trolley, an electric push rod B and a positioning sleeve; there are two guide rails, which are arranged parallel to each other and fixedly mounted on the second floor plate and distributed on both sides of the charging port of the smelting furnace; the two guide rails are arranged perpendicular to the drainage trough of the smelting furnace, one of which is relatively close to the drainage trough, and the other is relatively far away from the drainage trough; the trolley includes a body and electric wheels; the body is provided with hollow holes A and B; the electric wheels are mounted at the lower end of the body; the trolley is movably mounted on the two guide rails through the electric wheels; the electric push rod B is fixedly connected to one end of the trolley body and moves up and down in the vertical direction; the positioning sleeve is fixedly mounted on the tilting platform and is located at the lower end of the electric push rod B; when the trolley is in the first position, the electric push rod B and the positioning sleeve are directly opposite each other, and the electric push rod B extends into the inner hole of the positioning sleeve to lock the position of the trolley;

[0030] The feeding and docking mechanism includes an outer funnel, an inner funnel and a traveling crane; the outer funnel is fixedly installed in the hollow hole A of the vehicle body and is in a trumpet shape with a larger upper part and a smaller lower part; the inner funnel is in a trumpet shape with a larger upper part and a smaller lower part and is consistent with the shape of the inner hole of the outer funnel, and a hanging ear for docking with the traveling crane is provided at its upper end; the traveling crane is installed in the second-floor space, and is used to control the movement of the inner funnel, thereby docking or separating the inner funnel with the outer funnel; when the inner funnel is docked with the outer funnel, the lower port of the inner funnel extends into the smelting chamber of the smelting furnace through the feeding port of the smelting furnace;

[0031] The negative pressure dust removal mechanism includes a dust hood and a negative pressure dust collector; the electric push rod A is fixedly installed on the body of the trolley, and is fixedly connected to the dust hood through a connecting frame to drive the dust hood to move vertically up and down; an air path is provided inside the dust hood, and the air path forms a dust collection port and a dust exhaust port at both ends of the dust hood respectively; the dust hood is installed on the body of the trolley and is located in the hollow hole B of the trolley, and the dust exhaust port and the dust collection port thereon are respectively located at the upper end and the lower end of the hollow hole B; the negative pressure dust collector is provided with an air inlet and an exhaust port, and a filter element is provided inside the negative pressure dust collector, and the air inlet of the negative pressure dust collector is connected to the dust exhaust port of the dust hood through an air path pipeline;

[0032] The material conveying mechanism includes a support, a belt conveyor A and an upper pulling assembly; the support is fixedly installed in the second-floor space; the belt conveyor A is hinged on the support and rotates around the vertical plane of the hinge, thereby switching between a conveying state and an avoidance state; in the conveying state, it is used to convey the materials discharged by the vertical elevator into the smelting furnace, and in the avoidance state, it avoids the lifting and moving path of the inner funnel, the turning path of the smelting furnace and the turning path of the tilting platform; the upper pulling assembly is associated with the belt conveyor A to drive the belt conveyor A to rotate around its hinge;

[0033] The moving path of the trolley along the guide rail is sequentially provided with a first position, a second position and a third position; when the trolley is in the first position, the lower port of the outer funnel is vertically opposite to the feeding port of the smelting furnace in the working state; when the trolley is in the second position, the dust collecting port of the dust collecting cover is vertically opposite to the feeding port of the smelting furnace in the working state; when the trolley is in the third position, the rotation paths of the trolley and the tilting platform are staggered up and down; only when the trolley is in the first position, the outer funnel and the inner funnel can be docked or separated;

[0034] The sealing container preparation assembly includes a sand mold; the sand mold is provided with a pouring port at the upper end, a vent at the lower end, and a cavity connected to the pouring port and the vent inside; the sand mold is installed in a space directly below the smelting furnace, and the pouring port is used to receive the molten liquid poured from the drainage trough of the smelting furnace;

[0035] Before preparing the nuclear waste sealing container, the nuclear waste sealing container preparation system is in an initial state. In the initial state:

[0036] a. The steel balls inside the shot peening and decontamination device are concentrated in the screening bin;

[0037] b. The inlet and outlet of the box are open;

[0038] c. The X-axis push plate is flush with the rectangular opening B;

[0039] d. The Y-axis push plate is flush with the rectangular opening A;

[0040] e. The folding plate is in the state of filling the gap;

[0041] f. The smelting furnace is in working condition;

[0042] g. The car is in the first position;

[0043] h. The inner funnel is connected with the outer funnel;

[0044] i. Belt conveyor A is in the conveying state;

[0045] j. The electric push rod B extends into the inner hole of the positioning sleeve;

[0046] The steps to prepare a nuclear waste containment container are as follows:

[0047] S01, surface shot peening:

[0048] a. For nuclear scrap metal with inner wall surface, cut it with a metal cutting machine to expose the inner wall surface for subsequent surface shot peening;

[0049] b. Align the shot peening operation port of the spray gun to the surface of the nuclear waste metal, and then start the high-pressure air source and the negative pressure exhaust device; under the joint action of the high-pressure air source and the negative pressure exhaust device, the steel balls circulate between the spray gun, the screening bin, and the recovery bin;

[0050] When the steel balls flow through the spray gun, the moving paths are the steel ball injection channel, the confluence chamber, and the steel ball recovery channel in sequence; after entering the confluence chamber, the steel balls move toward the shot peening operation port and finally hit the metal surface, which, on the one hand, peels off the stains, rust stains and radioactive material layers on the metal surface, and on the other hand, immediately rebounds and changes direction, and enters the steel ball recovery channel under the action of negative pressure;

[0051] After the high-pressure air source is started, air is blown from bottom to top into the screening bin through the air blast port A, blowing the impurities, dust and debris in the screening bin to the upper area of ​​the screening bin;

[0052] After the high-pressure air source is started, air is blown into the steel ball injection channel 112 of the spray gun through the three-way joint and the steel ball inlet A, so that the steel ball outlet C connected to the three-way joint generates negative pressure. Under the action of negative pressure, the steel balls are discharged from the steel ball outlet C of the recovery bin, and then enter the air pipeline, and then flow into the steel ball injection channel of the spray gun under the push of wind force;

[0053] After the negative pressure exhaust device is started, negative pressure is generated in the upper chamber of the dust collecting bin, the lower chamber of the dust collecting bin, the upper area of ​​the screening bin, and the steel ball recovery channel of the spray gun in sequence; under the action of negative pressure, impurities, dust, and debris in the upper area of ​​the screening bin enter the lower chamber of the dust collecting bin, and then settle at the bottom of the lower chamber or be collected by the filter element;

[0054] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state;

[0055] S02, fragmentation processing:

[0056] The nuclear scrap metal after the surface shot blasting treatment is cut into a size that meets the feeding requirements of the metal shredder by a metal cutting machine; the cut nuclear scrap metal is put into the metal shredder for shredding;

[0057] S03, compression and packaging:

[0058] a. After the metal scraps formed by the shredding process are transferred to the compression chamber of the box, the turning hydraulic cylinder is started to drive the rotating plate to rotate in the vertical plane around the fourth hinge, on the one hand, the inlet and outlet of the box are closed, and on the other hand, the metal scraps in the compression chamber of the box are compressed in the height direction;

[0059] b. The X-direction hydraulic cylinder is started to drive the X-direction push plate to move toward the second wall, so as to compress the metal scraps in the compression chamber horizontally in the X-direction. When the X-direction push plate moves to the same level as the side edge of the rectangular opening A, it stops moving;

[0060] c. The Y-direction hydraulic cylinder is started to drive the Y-direction push plate to move toward the third wall, thereby compressing the metal scraps in the compression chamber in the horizontal Y-direction. After compression, the metal scraps form a rectangular block, which is hereinafter referred to as a metal block;

[0061] d. The X-direction hydraulic cylinder and the Y-direction hydraulic cylinder are started in no particular order, and drive the X-direction push plate and the Y-direction push plate to return to their original positions respectively;

[0062] e. The discharging hydraulic cylinder is started, and the folding plate is driven to rotate through the rotating shaft, so that the folding plate rotates from the gap filling state to the discharging state, thereby lifting the compressed rectangular block and discharging it from the compression chamber of the box body;

[0063] In this step, the moving direction of the X-direction push plate is defined as the X-direction, the moving direction of the Y-direction push plate is defined as the Y-direction, and the side edge is the side edge of the rectangular opening A relatively away from the second wall;

[0064] S04, cold furnace charging:

[0065] a. Send the metal block into the vertical elevator through the material inlet. After the vertical elevator lifts the metal block from the first floor space to the second floor space, it drives the metal block to be discharged from the material outlet to the outside of the vertical elevator;

[0066] b. After the metal block is discharged from the material outlet, it enters the conveyor belt A through the feed end A of the belt conveyor A, and the metal block moves along the conveyor belt A to the discharge end A of the belt conveyor A;

[0067] c. After the metal block is discharged from the discharging end A of the belt conveyor A, it enters the smelting chamber of the smelting furnace through the inner funnel;

[0068] d. After the feeding is completed, the winch starts, pulling the belt conveyor A to rotate upward around the first hinge, so that the belt conveyor A changes from the conveying state to the avoidance state;

[0069] e. Hook the hook at the lower end of the crane to the lug at the upper end of the inner funnel, and then operate the crane to lift the inner funnel upwards to completely separate the inner funnel from the outer funnel;

[0070] S05. Metal smelting:

[0071] a. The electric push rod B is withdrawn from the inner hole of the positioning sleeve to release the position lock of the trolley, and then the trolley 542 is moved from the first position to the second position so that the dust collecting port of the dust collecting cover faces the feeding port of the smelting furnace;

[0072] b. Start the heating function of the smelting furnace to melt the metal block; during the smelting process, on the one hand, ensure that the negative pressure dust collector is in continuous operation, so that the volatile gas generated by smelting enters the negative pressure dust collector through the dust collecting hood, and the radioactive nuclides in the gas are trapped in the filter element of the negative pressure dust collector. The filtered gas is discharged into the atmosphere through the negative pressure dust collector. On the other hand, the slag generated by smelting is manually cleaned in real time;

[0073] c. After the smelting is completed, the trolley is driven to move from the second position to the third position so that the rotation paths of the trolley and the tilting platform are staggered up and down;

[0074] S06. Preparation of nuclear waste storage container:

[0075] The nuclear waste storage container is in the shape of a hollow cube, which includes an upper cover, a tank body, a bottom plate and a steel bar connected in sequence from top to bottom; the tank body is in the shape of a square tube with upper and lower ends open, and hook ears are respectively provided at the four top corners of its upper end face, and connecting parts are respectively provided on the four sides of its upper end face; the upper cover is detachably mounted on the upper end face of the tank body through the connecting parts to close the upper end opening of the tank body; the bottom plate is welded and fixed to the lower end face of the tank body to close the lower end opening of the tank body; two steel sections are respectively welded and fixed to the two sides of the lower end of the bottom plate; the connecting parts include a fixing seat, a pressing plate and bolts; the fixing seat is welded and fixed to the edge of the upper end face of the tank body, and a threaded hole is provided on it; the pressing plate is provided with bolt holes that pass through its upper and lower ends, is hinged on the fixing seat, and rotates in a horizontal plane around its hinge, and is located on the outside or inside of the tank body through rotation. When the pressing plate rotates to the inside of the tank body, the bolt hole of the pressing plate and the threaded hole of the fixing seat overlap;

[0076] a. Control the action of the turning hydraulic cylinder to discharge the molten liquid in the smelting furnace through the feeding port and the drainage trough in turn, and enter the cavity of the sand mold through the casting port;

[0077] b. The tank body, bottom plate and steel bar obtained by sand casting are welded in sequence to form a whole; four hooks are welded to the four top corners of the upper end surface of the tank body; four sets of connecting parts are installed on the four sides of the upper end surface of the tank body; finally, the upper cover is installed on the upper end of the tank body through the connecting parts to obtain the nuclear waste storage container.

[0078] A further technical solution of the present invention is: in step S06 of preparing a nuclear waste storage container, the connecting components include a fixing seat, a pressing plate and a bolt; the fixing seat is welded and fixed to the edge of the upper end surface of the tank body, and is provided with a threaded hole; the pressing plate is provided with bolt holes that pass through the upper and lower ends thereof, is hinged to the fixing seat, and performs horizontal rotation around its hinge, and is located outside the tank body or inside the tank body through rotation, and when the pressing plate rotates to the inside of the tank body, the bolt hole of the pressing plate and the threaded hole of the fixing seat are in an overlapping position;

[0079] The steps to install the top cover are as follows:

[0080] 1. First rotate the pressing plate to the outside of the tank body, and then place the upper cover on the upper end surface of the tank body;

[0081] 2. Then rotate the pressing plate to the inside of the tank body so that the bolt holes of the pressing plate coincide with the threaded holes of the fixing seat;

[0082] 3. Screw the bolts into the bolt holes of the pressure plate and the threaded holes of the fixing seat, so that the pressure plate presses the upper cover, and then the upper cover presses the upper end surface of the tank body.

[0083] A further technical solution of the present invention is: when the shot peening decontamination device continues to operate for 4-10 minutes, the steel ball decontamination process is started to remove the radioactive nuclides contaminated on the surface of the steel balls; before the cleaning process is performed, the shot peening decontamination device is in the following state:

[0084] 1. The outer cylinder rotates until the steel ball outlet D faces obliquely upward;

[0085] 2. The electric control valve A on the steel ball drop port of the screening bin is closed;

[0086] 3. The electric control valve D on the steel ball outlet B of the screening bin is closed;

[0087] 4. The electric control valve B on the slag discharge port of the steel ball cleaning machine is closed;

[0088] 5. The electric control valve C on the receiving funnel of the steel ball repatriator is opened;

[0089] The steel ball decontamination process is as follows:

[0090] S01, collect the steel balls into the screening bin:

[0091] Place the shot peening operation port of the spray gun directly against a plane to close the shot peening operation port; then start the high-pressure air source and negative pressure exhaust equipment to make the steel balls flow along the flow path of the recovery bin-spray gun-screening bin and all gather in the screening bin, and then close the high-pressure air source and negative pressure exhaust equipment;

[0092] In this step, after the negative pressure exhaust device is started, negative pressure is generated in the upper chamber of the dust collecting bin, the lower chamber of the dust collecting bin, the upper area of ​​the screening bin, and the steel ball recovery channel of the spray gun in sequence;

[0093] In this step, after the high-pressure air source is started, air is blown into the steel ball injection channel of the spray gun through the three-way joint and the steel ball inlet A, so that the steel ball outlet C connected to the three-way joint generates negative pressure. Under the action of the negative pressure, the steel balls are discharged from the steel ball outlet C of the recovery bin, and then enter the air pipeline, and then flow into the steel ball injection channel of the spray gun under the push of wind force;

[0094] In this step, when the steel balls flow through the spray gun, the moving paths are the steel ball injection channel, the confluence chamber, and the steel ball recovery channel in sequence; after the steel balls enter the confluence chamber, they move toward the shot peening operation port and finally hit the metal surface. When the steel balls hit the plane, they immediately rebound and change direction, and enter the steel ball recovery channel under the action of negative pressure;

[0095] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state;

[0096] S02, conveying the steel balls to the steel ball cleaning machine:

[0097] Open the electric control valve D on the steel ball outlet B of the screening bin, so that the steel balls in the screening bin enter the inner cavity of the inner cylinder through the steel ball inlet D on the outer cylinder;

[0098] In this step, since the screening chamber is located above the steel ball cleaning machine, the steel balls can flow naturally by their own gravity;

[0099] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state;

[0100] S03, cleaning the steel balls:

[0101] a. Put the dry ice pellets into the dry ice storage chamber of the dry ice supply device through the dry ice feeding port, and then perform the following three operations at the same time:

[0102] 1. Start the motor to drive the inner cylinder to rotate in a circle relative to the outer cylinder, so that the steel balls in the inner cylinder cavity can fully roll. On the one hand, the entire surface of the steel balls has the opportunity to contact the dry ice particles. On the other hand, the mutual collision between the steel balls can peel off a small part of the radioactive nuclides on the surface of the steel balls. The debris generated by the collision enters the annular cavity through the hollow holes and gathers at the lowest point of the annular cavity.

[0103] 2. Start the high-pressure air source, so that the dry ice particles in the dry ice storage chamber pass through the dry ice outlet of the dry ice supply device and the dry ice inlet of the outer cylinder in turn, and enter the inner cavity of the inner cylinder; after the dry ice particles enter the inner cavity of the inner cylinder, they directly impact the surface of the steel ball, and most of the radioactive nuclides on the surface of the steel ball are stripped off by sublimation;

[0104] 3. Start the negative pressure exhaust device to generate negative pressure in the upper cavity of the dust collecting bin, the lower cavity of the dust collecting bin, and the inner cavity of the inner cylinder in turn; under the action of negative pressure, the gas containing radioactive nuclides in the inner cavity of the inner cylinder is discharged to the outside through the exhaust gas outlet of the outer cylinder, the sand and dust inlet of the dust collecting bin, the lower cavity of the dust collecting bin, the filter element, the upper cavity of the dust collecting bin, and the negative pressure exhaust device in turn; in this process, when the gas flows through the filter element, the radioactive nuclides are retained in the filter element, ensuring that the gas finally discharged to the outside is pollution-free gas;

[0105] b. After the steel ball cleaning is completed, turn off the high-pressure air source, negative pressure exhaust equipment and motor, and open the electric control valve B on the slag discharge port of the outer cylinder to discharge the debris in the annular cavity;

[0106] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state;

[0107] S04, send the steel balls into the recovery bin:

[0108] a. The electric push rod X moves, causing the outer cylinder to rotate in a vertical plane around its hinge. When the outer cylinder rotates to the point where the steel ball outlet D faces obliquely downward, the cover plate rotates under its own weight, causing the steel balls in the inner cylinder cavity to be discharged through the steel ball outlet D;

[0109] b. After being discharged, the steel balls fall freely and enter the repatriation chamber through the steel ball entrance E;

[0110] c. The electric push rod Y is started to drive the repatriation bin to rotate in a vertical plane around its hinge. When the repatriation bin rotates to the point where the steel ball outlet E faces obliquely downward, the negative pressure exhaust device is started to generate negative pressure in the recovery bin and the repatriation bin in turn. Under the action of the negative pressure, the steel balls in the repatriation bin pass through the steel ball outlet E of the repatriation bin and the steel ball repatriation port of the recovery bin in turn and enter the recovery bin;

[0111] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state.

[0112] A further technical solution of the present invention is: in step S04 of preparing a nuclear waste storage container, when the inner funnel is docked with the outer funnel, the distance between the lower port of the inner funnel and the bottom surface of the smelting chamber of the smelting furnace is 0-5cm; a disposable soft pad is arranged in the lower port of the inner funnel, and the soft pad plays a buffering role to prevent the bottom surface of the smelting chamber of the smelting furnace from being damaged by metal blocks.

[0113] A further technical solution of the present invention is: the trolley assembly also includes a universal ball seat and a steel ball, the lower end of the universal ball seat is fixedly mounted on the second floor plate or the tilting platform, and is located on the outside of a guide rail relatively close to the drainage groove, the upper end of the universal ball seat is provided with a spherical pit for accommodating the steel ball, and the steel ball is movably mounted in the spherical pit of the universal ball seat; there are multiple universal ball seats, all of which are arranged at intervals and arranged in a row parallel to the guide rail; when the trolley moves to any position along the guide rail, at least one steel ball on the universal ball seat contacts the lower surface of the trolley body; accordingly, the trolley body is a rectangular frame with four vertex corners, and the electric wheels are only arranged at the three vertex corners at the lower end of the body, and no electric wheels are arranged at the lower end of a vertex corner of the body relatively close to the drainage groove; during the movement of the trolley, the steel balls are used to auxiliary support the trolley to ensure the stability of the trolley during the movement.

[0114] A further technical solution of the present invention is: in step S05 of preparing a nuclear waste storage container, during the smelting process, there is a height difference between the dust collecting hood and the feeding port to facilitate observation of the situation in the smelting furnace. If the molten liquid crusts, manual intervention is immediately performed to avoid furnace explosion.

[0115] A further technical solution of the present invention is: in step S01 of the sealed container preparation method and step S01 of the steel ball decontamination process, the spray gun is grasped and moved by an industrial robot arm.

[0116] Compared with the prior art, the present invention has the following advantages:

[0117] 1. It uses nuclear waste metal as raw material, and through the two steps of shot peening and smelting, the radiation dose in the nuclear waste metal is greatly reduced (it can be reduced to the radiation dose that meets the requirements of civilian steel), and then the various components of the nuclear waste storage container are cast through sand molds, and finally welded and assembled to form a nuclear waste storage container. Based on the above process, the recycling and reuse of nuclear waste metal is realized, which can fully meet the requirements of "minimizing radioactive waste";

[0118] Most of the nuclear waste metals are collected from nuclear power plants or nuclear industrial enterprises. Except for a small part of the metals (such as the metals inside the reactor core) which are radioactively contaminated as a whole, most of the metals are only radioactively contaminated on the surface.

[0119] About shot peening: The shot peening decontamination device can effectively remove stains, rust and radioactive material layers on the surface of nuclear waste metal, achieving the effect of radioactive decontamination;

[0120] About smelting: Smelting nuclear scrap metal through a smelting furnace will release the radioactive nuclides retained in the nuclear scrap metal. The high temperature will cause some volatile radioactive nuclides to directly turn into gas and evaporate, while other radioactive nuclides will be deposited in the slag produced by the smelting. The gases and slag produced during the smelting process are collected to achieve the effect of radioactive decontamination.

[0121] 2. The shot peening decontamination device has the following advantages:

[0122] a. The steel balls circulate between the spray gun, the screening bin and the recovery bin. The circulation path is relatively short, the wear of the steel balls is relatively small, and the service life is longer;

[0123] b. The spray gun can be placed against the surface of the workpiece to perform decontamination operations. The decontamination location and decontamination time can be flexibly controlled by the operator, and the operation method is very convenient;

[0124] c. The dust and debris generated during the shot blasting operation can be immediately collected in the sand and dust collector and will not leak to the outside world, which can greatly reduce the radiation exposure of the operators;

[0125] d. Automatic cleaning of steel balls can be achieved. The cleaning process can fully remove radioactive nuclides on the surface of steel balls, extending the number of times the steel balls are used for radioactive decontamination of nuclear waste metal surfaces.

[0126] 3. The metal smelting and feeding assembly has a very high degree of automation. The entire process of feeding-smelting-pouring basically does not require manual intervention. In addition, while meeting the movement requirements of each component, multiple anti-interference structures (avoidance structures) are designed in a targeted manner according to the sequence and relative position relationship of each component during the movement process;

[0127] a. In order to avoid interference between the trolley and the furnace nozzle (the drainage trough is arranged on the furnace nozzle) during the movement of the trolley, on the one hand, the electric wheels at the lower end of the top corner of the trolley relatively close to the furnace nozzle are removed (that is, the trolley is only provided with electric wheels at the three top corners at the lower end); on the other hand, the universal ball seat and steel ball arranged on the second floor plate are used to provide auxiliary support for the trolley, thereby ensuring the stability of the trolley during movement;

[0128] b. In order to prevent the inner funnel from interfering with the belt conveyor A during docking or separation, on the one hand, a hinged structure that can rotate as a whole is designed for the belt conveyor A. On the other hand, the upper pulling assembly is used to provide the belt conveyor A with rotational power, thereby ensuring the stability and reliability of the belt conveyor A during rotation.

[0129] 4. The metal smelting and feeding assembly has good reliability. Various unfavorable factors in its working state are fully considered, and a variety of structures that help improve reliability are designed in a targeted manner;

[0130] a. In order to ensure that the trolley can be accurately aligned with the feeding port of the smelting furnace when it is in the first position and will not shake or slip due to the impact of the material, a locking structure in a specific state is designed for the trolley, that is, an electric push rod B is provided at one end of the trolley, and a positioning sleeve is provided at the corresponding position of the tilting platform. When the trolley is in the first position, the electric push rod B and the positioning sleeve are directly opposite each other, and the electric push rod B extends into the inner hole of the positioning sleeve to lock the position of the trolley;

[0131] b. In order to prevent the material from damaging the bottom surface of the smelting chamber of the smelting furnace when charging into a cold furnace, on the one hand, a disposable soft cushion is provided at the lower port of the inner funnel, and on the other hand, when the inner funnel is in the docking state, the distance between its lower port and the bottom surface of the smelting chamber is only 0-5cm; it can play a good buffering role when charging into a cold furnace, and prevent the bottom surface of the smelting chamber of the smelting furnace from being damaged;

[0132] c. In order to facilitate observation of the internal conditions of the smelting furnace at any time (through the feeding port) during the smelting process, the dust collecting hood is designed to be a height-adjustable structure.

[0133] The present invention is further described below in conjunction with the figures and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0134] Figure 1 It is a schematic diagram of the structure of the present invention;

[0135] Figure 2 It is a schematic diagram of the structure of the shot peening decontamination device;

[0136] Figure 3 It is a structural diagram of a steel ball cleaning machine;

[0137] Figure 4 This is a schematic diagram of the structure of the steel ball repatriator;

[0138] Figure 5 It is a schematic diagram of the structure of the spray gun;

[0139] Figure 6 It is a schematic diagram of the structure of a metal compression baler in one viewing angle;

[0140] Figure 7 It is a schematic diagram of the structure of the metal compression baler from another perspective;

[0141] Figure 8 It is a structural schematic diagram of the metal smelting feeding assembly;

[0142] Fig. 9 It is a state diagram of step S04 e of the working process of the present invention when the sub-steps are completed;

[0143] Fig.10It is a state diagram of step S05 a of the working process of the present invention when the steps are completed;

[0144] Fig.11 It is a state diagram of step S05 d of the working process of the present invention when the steps are completed;

[0145] Fig.12 for Fig. 9 A magnified view of part A;

[0146] Fig.13 The exploded view of the nuclear waste containment container prepared by the present invention.

[0147] Note: Vertical lift only Figure 8 It is shown in Figure 9-11 Not shown in FIG.

[0148] Legend: Shot peening and decontamination device 1; spray gun 11; confluence chamber 111; shot peening operation port 1111; steel ball injection channel 112; steel ball inlet A1121; steel ball recovery channel 113; steel ball outlet A1131; screening chamber 121; steel ball inlet B1211; sand and dust outlet 1212; blast port A1213; steel ball drop port 1214; steel ball outlet B1215; recovery chamber 122; steel ball outlet C1221; negative pressure exhaust port 1222; steel ball repatriation port 1223; three-way connector 123; first port 1231; second port 1232; third port 1233; dust collecting chamber 131; upper chamber 1311; lower chamber 1312; sand and dust inlet 1313 ; Filter outlet 1314; Filter element 132; Steel ball cleaning machine 14; Outer cylinder 141; Steel ball outlet D1411; Dry ice inlet 1412; Exhaust gas outlet 1413; Steel ball inlet D1414; Slag outlet 1415; Cover plate 1416; Inner cylinder 142; Hollow hole 1421; Bracket A143; Electric push rod X144; Motor 145; Annular cavity 146; Steel ball repatriator 15; Repatriation chamber 151; Steel ball inlet E1511; Steel ball outlet E1512; Material receiving funnel 1513; Bracket B152; Electric push rod Y153; High-pressure air inlet 161; Dry ice feeding port 162; Dry ice outlet 163; High-pressure air source 17; Negative pressure exhaust equipment 18; metal cutting machine 2; metal shredder 3; metal compression baler 4; box 41; first wall 411; second wall 412; third wall 413; fourth wall 414; bottom wall 415; X-direction hydraulic cylinder 421; X-direction push plate 422; Y-direction hydraulic cylinder 431; Y-direction push plate 432; rotating plate 441; flipping hydraulic cylinder 442; rotating shaft 451; folding plate 452; discharging hydraulic cylinder 453; first floor 511; second floor 512; connecting port 513; vertical lift 52; material inlet 521; material outlet 522; tilting platform 531; smelting furnace 532; feeding port 5321; drainage trough 5322; flipping hydraulic cylinder 533; guide rail 541; trolley 5 42; universal ball seat 543; steel ball 544; electric push rod B545; positioning sleeve 546; outer funnel 551; inner funnel 552; hanging ear 5521; electric push rod A561; connecting frame 562; dust cover 563; support 571; frame A5721; first hinge 57211; second hinge 57212; third hinge 57213; conveyor belt A5722; connecting frame 5731; steel cable 5732; winch 5733; lower supporting component 574; sand mold 6; upper cover 71; tank body 72; bottom plate 73; steel bar 74; fixing seat 751; pressure plate 752; bolt 753; belt conveyor B100; belt conveyor C200. DETAILED DESCRIPTION

[0149] Embodiment 1:

[0150] like Figure 1-12 As shown, a nuclear waste storage container preparation system is used for preparing nuclear waste storage containers, which includes a shot peening decontamination device 1, a metal cutting machine 2, a metal shredder 3, a metal compression baler 4, a metal smelting and feeding assembly and a storage container preparation assembly.

[0151] The shot peening decontamination device 1, the metal cutting machine 2, the metal shredder 3, the metal compression baler 4, the metal smelting and feeding assembly, and the sealing container preparation assembly are used in sequence in the preparation process of the nuclear waste sealing container.

[0152] The shot peening decontamination device 1 comprises a spray gun 11 , a sand and dust separator, a sand and dust collector, a steel ball cleaning machine 14 , a steel ball repatriator 15 , a dry ice supply device, a high-pressure air source 17 and a negative pressure exhaust device 18 .

[0153] The spray gun 11 is provided with a confluence chamber 111, a steel ball injection channel 112 and a steel ball recovery channel 113. The front end of the steel ball injection channel 112 and the front end of the steel ball recovery channel 113 are respectively connected to the rear end of the confluence chamber 111, and the front end of the confluence chamber 111, the rear end of the steel ball injection channel 112, and the rear end of the steel ball recovery channel 113 respectively form a shot peening operation port 1111, a steel ball inlet A1121, and a steel ball outlet A1131 on the spray gun 11.

[0154] The sand and dust separator includes a screening bin 121, a recovery bin 122 and a three-way joint 123 which are arranged in sequence from top to bottom. The upper ends of the screening bin 121 are provided with a steel ball inlet B1211 and a sand and dust outlet 1212 on both sides thereof, and the lower end of the screening bin 121 is provided with an air blast port A1213, a steel ball drop port 1214 and a steel ball outlet B1215. The steel ball inlet B1211 is connected to the steel ball outlet A1131 of the spray gun 11 through an air pipeline. The steel ball drop port 1214 is provided with an electric control valve A. The steel ball outlet B1215 is provided with an electric control valve D. The upper end of the recovery bin 122 is provided with an opening which is directly opposite to the steel ball drop port 1214 of the screening bin 121, the lower end of the recovery bin 122 is provided with a steel ball outlet C1221, and the side wall of the recovery bin 122 is provided with a negative pressure exhaust port 1222 and a steel ball repatriation port 1223. The three-way connector 123 is provided with a first port 1231, a second port 1232 and a third port 1233. The first port 1231 is connected to the steel ball outlet C1221 of the recovery bin 122, and the second port 1232 is connected to the steel ball inlet A1121 of the spray gun 11 through an air pipeline.

[0155] The sand and dust collector includes a dust collecting bin 131 and a filter element 132 installed in the inner cavity of the dust collecting bin 131. The filter element 132 divides the inner cavity of the dust collecting bin 131 into an upper cavity 1311 and a lower cavity 1312 which are not connected to each other. The outer wall of the dust collecting bin 131 is provided with a sand and dust inlet 1313 connected to the lower cavity 1312 and a post-filter air outlet 1314 connected to the upper cavity 1311. The sand and dust inlet 1313 is connected to the sand and dust outlet 1212 of the screening bin 121 through an air pipeline.

[0156] The steel ball cleaning machine 14 includes an outer cylinder 141, an inner cylinder 142, a bracket A143, an electric push rod X144 and a motor 145. A steel ball outlet D1411, a dry ice inlet 1412, an exhaust gas outlet 1413 and a steel ball inlet D1414 are provided at one end of the outer cylinder 141, and a machine shaft through hole and a slag discharge port 1415 are provided at the center and the lower edge of the other end, respectively, and an electric control valve B is provided on the slag discharge port 1415. A cover plate 1416 is rotatably connected to the steel ball outlet D1411 of the outer cylinder 141, and the cover plate 1416 is rotated to open or close the steel ball outlet D1411. The exhaust gas outlet 1413 of the outer cylinder 141 is connected to the sand and dust inlet 1313 of the dust collecting bin 131 through an air pipeline. The steel ball inlet D1414 of the outer cylinder 141 is connected to the steel ball outlet B1215 of the screening bin 121 through a pipeline. The inner cylinder 142 has an opening at one end and an end plate at the other end. A hollow hole 1421 is provided on its outer circumferential surface. The hollow hole 1421 is a strip hole that allows dust and debris smaller than the steel ball to pass through. The inner cylinder 142 can be rotatably mounted inside the outer cylinder 141 (through a bearing), and an annular cavity 146 is formed between the inner cylinder 142 and the outer cylinder 141. The opening of the inner cylinder 142 is directly opposite to and adjacent to the steel ball outlet D1411, the dry ice inlet 1412 and the exhaust gas outlet 1413 of the outer cylinder 141. The lower end of the bracket A143 is mounted on the ground, and the upper end is hinged to the outer wall of the outer cylinder 141. The lower end of the electric push rod X144 is hingedly mounted on the ground, and the upper end is hinged to the outer wall of the outer cylinder 141. It is used to drive the outer cylinder 141 to rotate in a vertical plane around its hinge, thereby making the steel ball outlet D1411 face obliquely upward or obliquely downward. When the steel ball outlet D1411 faces obliquely upward, the cover plate 1416 fits with the steel ball outlet D1411 to close the steel ball outlet D1411, and when the steel ball outlet D1411 faces obliquely downward, the cover plate 1416 separates from the steel ball outlet D1411 to open the steel ball outlet D1411. The motor 145 is fixedly mounted on an end surface of one side of the outer cylinder 141, and its shaft extends into the inner part of the outer cylinder 141 through the shaft through-hole, and is fixedly connected to the end plate of the inner cylinder 142. The shaft of the motor 145 rotates to drive the inner cylinder 142 to rotate in a circle relative to the outer cylinder 141.

[0157] The steel ball repatriator 15 includes a repatriation bin 151, a bracket B152 and an electric push rod Y153. The repatriation bin 151 is provided with a steel ball inlet E1511 at the upper end and a steel ball outlet E1512 at the lower end. The steel ball inlet E1511 of the repatriation bin 151 is located directly below the steel ball outlet D1411 of the outer cylinder 141. The lower end of the bracket B152 is fixedly mounted on the ground, and the upper end is hinged to the outer wall of the repatriation bin 151. The electric push rod Y153 is hingedly mounted on the ground at the lower end, and the upper end is hinged to the outer wall of the repatriation bin 151. It is used to drive the repatriation bin 151 to rotate in a vertical plane around its hinge, so that the steel ball outlet E1512 faces obliquely upward or obliquely downward. When the steel ball outlet E1512 faces obliquely upward, the steel ball repatriator 15 can receive the steel balls discharged from the steel ball cleaning machine 14 . When the steel ball outlet E1512 faces obliquely downward, the steel ball repatriator 15 can transport the steel balls to the recovery bin 122 .

[0158] The dry ice supply device has a dry ice storage chamber inside, and the outer wall of the dry ice supply device is provided with a high-pressure air inlet 161 connected to the dry ice storage chamber, a dry ice feeding port 162 and a dry ice outlet 163. The dry ice outlet 163 is connected to the dry ice inlet 1412 of the steel ball cleaning machine 14 through an air pipeline.

[0159] The high-pressure air source 17 is used to output compressed air. The high-pressure air source 17 is connected to the air blast port A1213 of the screening bin 121, the third port 1233 of the three-way joint 123, and the high-pressure air inlet 161 of the dry ice supply device through air pipelines.

[0160] The negative pressure exhaust device 18 is used to provide negative pressure. The negative pressure exhaust device 18 is connected to the post-filter air outlet 1314 of the dust collecting bin 131 and the negative pressure exhaust port 1222 of the recovery bin 122 through air pipelines.

[0161] The metal compression baler 4 includes a housing 41, an X-direction propulsion assembly, a Y-direction propulsion assembly, a top flip assembly and a discharge control assembly.

[0162] The box body 41 is in the shape of a hollow rectangular parallelepiped, in which a compression chamber is provided, and an inlet and outlet connected to the compression chamber are provided at the upper end thereof. The four side walls are named as the first wall 411, the second wall 412, the third wall 413 and the fourth wall 414 in clockwise order respectively. The first wall 411 is provided with a rectangular opening A connected to the compression chamber at the lower end adjacent to the second wall 412, and the fourth wall 414 is provided with a rectangular opening B connected to the compression chamber at the lower end. A corner notch is provided between the lower end of the third wall 413 and the bottom wall 415 of the box body 41, and the corner notch is formed by connecting a rectangular opening C provided on the third wall 413 and a rectangular opening D provided on the bottom wall 415 of the box body 41, and the rectangular opening C is opposite to the rectangular opening A.

[0163] The X-direction propulsion assembly includes an X-direction hydraulic cylinder 421 and an X-direction push plate 422 connected to the end of the piston rod of the X-direction hydraulic cylinder 421. The cylinder body of the X-direction hydraulic cylinder 421 is fixedly mounted on the fourth wall 414 of the box body 41 and is located outside the compression chamber. The X-direction push plate 422 is driven by the X-direction hydraulic cylinder 421 to perform horizontal reciprocating linear movement, and then changes between being flush with the rectangular opening B and extending into the compression chamber. The moving direction of the X-direction push plate 422 is perpendicular to the second wall 412.

[0164] The Y-direction propulsion assembly includes a Y-direction hydraulic cylinder 431 and a Y-direction push plate 432 connected to the end of the piston rod of the Y-direction hydraulic cylinder 431. The cylinder body of the Y-direction hydraulic cylinder 431 is fixedly mounted on the first wall 411 of the box body 41 and is located outside the compression chamber. The Y-direction push plate 432 is driven by the Y-direction hydraulic cylinder 431 to perform horizontal reciprocating linear movement, and then changes between being flush with the rectangular opening A and extending into the compression chamber. The moving direction of the Y-direction push plate 432 is parallel to the second wall 412.

[0165] The top flip assembly includes a rotating plate 441 and a flip hydraulic cylinder 442. A fourth hinge 4411 is provided at one end of the rotating plate 441, and a fifth hinge is provided in the middle of the rotating plate 441. The cylinder body of the flip hydraulic cylinder 442 is hinged at the upper end of the fourth wall 414, and the end of the piston rod of the flip hydraulic cylinder 442 is hinged at the fifth hinge of the rotating plate 441. The piston rod of the flip hydraulic cylinder 442 is extended and retracted to drive the rotating plate 441 to rotate in a vertical plane around the fourth hinge 4411, thereby closing or opening the inlet and outlet of the box body 41.

[0166] The discharging control assembly includes a rotating shaft 451, a folding plate 452 and a discharging hydraulic cylinder 453. The rotating shaft 451 is horizontally arranged and movably mounted on the upper end of the third wall 413 and arranged parallel to the third wall 413. The rotating shaft 451 is fixedly connected to the upper end of the plate A at one end, and is hinged to the piston rod end of the discharging hydraulic cylinder 453 at the other end. The folding plate 452 is composed of a plate A and a plate B that are perpendicular to each other and connected at the side. The folding plate 452 is arranged at the corner notch and is fixedly connected to the rotating shaft 451 at the upper end of the plate A. The cylinder body of the discharging hydraulic cylinder 453 is hinged at the lower end of the second wall 412. The piston rod of the discharging hydraulic cylinder 453 is extended and retracted to drive the rotating shaft 451 to rotate, thereby driving the folding plate 452 to rotate around the rotating shaft 451, so that the folding plate 452 is switched between the gap filling state and the discharging state. When the folding plate 452 is in the gap filling state, the surface of the plate A in the compression chamber is flush with the surface of the third wall 413 in the compression chamber, and the surface of the plate B in the compression chamber is flush with the surface of the bottom wall 415 of the box body 41 in the compression chamber. When the folding plate 452 is in the discharging state, the plate A is inclined toward the outside of the compression chamber, and the plate B is inclined toward the upper end of the compression chamber.

[0167] The metal smelting feeding assembly comprises a general frame, a vertical hoist 52, a smelting furnace assembly, a trolley assembly, a feeding docking mechanism, a negative pressure dust removal mechanism and a material conveying mechanism.

[0168] The main frame is provided with a first floor plate 511 and a second floor plate 512 from bottom to top. There is a first-layer space between the first floor plate 511 and the second floor plate 512. The upper end of the second floor plate 512 is a second-layer space. A connecting opening 513 connecting the first-layer space and the second-layer space is provided on the second floor plate 512.

[0169] The vertical hoist 52 is fixedly mounted on the main frame and is located between the first-floor space and the second-floor space. The vertical hoist 52 includes an elevator shaft, a lifting platform (not shown in the figure), a traction drive device (not shown in the figure) and a conveyor belt mechanism (not shown in the figure). A material inlet 521 connected to the first-floor space is provided at the lower end of the elevator shaft, and a material outlet 522 connected to the second-floor space is provided at the upper end. The lifting platform is installed in the elevator shaft through the traction drive device and performs lifting and lowering movements in the vertical direction. The conveyor belt mechanism is installed on the lifting platform, and a conveyor belt is provided on it, which moves up and down synchronously with the lifting platform, and then moves between the upper docking position and the lower docking position. When the conveyor belt mechanism is in the upper docking position, the conveyor belt is directly opposite to the material outlet 522 to output materials, and when the conveyor belt mechanism is in the lower docking position, the conveyor belt is directly opposite to the material inlet 521 to receive materials.

[0170] The smelting furnace assembly includes a tilting platform 531, a smelting furnace 532 and a turning hydraulic cylinder 533. The tilting platform 531 is hingedly mounted at the connecting port 513 of the second floor 512 and rotates in a vertical plane around the hinge. A smelting chamber is provided inside the smelting furnace 532. A feeding port 5321 connected to the smelting chamber and a drainage trough 5322 connected to the feeding port 5321 are provided at the upper end of the smelting furnace 532. The smelting furnace 532 is fixedly connected to the tilting platform 531 at the upper end of the outer wall, and is located at the connecting port 513 of the second floor 512, and is located between the first-floor space and the second-floor space. The tilting hydraulic cylinder 533 is arranged between a bottom plate 511 and the smelting furnace 532, with its lower end hinged on the bottom plate 511 and its upper end hinged to the lower surface of the tilting platform 531, and is used to drive the tilting platform 531 to rotate around its hinge, thereby driving the smelting furnace 532 to rotate, so that the smelting furnace 532 is switched between the working state and the pouring state. The smelting furnace 532 is in a vertical posture in the working state, and the feeding port 5321 is vertically facing upward. The smelting furnace 532 is in an inclined posture in the pouring state, and the molten liquid in the smelting furnace can be poured out through the feeding port 5321 and the drainage trough 5322.

[0171] The trolley assembly includes a guide rail 541 and a trolley 542. There are two guide rails 541, which are arranged parallel to each other and fixedly mounted on the second floor 512, and are distributed on both sides of the feeding port 5321 of the smelting furnace 532. The two guide rails are arranged perpendicular to the drainage groove 5322 of the smelting furnace 532, one of the guide rails 541 is relatively close to the drainage groove 5322, and the other guide rail is relatively far away from the drainage groove 5322. The trolley 542 includes a vehicle body 5421 and an electric wheel 5422. The vehicle body 5421 is provided with a hollow hole A and a hollow hole B. The electric wheel 5422 is mounted at the lower end of the vehicle body 5421. The trolley 542 is movably mounted on the two guide rails 541 through the electric wheel 5422.

[0172] The feeding and docking mechanism includes an outer funnel 551, an inner funnel 552 and a traveling crane (not shown in the figure). The outer funnel 551 is fixedly installed in the hollow hole A of the vehicle body 5421, and is in the shape of a trumpet with a larger top and a smaller bottom. The inner funnel 552 is in the shape of a trumpet with a larger top and a smaller bottom, and is consistent with the shape of the inner hole of the outer funnel 551. The upper end of the inner funnel is provided with a hanging ear 5521 for docking with the traveling crane. The traveling crane is installed in the second-floor space, which is used to control the movement of the inner funnel 552, and then dock or separate the inner funnel 552 with the outer funnel 551. When the inner funnel 552 is docked with the outer funnel 551, the lower port of the inner funnel 552 extends into the smelting chamber of the smelting furnace 532 through the feeding port 5321 of the smelting furnace 532.

[0173] The negative pressure dust removal mechanism includes a dust hood 563 and a negative pressure dust collector (not shown in the figure). The dust hood 563 is installed on the trolley 542 and is located in the hollow hole B of the trolley 542. An air path is provided inside the dust hood 563. The air path forms a dust collection port and a dust exhaust port at both ends of the dust hood 563. The dust exhaust port and the dust collection port are respectively located at the upper end and the lower end of the hollow hole B. The negative pressure dust collector is provided with an air inlet and an exhaust port. A filter element is provided inside the negative pressure dust collector. The air inlet of the negative pressure dust collector is connected to the dust exhaust port of the dust hood 563 through an air path pipeline.

[0174] The material conveying mechanism includes a support 571, a belt conveyor A and an upper pulling assembly. The support 571 is fixedly installed in the second-floor space. The belt conveyor A includes a frame A5721 and a conveyor belt A5722 installed on the frame A5721. The belt conveyor A is provided with a feed end A and a discharge end A at both ends along the conveying direction of the conveyor belt A5722. The frame A5721 is provided with a first hinge 57211, a second hinge 57212 and a third hinge 57213 from one end to the other end. The frame A5721 is hingedly installed on the support 571 through the first hinge 57211, and the rotation path of the belt conveyor A around the first hinge 57211 is located in a vertical plane. The upper pulling assembly includes a connecting frame 5731, a steel cable 5732 and a winch 5733. The lower end of the connecting frame 5731 is hinged on the third hinge 57213 of the frame body A5721. The lower end of the steel cable 5732 is connected to the upper end of the connecting frame 5731, and the upper end of the steel cable 5732 is wound on the winch 5733. The winch 5733 is fixedly installed on the support 571. The winch 5733 drives the belt conveyor A to rotate around the first hinge 57211 by retracting and releasing the steel cable 5732, thereby switching the belt conveyor A between the conveying state and the avoidance state. In the conveying state, the feeding end A of the belt conveyor A is close to and directly facing the material outlet 522 of the vertical hoist 52, and the discharging end A is located directly above the feeding port 5321 of the smelting furnace 532 to realize the conveying of materials. In the avoidance state, the belt conveyor A avoids the lifting and lowering movement path of the inner funnel 552, the turning path of the smelting furnace 532, and the turning path of the tilting platform 531.

[0175] The sealed container preparation assembly includes a sand mold 6. The sand mold 6 has a pouring port at the upper end, an exhaust hole at the lower end, and a cavity connected to the pouring port and the exhaust hole. The sand mold 6 is installed in a space directly below the smelting furnace 532, and its pouring port is used to receive the molten liquid poured from the drainage trough 5322 of the smelting furnace 532.

[0176] Preferably, it also includes a belt conveyor B100 and a belt conveyor C200. The belt conveyor B100 is provided between the metal shredder 3 and the metal compression baler 4, and is used to transfer the material processed by the metal shredder 3 to the metal compression baler 4. The belt conveyor C200 is provided between the material inlet and outlet of the metal compression baler 4 and the material inlet 521 of the vertical elevator 52, and is used to transfer the material processed by the metal compression baler 4 to the vertical elevator 52.

[0177] Preferably, it also includes an industrial robot arm (not shown in the figure), which is used to grasp and move the spray gun 11.

[0178] Preferably, the material conveying mechanism further includes a lower support member 574. The lower support member 574 is disposed between the second bottom plate 512 and the frame A5721, with its upper end hinged to the second hinge 57212 of the frame A5721, and its lower end suspended in the air, and it always remains vertical as the belt conveyor A rotates. When the belt conveyor A is in a conveying state, the lower end of the lower support member 574 abuts against the second bottom plate 512, thereby providing support for the belt conveyor A.

[0179] Preferably, the negative pressure dust removal mechanism further comprises an electric push rod A561 and a connecting frame 562. The electric push rod A561 is fixedly mounted on the body 5421 of the trolley 542, and is fixedly connected to the dust hood 563 through the connecting frame 562 to drive the dust hood 563 to move vertically.

[0180] Preferably, the trolley assembly further includes a universal ball seat 543 and a steel ball 544. The lower end of the universal ball seat 543 is fixedly mounted on the second floor 512 or the tilting platform 531, and is located on the outer side of a guide rail 541 relatively close to the drainage groove 5322. The upper end of the universal ball seat 543 is provided with a spherical pit for accommodating the steel ball 544, and the steel ball 544 is movably mounted in the spherical pit of the universal ball seat 543. There are multiple universal ball seats 543, and all the universal ball seats 543 are arranged at intervals and arranged in a row parallel to the guide rail 541. When the trolley 542 moves to any position along the guide rail 541, at least one steel ball 544 on the universal ball seat 543 contacts the lower surface of the body 5421 of the trolley 542. Correspondingly, the body 5421 of the trolley 542 is a rectangular frame with four vertex corners, and the electric wheels 5422 are only arranged at the three vertex corners at the lower end of the body 5421. The electric wheel 5422 is not arranged at the lower end of a vertex corner of the body 5421 relatively close to the drainage groove 5322.

[0181] Preferably, the trolley assembly further includes an electric push rod B545 and a positioning sleeve 546. The electric push rod B545 is fixedly connected to one end of the body 5421 of the trolley 542 and moves up and down in the vertical direction. The positioning sleeve 546 is fixedly mounted on the tilting platform 531 and is located at the lower end of the electric push rod B545. When the trolley 542 is located in the first position, the electric push rod B545 and the positioning sleeve 546 are directly opposite each other up and down, and the electric push rod B545 extends into the inner hole of the positioning sleeve 546 to lock the position of the trolley 542.

[0182] Preferably, when the inner funnel 552 is docked with the outer funnel 551, the distance between the lower end of the inner funnel 552 and the bottom surface of the smelting chamber of the smelting furnace 532 is 0-5 cm. A disposable soft pad (not shown in the figure) is arranged in the lower end of the inner funnel 552, and the soft pad can be dissolved at high temperature (between 200-500°C).

[0183] Preferably, all gas pipelines are provided with valves (not shown in the figure).

[0184] Preferably, a material receiving funnel 1513 with an electric-controlled valve C is connected to the upper end of the steel ball inlet E1511 of the repatriation bin 151.

[0185] Preferably, the steel ball outlet D1411 of the steel ball cleaning machine 14 is semicircular and is arranged close to the lower edge of the end face of the outer cylinder 141; accordingly, the cover plate 1416 is semicircular in shape matching the shape of the steel ball outlet D1411; accordingly, the dry ice inlet 1412, the exhaust gas outlet 1413 and the steel ball inlet D1414 are all located at the upper end of the end face of the outer cylinder 141.

[0186] Preferably, the high-pressure air source 17 is an air compressor.

[0187] Preferably, the negative pressure exhaust device 18 is a vacuum pump.

[0188] The status of the car is described as follows:

[0189] The trolley 542 is provided with a first position, a second position and a third position in sequence along the moving path of the guide rail 541. When the trolley 542 is in the first position, the lower port of the outer funnel 551 is vertically opposite to the feeding port 5321 of the smelting furnace 532 in working state. When the trolley 542 is in the second position, the dust collecting port of the dust collecting hood 563 is vertically opposite to the feeding port 5321 of the smelting furnace 532 in working state. When the trolley 542 is in the third position, the rotation paths of the trolley 542 and the tilting platform 531 are staggered up and down. Only when the trolley 542 is in the first position, the outer funnel 551 and the inner funnel 552 can be docked or separated.

[0190] The working principle of the shot peening decontamination device is as follows:

[0191] The operator remotely controls the industrial robot arm to grasp the spray gun 11 and control the movement of the spray gun 11, and makes the shot peening operation port 1111 of the spray gun 11 face and press against the surface of the nuclear waste metal, and then starts the high-pressure air source 17 and the negative pressure exhaust device 18. Under the joint action of the high-pressure air source 17 and the negative pressure exhaust device 18, the steel balls circulate between the spray gun 111, the screening bin 121, and the recovery bin 122.

[0192] When the steel balls flow through the spray gun 11, the moving paths are the steel ball injection channel 112, the confluence chamber 111, and the steel ball recovery channel 113. After entering the confluence chamber 111, the steel balls move toward the shot peening operation port 1111 and finally hit the metal surface, which, on the one hand, peels off the stains, rust stains and radioactive material layer on the metal surface, and on the other hand, immediately rebounds and changes direction, and enters the steel ball recovery channel 113 under the action of negative pressure.

[0193] After the high-pressure air source 17 is started, air is blown from bottom to top into the screening bin 121 through the air blast port A1213 , and impurities, dust and debris in the screening bin 121 are blown to the upper area of ​​the screening bin 121 .

[0194] After the high-pressure air source 18 is started, air is blown into the steel ball injection channel 112 of the spray gun 11 through the three-way joint 123 and the steel ball inlet A1121, so that negative pressure is generated at the steel ball outlet C1221 connected to the three-way joint 123. Under the action of negative pressure, the steel balls are discharged from the steel ball outlet C1221 of the recovery bin 122, then enter the air pipeline, and then flow toward the steel ball injection channel 112 of the spray gun 11 under the push of wind.

[0195] After the negative pressure exhaust device 19 is started, negative pressure is generated in the upper chamber 1311 of the dust collecting bin 131, the lower chamber 1312 of the dust collecting bin 131, the upper area of ​​the screening bin 121, and the steel ball recovery channel 113 of the spray gun 11. Under the action of the negative pressure, impurities, dust, and debris in the upper area of ​​the screening bin enter the lower chamber 1312 of the dust collecting bin 131, and then settle at the bottom of the lower chamber 1312 or be collected by the filter element 132.

[0196] In the above method, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state.

[0197] The working principle of the metal compression baler is as follows:

[0198] After the metal scraps enter the compression chamber of the box body 41 through the inlet and outlet ports at the upper end of the box body 41, the flip hydraulic cylinder 442 is started to drive the rotating plate 441 to rotate in a vertical plane around the fourth hinge 4411, on the one hand to close the inlet and outlet ports of the box body 41, and on the other hand to compress the metal scraps in the compression chamber of the box body 41 in the height direction.

[0199] Then, the X-direction hydraulic cylinder 421 is started, driving the X-direction push plate 422 to move toward the second wall 412, compressing the metal scraps in the compression chamber in the horizontal X-direction (the moving direction of the X-direction push plate 422 is defined as the X-direction). When the X-direction push plate 422 moves to be flush with the side edge of the rectangular opening A, it stops moving.

[0200] Next, the Y-direction hydraulic cylinder 431 is started, driving the Y-direction push plate 432 to move toward the third wall 413, compressing the metal scraps in the compression chamber in the horizontal Y-direction (the moving direction of the Y-direction push plate 432 is defined as the Y-direction). After the compression of the metal scraps is completed, a rectangular block is formed.

[0201] Afterwards, the X-direction hydraulic cylinder 421 and the Y-direction hydraulic cylinder 431 are started in no particular order, and the X-direction push plate 422 and the Y-direction push plate 432 are driven back to their original positions. Finally, the discharge hydraulic cylinder 453 is started, and the folding plate 452 is driven to rotate through the rotating shaft 451, so that the folding plate 452 rotates from the gap filling state to the discharge state, thereby lifting the compressed rectangular block and discharging it from the compression chamber of the box body 41.

[0202] Briefly describe the working process of the present invention: The method for preparing a nuclear waste sealing container is applied to the above-mentioned nuclear waste sealing container preparation system to prepare a nuclear waste sealing container. Before preparing a nuclear waste sealing container, the nuclear waste sealing container preparation system is in an initial state. In the initial state:

[0203] a. The steel balls inside the shot peening and decontamination device 1 are concentrated in the screening bin 121;

[0204] b. The inlet and outlet of the box body 41 are open;

[0205] c. The X-direction push plate 422 is flush with the rectangular opening B;

[0206] d. The Y-direction push plate 432 is flush with the rectangular opening A;

[0207] e. The folding plate 452 is in the gap filling state;

[0208] f. The smelting furnace 532 is in working condition;

[0209] g. Car 542 is in the first position;

[0210] h. The inner funnel 552 is connected to the outer funnel 551;

[0211] i. Belt conveyor A is in the conveying state;

[0212] j. The electric push rod B545 extends into the inner hole of the positioning sleeve 546.

[0213] The steps to prepare a nuclear waste containment container are as follows:

[0214] S01, surface shot peening:

[0215] a. For nuclear scrap metal with inner wall surface, the metal cutting machine 2 is used to cut the inner wall surface to expose the inner wall surface, so as to facilitate the subsequent surface shot peening;

[0216] b. The operator remotely controls the industrial robot arm to grasp the spray gun 11 and control the movement of the spray gun 11, and makes the shot peening operation port 1111 of the spray gun 11 face and press against the surface of the nuclear waste metal, and then starts the high-pressure air source 17 and the negative pressure exhaust device 18. Under the joint action of the high-pressure air source 17 and the negative pressure exhaust device 18, the steel balls circulate between the spray gun 111, the screening bin 121, and the recovery bin 122;

[0217] When the steel balls flow through the spray gun 11, the moving paths are the steel ball injection channel 112, the confluence chamber 111, and the steel ball recovery channel 113. After entering the confluence chamber 111, the steel balls move toward the shot peening operation port 1111 and finally hit the metal surface, which, on the one hand, peels off the stains, rust stains and radioactive material layer on the metal surface, and on the other hand, immediately rebounds and changes direction, and enters the steel ball recovery channel 113 under the action of negative pressure;

[0218] After the high-pressure air source 17 is started, air is blown from bottom to top into the screening bin 121 through the air blast port A1213, and impurities, dust and debris in the screening bin 121 are blown to the upper area of ​​the screening bin 121;

[0219] After the high-pressure air source 17 is started, air is blown into the steel ball injection channel 112 of the spray gun 11 through the three-way joint 123 and the steel ball inlet A1121, so that the steel ball outlet C1221 connected to the three-way joint 123 generates negative pressure. Under the action of the negative pressure, the steel balls are discharged from the steel ball outlet C1221 of the recovery bin 122, and then enter the air pipeline, and then flow into the steel ball injection channel 112 of the spray gun 11 under the push of wind force;

[0220] After the negative pressure exhaust device 18 is started, negative pressure is generated in the upper chamber 1311 of the dust collecting bin 131, the lower chamber 1312 of the dust collecting bin 131, the upper area of ​​the screening bin 121, and the steel ball recovery channel 113 of the spray gun 11. Under the action of the negative pressure, impurities, dust, and debris in the upper area of ​​the screening bin enter the lower chamber 1312 of the dust collecting bin 131, and then settle at the bottom of the lower chamber 1312 or be collected by the filter element 132.

[0221] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state.

[0222] S02, fragmentation processing:

[0223] The nuclear scrap metal after the surface shot peening treatment is cut into a size that meets the feeding requirements of the metal shredder 3 by a metal cutting machine; the cut nuclear scrap metal is fed into the metal shredder 3 for shredding treatment.

[0224] S03, compression and packaging:

[0225] a. After the metal scraps formed by the shredding process are transferred to the compression chamber of the box body 41, the turning hydraulic cylinder 442 is started to drive the rotating plate 441 to rotate in the vertical plane around the fourth hinge 4411, so as to close the inlet and outlet of the box body 41 on the one hand, and compress the metal scraps in the compression chamber of the box body 41 in the height direction on the other hand;

[0226] b. The X-direction hydraulic cylinder 421 is started to drive the X-direction push plate 422 to move toward the second wall 412, so as to compress the metal scraps in the compression chamber in the horizontal X-direction (the moving direction of the X-direction push plate 422 is defined as the X-direction). When the X-direction push plate 422 moves to be flush with the side edge of the rectangular opening A (the side edge is the side edge of the rectangular opening A that is relatively far from the second wall 412), the movement is stopped;

[0227] c. The Y-direction hydraulic cylinder 431 is started to drive the Y-direction push plate 432 to move toward the third wall 413, thereby compressing the metal scraps in the compression chamber in the horizontal Y direction (the moving direction of the Y-direction push plate 432 is defined as the Y direction). After the metal scraps are compressed, a rectangular block is formed, which is hereinafter referred to as a metal block;

[0228] d. The X-direction hydraulic cylinder 421 and the Y-direction hydraulic cylinder 431 are started in no particular order, and drive the X-direction push plate 422 and the Y-direction push plate 432 to return to their original positions respectively;

[0229] e. The discharge hydraulic cylinder 453 is started, and the folding plate 452 is driven to rotate through the rotating shaft 451, so that the folding plate 452 is rotated from the gap filling state to the discharge state, thereby lifting the compressed rectangular block and discharging it from the compression chamber of the box body 41.

[0230] S04, cold furnace charging:

[0231] a. The metal block is fed into the vertical elevator 52 through the material inlet 521. After the vertical elevator 52 lifts the metal block from the first-floor space to the second-floor space, the metal block is driven to be discharged from the material outlet 522 to the outside of the vertical elevator 52;

[0232] b. After the metal block is discharged from the material outlet 522, it enters the conveyor belt A5722 through the feed end A of the belt conveyor A, and the metal block moves toward the discharge end A of the belt conveyor A along the conveyor belt A5722;

[0233] c. After the metal block is discharged from the discharging end A of the belt conveyor A, it enters the smelting chamber of the smelting furnace 532 through the inner funnel 552;

[0234] d. After the feeding is completed, the hoist 5733 is started, pulling the belt conveyor A to rotate upward around the first hinge 57211, so that the belt conveyor A changes from the conveying state to the avoidance state;

[0235] e. Hook the hook at the lower end of the crane to the hanging ear at the upper end of the inner funnel 552, and then operate the crane to lift the inner funnel 552 upwards, so that the inner funnel 552 and the outer funnel 551 are completely separated.

[0236] In this step, when the inner funnel is docked with the outer funnel, the distance between the lower port of the inner funnel and the bottom surface of the smelting chamber of the smelting furnace is 0-5cm; a disposable soft pad is arranged in the lower port of the inner funnel, which plays a buffering role and can prevent the bottom surface of the smelting chamber of the smelting furnace from being damaged by metal blocks.

[0237] S05. Metal smelting:

[0238] a. The electric push rod B545 is withdrawn from the inner hole of the positioning sleeve 546 to release the position lock of the trolley 542, and then the trolley 542 is moved from the first position to the second position, so that the dust collecting port of the dust collecting cover 563 faces the feeding port 5321 of the smelting furnace 532;

[0239] b. Start the heating function of the smelting furnace to melt the metal block; during the smelting process, on the one hand, ensure that the negative pressure dust collector is in continuous operation, so that the volatile gas generated by the smelting enters the negative pressure dust collector through the dust collecting hood 563, and the radioactive nuclides in the gas are trapped in the filter element of the negative pressure dust collector. The filtered gas is discharged into the atmosphere through the negative pressure dust collector. On the other hand, the slag generated by the smelting is manually cleaned in real time;

[0240] c. After the smelting is completed, the trolley is driven to move from the second position to the third position, so that the rotation paths of the trolley 542 and the tilting platform 531 are staggered up and down.

[0241] In this step, during the smelting process, the height of the dust collecting hood 563 from the feeding port 5321 is adjusted to facilitate observation of the situation in the smelting furnace 532. If the smelting liquid is crusted, manual intervention is immediately performed to avoid furnace explosion.

[0242] S06. Preparation of nuclear waste storage container:

[0243] like Fig.13As shown, the nuclear waste storage container is in the shape of a hollow cube, which includes an upper cover 71, a tank body 72, a bottom plate 73 and a steel bar 74 connected in sequence from top to bottom. The tank body 72 is in the shape of a square tube with open ends at the upper and lower ends, and hook ears 711 are respectively provided at the four vertex corners of its upper end surface, and connecting parts are respectively provided on the four sides of its upper end surface. The upper cover 71 is detachably mounted on the upper end surface of the tank body 72 through the connecting parts to close the upper end opening of the tank body 72. The bottom plate 73 is welded and fixed on the lower end surface of the tank body 72 to close the lower end opening of the tank body 72. Two steel bars 74 are welded and fixed on both sides of the lower end of the bottom plate 73. The connecting parts include a fixing seat 751, a pressing plate 752 and a bolt 753. The fixing seat 751 is welded and fixed on the edge of the upper end surface of the tank body, and a threaded hole is provided on it. The pressure plate 752 is provided with bolt holes passing through its upper and lower ends, is hinged on the fixing seat, and rotates horizontally around its hinge. It is located on the outside or inside of the tank body 72 through rotation. When the pressure plate 752 rotates to the inside of the tank body 72, the bolt holes of the pressure plate 752 overlap with the threaded holes of the fixing seat 751.

[0244] a. Control the turning hydraulic cylinder 533 to make the molten liquid in the smelting furnace 532 be discharged through the feeding port 5321 and the drainage groove 5322 in sequence, and enter the cavity of the sand mold 6 through the casting port;

[0245] b. The tank body 72, the bottom plate 73 and the steel bar 74 cast by the sand mold 6 are welded in sequence to form a whole; the four hook ears 711 are respectively welded to the four top corners of the upper end surface of the tank body 72; then the four groups of connecting parts are respectively installed on the four sides of the upper end surface of the tank body; finally, the upper cover 71 is installed on the upper end of the tank body 72 through the connecting parts, and the nuclear waste storage container is obtained.

[0246] The steps to install the top cover are as follows:

[0247] 1. First, rotate the pressing plate to the outside of the tank body 72, and then place the upper cover on the upper end surface of the tank body 72;

[0248] 2. Rotate the pressing plate to the inside of the tank body 72 so that the bolt hole of the pressing plate 752 coincides with the threaded hole of the fixing seat 751;

[0249] 3. Screw the bolts into the bolt holes of the pressing plate 752 and the threaded holes of the fixing seat 751 , so that the pressing plate 752 presses the upper cover 71 , and then the upper cover 71 presses the upper end surface of the tank body 72 .

[0250] In this step, there are four specifications of sand molds, which are used to cast the upper cover, tank body, bottom plate and steel bars of the nuclear waste storage container.

[0251] When the shot peening decontamination device 1 continues to operate for 4-10 minutes, the steel ball decontamination process can be started to remove the radioactive nuclides contaminated on the surface of the steel balls. Before the cleaning process is performed, the shot peening decontamination device 1 is in the following state:

[0252] 1. The outer cylinder 141 rotates until the steel ball outlet D1411 faces obliquely upward;

[0253] 2. The electric control valve A on the steel ball drop port 1214 of the screening bin 121 is closed;

[0254] 3. The electric control valve D on the steel ball outlet B1215 of the screening bin 121 is closed;

[0255] 4. The electric control valve B on the slag discharge port 1415 of the steel ball cleaning machine 14 is closed;

[0256] 5. The electric control valve C on the receiving funnel 1513 of the steel ball repatriator 15 is opened.

[0257] The decontamination process is as follows:

[0258] S01, collect the steel balls into the screening bin:

[0259] The operator remotely controls the industrial robot arm to grasp the spray gun 11 and control the movement of the spray gun 11, and makes the shot peening operation port 1111 of the spray gun 11 face and press against a plane to close the shot peening operation port 1111; then start the high-pressure air source 17 and the negative pressure exhaust device 18, so that the steel balls follow the flow path of the recovery bin 122-spray gun 11-screening bin 121, and all gather in the screening bin 121, and then close the high-pressure air source 17 and the negative pressure exhaust device 18.

[0260] In this step, after the negative pressure exhaust device 18 is started, negative pressure is generated in the upper chamber 1311 of the dust collecting bin 131, the lower chamber 1312 of the dust collecting bin 131, the upper area of ​​the screening bin 121, and the steel ball recovery channel 113 of the spray gun 11 in sequence.

[0261] In this step, after the high-pressure air source 18 is started, air is blown into the steel ball injection channel 112 of the spray gun 11 through the three-way joint 123 and the steel ball inlet A1121, so that negative pressure is generated at the steel ball outlet C1221 connected to the three-way joint 123. Under the action of the negative pressure, the steel balls are discharged from the steel ball outlet C1221 of the recovery bin 122, and then enter the air pipeline, and then flow toward the steel ball injection channel 112 of the spray gun 11 under the push of wind.

[0262] In this step, when the steel balls flow through the spray gun 11, the moving paths are the steel ball injection channel 112, the confluence chamber 111, and the steel ball recovery channel 113. After entering the confluence chamber 111, the steel balls move toward the shot peening operation port 1111 and finally hit the metal surface. When the steel balls hit the plane, they immediately rebound and change direction, and enter the steel ball recovery channel 113 under the action of negative pressure.

[0263] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state.

[0264] S02, conveying the steel balls to the steel ball cleaning machine:

[0265] The electrically controlled valve D on the steel ball outlet B1215 of the screening bin 121 is opened, so that the steel balls in the screening bin 121 enter the inner cavity of the inner cylinder 142 through the steel ball inlet D1414 on the outer cylinder 141 .

[0266] In this step, since the screening bin 121 is located above the steel ball cleaning machine 14, the steel balls can flow naturally by their own gravity.

[0267] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state.

[0268] S03, cleaning the steel balls:

[0269] a. Put dry ice particles into the dry ice storage chamber of the dry ice supply device 16 through the dry ice feeding port 162, and then perform the following three operations simultaneously:

[0270] 1. Start the motor 145 to drive the inner cylinder 142 to rotate in a circle relative to the outer cylinder 141, so that the steel balls in the inner cavity of the inner cylinder 142 can fully roll. On the one hand, the entire surface of the steel balls has the opportunity to contact the dry ice particles. On the other hand, a small part of the radioactive nuclides on the surface of the steel balls are peeled off through the mutual collision between the steel balls. The debris generated by the collision enters the annular cavity 146 through the hollow hole 1421 and gathers at the lowest point of the annular cavity 146;

[0271] 2. Start the high-pressure air source 17, so that the dry ice particles in the dry ice storage chamber pass through the dry ice outlet 163 of the dry ice supply device and the dry ice inlet 1412 of the outer cylinder 141 in sequence, and enter the inner cavity of the inner cylinder 142; after entering the inner cavity of the inner cylinder 142, the dry ice particles directly impact the surface of the steel ball, and strip most of the radioactive nuclides on the surface of the steel ball through sublimation;

[0272] 3. Start the negative pressure exhaust device 18, so that negative pressure is generated in the upper chamber 1311 of the dust collecting bin 131, the lower chamber 1312 of the dust collecting bin 131, and the inner chamber of the inner cylinder 142 in turn; under the action of negative pressure, the gas containing radioactive nuclides in the inner chamber of the inner cylinder 142 is discharged to the outside through the exhaust gas outlet 1413 of the outer cylinder 141, the sand and dust inlet 1313 of the dust collecting bin 131, the lower chamber 1312 of the dust collecting bin 131, the filter element 132, the upper chamber 1311 of the dust collecting bin 131, and the negative pressure exhaust device 18 in turn. In this process, when the gas flows through the filter element 132, the radioactive nuclides are retained in the filter element 132, ensuring that the gas finally discharged to the outside is pollution-free gas;

[0273] b. After the steel ball cleaning is completed, the high-pressure air source 17, the negative pressure exhaust device 18 and the motor 145 are turned off, and the electric control valve B on the slag discharge port 1415 of the outer cylinder 141 is opened to discharge the debris in the annular cavity 146.

[0274] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state.

[0275] In this step, the dry ice particles are cylindrical, with a diameter of 3 mm and a length of 5.5 mm.

[0276] S04, send the steel balls into the recovery bin:

[0277] a. The electric push rod X144 moves, causing the outer cylinder 141 to rotate in a vertical plane around its hinge. When the outer cylinder 141 rotates until the steel ball outlet D1414 faces obliquely downward, the cover plate 1416 rotates under its own weight, causing the steel balls in the inner cavity of the inner cylinder 142 to be discharged through the steel ball outlet D1414;

[0278] b. After being discharged, the steel balls fall freely and enter the repatriation chamber 151 through the steel ball entrance E1511;

[0279] c. The electric push rod Y153 is started to drive the repatriation bin 151 to rotate in a vertical plane around its hinge. When the repatriation bin 151 rotates to the point where the steel ball outlet E1521 faces obliquely downward, the negative pressure exhaust device 18 is started to generate negative pressure in the recovery bin 122 and the repatriation bin 151 in turn. Under the action of the negative pressure, the steel balls in the repatriation bin 151 pass through the steel ball outlet E1521 of the repatriation bin 151 and the steel ball repatriation port 1223 of the recovery bin 122 in turn and enter the recovery bin 122.

[0280] In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state.

Claims

1. A method for preparing a nuclear waste storage container, which is applied to a system for preparing a nuclear waste storage container, and is used for preparing a nuclear waste storage container; The nuclear waste storage container preparation system includes a shot peening decontamination device, a metal cutting machine, a metal shredder, a metal compression baler, a metal smelting and feeding assembly, and a storage container preparation assembly; The shot peening decontamination device includes a spray gun, a sand and dust separator, a sand and dust collector, a steel ball cleaning machine, a steel ball repatriator, a dry ice supply device, a high-pressure air source and a negative pressure exhaust device; A merging chamber, a steel ball injection channel and a steel ball recovery channel are provided inside the spray gun; the front end of the steel ball injection channel and the front end of the steel ball recovery channel are respectively connected to the rear end of the merging chamber, and the front end of the merging chamber, the rear end of the steel ball injection channel and the rear end of the steel ball recovery channel respectively form a shot peening operation port, a steel ball inlet A and a steel ball outlet A on the spray gun; The sand and dust separator includes a screening bin, a recovery bin and a three-way joint which are arranged in sequence from top to bottom; a steel ball inlet B and a sand and dust outlet are respectively arranged on both sides of the upper end of the screening bin, and an air blast port A, a steel ball drop port and a steel ball outlet B are arranged at the lower end of the screening bin; the steel ball inlet B is connected with the steel ball outlet A of the spray gun through an air pipeline; an electric control valve A is arranged on the steel ball drop port; an electric control valve D is arranged on the steel ball outlet B; an opening facing the steel ball drop port A of the screening bin is arranged at the upper end of the recovery bin, a steel ball outlet C is arranged at the lower end of the recovery bin, and a negative pressure exhaust port and a steel ball repatriation port are arranged on the side wall of the recovery bin; a first port, a second port and a third port are arranged on the three-way joint, the first port is connected to the steel ball outlet C of the recovery bin, and the second port is connected with the steel ball inlet A of the spray gun through an air pipeline; The sand and dust collector comprises a dust collecting bin and a filter element installed in the inner cavity of the dust collecting bin; the filter element divides the inner cavity of the dust collecting bin into an upper cavity and a lower cavity which are not connected to each other; a sand and dust inlet connected to the lower cavity and a post-filter air outlet connected to the upper cavity are arranged on the outer wall of the dust collecting bin; the sand and dust inlet is connected to the sand and dust outlet of the screening bin through an air pipeline; The steel ball cleaning machine includes an outer cylinder, an inner cylinder, a bracket A, an electric push rod X and a motor; a steel ball outlet D, a dry ice inlet, an exhaust gas outlet and a steel ball inlet D are arranged at one end of the outer cylinder, and a machine shaft perforation and a slag discharge port are arranged at the center and the lower edge of the other end respectively, and an electric control valve B is arranged on the slag discharge port; a cover plate is rotatably connected to the steel ball outlet D of the outer cylinder, and the cover plate is rotated to open or close the steel ball outlet D; the exhaust gas outlet of the outer cylinder is connected to the sand and dust inlet of the dust collecting bin through an air pipeline; the steel ball inlet D of the outer cylinder is connected to the steel ball outlet B of the screening bin through a pipeline; an opening is arranged at one end of the inner cylinder, and an end plate is arranged at the other end, a cleaning cavity is arranged inside, and a hollow hole is arranged on the outer cylindrical surface; the inner cylinder can be rotatably installed inside the outer cylinder, and an annular cavity is formed between the inner cylinder and the outer cylinder, and the opening of the inner cylinder is directly opposite to and close to the outer cylinder The steel ball outlet D, dry ice inlet, exhaust gas outlet and steel ball inlet D of the outer cylinder are provided; the lower end of the bracket A is installed on the ground, and the upper end is hinged to the outer wall of the outer cylinder; the lower end of the electric push rod X is hingedly installed on the ground, and the upper end is hinged to the outer wall of the outer cylinder, which is used to drive the outer cylinder to rotate in a vertical plane around its hinge, so as to make the steel ball outlet D face obliquely upward or obliquely downward; when the steel ball outlet D faces obliquely upward, the cover plate fits with the steel ball outlet D to close the steel ball outlet D, and when the steel ball outlet D faces obliquely downward, the cover plate separates from the steel ball outlet D to open the steel ball outlet D; the motor is fixedly installed on one end surface of the outer cylinder, and its shaft extends into the inner part of the outer cylinder through the shaft through-hole, and is fixedly connected to the end plate of the inner cylinder, and the shaft of the motor rotates to drive the inner cylinder to rotate in a circle relative to the outer cylinder; The steel ball repatriation device comprises a repatriation bin, a bracket B and an electric push rod Y; the repatriation bin is provided with a steel ball inlet E at the upper end and a steel ball outlet E at the lower end, and the steel ball inlet E of the repatriation bin is located directly below the steel ball outlet D of the outer cylinder; the lower end of the bracket B is fixedly mounted on the ground, and the upper end is hinged to the outer wall of the repatriation bin; the electric push rod Y is hingedly mounted on the ground at the lower end, and the upper end is hinged to the outer wall of the repatriation bin, and is used to drive the repatriation bin to rotate in a vertical plane around its hinge, so as to make the steel ball outlet E face obliquely upward or obliquely downward; A dry ice storage chamber is provided inside the dry ice supply device, and a high-pressure air inlet, a dry ice feeding port and a dry ice outlet are provided on the outer wall of the dry ice supply device, which are connected to the dry ice storage chamber; the dry ice outlet is connected to the dry ice inlet of the steel ball cleaning machine through an air pipeline; The high-pressure air source is used to output compressed air, and the high-pressure air source is connected to the blast port A of the screening bin, the third port of the three-way joint, and the high-pressure air inlet of the dry ice supply device through the air pipeline respectively; The negative pressure exhaust device is used to provide negative pressure, and the negative pressure exhaust device is connected with the post-filter air outlet of the dust collecting bin and the negative pressure exhaust port of the recovery bin through the air pipeline respectively; The metal compression baler includes a box body, an X-direction propulsion assembly, a Y-direction propulsion assembly, a top flip assembly and a discharge control assembly; The box body is in the shape of a hollow rectangular parallelepiped, with a compression chamber provided therein, and an inlet and outlet connected to the compression chamber provided at the upper end thereof, and the four side walls thereof are respectively named as the first wall, the second wall, the third wall and the fourth wall in clockwise order, and the first wall is provided with a rectangular opening A connected to the compression chamber at the lower end adjacent to the second wall, and the fourth wall is provided with a rectangular opening B connected to the compression chamber at the lower end, and a corner notch is provided between the lower end of the third wall and the bottom wall of the box body, and the corner notch is formed by connecting a rectangular opening C provided on the third wall and a rectangular opening D provided on the bottom wall of the box body, and the rectangular opening C is directly opposite to the rectangular opening A; The X-direction propulsion assembly includes an X-direction hydraulic cylinder and an X-direction push plate connected to the end of the piston rod of the X-direction hydraulic cylinder; the cylinder body of the X-direction hydraulic cylinder is fixedly mounted on the fourth wall of the box body and is located outside the compression chamber; the X-direction push plate is driven by the X-direction hydraulic cylinder to perform horizontal reciprocating linear movement, and then changes between being flush with the rectangular opening B and extending into the compression chamber, and the moving direction of the X-direction push plate is perpendicular to the second wall; The Y-direction propulsion assembly includes a Y-direction hydraulic cylinder and a Y-direction push plate connected to the end of the piston rod of the Y-direction hydraulic cylinder; the cylinder body of the Y-direction hydraulic cylinder is fixedly mounted on the first wall of the box body and is located outside the compression chamber; the Y-direction push plate is driven by the Y-direction hydraulic cylinder to perform horizontal reciprocating linear movement, and then changes between being flush with the rectangular opening A and extending into the compression chamber, and the moving direction of the Y-direction push plate is parallel to the second wall; The top flip assembly includes a rotating plate and a flip hydraulic cylinder; a fourth hinge is provided at one end of the rotating plate, and a fifth hinge is provided in the middle of the rotating plate; the cylinder body of the flip hydraulic cylinder is hinged at the upper end of the fourth wall, and the piston rod end of the flip hydraulic cylinder is hinged on the fifth hinge of the rotating plate, and the piston rod of the flip hydraulic cylinder is extended and retracted to drive the rotating plate to rotate in a vertical plane around the fourth hinge, thereby closing or opening the inlet and outlet of the box body; The discharging control assembly includes a rotating shaft, a folding plate and a discharging hydraulic cylinder; the rotating shaft is arranged horizontally and movably installed at the upper end of the third wall and is arranged parallel to the third wall, the rotating shaft is fixedly connected to the upper end of plate A at one end, and the rotating shaft is hinged to the piston rod end of the discharging hydraulic cylinder at the other end; the folding plate is composed of plate A and plate B that are perpendicular to each other and connected at the side, the folding plate is arranged at the corner notch, and is fixedly connected to the rotating shaft at the upper end of plate A; the cylinder body of the discharging hydraulic cylinder is hinged at the lower end of the second wall, and the piston rod of the discharging hydraulic cylinder is extended and retracted to drive the rotating shaft to rotate, thereby driving the folding plate to rotate around the rotating shaft, so that the folding plate is converted between the gap filling state and the discharging state; when the folding plate is in the gap filling state, the surface of plate A located in the compression chamber is flush with the surface of the third wall located in the compression chamber, and the surface of plate B located in the compression chamber is flush with the surface of the bottom wall of the box located in the compression chamber; when the folding plate is in the discharging state, plate A tilts toward the outside of the compression chamber, and plate B tilts toward the upper end of the compression chamber; The metal smelting feeding assembly includes a general frame, a vertical hoist, a smelting furnace assembly, a trolley assembly, a feeding docking mechanism, a negative pressure dust removal mechanism and a material conveying mechanism; The main frame is provided with a first floor and a second floor from bottom to top, a first floor space is between the first floor and the second floor, a second floor space is located at the upper end of the second floor, and a connecting opening is provided on the second floor connecting the first floor space and the second floor space; The vertical elevator is fixedly installed on the main frame and is located between the first-floor space and the second-floor space. The lower end of the vertical elevator is provided with a material inlet connected to the first-floor space, and the upper end is provided with a material outlet connected to the second-floor space. The smelting furnace assembly includes a tilting platform, a smelting furnace and a tilting hydraulic cylinder; the tilting platform is hingedly installed at the connecting port of the second floor plate and rotates in a vertical plane around the hinge; a smelting chamber is arranged inside the smelting furnace, and a feeding port connected to the smelting chamber and a drainage trough connected to the feeding port are arranged at the upper end of the smelting furnace. The smelting furnace is fixedly connected to the tilting platform at the upper end of the outer wall, and is located at the connecting port of the second floor plate, and is located between the first floor space and the second floor space; the tilting hydraulic cylinder is arranged between the first floor plate and the smelting furnace, the lower end of which is hinged on the first floor plate, and the upper end is hinged to the lower surface of the tilting platform, which is used to drive the tilting platform to rotate around its hinge, thereby driving the smelting furnace to rotate, so that the smelting furnace is converted between the working state and the pouring state; the smelting furnace is in a vertical posture in the working state, and the feeding port is vertically facing upward; the smelting furnace is in an inclined posture in the pouring state, and the smelting liquid in the smelting furnace can be poured out through the feeding port and the drainage trough; The trolley assembly includes guide rails, a trolley, an electric push rod B and a positioning sleeve; there are two guide rails, which are arranged parallel to each other and fixedly mounted on the second floor plate and distributed on both sides of the charging port of the smelting furnace; the two guide rails are arranged perpendicular to the drainage trough of the smelting furnace, one of which is relatively close to the drainage trough, and the other is relatively far away from the drainage trough; the trolley includes a body and electric wheels; the body is provided with hollow holes A and B; the electric wheels are mounted at the lower end of the body; the trolley is movably mounted on the two guide rails through the electric wheels; the electric push rod B is fixedly connected to one end of the trolley body and moves up and down in the vertical direction; the positioning sleeve is fixedly mounted on the tilting platform and is located at the lower end of the electric push rod B; when the trolley is in the first position, the electric push rod B and the positioning sleeve are directly opposite each other, and the electric push rod B extends into the inner hole of the positioning sleeve to lock the position of the trolley; The feeding and docking mechanism includes an outer funnel, an inner funnel and a traveling crane; the outer funnel is fixedly installed in the hollow hole A of the vehicle body and is in a trumpet shape with a larger upper part and a smaller lower part; the inner funnel is in a trumpet shape with a larger upper part and a smaller lower part and is consistent with the shape of the inner hole of the outer funnel, and a hanging ear for docking with the traveling crane is provided at its upper end; the traveling crane is installed in the second-floor space, and is used to control the movement of the inner funnel, thereby docking or separating the inner funnel with the outer funnel; when the inner funnel is docked with the outer funnel, the lower port of the inner funnel extends into the smelting chamber of the smelting furnace through the feeding port of the smelting furnace; The negative pressure dust removal mechanism includes a dust hood and a negative pressure dust collector; the electric push rod A is fixedly installed on the body of the trolley, and is fixedly connected to the dust hood through a connecting frame to drive the dust hood to move vertically up and down; an air path is provided inside the dust hood, and the air path forms a dust collection port and a dust exhaust port at both ends of the dust hood respectively; the dust hood is installed on the body of the trolley and is located in the hollow hole B of the trolley, and the dust exhaust port and the dust collection port thereon are respectively located at the upper end and the lower end of the hollow hole B; the negative pressure dust collector is provided with an air inlet and an exhaust port, and a filter element is provided inside the negative pressure dust collector, and the air inlet of the negative pressure dust collector is connected to the dust exhaust port of the dust hood through an air path pipeline; The material conveying mechanism includes a support, a belt conveyor A and an upper pulling assembly; the support is fixedly installed in the second-floor space; the belt conveyor A is hinged on the support and rotates around the vertical plane of the hinge, thereby switching between a conveying state and an avoidance state; in the conveying state, it is used to convey the materials discharged by the vertical elevator into the smelting furnace, and in the avoidance state, it avoids the lifting and moving path of the inner funnel, the turning path of the smelting furnace and the turning path of the tilting platform; the upper pulling assembly is associated with the belt conveyor A to drive the belt conveyor A to rotate around its hinge; The moving path of the trolley along the guide rail is sequentially provided with a first position, a second position and a third position; when the trolley is in the first position, the lower port of the outer funnel is vertically opposite to the feeding port of the smelting furnace in the working state; when the trolley is in the second position, the dust collecting port of the dust collecting cover is vertically opposite to the feeding port of the smelting furnace in the working state; when the trolley is in the third position, the rotation paths of the trolley and the tilting platform are staggered up and down; only when the trolley is in the first position, the outer funnel and the inner funnel can be docked or separated; The sealing container preparation assembly includes a sand mold; the sand mold is provided with a pouring port at the upper end, a vent at the lower end, and a cavity connected to the pouring port and the vent inside; the sand mold is installed in a space directly below the smelting furnace, and the pouring port is used to receive the molten liquid poured from the drainage trough of the smelting furnace; Before preparing the nuclear waste sealing container, the nuclear waste sealing container preparation system is in an initial state. In the initial state: a. The steel balls inside the shot peening and decontamination device are concentrated in the screening bin; b. The inlet and outlet of the box are open; c. The X-axis push plate is flush with the rectangular opening B; d. The Y-axis push plate is flush with the rectangular opening A; e. The folding plate is in the state of filling the gap; f. The smelting furnace is in working condition; g. The car is in the first position; h. The inner funnel is connected with the outer funnel; i. Belt conveyor A is in the conveying state; j. The electric push rod B extends into the inner hole of the positioning sleeve; The steps for preparing a nuclear waste containment container are as follows: S01, surface shot peening: a. For nuclear scrap metal with inner wall surface, cut it with a metal cutting machine to expose the inner wall surface for subsequent surface shot peening; b. Align the shot peening operation port of the spray gun to the surface of the nuclear waste metal, and then start the high-pressure air source and negative pressure exhaust equipment; Under the combined action of the high-pressure air source and the negative-pressure exhaust equipment, the steel balls circulate between the spray gun, the screening bin, and the recovery bin; When the steel balls flow through the spray gun, the moving paths are the steel ball injection channel, the confluence chamber, and the steel ball recovery channel in sequence; after entering the confluence chamber, the steel balls move toward the shot peening operation port and finally hit the metal surface, which, on the one hand, peels off the stains, rust stains and radioactive material layers on the metal surface, and on the other hand, immediately rebounds and changes direction, and enters the steel ball recovery channel under the action of negative pressure; After the high-pressure air source is started, air is blown from bottom to top into the screening bin through the air blast port A, blowing the impurities, dust and debris in the screening bin to the upper area of ​​the screening bin; After the high-pressure air source is started, air is blown into the steel ball injection channel (112) of the spray gun through the three-way joint and the steel ball inlet A, so that a negative pressure is generated at the steel ball outlet C connected to the three-way joint. Under the action of the negative pressure, the steel balls are discharged from the steel ball outlet C of the recovery bin, and then enter the air pipeline, and then flow into the steel ball injection channel of the spray gun under the push of wind force; After the negative pressure exhaust device is started, negative pressure is generated in the upper chamber of the dust collecting bin, the lower chamber of the dust collecting bin, the upper area of ​​the screening bin, and the steel ball recovery channel of the spray gun in sequence; under the action of negative pressure, impurities, dust, and debris in the upper area of ​​the screening bin enter the lower chamber of the dust collecting bin, and then settle at the bottom of the lower chamber or be collected by the filter element; In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state; S02, fragmentation processing: The nuclear scrap metal after the surface shot blasting treatment is cut into a size that meets the feeding requirements of the metal shredder by a metal cutting machine; the cut nuclear scrap metal is put into the metal shredder for shredding; S03, compression and packaging: a. After the metal scraps formed by the shredding process are transferred to the compression chamber of the box, the turning hydraulic cylinder is started to drive the rotating plate to rotate in the vertical plane around the fourth hinge, on the one hand, the inlet and outlet of the box are closed, and on the other hand, the metal scraps in the compression chamber of the box are compressed in the height direction; b. The X-axis hydraulic cylinder is started to drive the X-axis push plate to move toward the second wall, so as to compress the metal scraps in the compression chamber horizontally in the X-axis. When the X-axis push plate moves to the same level as the side edge of the rectangular opening A, it stops moving; c. The Y-direction hydraulic cylinder is started to drive the Y-direction push plate to move toward the third wall, thereby compressing the metal scraps in the compression chamber in the horizontal Y-direction. After compression, the metal scraps form a rectangular block, which is hereinafter referred to as a metal block; d. The X-direction hydraulic cylinder and the Y-direction hydraulic cylinder are started in no particular order, and drive the X-direction push plate and the Y-direction push plate to return to their original positions respectively; e. The discharging hydraulic cylinder is started, and the folding plate is driven to rotate through the rotating shaft, so that the folding plate rotates from the gap filling state to the discharging state, thereby lifting the compressed rectangular block and discharging it from the compression chamber of the box body; In this step, the moving direction of the X-direction push plate is defined as the X-direction, the moving direction of the Y-direction push plate is defined as the Y-direction, and the side edge is the side edge of the rectangular opening A relatively away from the second wall; S04, cold furnace charging: a. Send the metal block into the vertical elevator through the material inlet. After the vertical elevator lifts the metal block from the first floor space to the second floor space, it drives the metal block to be discharged from the material outlet to the outside of the vertical elevator; b. After the metal block is discharged from the material outlet, it enters the conveyor belt A through the feed end A of the belt conveyor A, and the metal block moves along the conveyor belt A to the discharge end A of the belt conveyor A; c. After the metal block is discharged from the discharging end A of the belt conveyor A, it enters the smelting chamber of the smelting furnace through the inner funnel; d. After the feeding is completed, the winch starts, pulling the belt conveyor A to rotate upward around the first hinge, so that the belt conveyor A changes from the conveying state to the avoidance state; e. Hook the hook at the lower end of the crane to the lug at the upper end of the inner funnel, and then operate the crane to lift the inner funnel upwards to completely separate the inner funnel from the outer funnel; S05. Metal smelting: a. The electric push rod B is withdrawn from the inner hole of the positioning sleeve to release the position lock of the trolley, and then the trolley (542) is moved from the first position to the second position so that the dust collecting port of the dust collecting cover is directly opposite to the feeding port of the smelting furnace; b. Start the heating function of the smelting furnace to melt the metal block; during the smelting process, on the one hand, ensure that the negative pressure dust collector is in continuous operation, so that the volatile gas generated by smelting enters the negative pressure dust collector through the dust collecting hood, and the radioactive nuclides in the gas are trapped in the filter element of the negative pressure dust collector. The filtered gas is discharged into the atmosphere through the negative pressure dust collector. On the other hand, the slag generated by smelting is manually cleaned in real time; c. After the smelting is completed, the trolley is driven to move from the second position to the third position so that the rotation paths of the trolley and the tilting platform are staggered up and down; S06. Preparation of nuclear waste storage container: The nuclear waste storage container is in the shape of a hollow cube, which includes an upper cover, a tank body, a bottom plate and a steel bar connected in sequence from top to bottom; the tank body is in the shape of a square tube with upper and lower ends open, and hook ears are respectively provided at the four top corners of its upper end face, and connecting parts are respectively provided on the four sides of its upper end face; the upper cover is detachably mounted on the upper end face of the tank body through the connecting parts to close the upper end opening of the tank body; the bottom plate is welded and fixed to the lower end face of the tank body to close the lower end opening of the tank body; two steel sections are respectively welded and fixed to the two sides of the lower end of the bottom plate; the connecting parts include a fixing seat, a pressing plate and bolts; the fixing seat is welded and fixed to the edge of the upper end face of the tank body, and a threaded hole is provided on it; the pressing plate is provided with bolt holes that pass through its upper and lower ends, is hinged on the fixing seat, and rotates in a horizontal plane around its hinge, and is located on the outside or inside of the tank body through rotation. When the pressing plate rotates to the inside of the tank body, the bolt hole of the pressing plate and the threaded hole of the fixing seat overlap; a. Control the action of the turning hydraulic cylinder so that the molten liquid is discharged through the feeding port and the drainage trough in sequence and enters the cavity of the sand mold through the casting port; b. The tank body, bottom plate and steel bar obtained by sand casting are welded in sequence to form a whole; four hooks are welded to the four top corners of the upper end surface of the tank body; four sets of connecting parts are installed on the four sides of the upper end surface of the tank body; finally, the upper cover is installed on the upper end of the tank body through the connecting parts to obtain the nuclear waste storage container.

2. The method for preparing a nuclear waste storage container according to claim 1, characterized in that: In step S06 of preparing the nuclear waste storage container, there are four specifications of sand molds, which are used to cast the upper cover, tank body, bottom plate and steel bars of the nuclear waste storage container respectively.

3. The method for preparing a nuclear waste storage container according to claim 2, characterized in that: In step S06 of preparing a nuclear waste storage container, the connecting components include a fixing seat, a pressing plate and bolts; the fixing seat is welded and fixed to the edge of the upper end surface of the tank body, and is provided with a threaded hole; the pressing plate is provided with bolt holes that pass through the upper and lower ends thereof, is hinged to the fixing seat, and rotates in a horizontal plane around its hinge, and is located outside the tank body or inside the tank body through rotation. When the pressing plate rotates to the inside of the tank body, the bolt hole of the pressing plate and the threaded hole of the fixing seat overlap; The steps to install the top cover are as follows:

1. First rotate the pressing plate to the outside of the tank body, and then place the upper cover on the upper end surface of the tank body; 2. Then rotate the pressing plate to the inside of the tank body so that the bolt holes of the pressing plate coincide with the threaded holes of the fixing seat; 3. Screw the bolts into the bolt holes of the pressure plate and the threaded holes of the fixing seat, so that the pressure plate presses the upper cover, and then the upper cover presses the upper end surface of the tank body.

4. The method for preparing a nuclear waste storage container according to claim 3, characterized in that: When the shot peening decontamination device runs continuously for 4-10 minutes, the steel ball decontamination process is started to remove the radioactive nuclides on the surface of the steel balls. Before the cleaning process is performed, the shot peening decontamination device is in the following state:

1. The outer cylinder rotates until the steel ball outlet D faces obliquely upward; 2. The electric control valve A on the steel ball drop port of the screening bin is closed; 3. The electric control valve D on the steel ball outlet B of the screening bin is closed; 4. The electric control valve B on the slag discharge port of the steel ball cleaning machine is closed; 5. The electric control valve C on the receiving funnel of the steel ball repatriator is opened; The steel ball decontamination process is as follows: S01, collect the steel balls into the screening bin: Place the shot peening operation port of the spray gun directly against a plane to close the shot peening operation port; then start the high-pressure air source and negative pressure exhaust equipment to make the steel balls flow along the flow path of the recovery bin-spray gun-screening bin and all gather in the screening bin, and then close the high-pressure air source and negative pressure exhaust equipment; In this step, after the negative pressure exhaust device is started, negative pressure is generated in the upper chamber of the dust collecting bin, the lower chamber of the dust collecting bin, the upper area of ​​the screening bin, and the steel ball recovery channel of the spray gun in sequence; In this step, after the high-pressure air source is started, air is blown into the steel ball injection channel of the spray gun through the three-way joint and the steel ball inlet A, so that the steel ball outlet C connected to the three-way joint generates negative pressure. Under the action of the negative pressure, the steel balls are discharged from the steel ball outlet C of the recovery bin, and then enter the air pipeline, and then flow into the steel ball injection channel of the spray gun under the push of wind force; In this step, when the steel balls flow through the spray gun, the moving paths are the steel ball injection channel, the confluence chamber, and the steel ball recovery channel in sequence; after the steel balls enter the confluence chamber, they move toward the shot peening operation port and finally hit the metal surface. When the steel balls hit the plane, they immediately rebound and change direction, and enter the steel ball recovery channel under the action of negative pressure; In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state; S02, conveying the steel balls to the steel ball cleaning machine: Open the electric control valve D on the steel ball outlet B of the screening bin, so that the steel balls in the screening bin enter the inner cavity of the inner cylinder through the steel ball inlet D on the outer cylinder; In this step, since the screening chamber is located above the steel ball cleaning machine, the steel balls can flow naturally by their own gravity; In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state; S03, cleaning the steel balls: a. Put the dry ice pellets into the dry ice storage chamber of the dry ice supply device through the dry ice feeding port, and then perform the following three operations at the same time:

1. Start the motor to drive the inner cylinder to rotate in a circle relative to the outer cylinder, so that the steel balls in the inner cylinder cavity can fully roll. On the one hand, the entire surface of the steel balls has the opportunity to contact the dry ice particles. On the other hand, the mutual collision between the steel balls can peel off a small part of the radioactive nuclides on the surface of the steel balls. The debris generated by the collision enters the annular cavity through the hollow holes and gathers at the lowest point of the annular cavity.

2. Start the high-pressure air source, so that the dry ice particles in the dry ice storage chamber pass through the dry ice outlet of the dry ice supply device and the dry ice inlet of the outer cylinder in turn, and enter the inner cavity of the inner cylinder; after the dry ice particles enter the inner cavity of the inner cylinder, they directly impact the surface of the steel ball, and most of the radioactive nuclides on the surface of the steel ball are stripped off by sublimation; 3. Start the negative pressure exhaust device to generate negative pressure in the upper cavity of the dust collecting bin, the lower cavity of the dust collecting bin, and the inner cavity of the inner cylinder in turn; under the action of negative pressure, the gas containing radioactive nuclides in the inner cavity of the inner cylinder is discharged to the outside through the exhaust gas outlet of the outer cylinder, the sand and dust inlet of the dust collecting bin, the lower cavity of the dust collecting bin, the filter element, the upper cavity of the dust collecting bin, and the negative pressure exhaust device in turn; During this process, when the gas flows through the filter element, the radioactive nuclides are retained in the filter element, ensuring that the gas finally discharged to the outside is pollution-free gas; b. After the steel ball cleaning is completed, turn off the high-pressure air source, negative pressure exhaust equipment and motor, and open the electric control valve B on the slag discharge port of the outer cylinder to discharge the debris in the annular cavity; In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state; S04, send the steel balls into the recovery bin: a. The electric push rod X moves, causing the outer cylinder to rotate in a vertical plane around its hinge. When the outer cylinder rotates to the point where the steel ball outlet D faces obliquely downward, the cover plate rotates under its own weight, causing the steel balls in the inner cylinder cavity to be discharged through the steel ball outlet D; b. After being discharged, the steel balls fall freely and enter the repatriation chamber through the steel ball entrance E; c. The electric push rod Y is started to drive the repatriation bin to rotate in a vertical plane around its hinge. When the repatriation bin rotates to the point where the steel ball outlet E faces obliquely downward, the negative pressure exhaust device is started to generate negative pressure in the recovery bin and the repatriation bin in turn. Under the action of the negative pressure, the steel balls in the repatriation bin pass through the steel ball outlet E of the repatriation bin and the steel ball repatriation port of the recovery bin in turn and enter the recovery bin; In this step, the valves on the gas pipelines not involved are in a closed state, and the valves on the gas pipelines involved are in an open state.

5. The method for preparing a nuclear waste storage container according to claim 4, characterized in that: In step S04 of preparing a nuclear waste storage container, when the inner funnel is docked with the outer funnel, the distance between the lower port of the inner funnel and the bottom surface of the smelting chamber of the smelting furnace is 0-5cm; a disposable soft pad is arranged in the lower port of the inner funnel, which acts as a buffer to prevent the bottom surface of the smelting chamber of the smelting furnace from being damaged by metal blocks.

6. The method for preparing a nuclear waste storage container according to claim 5, characterized in that: The trolley assembly also includes a universal ball seat and a steel ball. The lower end of the universal ball seat is fixedly mounted on the second floor plate or the tilting platform and is located on the outside of a guide rail relatively close to the drainage groove. The upper end of the universal ball seat is provided with a spherical pit for accommodating the steel ball, and the steel ball is movably mounted in the spherical pit of the universal ball seat. There are multiple universal ball seats, and all of them are arranged at intervals and arranged in a row parallel to the guide rail. When the trolley moves to any position along the guide rail, at least one steel ball on the universal ball seat contacts the lower surface of the trolley body. Accordingly, the trolley body is a rectangular frame with four vertex corners, and the electric wheels are only arranged at the three vertex corners at the lower end of the body, and no electric wheels are arranged at the lower end of a vertex corner of the body relatively close to the drainage groove. During the movement of the trolley, the steel balls are used to provide auxiliary support for the trolley, thereby ensuring the stability of the trolley during movement.

7. The method for preparing a nuclear waste storage container according to claim 6, characterized in that: In step S05 of preparing a nuclear waste storage container, during the smelting process, there is a height difference between the dust collecting hood and the feeding port to facilitate observation of the situation in the smelting furnace. If the molten liquid crusts, manual intervention is immediately carried out to avoid furnace explosion.

8. The method for preparing a nuclear waste storage container according to claim 6, characterized in that: In step S01 of the sealed container preparation method and step S01 of the steel ball decontamination process, the spray gun is grasped and moved by an industrial robot arm.