Construction method and management system of thin shell structure formwork system based on BIM technology

Through BIM technology, a dome three-dimensional model and 3D printing model are established, and an accurate mold frame system is built, which solves the accuracy and material waste problems in the construction of curvature spheres of thin shell structures, and achieves high-quality molding and cost-effectiveness.

CN114266087BActive Publication Date: 2024-11-12CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202111198396.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-14
Publication Date
2024-11-12
Estimated Expiration
2041-10-14

AI Technical Summary

Technical Problem

The existing thin-shell structure formwork support system is difficult to accurately control during curvature sphere construction, resulting in poor concrete forming quality and difficult to control thickness, difficult to repair later and serious waste of materials.

Method used

Using the thin shell structure mold frame system construction method based on BIM technology, by establishing a dome BIM three-dimensional model and 3D printing a solid sample model, determining the distribution of the action points of the mold frame system, building a keel frame body, and performing segmented casting, combining BIM technology for Project volume statistics and construction management.

Benefits of technology

The accuracy of curvature sphere construction has been improved, the molding quality has been improved, the material utilization has been increased, and the later repair has been reduced, reducing project costs and construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114266087B_ABST
    Figure CN114266087B_ABST
Patent Text Reader

Abstract

The invention discloses a construction method and management system of a thin shell structure formwork system based on BIM technology, the method comprises establishing a dome BIM three-dimensional model, using 3D printing technology to print a physical sample model of the dome BIM three-dimensional model, determining the distribution position of the action points of the formwork system based on the physical sample model, building a dome keel body based on the dome BIM three-dimensional model and the distribution position of the action points of the formwork system, deepening the dome template based on the dome BIM three-dimensional model, laying the deepened dome template on the dome keel body, casting the built dome formwork system in sections to form a dome concrete component, and performing engineering quantity statistics on the dome BIM three-dimensional model based on BIM technology, including engineering quantity statistics of the template of the dome BIM three-dimensional model, the dome keel body and concrete. The invention effectively guarantees the construction quality, shortens the construction period, saves labor and reduces the waste of turnover materials, and has good molding quality, effectively reducing the engineering cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of concrete thin-shell structure construction, and in particular relates to a thin-shell structure formwork system construction method and management system based on BIM technology. Background Art

[0002] In recent years, with people's growing material and cultural needs, various architectural styles have emerged. Many designs that were abandoned in the past due to the difficulty of construction have sprung up, among which the concrete thin shell structure is more prominent. The thin shell structure is a thin-walled structure with a curved surface, which can make full use of the strength of the material and integrate the two functions of load-bearing and enclosure. The unique and novel shape can express its magnificent momentum, extensive cultural origins, and reflect its traditional style. But at the same time, the construction difficulty of irregular cross-section structures is very obvious. First, the formwork support system is complex. Traditional keel materials such as wooden squares cannot meet the requirements of the arc support mechanism. Bending can easily cause the keel to break, resulting in instability or even overturning of the support system. In addition, the materials cannot be circulated, resulting in waste. Second, it is difficult to restore the variable curvature process of the dome in the plane deepening design. The different curvatures at different heights and the top formwork converging at one point will cause the formwork to be made into a trapezoid or triangle (with an arc on the waist). The phenomenon of missing and filling in the local formwork process is prone to occur, resulting in the concrete being not smooth, the curves not being smooth, the molding effect being extremely poor, and the difficulty of later repairs. Third, the thickness of the spherical concrete is difficult to control, which can easily lead to a reduction in the steel bar protective layer and structural failure. Summary of the invention

[0003] The purpose of the present invention is to provide a thin-shell structure formwork system construction method and management system based on BIM technology, so as to solve the problems that the construction accuracy of the variable curvature sphere of the existing formwork support system is difficult to control, the concrete molding quality is poor, the thickness is difficult to control, the later repair work is large, and it is easy to cause hidden dangers such as leakage and seepage, and there is a lot of material waste.

[0004] To achieve the above object, the present invention provides a thin shell structure formwork system construction method based on BIM technology, comprising:

[0005] Establish a dome BIM 3D model;

[0006] Use 3D printing technology to print a physical sample model of the dome BIM three-dimensional model;

[0007] Determine the distribution position of the action points of the formwork system based on the solid sample model;

[0008] The dome keel is built based on the dome BIM 3D model and the distribution of the points of action of the formwork system;

[0009] The dome formwork is deepened based on the dome BIM 3D model, and the deepened dome formwork is laid on the dome keel body;

[0010] The constructed dome formwork system is poured in sections to form dome concrete components;

[0011] Based on BIM technology, the quantity statistics of the dome BIM three-dimensional model are carried out, including the quantity statistics of the dome BIM three-dimensional model's template, dome keel body and concrete.

[0012] According to a specific embodiment of the present invention, establishing a dome BIM three-dimensional model includes:

[0013] Establish the dome three-dimensional space coordinate system;

[0014] Calculate the control points and control lines of each construction plane of the dome based on the three-dimensional spatial coordinate system of the dome;

[0015] The position of the main keel of the dome is determined according to the control points and control lines, and the construction of the dome is simulated in combination with the construction plan and process flow of the dome to generate a BIM three-dimensional model of the dome.

[0016] According to a specific embodiment of the present invention, establishing a dome three-dimensional space coordinate system includes:

[0017] The dome's three-dimensional space coordinate system is established with the line connecting the centers of the dome's latitudinal concentric circles as the Z axis, the second-floor structural plane as the horizontal coordinate axis as the X axis, and the second-floor structural plane as the vertical coordinate axis as the Y axis.

[0018] According to a specific embodiment of the present invention, the physical sample model includes a dome model and a template model with a production scale of 1:1000.

[0019] According to a specific embodiment of the present invention, building a dome keel body based on the dome BIM three-dimensional model and the distribution position of the action points of the formwork system includes:

[0020] According to the distribution of the action points of the formwork system, the dome formwork support is built with the z-axis of the spatial coordinate system of the dome BIM three-dimensional model as the center;

[0021] Tie a plurality of cross bars between the two outermost spans of the dome formwork support, and tie a plurality of vertical bars on the top of the formwork support;

[0022] The dome keel body is formed by welding and binding Φ20 steel bars, and the keel body is fixedly connected to the dome formwork support, as well as the encrypted cross bars and encrypted vertical bars on the dome formwork support.

[0023] According to a specific embodiment of the present invention, the dome formwork support adopts a fastener-type full-floor scaffolding, the vertical pole spacing of the dome formwork support is 900mm×900mm, and the frame step distance is 600mm.

[0024] According to a specific embodiment of the present invention, Φ20 steel bars are welded and tied to form a dome keel body, and the keel body is fixedly connected to the dome formwork support, and the encrypted cross bars and encrypted vertical bars on the dome formwork support, respectively, including:

[0025] According to the dome BIM 3D model, the diameters of the latitudinal arc steel bars corresponding to the encrypted cross bars of different heights are measured, and the latitudinal arc steel bars of the corresponding diameters are fully welded to the dome formwork bracket. The longitudinal arc steel bars are divided into 48 equal parts and welded to the latitudinal arc steel bars according to the curvature trend of the latitudinal arc steel bars to form the main keel of the dome.

[0026] Three layers of slats connected by staggered ends with an air nail gun are used as secondary keels, and the secondary keels are tied to the main keel body of the dome along the curvature of the latitudinal arc-shaped steel bars of the steel frame.

[0027] According to a specific embodiment of the present invention, deepening the dome template based on the dome BIM three-dimensional model, and laying the deepened dome template on the dome keel body includes:

[0028] The dome template is divided into 24 groups along the radial direction of the dome keel body, and the dome template is divided into 15 groups along the weft direction of the dome keel body to form 360 template splicing pieces, which are then laid on the dome keel body, wherein the template splicing pieces are isosceles trapezoids.

[0029] According to a specific embodiment of the present invention, the constructed dome formwork system is cast in sections to form a dome concrete component, which includes:

[0030] The dome formwork system is cast in three sections, once every one-third of the construction height. The first and second casting sections are cast using self-compacting concrete double-sided closed formwork, and the third casting section is cast using the sloping roof casting method. The first and second casting sections are both equipped with three-section waterstop bolts to control the thickness of the dome sphere and make the dome waterproof, ultimately forming the dome concrete components.

[0031] A thin shell structure formwork system construction management system based on BIM technology, including:

[0032] BIM modeling unit, used to build a BIM three-dimensional model of the dome;

[0033] 3D printing unit, used to print the physical sample model of the dome BIM detailed model, including the dome model and the template model;

[0034] A model deepening unit is used to deepen the dome BIM three-dimensional model according to the printed solid sample model to obtain a dome BIM deepening model;

[0035] The engineering quantity statistics unit is used to automatically count the template, dome keel and concrete quantities of the dome BIM 3D model;

[0036] The construction period deepening unit is used to deepen each construction process. By identifying the on-site construction situation, it can adaptively allocate and schedule the work of on-site materials, personnel, and machinery.

[0037] Compared with the prior art, the present invention provides a thin-shell structure formwork system construction method and management system based on BIM technology, which simulates the dome construction process by establishing a dome BIM three-dimensional model, 3D printing a physical sample, and then accurately lofting the dome's internal and external template dimensions and scaffolding layout through the model, statistically calculating the engineering quantity, and managing the construction process, ultimately achieving the results of accurate material cutting, reduced costs, accurate positioning of hyperbolic construction, and high dome molding quality. This method effectively guarantees the construction quality, and the technical and economic benefits are significant. In-depth work shortens the construction period, saves labor and reduces the waste of turnover materials, and has better molding quality, reduces later grinding and maintenance, and also reduces the leakage and maintenance problems of later waterproofing, effectively reducing engineering costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 It is a flow chart of a construction method of a thin shell structure formwork system based on BIM technology provided according to an embodiment of the present invention.

[0039] Figure 2 The present invention is a flowchart of a method for establishing a dome BIM three-dimensional model according to an embodiment of the present invention.

[0040] Figure 3 It is a flow chart of a method for constructing a dome keel frame according to an embodiment of the present invention.

[0041] Figure 4 It is a structural schematic diagram of a thin-shell structure formwork system construction management system based on BIM technology provided according to an embodiment of the present invention. DETAILED DESCRIPTION

[0042] In order to make those skilled in the art understand the concept and thought of the present invention more clearly, the present invention is described in detail below in conjunction with specific embodiment.It should be understood that the embodiment provided herein is only a part of all embodiments that the present invention may have.Those skilled in the art, after reading the specification of the application, have the ability to make improvements, transformations, or replacements to part or the whole of the following embodiments, and these improvements, transformations, or replacements are also included in the scope of the present invention.

[0043] In this article, the terms "first", "second" and other similar words are not intended to imply any order, quantity and importance, but are only used to distinguish different elements. In this article, the terms "one", "an" and other similar words are not intended to indicate that there is only one thing, but to indicate that the relevant description is only for one of the things, and the thing may have one or more. In this article, the terms "comprise", "include" and other similar words are intended to indicate logical mutual relations, and cannot be regarded as indicating spatial structural relations. For example, "A includes B" is intended to indicate that B belongs to A logically, but does not mean that B is located inside A in space. In addition, the meanings of the terms "comprise", "include" and other similar words should be regarded as open, rather than closed. For example, "A includes B" is intended to indicate that B belongs to A, but B does not necessarily constitute the whole of A, and A may also include other elements such as C, D, and E.

[0044] In this document, the terms "embodiment", "this embodiment", "one embodiment", and "an embodiment" do not mean that the relevant description is only applicable to a specific embodiment, but rather that the description may also be applicable to one or more other embodiments. Those skilled in the art should understand that in this document, any description of a certain embodiment can be replaced, combined, or combined in other ways with the relevant descriptions in one or more other embodiments, and the new embodiments generated by the replacement, combination, or combination in other ways are easily conceivable by those skilled in the art and fall within the scope of protection of the present invention.

[0045] Example 1

[0046] Additional aspects and advantages of embodiments of the present invention will be given in part in the following description and in part will be obvious from the following description or learned through practice of embodiments of the present invention.

[0047] Combination Figure 1-Figure 3 The embodiment of the present invention provides a thin shell structure formwork system construction method based on BIM technology, including:

[0048] S1: Establish the dome BIM 3D model.

[0049] S2: Use 3D printing technology to print a physical sample model of the dome BIM three-dimensional model, including a dome model and a template model with a production scale of 1:1000.

[0050] S3: Determine the distribution position of the action points of the formwork system based on the solid sample model.

[0051] S4: Build the dome keel body based on the dome BIM 3D model and the distribution of the points of action of the formwork system.

[0052] S5: The dome formwork is deepened based on the dome BIM 3D model, and the deepened dome formwork is laid on the dome keel body.

[0053] S6: The constructed dome formwork system is cast in sections to form dome concrete components.

[0054] S7: Carry out quantity statistics of the dome BIM 3D model based on BIM technology, including the quantity statistics of the dome BIM 3D model template, dome keel body and concrete.

[0055] Specifically, step S1 of establishing the dome BIM three-dimensional model also includes:

[0056] S11: Establishing the dome three-dimensional space coordinate system, including:

[0057] Based on BIM technology, Revit is used to establish the dome's three-dimensional spatial coordinate system. The dome's three-dimensional spatial coordinate system is established with the center line of the dome's latitudinal concentric circles as the Z axis of the spatial coordinate system, the second-floor structural plane as the horizontal coordinate axis as the X axis, and the second-floor structural plane as the vertical coordinate axis as the Y axis. S12: Calculate the control points and control lines of each construction plane of the dome based on the dome's three-dimensional spatial coordinate system.

[0058] The dome three-dimensional space coordinate system established in step S11 is used to locate the position of the steel keel. In order to meet the support requirements and achieve a smooth inner surface arc, the steel keel is set at a longitudinal coordinate axis spacing of 300mm (locally 350mm) through Revit software calculation, and the control points of each construction plane are set out in the model. During the construction process, the control lines of each stage are set out and marked with red paint. At the same time, the dimensions of the components at each stage on site are reviewed according to the dome BIM three-dimensional model, and the position of the main keel of the inner wall of the sphere is controlled.

[0059] S13: Determine the main keel position of the dome according to the control points and control lines, and perform construction simulation on the dome in combination with the construction plan and process flow of the dome to generate a BIM three-dimensional model of the dome.

[0060] Before the construction of the project, the construction plan, process flow, etc. are combined with BIM software for construction simulation. The main keel position of the dome is determined according to the control points and control lines, and the dome BIM three-dimensional model is generated. Through the construction simulation of the dome project, combined with rendering and roaming, the management personnel and workers are presented with a close-to-real sense of the scene, reflecting the various construction processes, facilitating the coordination of the construction sequence of various professions, organizing the teams to enter the construction site in advance, preparing equipment, sites and turnover materials, etc. Through on-site video detection of the construction site, early warning of safety and quality hazards in the construction process can be obtained to reduce rework and rectification. In addition, combined with BIM real-time query of the project volume, reasonable arrangements for labor, material and machinery consumption plans.

[0061] Specifically, step S2 uses 3D technology to print the dome and its template model. 3D printing is a technology that uses a digital model file as the basis, uses powdered metal or plastic and other adhesive materials, and constructs objects by printing layer by layer. Draw a model of the dome, and use 3D printing technology to make a 1:1000 physical sample. The 3D printed model of the dome and template can be used to understand the spatial relationship of the dome, intuitively analyze the distribution position of the support system's action points, and effectively improve work efficiency. At the same time, the 3D printed model is also used to explain the structural characteristics of each part of the dome during the construction briefing, which is intuitive and easy to understand.

[0062] Specifically, step S4 of building the dome keel body based on the dome BIM three-dimensional model and the distribution position of the action points of the formwork system also includes:

[0063] S41: According to the distribution of the action points of the formwork system, the dome formwork support is built with the z-axis of the spatial coordinate system of the dome BIM three-dimensional model as the center. The dome formwork support adopts a fastener-type full-floor scaffolding, the vertical pole spacing of the dome formwork support is 900mm×900mm, and the frame step is 600mm.

[0064] S42: Tie a plurality of encrypted cross bars between the two outermost spans of the dome formwork support, and tie a plurality of encrypted vertical bars on the top of the formwork support.

[0065] In order to ensure an effective connection between the dome keel body and the dome formwork support, according to the characteristics of the different heights and radii of the sphere, encrypted cross bars of different lengths are added around the two outermost spans of the support, and the step distance is adjusted to 300mm to reinforce the arc-shaped steel bars. Encrypted vertical poles and encrypted cross bars are added on the top to form a tic-tac-toe shape to facilitate the laying of the top inner formwork.

[0066] S43: Use Φ20 steel bars to weld and tie up the dome keel body, and fix the keel body to the dome formwork support, as well as the encrypted cross bars and encrypted vertical bars on the dome formwork support. In order to simultaneously meet the support function and control the accuracy of the dome plane radius at different heights, and ensure that the curve of the dome inner surface is smooth after forming, the embodiment of the present invention uses Φ20 steel bars with high rigidity and easy bending to weld and tie up the dome keel body to replace the steel pipes in the traditional formwork system. Specifically including:

[0067] S431: According to the dome BIM 3D model, the diameters of the latitudinal arc steel bars corresponding to the encrypted cross bars of different heights are measured, and the latitudinal arc steel bars of the corresponding diameters are fully welded to the dome formwork bracket. The warp arc steel bars are welded to the latitudinal arc steel bars in 48 equal parts according to the curvature trend of the latitudinal arc steel bars to form the main keel of the dome. The integrity of the main keel of the dome and the strength of the support system are guaranteed. At the same time, the engineering quantity is extracted through the BIM model to make a material list for the steel skeleton.

[0068] S432: Use three layers of slats connected by staggered ends with an air nail gun as the secondary keel, and tie the secondary keel to the main keel of the dome along the curvature of the latitudinal arc-shaped steel bars of the steel frame.

[0069] In order to ensure the smoothness of the arc and the effectiveness of the formwork support system, the secondary keel uses three-layer slats connected by staggered ends with an air nail gun instead of traditional wooden squares. The template strips are 80mm wide and 1500mm long. The dome BIM three-dimensional model can effectively identify the position and length of the template strips, and the secondary keel is tied to the main keel using No. 8 wire along the changes in the weft reinforcement of the steel skeleton.

[0070] Specifically, step S5 deepens the dome template based on the dome BIM three-dimensional model, and lays the deepened dome template on the dome keel body, including:

[0071] The dome template is divided into 24 groups along the radial direction of the dome keel body, and the dome template is divided into 15 groups along the weft direction of the dome keel body to form 360 template splicing pieces, which are then laid on the dome keel body, wherein the template splicing pieces are isosceles trapezoids.

[0072] The dome formwork in the embodiment of the present invention adopts a 15mm thick formwork. Since the inner and outer surfaces of the dome are both hyperbolic surfaces, the BIM technology can be used to effectively consider the process of the formwork changing with the curvature of the dome. The size of the formwork lofted out at a ratio of 1:1 is more reasonable. During construction, the formwork is divided into 24 equal parts and laid throughout the length. The formwork is radially segmented into 15 pieces and processed into a trapezoid with slightly curved sides. Sponge glue is added to the gaps in the formwork to ensure the molding quality of the concrete surface. After the steel bars are tied, the outer formwork is assembled in the same way as the inner formwork.

[0073] Specifically, step S6 of casting the constructed dome formwork system in sections to form dome concrete components includes:

[0074] The dome formwork system is cast in three sections, once every one-third of the construction height. The first and second casting sections are cast using self-compacting concrete double-sided closed formwork, and the third casting section is cast using the sloping roof casting method. The first and second casting sections are both equipped with three-section waterstop bolts to control the thickness of the dome sphere and make the dome waterproof, ultimately forming the dome concrete components.

[0075] In the process of building the construction model, the amount of concrete used in each construction stage can be quickly calculated, effectively controlling the use of on-site concrete. The thickness of the dome at different heights can be deepened through the dome BIM three-dimensional model, and the length of the middle rod of the three-stage water-stop screw can be used to control the thickness of the sphere. The middle rod of the water-stop screw with the corresponding length can be made. Without adding other processes, the concrete of the dome can be guaranteed to be self-waterproof and the wall thickness can be effectively controlled.

[0076] Example 2

[0077] Combination Figure 4 The embodiment of the present invention provides a thin shell structure formwork system construction management system based on BIM technology, including:

[0078] The BIM modeling unit 1 is used to establish a dome BIM three-dimensional model. The embodiment of the present invention is based on BIM technology, uses Revit to establish a dome three-dimensional construction model, lays out construction plane control points through BIM, and creates a dome BIM three-dimensional model to pre-simulate the site.

[0079] 3D printing unit 2 is used to print the physical sample model of the dome BIM deepening model, including the dome model and the template model. Through 3D printing technology, a 1:1000 physical sample is produced. During the program discussion, the 3D printing model of the dome and the inner template is used to understand the spatial relationship of the dome, intuitively analyze the distribution position of the support system action points, and effectively improve work efficiency.

[0080] The model deepening unit 3 is used to deepen the dome BIM three-dimensional model according to the printed entity sample model to obtain the dome BIM deepening model. The dome construction plan based on BIM technology adopts the method of splicing wooden templates to support the template. After deepening, the template is accurate in cutting materials. Compared with the traditional fixed plastic template, it is cheaper, simple to operate, easy to assemble, easy to obtain materials, and the template can be recycled for secondary use.

[0081] The engineering quantity statistics unit 4 is used to automatically count the template, dome keel and concrete engineering quantities of the dome BIM three-dimensional model. Since the outer surface of the dome is a variable curvature surface, the calculation of engineering measurement is complicated and time-consuming, and the accuracy of the calculation result is not high. The embodiment of the present invention draws a solid model through BIM technology, inputs geometric data into the model, and can automatically count the engineering quantity. The template, dome keel and concrete engineering quantities of the dome BIM three-dimensional model are calculated through the software's own geometric data processing. Breaking the limitations of traditional construction engineering quantity calculation, the engineering quantity calculation becomes more transparent, more orderly, reasonable and accurate.

[0082] The construction period deepening unit 5 is used to deepen each construction process, identify the on-site construction situation, and adaptively allocate and schedule the work of on-site materials, personnel, and machinery. Through BIM technology, each construction process is deepened, the on-site construction situation is quickly identified, and the next step of on-site material, personnel, and machinery work arrangements are made in a timely manner, which effectively improves work efficiency and saves construction period.

[0083] In summary, the present invention provides a thin-shell structure formwork system construction method and management system based on BIM technology, which establishes a dome BIM three-dimensional model, 3D prints a physical sample, simulates the dome construction process, and then accurately lays out the dome's internal and external template dimensions and scaffolding layout through the model, counts the engineering quantity, and manages the construction process, ultimately achieving the results of accurate material cutting, reduced costs, accurate positioning of hyperbolic construction, and high dome molding quality. This method effectively guarantees the construction quality, and the technical and economic benefits are significant. In-depth work shortens the construction period, saves labor and reduces the waste of turnover materials, and has better molding quality, reduces later grinding and maintenance, and also reduces the leakage and maintenance problems of later waterproofing, effectively reducing engineering costs.

[0084] The above describes in detail the concepts, principles and ideas of the present invention in conjunction with specific implementation methods (including embodiments and examples). Those skilled in the art should understand that the implementation methods of the present invention are not limited to the forms given above. After reading this application document, those skilled in the art can make any possible improvements, substitutions and equivalent forms to the steps, methods, devices and components in the above implementation methods, and these improvements, substitutions and equivalent forms should be deemed to fall within the scope of the present invention. The scope of protection of the present invention shall be subject only to the claims.

Claims

1. A method for constructing a thin shell structure formwork system based on BIM technology, characterized in that: include: Establish a dome BIM 3D model; Printing a physical sample model of the dome BIM three-dimensional model using 3D printing technology; Determine the distribution position of the action points of the formwork system based on the solid template model; Building a dome keel body based on the dome BIM three-dimensional model and the distribution position of the action points of the formwork system; Performing a deepening process on the dome template based on the dome BIM three-dimensional model, and laying the deepened dome template on the dome keel body; The constructed dome formwork system is poured in sections to form dome concrete components; Perform engineering quantity statistics on the dome BIM three-dimensional model based on BIM technology, including engineering quantity statistics of the template, dome keel body and concrete of the dome BIM three-dimensional model; The establishment of the dome BIM three-dimensional model includes: Establish the dome three-dimensional space coordinate system; Calculating the control points and control lines of each construction plane of the dome based on the three-dimensional spatial coordinate system of the dome; Determine the main keel position of the dome according to the control points and control lines, and perform construction simulation on the dome in combination with the construction plan and process flow of the dome to generate a BIM three-dimensional model of the dome; The establishment of the dome three-dimensional space coordinate system comprises: The dome three-dimensional space coordinate system is established with the center line of the dome's latitudinal concentric circles as the Z axis, the second-floor structural plane as the horizontal coordinate axis as the X axis, and the second-floor structural plane as the vertical coordinate axis as the Y axis; The construction of the dome keel body based on the dome BIM three-dimensional model and the distribution position of the action points of the formwork system includes: According to the distribution position of the action points of the formwork system, a dome formwork support is built with the z-axis of the spatial coordinate system of the dome BIM three-dimensional model as the center; A plurality of dense cross bars are tied between the two outermost spans of the dome formwork support, and a plurality of dense vertical bars are tied on the top of the formwork support; Use Φ20 steel bars to weld and bind to form a dome keel body, and fix the keel body to the dome formwork support, as well as the encrypted cross bars and encrypted vertical bars on the dome formwork support; According to the dome BIM three-dimensional model, the diameters of the latitudinal arc steel bars corresponding to the encrypted cross bars of different heights are measured, and the latitudinal arc steel bars of the corresponding diameters are fully welded to the dome formwork support, and the longitudinal arc steel bars are welded to the latitudinal arc steel bars according to the curvature trend of the latitudinal arc steel bars in 48 equal parts to form the main keel of the dome; The step of deepening the dome template based on the dome BIM three-dimensional model and laying the deepened dome template on the dome keel body comprises: Divide the dome template into 24 groups along the radial direction of the dome keel body, and divide the dome template into 15 groups along the weft direction of the dome keel body to form 360 template splicing pieces, and then lay the template splicing pieces on the dome keel body, wherein the template splicing pieces are isosceles trapezoids; The step of pouring the constructed dome formwork system in sections to form the dome concrete components includes: The dome formwork system is cast in three sections, and is cast every one-third of the construction height. The first casting section and the second casting section are cast using self-compacting concrete double-sided closed formwork, and the third casting section is cast using a sloping roof casting method. The first casting section and the second casting section are both provided with three-section water stop bolts for controlling the thickness of the dome sphere and making the dome waterproof, thereby finally forming a dome concrete component.

2. The method for constructing a thin shell structure formwork system based on BIM technology according to claim 1, characterized in that: The physical sample model includes a dome model and a template model with a production scale of 1:1000.

3. The method for constructing a thin shell structure formwork system based on BIM technology according to claim 1, characterized in that: The dome formwork support adopts a fastener-type full-floor scaffolding, the vertical pole spacing of the dome formwork support is 900mm×900mm, and the frame step distance is 600mm.

4. The method for constructing a thin shell structure formwork system based on BIM technology according to claim 1, characterized in that: The method of welding and binding the Φ20 steel bars to form a dome keel body, and fixing the keel body to the dome formwork support, and the encrypted cross bars and encrypted vertical bars on the dome formwork support, respectively, also includes: Three layers of slats connected by staggered ends with an air nail gun are used as secondary keels, and the secondary keels are tied to the main keel body of the dome along with the curvature of the latitudinal arc-shaped steel bars of the steel bar skeleton.

Citation Information

Patent Citations

  • Method for constructing special-shaped thin shell of concrete structure

    CN103726654A

  • Construction method of beam-slab type reinforced concrete domed chamber structure

    CN104278837A

  • Method for applying BIM and 3D printing technology to construction

    CN105204793A

  • Construction method of spiral-rising-type reinforced concrete structure based on BIM

    CN108416162A

  • Wide-span semispherical reinforced concrete dome structure and construction method thereof

    CN108678258A