A train automatic operation planning control method and related device

By determining the fastest and slowest curves and corresponding times of train operation, real-time target matching is performed, which solves the problem of low operating level adjustment accuracy in the existing technology and achieves higher accuracy and accuracy of operation planning.

CN114291138BActive Publication Date: 2024-10-25NEW UNITED RAIL TRANSIT TECH
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210121477.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-09
Publication Date
2024-10-25
Estimated Expiration
2042-02-09

AI Technical Summary

Technical Problem

In the existing automatic train operation system, the operation level adjustment accuracy is low and cannot be adjusted in real time, resulting in insufficient accuracy and precision of operation planning.

Method used

By obtaining the train's operation information and planned operation time, determine the fastest and slowest operation curve based on the track section list, use the time prediction algorithm to calculate the predicted fastest and slowest operation time, and match the operation target to determine the operation control target. Enable real-time adjustments.

Benefits of technology

It improves the accuracy and precision of operation planning, supports real-time adjustment at any location, and enhances the flexibility of operation control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114291138B_ABST
    Figure CN114291138B_ABST
Patent Text Reader

Abstract

The present application discloses a method for automatic train operation planning and control, including: obtaining the operation information and planned operation time of the train; determining the fastest operation curve and the slowest operation curve based on the list of track sections between the train and the next stop; calculating the fastest operation curve and the slowest operation curve respectively based on the operation information and the time prediction algorithm to obtain the predicted fastest operation time and the predicted slowest operation time; matching the operation target based on the planned operation time, the predicted fastest operation time and the predicted slowest operation time to obtain the operation control target. The operation control target is matched by the planned operation time, the predicted fastest operation time and the predicted slowest operation time to obtain the operation control target, so as to improve the accuracy and precision of the operation planning. The present application also provides a train automatic operation planning control device, a control device and a computer-readable storage medium, which have the above beneficial effects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of train control technology, and in particular to a train automatic operation planning control method, a train automatic operation planning control device, a control equipment and a computer-readable storage medium. Background Art

[0002] In order to improve driving efficiency, the ATO (Automatic Train Operation) subsystem in the CBTC (Communication based Train Control System) system needs to be able to respond to the instructions of the ATS (Automatic Train Supervision) system in order to adjust the running time of the train between stations.

[0003] In the related art, the adjustment of the running time between stations is mainly based on the adjustment of the running level, that is, the maximum running speed between stations is divided into several levels, 5 levels are common, and then ATS sends different running levels to the train before the train departs from a certain station. After ATO obtains this level information, it adjusts the running curve during the driving process from this station to the next station, and runs according to a certain percentage of the maximum speed limit on the corresponding track section. However, the running level is discrete information and the adjustment accuracy is low. In addition, the current running level adjustment only supports one adjustment before departure at the platform, because the pre-agreed level is based on the calculation from departure at the previous platform to stop at the next platform. Once the train starts, it cannot be adjusted in real time, which reduces the effect of the adjustment.

[0004] Therefore, how to improve the accuracy and precision of operation planning is a key issue that technical personnel in this field are concerned about. Summary of the invention

[0005] The purpose of this application is to provide a train automatic operation planning control method, a train automatic operation planning control device, a control device and a computer-readable storage medium to improve the accuracy and precision of operation planning.

[0006] In order to solve the above technical problems, the present application provides a train automatic operation planning and control method, comprising:

[0007] Obtain train operation information and planned running time;

[0008] Determining a fastest operating curve and a slowest operating curve based on a list of track sections between the train arriving at a next stop;

[0009] Based on the operation information and the time prediction algorithm, the fastest operation curve and the slowest operation curve are calculated respectively to obtain the predicted fastest operation time and the predicted slowest operation time;

[0010] An operation target is matched based on the planned operation time, the predicted fastest operation time, and the predicted slowest operation time to obtain an operation control target.

[0011] Optionally, determining the fastest running curve and the slowest running curve based on the track section list between the train and the next stop point includes:

[0012] Searching for a list of track sections between the train's arrival at the next stop based on map information;

[0013] The fastest running curve and the slowest running curve are determined from the track section list based on the speed limit information list.

[0014] Optionally, the fastest running curve and the slowest running curve are calculated respectively based on the running information and the time prediction algorithm to obtain the predicted fastest running time and the predicted slowest running time, including:

[0015] Acquiring traction and braking performance information of the train;

[0016] Calculate the operation time of each track section in the track section list based on the operation information and the traction brake performance information;

[0017] The fastest running curve and the slowest running curve are time-calculated based on the running time of each track section to obtain the predicted fastest running time and the predicted slowest running time.

[0018] Optionally, performing operation target matching based on the planned operation time, the predicted fastest operation time, and the predicted slowest operation time to obtain an operation control target includes:

[0019] Determining whether the planned running time is less than the predicted fastest running time;

[0020] If so, the fastest running curve is used as the running control target.

[0021] Optionally, performing operation target matching based on the planned operation time, the predicted fastest operation time, and the predicted slowest operation time to obtain an operation control target includes:

[0022] Determining whether the planned running time is greater than the predicted slowest running time;

[0023] If so, the slowest operation curve is used as the operation control target.

[0024] The present application also provides a train automatic operation planning control device, comprising:

[0025] An information acquisition module is used to obtain the train operation information and planned operation time;

[0026] A curve determination module, for determining a fastest running curve and a slowest running curve based on a list of track sections between the train arriving at a next stop;

[0027] A time prediction module, used to calculate the fastest running curve and the slowest running curve respectively based on the running information and the time prediction algorithm to obtain a predicted fastest running time and a predicted slowest running time;

[0028] The target matching module is used to match the operation target based on the planned operation time, the predicted fastest operation time and the predicted slowest operation time to obtain the operation control target.

[0029] Optionally, the curve determination module is specifically used to search for a list of track sections between the train and the next stop based on map information; and determine the fastest running curve and the slowest running curve from the list of track sections based on a speed limit information list.

[0030] Optionally, the time prediction module is specifically used to obtain traction and braking performance information of the train; calculate the running time of each track section in the track section list based on the running information and the traction and braking performance information; and perform time calculation on the fastest running curve and the slowest running curve based on the running time of each track section to obtain the predicted fastest running time and the predicted slowest running time.

[0031] The present application also provides a control device, comprising:

[0032] Memory for storing computer programs;

[0033] A processor is used to implement the steps of the above-mentioned train automatic operation planning and control method when executing the computer program.

[0034] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the train automatic operation planning and control method as described above are implemented.

[0035] The present application provides a method for automatic train operation planning and control, including: obtaining the operation information and planned operation time of the train; determining the fastest operation curve and the slowest operation curve based on the list of track sections between the train and the next stop; calculating the fastest operation curve and the slowest operation curve respectively based on the operation information and the time prediction algorithm to obtain the predicted fastest operation time and the predicted slowest operation time; matching the operation targets based on the planned operation time, the predicted fastest operation time and the predicted slowest operation time to obtain the operation control target.

[0036] The fastest and slowest running curves are determined by the list of track sections between the train's arrival at the next stop, and then the predicted fastest running time and the predicted slowest running time are predicted. The operation control targets are matched based on the planned running time, the predicted fastest running time and the predicted slowest running time to obtain the operation control target. Instead of using hierarchical control, the control process is more linear to improve the accuracy and precision of operation planning.

[0037] The present application also provides a train automatic operation planning control device, a control equipment and a computer-readable storage medium, which have the above beneficial effects and are not elaborated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.

[0039] Figure 1 A flow chart of a train automatic operation planning and control method provided in an embodiment of the present application;

[0040] Figure 2 A schematic diagram of the structure of a train automatic operation planning control device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0041] The core of this application is to provide a train automatic operation planning control method, a train automatic operation planning control device, a control device and a computer-readable storage medium to improve the accuracy and precision of operation planning.

[0042] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0043] In the related art, the adjustment of the running time between stations is mainly based on the adjustment of the running level, that is, the maximum running speed between stations is divided into several levels, 5 levels are common, and then ATS sends different running levels to the train before the train departs from a certain station. After ATO obtains this level information, it adjusts the running curve during the driving process from this station to the next station, and runs according to a certain percentage of the maximum speed limit on the corresponding track section. However, the running level is discrete information and the adjustment accuracy is low. In addition, the current running level adjustment only supports one adjustment before departure at the platform, because the pre-agreed level is based on the calculation from departure at the previous platform to stop at the next platform. Once the train starts, it cannot be adjusted in real time, which reduces the effect of the adjustment.

[0044] Therefore, the present application provides a method for automatic train operation planning and control, which determines the fastest running curve and the slowest running curve through a list of track sections between the train arriving at the next stop, and then predicts the fastest running time and the slowest running time. The operation control target is matched based on the planned running time, the predicted fastest running time and the predicted slowest running time to obtain the operation control target. Instead of using hierarchical control, the control process is more linear to improve the accuracy and precision of operation planning.

[0045] The following is an explanation of a train automatic operation planning and control method provided by the present application through an embodiment.

[0046] Please refer to Figure 1 , Figure 1 A flow chart of a train automatic operation planning and control method provided in an embodiment of the present application.

[0047] In this embodiment, the method may include:

[0048] S101, obtaining train operation information and planned operation time;

[0049] It can be seen that this step aims to obtain the train operation information and planned running time.

[0050] The running information includes position and speed. The planned running time is the planned running time sent by the train control device.

[0051] S102, determining the fastest running curve and the slowest running curve based on the track section list between the train arriving at the next stop;

[0052] Based on S101, this step aims to determine the fastest running curve and the slowest running curve based on the list of track sections between the train arriving at the next stop.

[0053] Furthermore, this step may include:

[0054] Step 1, searching for a list of track sections between the train's arrival at the next stop based on map information;

[0055] Step 2: determine the fastest running curve and the slowest running curve from the track section list based on the speed limit information list.

[0056] It can be seen that this optional solution mainly describes how to determine the running curve. In this optional solution, the track section list between the train arriving at the next stop is searched based on the map information, and the fastest running curve and the slowest running curve are determined from the track section list based on the speed limit information list.

[0057] S103, calculating the fastest running curve and the slowest running curve respectively based on the running information and the time prediction algorithm to obtain the predicted fastest running time and the predicted slowest running time;

[0058] Based on S102, this step aims to calculate the fastest running curve and the slowest running curve respectively based on the running information and the time prediction algorithm to obtain the predicted fastest running time and the predicted slowest running time. That is, to predict the fastest running time and the slowest running time of the train running on different lines.

[0059] Furthermore, this step may include:

[0060] Step 1, obtaining the traction and braking performance information of the train;

[0061] Step 2, calculating the running time of each track section in the track section list based on the running information and the traction braking performance information;

[0062] Step 3: Based on the running time of each track section, the fastest running curve and the slowest running curve are calculated to obtain the predicted fastest running time and the predicted slowest running time.

[0063] It can be seen that this optional solution mainly explains how to perform time prediction. In this optional solution, the traction and braking performance information of the train is obtained, the running time of each track section in the track section list is calculated based on the running information and the traction and braking performance information, and the time of the fastest running curve and the slowest running curve is calculated based on the running time of each track section to obtain the predicted fastest running time and the predicted slowest running time.

[0064] S104, performing operation target matching based on the planned operation time, the predicted fastest operation time, and the predicted slowest operation time to obtain an operation control target.

[0065] Based on S103, this step aims to match the operation target based on the planned operation time, the predicted fastest operation time and the predicted slowest operation time to obtain the operation control target.

[0066] Furthermore, this step may include:

[0067] Step 1: determine whether the planned running time is less than the predicted fastest running time;

[0068] Step 2: If yes, the fastest running curve is used as the running control target.

[0069] It can be seen that this optional solution mainly explains how to perform target matching. In this optional solution, it is determined whether the planned running time is less than the predicted fastest running time; if so, the fastest running curve is used as the running control target.

[0070] Furthermore, this step may include:

[0071] Step 1, determine whether the planned running time is greater than the predicted slowest running time;

[0072] Step 2: If yes, the slowest running curve is used as the running control target.

[0073] It can be seen that this optional solution mainly explains how to perform target matching. In this optional solution, it is determined whether the planned running time is greater than the predicted slowest running time; if so, the slowest running curve is used as the running control target.

[0074] In summary, this embodiment determines the fastest running curve and the slowest running curve through the list of track sections between the train arriving at the next stop, and then predicts the fastest running time and the slowest running time, and matches the operation control target based on the planned running time, the predicted fastest running time and the predicted slowest running time to obtain the operation control target, instead of using hierarchical control. The control process is more linear, so as to improve the accuracy and precision of operation planning.

[0075] The following further illustrates a train automatic operation planning and control method provided by the present application through another specific embodiment.

[0076] In this embodiment, the method may include:

[0077] Step 1: Obtain the train's position, speed, movement authorization, and planned running time between stations sent by ATS from ATP (Automatic Train Protection);

[0078] Step 2: Searching for a list of track sections containing civil engineering speed limits between the train head and the next stop based on the electronic map and mobile authorization;

[0079] Step 3: The civil engineering speed limit list constitutes the fastest running curve, and the lower fixed speed limit list (such as 40km / h) constitutes the slowest running curve. The time prediction algorithm is used to calculate the running time on the slowest curve and the running time on the fastest curve respectively.

[0080] Step 4, determine whether the planned running time is less than the predicted fastest running time; if so, execute step 5; if not, execute step 6;

[0081] Step 5, target the civil engineering speed limit list;

[0082] Step 6, determine whether the planned running time is greater than the predicted slowest running time; if so, execute step 7; if not, execute step 8;

[0083] Step 7, targeting the fixed speed limit list;

[0084] Step 8: Use the optimal curve search algorithm between the civil engineering speed list and the fixed speed limit list to obtain the best matching result.

[0085] Among them, time prediction is mainly based on the train's position, speed, and speed limit information of all track sections between the front of the train and the next platform stop. Combined with the train's traction and braking performance, the train's running time on each track section is calculated, and the running time on all track sections is combined to obtain the time required for the train to run to the next station and stop at a certain moment.

[0086] Among them, the time prediction method may include:

[0087] Step 1: merge the track sections with the same speed limit between the front of the train and the next stop into one track section, obtain a list of track sections with different speed limits, traverse the list of track sections, and estimate the running time on each section;

[0088] Step 2, determine whether the track segment list has not been traversed to the end; if so, execute step 3; if not, execute step 12;

[0089] Step 3, obtain a track section, calculate the relative positions of the starting point, the end point, the front end, and the rear end of the vehicle;

[0090] Step 4, determine whether the vehicle head has crossed the end point of the partition; if so, execute step 5; if not, execute step 6;

[0091] Step 5, the estimated time of the current segment is 0;

[0092] Step 6, determine whether the front of the vehicle crosses the starting point of the partition and the rear of the vehicle does not cross the starting point of the partition; if so, execute step 7; if not, execute step 8;

[0093] Step 7, using the current vehicle speed, the speed limit of the previous partition, the speed limit of the current partition, the speed limit of the next partition, and the distance from the rear of the vehicle to the starting point of the current partition as input, estimate the time of the current segment (refer to the T1 algorithm below);

[0094] Step 8, determine whether the front of the vehicle crosses the starting point of the partition and the rear of the vehicle crosses the starting point of the partition; if so, execute step 9; if not, execute step 10;

[0095] Step 9, using the current vehicle speed, the current partition speed limit, the next partition speed limit, and the remaining length of the current partition as input, estimate the remaining running time of the current partition (refer to the following T2 algorithm);

[0096] Step 10, determine whether the vehicle head has not crossed the current partition starting point; if so, execute step 11; if not, execute step 2;

[0097] Step 11, using the exit speed of the previous partition as the current speed, the speed limit of the previous partition, the speed limit of the current partition, the speed limit of the next partition, and the train length as input, estimate the remaining running time of the current partition (refer to the T1 algorithm below); execute step 2;

[0098] Step 12, summarize the operating time of all sections to obtain the predicted operating time between stations.

[0099] Among them, the T1 algorithm may include:

[0100] Step 1, using the current vehicle speed, the speed limit of the previous partition, the speed limit of the current partition, the speed limit of the next partition, and the length of the vehicle body that has not entered the partition as input to identify the motion scene;

[0101] Step 2, determine whether the previous partition speed limit is less than the current partition speed limit; if so, execute step 3; if not, execute step 10;

[0102] Step 3, determine whether the speed limit of the next partition is less than the speed limit of the previous partition; if so, execute step 4; if not, execute step 5;

[0103] Step 4: determine that the current scenario is "the current zone speed limit is greater than the next zone speed limit, and the overall trend is deceleration"; execute step 13;

[0104] Step 5, determine whether the current partition length is not greater than the vehicle length; if so, execute step 6; if not, execute step 7;

[0105] Step 6: Determine that the current scenario is "the speed limit of the current partition is lower than that of the previous and next partitions". Go to step 13.

[0106] Step 7, determine whether the speed limit of the next partition is less than the speed limit of the current partition; if so, execute step 8; if not, execute step 9;

[0107] Step 8: determine that the current scenario is "the speed limit of the current partition is higher than that of the front and rear partitions, and the partition length is greater than the vehicle length"; execute step 13;

[0108] Step 9, determine that the current scenario is "the speed limit of the previous partition is less than the speed limit of the current partition, and the speed limit of the current partition is not greater than the speed limit of the next partition"; execute step 13;

[0109] Step 10, determine whether the speed limit of the next partition is less than the speed limit of the current partition; if so, execute step 11; if not, execute step 12;

[0110] Step 11, determine that the current scenario is "the speed limit of the current partition is not higher than that of the previous partition, but higher than that of the next partition"; execute step 13;

[0111] Step 12, determine that the current scenario is "the speed limit of the current partition is lower than that of the previous and next partitions"; execute step 13;

[0112] Step 13, based on the principle that acceleration priority is greater than uniform speed, uniform speed priority is greater than deceleration, and the vehicle can be guaranteed to decelerate to the lower speed limit before the next lower speed limit section, estimate the acceleration, uniform speed and deceleration time during the operation of the partition according to the dynamic equation, as well as the vehicle speed when leaving the partition.

[0113] Among them, the T2 algorithm may include:

[0114] Step 1, using the current vehicle speed, the current zone speed limit, the next zone speed limit, and the vehicle body length as input, to identify the motion scene;

[0115] Step 2, determine whether the current partition speed limit is greater than the next partition speed limit; if so, execute step 3; if not, execute step 4;

[0116] Step 3: determine that the current scenario is "the speed limit of the current partition is greater than the speed limit of the next partition, and the overall trend is deceleration";

[0117] Step 4: determine that the current scenario is "the speed limit of the current partition is less than the speed limit of the next partition, and the overall trend is accelerating";

[0118] Step 5, based on the principle that acceleration priority is greater than uniform speed, uniform speed priority is greater than deceleration, and the vehicle can be guaranteed to decelerate to the lower speed limit before the next lower speed limit section, estimate the acceleration, uniform speed and deceleration time during the operation of the partition according to the dynamic equation, as well as the vehicle speed when leaving the partition.

[0119] The time prediction algorithm mentioned in this embodiment supports calculation at any location and is a dynamic programming algorithm, which solves the defect of the existing solution that only one adjustment is supported at the platform.

[0120] It can be seen that through the application of this embodiment, in the CBTC automatic driving mode, the operator can modify the planned operating time as needed at any time, and then send it to the train. The ATO software will make real-time adjustments and calculate the speed curve that best matches the planned operating time, and then control the train operation according to the curve.

[0121] It can be seen that this embodiment determines the fastest running curve and the slowest running curve through the list of track sections between the train arriving at the next stop, and then predicts the fastest running time and the slowest running time, and matches the operation control target based on the planned running time, the predicted fastest running time and the predicted slowest running time to obtain the operation control target, rather than using hierarchical control. The control process is more linear, so as to improve the accuracy and precision of operation planning.

[0122] The following is an introduction to the train automatic operation planning control device provided in an embodiment of the present application. The train automatic operation planning control device described below and the train automatic operation planning control method described above can be referenced to each other.

[0123] Please refer to Figure 2 , Figure 2 A schematic diagram of the structure of a train automatic operation planning control device provided in an embodiment of the present application.

[0124] In this embodiment, the device may include:

[0125] The information acquisition module 100 is used to obtain the running information and planned running time of the train;

[0126] A curve determination module 200, for determining the fastest running curve and the slowest running curve based on a list of track sections between the train arriving at the next stop;

[0127] The time prediction module 300 is used to calculate the fastest running curve and the slowest running curve respectively based on the running information and the time prediction algorithm to obtain the predicted fastest running time and the predicted slowest running time;

[0128] The target matching module 400 is used to match the operation target based on the planned operation time, the predicted fastest operation time and the predicted slowest operation time to obtain the operation control target.

[0129] Optionally, the curve determination module 200 is specifically used to search for a track section list between the train and the next stop based on map information; and determine the fastest running curve and the slowest running curve from the track section list based on the speed limit information list.

[0130] Optionally, the time prediction module 300 is specifically used to obtain traction and braking performance information of the train; calculate the running time of each track section in the track section list based on the running information and traction and braking performance information; perform time calculation on the fastest running curve and the slowest running curve based on the running time of each track section to obtain the predicted fastest running time and the predicted slowest running time.

[0131] Optionally, the target matching module 400 is specifically used to determine whether the planned running time is less than the predicted fastest running time; if so, the fastest running curve is used as the running control target; determine whether the planned running time is greater than the predicted slowest running time; if so, the slowest running curve is used as the running control target.

[0132] The present application also provides a control device, including:

[0133] Memory for storing computer programs;

[0134] A processor is used to implement the steps of the train automatic operation planning and control method as described in the above embodiment when executing the computer program.

[0135] An embodiment of the present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the train automatic operation planning and control method as described in the above embodiment are implemented.

[0136] The various embodiments in the specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.

[0137] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0138] The steps of the method or algorithm described in conjunction with the embodiments disclosed herein may be implemented directly using hardware, a software module executed by a processor, or a combination of the two. The software module may be placed in a random access memory (RAM), a memory, a read-only memory (ROM), an electrically programmable ROM, an electrically erasable programmable ROM, a register, a hard disk, a removable disk, a CD-ROM, or any other form of storage medium known in the art.

[0139] The above is a detailed introduction to a train automatic operation planning control method, a train automatic operation planning control device, a control device and a computer-readable storage medium provided by the present application. Specific examples are used herein to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of the present application.

Claims

1. A train automatic operation planning and control method, characterized in that: include: Obtain train operation information and planned running time; Determining a fastest operating curve and a slowest operating curve based on a list of track sections between the train arriving at a next stop; The fastest running curve and the slowest running curve are calculated based on the running information and the time prediction algorithm to obtain the predicted fastest running time and the predicted slowest running time; wherein the time prediction algorithm includes merging the track sections with the same speed limit in adjacent sections of all track sections between the locomotive head and the next stop into one track section, obtaining a list of track sections with different speed limits in adjacent sections, traversing the list of track sections, and estimating the running time on each section; Determine whether the track segment list has not been traversed to the end. If not, summarize the running time of all segments to obtain the predicted running time between stations. If so, obtain a track segment and calculate the relative positions of the starting point, the end point, the front and the rear of the train. Determine whether the vehicle head has crossed the end point of the partition; if so, determine that the estimated time of the current segment is 0; If not, determine whether the front of the vehicle has crossed the starting point of the partition and the rear of the vehicle has not crossed the starting point of the partition; if so, use the current vehicle speed, the speed limit of the previous partition, the speed limit of the current partition, the speed limit of the next partition, and the distance from the rear of the vehicle to the starting point of the current partition as input to estimate the time of the current section; if not, determine whether the front of the vehicle has crossed the starting point of the partition and the rear of the vehicle has crossed the starting point of the partition; If yes, the current vehicle speed, the speed limit of the current partition, the speed limit of the next partition, and the remaining length of the current partition are used as input to estimate the remaining running time of the current partition. If no, it is determined whether the vehicle head has not passed the starting point of the current partition. If yes, then the exit speed of the previous partition is used as the current vehicle speed, the speed limit of the previous partition, the speed limit of the current partition, the speed limit of the next partition, and the train length are used as input to estimate the remaining running time of the current partition, and jump back to the step of determining whether the track segment list has not been traversed to the end; if no, jump back to the step of determining whether the track segment list has not been traversed to the end; Performing operation target matching based on the planned operation time, the predicted fastest operation time, and the predicted slowest operation time to obtain an operation control target; The fastest running curve and the slowest running curve are calculated based on the running information and the time prediction algorithm to obtain the predicted fastest running time and the predicted slowest running time, including: Acquiring traction and braking performance information of the train; Calculate the operation time of each track segment in the track segment list based on the operation information and the traction brake performance information; Performing time calculation on the fastest running curve and the slowest running curve based on the running time of each track section to obtain the predicted fastest running time and the predicted slowest running time; The operation target is matched based on the planned operation time, the predicted fastest operation time, and the predicted slowest operation time to obtain the operation control target, including: Determining whether the planned running time is less than the predicted fastest running time; If yes, then taking the fastest running curve as the running control target; The operation target is matched based on the planned operation time, the predicted fastest operation time, and the predicted slowest operation time to obtain the operation control target, including: Determining whether the planned running time is greater than the predicted slowest running time; If so, the slowest operation curve is used as the operation control target.

2. The train automatic operation planning and control method according to claim 1, characterized in that: Determining the fastest running curve and the slowest running curve based on the track section list between the train arriving at the next stop point includes: Searching for a list of track sections between the train's arrival at the next stop based on map information; The fastest running curve and the slowest running curve are determined from the track section list based on the speed limit information list.

3. A train automatic operation planning control device, characterized in that: include: An information acquisition module is used to obtain the train operation information and planned operation time; A curve determination module, for determining a fastest running curve and a slowest running curve based on a list of track sections between the train arriving at a next stop; A time prediction module is used to calculate the fastest running curve and the slowest running curve respectively based on the running information and the time prediction algorithm to obtain the predicted fastest running time and the predicted slowest running time; wherein the time prediction algorithm includes merging the track sections with the same speed limit in adjacent sections of all track sections between the locomotive head and the next stop into one track section, obtaining a list of a group of track sections with different speed limits in adjacent track sections, traversing the track section list, and estimating the running time on each section; Determine whether the track segment list has not been traversed to the end. If not, summarize the running time of all segments to obtain the predicted running time between stations. If so, obtain a track segment and calculate the relative positions of the starting point, the end point, the front and the rear of the train. Determine whether the vehicle head has crossed the end point of the partition; if so, determine that the estimated time of the current segment is 0; If not, determine whether the front of the vehicle has crossed the starting point of the partition and the rear of the vehicle has not crossed the starting point of the partition; if so, use the current vehicle speed, the speed limit of the previous partition, the speed limit of the current partition, the speed limit of the next partition, and the distance from the rear of the vehicle to the starting point of the current partition as input to estimate the time of the current section; if not, determine whether the front of the vehicle has crossed the starting point of the partition and the rear of the vehicle has crossed the starting point of the partition; If yes, the current vehicle speed, the speed limit of the current partition, the speed limit of the next partition, and the remaining length of the current partition are used as input to estimate the remaining running time of the current partition. If no, it is determined whether the vehicle head has not passed the starting point of the current partition. If yes, then the exit speed of the previous partition is used as the current vehicle speed, the speed limit of the previous partition, the speed limit of the current partition, the speed limit of the next partition, and the train length are used as input to estimate the remaining running time of the current partition, and jump back to the step of determining whether the track segment list has not been traversed to the end; if no, jump back to the step of determining whether the track segment list has not been traversed to the end; A target matching module, used to match the operation target based on the planned operation time, the predicted fastest operation time and the predicted slowest operation time to obtain the operation control target; The time prediction module is specifically used to obtain the traction and braking performance information of the train; calculate the running time of each track section in the track section list based on the running information and the traction and braking performance information; perform time calculation on the fastest running curve and the slowest running curve based on the running time of each track section to obtain the predicted fastest running time and the predicted slowest running time; The target matching module is specifically used to determine whether the planned running time is less than the predicted fastest running time; if so, the fastest running curve is used as the running control target; determine whether the planned running time is greater than the predicted slowest running time; if so, the slowest running curve is used as the running control target.

4. The train automatic operation planning control device according to claim 3, characterized in that: The curve determination module is specifically used to search for a track section list between the train and the next stop based on map information; and determine the fastest running curve and the slowest running curve from the track section list based on a speed limit information list.

5. The train automatic operation planning control device according to claim 3, characterized in that: The time prediction module is specifically used to obtain the traction and braking performance information of the train; and calculate the running time of each track section in the track section list based on the running information and the traction and braking performance information; The fastest running curve and the slowest running curve are time-calculated based on the running time of each track section to obtain the predicted fastest running time and the predicted slowest running time.

6. A control device, characterized in that: include: Memory for storing computer programs; A processor is used to implement the steps of the train automatic operation planning and control method as claimed in claim 1 or 2 when executing the computer program.

7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by the processor, the steps of the train automatic operation planning and control method as claimed in claim 1 or 2 are implemented.

Citation Information

Patent Citations

  • Train automatic-control method and device and vehicle-mounted ATO

    CN107878510A

  • Urban rail transit train energy-saving operation method

    CN111267913A

  • Train, and driving method and system for controlling driving of train

    CN112977545A

  • Train operation support device

    JP2005231447A

  • Locomotive running speed curve planning method and apparatus, and related components

    WO2022021700A1