A construction method and structure for beam variable cross-section reinforcement

By cutting out grooves on the top of the beams and reinforcing the top bars in the grooves to bypass the original columns, the problem of difficulty in constructing reinforced beams with enlarged cross-sections at the nodes has been solved, the construction efficiency and quality have been improved, and the need for floor slab removal and temporary supports has been reduced. , which enhances the flexural bearing capacity and enables efficient construction of beams with enlarged cross-sections.

CN114293809BActive Publication Date: 2024-10-22央固工程科技(上海)有限公司
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202210156743.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-02-21
Publication Date
2024-10-22
Estimated Expiration
2042-02-21

AI Technical Summary

Technical Problem

In the existing technology, the reinforcement of beams with enlarged cross-sections is difficult to construct when encountering column nodes, and the construction quality is poor. Moreover, the traditional method requires large-scale removal of floor slabs along the beam span direction, which increases the construction difficulty and construction period.

Method used

By cutting out the running grooves and construction grooves on the top of the original beams, the new top bars are bypassed from both sides of the original columns and fixed in the original beams, reducing floor slab removal and temporary support. Erection steel bars and beam top stirrups are used for positioning and connection, increase the flexural bearing capacity, and chemically plant reinforcement at the bottom of the original beam for reinforcement.

Benefits of technology

It improves construction efficiency and quality, reduces floor slab removal and temporary supports, shortens the construction period, enhances bending bearing capacity, reduces construction difficulty and cost, and improves the applicability and economic benefits of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114293809B_ABST
    Figure CN114293809B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction method and structure for beam variable cross-section reinforcement, which belongs to the field of building construction. Aiming at the problems of difficulty in construction and poor construction quality of existing beams with increased cross-sections meeting column nodes, the present invention provides a construction method for beam variable cross-section reinforcement, which includes chiseling out the floor slabs on both sides of the original beam to form a positioning groove; starting from the end of the top surface of the original beam, chiseling out the floor slabs along the length direction of the original beam, and chiseling a groove on the top surface of the original beam to form a construction groove; tying new top bars in the positioning groove along the length direction of the positioning groove, and when the new top bars meet the original column, the new top bars bypass from both sides of the original column respectively; the top stirrups at the end of the beam close themselves, and form a new steel skeleton with the new top bars and the original beam top bars, and cast. The present invention avoids the construction difficulties caused by the new top bars being directly implanted into the original column by bypassing the two sides of the original column, reduces the chiseling operation of the floor slab and the arrangement of temporary supports, shortens the construction period, and ensures the construction quality while ensuring the applicability of the construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and more specifically, relates to a construction method and structure for beam variable cross-section reinforcement. Background Art

[0002] In the prior art, building renovation and expansion often encounter situations where the bearing capacity of the original concrete beams needs to be greatly improved. For concrete beams, the reinforcement methods at this time mainly include steel cladding and increasing the cross-section. Among them, steel cladding reinforcement is completely bonded to the original component by structural adhesive, which is costly and has average durability and fire resistance; increasing the cross-section reinforcement greatly increases the bearing capacity of the component. The traditional method of increasing the cross-section on three sides of the beam requires chiseling away the floor slab within the width of the increased cross-section on both sides of the top of the beam along the span direction of the beam to arrange the longitudinal reinforcement on the top of the beam; but the steel bars with increased cross-section of the beam have small space for embedding reinforcement at the nodes of the concrete columns, making construction difficult, and making it difficult to guarantee the construction quality, and even difficult to meet the design requirements. How to avoid embedding the longitudinal reinforcement of the beam, reduce the difficulty of construction, and improve the construction quality are problems that need to be solved in the prior art.

[0003] Corresponding improvements have also been made to address the above problems, such as Chinese patent application number CN200910104433.0, published on February 17, 2010. The patent discloses a beam-column node reinforcement structure using the enlarged section method, which includes an original column and an original beam. Below the original beam is an enlarged section beam. A steel sleeve is fixedly connected to the node where the original column and the enlarged section beam are connected by chemical anchor bolts, and the steel sleeve is sleeved on the original column. New longitudinal reinforcement parallel to the original beam is cast in the enlarged section beam, and the end of the new longitudinal reinforcement is provided with a hook parallel to the outer surface of the steel sleeve, and the hook is fixedly connected to the outer surface of the steel sleeve. The construction method includes: a) designing, making, and installing the steel sleeve; b) anchoring; c) welding the new longitudinal reinforcement; d) bonding; e) casting the enlarged section beam. The present invention makes it possible to avoid drilling holes in the beams to plant reinforcement bars, or cutting and reconnecting the reinforcement bars when multiple beams intersect a column, which is convenient for construction, saves labor and materials; it is unnecessary to drill many deeper holes in the original column, or cut and reconnect the newly allocated longitudinal reinforcement bars, which is very beneficial to the effect of structural reinforcement. The disadvantage of this patent is that although it solves the problem of not drilling too many holes in the original column, the overall strength is average and the reinforcement effect is limited.

[0004] Another example is Chinese patent application number CN201820079536.0, which was published on September 4, 2018. The patent discloses a frame beam with an enlarged cross-section and reinforcement, including a floor slab, an original frame beam, a reinforced steel plate, new beam stirrups and a concrete reinforcement layer. The top of the original frame beam is anchored in the floor slab, and the original frame beam includes original beam stirrups for enhancing shear resistance. The outer surface of the original frame beam is fixed with a reinforced steel plate by chemical bolts, and the reinforced steel plate is longitudinally wound with new beam stirrups. The top of the new beam stirrups is anchored in the floor slab and welded with the original beam stirrups. Concrete is poured into the gap between the new beam stirrups and the reinforced steel plate, and the concrete permeates outward to wrap the new beam stirrups to form a concrete reinforcement layer. A haunch structure is provided at the intersection of the concrete reinforcement layer and the floor slab. The disadvantage of this patent is that although it can enhance stability and safety as a whole, the construction is cumbersome and the cycle is slow. Summary of the invention

[0005] 1. Problems to be solved

[0006] In view of the problems of construction difficulties and poor construction quality when the existing beams with increased cross-sections meet the column nodes, the present invention provides a construction method and structure for beam variable cross-section reinforcement. The construction method of the present invention bypasses the newly added top reinforcement from both sides of the original column to avoid the construction difficulties caused by directly implanting it into the original column, and reduces the chiseling operation of the floor slab and the arrangement of temporary supports during the construction process, which greatly shortens the construction period, ensures the overall construction quality and ensures the applicability of the construction; the overall structure of the present invention is simple and has high construction efficiency. It meets the stress effect of the original beam that needs to increase the cross-section while greatly reducing the reinforcement planting operation.

[0007] 2. Technical solution

[0008] To solve the above problems, the present invention adopts the following technical solutions.

[0009] A construction method for beam variable cross-section reinforcement comprises the following steps:

[0010] S1: Remove the floor slabs on both sides of the top of the original beam to form a positioning groove. The length direction of the positioning groove is consistent with the length direction of the original beam, and the length is not less than one-fourth of the clear span of the original beam;

[0011] S2: Starting from the end of the top surface of the original beam, the floor slab is chiseled out along the length direction of the original beam, and a groove is chiseled out on the top surface of the original beam to form a construction groove, the length of which is not less than one-fourth of the clear span of the original beam; at the same time, the top steel bars of the chiseled floor slab are disconnected, and the bottom steel bars of the chiseled floor slab are kept intact;

[0012] S3: Add new top reinforcement along the length direction of the positioning groove. When the new top reinforcement meets the original column, the new top reinforcement bypasses the original column and then fixes the new top reinforcement. Construct the top reinforcement of the beam on the side of the original beam where the groove is not cut, and connect the top reinforcement of the beam with the new top reinforcement.

[0013] S4: construct several beam top stirrups in the construction trench, and the beam top stirrups will tie the newly added top reinforcement with the steel bars in the original beam;

[0014] S5: After the binding is completed, the top steel bars of the removed floor slab are welded back into a whole, and then concrete or grouting is poured to finally complete the construction of the enlarged cross-section of the beam.

[0015] Furthermore, in step S3, it also includes constructing erection steel bars in the positioning groove for respectively positioning two newly added top bars, and the erection steel bars and the newly added top bars are tied together by beam top stirrups.

[0016] Furthermore, the number of the beam top stirrups is not less than six.

[0017] Furthermore, in step S4, a number of additional steel bars are constructed between the newly added top bars on both sides of the original beam, and the additional steel bars are connected to the newly added top bars.

[0018] Furthermore, in step S5, it also includes constructing bottom reinforcement of the beam at the bottom of the original beam, the bottom reinforcement of the beam is fixed to the original column by chemical anchoring, and the bottom reinforcement of the beam is tied to the newly added top reinforcement by newly added stirrups.

[0019] A structure adopting a construction method for beam variable cross-section reinforcement as described in any of the above items, comprising positioning grooves opened on both sides of the top of an original beam, the length of the positioning groove being not less than one-fourth of the clear span of the original beam, a construction groove opened at the end of the top surface of the original beam along the length direction of the original beam, the length of the construction groove being not less than one-fourth of the clear span of the original beam, new top reinforcements are arranged in the positioning grooves along the length direction of the positioning grooves, the end of the new top reinforcement close to the original column is fixed after passing around the original column, and the new top reinforcement is fixed to the steel bars in the original beam by means of beam top stirrups, beam top reinforcements are arranged on the side of the original beam where no grooves are cut, and the beam top reinforcements are connected to the new top reinforcements at the same time.

[0020] Furthermore, the distance between the positioning groove and the side of the original beam is the required increased cross-sectional width of the beam + 10cm.

[0021] 3. Beneficial effects

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] (1) When the beam meets the column, the present invention bypasses the newly added top reinforcement from both sides of the original column to avoid the construction difficulties and construction quality problems caused by directly implanting the newly added top reinforcement into the column, thereby effectively ensuring high construction efficiency and quality; at the same time, it changes the previous phenomenon of completely chiseling out the floor slabs within the increased cross-sectional width on both sides of the beam top, and only chiseling out part of the floor slabs on the beam top and both sides of the beam top ensures the force effect of the original beam with increased cross-sectional width, while greatly reducing the chiseling operation of the floor slab and the arrangement of temporary supports during construction, greatly shortening the construction period, improving economic benefits, increasing the overall constructability, and being less restricted by the on-site environment, thereby ensuring the applicability of the construction;

[0024] (2) The present invention adds stand-up steel bars, which play a role in positioning and fixing the two newly added top bars, thereby meeting the structural requirements for the spacing of the newly added top bars, so that the newly added top bars can normally and stably play their functional roles, ensuring that the newly added top bars can significantly improve the bending bearing capacity and shear bearing capacity; and the arrangement of the beam top stirrups makes the newly added top bars and the steel bars in the original beam form a whole, ensuring reliable transmission of force; and the beam top stirrups are used to bear the lateral component of force generated by the bending of the newly added top bars around the original column, ensuring the effective transmission of the tension of the newly added top bars;

[0025] (3) The present invention further strengthens the stability of the newly added top reinforcement by adding steel bars, and at the same time improves the bearing capacity within the width range of the cross section that needs to be increased, ensuring that the overall structure meets the force requirements while enhancing stability; and the additional steel bars and the newly added top reinforcement are welded on one side so that the additional steel bars will not be embedded in the original column, reducing the construction difficulty, improving the construction efficiency, and shortening the construction period; and the bottom and side of the original beam are embedded in the original column to achieve the effect of reinforcing the three sides of the beam, and different construction is carried out for different positions, which improves the construction progress while ensuring the construction efficiency and effect;

[0026] (4) The reinforcement structure of the present invention has a simple overall structure and high construction efficiency. It does not require rebar planting while meeting the stress effect of the original beam with a larger cross-section. It has high construction efficiency and is not easily affected by the distribution of steel bars in the original beam and column in the on-site environment. It greatly reduces the construction difficulty, reduces the chiseling work of the floor slab, and reduces the setting of temporary supports on site. It saves costs and greatly improves construction efficiency, and has high overall applicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the structure of beam groove;

[0028] Figure 2 It is a schematic diagram of the overall structure of the present invention;

[0029] Figure 3 for Figure 2 Schematic diagram of AA structure in;

[0030] Figure 4 for Figure 2 Schematic diagram of BB structure;

[0031] Figure 5 for Figure 2 Schematic diagram of CC structure;

[0032] Figure 6 This is a schematic diagram of the enlarged cross-section structure of the beams on both sides of the original column;

[0033] Figure 7 This is a schematic diagram of the enlarged cross-section structure of the original column single-side beam.

[0034] In the figure: 1. Original column; 2. Original beam; 3. Construction trench; 4. Original floor slab reinforcement; 5. Slab top reinforcement; 6. Slab bottom reinforcement; 7. Beam top stirrups; 8. Beam top reinforcement; 9. Tie bars; 10. Beam waist reinforcement; 11. Newly planted reinforcement; 12. Newly added stirrups; 13. Chemically planted reinforcement; 14. Frame reinforcement; 15. Beam bottom reinforcement; 16. Newly added top reinforcement. DETAILED DESCRIPTION

[0035] The present invention is further described below in conjunction with specific embodiments and drawings.

[0036] Example 1

[0037] like Figures 1 to 7 As shown, a construction method for beam variable cross-section reinforcement includes the following steps:

[0038] S1: Chisel away the floor slabs on both sides of the top of the original beam 2 to form a positioning groove, the length direction of the positioning groove is consistent with the length direction of the original beam 2, and the length is not less than one-fourth of the net span of the original beam 2, and the width is the beam plus the required large section width + 10cm, leaving enough construction space; the width is the distance between the positioning groove and the side of the top of the original beam 2; it is convenient for subsequent construction while not performing too much floor slab chiseling operations, thereby improving construction efficiency; it is explained here that the six faces of the original beam 2 are the upper and lower faces, the left and right faces, and the front and back faces, the upper face is connected to the floor slab, the lower face is opposite to the upper face and is not connected to any object, and the front and back faces are connected to the original column 1, and the original column 1 supports the original beam 2, and the two sides of the top of the original beam 2 here refer to the left and right sides of the original beam 2, and the positioning groove here specifically refers to the grooves opened at the left and right positions on the top of the original beam 2 along the length direction of the original beam 2, and the grooves are opened along the length direction of the original beam 2, and the length of the positioning groove is not less than one-fourth of the net span of the original beam 2, and the net span of the original beam 2 is L nIt refers to the length of the beam between two original columns 1; when encountering an original column 1 connected to an original beam 2, the floor slabs on both sides of the original column 1 (here both sides refer to the same direction as the two sides of the original beam 2) are also chiseled off at the same time, and connected with the positioning groove to facilitate subsequent construction. The length of the floor slabs on both sides of the original column 1 removed is the length of the original column 1 in the length direction exceeding that of the original column 1;

[0039] S2: Starting from the end of the top surface of the original beam 2, the floor slab is chiseled out along the length direction of the original beam 2. The end of the top surface is connected to the original column 1. Therefore, the floor slab is chiseled out in the direction away from the original column 1, and a groove is chiseled out on the top surface of the original beam 2 to form a construction groove 3. The length of the construction groove 3 is not less than one-fourth of the net span of the original beam 2; at the same time, the top steel bars 5 of the chiseled floor slab are kept disconnected to facilitate the subsequent construction and binding of new steel bars, and the bottom steel bars 6 of the chiseled floor slab are kept unchanged. The original floor slab steel bars 4 are kept unchanged in the interval where the floor slab is not chiseled out on the top surface of the original beam 2; the traditional method of increasing the cross-section of the three sides of the original beam 2 is to chisel out all the floor slabs within the range of the increased cross-section width on both sides of the beam top along the beam span direction to arrange Place the top longitudinal reinforcement of the beam; in this step, there is no need to completely chisel out the floor slab within the enlarged cross-section width range, and only a length not less than one-quarter of the clear span of the original beam 2 needs to be chiseled out, and the rest of the floor slab on the top of the original beam 2 is retained, and the full-length steel bars on the top of the beam are arranged at the bottom of the slab without being affected; in this step, one-quarter of the clear span of the beam is obtained by the inventor through continuous force analysis and testing of the longitudinal reinforcement on the top of the beam to be added, which can ensure the force effect of the enlarged cross-section beam while minimizing the chiseling of the floor slab; of course, the length range of the construction groove 3 is between one-quarter of the clear span of the original beam 2 and all chiseling out, and the specific length selection depends on the specific on-site construction conditions;

[0040] S3: Add new top reinforcement 16 along the length direction of the positioning groove. When the new top reinforcement 16 meets the original column 1, the new top reinforcement 16 bypasses the original column 1. The bypass here means that when the new top reinforcement 16 meets the original column 1, the new top reinforcement 16 is bent and passes through the grooves on both sides of the original column 1. That is, when the enlarged cross-section of the beam meets the column node, the beam top is added with a haunch, that is, the new top reinforcement 16 is bent, and the haunch length E needs to meet the angle requirement of 1:6 for the steel bar bending, that is, for the bent new As for the additional top reinforcement 16, it must meet the requirement of the additional armpit height D / added armpit length E≤1 / 6. Therefore, the additional top reinforcement 16 for reinforcement bypasses the two sides of the original column 1 and is used as the additional reinforcement of the combined cross-section. While avoiding the planting of the additional top reinforcement 16, it meets the design requirements of greatly improving the bending bearing capacity and shear bearing capacity; then the additional top reinforcement 16 bypassing the original column 1 is fixed; it is worth explaining here that there are two situations for the additional top reinforcement 16 bypassing the original column 1. One is that both sides of the original column 1 are connected to the beam. Figure 6As shown, in this case, the two beams are connected by the newly added top reinforcement 16 bypassing the two sides of the original column 1; another method is that the original column 1 is connected to the beam on one side, such as Figure 7 As shown, the newly added top reinforcement 16 bypassing both sides of the original column 1 is welded around the column on one side to complete the fixation; the specific connection method depends on the specific situation on site; the top reinforcement 8 of the beam is constructed on the side of the original beam 2 where the groove is not cut, and the top reinforcement 8 of the beam is connected with the newly added top reinforcement 16 at the same time, that is, for the original beam 2, the floor slab is only cut off at the top and side of the beam, and the corresponding groove is formed, and the newly added top reinforcement 16 is tied in the positioning groove corresponding to the chiseled floor slab, and the top reinforcement 8 of the beam is arranged on the side of the beam top corresponding to the uncut floor slab. The top reinforcement 8 of the beam is set close to the bottom of the floor slab, so the newly added top reinforcement 16 and the top reinforcement 8 of the beam are not on the same horizontal plane. Specifically, although the top reinforcement 8 of the beam is set in the position where the floor slab is not cut, the end portion still extends into the positioning groove on both sides of the top of the original beam 2, and the specific extension length is 20 times the diameter of the top reinforcement 8 of the beam, and the part of the length extending into the positioning groove is for better overlap and better connection with the newly added top reinforcement 16.

[0041] Preferably, in this step, it also includes constructing a set of steel bars 14 for positioning two newly added top bars 16 in the positioning groove 3, and the set of steel bars 14 and the newly added top bars 16 are tied together by the beam top stirrups 7. Since the two positioning grooves 3 are respectively provided with newly added top bars 16, the setting of the set of steel bars 14 can effectively determine and position the width between the two newly added top bars 16, so that the spacing between the two newly added top bars 16 meets the structural requirements; and it should be explained here that: the present application does not make specific requirements on the number of newly added top bars 16 in a single positioning groove 3, and it can be selected accordingly according to the actual construction conditions and load-bearing requirements; the setting of the set of steel bars 14 is to ensure that the spacing between the newly added top bars 16 in the two positioning grooves 3 meets the industry requirements and specifications;

[0042] S4: construct a number of beam top hoops 7 in the construction groove 3, the number of which is not less than six, to avoid too low a number of beam top hoops 7 failing to meet the connection strength requirement; the beam top hoops 7 bind the newly added top bars 16 with the steel bars in the original beam 2, and the beam top hoops 7 firmly connect the newly added top bars 16 with the steel bars in the original beam 2. The connection between the newly added top bars 16, the erected steel bars 14, the beam top hoops 7, and the steel bars in the original beam 2 forms a steel cage as a whole, which can ensure that the composite section and the original concrete are filled densely and reliable force transmission is ensured; and more importantly, because the newly added top bars 16 are bent around the column A lateral component force will be generated. In order to ensure the effective transmission of the tension of the newly added top reinforcement 16, the beam top hoop 7 is used to bear the lateral component force generated by the newly added top reinforcement 16, so as to ensure that the newly added top reinforcement 16 can play its role stably and firmly; further, a number of additional steel bars are constructed between the newly added top reinforcements 16 on both sides of the original beam, and the additional steel bars are connected to the newly added top reinforcement 16. The additional steel bars are similar to the existence of reinforcing bars. In order to compensate for the strength reduction problem of only concrete reinforcement within the enlarged section width range, the additional steel bars are single-sidedly welded to the newly added top reinforcement 16, so as to ensure the connection quality while enhancing the bearing capacity within the enlarged section width range of the original beam 2;

[0043] S5: After the binding is completed, the top steel bars 5 of the removed floor slab are re-welded into a whole. At this time, the operation of increasing the cross-section of the top surface of the original beam 2 is completed, and it also includes constructing the bottom steel bars 15 at the bottom of the original beam 2. The bottom steel bars 15 are fixed to the original column 1 by chemically embedding 13, and the bottom steel bars 15 are bound with the newly added top bars 16 by newly added stirrups 12; that is, new embedded steel bars 11 are constructed in the length direction of the original beam 2, and the steel bars are directly implanted in the original column 1 to complete the operation of increasing the cross-section of the bottom surface of the original beam 2; it also includes constructing the waist bars 10 on the side of the original beam 2 along the length direction of the beam, the waist bars 10 are also fixed to the original column 1 by chemically embedding 13, and the waist bars 10 are connected to the steel bars on the original beam 2 by tension bars 9 to complete the operation of increasing the cross-section of the side of the original beam 2, and then concrete or grouting material is poured to finally complete the construction of increasing the cross-section of the beam.

[0044] The invention can effectively ensure the high construction efficiency and quality by bypassing the newly added top reinforcement 16 from both sides of the column when the increased cross-section of the beam is constructed and encountering a column, thereby avoiding the construction difficulties and the difficulty in ensuring the construction quality caused by directly implanting the newly added top reinforcement 16 into the column; at the same time, it changes the previous phenomenon of completely chiseling away the floor slabs within the increased cross-section width on both sides of the beam top, and only chiseling away part of the floor slabs on both sides of the beam top and the beam top, constructing the beam top reinforcement 8 in the area where the floor slabs are not chiseled, and constructing the newly added top reinforcement 16 in the chiseled floor slab area, and completing the increase of the cross-section of the entire original beam 2 along the length direction by connecting the newly added top reinforcement 16 with the beam top reinforcement 8, and chiseling away the floor slab only in a part of the end area of ​​the original beam 2, ensuring the force effect of the original beam to be increased in cross-section, while greatly reducing the chiseling operation of the floor slab and the arrangement of temporary supports during the construction process, greatly reducing the reinforcement planting operation, greatly shortening the construction period, improving the economic benefits, increasing the overall constructability, being less constrained by the on-site environment, and then ensuring the applicability of the construction.

[0045] Example 2

[0046] A structure adopting the construction method of increasing the cross-section of a beam as described in any of the above items, including slots opened on both sides of the top of the original beam 2, the length of the slots not less than one-fourth of the clear span of the original beam 2, and the width of the slots, that is, the distance between the slots and the side of the original beam 2, is the width of the required increased cross-section of the beam + 10 cm, to avoid the increase in the amount of floor slab chiseling caused by excessive width, increase cost and construction time; to avoid the direction of the newly added top reinforcement 16 being affected by the entire bearing capacity performance due to the small width. A construction slot 3 is opened along the length direction of the original beam 2 at the end of the top surface of the original beam 2, the length of the construction slot 3 is not less than one-fourth of the clear span of the original beam 2, and newly added top reinforcement 16 is arranged in the slot along the length direction of the slot, and the end of the newly added top reinforcement 16 close to the original column 1 is fixed after passing around the original column 1, and the newly added top reinforcement 16 is fixed to the steel bars in the original beam 2 through the top stirrups 7, and the top reinforcement 8 of the beam is arranged on the side of the original beam 2 where the slot is not chiseled, and the top reinforcement 8 of the beam is connected to the newly added top reinforcement 16 at the same time.

[0047] The reinforcement structure of the present invention has a simple overall structure and high construction efficiency. It does not require the operation of planting reinforcement while satisfying the stress effect of the original beam with a larger cross section. It has high construction efficiency and is not easily affected by the distribution of steel bars in the original beam 2 and the original column 1 in the on-site environment. It greatly reduces the construction difficulty, reduces the chiseling of the floor slab, and reduces the setting of temporary support on site. It saves costs and greatly improves the construction efficiency. It has high overall universality. The reinforcement structure and construction method of the present application have been applied in the structural reinforcement design of a factory building in Shenzhen, reducing at least 50% of the chiseling of the floor slab and the setting of temporary support, greatly shortening the construction period and improving economic benefits.

[0048] The examples described in the present invention are merely descriptions of the preferred implementation modes of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made to the technical solutions of the present invention by engineers and technicians in this field should all fall within the protection scope of the present invention.

Claims

1. A construction method for beam variable cross-section reinforcement, Features: The following steps are involved: S1: chiseling away the floor slabs on both sides of the top of the original beam (2) to form a positioning groove, the length direction of the positioning groove is consistent with the length direction of the original beam (2), and the length is not less than one quarter of the clear span of the original beam (2); S2: Starting from the end of the top surface of the original beam (2), the floor slab is chiseled away along the length direction of the original beam (2), and a groove is chiseled on the top surface of the original beam (2) to form a construction groove (3), wherein the length of the construction groove (3) is not less than one-fourth of the clear span of the original beam (2); at the same time, the top steel bars (5) of the chiseled floor slab are disconnected, and the bottom steel bars (6) of the chiseled floor slab are kept intact; S3: constructing new top reinforcement (16) in the positioning groove along the length direction of the positioning groove. When the new top reinforcement (16) meets the original column (1), the new top reinforcement (16) bypasses the original column (1) respectively, and then fixes the new top reinforcement (16); constructing the beam top reinforcement (8) on the side of the original beam (2) where the groove is not cut, and connecting the beam top reinforcement (8) with the new top reinforcement (16); S4: constructing a plurality of beam top stirrups (7) in the construction trench (3), wherein the beam top stirrups (7) bind the newly added top reinforcement (16) with the reinforcement in the original beam (2); S5: After the binding is completed, the top steel bars (5) of the removed floor slab are welded back into a whole, and then concrete or grouting material is poured to finally complete the construction of the enlarged cross-section of the beam.

2. A construction method for beam variable cross-section reinforcement according to claim 1, Features: In step S3, it also includes constructing erection steel bars (14) in the positioning groove for respectively positioning two newly added top bars (16), and the erection steel bars (14) and the newly added top bars (16) are tied together by means of beam top stirrups (7).

3. A construction method for beam variable cross-section reinforcement according to claim 2, Features: The number of the beam top stirrups (7) is not less than six.

4. A construction method for beam variable cross-section reinforcement according to claim 1, Features: In step S4, a plurality of additional steel bars are constructed between the newly added top bars (16) on both sides of the original beam (2), and the additional steel bars are connected to the newly added top bars (16).

5. A construction method for beam variable cross-section reinforcement according to claim 1, Features: In step S5, it also includes constructing beam bottom reinforcement (15) at the bottom of the original beam (2), the beam bottom reinforcement (15) is fixed to the original column (1) by means of chemical reinforcement (13), and the beam bottom reinforcement (15) and the newly added top reinforcement (16) are tied together by means of newly added stirrups (12).

6. A structure using the construction method for beam variable cross-section reinforcement as described in any one of claims 1 to 5, Features: The invention comprises a positioning groove opened on both sides of the top of the original beam (2), the length of the positioning groove being not less than one-fourth of the clear span of the original beam (2), a construction groove (3) opened at the end of the top surface of the original beam (2) along the length direction of the original beam (2), the length of the construction groove (3) being not less than one-fourth of the clear span of the original beam (2), and a newly added top reinforcement (16) being arranged in the positioning groove along the length direction of the positioning groove, the end of the newly added top reinforcement (16) close to the original column (1) passing around the original column (1) and then being fixed, and the newly added top reinforcement (16) and the steel bars in the original beam (2) being fixed by the beam top stirrup (7), and a beam top reinforcement (8) being arranged on the side of the original beam (2) where the groove is not cut, and the beam top reinforcement (8) and the newly added top reinforcement (16) being connected at the same time.

7. A structure of a beam with an enlarged cross-section according to claim 6, Features: The distance between the positioning groove and the side of the original beam (2) is the width of the beam plus the required large cross-section + 10 cm.

Citation Information

Patent Citations

  • Structure for strengthening node of beam column by section increase method and construction method thereof

    CN101649678A

  • Increase reinforced (rfd) frame strutbeam in cross -section

    CN207813083U

  • Novel joint for connection of existing reinforced concrete column and newly-added reinforced concrete beams

    CN107269016A

  • Concrete floor structure with secondary beam and reinforcing method thereof

    CN109914842A

  • Reinforcement structure adopting laminated hollow floor grille system and construction new method

    CN110878641A