Method for performing communication by user equipment and base station and apparatus for wireless communication

By using subcarrier spacing of different frequency bands and time units for data reception and transmission in the wireless communication system, the problem of low efficiency of control information transmission in wireless communication is solved and the efficiency and reliability of signal transmission are improved.

CN114364047BActive Publication Date: 2024-10-18LG ELECTRONICS INC
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202210149516.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-06-18
Publication Date
2024-10-18
Estimated Expiration
2038-06-18

AI Technical Summary

Technical Problem

In wireless communication systems, existing technologies are difficult to effectively send and receive control information, especially when multiple users share system resources, resulting in limited signal transmission efficiency and reliability.

Method used

In the wireless communication system, the user equipment and the base station receive and send data in time units of different frequency bands, use different subcarrier spacing, and use multiple time units to send and receive confirmation/negative acknowledgment (A/N) signals. reception to ensure effective scheduling and resource management of control channels.

Benefits of technology

It achieves effective signal transmission and reception in wireless communication systems, improves the efficiency and reliability of signal transmission, especially in multi-user sharing systems, ensuring the timely transmission of control information and the stability of data transmission.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114364047B_ABST
    Figure CN114364047B_ABST
Patent Text Reader

Abstract

The present invention relates to a method for performing communication by a user equipment and a base station and an apparatus for wireless communication. The present invention relates to a wireless communication system, and more particularly, to a method and an apparatus thereof, the method comprising the following steps: a step of receiving data in a time unit #n of a first frequency band; and a step of sending an A / N for the data in a time unit #m+k of a second frequency band, wherein the first frequency band and the second frequency band have different subcarrier spacings and the time unit #m of the second frequency band indicates the last time unit corresponding to the time unit #n of the first frequency band among a plurality of time units of the second frequency band.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of the invention patent application with the original application number 201880003903.1 (International application number: PCT / KR2018 / 006855, application date: June 18, 2018, invention name: Method and device for sending and receiving wireless signals in a wireless communication system). Technical Field

[0002] The present invention relates to a wireless communication system, and more particularly to a method and device for transmitting / receiving wireless signals. The wireless communication system includes a wireless communication system based on CA (based on carrier aggregation). Background Art

[0003] In general, wireless communication systems are developing to cover a wide range in various ways to provide communication services such as audio communication services, data communication services, etc. Wireless communication is a multiple access system that can support communication with multiple users by sharing available system resources (e.g., bandwidth, transmission power, etc.). For example, the multiple access system may include one of a CDMA (Code Division Multiple Access) system, an FDMA (Frequency Division Multiple Access) system, a TDMA (Time Division Multiple Access) system, an OFDMA (Orthogonal Frequency Division Multiple Access) system, an SC-FDMA (Single Carrier Frequency Division Multiple Access) system, and the like. Summary of the invention

[0004] Technical tasks

[0005] An object of the present invention is to provide a method and apparatus for efficiently transmitting / receiving control information in wireless communication.

[0006] The technical tasks that can be obtained from the present invention are not limited to the above-mentioned technical tasks. Moreover, ordinary technicians in the technical field to which the present invention belongs can clearly understand other unmentioned technical tasks from the following description.

[0007] Technical Solution

[0008] To achieve these and other advantages and in accordance with the purpose of the present invention, as specifically implemented and broadly described, according to one embodiment, a method for performing communication by a user equipment in a wireless communication system is provided, wherein the method includes: receiving data in a time unit #n of a first frequency band; and sending an A / N (acknowledgement / negative acknowledgement) to the data in a time unit #m+k of a second frequency band. In this case, the subcarrier spacing of the first frequency band is different from the subcarrier spacing of the second frequency band, and the time unit #m of the second frequency band indicates the last time unit corresponding to the time unit #n of the first frequency band among a plurality of time units of the second frequency band.

[0009] To further achieve these and other advantages and in accordance with the purpose of the present invention, according to different embodiments, a user equipment for a wireless communication system is provided, wherein the user equipment includes: an RF (radio frequency) module and a processor, the processor is configured to receive data in a time unit #n of a first frequency band, and the processor is configured to send an A / N (acknowledgement / negative acknowledgement) to the data in a time unit #m+k of a second frequency band. In this case, the subcarrier spacing of the first frequency band is different from the subcarrier spacing of the second frequency band, and the time unit #m of the second frequency band indicates the last time unit corresponding to the time unit #n of the first frequency band among a plurality of time units of the second frequency band.

[0010] To further achieve these and other advantages and in accordance with the purpose of the present invention, according to another different embodiment, a method for performing communication by a base station in a wireless communication system is provided, wherein the base station includes: receiving data in a time unit #n of a first frequency band; and sending an A / N (acknowledgement / negative acknowledgement) to the data in a time unit #m+k of a second frequency band. In this case, the subcarrier spacing of the first frequency band is different from the subcarrier spacing of the second frequency band, and the time unit #m of the second frequency band indicates the last time unit corresponding to the time unit #n of the first frequency band among a plurality of time units of the second frequency band.

[0011] To further achieve these and other advantages and in accordance with the purpose of the present invention, according to another different embodiment, a base station for use in a wireless communication system is provided, wherein the base station includes: an RF (radio frequency) module and a processor, the processor being configured to send data in a time unit #n of a first frequency band, and the processor being configured to receive an A / N (acknowledgement / negative acknowledgement) of the data in a time unit #m+k of a second frequency band. In this case, the subcarrier spacing of the first frequency band is different from the subcarrier spacing of the second frequency band, and the time unit #m of the second frequency band indicates the last time unit corresponding to the time unit #n of the first frequency band among a plurality of time units of the second frequency band.

[0012] Preferably, each time unit includes the same number of OFDM (Orthogonal Frequency Division Multiplexing) based symbols, and the length of each time unit may be determined based on a subcarrier spacing.

[0013] Preferably, the subcarrier spacing of the first frequency band may be smaller than the subcarrier spacing of the second frequency band.

[0014] Preferably, the information about k may be received via a control channel that schedules the data.

[0015] Preferably, the first frequency band corresponds to an Scell ​​(Secondary Cell), and the second frequency band may correspond to a cell configured to transmit a PUCCH (Physical Uplink Control Channel).

[0016] Preferably, data is received via PDSCH (Physical Downlink Shared Channel), and A / N may be transmitted via PUCCH (Physical Uplink Control Channel).

[0017] Preferably, the wireless communication system may include a 3GPP (3rd Generation Partnership Project) based wireless communication system.

[0018] Beneficial Effects

[0019] According to the present invention, wireless signal transmission and reception can be efficiently performed in a wireless communication system.

[0020] Effects obtainable from the present invention are not limited to the above-mentioned effects. Also, other unmentioned effects can be clearly understood from the following description by those of ordinary skill in the technical field to which the present invention pertains. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention.

[0022] Figure 1 Physical channels used in 3GPP LTE(-A) and a signal transmission method using the physical channels are shown.

[0023] Figure 2 Shows the radio frame structure.

[0024] Figure 3 A resource grid for a downlink time slot is shown.

[0025] Figure 4 The downlink subframe structure is shown.

[0026] Figure 5 The structure of an uplink subframe used in LTE(-A) is shown.

[0027] Figure 6 A single carrier frequency division multiple access (SC-FDMA) scheme and an orthogonal frequency division multiple access (OFDMA) scheme are shown.

[0028] Figure 7 UL HARQ (Uplink Hybrid Automatic Repeat Request) operation is shown.

[0029] Figure 8 A wireless communication system based on carrier aggregation (CA) is shown.

[0030] Fig. 9 Cross-carrier scheduling is shown.

[0031] Fig.10 The structure of a self-contained subframe is shown.

[0032] Fig.11 The frame structure defined in 3GPP NR is shown.

[0033] Figures 12 to 16 The signal transmission according to the invention is shown.

[0034] Fig.17 A base station and a user equipment applicable to the embodiments of the present invention are shown. DETAILED DESCRIPTION

[0035] Embodiments of the present invention are applicable to various wireless access technologies such as code division multiple access (CDMA), frequency division multiple access (FDMA), time division multiple access (TDMA), orthogonal frequency division multiple access (OFDMA) and single carrier frequency division multiple access (SC-FDMA). CDMA can be implemented as a radio technology such as Universal Terrestrial Radio Access (UTRA) or CDMA2000. TDMA can be implemented as a radio technology such as Global System for Mobile Communications (GSM) / General Packet Radio Service (GPRS) / Enhanced Data Rates for GSM Evolution (EDGE). OFDMA can be implemented as a radio technology such as Institute of Electrical and Electronics Engineers (IEEE) 802.11 (Wireless Fidelity (Wi-Fi)), IEEE 802.16 (Worldwide Interoperability for Microwave Access (WiMAX)), IEEE 802.20 and Evolved UTRA (E-UTRA). UTRA is part of Universal Mobile Telecommunications System (UMTS). 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) is a part of Evolved UMTS (E-UMTS) using E-UTRA, which adopts OFDMA for downlink and SC-FDMA for uplink. LTE Advanced (LTE-A) evolved from 3GPP LTE. Although the following description is given focusing on 3GPP LTE / LTE-A for clarity, this is only exemplary and should not be construed as limiting the present invention.

[0036] In a wireless communication system, a user equipment (UE) receives information from a base station (BS) through a downlink (DL) and transmits information to the BS through an uplink (UL). The information transmitted and received by the BS and the UE includes data and various control information, and includes various physical channels according to the type / purpose of the information transmitted and received by the UE and the BS.

[0037] Figure 1 Physical channels used in 3GPP LTE(-A) and a signal transmission method using the physical channels are shown.

[0038] When powered on or when the UE initially enters a cell, the UE performs an initial cell search involving synchronization with the BS in step S101. For the initial cell search, the UE synchronizes with the BS and acquires information such as a cell identifier (ID) by receiving a primary synchronization channel (P-SCH) and a secondary synchronization channel (S-SCH) from the BS. The UE may then receive broadcast information from the cell on a physical broadcast channel (PBCH). In addition, the UE may check the downlink channel status by receiving a downlink reference signal (DL RS) during the initial cell search.

[0039] After the initial cell search, the UE may acquire more specific system information by receiving a physical downlink control channel (PDCCH) and receiving a physical downlink shared channel (PDSCH) based on information of the PDCCH in step S102.

[0040] The UE may perform a random access procedure to access the BS in steps S103 to S106. For random access, the UE may send a preamble to the BS on a physical random access channel (PRACH) (S103) and receive a response message to the preamble on a PDCCH and a PDSCH corresponding to the PDCCH (S104). In the case of contention-based random access, the UE may perform a contention resolution procedure by further sending a PRACH (S105) and receiving a PDCCH and a PDSCH corresponding to the PDCCH (S106).

[0041] After the foregoing process, the UE may receive PDCCH / PDSCH (S107) and send a physical uplink shared channel (PUSCH) / physical uplink control channel (PUCCH) (S108) as a general downlink / uplink signal transmission process. The control information sent from the UE to the BS is called uplink control information (UCI). UCI includes hybrid automatic repeat and request confirmation / negative determination (HARQ-ACK / NACK), scheduling request (SR), channel state information (CSI), etc. CSI includes channel quality indicator (CQI), precoding matrix indicator (PMI), rank indicator (RI), etc. Although UCI is usually sent on PUCCH, UCI may be sent on PUSCH when control information and service data need to be sent simultaneously. In addition, UCI may be sent aperiodically via PUSCH according to the request / command of the network.

[0042] Figure 2 The radio frame structure is shown. Uplink / downlink data packet transmission is performed subframe by subframe. A subframe is defined as a predetermined time interval including a plurality of symbols. 3GPP LTE supports a type 1 radio frame structure applicable to frequency division duplex (FDD) and a type 2 radio frame structure applicable to time division duplex (TDD).

[0043] Figure 2 (a) shows a type 1 radio frame structure. A downlink subframe includes 10 subframes in the time domain, and each subframe includes 2 time slots. The time for sending a subframe is defined as a transmission time interval (TTI). For example, each subframe has a duration of 1 ms, and each time slot has a duration of 0.5 ms. A time slot includes multiple OFDM symbols in the time domain and multiple resource blocks (RBs) in the frequency domain. Since OFDM is used in the downlink in 3GPP LTE, an OFDM symbol represents a symbol period. An OFDM symbol may be referred to as an SC-FDMA symbol or a symbol period. An RB, as a resource allocation unit, may include multiple consecutive subcarriers in a time slot.

[0044] The number of OFDM symbols included in one slot may depend on the cyclic prefix (CP) configuration. The CP includes an extended CP and a normal CP. For example, when the OFDM symbol is configured with a normal CP, the number of OFDM symbols included in one slot may be 7. When the OFDM symbol is configured with an extended CP, the length of one OFDM symbol increases, so the number of OFDM symbols included in one slot is less than that in the case of a normal CP. In the case of an extended CP, the number of OFDM symbols allocated to one slot may be 6. When the channel state is unstable (for example, when the UE moves at high speed), the extended CP may be used to reduce inter-symbol interference.

[0045] When a normal CP is used, since one slot has 7 OFDM symbols, one subframe includes 14 OFDM symbols. Up to the first three OFDM symbols in each subframe may be allocated to the PDCCH, and the remaining OFDM symbols may be allocated to the PDSCH.

[0046] Figure 2 (b) shows a type 2 radio frame structure. A type 2 radio frame includes 2 half frames. Each half frame includes 4 (5) normal subframes and 10 special subframes. Depending on the UL-DL configuration, a normal subframe is used for uplink or downlink. A subframe includes 2 time slots.

[0047] Table 1 shows a subframe configuration in a radio frame according to UL-DL configuration.

[0048] [Table 1]

[0049]

[0050] In Table 1, D represents a downlink subframe, U represents an uplink subframe, and S represents a special subframe. The special subframe includes DwPTS (downlink pilot time slot), GP (guard period) and UpPTS (uplink pilot time slot). DwPTS is used for initial cell search, synchronization or channel estimation in the UE, and UpPTS is used for channel estimation in the BS and uplink transmission synchronization in the UE. GP eliminates UL interference caused by multipath delay of DL signals between UL and DL.

[0051] The radio frame structure is merely exemplary, and the number of subframes included in the radio frame, the number of symbols included in the subframe, and the number of symbols included in the slot may vary.

[0052] Figure 3 A resource grid for a downlink time slot is shown.

[0053] Reference Figure 3 , a downlink time slot includes multiple OFDM symbols in the time domain. Although in the figure one downlink time slot may include 7 OFDM symbols and one resource block (RB) may include 12 subcarriers in the frequency domain, the present invention is not limited thereto. Each element on the resource grid is called a resource element (RE). One RB includes 12×7 REs. The number of RBs NRB included in a downlink time slot depends on the downlink transmission bandwidth. The structure of an uplink time slot may be the same as that of a downlink time slot.

[0054] Figure 4 The downlink subframe structure is shown.

[0055] Reference Figure 4 , up to three (four) OFDM symbols located at the front of the first time slot in the subframe correspond to the control region to which the control channel is allocated. The remaining OFDM symbols correspond to the data region to which the physical downlink shared channel (PDSCH) is allocated. The basic resource unit of the data region is RB. Examples of downlink control channels used in LTE include the physical control format indicator channel (PCFICH), the physical downlink control channel (PDCCH), the physical hybrid ARQ indicator channel (PHICH), etc. The PCFICH is sent at the first OFDM symbol of the subframe and carries information about the number of OFDM symbols used for transmission of control channels in the subframe. The PHICH is a response to an uplink transmission and carries a HARQ acknowledgment (ACK) / negative acknowledgment (NACK) signal. The control information sent through the PDCCH is called downlink control information (DCI). The DCI includes uplink or downlink scheduling information or uplink transmit power control commands for any UE group.

[0056] The control information sent by PDCCH is called downlink control information (DCI). Formats 0, 3, 3A and 4 for uplink and formats 1, 1A, 1B, 1C, 1D, 2, 2A, 2B and 2C for downlink are defined as DCI formats. The type of information field, the number of information fields, the number of bits of each information field, etc. depend on the DCI format. For example, as needed, the DCI format selectively includes information such as frequency hopping flag, RB assignment, MCS (modulation and coding scheme), RV (redundancy version), NDI (new data indicator), TPC (transmit power control), HARQ process number, PMI (precoding matrix indicator) confirmation. Therefore, the size of the control information matched with the DCI format depends on the DCI format. Any DCI format can be used to send two or more types of control information. For example, DCI format 0 / 1A is used to carry DCI format 0 or DCI format 1 that are distinguished from each other using a flag field.

[0057] PDCCH can carry the transmission format and resource allocation of the downlink shared channel (DL-SCH), resource allocation information of the uplink shared channel (UL-SCH), paging information about the paging channel (PCH), system information about the DL-SCH, information about resource allocation of upper layer control messages such as random access responses sent on the PDSCH, a set of Tx power control commands for each UE in any UE group, Tx power control commands, information about the activation of IP voice (VoIP), etc. Multiple PDCCHs can be sent in the control region. The UE can monitor multiple PDCCHs. PDCCH is sent on an aggregation of one or more consecutive control channel elements (CCEs). CCE is a logical allocation unit for providing a coding rate to the PDCCH based on the state of the radio channel. CCE corresponds to multiple resource element groups (REGs). The format of the PDCCH and the number of bits of the available PDCCH are determined according to the number of CCEs. The BS determines the PDCCH format according to the DCI to be sent to the UE and attaches a cyclic redundancy check (CRC) to the control information. Depending on the owner or purpose of the PDCCH, the CRC is masked with a unique identifier (called a radio network temporary identifier (RNTI)). If the PDCCH is used for a specific UE, the UE's unique identifier (e.g., cell RNTI (C-RNTI)) may be masked as the CRC. Alternatively, if the PDCCH is used for a paging message, the paging identifier (e.g., paging RNTI (P-RNTI)) may be masked as the CRC. If the PDCCH is used for system information (more specifically, system information block (SIB)), the system information RNTI (SI-RNTI) may be masked as the CRC. When the PDCCH is used for a random access response, the random access-RNTI (RA-RNTI) may be masked as the CRC.

[0058] PDCCH carries a message called DCI, which includes resource assignment information and other control information for UE or UE group. Typically, multiple PDCCHs can be sent in a subframe. Each PDCCH is sent using one or more CCEs. Each CCE corresponds to 9 sets of 4 REs. 4 REs are called REGs. 4 QPSK symbols are mapped to one REG. REs allocated to reference signals are not included in REGs, so the total number of REGs in an OFDM symbol depends on whether there is a cell-specific reference signal. The concept of REG (i.e., group-based mapping, each group includes 4 REs) is used for other downlink control channels (PCFICH and PHICH). That is, REG is used as the basic resource unit of the control area. As shown in Table 2, 4 PDCCH formats are supported.

[0059] [Table 2]

[0060] PDCCH format Number of CCEs (n) Number of REGs Number of PDCCH bits 0 1 9 72 1 2 8 144 2 4 36 288 3 5 72 576

[0061] CCEs are numbered sequentially. In order to simplify the decoding process, the transmission of a PDCCH with a format including n CCEs can be started using as many CCEs as a multiple of n. The number of CCEs used to send a specific PDCCH is determined by the BS according to channel conditions. For example, if the PDCCH is used for a UE with a high-quality downlink channel (e.g., a channel close to the BS), only one CCE can be used for PDCCH transmission. However, for a UE with a poor channel (e.g., a channel close to the edge of a cell), 8 CCEs can be used for PDCCH transmission in order to obtain sufficient robustness. In addition, the power level of the PDCCH can be controlled according to the channel conditions.

[0062] LTE defines a limited set of CCE positions where PDCCH can be set for each UE. The CCE positions that the UE needs to monitor in order to detect the limited set of PDCCHs assigned to it can be called a search space (SS). In LTE, the SS has a size that depends on the PDCCH format. The UE-specific search space (USS) and the common search space (CSS) are defined separately. The USS is set according to the UE, and the range of the CSS is signaled to all UEs. For a given UE, the USS and CSS may overlap. In the case of a relatively small SS relative to a specific UE, when some CCE positions are allocated in the SS, there are no remaining CCEs. Therefore, the BS may not be able to find CCE resources that will send PDCCH to available UEs within a given subframe. In order to minimize the possibility of this blocking continuing to the next subframe, a UE-specific frequency hopping sequence is applied to the starting point of the USS.

[0063] Table 3 shows the sizes of CSS and USS.

[0064] [Table 3]

[0065]

[0066]

[0067] In order to control the computational load of blind decoding based on the number of blind decoding processes to an appropriate level, the UE does not need to search all defined DCI formats at the same time. Typically, the UE always searches for formats 0 and 1A in the USS. Formats 0 and 1A have the same size and are distinguished from each other by flags in the message. The UE may need to receive additional formats (e.g., formats 1, 1B, or 2 according to the PDSCH transmission mode set by the BS). The UE searches for formats 1A and 1C in the CSS. In addition, the UE can be set to search for formats 3 or 3A. Formats 3 and 3A have the same size as formats 0 and 1A and can be distinguished from each other by scrambling the CRC with different (public) identifiers other than the UE-specific identifier. The information content of the PDSCH transmission scheme and DCI format according to the transmission mode (TM) is listed below.

[0068] Transfer Mode (TM)

[0069] ● Transmission Mode 1: Transmission from a single base station antenna port

[0070] ●Transmission mode 2: Transmit diversity

[0071] ●Transmission mode 3: Open-loop spatial multiplexing

[0072] ●Transmission mode 4: Closed-loop spatial multiplexing

[0073] ●Transmission mode 5: Multi-user MIMO (Multiple Input Multiple Output)

[0074] ●Transmission mode 6: Closed-loop rank 1 precoding

[0075] ●Transmission mode 7: Single antenna port (port 5) transmission

[0076] ● Transmission mode 8: dual-layer transmission (ports 7 and 8) or single antenna port (port 7 or 8) transmission

[0077] ● Transmission mode 9: Transmission via up to 8 layers (ports 7 to 14) or a single antenna port (port 7 or 8)

[0078] DCI format

[0079] ●Format 0: Resource grant for PUSCH transmission

[0080] ●Format 1: Resource assignment for single codeword PDSCH transmission (transmission modes 1, 2 and 7)

[0081] ● Format 1A: Compact signaling of resource assignment for single codeword PDSCH (all modes)

[0082] ● Format 1B: Compact resource assignment for PDSCH using rank 1 closed-loop precoding (mode 6)

[0083] ● Format 1C: Very compact resource assignment for PDSCH (e.g., paging / broadcast system information)

[0084] ● Format 1D: Compact resource assignment for PDSCH using multi-user MIMO (Mode 5)

[0085] ●Format 2: Resource assignment for PDSCH for closed-loop MIMO operation (Mode 4)

[0086] ● Format 2A: Resource assignment for PDSCH for open-loop MIMO operation (Mode 3)

[0087] ● Format 3 / 3A: Power control commands for PUCCH and PUSCH with 2-bit / 1-bit power adjustment

[0088] Figure 5 The structure of an uplink subframe used in LTE(-A) is shown.

[0089] Reference Figure 5 , a subframe 500 consists of two 0.5ms time slots 501. Assuming the length of a normal cyclic prefix (CP), each time slot consists of 7 symbols 502, and one symbol corresponds to one SC-FDMA symbol. A resource block (RB) 503 is a resource allocation unit corresponding to 12 subcarriers in the frequency domain and one time slot in the time domain. The structure of the uplink subframe of LTE(-A) is roughly divided into a data region 504 and a control region 505. The data region refers to a communication resource for the transmission of data such as voice, packets, etc. sent to each UE, and includes a physical uplink shared channel (PUSCH). The control region refers to a communication resource for the transmission of an uplink control signal (e.g., a downlink channel quality report from each UE, reception of ACK / NACK for a downlink signal, an uplink scheduling request, etc.), and includes a physical uplink control channel (PUCCH). The sounding reference signal (SRS) is transmitted through the SC-FDMA symbol located at the last position on the time axis in a subframe. The SRSs of multiple UEs sent to the last SC-FDMA of the same subframe can be distinguished according to the frequency position / order. The SRS is used to send the uplink channel status to the eNB, and is sent periodically according to the subframe period / offset set by the higher layer (e.g., RRC layer) or aperiodically at the request of the eNB.

[0090] Figure 6SC-FDMA and OFDMA schemes are shown. The 3GPP system adopts OFDMA in downlink and uses SC-FDMA in uplink.

[0091] Reference Figure 6 , both the UE transmitting uplink signals and the BS transmitting downlink signals include a serial-to-parallel converter 401, a subcarrier mapper 403, an M-point IDFT module 404, and a cyclic prefix (CP) adder 406. The UE transmitting signals according to SC-FDMA further includes an N-point DFT module 402.

[0092] Next, HARQ (Hybrid Automatic Repeat Request) will be described. When there are multiple UEs to which data is to be transmitted on uplink / downlink in wireless communication, the eNB selects the UE to which data will be transmitted according to a transmission time interval (TTI) (e.g., a subframe). In a system using multiple carriers, etc., the eNB selects the UE to which data will be transmitted on uplink / downlink according to the TTI and also selects a frequency band for data transmission of the corresponding UE.

[0093] When described based on the uplink (UL), the UE sends a reference signal (or pilot signal) on the uplink, and the eNB uses the reference signal sent from the UE to detect the channel state of the UE and selects the UE that will send data on the uplink in each unit frequency band according to the TTI. The eNB notifies the UE of the result of the selection. That is, the eNB sends a UL assignment message to the UE scheduled for UL, indicating that the UE can use a specific frequency band in a specific TTI to send data. The UL assignment message is also called a UL grant. The UE sends data on the uplink according to the UL assignment message. The UL assignment message may include a UE identity (ID), RB allocation information, a modulation and coding scheme (MCS), a redundancy version (RV), a new data indication (NDI), etc.

[0094] In the case of synchronous HARQ, a retransmission time is specified in the system (for example, 4 subframes after the NACK reception time) (synchronous HARQ). Therefore, the eNB can send a UL grant message to the UE only in the initial transmission, and perform subsequent retransmissions according to the ACK / NACK signal (for example, PHICH signal). In the case of asynchronous HARQ, the retransmission time is not specified, so the eNB needs to send a retransmission request message to the UE. In addition, the frequency resources or MCS used for retransmission in the case of non-adaptive HARQ are the same as those in the previous transmission, while the frequency resources or MCS used for retransmission in the case of adaptive HARQ may be different from those in the previous transmission. For example, in the case of asynchronous adaptive HARQ, the retransmission request message may include UE ID, RB allocation information, HARQ process ID / number, RV and NDI information, because the frequency resources or MCS used for retransmission varies with the transmission time.

[0095] Figure 7 UL HARQ operation in the LTE(-A) system is shown. In the LTE(-A) system, asynchronous adaptive HARQ is used as UL HARQ. When 8-channel HARQ is used, 0 to 7 are provided as HARQ process numbers. One HARQ process operates according to TTI (eg, subframe). Figure 7 , a UL grant is sent to UE 120 through PDCCH (S600). UE 120 sends UL data to eNB 110 after 4 subframes from the time (e.g., subframe 0) when the UL grant is received using the RB and MCS specified by the UL grant (S602). eNB 110 decodes the UL data received from UE 120 and then generates ACK / NACK. When the decoding of the UL data fails, eNB 110 sends NACK to UE 120 (S604). UE 120 retransmits the UL data after 4 subframes from the time of receiving the NACK (S606). The initial transmission and retransmission of the UL data are performed through the same HARQ process (e.g., HARQ process 4). ACK / NACK information may be sent through PHICH.

[0096] Figure 8 A carrier aggregation (CA) communication system is shown.

[0097] Reference Figure 8 , multiple UL / DL component carriers (CCs) can be aggregated to support a wider UL / DL bandwidth. CCs can be adjacent or non-adjacent in the frequency domain. The bandwidth of a CC can be determined independently. Asymmetric CA in which the number of UL CCs is different from the number of DL CCs can be implemented. Control information can be sent / received only through a specific CC. The specific CC can be referred to as a primary CC, and other CCs can be referred to as secondary CCs. For example, when cross-carrier scheduling (or cross-CC scheduling) is applied, a PDCCH for downlink allocation can be sent on DL CC#0, and a corresponding PDSCH can be sent on DL CC#2. The term "component carrier" can be replaced by other equivalent terms (e.g., "carrier", "cell", etc.).

[0098] For cross-CC scheduling, a carrier indicator field (CIF) is used. Whether a CIF is present in a PDCCH may be determined semi-statically and UE-specifically (or UE group-specifically) by higher layer signaling (eg, RRC signaling). The baseline of PDCCH transmission is summarized as follows.

[0099] ■ CIF disabled: PDCCH on a DL CC is used to allocate PDSCH resources on the same DL CC or PUSCH resources on a linked UL CC.

[0100] No CIF

[0101] ■ CIF enabled: A PDCCH on a DL CC may be used to allocate PDSCH or PUSCH resources on a specific DL / UL CC among multiple aggregated DL / UL CCs using CIF.

[0102] ●Extended to LTE DCI format with CIF

[0103] - CIF corresponds to a fixed x-bit field (e.g., x=3) (when CIF is set)

[0104] -CIF position is fixed regardless of DCI format size (when CIF is set)

[0105] When CIF exists, the BS can allocate monitoring DL CC (set) to reduce the BD complexity of the UE. For PDSCH / PUSCH scheduling, the UE can only detect / decode the PDCCH on the corresponding DL CC. The BS can only send PDCCH through the monitoring DL CC (set). The monitoring DL CC set can be set UE-specifically, UE group-specifically, or cell-specifically.

[0106] Fig. 9 The scheduling when multiple carriers are aggregated is shown. Assume that 3 DL CCs are aggregated and DL CC A is set as the PDCCH CC. DL CC A~C may be referred to as serving CC, serving carrier, serving cell, etc. When CIF is disabled, each DL CC may send only the PDCCH that schedules the PDSCH corresponding to the DL CC without CIF according to the LTE PDCCH rule (non cross-CC scheduling). When CIF is enabled by UE-specific (or UE group-specific or cell-specific) high-layer signaling, a specific CC (e.g., DL CC A) may send not only the PDCCH that schedules the PDSCH of DL CC A, but also the PDCCH that schedules the PDSCH of other DL CCs using CIF (cross scheduling). PDCCH is not sent on DL CC B and DL CC C.

[0107] In the next generation RAT (Radio Access Technology), self-contained subframes are considered to minimize data transmission delay. Fig.10 shows a self-contained subframe structure. Fig.10 In the figure, the shaded area represents the DL control area, and the black area represents the UL control area. The blank area can be used for DL ​​data transmission or UL data transmission. DL transmission and UL transmission are sequentially performed in a single subframe, so DL data can be sent and UL ACK / NACK can also be received in the subframe. Therefore, the time taken until data retransmission is performed when a data transmission error is generated is reduced, so the final data transmission delay can be reduced.

[0108] As examples of configurable / settable self-contained subframe types, the following four subframe types may be considered: The individual periods are arranged in time order.

[0109] -DL control period + DL data period + GP (protection period) + UL control period

[0110] -DL control period + DL data period

[0111] -DL control period + GP + UL data period + UL control period

[0112] -DL control period + GP + UL data period

[0113] PDFICH, PHICH and PDCCH may be transmitted in the data control period, and PDSCH may be transmitted in the DL data period. PUCCH may be transmitted in the UL control period, and PUSCH may be transmitted in the UL data period. GP provides a time gap in the process of switching the BS and UE from the transmission mode to the reception mode or in the process of switching the BS and UE from the reception mode to the transmission mode. Some OFDM symbols in a subframe may be set as GP when DL is switched to UL.

[0114] Implementation method: CA scheme between different OFDM parameter sets

[0115] In a 3GPP New RAT (NR) system environment, OFDM parameter sets (e.g., subcarrier spacing and OFDM symbol duration based on the subcarrier spacing) can be configured differently between multiple cell carriers aggregated on a signal UE. Therefore, the (absolute time) duration of time resources configured by the same number of symbols (e.g., SF, time slot, or TTI (collectively referred to as TU (time unit) for clarity)) may be configured differently between CA cells. In this case, the symbol may include an OFDM symbol and an SC-FDMA symbol.

[0116] Fig.11 3GPP NR frame structure is shown. Similar to the radio frame structure of LTE / LTE-A (refer to Figure 2 ), in 3GPP NR, a radio frame includes 10 subframes and each subframe has a length of 1 ms. A subframe includes one or more time slots, and the time slot length varies according to the SCS. 3GPP NR supports SCSs of 15 KHz, 30 KHz, 60 KHz, 120 KHz, and 240 KHz. In this case, the time slot corresponds to Fig.10 TTI shown.

[0117] Table 4 shows how the number of symbols per slot, the number of slots per frame, and the number of slots per subframe vary according to the SCS.

[0118] [Table 4]

[0119] SCS(15*2^u) Number of symbols in a time slot Number of time slots in a frame Number of time slots in a subframe 15KHz(u=0) 14 10 1 30KHz(u=1) 14 20 2 60KHz(u=2) 14 40 4 120KHz(u=3) 14 80 8 240KHz(u=4) 14 160 16

[0120] In view of this, when CA is performed on cells with different SCS and OS durations, the operation method described below for the DL / UL data-related HARQ process may be considered (e.g., when DL / UL data transmission in the Scell ​​is scheduled across CCs from the Pcell, A / N feedback is sent via the Pcell in response to DL data received in the Scell). When CA is performed on cells with the same SCS and OS duration, the same principle may be applied even though the TU (e.g., time slot) duration is configured differently between cells.

[0121] In the following, the present invention is explained with reference to the frame structure of NR focusing on the case where TU corresponds to a time slot. TU may be defined by various time resource units according to the system. In the following description, Pcell may be common to cells configured to send PUCCH (hereinafter, PUCCH cells). For example, the PUCCH cell may include a specific Scell ​​(e.g., a primary and secondary cell (PSCell)) configured to send PUCCH. And, the Scell ​​that sends / receives data is common to data cells or scheduled cells, and the cell that sends the granted DCI may be common to the control cell or the scheduling cell. And, the cell may be replaced by a CC (component carrier). DCI is sent via PDCCH, UL data is sent via PUSCH, and DL data may be sent via PDSCH.

[0122] (A) Cross-CC Scheduling between Different SCSs

[0123] Fig.12 1 shows a case where a cell X with a large SCS (i.e., a short OS duration or a short TU (e.g., time slot) duration) is configured to be scheduled by a cell Y with a small SCS (i.e., a long OS duration or a long TU duration). Fig.12, DL / UL data transmission in K (K>1) number of TUs of cell X may be configured to be scheduled by one TU of cell Y. In this case, a single TU of cell Y and K (e.g., a multiple of 2) number of TUs of cell X may have the same duration. Specifically, Opt 1) when DL / UL grants for scheduling a (maximum) K number of TUs of cell X are simultaneously transmitted / detected via a DL control channel transmission area (within a single TU) of cell Y, or Opt 2) when K number of DL control channel transmission areas within a single TU of cell Y are independently configured, DL / UL grants for scheduling different single TUs in cell X can be transmitted / detected via respective areas. In this case, the TU to be scheduled among the K number of TUs of cell X corresponding to the single TU duration of cell Y may be indicated via a DL / UL grant.

[0124] In the above method (i.e., Opt 1), the operation of simultaneously detecting / receiving multiple DCIs can be supported differently for multiple DL / UL data channels (and multiple PDCCHs carrying DL / UL grant DCIs of scheduling channels) according to the parallel (decoding / encoding) processing capabilities of the UE implementation. For example, in the case of a UE supporting cross-CC scheduling operations between a scheduling cell Y operating with a specific SCS and a scheduled cell X operating with an SCS that is K times larger than the specific SCS, the UE capability / implementation can be adjusted so that the UE simultaneously detects / receives (and simultaneously performs a maximum of K number of DL (UL) data processing) (at least) a maximum of K number of DL (UL) grant DCIs via a DL control channel transmission / search (resource) area. As a different example, (under a cross-CC scheduling configuration), the maximum number of DL (UL) grant DCIs (e.g., Lu) that can be simultaneously detected / received via a DL control channel transmission / search (resource) area may vary depending on the UE implementation. Specifically, the UE may report the UE's capabilities related to the operation (i.e., Lu value) to the base station. As another different example, (in Fig.12 In the case of a cross-CC scheduling configuration, the UE may receive a configuration of the maximum number (e.g., Lc) of DL (UL) grant DCIs that can be simultaneously scheduled / sent from the base station (via a DL control channel transmission / search (resource) region). Therefore, the UE may perform blind decoding by assuming a state in which the UE can simultaneously detect / receive a maximum number of Lc of DL (UL) grant DCIs.

[0125] The above method / operation can be similarly applied to the case where self-CC scheduling is configured in a manner that DL / UL data sent via a random cell is scheduled by DCI sent via the cell itself (in a state where DL grant DCI is dynamically indicated via DCI for DL ​​data timing (or UL grant DCI for UL data timing)) or the case where cross-CC scheduling is configured between the scheduled cell X and the scheduling cell Y operating with the same SCS. For example, the maximum number of DL (UL) grant DCIs (e.g., Lu) that can be simultaneously detected / received via a DL control channel transmission / search (resource) region can be distinguished according to the UE implementation. Therefore, the UE can report the UE's capabilities (i.e., Lu value) related to the above operation to the base station. As a different example, the UE can receive a configuration of the maximum number of DL (UL) grant DCIs (e.g., Lc) that can be simultaneously scheduled / sent from the base station (via a DL control channel transmission / search (resource) region). Therefore, the UE can perform blind decoding by assuming a state in which the UE can simultaneously detect / receive a maximum number of Lc DL (UL) grant DCIs.

[0126] In addition, when multiple DL grant DCIs schedule multiple different DL data (e.g., PDSCH) sent on a single CC (e.g., data CC), it is possible to configure multiple DL grant DCIs to be sent via the same time slot (the same control resource set or the same PDCCH search space within the time slot) within a specific CC (e.g., control CC). In this case, the control CC corresponds to the CC monitored by the UE for PDCCH. Depending on the cross-CC scheduling configuration, the control CC may be configured to be the same as the CC (e.g., data CC) performing data transmission / reception or the control CC may be configured by a CC different from the data CC. In addition, in order to configure a dynamic HARQ-ACK payload (codebook), a counter DAI (and / or total DAI) signaling may be applied to indicate the scheduling order (based on the CC index) (and / or the total number of scheduled DL data (up to the current time slot)) of DL data sent via a specific CC via the DL grant DCI. When multiple DL grant DCIs are sent in the same time slot (same control resource set or same PDCCH search space within a time slot) in a control CC in response to multiple DL data sent on the same data CC, it is necessary to have a reference for determining the order / size of the counter DAI values ​​signaled by the multiple DCIs. To this end, a method of determining the counter DAI value according to one of the indices described below (e.g., a low index is mapped to a small counter DAI value) may be considered.

[0127] 1) CCE Index

[0128] 2) PDCCH candidate index for sending DL grant DCI

[0129] 3) PDCCH search space or control resource set index for sending DL grant PDCCH

[0130] 4) The time slot index (of the data CC) for sending DL data

[0131] 5) Allocate the first symbol index or the last symbol index for sending DL data

[0132] 6) Index of DL data resource candidates (combined by slot offset / starting symbol / duration) configured via RRC

[0133] Fig.13 2 shows a case where a cell X with a small SCS (i.e., a long OS duration or a long TU duration) is configured to be scheduled by a cell Y with a large SCS (i.e., a short OS duration or a short TU duration). Fig.13 , DL / UL data transmission in a single TU of cell X may be configured to be scheduled by all or part (e.g., 1 TU) of N (N>1) number of TUs of cell Y. In this case, N (e.g., a multiple of 2) number of TUs of cell Y and a single TU of cell X may have the same duration (for clarity, N number of TUs of cell Y aligned with a single TU of cell X). Specifically, Opt 1) DL / UL grants for scheduling a single TU of cell X are transmitted / detected via TUs belonging to a plurality of TUs (i.e., TU groups) corresponding to all or part of the N number of TUs of cell Y ( Fig.13 ), or Opt 2) a DL / UL grant for scheduling a TU of cell X may be transmitted / detected via a specific TU among the N number of TUs of cell Y (e.g., the first TU among the N number of TUs or a TU of cell Y that overlaps with the first OS within a TU of cell X over time) ( Fig.13 ).

[0134] In the above method (i.e., Opt 1), the operation of simultaneously detecting / receiving DCI may be supported differently for DL / UL data channels according to the buffer processing capability of the UE implementation. For example, in the case of a UE supporting cross-CC scheduling operation between a scheduled cell X operating at a specific SCS and a scheduling cell Y operating at an SCS K times larger than the specific SCS, it is possible to adjust the UE capability / implementation to enable the UE to detect / receive the DL (UL) grant DCI of the TU of the scheduling cell X (and perform buffer processing of DL data) via any TU among the N number of TUs of cell Y aligned with the TU of cell X. As a different example, (in Fig.13), among the N number of TUs of cell Y, the TU timing (of cell Y) that can detect / receive the DL (UL) grant DCI of the TU scheduling cell X can be distinguished according to the UE implementation. Therefore, the UE can report the UE's capability related to the above operation (i.e., the TU timing information of cell Y that can detect / receive the DL (UL) grant DCI of the TU scheduling cell X) to the base station. As another different example, (in Fig.13 In the cross-CC scheduling configuration shown in the figure), it is possible to configure the DL (UL) grant DCI of the TU of the scheduling cell X to be detected / received only through the TU (of cell Y) that is equal to or faster than the DL (UL) data start symbol / timing sent through the TU of cell X among the N number of TUs of cell Y.

[0135] In addition, in the case of Opt 1, the TU timing for sending DL / UL grants within the TU group may vary, and each of the DL grants and UL grants may be sent via different TUs within the TU group. Therefore, the UE may sequentially perform blind decoding operations on the DL control channel transmission areas of all TUs belonging to the TU group. If all DL / UL grants for cell X are detected within the TU group of cell Y, the UE may not perform blind decoding operations on the DL control channel transmission areas within the remaining TUs. And, in the case of Opt 1, the UE's DL control channel detection operation may be performed (e.g., BD (Nb / Ns) times in each TU) in such a manner that the BD count (e.g., Nb times) of the DL control channel assigned by the single TU scheduling of cell X is allocated to multiple TUs (e.g., Ns number of TUs) constituting the TU group of cell Y. In addition, according to Opt 2, the specific TU for sending the DL / UL grant to cell X among the N number of TUs of cell Y can be configured via high-level signaling (e.g., RRC signaling), or can be automatically designated based on a predefined rule (e.g., the first TU of the N number of TUs of the Y unit is located at the same timing as the TU of cell X).

[0136] In addition, when cell X with a long TU length is configured to perform cross-scheduling on cell Y with a short TU length, since scheduling is performed on multiple TUs of cell Y in a single TU of cell X (together with DL / UL grant DCI transmission), the DL control resource burden may increase. Therefore, cross-CC scheduling may be allowed only when the difference between the long TU length of (scheduling) cell X and the short TU length of (scheduled) cell Y is equal to or less than a specific level (for example, when the TU of cell X is equal to or less than a specific multiple of the TU of cell Y). As a different method, a method of setting a limit on the number of cells Y with short TUs configured to be cross-CC scheduled by cell X with a long TU so that the number is a value equal to or less than a specific value may be considered.

[0137] (B) HARQ-ACK timing for CA with different SCSs

[0138] 1) DL data to HARQ-ACK

[0139] In the case of CA of the 3GPP NR system, the SCS or OS duration (or TU length) may be configured differently between a cell (e.g., Scell) that transmits DL data and a cell (e.g., Pcell) that transmits A / N feedback in response to DL data. In this case, Opt 1-1) A / N timing (e.g., the delay between DL data reception and A / N transmission) may be configured based on the TU length of the Scell ​​that transmits DL data (e.g., the A / N timing (candidate set) is configured by a multiple of the Scell ​​TU length), or Opt 1-2) A / N timing may be configured based on the TU length of the Pcell that transmits A / N feedback (e.g., the A / N timing (candidate set) is configured by a multiple of the Pcell TU length). Opt 1-1 may be understood as the A / N timing being configured based on a parameter set for transmitting DL data (e.g., PDSCH transmission). Opt 1-2 may be understood as the A / N timing being configured based on a parameter set for performing A / N transmission (e.g., PUCCH transmission). For clarity, the A / N timing configured based on Opt 1-1 / 1-2 is referred to as temporary A / N timing. In this case, information about the A / N timing (eg, the number of TUs) may be indicated via a DL grant that schedules DL data.

[0140] First, in the case of Opt 1-1, the actual A / N timing of the actual application of the Pcell can be determined as the overlapping timing with the timing that appears after the temporary A / N timing (e.g., the time corresponding to N numbers of Scell TUs) from the timing of receiving DL data on the Scell, or the earliest TU (or UL control channel transmission (for A / N)) duration on the Pcell that appears on or after this overlapping timing. Specifically, when it is assumed that DL data is received at Scell TU#k, for a Pcell TU length < Scell TU length, a specific (e.g., the first or last) Pcell TU#n among multiple Pcell TUs located at the same timing as Scell TU#(k+N) can be determined as the actual A / N timing. In this case, among multiple Pcell TUs located at the same timing as Scell SF#(k+N), the Pcell TU#n corresponding to the actual A / N timing can be configured via higher layer signaling (e.g., RRC signaling), dynamically indicated via DL grant DCI, or automatically specified based on a predefined rule (e.g., the first TU or the last TU among multiple Pcell TUs). Additionally, when the number of candidate A / N timing types is indicated via DL grant, the DL data of the Scell can be configured to have a smaller number of types compared to the DL data of the Pcell (e.g., a value corresponding to 1 / N when the TU lengths of the two cells have an N-fold relationship). In this case, the interval between candidate A / N timings corresponding to the DL data of each cell can be configured with the same value between the two cells.

[0141] On the contrary, for Pcell TU length>Scell ​​TU, PcellTU#n located at the same timing as Scell ​​TU#(k+N) or Pcell TU#(n+1) that appears immediately after Pcell TU#n may be determined as the actual HARQ timing. In this case, Pcell TU#n or Pcell TU#(n+1) corresponding to the actual A / N timing may be configured via high-layer signaling (e.g., RRC signaling), may be dynamically indicated via DL grant DCI, or may be automatically designated based on a predefined rule, for example, if the PUCCH transmission duration or number of symbols in the Pcell is equal to or less than a specific value, Pcell TU#n is designated as the actual A / N timing. If the PUCCH transmission duration or number of symbols exceeds a specific value, Pcell TU#(n+1) is designated as the actual A / N timing. And / or, if the order of Scell ​​TU#(k+N) among a plurality of Scell ​​TUs at the same time as Pcell TU#n is equal to or less than a specific value, Pcell TU#n is designated as the actual A / N timing. If the order of Scell ​​TU#(k+N) exceeds a specific value, Pcell TU#(n+1) is designated as the actual A / N timing.

[0142] In addition, the interval (N) between the candidate A / N timings that can be indicated via the DL grant may be configured so that the DL data of the Scell ​​has a longer interval than the DL data of the Pcell (for example, when the TU lengths of the two cells have an N-fold relationship, a multiple of N). In this case, the number of candidate A / N timings may be configured by the same value between the two cells.

[0143] Also, in the case of Opt 1-2, the actual A / N timing applied on the Pcell can be determined as the duration of the TU (or (A / N) UL control channel transmission) that appears after the overlapping timing with the DL data reception timing on the Scell at the temporary A / N timing (e.g., the time corresponding to the M number of Pcell TUs), or the duration of the earliest TU (or (A / N) UL control channel transmission) on the Pcell that exists at or after the overlapping timing. Specifically, when assuming that the DL data reception timing corresponds to Scell TU#n, for the Pcell TU length < Scell TU length (i.e., Pcell SCS > Scell SCS), based on a specific Pcell TU#k (e.g., the first or the last) among multiple Pcell TUs located at the same timing as Scell TU#n, Pcell TU#(k + M) can be determined as the actual A / N timing. In the above description, "a specific Pcell TU#k among multiple Pcell TUs (hereinafter, HARQ-ACK reference TU)" can be configured via higher layer signaling (e.g., RRC signaling), can be dynamically indicated via DL grant DCI, or can be specified based on a predefined rule (e.g., the first or the last TU among multiple Pcell TUs). On the contrary, for "Pcell TU length > Scell TU length" or "Pcell TU length = Scell TU length" (i.e., Pcell SCS <= Scell SCS), based on Pcell TU#k located at the same timing as Scell TU#n, Pcell TU#(k + M) can be determined as the actual A / N timing.

[0144] In addition, when a cell X with a long TU length is configured to send A / N in response to DL data reception in a cell Y with a short TU length (i.e., cross-CC UCI transmission), since multiple A / N transmissions (PUCCH transmissions) need to be performed in a single TU of cell X in response to multiple DL data in cell Y, the UL control resource burden can increase. Therefore, cross-CC UCI transmission is allowed only when the difference between the long TU length of (UL control) cell X and the short TU length of (DL data) cell Y is equal to or less than a specific level (e.g., when the TU of cell X is equal to or less than a specific multiple of the TU of cell Y). As a different method, a method of setting a limit on the number of cells Y with (DL data) short TUs configured to send UCI via (UL control) cell X with a long TU so that the number is equal to or less than a specific value can be considered.

[0145] 2) UL permission DCI for UL data

[0146] In addition, in the case of UL HARQ, the SCS or OS duration (or TU length) may be configured differently between a cell (e.g., Pcell) that transmits a UL grant and a cell (e.g., Scell) that transmits UL data in response to a UL grant. In this case, Opt 2-1) HARQ timing (e.g., a delay between UL grant reception and UL data transmission) may be configured based on the TU length of the Scell ​​that transmits the UL grant (e.g., the HARQ timing (candidate set) is configured by a multiple of the Pcell TU length), or Opt 2-2) HARQ timing may be configured based on the TU length of the Scell ​​that transmits UL data (e.g., the HARQ timing (candidate set) is configured by a multiple of the Scell ​​TU length). Opt 2-1 may be understood as HARQ timing being configured based on a parameter set for transmitting a UL grant (e.g., PDCCH transmission). Opt 2-2 may be understood as HARQ timing being configured based on a parameter set for performing UL data transmission (e.g., PUSCH transmission). For clarity, the HARQ timing based on the Opt 2-1 / 2-2 configuration is referred to as temporary HARQ timing. In this case, information about the HARQ timing (eg, the number of TUs) may be indicated via a UL grant.

[0147] First, in the case of Opt 2-1, the actual HARQ timing of the actual application on the Scell ​​can be determined by the overlapping timing of the timing that occurs after the temporary HARQ timing (for example, the time corresponding to K number of Pcell TUs) from the timing of receiving the UL grant on the Pcell, or the earliest TU (or UL data channel transmission) on the Scell ​​that occurs on or after the overlapping timing.

[0148] In addition, in the case of Opt 2-2, the actual HARQ timing for the actual application on the Scell can be determined as the duration of the TU (or UL data channel transmission) that occurs after the overlapping timing with the UL grant reception timing on the Pcell by the temporary HARQ timing (e.g., the time corresponding to the Scell TUs of L number), or the earliest TU (or UL data channel transmission) duration on the Scell that exists at or after the overlapping timing. Specifically, when assuming that the UL grant reception timing corresponds to Pcell TU #n, for Pcell TU length > Scell TU length (i.e., Pcell SCS < Scell SCS), based on a specific Scell TU #k (e.g., the first or the last) among multiple Scell TUs located at the same timing as Pcell TU #n, Scell TU #(k + L) can be determined as the actual HARQ timing. In the above description, "a specific Scell TU #k among multiple Scell TUs (hereinafter, UL-HARQ reference TU)" can be configured via higher layer signaling (e.g., RRC signaling), can be dynamically indicated via UL grant DCI, or can be specified based on predefined rules (e.g., the first or the last TU among multiple Scell TUs). On the contrary, for "Pcell TU length < Scell TU length" or "Pcell TU length = Scell TU length" (i.e., Pcell SCS >= Scell SCS), based on Scell TU #k located at the same timing as Pcell TU #n, Scell TU #(k + L) can be determined as the actual HARQ timing.

[0149] 3) DL permission DCI for DL ​​data

[0150] In addition, in the case of DL HARQ, the SCS or OS duration (or TU length) may be configured differently between a cell (e.g., Pcell) that sends a DL grant and a cell (e.g., Scell) that sends DL data in response to a DL grant. In this case, Opt 3-1) HARQ timing (e.g., the delay between DL grant reception and DL data transmission) may be configured based on the TU length of the Pcell that sends the DL grant (e.g., the HARQ timing (candidate set) is configured by a multiple of the Pcell TU length), or Opt 3-2) HARQ timing may be configured based on the TU length of the Scell ​​that sends DL data (e.g., the HARQ timing (candidate set) is configured by a multiple of the Scell ​​TU length). Opt 3-1 may be understood as the HARQ timing being configured based on a parameter set for sending a DL grant (e.g., PDCCH transmission). Opt 3-2 may be understood as the HARQ timing being configured based on a parameter set for performing DL data transmission (e.g., PDSCH transmission). For clarity, the HARQ timing configured based on Opt 3-1 / 3-2 is referred to as temporary HARQ timing. In this case, information about the HARQ timing (eg, the number of TUs) may be indicated via a DL grant.

[0151] First, in the case of Opt 3-1, the actual HARQ timing of the actual application of the Scell ​​can be determined as the overlapping timing of the timing that occurs after the temporary HARQ timing (for example, the time corresponding to K number of Pcell TUs) from the timing of receiving the DL grant on the Pcell, or the earliest TU (or DL ​​data channel transmission) on the Scell ​​that occurs after the overlapping timing.

[0152] In addition, in the case of Opt 3-2, the actual HARQ timing of the actual application on the Scell can be determined as the duration of the TU (or DL data channel transmission) that appears after the overlapping timing with the DL grant reception timing on the Pcell by the temporary HARQ timing (e.g., the time corresponding to the Scell TUs of L number) or the earliest TU (or DL data channel transmission) duration on the Scell that exists on or after the overlapping timing. Specifically, when it is assumed that the DL grant reception timing corresponds to Pcell TU#n, for Pcell TU length > Scell TU length (i.e., Pcell SCS < Scell SCS), based on a specific Scell TU#k (e.g., the first or the last) among multiple Scell TUs located at the same timing as Pcell TU#n, Scell TU#(k + L) can be determined as the actual HARQ timing. In the above description, "a specific Scell TU#k among multiple Scell TUs (hereinafter, DL-HARQ reference TU)" can be configured via higher layer signaling (e.g., RRC signaling), can be dynamically indicated via DL grant DCI, or can be specified based on a predefined rule (e.g., the first TU or the last TU among multiple Scell TUs). On the contrary, for "Pcell TU length < Scell TU length" or "Pcell TU length = Scell TU length" (i.e., Pcell SCS >= Scell SCS), based on Scell TU#k located at the same timing as Pcell TU#n, Scell TU#(k + L) can be determined as the actual HARQ timing.

[0153] Preferably, in Opt 1-2, the "specific Pcell TU #k among multiple Pcell TUs" for the HARQ-ACK reference TU can be configured as the last TU among the multiple Pcell TUs. To send A / N after receiving DL data, a specific amount of processing time is required. For example, if the HARQ-ACK reference TU is designated as the first TU among the multiple Pcell TUs, A / N cannot be sent in the HARQ-ACK reference TU. Therefore, if the information about the A / N timing is indicated via the DL grant DCI, the information indicating a specific TU (e.g., the TU between the HARQ-ACK reference TU and the TU within the processing time required to send A / N) is invalid. Therefore, since a part of the information about the A / N timing cannot be used, the signaling information is restricted. For example, if the A / N timing is defined by a TU offset having a value in the range of 0 to N-1, the values in the range of 0 to L-1 (L < N) cannot be used for signaling. Also, since the length of the time slot is provided differently according to the SCS, the number (L) of TUs within the processing time required to send A / N varies. As a result, the signaling information is restricted, and the system complexity may increase.

[0154] Fig.14 Shows signal transmission according to Option 1-2. Refer to Fig.14 , DL data (SCS: X KHz) is received in time slot #n of cell X. If cell X is not a PUCCH cell (e.g., Pcell), A / N can be sent in a PUCCH cell (e.g., cell Y) in response to the DL data. In this case, since the SCS of cell Y corresponds to 4X KHz, time slot #n of cell X corresponds / aligns with 4 time slots (e.g., time slot #p to time slot #p+3) of cell Y, and A / N for the DL data can be sent after k time slots (e.g., 4 time slots) based on the last time slot (i.e., time slot #p+3) among the 4 time slots of cell Y corresponding to time slot #n of cell X. The information about k can be indicated via the control information (e.g., DL grant DCI) scheduling the DL data. In this case, k can correspond to an integer equal to or greater than 0. k is configured based on the parameter set for sending A / N (e.g., PUCCH transmission). In this case, the DL data and the DL grant DCI can be received via the PDSCH and the PDCCH, respectively. In this case, as described later, the cell can be replaced by a sub-band.

[0155] In option 2-2, a specific Scell ​​TU#k for a UL-HARQ reference TU may be configured by the last TU among a plurality of Scell ​​TUs, or may be configured by one of a plurality of Scell ​​TUs via high-layer signaling (e.g., RRC signaling). In order to send UL data after receiving a UL grant DCI, a certain amount of processing time is required. Specifically, similar to the HARQ-ACK reference TU, the UL-HARQ reference TU may be designated by the last TU among a plurality of Scell ​​TUs. In addition, in order to maintain the unity between UL data processing and DL data processing, similar to the DL-HARQ reference TU described later, the UL-HARQ reference TU may be designated by the first TU among a plurality of Scell ​​TUs.

[0156] Fig.15 The signal transmission according to option 2-2 is shown. Fig.15 , a UL grant DCI (SCS: X KHz) is received in slot #n of cell X, and UL data (SCS: 4X KHz) may be transmitted in cell Y. In this case, since the SCS of cell Y corresponds to 4X KHz, slot #n of cell X corresponds / aligns with 4 slots of cell Y (e.g., slot #p to slot #p+3), and UL data may be transmitted after k slots (e.g., 4 slots) based on the last slot (i.e., slot #p+3) among the 4 slots of cell Y corresponding to slot #n of cell X (option 1), or may be transmitted after k (e.g., 7) slots based on the first slot (i.e., slot #p) (option 2). Information about k may be indicated via UL grant DCI. In this case, k may correspond to an integer equal to or greater than 0. k is configured based on a parameter set for transmitting UL data (e.g., PUSCH transmission). In this case, UL data may be transmitted via PUSCH, and UL grant DCI may be received via PDCCH. In this case, as described later, the cell may be replaced by a subband.

[0157] In option 3-2, a specific Scell ​​TU#k for DL-HARQ reference TU may be configured by the first TU among multiple Scell ​​TUs. Since DL grant DCI and DL data can be received simultaneously, if the HARQ-ACK reference TU is designated by the first TU among multiple Scell ​​TUs, the use efficiency of DL data transmission resources can be increased.

[0158] Fig.16 The signal transmission according to option 3-2 is shown. Fig.16, a DL grant DCI (SCS: X KHz) is received in slot #n of cell X, and DL data (SCS: 4X KHz) may be sent in cell Y. In this case, since the SCS of cell Y corresponds to 4X KHz, slot #n of cell X corresponds / aligns with 4 slots of cell Y (e.g., slot #p to slot #p+3), and DL data may be received after k slots (e.g., 2 slots) based on the first slot (i.e., slot #p) among the 4 slots of cell Y corresponding to slot #n of cell X. Information about k may be indicated via a DL grant DCI. In this case, k may correspond to an integer equal to or greater than 0. k is configured based on a parameter set for sending DL data (e.g., PDSCH transmission). In this case, DL data may be received via PDSCH, and DL grant DCI may be received via PDCCH. In this case, as described later, the cell may be replaced by a subband.

[0159] In addition, when a single cell or carrier is divided into multiple subbands and SCSs or TUs of different sizes are set for each of the multiple subbands, the method proposed in the present invention can be similarly applied even if the UE operates on multiple subbands at the same time or switches between subbands. In this case, in the present invention, the cell can be replaced by a (intra-cell) subband. In this case, the subband is configured by adjacent frequency resources (e.g., multiple adjacent RBs) and can be called a BWP (bandwidth part).

[0160] Fig.17 A BS and a UE of a wireless communication system applicable to the embodiment of the present invention are shown.

[0161] Reference Fig.17 , the wireless communication system includes a BS 110 and a UE 120. When the wireless communication system includes a relay, the BS or the UE may be replaced by the relay.

[0162] The BS 110 includes a processor 112, a memory 114, and a radio frequency (RF) unit 116. The processor 112 may be configured to implement the process and / or method proposed in the present invention. The memory 114 is connected to the processor 112 and stores information related to the operation of the processor 112. The RF unit 116 is connected to the processor 112 and transmits and / or receives RF signals. The UE 120 includes a processor 122, a memory 124, and an RF unit 126. The processor 122 may be configured to implement the process and / or method proposed in the present invention. The memory 124 is connected to the processor 122 and stores information related to the operation of the processor 122. The RF unit 126 is connected to the processor 122 and transmits and / or receives RF signals.

[0163] The embodiments of the present invention described below are combinations of elements and features of the present invention. The elements and features may be considered to be selective, unless otherwise mentioned. Each element or feature may be put into practice without being combined with other elements or features. In addition, the embodiments of the present invention may be constructed by combining some elements and / or features. The order of operations described in the embodiments of the present invention may be rearranged. Some constructions of any one embodiment may be included in another embodiment, and may be replaced by the corresponding construction of another embodiment. It will be apparent to those skilled in the art that claims that are not clearly referenced to each other in the attached claims may be presented as embodiments of the present invention in combination, or may be included as new claims by subsequent amendments after submitting an application.

[0164] In the embodiments of the present invention, the description is focused on the data transmission and reception relationship between the BS, the relay and the MS. In some cases, a specific operation described as being performed by the BS may be performed by an upper node of the BS. That is, it is obvious that in a network consisting of a plurality of network nodes including a BS, various operations performed for communicating with the MS may be performed by the BS or network nodes other than the BS. The term "BS" may be replaced by the terms "fixed station", "Node B", "enhanced Node B (eNodeB or eNB)", "access point", etc. The term "UE" may be replaced by the terms "mobile station (MS)", "mobile subscriber station (MSS)", "mobile terminal", etc.

[0165] The embodiments of the present invention can be implemented by various means such as hardware, firmware, software or a combination thereof. In a hardware configuration, the method according to the embodiments of the present invention can be implemented by one or more application specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), processors, controllers, microcontrollers, microprocessors, etc.

[0166] In firmware or software configuration, the embodiments of the present invention may be implemented in the form of modules, procedures, functions, etc. For example, software codes may be stored in a memory unit and executed by a processor. The memory unit is located inside or outside the processor and may send data to and receive data from the processor via various known means.

[0167] Those skilled in the art will appreciate that the present invention may be implemented in specific ways other than those described herein without departing from the spirit and essential characteristics of the present invention. Therefore, the above embodiments should be interpreted as illustrative rather than restrictive in all respects. The scope of the present invention should be determined by the appended claims and their legal equivalents rather than by the above description, and all changes falling within the meaning and equivalent scope of the appended claims are intended to be included therein.

[0168] Industrial Applicability

[0169] The present invention is applicable to UE, eNB or other equipment in a wireless mobile communication system.

Claims

1. A method for performing communication by a user equipment configured with multiple serving cells in a wireless communication system, the method comprising the following steps: receiving a plurality of downlink control information DCIs for downlink scheduling, wherein each of the plurality of DCIs comprises a counter downlink assignment index c-DAI and a total DAI t-DAI; receiving respective downlink data in a serving cell scheduled based on a corresponding one of the plurality of DCIs; and Based on the c-DAI and t-DAI in the plurality of DCIs, a dynamic A / N codebook including acknowledgement / negative acknowledgement A / N information for each downlink data is sent, wherein each c-DAI is related to the order of downlink scheduling and is counted based on the serving cell index, and wherein each t-DAI notifies the total number of downlink scheduling up to the current time unit TU, The plurality of DCIs include a first DCI and a second DCI received in the same time unit TU, and the c-DAI of the first DCI and the c-DAI of the second DCI are associated with the same serving cell index, and Wherein, the c-DAI of the first DCI is configured with a c-DAI value that is earlier in sequence than the c-DAI of the second DCI, based on the fact that the c-DAI of the first DCI is configured with a c-DAI value that is earlier in sequence than the c-DAI of the second DCI, in the same time slot of a subframe, the starting symbol index of the downlink data related to the first DCI is lower than the starting symbol index of the downlink data related to the second DCI.

2. The method according to claim 1, wherein: The wireless communication system includes a wireless communication system based on the 3rd Generation Partnership Project 3GPP.

3. A method for performing communication by a base station in a wireless communication system, the method comprising the following steps: Sending a plurality of downlink control information DCIs for downlink scheduling to a user equipment configured with a plurality of serving cells, wherein each of the plurality of DCIs comprises a counter downlink assignment index c-DAI and a total DAI t-DAI; In a serving cell scheduled based on a corresponding one of the multiple DCIs, transmitting each downlink data; and receiving a dynamic A / N codebook including acknowledgement / negative acknowledgement A / N information for each downlink data based on the c-DAI and t-DAI in the plurality of DCIs, wherein each c-DAI is related to the order of downlink scheduling and is counted based on each serving cell index, and wherein each t-DAI notifies the total number of downlink scheduling up to the current time unit TU, The multiple DCIs include a first DCI and a second DCI transmitted in the same time unit TU, and the c-DAI of the first DCI and the c-DAI of the second DCI are associated with the same serving cell index, and Wherein, the c-DAI of the first DCI is configured with a c-DAI value that is earlier in sequence than the c-DAI of the second DCI, based on the fact that the c-DAI of the first DCI is configured with a c-DAI value that is earlier in sequence than the c-DAI of the second DCI, in the same time slot of a subframe, the starting symbol index of the downlink data related to the first DCI is lower than the starting symbol index of the downlink data related to the second DCI.

4. The method according to claim 3, wherein: The wireless communication system includes a wireless communication system based on the 3rd Generation Partnership Project 3GPP.

5. A device for wireless communication configured with multiple serving cells, the device comprising: Memory; as well as A processor configured to: receiving a plurality of downlink control information DCIs for downlink scheduling, wherein each of the plurality of DCIs comprises a counter downlink assignment index c-DAI and a total DAI t-DAI; receiving respective downlink data in a serving cell scheduled based on a corresponding one of the plurality of DCIs; and Based on the c-DAI and t-DAI in the plurality of DCIs, a dynamic A / N codebook including acknowledgement / negative acknowledgement A / N information for each downlink data is sent, wherein each c-DAI is related to the order of downlink scheduling and is counted based on the serving cell index, and wherein each t-DAI notifies the total number of downlink scheduling up to the current time unit TU, The plurality of DCIs include a first DCI and a second DCI received in the same time unit TU, and the c-DAI of the first DCI and the c-DAI of the second DCI are associated with the same serving cell index, and Wherein, the c-DAI of the first DCI is configured with a c-DAI value that is earlier in sequence than the c-DAI of the second DCI, based on the fact that the c-DAI of the first DCI is configured with a c-DAI value that is earlier in sequence than the c-DAI of the second DCI, in the same time slot of a subframe, the starting symbol index of the downlink data related to the first DCI is lower than the starting symbol index of the downlink data related to the second DCI.

6. The device according to claim 5, further comprising: Radio frequency RF module.

7. An apparatus for wireless communication, the apparatus comprising: Memory; as well as A processor configured to: Sending a plurality of downlink control information DCIs for downlink scheduling to a user equipment configured with a plurality of serving cells, wherein each of the plurality of DCIs comprises a counter downlink assignment index c-DAI and a total DAI t-DAI; In a serving cell scheduled based on a corresponding one of the multiple DCIs, transmitting each downlink data; and receiving a dynamic A / N codebook including acknowledgement / negative acknowledgement A / N information for each downlink data based on the c-DAI and t-DAI in the plurality of DCIs, wherein each c-DAI is related to the order of downlink scheduling and is counted based on each serving cell index, and wherein each t-DAI notifies the total number of downlink scheduling up to the current time unit TU, The multiple DCIs include a first DCI and a second DCI transmitted in the same time unit TU, and the c-DAI of the first DCI and the c-DAI of the second DCI are associated with the same serving cell index, and Wherein, the c-DAI of the first DCI is configured with a c-DAI value that is earlier in sequence than the c-DAI of the second DCI, based on the fact that the c-DAI of the first DCI is configured with a c-DAI value that is earlier in sequence than the c-DAI of the second DCI, in the same time slot of a subframe, the starting symbol index of the downlink data related to the first DCI is lower than the starting symbol index of the downlink data related to the second DCI.

8. The device according to claim 7, further comprising: Radio frequency RF module.

Citation Information

Patent Citations

  • Methods and apparatus for transmitting and receiving wireless signals in a wireless communication system

    CN109845178B