Inflatable and adjustable rising and falling anti-pollution curtain for dredging and its use and operation method

By using inflatable dredging anti-pollution curtains to adjust the rise and fall in dredging construction, the problem of sludge diffusion is solved, effective enclosure and environmental protection of the construction area are achieved, and the operation is simple and reliable.

CN114367511BActive Publication Date: 2025-04-18CCCC SECOND HARBOR CONSULTANTS CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202111620418.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-28
Publication Date
2025-04-18
Estimated Expiration
2041-12-28

AI Technical Summary

Technical Problem

During the dredging construction of waterways or port pools, the existing technology is difficult to effectively prevent the diffusion of sludge and cannot meet the strict environmental protection requirements.

Method used

A dredging anti-pollution curtain with inflatable adjustment of lifting and falling is adopted, including floating pipes, nylon cloth, contact ropes, limit rods, steel sinkers and balanced steel pipes. Through the inflation and emission of rubber airbags, the lifting and falling of the curtains are realized, forming an effective enclosure of the construction area.

Benefits of technology

This technical means can enclose the construction area in a small range during dredging construction, effectively prevent the diffusion of excavated dredging, meet strict environmental protection requirements, and be easy to install. No additional power equipment is required to move, and it is easy to operate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114367511B_ABST
    Figure CN114367511B_ABST
Patent Text Reader

Abstract

The present invention relates to an inflatable and adjustable rising and falling anti-pollution curtain for dredging and a method for using the curtain, the curtain comprises a dredging boat and a bucket, the bucket is arranged at the front end of the dredging boat, the curtain is arranged outside the grabbing range of the bucket, the curtain comprises a floating tube and a nylon cloth arranged under the floating tube, the nylon cloth is hung on the floating tube through a connecting rope, a fixed pulley is fixedly arranged at the lower end of the floating tube, a steel pendant is fixedly arranged at one end of the connecting rope, the other end of the connecting rope bypasses the fixed pulley and is fixedly connected to a balance steel pipe, the upper part of the nylon cloth is connected to the floating tube through a pressing plate and a first bolt, the lower part of the nylon cloth is connected to the steel pendant through a second bolt, a rubber airbag is arranged in the balance steel pipe, and a limit rod is fixedly arranged on the connecting rope. The present invention can effectively prevent the diffusion of soil in the excavation area, is easy to install, and is simple and reliable to operate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of environmental protection dredging construction engineering, and more specifically to an air-inflated, adjustable rising and falling dredging anti-pollution curtain and a use and operation method thereof. Background Art

[0002] During the dredging construction of waterways or harbors, a large amount of sludge will splash in the process of taking and dumping soil. Due to the high water content of sludge, it is easy to spread everywhere, especially in large-scale construction, which will cause the excavated soil to spread. With the development and progress of society, the requirements for the environment are getting higher and higher, and the pollution prevention requirements for dredging construction of waterways or harbors are becoming more and more stringent. The existing bucket construction is easy to cause sludge to spread and cannot meet the construction requirements. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a completely effective enclosure for the construction area, which is easy to install and does not require additional power equipment for movement, and is easy and reliable to operate, an inflatable and adjustable rising and falling dredging anti-pollution curtain and a method of using it.

[0004] The technical solution adopted by the present invention to solve its technical problems is: constructing an inflatable and adjustable rise and fall dredging anti-pollution curtain, comprising a dredging boat and a bucket, wherein the bucket is arranged at the front end of the dredging boat, and the curtain is arranged outside the grasping range of the bucket, and the curtain comprises a floating tube and a nylon cloth arranged under the floating tube, and the nylon cloth is suspended on the floating tube through a connecting rope, a fixed pulley is fixedly arranged at the lower end of the floating tube, a steel pendant is fixedly arranged at one end of the connecting rope, and the other end of the connecting rope passes around the fixed pulley and is fixedly connected to a balance steel pipe, the upper part of the nylon cloth is connected to the floating tube through a pressure plate and a first bolt, and the lower part of the nylon cloth is connected to the steel pendant through a second bolt, a rubber airbag is arranged in the balance steel pipe, and a limit rod is fixedly arranged on the connecting rope.

[0005] According to the above scheme, the floating tube includes a double row of first steel tubes and second steel tubes fixedly connected in parallel, and the floating tube includes a plurality of sections of steel tubes of equal length, and adjacent steel tubes are hingedly connected.

[0006] According to the above solution, the limit rod is arranged on two adjacent connecting ropes, that is, one limit rod is arranged on every two adjacent connecting ropes.

[0007] According to the above solution, the floating plate and the pressing plate are arranged with the same length.

[0008] According to the above scheme, the steel section pendant corresponds to the balance steel pipe one by one and is arranged in sections. The weight of the steel section pendant is less than the weight of the balance steel pipe.

[0009] According to the above scheme, the balance steel pipes are disconnected from each other, and the steel section pendants are disconnected from each other.

[0010] According to the above scheme, the first bolts are arranged at intervals of 250m-350m, the steel drop bodies are arranged at intervals of 2.5m-3.5m, and the balance steel pipes are arranged at intervals of 2.5m-3.5m.

[0011] The present invention also provides a method for using and operating a dredging anti-pollution curtain with air-inflated rise and fall adjustment, comprising the following steps:

[0012] S1. Use steel pipes and fixed pulleys to make floating pipes, use steel sections to make steel pendants, and splice nylon cloth to make large-scale panels. The width of the panels is 2 to 3 meters larger than the maximum water depth of dredging construction, and the length is 1.2 times the circumference of the enclosure. The weight of the steel pendant is less than the weight of the balance steel pipe;

[0013] S2. Fix the processed floating tube in the construction area through a hinged connection, and make the floating tube in a flipped state under working condition. Fix one side of the sewn nylon cloth on the floating tube with a pressing plate and a first bolt. Pass the connecting rope through the fixed pulley so that the center is located at the fixed pulley. A limit rod is fixedly set on the connecting rope. Every two adjacent connecting ropes share a limit rod. Then, each balancing steel pipe with a rubber airbag inside is placed at a preset position, and the connecting rope is fixedly connected to the balancing steel pipe. Finally, the steel pendant is placed on the floating tube at a position corresponding to the balancing steel pipe. First, clamp the nylon cloth between the two halves of the steel pendant, and tighten and fix it with the second bolt. The other end of the connecting rope is fixedly connected to the steel pendant, and the connecting plastic tube of each rubber airbag is connected and fixed.

[0014] S3, turn the floating tube with the bottom facing upward to the working state, and the steel pendant will sink into the water with the nylon cloth and the contact rope;

[0015] S4. Inflate the rubber airbag to make the balance steel pipe float up. At this time, the steel drop body with the nylon cloth falls on the mud surface to form a space enclosure;

[0016] S5. After the dredging work in the enclosed area is completed, the air in the rubber airbag is discharged, the balancing steel pipe sinks, and the steel pendant floats up and leaves the mud surface under the traction of the contact rope. To prevent the balancing steel pipe from sinking excessively, the maximum sinking range of the balancing steel pipe is limited by the limit rod;

[0017] S6. Move the dredger to the next excavation area and repeat step S4.

[0018] The pneumatically adjustable dredging anti-pollution curtain and the method of using the present invention have the following beneficial effects:

[0019] The inflatable and adjustable rising and falling anti-pollution curtain for dredging and the method for using the same of the present invention can prevent the excavated soil from spreading by fencing off a small area during dredging. The inflatable and adjustable rising and falling anti-pollution curtain for dredging can form a completely effective enclosure for the construction area. The process is easy to install and does not require the addition of other power equipment for movement. The operation is simple and reliable. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0021] Figure 1 It is a schematic diagram of the installation of the dredging anti-pollution curtain with air-inflated rise and fall according to the present invention;

[0022] Figure 2 yes Figure 1 A top view of

[0023] Figure 3 It is a structural schematic diagram of the dredging anti-pollution curtain with air-inflated rise and fall adjustment according to the present invention. DETAILED DESCRIPTION

[0024] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0025] like Figure 1-3 As shown, the inflatable and adjustable dredging anti-pollution curtain of the present invention comprises a dredging vessel 1 and a bucket, the bucket is arranged at the front end of the dredging vessel 1, the curtain is arranged outside the grabbing range of the bucket, the curtain comprises a floating tube 3 and a nylon cloth 5 arranged under the floating tube 3, the floating tube 3 comprises a first steel tube and a second steel tube which are fixedly connected in double rows in parallel, the floating tube 3 comprises a plurality of steel tubes of equal length, and adjacent steel tubes are hingedly connected. The nylon cloth 5 is hung on the floating tube 3 through a connecting rope 4, a fixed pulley 301 is fixedly arranged at the lower end of the floating tube 3, a steel pendant 7 is fixedly arranged at one end of the connecting rope 4, and a mud surface line 8 is provided below the steel pendant 7. The other end of the connecting rope 4 bypasses the fixed pulley 301 and is fixedly connected to the balance steel tube 9, the upper part of the nylon cloth 5 is connected to the floating tube 3 through a pressing plate 302 and a first bolt 303, and the floating plate and the pressing plate 302 are arranged with equal length. The first bolts 303 are arranged at intervals of 250m-350m, and the lower part of the nylon cloth 5 is connected to the steel pendant 7 through the second bolt 501, and the steel pendants 7 are arranged disconnected. The steel pendants 7 are arranged at intervals of 2.5m-3.5m, and a rubber airbag 10 is arranged in the balance steel pipe 9, and a limit rod 6 is fixed on the contact rope 4. The balance steel pipes 9 are arranged disconnected, and the balance steel pipes 9 are arranged at intervals of 2.5m-3.5m. The steel pendants 7 correspond to the balance steel pipes 9 one by one and are arranged in sections. The weight of the steel pendants 7 is less than the weight of the balance steel pipes 9. The limit rod 6 is arranged on two adjacent contact ropes 4, that is, one limit rod 6 is arranged on every two adjacent contact ropes 4.

[0026] The inflatable and adjustable dredging anti-pollution curtain of the present invention comprises a floating tube 3, a connecting rope 4, a nylon cloth 5, a limit rod 6, a steel pendant 7, a balance steel tube 9, a rubber airbag 10, etc. The curtain is arranged outside the grabbing range of the grab bucket 2, the floating tube 3 floats on the water surface, the nylon cloth 5 is hung on the floating tube 3 through the connecting rope 4, the lower part of the nylon cloth 5 and the connecting rope 4 is connected by the steel pendant 7, and the connecting rope 4 passes around the fixed pulley 301 under the floating tube 3 and is connected to the balance steel tube 9. When the construction ship is dredging, the curtain system is fixed to the bow of the dredger 1. Before dredging, the rubber airbag 10 in the balance pipe is inflated, the balance pipe floats up, and the steel pendant 7 drives the connecting rope 4 and the nylon cloth 5 to sink. The steel pendant 7 sinks to the mud surface. At this time, the nylon cloth 5 wraps the entire excavation area. After the excavation of the area is completed, the rubber airbag 10 is opened and deflated, and the balance steel pipe 9 sinks. When the limit rod 6 rises to the position of the fixed pulley 301, it is blocked and the balance pipe no longer sinks. At this time, the steel pendant 7 rises and leaves the mud surface driven by the connecting rope 4, and then the dredger 1 moves to the new excavation area to continue the above operation, which can effectively prevent the spread of mud in the excavation area.

[0027] The present invention also provides a method for using and operating a dredging anti-pollution curtain with air-inflated rise and fall adjustment, comprising the following steps:

[0028] S1, use steel pipe and fixed pulley 301 to make floating tube 3, use steel section to make steel pendant 7, splice nylon cloth 5 to make a large format, the width of the format is 2-3m larger than the maximum water depth of dredging construction, the length is 1.2 times the circumference of the enclosure, and the weight of the steel pendant 7 is less than the weight of the balance steel pipe 9;

[0029] S2. Connect the processed floating tube 3 with a short steel wire rope buckle in the construction area, and make the floating tube 3 in the flipping state under the working state, fix one side of the sewn nylon cloth 5 on the floating tube 3 with a pressing plate 302 and a bolt 303, pass the connecting rope 4 through the fixed pulley 301, so that the center is located at the fixed pulley 301, and fix the limiting rod 6 on the connecting rope 4 by binding. Use a limiting rod 6 for every two adjacent connecting ropes 4, and then place each balancing steel pipe 9 with a rubber air bag 10 placed in it according to the designed position, connect the connecting rope 4 with the balancing steel pipe 9 by binding, and finally place the steel pendant 7 on the floating tube 3 at a position corresponding to the balancing steel pipe 9, first clamp the nylon cloth 5 between the two half-piece steel pendant 7, press and fix it with bolts 303, connect the other end of the connecting rope 4 with the steel pendant 7 by binding, and connect the connecting plastic pipe of each rubber air bag 10.

[0030] S3, flip the floating tube 3 with the bottom facing upward to the working state, and the steel pendant 7 with the nylon cloth 5 and the contact rope 4 falls into the water and sinks;

[0031] S4, inflate the rubber airbag 10 to make the balance steel pipe 9 float up, and the steel pendant 7 with the nylon cloth 5 falls on the mud surface to form a space enclosure;

[0032] S5, dredging work is carried out. After the dredging work in the enclosed area is completed, the air in the rubber airbag 10 is discharged, the balancing steel pipe 9 sinks, and the steel pendant 7 floats up and leaves the mud surface under the traction of the contact rope 4. In order to prevent the balancing steel pipe 9 from sinking excessively, the maximum sinking range of the balancing steel pipe 9 is limited by the limit rod 6;

[0033] S6. Move the dredger 1 to the next excavation area and repeat step S4.

[0034] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.

Claims

1. A method for using and operating a pneumatically adjustable dredging anti-pollution curtain, characterized in that An inflatable and adjustable rising and falling dredging anti-pollution curtain comprises a dredging vessel and a bucket, wherein the bucket is arranged at the front end of the dredging vessel, and the curtain is arranged outside the graspable range of the bucket, and the curtain comprises a floating tube and a nylon cloth arranged under the floating tube, wherein the nylon cloth is suspended on the floating tube through a connecting rope, a fixed pulley is fixedly arranged at the lower end of the floating tube, a steel pendant is fixedly arranged at one end of the connecting rope, and the other end of the connecting rope passes around the fixed pulley and is fixedly connected to a balancing steel tube, the upper part of the nylon cloth is connected to the floating tube through a pressing plate and a first bolt, and the lower part of the nylon cloth is connected to the steel pendant through a second bolt, a rubber airbag is arranged in the balancing steel tube, and a limit rod is fixedly arranged on the connecting rope; Using the operation method includes the following steps: S1. Use steel pipes and fixed pulleys to make floating pipes, use steel sections to make steel pendants, and splice nylon cloth to make large-scale panels. The width of the panels is 2-3m larger than the maximum water depth of dredging construction, and the length is 1.2 times the circumference of the enclosure. The weight of the steel pendant is less than the weight of the balance steel pipe; S2. Fix the processed floating tube in the construction area through a hinged connection, and make the floating tube in a flipped state under working condition. Fix one side of the sewn nylon cloth on the floating tube with a pressing plate and a first bolt. Pass the connecting rope through the fixed pulley so that the center is located at the fixed pulley. A limit rod is fixedly set on the connecting rope. Every two adjacent connecting ropes share a limit rod. Then, each balancing steel pipe with a rubber airbag inside is placed at a preset position, and the connecting rope is fixedly connected to the balancing steel pipe. Finally, the steel pendant is placed on the floating tube at a position corresponding to the balancing steel pipe. First, clamp the nylon cloth between the two halves of the steel pendant, and tighten and fix it with the second bolt. The other end of the connecting rope is fixedly connected to the steel pendant, and the connecting plastic tube of each rubber airbag is connected and fixed. S3, turn the floating tube with the bottom facing upward to the working state, and the steel pendant will sink into the water with the nylon cloth and the contact rope; S4. Inflate the rubber airbag to make the balance steel pipe float up. At this time, the steel drop body with the nylon cloth falls on the mud surface to form a space enclosure; S5. After the dredging work in the enclosed area is completed, the air in the rubber airbag is discharged, the balancing steel pipe sinks, and the steel pendant floats up and leaves the mud surface under the traction of the contact rope. To prevent the balancing steel pipe from sinking excessively, the maximum sinking range of the balancing steel pipe is limited by the limit rod; S6. Move the dredger to the next excavation area and repeat step S4.

2. The method for using and operating the pneumatically adjustable dredging anti-pollution curtain according to claim 1 is characterized in that: The floating tube comprises a first steel tube and a second steel tube which are fixedly connected in double rows in parallel, and the floating tube comprises a plurality of sections of steel tubes of equal length, and adjacent steel tubes are hingedly connected.

3. The method for using and operating the pneumatically adjustable dredging anti-pollution curtain according to claim 2 is characterized in that: The floating tube and the pressing plate are arranged with the same length.

4. The method for using and operating the pneumatically adjustable dredging anti-pollution curtain according to claim 1 is characterized in that: The steel pendant body corresponds to the balance steel pipe one by one and is arranged in sections.

5. The method for using and operating the pneumatically adjustable dredging anti-pollution curtain according to claim 3 is characterized in that: The balancing steel pipes are disconnected from each other, and the steel pendants are disconnected from each other.

6. The method for using and operating the pneumatically adjustable dredging anti-pollution curtain according to claim 1 is characterized in that: The first bolts are arranged at intervals of 250m-350m, the steel drop bodies are arranged at intervals of 2.5m-3.5m, and the balance steel pipes are arranged at intervals of 2.5m-3.5m.

Citation Information

Patent Citations

  • Dredging anti-pollution curtain capable of being adjusted to rise and fall through inflation

    CN216937596U

  • Silt protection installation for prevention of water pollution

    KR1020110109376A

  • Self-positioning subsea oil spill containment system

    US8398334B1