A method for analyzing the working condition and measuring the liquid volume of an electric pump well under digital conditions
Through the method of current reference value and characteristic curve correction, the non-dramatic working conditions of the electric pump well are identified and analyzed, which solves the shortcomings of liquid volume measurement in the existing technology and achieves more accurate liquid volume measurement and working condition analysis. It improves the application foundation of intelligent oilfield construction.
Patent Information
- Application Number
- CN202111668236.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-12-31
AI Technical Summary
The existing technology has limited maturity in the working condition analysis and liquid volume measurement of electric pump wells, making it difficult to achieve more accurate identification of non-dramatic working conditions and liquid production measurement, which affects the application of intelligent oilfield construction.
By calculating the current reference value, the change rate and trend of the real-time collected parameters are processed, divided into five types of non-severe working conditions, and the characteristic curve is corrected based on the actual production data, and the oil well fluid volume and dynamic fluid level are calculated based on the characteristic curve to achieve more accuracy Analysis of non-dramatic working conditions of electric pump wells and software measurement of liquid production volume.
It improves the level of refined analysis of non-dramatically changing working conditions of electric pump wells, enables more accurate liquid volume measurement and production prediction, strengthens the application foundation of intelligent oilfield construction in electric pumps, and simplifies the surface production process.
Smart Images

Figure CN114412438B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of oil production engineering, and in particular to a method for analyzing the working condition of an electric pump well and measuring the amount of liquid under digital conditions. Background Art
[0002] As a mature oil production process, electric pump production is widely adopted by major oil fields at home and abroad for its easy control and wide displacement adaptability. In recent years, with the advancement of oil field digitization and Internet of Things construction, electric pump well analysis and metering technology based on real-time acquisition parameters has become one of the core technologies for the in-depth application of the Internet of Things in oil and gas production. This technology is based on the characteristics of electric pump well production data to classify and identify non-dramatic conditions. As the main technical support for the intelligent application of such oil production technology, it provides an important reference for decision-making on measures related to the optimization of electric pump well production, and is of great significance to the realization of intelligent management of electric pump wells.
[0003] Chinese patent application number CN201610463315.9 discloses a system and method for real-time flow metering of capillary pressure measuring electric pump wells. The real-time flow metering system includes a submersible pump, a submersible motor, a pressure stabilizing cylinder, a control cabinet, a ground data acquisition and analysis system, a wellhead casing pressure measuring device, a wellhead oil pressure measuring device, a wellhead temperature measuring device, and a capillary pressure measuring system ground device; the control cabinet supplies power to the submersible motor through a cable; the pressure stabilizing cylinder is connected to a certain distance below the submersible motor and is connected to the capillary pressure measuring system ground device through a capillary; the ground data acquisition and analysis system collects and saves the wellhead oil pressure, casing pressure, temperature, and liquid column pressure at the pressure stabilizing cylinder as well as the ground current and voltage, and calculates and displays the flow of the electric pump well in real time. It is only necessary to install a downhole capillary single-point pressure measuring device and a wellhead pressure and temperature measuring device, combined with a power balance method and a wellbore multiphase flow calculation method, to achieve real-time flow metering of the electric pump well online.
[0004] At present, the overall maturity of this technology is limited and further research and improvement is needed. How to further integrate oil production engineering theory with digital acquisition testing and artificial intelligence analysis is one of the keys to improving this technology. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides a method for analyzing the operating conditions and measuring the liquid volume of an electric pump well under digital conditions, so as to achieve more accurate analysis of the non-dramatic operating conditions of the electric pump well, realize software measurement of the liquid production of the electric pump well, and strengthen the application foundation of intelligent oilfield construction in electric pumps.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a method for analyzing the working conditions and measuring the liquid volume of an electric pump well under digital conditions, comprising the following steps:
[0007] S1, calculate the current reference value;
[0008] S2, mainly uses the change amplitude of the collected current compared with the reference current, processes the real-time collected parameters into data of the following four time dimensions, and performs change rate and trend analysis;
[0009] S3. Working condition analysis: Divide the working conditions that do not change dramatically into the following five categories:
[0010] 1) The parameters are too large, characterized by increased head, low submergence, low pump efficiency, and large electrical parameters;
[0011] 2) When wax is deposited, the characteristics are increased discharge pressure, increased head, reduced output, rising liquid level, decreased actual lifting height, increased pump loss, and slow increase in electrical parameters;
[0012] 3) Under normal circumstances, electrical parameters and wellhead pressure remain basically unchanged;
[0013] 4) When the parameters are small, the characteristics are high dynamic liquid level, high pump efficiency and stable electrical parameters;
[0014] 5) When leakage occurs, the characteristics are that the lifting pressure remains unchanged, the liquid level rises, the output decreases, the pump is lightly loaded, and the electrical parameters drop slightly. The characteristic curve needs to be readjusted;
[0015] S4. Characteristic curve correction:
[0016] 1) Obtaining the initial characteristic curve of the pump;
[0017] 2) Production correction: obtain the actual production data, the corresponding liquid production, dynamic liquid level, current, voltage, and power, calculate the actual pump head based on the actual production data, and use the actual liquid production to calculate the head deviation coefficient. When the head deviation coefficient is less than a certain value, directly use the theoretical correction value, otherwise perform production correction;
[0018] 3) Obtain multiple sets of data and fit the relationship between the head deviation coefficient and the liquid production, frequency and power;
[0019] 4) Obtaining the actual characteristic curve;
[0020] S5. Liquid quantity measurement and dynamic liquid level prediction: production forecast according to different working conditions.
[0021] Preferably, in step S1, the method for calculating the current reference value includes three specific methods: Method 1, the current reference value is selected by first using the theoretical current value calculation method provided in the oil production engineering manual or the empirical formula of a specific unit for calculation;
[0022] Method 2: Read the current value of an electric pump well during normal production;
[0023] Method 3: Use big data analysis methods to extract the statistical average value of normal operating conditions of the same model of electric pumps under the same production parameters.
[0024] 3. The method for analyzing the working condition and measuring the liquid volume of an electric pump well under digital conditions according to claim 1 is characterized in that: the step S2 specifically includes the following steps:
[0025] 1) Is: Second-level data changes. If the deviation from the benchmark value exceeds the second-level threshold or the before-after comparison value, the warning state is entered;
[0026] 2) Im: minute-level data change. Take the average value of 60 second-level data per minute. Compared with the baseline value, if the change rate exceeds the minute-level threshold, an early warning will be issued. The change trend ΔIm of the minute-level data in the past 60 minutes is calculated every minute.
[0027] 3) Ih: Hourly data trend change. Take the average value of 60 minute-level data per hour. Compared with the baseline value, if the change exceeds the hourly threshold, an early warning will be issued. The change trend ΔIh of the hourly data in the past 72 hours is calculated every hour.
[0028] 4) Id: Daily data trend change. The average value of 24 hourly data per day is taken as the daily data. Compared with the baseline value, if the change exceeds the daily threshold, an early warning is issued. The change trend ΔId of the daily data in the past 30 days is calculated every day.
[0029] Preferably, in step S4, multiple groups of fitting values are obtained and an average lift deviation coefficient is calculated.
[0030] Preferably, step S5 specifically includes the following method steps: liquid volume measurement and dynamic liquid level prediction: production prediction according to different working conditions:
[0031] Category 1: Production planning under normal, small parameters, and large parameters:
[0032] 1) Take the liquid production corresponding to the statistical average pump efficiency of various working conditions of the current frequency of the pump unit as the initial value;
[0033] 2) According to the corrected characteristic curve formula, take the corresponding initial value of the lift;
[0034] 3) Calculate the corresponding lift using the multiphase flow formula based on the initial liquid volume and the tested wellhead casing pressure;
[0035] 4) Determine whether the calculated error of the two lifts is a certain value. If yes, stop the calculation and output the result. If no, fine-tune the value until the calculated error is less than a certain value.
[0036] 5) Calculate the dynamic liquid level of the oil well by the suction pressure corresponding to the lift that satisfies the lift calculation error;
[0037] The second category is the production planning under wax deposition conditions:
[0038] 1) Take the liquid production corresponding to the statistical average pump efficiency of the wax deposition condition of the current frequency of the pump unit as the initial value;
[0039] 2) According to the corrected characteristic curve formula, take the corresponding initial value of the lift;
[0040] 3) Calculate the corresponding lift using the multiphase flow formula based on the initial liquid volume and the tested wellhead casing pressure;
[0041] 4) Determine whether the calculation error of the two lifts is less than a certain value. If so, stop the calculation and output the result. If not, fine-tune the effective pipe diameter until the calculation error is less than a certain value.
[0042] 5) Calculate the dynamic liquid level of the oil well by the suction pressure corresponding to the lift that satisfies the lift calculation error;
[0043] The third category, production calculation under the condition of leakage: recalibrate the characteristic curve and calculate the production according to the method of the first category after correction
[0044] The present invention provides a method for analyzing the working condition of an electric pump well and measuring the liquid volume under digital conditions. It has the following beneficial effects:
[0045] 1. The present invention realizes the identification of five non-drastic operating conditions based on characteristic parameters, then corrects the characteristic curve based on actual production data, calculates the oil well fluid volume and dynamic liquid level in combination with the characteristic curve, realizes more accurate analysis of non-drastic operating conditions of electric pump wells, realizes software measurement of liquid production of electric pump wells, and strengthens the application foundation of intelligent construction of oil fields in electric pumps.
[0046] 2. The present invention classifies non-dramatically changing working conditions into five categories: large parameters, wax deposition, normal, small parameters, and leakage, obtains actual production data, the corresponding liquid production, dynamic liquid level, current, voltage, and power, calculates the actual head of the pump based on the actual production data, performs production correction, obtains the actual characteristic curve, and other method steps to improve the level of refined analysis of non-dramatically changing working conditions of electric pump oil wells.
[0047] 3. The present invention makes up for the shortcomings of electric pump liquid quantity metering through liquid quantity metering and dynamic liquid level prediction, and predicts production according to different working conditions, thereby assisting in simplifying the ground production process. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 It is a schematic diagram of the method flow of the present invention; DETAILED DESCRIPTION
[0049] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] Example:
[0051] like Figure 1 As shown, an embodiment of the present invention provides a method for analyzing the working condition of an electric pump well and measuring the liquid volume under digital conditions, comprising the following steps:
[0052] (1) Data processing
[0053] First calculate the current reference value.
[0054] There are three methods for selecting the current reference value (Ib):
[0055] Method 1: The current reference value is selected by first using the theoretical current value calculation method provided in the oil production engineering manual or the empirical formula of a specific unit for calculation;
[0056] Method 2: Read the current value of an electric pump well during normal production;
[0057] Method 3: Use big data analysis methods to extract the statistical average value of normal operating conditions of the same model of electric pumps under the same production parameters.
[0058] (2) The main application is the change amplitude of the collected current compared with the reference current, and the real-time collected parameters are processed into data in the following four time dimensions for change rate and trend analysis:
[0059] 1) Is: If the data changes in seconds, the deviation from the baseline value exceeds 20% or the comparison value before and after exceeds 20%, the warning state is entered;
[0060] 2) Im: Minute-level data changes. The average value of 60 second-level data per minute is taken. If the change rate exceeds 15% compared with the baseline value, an early warning is issued. The change trend of the minute-level data in the past 60 minutes (linear fitting of 60 points) ΔIm is calculated every minute and is divided into four states: rising, falling, stable, and fluctuating.
[0061] 3) Ih: Hourly data trend change, take the average of 60 minute-level data per hour, and issue an early warning if the change exceeds 10% compared with the baseline value. Every hour, calculate the change trend ΔIh (linear fit of 72 points) of the hourly data in the past 72 hours, which is divided into four conditions: rising, falling, stable, and fluctuating.
[0062] 4) Id: Daily data trend change. The average value of 24 hourly data per day is taken as the daily data. If the change exceeds 7% compared with the baseline value, an early warning is issued. The change trend of daily data in the past 30 days, ΔId, is calculated every day and divided into four conditions: rising, falling, stable, and fluctuating.
[0063] The above thresholds can be dynamically and accurately adjusted according to the big data analysis results and different well fluid types and pump types.
[0064] (3) Working condition analysis
[0065] For drastically changing working conditions, you can refer to the existing industry technologies.
[0066] The non-dramatic operating conditions are divided into the following five categories:
[0067] 1) The parameters are too large, characterized by increased head, low submergence, low pump efficiency, and large electrical parameters; the criteria are: A, the trend of ΔIh is stable, B, Id becomes large and warns, C, the trend of ΔId is rising, D, (Id-Ib) / Ib is greater than 0.15;
[0068] 2) When wax is deposited, the characteristics are increased discharge pressure, increased head, reduced output, rising liquid level, decreased actual lifting height, increased pump loss, and slow increase in electrical parameters.
[0069] The criteria are: A, the trend of ΔIh is stable, B, Id increases and warns, C, the trend of ΔId is rising, D, (Id-Ib) / Ib is greater than 0.07 and less than 0.15;
[0070] 3) Normal: electrical parameters and wellhead pressure remain basically unchanged.
[0071] The criteria are: A. The trends of ΔIm, ΔIh, and ΔId are all stable; B. (Id-Ib) / Ib is less than 0.07;
[0072] 4) Parameters are too small: Its characteristics are high dynamic liquid level, high pump efficiency, and stable electrical parameters.
[0073] The criteria are: A, the trend of ΔIh is stable, B, Id decreases and warns, C, the trend of ΔId is decreasing, D, (Ib-Id) / Ib is less than 0.07;
[0074] 5) Leakage (leakage caused by normal wear of the pump): Its characteristics are that the lifting pressure remains unchanged, the liquid level rises, the output decreases, the pump is lightly loaded, and the electrical parameters drop slightly (the characteristic curve needs to be readjusted). The judgment criteria are:
[0075] The criteria are: A, the trend of ΔIh is stable, B, Id decreases and warns, C, the trend of ΔId is decreasing, D, (Ib-Id) / Ib is greater than 0.15;
[0076] (4) Characteristic curve correction
[0077] 1) Obtain the initial characteristic curve of the pump
[0078] The original characteristic curve is expressed as
[0079] H=aQ 2 +bQ+c (1)
[0080] 2) Production calibration
[0081] Acquisition of actual production data, corresponding liquid production, dynamic liquid level, current, voltage and power.
[0082] Calculate the actual pump head H based on actual production data real
[0083] Calculation of suction pressure of electric pump in
[0084] p in =p c +H cmd [ρ w F w +ρ o (1-F w )]g (2)
[0085] Electric pump discharge pressure calculation p out
[0086] Taking the oil pressure as the starting point, the multiphase flow formula (provided in the Oil Production Engineering Manual) is used to calculate to the pump outlet, and then p is obtained. out
[0087] Actual head of the pump: H real
[0088] H real =[ρ w F w +ρ o (1-F w )](p out -p in ) / g (3)
[0089] Substitute the actual liquid production into formula (1) to obtain an H th
[0090] Head deviation coefficient
[0091] ΔH=(H real -H th ) / H real (4)
[0092] If ΔH is less than 0.05, the theoretical correction value is used directly, otherwise, production correction is performed.
[0093] H cmd , submergence, the difference between the dynamic liquid level of the oil well and the position of the suction port of the electric pump, m;
[0094] H cmd =H d -H dfl (5)
[0095] H d , pump depth, i.e. the position of the suction port of the electric pump, m;
[0096] H dfl , dynamic liquid level of oil well, m;
[0097] F w , volumetric moisture content, decimal;
[0098] p t , oil pressure, MPa;
[0099] p c , casing pressure, MPa;
[0100] ρ w , relative density of formation water, dimensionless;
[0101] ρ o , relative density of crude oil, dimensionless.
[0102] ΔH is generally between 0-1.
[0103] Note: The initial head deviation coefficient ΔH is calculated based on production data using the above formula. If the fitting effect is not good, ΔH can be adjusted according to the needs of the fitting. After ΔH is selected, the actual characteristic curve of the electric pump can be calculated using formula (7).
[0104] 3) Obtain multiple sets of data and fit the relationship between the head deviation coefficient and the liquid production, frequency, and power. If multiple sets of fitting values can be obtained, it is necessary to calculate the average head deviation coefficient.
[0105] 4) Obtain the actual characteristic curve
[0106] The actual pump head is calculated by the following formula
[0107] H real =(1-ΔH)H th (6)
[0108] The corrected characteristic curve:
[0109] H real =(1-ΔH)(aQ 2+bQ+c) (7)
[0110] (5) Liquid volume measurement and dynamic liquid level prediction:
[0111] Production forecast according to different working conditions:
[0112] Category 1: Production planning under normal, small parameters, and large parameters:
[0113] 1) Take the liquid production corresponding to the statistical average pump efficiency of various working conditions of the current frequency of the pump unit as the initial value Q;
[0114] 2) According to the corrected characteristic curve formula (7), take the corresponding initial lift value H real ;
[0115] 3) According to the initial liquid volume and the tested wellhead casing pressure, the corresponding head is calculated using the multiphase flow formula to obtain H cul
[0116] 4) Determine the calculation error ΔH of the two lifts cul Is it less than 0.05? If so, the calculation stops and the result is output. If not, the Q value is fine-tuned until the calculation error is less than 0.05.
[0117] ΔH cul =|H real -H cul | / H real (8)
[0118] 5) Calculate the dynamic liquid level of the oil well by the suction pressure corresponding to the lift that satisfies the lift calculation error.
[0119] H dfl =H d -(p in -p c ) / [ρ w F w +ρ o (1-F w )]g (9)
[0120] The second category is the production planning under wax deposition conditions:
[0121] 1) Take the liquid production corresponding to the statistical average pump efficiency of the wax deposition condition of the current frequency of the pump unit as the initial value Q;
[0122] 2) According to the corrected characteristic curve formula (7), take the corresponding initial lift value H real ;
[0123] 3) According to the initial liquid volume and the tested wellhead casing pressure, the corresponding head is calculated using the multiphase flow formula to obtain H cul ;
[0124] 4) Apply formula (8) to determine the calculation error ΔH of the two lifts cul Is it less than 0.05? If yes, the calculation stops and the result is output. If no, the effective pipe diameter value is fine-tuned until the calculation error is less than 0.05.
[0125] 5) Calculate the dynamic liquid level of the oil well from the suction pressure corresponding to the lift that satisfies the lift calculation error, and apply formula (9).
[0126] The third category is the production calculation under the condition of missing work: recalibrate the characteristic curve and calculate the production according to the method of the first category after correction.
[0127] By identifying five non-drastic operating conditions based on characteristic parameters, and then correcting the characteristic curve based on actual production data, the oil well liquid volume and dynamic liquid level are calculated in combination with the characteristic curve, a more accurate analysis of the non-drastic operating conditions of electric pump wells can be achieved, and software measurement of the liquid production of electric pump wells can be realized. This will strengthen the application foundation of intelligent oilfield construction in electric pumps, improve the level of refined analysis of non-drastic operating conditions of electric pump oil production wells, make up for the shortcomings of electric pump liquid volume measurement, and assist in simplifying the ground production process.
[0128] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for analyzing the working condition and measuring the liquid volume of an electric pump well under digital conditions, characterized in that: The following steps are involved: S1. Calculate the current reference value. In this step, the method for calculating the current reference value includes three specific methods: Method 1: The current reference value is calculated using the theoretical current value calculation method provided in the oil production engineering manual; Method 2: Read the current value of an electric pump well during normal production; Method 3: Apply big data analysis methods to extract the statistical average value of normal working conditions of the same model of electric pumps under the same production parameters; S2. Using the change amplitude of the collected current compared with the reference current, the real-time collected parameters are processed into data of the following four time dimensions, and the change rate and trend analysis are performed; this step specifically includes the following steps: 1) Is: Second-level data changes. If the deviation from the benchmark value exceeds the second-level threshold, the warning state is entered; 2) Im: minute-level data change. Take the average value of 60 second-level data per minute. Compared with the baseline value, if the change rate exceeds the minute-level threshold, an early warning will be issued. The change trend ΔIm of the minute-level data in the past 60 minutes is calculated every minute. 3) Ih: Hourly data trend change. Take the average value of 60 minute-level data per hour. Compared with the baseline value, if the change exceeds the hourly threshold, an early warning will be issued. The change trend ΔIh of the hourly data in the past 72 hours is calculated every hour. 4) Id: Daily data trend change. The average value of 24 hourly data per day is taken as the daily data. Compared with the baseline value, if the change exceeds the daily threshold, an early warning is issued. The change trend ΔId of the daily data in the past 30 days is calculated every day; S3. Working condition analysis: Divide the working conditions that do not change dramatically into the following five categories: 1) The parameters are too large, characterized by increased head, low submergence, low pump efficiency, and large electrical parameters; 2) When wax is deposited, the characteristics are increased discharge pressure, increased head, reduced output, rising liquid level, decreased actual lifting height, increased pump loss, and slow increase in electrical parameters; 3) Under normal circumstances, electrical parameters and wellhead pressure remain basically unchanged; 4) When the parameters are small, the characteristics are high dynamic liquid level, high pump efficiency and stable electrical parameters; 5) When leakage occurs, the characteristics are that the lifting pressure remains unchanged, the liquid level rises, the output decreases, the pump is lightly loaded, and the electrical parameters drop slightly. The characteristic curve needs to be readjusted; S4. Characteristic curve correction: 1) Obtain the initial characteristic curve of the pump; 2) Production correction: Obtain the actual production data, the corresponding liquid production, dynamic liquid level, current, voltage, and power, calculate the actual pump head based on the actual production data, and use the actual liquid production to calculate the head deviation coefficient. When the head deviation coefficient is less than a certain value, directly use the theoretical correction value, otherwise perform production correction; 3) Obtain multiple sets of data and fit the relationship between the head deviation coefficient and the liquid production, frequency and power; 4) Obtain the actual characteristic curve; In step S4, multiple groups of fitting values are obtained to obtain an average lift deviation coefficient; S5. Liquid quantity measurement and dynamic liquid level prediction: production forecast according to different working conditions.
2. The method for analyzing the working condition and measuring the liquid volume of an electric pump well under digital conditions according to claim 1 is characterized in that: Step S3 specifically includes: Working condition analysis: Divide the working conditions that do not change dramatically into the following five categories: 1) The parameters are too large, characterized by increased head, low submergence, low pump efficiency, and large electrical parameters; the criteria are: A, the trend of ΔIh is stable, B, Id becomes large and warns, C, the trend of ΔId is rising, D, (Id- Ib) / Ib is greater than 0.15; 2) When wax is deposited, the characteristics are increased discharge pressure, increased head, reduced output, rising liquid level, decreased actual lifting height, increased pump loss, and slow increase in electrical parameters. The judgment criteria are: A, the trend of ΔIh is stable, B, Id increases and warns, C, the trend of ΔId is rising, D, (Id- Ib) / Ib is greater than 0.07 and less than 0.15; 3) Normal: electrical parameters and wellhead pressure remain basically unchanged. The criteria are: A. The trends of ΔIm, ΔIh, and ΔId are all stable; B. (Id- Ib) / Ib is less than 0.07; 4) Small parameters: Its characteristics are high dynamic liquid level, high pump efficiency, and stable electrical parameters. The judgment criteria are: A, the trend of ΔIh is stable, B, Id decreases and warns, C, the trend of ΔId is decreasing, D, (Ib- Id) / Ib is less than 0.07; 5) Leakage: Its characteristics are that the lifting pressure remains unchanged, the liquid level rises, the output decreases, the pump is lightly loaded, and the electrical parameters drop slightly. The judgment criteria are: A, the trend of ΔIh is stable, B, Id decreases and warns, C, the trend of ΔId is decreasing, D, (Ib- Id) / Ib is greater than 0.
15.
3. The method for analyzing the working condition and measuring the liquid volume of an electric pump well under digital conditions according to claim 1 is characterized in that: Step S5 specifically includes the following method steps: Liquid volume measurement and dynamic liquid level prediction: Production prediction according to different working conditions: Category 1: Production planning under normal, small parameters, and large parameters: 1) Take the liquid production corresponding to the statistical average pump efficiency of various working conditions of the current frequency of the pump unit as the initial value; 2) According to the corrected characteristic curve formula, take the corresponding initial value of the head; 3) Calculate the corresponding lift using the multiphase flow formula based on the initial liquid volume and the tested wellhead casing pressure; 4) Determine whether the calculation error ΔHcul between the initial head value in 2) and the corresponding head calculated using the multiphase flow formula in 3) is less than 0.
05. If so, stop the calculation and output the result. If not, fine-tune the Q value until the calculation error is less than 0.
05. 5) Calculate the dynamic liquid level of the oil well by the suction pressure corresponding to the lift that satisfies the lift calculation error; The second category is the production planning under wax deposition conditions: 1) Take the liquid production corresponding to the statistical average pump efficiency of the wax deposition condition of the current frequency of the pump unit as the initial value; 2) According to the corrected characteristic curve formula, take the corresponding initial value of the head; 3) Calculate the corresponding lift using the multiphase flow formula based on the initial liquid volume and the tested wellhead casing pressure; 4) Determine whether the calculation error ΔHcul between the initial head value in 2) and the corresponding head calculated using the multiphase flow formula in 3) is less than 0.
05. If so, stop the calculation and output the result. If not, fine-tune the Q value until the calculation error is less than 0.
05. 5) Calculate the dynamic liquid level of the oil well by the suction pressure corresponding to the lift that satisfies the lift calculation error; The third category is the production calculation under the condition of missing work: recalibrate the characteristic curve and calculate the production according to the method of the first category after correction.
Citation Information
Patent Citations
Real-time online flow metering system and method for capillary pressure measuring electric pump wells
CN105888646B
Parameter diagnosis and analysis method for electric submersible pump well working condition instrument
CN105781527A
Electric pump well fault real-time diagnostic system and method based on time series data analysis
CN106761681A
Electric submersible pump well working condition diagnosis method and device based on current parameters
CN110284875A