A bridge external twisted prestressed reinforcement device and reinforcement method

Through the co-directional torsional winding technology of the external twisted prestressed reinforcement device of the bridge, the problems of small reinforcement range, complex construction and high safety hazards in the existing bridge reinforcement methods have been solved, and efficient and safe multiple prestressed reinforcements have been achieved, extending the the service life of the bridge.

CN114481866BActive Publication Date: 2024-10-29CCCC FIRST HIGHWAY CONSULTANTS CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210109026.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-28
Publication Date
2024-10-29
Estimated Expiration
2042-01-28

AI Technical Summary

Technical Problem

Existing external prestressed reinforcement methods for bridges have problems such as limited reinforcement range, long construction time, large equipment requirements, complex operations, and high safety hazards, and cannot achieve secondary reinforcement after prestress loss.

Method used

The external twisted prestressed reinforcement device of the bridge is used to apply prestressed force in the middle of the beam body through the same direction torsional winding method of the prestressed tendons, eliminating the need for jacks, expanding the reinforcement range, achieving multiple tensions, simplifying construction operations, and locking Buckle and winch secure the prestressed tendons to maintain prestress.

Benefits of technology

It significantly shortens the construction time, expands the reinforcement scope, improves operational safety, realizes secondary reinforcement after prestress loss, and reduces damage to the original structure and equipment requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114481866B_ABST
    Figure CN114481866B_ABST
Patent Text Reader

Abstract

The present invention discloses a bridge external twisted prestressed reinforcement device and a reinforcement method, which are applied to the technical field of bridge external prestressed reinforcement. The reinforcement device comprises prestressed tendons, an anchoring device and a winch. The prestressed tendons are arranged on the side of the beam body and the two ends are respectively fixed to the two ends on the same side of the beam body by anchoring devices. The winch is installed on two adjacent prestressed tendons. The two adjacent prestressed tendons are applied with torsional force by the winch and are wound together by twisting in the same direction. After winding, prestress can be applied to the beam body, and the prestressed tendons remain fixed in a fixed state after winding. The reinforcement method can be applied to different bridges, and the position of tensioning construction can be moved from the end of the beam body to the middle of the beam body, avoiding the narrow space at the two ends of the beam body, expanding the reinforcement range of the beam body, and after the prestress is lost, secondary tensioning can be performed to repeatedly apply prestress to achieve multiple reinforcements of the beam body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of external prestressed reinforcement of bridges, and in particular to an external twisted prestressed reinforcement device and a reinforcement method for bridges. Background Art

[0002] As the service time of bridge structures increases, some bridge structures have cracks and bearing capacity degradation due to factors such as complex natural environment and overload, which destroys the good condition of the original bridge, causes structural deformation, structural cracks and other problems, and the safety of the internal structure of the bridge decreases, which cannot meet the use requirements. In order to ensure that the bridge structure has good performance during its service life, it is necessary to take reinforcement measures in time to close the cracks to improve durability or restore the bearing capacity of the structure. If it is not discovered and reinforced in time, if it is not repaired and reinforced in time, the cracks will continue to expand under the influence of load, temperature difference, materials, technology and other factors, forming cracks visible to the naked eye, and eventually endanger the entire bridge structure, and even cause bridge collapse accidents, which will have a serious impact on engineering safety and threaten life safety. Therefore, it is very important to reinforce the bridge in time, which can achieve: 1. Eliminate traffic safety hazards to the greatest extent and ensure the safe use of the bridge; 2. Save a lot of investment, reduce the demolition of old bridges and rebuild bridges; 3. Restore the bearing capacity and traffic capacity of the bridge and extend its service life.

[0003] When reinforcing a bridge structure, it is necessary to apply pressure to it in advance so that the internal force of the concrete in the tension zone under the action of external loads produces compressive stress, which is used to offset or reduce the tensile stress generated by the external load, so that the structure will not produce cracks under normal use, cracks will occur later, or the crack width is within a controllable range. Based on the requirements of closed cracks and bearing capacity, external prestressing reinforcement is often used. External prestressing is an important part of the post-tensioning system. The external prestressed structure is to apply prestress to the outside of the original bridge structure through a reinforcement device, and anchor the reinforcement device to the original bridge structure to achieve the re-application of prestress to the bridge structure.

[0004] There are two existing external prestressing reinforcement methods: one is to tension the prestressed tendons transversely. This method has low reinforcement efficiency, the tensioning amplitude cannot be too large, and there will be danger if the tensioning is in place at one time. This method is generally no longer used; the other is to tension the prestressed tendons along the bridge direction at the end of the beam, which requires the use of a jack to push the end of the prestressed tendons to apply prestress. The second method is commonly used now, but this tensioning method is complicated in construction operation because the tensioning process requires the setting of a jack to push the base. It usually requires the use of large-tonnage auxiliary mechanical equipment at the end of the beam to complete the operation. The construction of a single beam takes 4-5 days, and the prestressing construction of the entire bridge will take at least 1 month, which is a long time.

[0005] Specifically, the existing bridge external prestressing reinforcement method has the following problems:

[0006] 1. Only one tensioning can be performed, and there is no possibility of secondary tensioning. If the prestress is lost after reinforcement, it cannot be restored, and the reinforcement device needs to be removed and reinforced again, which is time-consuming and labor-intensive;

[0007] 2. The reinforcement range is limited, and the end of the beam is difficult to reinforce;

[0008] 3. Powerful tensioning equipment and anchoring devices are required, and tensioning and anchoring will cause great damage to the original structure;

[0009] 4. A large space is required for tensioning, but the space at the beam end is limited, making construction and operation difficult;

[0010] 5. The tensioning process has certain risks and needs to be tensioned in place at one time. It may be dangerous and requires high tensioning control. Summary of the invention

[0011] The purpose of the present invention is to overcome the above-mentioned deficiencies in the prior art and to provide a bridge external twisted prestressed reinforcement device and reinforcement method, which can move the tensioning construction position from the end of the beam body to the middle of the beam body, thereby reducing the volume of the tensioning device. The reinforcement device is arranged at a position that avoids the narrow space at both ends of the beam body, thereby expanding the reinforcement range of the beam body. In addition, after the prestress is lost, the prestress can be repeatedly applied, which is convenient for multiple tensioning and multiple reinforcement of the beam body. At the same time, the jack is omitted and the operation is more convenient.

[0012] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:

[0013] A bridge body external twisted prestressed reinforcement device, characterized in that it includes prestressed tendons and anchoring devices, the two ends of the prestressed tendons are respectively fixed to the two ends on the same side of the beam body by the anchoring devices, all prestressed tendons are an even number, two adjacent prestressed tendons form a group, each group of prestressed tendons is wound by twisting in the same direction and can apply prestress to the beam body, and each group of prestressed tendons is fixed to the beam body after winding.

[0014] Multiple groups of structures for tensioning are formed by prestressed tendons. Each group of prestressed tendons is twisted in the same direction so that they are wound together under the action of torque and deformed in the axial direction of the prestressed tendons. In the elongated state, the prestressed tendons generate tensile stress on the beams connected at both ends, thereby tensioning the beams. This eliminates the need for jacks and allows the beams to be tensioned on the top, side or bottom surfaces instead of in the narrow space at both ends of the beams. This makes the operation more convenient. By tensioning each group of prestressed tendons, multiple groups can be tensioned simultaneously, thereby providing sufficient tensioning stress to achieve prestressing of the beams. The prestressing can adapt to the reinforcement of beams of different lengths, provide sufficient prestress through the winding interval length, and achieve reinforcement of beams over a larger range. Compared with the existing reinforcement range of up to 2 / 3 of the beam length, the reinforcement range is significantly expanded. The prestress of the beam can be stably maintained after only one installation, and secondary tensioning after the prestress is lost is also convenient. After being used for a period of time, the existing reinforcement device of the beam body needs to be dismantled and reset due to the degradation of structural performance. However, the present reinforcement device can perform secondary tensioning of the prestressed tendons by torsion force, thereby achieving multiple reinforcement of the beam body.

[0015] In a preferred embodiment of the present invention, the above-mentioned reinforcement device also includes a winch and / or a lock, and each group of prestressed tendons is fixed to the beam body by the winch and / or the lock; each group of prestressed tendons is clamped by the lock or the winch, so that each group of prestressed tendons is fixed after winding, thereby preventing the prestressed tendons from twisting in the opposite direction after winding.

[0016] In a preferred embodiment of the present invention, the middle section of each group of prestressed tendons forms a bayonet after winding, and a lock is locked in the bayonet, and the lock is fixed to the beam body; the number of turns of each group of prestressed tendons after winding is fixed by the lock to prevent the prestressed tendons from twisting in the opposite direction, which would cause failure of the applied prestress.

[0017] In a preferred embodiment of the present invention, at least one winch is provided on each group of prestressed tendons. The setting of the winch facilitates the application of torsional force to each group of prestressed tendons. During the construction process, each group of prestressed tendons can be twisted using a simple lever principle, which is convenient for construction workers to carry out construction. At the same time, the torsional force and the applied prestress are in different directions, and can be twisted multiple times by the winch. The torsional force is much smaller than the tensioning force required for the prestress to reach the design stress, and the operation safety is relatively high.

[0018] In a preferred embodiment of the present invention, the above includes anchor heads, which are arranged at both ends of the prestressed tendons and are used to fix the prestressed tendons on the anchoring device; the prestressed tendons and the anchoring device are firmly connected through the anchor heads.

[0019] In a preferred embodiment of the present invention, the above-mentioned anchoring device is a concrete block or a steel member; through the anchoring device, both ends of each group of prestressed tendons can be fixed, and the prestressed tendons can be kept in a tensioned state to facilitate construction.

[0020] In a preferred embodiment of the present invention, the ends of the above-mentioned prestressed tendons are fixed to the ends of the beam body by casting concrete blocks, and anchor steel bars and steel meshes are provided in the concrete blocks. One end of the anchor steel bars is implanted and fixed in the anchoring holes drilled at both ends of the beam body; by applying concrete blocks with built-in steel meshes at the ends of the beam body, the connection strength between the concrete blocks and the beam body is strengthened, so that the prestressed tendons are firmly connected.

[0021] In a preferred embodiment of the present invention, the above-mentioned steel structure includes an anchor plate, a fixing plate, a limiting plate and a locking piece. The anchor plate is provided with a mounting hole and can be fixed to the beam body through the mounting hole. One side of the fixing plate is connected to the top of the anchor plate, and the other side of the fixing plate is recessed with a limiting opening. The limiting plate is connected to the fixing plate through the locking piece. The anchoring device is tightly attached to and fixed to the beam body through the anchor plate. The limiting opening for fixing both ends of the prestressed tendon can be provided through the fixing plate. The prestressed tendon can be clamped at the fixing plate through the limiting plate, so that the prestressed tendon can be fixed, thereby strengthening the stable connection between the two ends of the prestressed tendon and the beam body.

[0022] In a preferred embodiment of the present invention, the above-mentioned reinforcement device also includes a shock-absorbing device, at least two shock-absorbing devices are arranged at intervals between each group of prestressed tendons and the beam body; or a capstan seat is arranged between the capstan and the beam body, and the capstan seat is made of soft material; through the setting of the shock-absorbing device, each group of prestressed tendons can be shock-absorbing and buffered, thereby reducing the vibration impact of the prestressed tendons on the beam body during construction.

[0023] In a preferred embodiment of the present invention, the installation position of the above-mentioned prestressed tendons and the end of the beam body is 50 to 100 cm away from the end of the beam body, and there is a gap between the prestressed tendons and the beam body; by setting the distance from the end of the beam body, it can be ensured that the range of beam reinforcement is large and covers most of the length of the beam body, and it can also be ensured that there is no contact between the prestressed tendons and the surface of the beam body, and no close contact occurs, thereby ensuring that a certain space is reserved for torsion of the prestressed tendons.

[0024] In a preferred embodiment of the present invention, the above-mentioned bridge external twisted prestressed reinforcement device is adopted, which is characterized by comprising the following steps:

[0025] S1. Determine the installation positions of the anchor heads for fixing the ends of the prestressed tendons at the two ends of the same side of the beam body, install anchoring devices at the two ends of the beam body, fix the two ends of the prestressed tendons to the anchoring devices respectively, and install multiple prestressed tendons side by side;

[0026] S2. Apply a torsional normal force to each group of prestressed tendons at the middle position of each group of prestressed tendons to perform twisting;

[0027] S3. When the number of twisting turns reaches the design value, stabilize for a period of time and measure the tension. If the prestressing value requirement is not reached, continue twisting. If the prestressing value requirement is reached, stop twisting and fix the corresponding group of prestressed tendons;

[0028] S4, maintaining the torsion state of each group of prestressed tendons, and fixing each group of prestressed tendons after torsion to the beam body;

[0029] S5. All prestressed tendons and anchoring devices shall be treated with anti-corrosion measures.

[0030] By determining the installation position and installing anchoring devices or pouring concrete blocks, the connection of prestressed tendons and the foundation for setting them on the beam body are formed, which makes it convenient to set the prestressed tendons on the beam body. By installing the prestressed tendons, multiple groups of prestressed tendons can be formed, so as to form multiple groups of prestressed structures, which is convenient for construction. By installing a winch, it is convenient to twist and prestress the prestressed tendons on the top, side or bottom of the beam body. By twisting and measuring the tension, it is ensured that the prestressing meets the requirements. The winding state of each group of prestressed tendons is fixed by installing the lock buckle to maintain the application of prestress. The service life of the prestressed tendons is extended by anti-corrosion treatment. The tensioning method in the existing prestressed reinforcement is to tension the prestressed tendons or prestressed bundles independently to avoid the prestressed tendons or prestressed bundles from being close to each other and causing no entanglement. If each group of prestressed structures comes into contact, it will affect the prestressed structure of each group. The present scheme overcomes technical prejudice and applies prestress by winding, which is completely different from conventional technology.

[0031] In a preferred embodiment of the present invention, if the prestressed tendons are relaxed or prestress loss occurs, the fixation between each group of prestressed tendons and the beam body is first released, and then the twisting operation is repeated on each group of prestressed tendons through step S2. After the number of prestressed tendons intertwined with each other increases, the tension is measured through step S3. When the tension reaches the expected value, the winding state of each group of prestressed tendons is fixed by using a lock and / or a winch through step S4 to complete the re-application of prestress; after the prestress is lost, prestress is applied again by each group of prestressed tendons, so that the prestressed tendons can be tensioned for the second time, thereby achieving repeated application of prestress to the beam body.

[0032] In a preferred embodiment of the present invention, the number of twisting turns n of the prestressed tendon is based on Determine; wherein, σ is the design tension stress of a single prestressed tendon, E is the elastic modulus of the prestressed tendon, L is the length of the beam, L1 is the distance between the installation positions at both ends of the prestressed tendon, and d is the diameter of a single prestressed tendon; according to the state of the prestressed tendons, the prestress generated by each group of prestressed tendons can be calculated, so that when prestress is applied to the entire beam, the number and size parameters of the required prestressed tendons can be designed, and the number of twists required can be inferred based on the prestress value.

[0033] Compared with the prior art, the present invention has the following beneficial effects:

[0034] 1. Through the reinforcement device, tensile stress can be generated at both ends of the beam body, and then the beam body can be tensioned, eliminating the use of jacks. The operation is not performed in the narrow space at both ends of the beam body but on both sides of the beam body, which is more convenient to operate. By tensioning each group of prestressed tendons, multiple groups can be tensioned at the same time, thereby providing sufficient tensioning stress to achieve prestressing on the beam body, which can expand the scope of reinforcement and achieve a larger range of beam reinforcement. The prestress on the beam body can be stably maintained with only one installation.

[0035] 2. Through the reinforcement method, it is convenient to set the prestressed tendons on different bridge structures, and the application range is wide. By installing the prestressed tendons, multiple groups of prestressed tendons can be formed, so as to form multiple groups of prestressed structures, which is convenient for construction. At the same time, the reinforcement installation is fast, which can increase the time by at least 50%; the prestress can be maintained for a long time after construction. After the prestress is lost, there is no need to remove the reinforcement device. Secondary tensioning can be carried out through the prestressed tendons, and the prestress is repeatedly applied to achieve multiple reinforcements of the beam body; at the same time, the construction is transferred from the beam end to the side, and the construction and operation are convenient, and the operation safety is relatively high. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 This is a schematic diagram of an external twisted prestressed reinforcement device for a bridge according to Embodiment 1 of the present invention;

[0037] Figure 2 Schematic diagram of a prestressed tendon according to Embodiment 1 of the present invention;

[0038] Figure 3 is a schematic diagram of an anchor head according to Embodiment 1 of the present invention;

[0039] Figure 4 It is a front schematic diagram of the anchoring device of Example 1 of the present invention;

[0040] Figure 5 It is a side schematic diagram of the anchoring device of Example 1 of the present invention;

[0041] Figure 6 Schematic diagram of a winch according to Embodiment 1 of the present invention;

[0042] Figure 7 This is a schematic diagram of the installation of the winch and the lock buckle of Example 1 of the present invention;

[0043] Figure 8 is a schematic diagram of a lock buckle according to Embodiment 1 of the present invention;

[0044] Fig. 9 It is a schematic front view of the winch structure of Example 2 of the present invention;

[0045] Fig.10 It is a schematic side view of the winch structure of Example 2 of the present invention;

[0046] Fig.11 A schematic diagram of the location of the damping device according to Embodiment 2 of the present invention;

[0047] Fig.12 This is a step diagram of a reinforcement method according to Embodiment 3 of the present invention;

[0048] Fig.13 This is a schematic diagram of the construction status of Example 3 of the present invention;

[0049] Markings in the figure: 1-beam body, 2-prestressed tendon, 3-anchor head, 4-anchoring device, 41-anchor plate, 42-fixing plate, 421-limiting opening, 43-limiting plate, 44-locking piece, 5-capstan, 51-first disc body, 52-second disc body, 53-insertion hole, 54-through hole, 55-connecting piece, 56-seat body, 57-first clamping ring, 58-second clamping ring, 6-locking buckle, 61-locking buckle hole, 7-shock absorbing device. DETAILED DESCRIPTION

[0050] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0051] Example 1

[0052] Please refer to Figure 1 The present embodiment provides a bridge external twisted prestressed reinforcement device, which is used to be arranged on the outside of the beam body 1 of the upper main beam of the bridge structure, and includes a prestressed tendon 2, an anchor head 3, a lock 6, a winch 5, a shock absorbing device 7 and an anchoring device 4. The prestressed tendon 2 is installed on one side of the beam body 1 through the anchoring device 4. If it is arranged on the side, all the prestressed tendons 2 are arranged along the height direction. If it is arranged on the bottom surface, they are arranged along the width direction. A winch 5 is provided and installed in the middle section of each group of prestressed tendons 2, and the lock 6 is clamped between the two prestressed tendons 2 of each group; the structure tensions the beam body 1 through the prestressed tendons 2, twists the prestressed tendons 2 through the winch 5, and fixes the winding state of the two prestressed tendons 2 through the lock 6. The winch 5 can play a certain buffering and shock absorbing role, and can also replace the shock absorbing device 7, and fix the two ends of the prestressed tendons 2 through the anchoring device 4.

[0053] The prestressed tendon 2 is made of a high-strength and high-toughness material. The material can be selected according to the prestress or torsional force to be applied. It can be a highly stretchable, high-toughness polymer material or metal material, or a metal-nonmetal composite material, as long as it meets the high strength and high toughness requirements. The prestressed tendon 2 can generate sufficient tensile stress on the beam body 1, which can facilitate the torsion of the prestressed tendon 2 and provide a material basis for the tensioning and torsion of the prestressed tendon 2; there is a gap between the prestressed tendon 2 and the corresponding top surface, side surface or bottom surface of the beam body 1, and in this embodiment, the prestressed tendon 2 is arranged on one side of the beam body 1, through Prestress is applied to one side of the beam body 1 to achieve prestressed tensioning of the beam body 1. There is no contact between the prestressed tendons 2 and the side of the beam body 1, and no close contact occurs, ensuring that a certain space is reserved for the torsion prestressed tendons 2 for installing the winch 5 and torsion construction. The installation position of the prestressed tendons 2 and the end of the beam body 1 needs to be a certain distance away from the end of the beam body 1. The end of the beam body 1 is the end face at both ends of the beam body 1. The end of the prestressed tendon 2 is 50cm-100cm away from the end of the beam body 1. By setting the distance from the end of the beam body 1, it can be ensured that the reinforcement range of the beam body 1 is large and covers most of the length of the beam body 1.

[0054] Please refer to Figure 2 and Figure 3The present embodiment has a plurality of prestressed tendons 2, each of which is arranged in parallel. For example, if the length of the beam is 11m, each prestressed tendon 2 is 10m. If the length of the prestressed tendons 2 is 5-50m, the winding interval of each group of prestressed tendons 2 can be 3-48m, which can adapt to the reinforcement of beams 1 of different lengths. There are intervals between different prestressed tendons 2, and each prestressed tendon 2 is linear (there is a sag effect before tensioning), that is, each prestressed tendon 2 is a line segment, and the plurality of prestressed tendons 2 are located on different straight lines when laid out, without reciprocating and winding, and different prestressed tendons 2 are located on different straight lines. All the prestressed tendons 2 are an even number, and an even number of prestressed tendons 2 can form a group of prestressed tendons 2. For example, in the present embodiment, if they are arranged on the side, two upper and lower adjacent prestressed tendons 2 among the multiple prestressed tendons 2 are taken as a group, and all the prestressed tendons 2 are divided into multiple groups. The two prestressed tendons 2 in each group are wound together. When winding, the two prestressed tendons 2 in each group are wound together by twisting in the same direction. Specifically, in a direction perpendicular to the prestressed tendons 2, the two prestressed tendons 2 are rotated synchronously in the same direction, so that the two prestressed tendons 2 are twisted and wound together. After the two prestressed tendons 2 in each group are wound, a bayonet is formed at the middle position, and a lock buckle 6 is installed in the bayonet. The wound state The two prestressed tendons 2 on both sides of the bayonet are in a twist shape, and the two twist-shaped structures are symmetrical about the bayonet. The length of the winding interval of each group of prestressed tendons 2 is 8m, that is, the single-sided winding interval on one side of the bayonet is 4m; all groups of prestressed tendons 2 have the same structure, and all groups of prestressed tendons 2 after winding generate tensile stress on both ends of the beam body 1. By tensioning each group of prestressed tendons 2, multiple groups can be tensioned at the same time, thereby providing sufficient tensile stress to achieve prestressing on the beam body 1, and each group of prestressed tendons 2 is clamped by the lock buckle 6 to achieve each group of prestressed tendons 2. Fixation after winding is achieved to prevent the prestressed tendons 2 from recovering their deformation after winding, and the prestress on the beam body 1 can be stably maintained after only one installation.

[0055] Please refer to Figure 4 and Figure 5, the two ends of each prestressed tendon 2 are fixed on the anchor device 4, and the anchor device 4 is installed on the two ends on the same side of the beam body 1. The two ends of the prestressed tendon 2 are fixed to the anchor device 4 through the anchor head 3 respectively, and the prestressed tendon 2 and the anchor device 4 are firmly connected through the anchor head 3. One end of the anchor head 3 wraps and presses the outer side of the end of the prestressed tendon 2, and the two are interference connected, and the other end of the anchor head 3 is cylindrical, and the diameter of the end of the anchor head 3 is larger than the diameter of the prestressed tendon 2. The anchor head 3 passes through the steel washer and is clamped with the anchor device 4 through the steel washer, so that the end of the anchor head 3 can be clamped on the anchor device 4; this embodiment The anchoring device 4 is made of steel components, which include an anchoring plate 41, a fixing plate 42, a limiting piece 43 and a locking piece 44. The anchoring plate 41 is a square plate, and mounting holes are respectively provided at the four corners of the anchoring plate 41, and the sides of the two ends of the beam body 1 are respectively provided with anchoring holes corresponding to the mounting holes. Anchor bolts are used to pass through the mounting holes and the anchoring holes to fix the anchoring plate 41 on the side of the end of the beam body 1. The fixing plate 42 is strip-shaped, and its width is much smaller than that of the anchoring plate 41. The fixing plate 42 and the anchoring plate 41 are an integrally formed structure. One side of the fixing plate 42 is connected to the middle position of the top of the anchoring plate 41. The fixing plate 4 2 is provided with a limit opening 421, two limit openings can be provided on a fixing plate 42 for connecting the anchor heads 3 of the two prestressed tendons 2 of each group, or a plurality of limit openings 421 spaced apart from each other can be provided for connecting the anchor heads 3 of all prestressed tendons 2; the limit piece 43 is provided with two arc-shaped notches for fixing and clamping the edges of the prestressed tendons 2, locking holes are provided on the limit piece 43 on both sides of the arc-shaped notches, and locking holes are also provided on both sides of the limit opening 421 of the fixing plate 42, the limit piece 43 is connected to the fixing plate 42 through a locking member 44, and the locking member 44 adopts a bolt, and the limit piece is fixed by the bolt 43 is fixed on the side of the fixing plate 42, so that after the prestressed tendon 2 is inserted into the limiting opening 421, the limiting plate 43 limits the prestressed tendon 2 to prevent the prestressed tendon 2 from escaping from the limiting opening 421; the anchoring device 4 is tightly attached to and fixed to the beam body 1 through the anchoring plate 41, and the limiting opening 421 for fixing the two ends of the prestressed tendon 2 can be provided through the fixing plate 42. The prestressed tendon 2 is clamped on the fixing plate 42 through the limiting plate 43, which can fix the prestressed tendon 2 and strengthen the stable connection between the two ends of the prestressed tendon 2 and the beam body 1. The prestressed tendon 2 is kept in a tensioned state through the anchor head 3 and the anchoring device 4 for easy construction.

[0056] Please refer to Figure 6 and Figure 7A winch 5 is arranged on each group of prestressed tendons 2. In this embodiment, a winch 5 is arranged in the middle section of each group of prestressed tendons 2. The winch 5 includes a disc body. A through hole 54 penetrating through both sides is arranged in the middle of the disc body. The through hole 54 is used to pass the prestressed tendons 2. The disc body is composed of a first disc body 51 and a second disc body 52 connected to each other. The first disc body 51 and the second disc body 52 are fixedly connected by a connecting piece 55. Specifically, the first disc body 51 and the second disc body 52 are semicircular flat structures. The connecting piece 55 adopts bolts, and the first disc body 51 and the second disc body 52 are assembled into a disc shape by bolts. A plug hole 53 is respectively arranged in the first disc body 51 and the second disc body 52. ​​On the butt joint edge of the first disc body 51 and the second disc body 52, two notches for clamping the prestressed tendons 2 are concave inwardly, and the two notches are symmetrical about the middle part of the butt joint edge of the first disc body 51 or the second disc body 52. When a disk body 51 and a second disk body 52 are docked, the notch of the first disk body 51 and the notch of the second disk body 52 are docked to form an insertion hole 53. In this way, the first disk body 51 and the second disk body 52 have a total of four insertion holes 53, and the four insertion holes 53 are arranged in a cross shape. The four insertion holes 53 are radially distributed from the middle of the disk body to the edge, and the insertion holes 53 are used to insert rods to apply a torsional normal force; the outer edge formed by the first disk body 51 and the second disk body 52 is circular, and the surface where the outer edge is located is a cylindrical surface. The disk body can be rotated relative to the side of the beam body 1 through the cylindrical surface where the outer edge is located. When in use, after the rod is inserted into the insertion hole 53, the outer edge of the disk body is placed against the side of the beam body 1. After the torsional normal force is applied, the disk body rolls relative to the beam body 1. During the construction process, the position of the disk body is moved to the initial position of the torsion by the inserted rod, and the torsion is repeated until the prestress is applied in place.

[0057] Semicircular notches are also provided on the butt joint edges of the first plate body 51 and the second plate body 52, and the two notches are located in the middle of the butt joint edges of the first plate body 51 and the second plate body 52, so that when the first plate body 51 and the second plate body 52 are butt jointed, the notches are butt jointed to form a through hole 54, and the through hole 54 is used to pass through each group of prestressed tendons 2; the first plate body 51 is also provided with a first connecting hole, and the second plate body 52 is provided with a second connecting hole, the first connecting hole is connected to the plug hole 53 in the first plate body 51, and the second connecting hole is connected to the plug hole 53 of the second plate body 52, and the first connecting hole and the second connecting hole are connected when the first plate body 51 and the second plate body 52 are butt jointed The first and second disc bodies 51 and 52 are fixedly connected by a connecting piece 55. Specifically, a bolt passes through the first connecting hole and the second connecting hole to connect the first disc body 51 and the second disc body 52. ​​After the connection, both ends of the bolt are placed in the insertion hole 53. When the winch 5 is installed to the prestressed tendon 2, the prestressed tendon 2 is first clamped in the groove, and then the first disc body 51 and the second disc body 52 are connected. Finally, the first disc body 51 and the second disc body 52 are fixedly connected by bolts. Through the setting of the winch 5, it is convenient to apply a torsional force to each group of prestressed tendons 2. During the construction process, each group of prestressed tendons 2 can be twisted by using a simple lever principle, which is convenient for construction personnel to carry out construction.

[0058] Please refer to Figure 8 After the capstan 5 is set, each group of prestressed tendons 2 is twisted and wound. After twisting, each group of prestressed tendons 2 forms a bayonet, which is located on both sides of the capstan 5; two lock buckles 6 are used to clamp at the two ends of the bayonet, that is, the initial position where each group of prestressed tendons 2 in the winding state are wound together. The side surface of the lock buckle 6 is diamond-shaped, and the end of the lock buckle 6 is set as a wedge shape. The lock buckle 6 clamps each group of prestressed tendons 2 on both sides of the wedge surface, and the middle part of the wedge surface of the lock buckle 6 is concave, which is convenient for The prestressed tendons 2 are inserted, and the wedge-shaped surface is concavely set to form retaining edges on both sides of the lock buckle 6 for blocking positions, so that it is convenient to clamp the lock buckle 6 with each group of prestressed tendons 2. A through hole is provided in the middle of the lock buckle 6, and a lock buckle hole 61 is drilled in the middle of the beam body 1. A steel rod is inserted into the through hole and the lock buckle hole 61 to fix the lock buckle 6 to the beam body 1; the number of turns of each group of prestressed tendons 2 after winding is fixed by the lock buckle 6 to prevent each group of prestressed tendons 2 from recovering their deformation after winding.

[0059] Example 2

[0060] This embodiment provides an external twisted prestressed reinforcement device for a bridge. The structure of Embodiment 2 is substantially the same as that of Embodiment 1, except for the arrangement of the winch 5 and the shock absorbing device 7 of this embodiment. The differences in Embodiment 2 are described below.

[0061] Please refer to Fig. 9 and Fig.10The winch 5 of this embodiment also includes a winch seat, and the winch 5 is clamped on the winch seat. The winch seat includes a seat body 56, a first clamping ring 57 and a second clamping ring 58. The first side of the seat body 56 is attached to the side of the beam body 1, and the second side of the seat body 56 is used to connect the first clamping ring 57 and the second clamping ring 58. The winch 5 is used to be clamped on the second side of the seat body 56. The winch 5 is just clamped between the first clamping ring 57 and the seat body 56, and between the second clamping ring 58 and the seat body 56. The two sides of the cylindrical surface where the outer edge of the winch 5 is located are clamped by the first clamping ring 57 and the second clamping ring 58. There is a There is a gap, which is used to insert the rod into the socket 53 of the winch 5; the first snap ring 57 and the second snap ring 58 are respectively in the form of a semi-closed notched ring, and the two ends of the annular notch of the first snap ring 57 are provided with connecting holes, and the two ends of the annular notch of the second snap ring 58 are also provided with connecting holes, and the second side of the seat body 56 is set as an arc edge, and a hole opposite to the position of the connecting hole is set at the arc edge, and the first snap ring 57 and the second snap ring 58 are fixed to the seat body 56 with bolts. After the connection, the winch 5 can be rotated relative to the winch seat; through the setting of the winch seat, the torsion construction of the prestressed tendon 2 can be facilitated. Other embodiments may also be adopted, in which the lock buckle 6 is not provided, and the capstan 5 is fixed to the capstan seat by providing a fixing hole and passing through the fixing hole. Specifically, a fixing hole for fixing is provided on the first disk body 51 or the second disk body 52, and a fixing hole is also provided on the capstan seat. The capstan 5 and the capstan seat are relatively fixed by using non-closed-loop steel bars or bent steel bars to pass through the two fixing holes. After the capstan 5 is installed on the capstan seat, the lock buckle 6 is no longer needed; for the selection of the capstan 5, an electric capstan 5 may also be adopted, and a socket is no longer provided. The capstan 5 is equipped with a motor, and each group of prestressed tendons 2 is driven by the motor of the capstan 5 to twist, and the motor stops rotating and locks, and the winding state of each group of prestressed tendons 2 after twisting and winding is fixed; for the selection of the capstan 5, an electric capstan 5 may also be adopted, and a socket is no longer provided. The capstan 5 is equipped with a motor, and each group of prestressed tendons 2 is driven by the motor of the capstan 5 to twist, and the motor stops rotating and locks, and the winding state of each group of prestressed tendons 2 after twisting and winding is fixed.

[0062] Please refer to Fig.11 The present embodiment further provides two shock absorbing devices 7, which are buffer washers. The two buffer washers are arranged at intervals between each group of prestressed tendons 2 and the beam body 1, that is, the buffer washers are inserted between the winding position of each group of prestressed tendons 2 in the winding state and the beam body 1; through the setting of the buffer washers, each group of prestressed tendons 2 can be shock-absorbing and buffered, thereby reducing the impact of the prestressed tendons 2 on the beam body 1 during construction.

[0063] Example 3

[0064] Please refer to Fig.12 and Fig.13This embodiment provides a reinforcement method for a bridge external twisted prestressed reinforcement device, using a bridge external twisted prestressed reinforcement device of embodiment 1 or embodiment 2, which includes the following steps:

[0065] S1. Determine the installation positions of the anchor heads at the two ends of the fixed prestressed tendons 2 at the two ends on the same side of the beam body 1, that is, the prestressed reinforcement area of ​​the beam body 1. According to the scope of the prestressed reinforcement area, determine the length of the prestressed tendons 2, and drill anchor holes at the two ends of the beam body 1. Install the anchor device 4 through the anchor holes, that is, use anchor bolts to connect to the anchor holes and fix the anchor plate 41 to the sides of the two ends of the beam body 1. When anchoring, use the tendon embedding glue to tightly combine the anchor plate 41 and the beam body 1, as well as the anchor bolts and the beam body 1, so that the anchor plate 41 is more firmly connected to the beam body 1 and the force is balanced; drill anchor holes on the beam body 1, the size and number of the holes are determined according to the number of prestressed tendons 2 required for the beam body 1, and when drilling other holes, it is necessary to determine according to the corresponding hole size and number, such as the hole used to fix the lock buckle 6, it is necessary to determine according to the hole set on the lock buckle 6.

[0066] In addition to using steel components, the anchoring device 4 can also use concrete blocks to fix the prestressed tendons 2. Specifically, first, anchor holes are drilled on the side positions of both ends of the beam body 1, and the anchor steel bars are fixed to the beam body 1 by implanting one end of the anchor steel bars in the anchor holes. Then, a steel mesh is set on the anchor steel bars, cast into concrete blocks, and anchor holes are set on the concrete blocks.

[0067] The two ends of the prestressed tendon 2 are respectively fixed to the steel member or the anchor hole of the concrete block. The two ends of the prestressed tendon 2 are anchor heads 3. The diameter of the end of the anchor head 3 is larger than the limit opening 421 of the fixing plate 42, or larger than the anchor hole on the concrete block. In this way, the anchor head 3 is stuck on one side of the steel member or the concrete block, and the prestressed tendon 2 is arranged on the other side. After multiple prestressed tendons 2 are installed side by side, adjacent prestressed tendons 2 can be regarded as a group, and there is a gap between adjacent prestressed tendons 2.

[0068] S2. Apply a torsional normal force to each group of prestressed tendons 2 at the middle position of each group of prestressed tendons 2 to twist them. Specifically, a winch 5 is installed at the middle position of each group of prestressed tendons 2, and two prestressed tendons 2 are inserted into the through holes 54 of the winch 5. In this way, the winch 5 fixes the positions of the two prestressed tendons 2. The winch 5 is rotated to allow each group of prestressed tendons 2 to be wound around each other. During the winding, the two prestressed tendons 2 are twisted in the same direction, and two winding intervals appear on both sides of the winch 5. During the specific construction, a rod is inserted through the insertion hole 53 of the winch 5. The rod uses a wrench to apply a torsional normal force to each group of prestressed tendons 2 to drive each group of prestressed tendons 2 to rotate. The capstan 5 of different groups of prestressed tendons 2 are twisted to apply prestress to the beam body 1. The number of twisting turns of the capstan 5 of different groups of prestressed tendons 2 is kept consistent. The number of twisting turns is kept consistent so that the prestress applied to the beam body by each group of prestressed tendons 2 is the same or similar. When the capstans of multiple groups of prestressed tendons 2 are twisted, force is applied to the capstans of different groups together to twist them, so that the twisting and winding processes of the prestressed tendons 2 of different groups are carried out synchronously. Manual operation can be adopted, using a handheld wrench or other mechanical equipment to apply rotational torque through the capstan 5, so that the prestressed tendons 2 of each group are wound around each other, so as to achieve the purpose of stretching the prestressed tendons 2.

[0069] S3. A sensor is set at the anchor head 3 at the end of the prestressed tendon 2 to sense the tension of the prestressed tendon 2. When the number of twisting turns reaches the design value, it is stabilized for 2-5 minutes and the tension is measured. After stabilization, the tensile state of the prestressed tendon 2 and the winding state of the adjacent prestressed tendons 2 are fixed, and the size of the prestress can be determined. If the prestress value requirement is not met, the twisting continues. If the prestress value requirement is met, the twisting is stopped and fixed.

[0070] The number of torsion turns n of the prestressed tendon 2 during winding is determined according to the following formula:

[0071]

[0072] Among them, σ is the design tension stress of a single prestressed tendon, E is the elastic modulus of the prestressed tendon 2, n is the number of twisted turns of the prestressed tendon 2, L is the length of the beam body 1, L1 is the distance between the installation positions at both ends of the prestressed tendon 2, and d is the diameter of a single prestressed tendon 2; according to the state of the prestressed tendons 2, the prestress generated by each group of prestressed tendons 2 can be calculated, so that when prestress is applied to the entire beam body 1, the number and size parameters of the prestressed tendons 2 need to be designed.

[0073] The torsional normal force F applied to each group of prestressed tendons 2 by the winch 5 is:

[0074]

[0075] Among them, σ is the tensile stress generated by each group of prestressed tendons 2, A is the cross-sectional area of ​​a single prestressed tendon 2, d is the diameter of the prestressed tendon 2, and D is the spacing between each group of adjacent prestressed tendons 2 in the direction of the prestressed tendons in the winding state; according to the size of the designed prestress value, the torsional normal force can be calculated, thereby realizing the calculation of the force applied to the winch 5 and obtaining the parameter design of the rod that applies the torsional force.

[0076] S4. Maintain the torsion state of each group of prestressed tendons 2, and fix each group of prestressed tendons 2 after twisting to the beam body 1. Specifically, install the lock 6 at the bayonet of each group of prestressed tendons 2. The lock 6 is used to fix each group of prestressed tendons 2. Disassemble the winch 5, that is, remove the bolts of the first disc 51 and the second disc 52, and take it off, or fix the winch 5 to the side wall of the beam body 1. This operation is to fix the winch 5 to the side of the beam body 1 without removing it, so as to facilitate the re-application of prestress later; by inserting the steel rod into the lock 6 and fixing it on the beam body 1, the winding state of all groups of prestressed tendons 2 can be fixed.

[0077] S5. Perform anti-corrosion treatment on all prestressed tendons 2 and anchoring devices 4. The prestressed tendons 2 are exposed components. A protective layer is sprayed circumferentially on the prestressed tendons 2 from one end to the other. A protective layer is also sprayed on the anchoring device 4 at the end of the beam body 1. The protective layer is a paint with anti-corrosion properties.

[0078] After a period of use, the structural performance of the reinforcement device of the beam body degrades, resulting in a decrease in the prestress of the reinforcement device. The existing reinforcement device needs to be dismantled and reset. However, after reinforcement in steps S1 to S5 in this embodiment, if the prestressed tendons 2 relax or prestress loss occurs, the prestressed tendons 2 can be tensioned for a second time by torsion force application, thereby achieving multiple reinforcement of the beam body. During the secondary tensioning, repeat steps S2 to S5. Specifically, first check the anchoring device, then clean the protective layer, and then repeat the twisting operation on each group of prestressed tendon segments 21 through step S2. If there is a lock buckle 6, remove the lock buckle 6 before twisting, and then twist. After the number of turns of the prestressed tendon segments 21 winding around each other increases, measure the tension according to the operation of step S3. When the tension reaches the expected value, use the lock buckle 6 to fix the winding state of each group of prestressed tendon segments 21 to complete the re-application of prestress. At this time, each group of prestressed tendons 2 is tensioned for the second time, and the number of winding turns of each group of prestressed tendon bundles 2 may be different, because when the prestress is applied for the second time, the amount of stress lost by each group of prestressed tendons 2 is compensated for each group, and the stress lost by each group of prestressed tendons 2 may be different; after the prestress is lost, prestress is applied again by each group of prestressed tendon segments 21, so that the prestressed tendons 2 can be tensioned for the second time, and the beam body 1 can be repeatedly prestressed. Finally, steps S4 and S5 are repeated to fix the prestressed tendons 2 and perform anti-corrosion treatment.

[0079] By determining the installation position and installing the anchoring device 4, the connection of the prestressed tendons 2 and the foundation for setting them on the beam body 1 are formed, which facilitates the setting of the prestressed tendons 2 on the beam body 1. By installing the prestressed tendons 2, multiple groups of prestressed tendons 2 can be formed, so as to form multiple groups of prestressed structures, which is convenient for construction. By installing the winch 5 and inserting the rod into the winch 5, it is convenient to twist and prestress the prestressed tendons 2 on the side of the beam body 1. By twisting and measuring the tensile force, it is ensured that the applied prestress meets the requirements. By installing the lock 6, the winding state of each group of prestressed tendons 2 is fixed to maintain the application of prestress. The service life of the prestressed tendons 2 is extended by anti-corrosion treatment.

[0080] The length of the prestressed tendon 2 is selected according to the actual situation of the beam body 1. This embodiment uses a 5-10m prestressed tendon 2 for simulation experiments. The two ends of the prestressed tendon 2 are fixed in the area of ​​the beam body 1 where prestressing is required. After the prestressed tendon 2 is wound, the length of the winding interval, the number of turns, the distance between turns, and the length of the steel strand after winding are measured, and the elongation of the prestressed tendon 2, the tension stress, the torsional normal force of the prestressed tendon, the rotational torque, and the 1.5-meter wrench force are calculated. As shown in Table 1 below:

[0081] Table 1 Prestressed tendon tension calculation table

[0082]

[0083] Through simulation calculation of the winding and tensioning of prestressed tendon 2, it can be known that the tensioning of prestressed tendon 2 should be closely related to the spacing of one circle of prestressed tendon 2. The stress of 1116MPa corresponds to a spacing of about 0.4m for one circle of rotation. The maximum load to be applied by a 1.5m long rotary wrench during tensioning is 31.4kg. Theoretically, one person can complete the tensioning operation of the extracorporeal prestressing of prestressed tendon 2.

[0084] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A bridge external twisted prestressed reinforcement device, characterized in that: It comprises prestressed tendons and anchoring devices, wherein the two ends of the prestressed tendons are respectively fixed to the two ends on the same side of the beam body by the anchoring devices, all the prestressed tendons are an even number, each section of the prestressed tendons is arranged in parallel, two adjacent prestressed tendons form a group, each group of the prestressed tendons is wound in the same direction and can apply prestress to the beam body, and a winch is arranged in the middle section of each group of the prestressed tendon sections; At least two through holes are provided on the capstan, and each group of the prestressed tendon segments passes through the corresponding through holes on the capstan. Rotating the capstan can twist the prestressed tendon segments in the same direction and apply prestress to the beam body; The middle section of each group of the prestressed tendon segments forms a bayonet after winding, and a lock buckle is provided at the bayonet. The lock buckle is fixed to the beam body so that the corresponding prestressed tendon segment is fixed relative to the beam body.

2. The bridge external twisted prestressed reinforcement device according to claim 1 is characterized in that: It also includes anchor heads, which are arranged at both ends of the prestressed tendons and are used to fix the prestressed tendons on the anchoring device.

3. The bridge external twisted prestressed reinforcement device according to claim 1 is characterized in that: The anchoring device is a concrete block or a steel member.

4. The bridge external twisted prestressed reinforcement device according to claim 3 is characterized in that: The ends of the prestressed tendons are fixed to the ends of the beam body by casting concrete blocks. Anchor steel bars and steel mesh are arranged in the concrete blocks. One end of the anchor steel bars is implanted and fixed in the anchoring holes drilled at the two ends of the beam body.

5. The bridge external twisted prestressed reinforcement device according to claim 3 is characterized in that: The steel component includes an anchor plate, a fixing plate, a limiting plate and a locking piece. The anchor plate is provided with a mounting hole and can be fixed to the beam body through the mounting hole. One side of the fixing plate is connected to the side of the anchor plate, and the other side of the fixing plate is recessed with a limiting opening. The limiting plate is connected to the fixing plate through a locking piece.

6. The bridge external twisted prestressed reinforcement device according to claim 1 is characterized in that: It also includes a shock absorbing device, at least two of which are arranged at intervals between each group of prestressed tendons and the beam body; or a capstan seat is arranged between the capstan and the beam body, and the capstan seat is made of soft material.

7. The bridge external twisted prestressed reinforcement device according to claim 1 is characterized in that: The installation position of the prestressed tendons and the end of the beam body is 50 to 100 cm away from the end of the beam body, and there is a gap between the prestressed tendons and the beam body.

8. A reinforcement method for an external twisted prestressed reinforcement device for a bridge, using the external twisted prestressed reinforcement device for a bridge according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1. Determine the installation positions of the anchor heads for fixing the ends of the prestressed tendons at the two ends of the same side of the beam body, install anchoring devices at the two ends of the beam body, fix the two ends of the prestressed tendons to the anchoring devices respectively, and install multiple prestressed tendons side by side; S2. Apply a torsional normal force to each group of prestressed tendons at the middle position of each group of prestressed tendons to perform twisting; S3. When the number of twisting turns reaches the design value, stabilize for a period of time and measure the tension. If the prestressing value requirement is not reached, continue twisting. If the prestressing value requirement is reached, stop twisting and fix the corresponding group of prestressed tendons; S4, maintaining the torsion state of each group of prestressed tendons, and fixing each group of prestressed tendons after torsion to the beam body; S5. All prestressed tendons and anchoring devices shall be treated with anti-corrosion measures.

9. The reinforcement method of the bridge external twisted prestressed reinforcement device according to claim 8 is characterized in that: If the prestressed tendons are loose or prestress loss occurs, first release the fixation between each group of prestressed tendons and the beam body, and then repeat steps S2-S4 to complete the re-application of prestress.

10. The reinforcement method of the bridge external twisted prestressed reinforcement device according to claim 8, characterized in that: The number of torsion turns n of the prestressed tendon is based on Determine; among them, is the design tensile stress of a single prestressed tendon, is the elastic modulus of the prestressed tendons, is the beam length, is the distance between the installation positions at both ends of the prestressed tendon segment, is the diameter of a single prestressed tendon.

Citation Information

Patent Citations

  • Reinforcing apparatus of control steel strand wires prestressing force value

    CN206681268U

  • Locking structure for external prestressing tendon stranding type reinforcement of bridge

    CN217352194U

  • The cross-lined steel wire rope support and thereinforcement method of construction using of thecross-lined steel wire rope support

    KR1020050061435A