A tunnel construction method based on arc steel mold trolley
Through the design of the arc steel formwork trolley and the synergy of the lifting device and the driving cylinder, the efficient demoulding of the secondary lining construction of the tunnel is achieved, which solves the problems of high demoulding difficulty and low safety of the traditional trolley, and improves the efficiency of the tunnel secondary lining construction. Construction efficiency and safety.
Patent Information
- Application Number
- CN202210092889.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-12-31
AI Technical Summary
During the demoulding process of traditional trolleys, the driving cylinders of multiple formwork are easy to interfere with each other, resulting in high difficulty and low efficiency in demoulding. After demoulding, the formwork is close to the inner wall of the tunnel and is prone to collision, affecting construction efficiency and safety.
An arc steel formwork trolley is used, including a first mast, a second mast and a mold supporting mechanism. The second mast is equipped with lifting devices and work stations in the front and rear directions. The mold supporting mechanism includes template components, driving cylinders and adjusting wires. Through the synergy of the driving cylinder and the adjusting screw, the formwork components can be supported and demoulded simultaneously to reduce the difficulty of demoulding, and the formwork components can be gathered in the demoulding state to avoid collision with the inner wall of the tunnel.
It improves the efficiency of tunnel secondary lining construction, reduces the difficulty of demoulding, enhances construction safety, and ensures the stability and safety of the formwork components during movement.
Smart Images

Figure CN114526090B_ABST
Abstract
Description
[0001] This application is a divisional application with the application date of "2021.12.31", application number "202111679334.2", and application name "Arc steel mold trolley and tunnel construction method using the same". Technical Field
[0002] The invention relates to the technical field of tunnels, and in particular to a tunnel construction method based on an arc steel mold trolley. Background Art
[0003] For tunnels with high sealing requirements, secondary lining is required after shield construction to meet the requirements of reinforcement support, sealing and waterproofing. In related technologies, the secondary lining construction of tunnels generally requires the use of a trolley for pouring, and the trolley's template is driven by the cylinder to support or demold. However, during the demolding process of traditional trolleys, the driving cylinders of multiple templates are prone to mutual interference, resulting in greater difficulty in demolding and lower efficiency. Moreover, after demolding, the distance between the template and the inner wall of the tunnel is relatively close, and it is easy to collide with the inner wall of the tunnel during the movement of the trolley. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, the present invention proposes a tunnel construction method based on an arc steel mold trolley, which can reduce the demoulding difficulty and improve the demoulding efficiency, thereby greatly improving the efficiency of tunnel secondary lining construction.
[0005] According to an embodiment of the present invention, a tunnel construction method based on an arc steel formwork trolley is provided, wherein the arc steel formwork trolley comprises a first gantry, a second gantry and a formwork support mechanism, both ends of the second gantry along the front-to-back direction are provided with lifting devices, the second gantry is provided with a first workstation and a second workstation along the front-to-back direction, the first gantry is movably sleeved on the second gantry and can move between the first workstation and the second workstation; the formwork support mechanism comprises a template assembly, a first driving cylinder, a second driving cylinder, a third driving cylinder and an adjusting screw, the template assembly comprises an upper template, a first side template, a second side template and a lower template; the upper template, the first side template, the lower template and the The second side formwork is sequentially connected and arranged around the first portal; the two ends of the first driving cylinder are respectively hinged to the first side formwork and the first portal, the two ends of the second driving cylinder are respectively hinged to the second side formwork and the first portal, and the two ends of the third driving cylinder are respectively hinged to one end of the upper formwork close to the first side formwork and one end of the first side formwork close to the upper formwork; the two ends of the adjusting screw can be respectively hinged to the first portal and one end of the upper formwork away from the first side formwork; in the front-to-back direction, the length of the second portal is L1, and the length of the formwork assembly is L2, which satisfies: L1 / L2≥2; the construction method includes The method comprises the following steps: setting up a first steel mesh frame on the inner wall of the tunnel; moving the first gantry from the first station to the second station; the lifting device driving the second gantry to descend to a first target position so that the lower template matches the partial structure corresponding to the first steel mesh frame; the second driving cylinder driving the second side template to move to a position matching the partial structure corresponding to the first steel mesh frame; the first driving cylinder driving the first side template to move to a position matching the partial structure corresponding to the first steel mesh frame; the third driving cylinder driving the upper template to move to a position matching the partial structure corresponding to the first steel mesh frame; installing the adjusting screw, and The adjusting screw adjusts the position of the upper template; concrete is poured between the template assembly and the inner wall of the tunnel; the lifting device retracts and disengages from the supporting surface of the tunnel; the second gantry moves along the extension direction of the tunnel to switch the first gantry from the second station to the first station; the lifting device extends and is supported on the supporting surface; the adjusting screw is removed; the third driving cylinder drives the upper template to reset and demold; the first driving cylinder drives the first side template to reset and demold; the second driving cylinder drives the second side template to reset and demold; the lifting device drives the second gantry to rise to the second target position to demold the lower template.
[0006] The tunnel construction method based on the arc steel mold trolley according to the embodiment of the present invention has at least the following beneficial effects:
[0007] In the construction of the secondary lining of the tunnel, the embodiment of the present invention adopts an arc steel mold trolley to realize the integral casting of the second lining of the cylindrical tunnel segment. The arc steel mold trolley moves along the extension direction of the tunnel and continues to cast the second lining of the remaining tunnel segments; the arc steel mold trolley includes a first gantry, a second gantry and a mold support mechanism. The second gantry is provided with a first station and a second station. The first gantry is fixedly connected to the mold support mechanism and movably sleeved on the second gantry, so that it can switch positions between the first station and the second station. The second gantry is supported on the supporting surface of the tunnel. The mold support mechanism can complete the processes of mold support, casting, and molding at the second station under the drive of the first gantry. At the same time, before demoulding, the second gantry is separated from the supporting surface and moves along the extension direction of the tunnel, so that the mold support mechanism is switched to the first station. The second gantry is supported on the supporting surface of the tunnel again. At this time, the mold support mechanism completes demoulding at the first station, and moves to the second station again to realize the processes of mold support, casting, and molding of the second lining of the next tunnel segment, thereby realizing the cycle of integral casting of the second lining of the tunnel segment. The embodiment of the present invention realizes the integral casting of the secondary lining of multiple tunnel sections through the step-changing operation of the second gantry and the formwork mechanism, thereby improving the efficiency of the secondary lining construction. The formwork mechanism includes a formwork assembly, a first driving oil cylinder, a third driving oil cylinder and an adjusting screw. The formwork assembly includes an upper formwork and a first side formwork. The two ends of the first driving oil cylinder are respectively hinged to the first side formwork and the first gantry. The two ends of the third driving oil cylinder are respectively hinged to one end of the upper formwork close to the first side formwork and one end of the first side formwork close to the upper formwork. The two ends of the adjusting screw can be respectively hinged to the first gantry and one end of the upper formwork away from the first side formwork. The connection method of the third driving oil cylinder and the adjusting screw enables the first side formwork and the upper formwork to be synchronously supported and demolded through the first driving oil cylinder and the third driving oil cylinder, respectively, which reduces the difficulty of demolding, improves the demolding efficiency, and further improves the efficiency of the secondary lining construction of the tunnel. Moreover, the formwork assembly can be more retracted to the first gantry in the demolding state, effectively avoiding the collision of the first gantry with the inner wall of the tunnel during movement, thereby improving the safety of construction.
[0008] According to some embodiments of the present invention, before the second portal moves along the extension direction of the tunnel, the method includes: erecting a second steel mesh frame on the inner wall of the tunnel in the extension direction.
[0009] According to some embodiments of the present invention, the first gantry is provided with a first supporting device at both ends along the front-to-back direction, the first supporting device includes a limiting oil cylinder and a first supporting beam, and the two ends of the limiting oil cylinder are respectively connected to the first gantry and the first supporting beam; before pouring concrete between the formwork assembly and the inner wall of the tunnel, it also includes: the limiting oil cylinder drives the first supporting beam to support the supporting surface of the tunnel; before the lifting device drives the second gantry to rise to the second target position, it also includes: the limiting oil cylinder retracts and disengages from the supporting surface.
[0010] According to some embodiments of the present invention, after the first door frame moves from the first station to the second station, the process further includes: cleaning the outer surface of the template assembly.
[0011] According to some embodiments of the present invention, cleaning the outer surface of the formwork assembly includes: cleaning the concrete and curing agent on the outer surfaces of the upper formwork, the first side formwork, the second side formwork and the lower formwork; and applying a release agent on the outer surfaces of the upper formwork, the first side formwork, the second side formwork and the lower formwork.
[0012] According to some embodiments of the present invention, the formwork mechanism further includes a plurality of end form units, which are arranged around the front end of the formwork assembly along the moving direction of the formwork mechanism, and the end form unit includes a first baffle, a second baffle, a limiter, a rotating member, a support rod and a limit screw. The first baffle and the second baffle are spaced apart in the radial direction of the formwork assembly and form a connecting port. The first baffle and the second baffle are connected through the limiter, one end of the rotating member is fixedly connected to the first baffle and / or the second baffle, and the other end of the rotating member is hinged to the formwork assembly. One end of the limit screw is fixedly connected to the formwork assembly through the support rod, and the other end is hinged to the first baffle or the second baffle. Before pouring concrete between the formwork assembly and the inner wall of the tunnel, the method further includes: installing a plurality of limit screws, and supporting the plurality of end form units between the formwork assembly and the inner wall of the tunnel through the plurality of limit screws. Before the lifting device drives the second gantry to rise to the second target position, the method further includes: removing a plurality of limit screws and resetting the plurality of end form assemblies.
[0013] According to some embodiments of the present invention, after installing the plurality of limit screws and supporting the plurality of end mold units between the template assembly and the inner wall of the tunnel through the plurality of limit screws, it also includes: installing the embedded parts between the template assembly and the inner wall of the tunnel through the connecting port; and closing the connecting port with a sealing strip.
[0014] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention will be further described below with reference to the accompanying drawings and embodiments, wherein:
[0016] Figure 1 It is a schematic diagram of the overall structure of a circular arc steel mold trolley according to an embodiment of the present invention;
[0017] Figure 2 It is a schematic diagram of the formwork construction of the arc steel formwork trolley according to one embodiment of the present invention;
[0018] Figure 3 It is a schematic diagram of demoulding construction of a circular arc steel mold trolley according to an embodiment of the present invention;
[0019] Figure 4 It is a schematic diagram of the retraction of the lifting device of the arc steel mold trolley according to one embodiment of the present invention;
[0020] Figure 5 yes Figure 4 Sectional view in the AA direction;
[0021] Figure 6 yes Figure 5 The enlarged view of point B in the middle;
[0022] Figure 7 It is a schematic diagram of a lifting device of a circular arc steel mold trolley according to an embodiment of the present invention;
[0023] Figure 8 It is an exploded schematic diagram of a second supporting device of a circular arc steel mold trolley according to an embodiment of the present invention;
[0024] Fig. 9 It is a schematic diagram of a synchronous circuit of an arc steel mold trolley according to an embodiment of the present invention;
[0025] Fig.10 It is a schematic diagram of the adjusting screw structure of the arc steel mold trolley according to an embodiment of the present invention;
[0026] Fig.11 It is an exploded schematic diagram of an adjustment screw of an arc steel mold trolley according to an embodiment of the present invention;
[0027] Fig.12 It is a structural schematic diagram of a first side template of a circular arc steel mold trolley according to an embodiment of the present invention;
[0028] Fig.13 It is a structural schematic diagram of the first side template of the arc steel mold trolley from another perspective of an embodiment of the present invention;
[0029] Fig.14 It is a schematic diagram of the structure of the end mold unit of the arc steel mold trolley according to an embodiment of the present invention;
[0030] Fig.15a It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to an embodiment of the present invention;
[0031] Fig.15b It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to an embodiment of the present invention;
[0032] Fig.16It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to another embodiment of the present invention;
[0033] Fig.17 It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to another embodiment of the present invention;
[0034] Fig.18 It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to another embodiment of the present invention;
[0035] Fig.19 It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to another embodiment of the present invention;
[0036] Fig. 20 It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to another embodiment of the present invention;
[0037] Fig.21 It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to another embodiment of the present invention;
[0038] Fig. 22 It is a flow chart of a tunnel construction method based on a circular arc steel mold trolley according to another embodiment of the present invention;
[0039] Fig.23 It is a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention. DETAILED DESCRIPTION
[0040] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0041] In the description of the present invention, it is necessary to understand that descriptions involving orientation, such as up, down, left, right, etc., the orientations or positional relationships indicated are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0042] In the description of the present invention, the meaning of "a plurality" is more than two, and "exceed" etc. is understood to exclude the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0043] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.
[0044] Reference Figure 1 , Figure 2 and Figure 5 As shown, it is a schematic diagram of the overall structure of the arc steel mold trolley 1000 provided in an embodiment of the present invention, which can be used for tunnel lining, especially for secondary lining after initial tunnel support. The arc steel mold trolley 1000 includes a second gantry 100, a first gantry 200 and a formwork mechanism 300. A lifting device 110 is provided at both the front and rear ends of the second gantry 100, which is used to drive the second gantry 100 to rise or fall, and then drive the first gantry 200 and the formwork mechanism 300 to rise or fall. The second gantry 100 is partially penetrated through the first gantry 200, and the second gantry 100 and the first gantry 200 can move relative to each other. When the second gantry 100 supports the first gantry 200, the first gantry 200 can move along the front and rear direction of the second gantry 100; when the first gantry 200 supports the second gantry 100, refer to Figure 4 As shown, the lifting device 110 retracts and detaches from the supporting surface of the tunnel, and the second gantry 100 can move along the front-rear direction of the first gantry 200, and the movement of the arc steel mold trolley 1000 is achieved by supporting each other. It should be noted that the relative movement of the second gantry 100 and the first gantry 200 can be achieved by a motor driving a gear, and the gear and the rack can be moved in a manner, or by a winch driving a wire rope, and the present invention does not make specific restrictions. The cooperation method of the second gantry 100 and the first gantry 200 can be in the form of a ball and a slide groove, or in the form of a guide wheel 220 and a guide rail 130. In the following description, the present invention is illustrated by the form of a guide wheel 220 cooperating with a guide rail 130.
[0045] Reference Figure 2 and Figure 3 As shown, Figure 2 This is a schematic diagram of the formwork of the arc steel mold trolley 1000. Figure 3 This is a schematic diagram of the arc steel mold trolley 1000 demoulding. Figure 2 and Figure 3The middle section line is the poured concrete, and the outer side of the concrete is the pipe segment. The formwork mechanism 300 includes a formwork assembly 310, a first driving cylinder 320, a second driving cylinder 330 and a third driving cylinder 340. The formwork assembly 310 includes an upper formwork 311, a first side formwork 312, a lower formwork 313 and a second side formwork 314 which are sequentially arranged around the first portal 200. The upper formwork 311, the first side formwork 312, the lower formwork 313 and the second side formwork 314 are sequentially hinged by latches, the upper formwork 311 is located above the first portal 200, the first side formwork 312 and the second side formwork 314 are respectively located on the left and right sides of the first portal 200, and the lower formwork 313 is located below the first portal 200 and is fixedly connected to the first portal 200. The formwork assembly 310 is used to enclose a pouring area with the tunnel wall to facilitate the shaping of concrete.
[0046] Reference Figure 4 As shown, one end of the first driving cylinder 320 is hinged to the first side template 312, and the other end of the first driving cylinder 320 is hinged to the first gantry 200; one end of the second driving cylinder 330 is hinged to the second side template 314, and the other end of the second driving cylinder 330 is hinged to the first gantry 200; one end of the third driving cylinder 340 is hinged to one end of the upper template 311 close to the first side template 312, and the other end of the third driving cylinder 340 is hinged to one end of the first side template 312 close to the upper template 311, and the third driving cylinder 340 can drive the upper template 311 and the second side template 314 to be connected or separated from each other. The first driving cylinder 320, the second driving cylinder 330 and the third driving cylinder 340 are all used to drive the corresponding template assembly 310 to approach the first gantry 200 to achieve demolding, or to move away from the first gantry 200 to achieve formwork.
[0047] Reference Figure 5 As shown, the length of the second portal 100 along the front-to-back direction is L1, the length of the template assembly 310 is L2, and L1 and L2 satisfy L1 / L2≥2. It can be understood that the template assembly 310 needs to move along the front-to-back direction of the second portal 100 to achieve different positions of the casting tunnel, so the length of the second portal 100 needs to be greater than or equal to twice that of the template assembly 310 so that the template assembly 310 can move smoothly to achieve demoulding.
[0048] Reference Figure 2As shown, the mold support mechanism 300 further includes a first adjusting screw 350, a second adjusting screw 360 and a third adjusting screw 370. The upper mold plate 311 is hinged to the first door frame 200 through the first adjusting screw 350, the first side mold plate 312 is hinged to the first door frame 200 through the second adjusting screw 360, and the second side mold plate 314 is hinged to the first door frame 200 through the third adjusting screw 370. Among them, one end of the first adjusting screw 350 is hinged to one end of the upper mold plate 311 away from the first side mold plate 312, and the other end of the first adjusting screw 350 is hinged to the first door frame 200. The first adjusting screw 350, the second adjusting screw 360 and the third adjusting screw 370 are all used to adjust the position of the corresponding template assembly 310. After determining the position of the template assembly 310, the first adjusting screw 350, the second adjusting screw 360 and the third adjusting screw 370 can be used to support the template assembly 310 and can limit the position of the template assembly 310 so that the template assembly 310 can be in a suitable casting position.
[0049] The structure of the first adjusting screw 350 is specifically referred to Fig.10 and Fig.11 As shown, the first adjusting screw 350 includes a first screw rod 351, a first nut 352, a second nut 353, a second screw rod 354 and an adjusting sleeve 355. The first screw rod 351 and the second screw rod 354 are respectively screwed to the two ends of the adjusting sleeve 355. The first nut 352 is screwed to the first screw rod 351 to limit the relative rotation between the first screw rod 351 and the adjusting sleeve 355. The second nut 353 is screwed to the second screw rod 354 to limit the relative rotation between the second screw rod 354 and the adjusting sleeve 355. The position of the template assembly 310 is adjusted by rotating the adjusting sleeve 355 to change the overall length of the first adjusting screw rod 350. After the position of the template assembly 310 is determined, the length of the first adjusting screw rod 350 is fixed by the first nut 352 and the second nut 353, thereby fixing the position of the template assembly 310. It should be noted that the structures of the second adjusting screw 360 and the third adjusting screw 370 are basically the same as those of the first adjusting screw 350 and will not be repeated here. The structures of the second adjusting screw 360 and the third adjusting screw 370 can be understood by referring to the structure of the first adjusting screw 350.
[0050] Reference Figure 2 As shown, the upper template 311 abuts against the second side template 314 during the mold support process. The wall where the second side template 314 abuts against the upper template 311 is provided with a rubber gasket to reduce wear. After abutment, the second side template 314 and the upper template 311 can be fixedly connected by bolts or pins, and the position of the upper template 311 can also be limited only by the first adjusting screw 350. During the demoulding process, refer to Figure 3As shown, if bolts or latches are provided between the upper template 311 and the second side template 314, the bolts or latches need to be removed first, and the first adjusting screw 350, the second adjusting screw 360 and the third adjusting screw 370 need to be removed, and then the first driving cylinder 320, the second driving cylinder 330 and the third driving cylinder 340 are controlled to drive the corresponding template assembly 310 to demould. After demoulding, the upper template 311 is separated from the second side template 314, and the other templates are still hinged. The lower template 313 needs to be lifted by the lifting device 110 to increase the height of the template assembly 310 to achieve demoulding.
[0051] Reference Figure 3 In order to make the upper template 311, the first side template 312 and the second side template 314 closer to the first door frame 200 during the demoulding process, the third driving cylinder 340 is set on the upper template 311 and the first side template 312. It is understandable that during the demoulding process, if the third driving cylinder 340 is connected to the first gantry 200, since the distance between the upper template 311 and the first gantry 200 is relatively far, the length of the third driving cylinder 340 is relatively long, resulting in a decrease in rigidity, and vibration is likely to occur during the driving process, resulting in unstable driving; when the third driving cylinder 340 shrinks to demould, if the first driving cylinder 320 also shrinks to demould, under unstable control, it is easy to cause a certain template to be too fast or too slow, thereby damaging the cylinder. In order to reduce the occurrence of this situation, the third driving cylinder 340 is usually required to drive the upper template 311 to demould first, and the first driving cylinder 320 can drive the demoulding; due to the length limitation of the third driving cylinder 340, its deflection angle is limited, which limits the upper template 311, the first side template 312 and the second side template 314 from approaching the first gantry 200.
[0052] Setting the third driving cylinder 340 on the upper template 311 and the first side template 312 can reduce the above-mentioned problems. The upper template 311 is adjacent to the first side template 312, so the length of the third driving cylinder 340 is shorter than when it is set on the first gantry 200, and its rigidity is better, which can reduce the occurrence of vibration and improve the driving stability; the third driving cylinder 340 can work simultaneously with the first driving cylinder 320 without affecting each other, which can improve the efficiency of demolding or supporting the formwork; during the demolding process, the third driving cylinder 340 has little effect on the overall rotation position of the template, so the template can be closer to the first gantry 200, which can reduce the situation where the supporting formwork mechanism 300 hits the inner wall of the tunnel or the steel bars during movement.
[0053] Reference Figure 1 As shown, in some embodiments, the upper template 311, the first side template 312 and the second side template 314 all include an arc plate 3121 and a plurality of reinforcing rib plates 3122. Fig.12 and Fig.13, taking the first side formwork 312 as an example for explanation. The inner wall surface of the arc plate 3121 is staggered with multiple reinforcing rib plates 3122 to improve the overall strength of the arc plate 3121, reduce the deformation of the arc plate 3121, and improve its stability. Among them, the arc plate 3121 is integrally formed. It can be understood that the arc plate 3121 is integrally formed, and its surface quality is good, smooth and flat, and the surface of the concrete structure is smooth and flat when demolding. If the first side formwork 312 is spliced by multiple pieces, stress concentration is easy to occur at the splicing point, causing the first side formwork 312 to deform and affect the casting effect; and the arc plate 3121 is integrally formed and can be subjected to aging treatment after manufacturing to reduce the phenomenon of stress concentration.
[0054] In some embodiments, the curved plate 3121 is made of manganese steel, which is a high-strength steel material mainly used for harsh working conditions such as impact, extrusion, and material wear, and has excellent alkali and corrosion resistance. It is understandable that concrete is usually alkaline and easily corrodes the curved plate 3121. Using manganese steel to make the curved plate 3121 can reduce the corrosion of the curved plate 3121.
[0055] Reference Fig. 9 As shown, in some embodiments, in order to improve the synchronization of the driving of the first driving cylinder 320, multiple first driving cylinders 320 are connected by a synchronization valve (the second driving cylinder 330 and the third driving cylinder 340 are also connected by a synchronization valve to ensure the synchronization of the driving, and the structure and function are basically similar to the first driving cylinder 320, and the first driving cylinder 320 is used as an example for illustration). Commonly used synchronization valves are diverter valves and diverter and collector valves 420. Taking the diverter and collector valve 420 as an example, the diverter and collector valve 420 can be used to synchronize the first driving cylinder 320 in both directions. The diverter and collector valve 420 can also be used for a synchronization circuit 400 with a large load difference, and speed synchronization can still be guaranteed when the load is completely biased, and the synchronization accuracy is high. Among them, the synchronization circuit 400 refers to two or more hydraulic actuators in the hydraulic system running synchronously with the same displacement or the same speed (or fixed speed ratio).
[0056] Reference Fig. 9As shown, taking the driving of two first driving cylinders 320 as an example, when the reversing valve 440 is connected to the circuit in the left position, the hydraulic oil of the hydraulic pump 460 is divided into two equal amounts of hydraulic oil through the diverter and collector valve 420 and enters the first driving cylinder 320, so that the first driving rods of the two cylinders rise synchronously; when the reversing valve 440 is connected to the circuit in the right position, the diverter and collector valve 420 plays a collecting role and controls the pistons of the two cylinders to descend synchronously. The hydraulically controlled one-way valve 410 in the circuit is to prevent the two first driving cylinders 320 from moving due to different loads when the stroke stops midway. If one of the first driving cylinders 320 reaches the end of the stroke first, oil can flow through the throttle hole in the one-way throttle valve 430, so that each cylinder can reach the end, thereby eliminating the accumulated error. Among them, the overflow valve 450 plays a safety protection role and releases pressure when the pressure exceeds the threshold. The synchronization circuit 400 can keep the driving of the first driving cylinder 320 synchronized and reduce the deformation of the template assembly 310.
[0057] Reference Figure 5 and Figure 6 As shown, in some embodiments, the second gantry 100 includes a guide rail 130, which extends along the front-rear direction of the second gantry 100, and two guide rails 130 are arranged at intervals at the upper end and the lower end of the second gantry 100, and the first gantry 200 includes a guide wheel group, and two rows of guide wheel groups corresponding to the positions of the guide rails 130 are arranged at intervals at the upper end and the lower end of the first gantry 200, and each row of guide wheel groups includes a plurality of guide wheels 220, and the guide wheels 220 are arranged at intervals along the extension direction of the guide rails 130. The guide rails 130 and the guide wheels 220 roll in coordination, so that the second gantry 100 and the first gantry 200 can slide relative to each other.
[0058] It should be noted that the number of guide rails 130 can be three, four or other numbers, which can be selected according to actual needs; the number of guide wheels 220 can also be other numbers, which can be selected according to actual needs. In some embodiments, the guide rails 130 can also be arranged on the first door frame 200, and the guide wheels 220 can be arranged on the second door frame 100.
[0059] Reference Figure 3 , Figure 4 and Figure 5As shown, the first gantry 200 also includes a first support device 210, and the first support device 210 is provided at both the front and rear ends of the first gantry 200. It can be understood that the arc steel mold trolley 1000 is basically supported in the tunnel by its own gravity. During the pouring process, the concrete easily lifts the arc steel mold trolley 1000, causing the position of the arc steel mold trolley 1000 to change, affecting the pouring effect. Therefore, the first support device 210 is used to fix the position of the arc steel mold trolley 1000. The first support device 210 includes a first support beam 211 and two limit cylinders 212. The two limit cylinders 212 are spaced apart on the left and right sides of the first gantry 200, and the output ends are fixedly connected to the first support beam 211. The shape of the first support beam 211 matches the wall of the tunnel or the shape of the steel mesh. The limiting cylinder 212 drives the first support beam 211 in the vertical direction to abut against the tunnel wall or the steel bars fixed on the tunnel wall to limit the position of the arc steel mold trolley 1000, reduce the problem of the arc steel mold trolley 1000 being lifted up, and improve the stability of the arc trolley.
[0060] Reference Figure 7 and Figure 8 As shown, the lifting device 110 includes two legs 111, each leg 111 includes a fixing member 1111, a lifting cylinder 1112, a guide member 1114 and a sliding member 1113, the fixing member 1111 is fixedly connected to the guide member 1114, a cavity is formed inside the guide member 1114, and the sliding member 1113 is arranged in the cavity, one end of the lifting cylinder 1112 is connected to the fixing member 1111, and the other end of the lifting cylinder 1112 is connected to the sliding member 1113, so that the sliding member 1113 can slide along the axial direction of the guide member 1114, thereby driving the second gantry 100 to move in the vertical direction.
[0061] Continue to refer to Figure 7 and Figure 8As shown, the second gantry 100 also includes a second supporting device 120, and the second supporting device 120 is provided at both the front and rear ends of the second gantry 100. The second supporting device 120 is connected to the two legs 111 and is used to drive the arc steel mold trolley 1000 to deviate to the left or right. The second supporting device 120 includes a connecting member 121, a second supporting beam 123 and an adjusting cylinder 122. The connecting member 121 includes a plurality of channel steels 1211 and a plurality of connecting ribs 1212. The plurality of channel steels 1211 are connected in sequence to enclose a cavity, and some of the channel steels 1211 are fixedly connected to the legs 111 through the connecting ribs 1212. The adjusting cylinder 122 is arranged in the cavity enclosed by the channel steels 1211, and one end of the adjusting cylinder 122 is connected to the channel steel 12111, and the other end is connected to the second supporting beam 123. The legs 111 are provided with a moving member 112, and the cross section of the moving member 112 is "L" shaped. There are four moving parts 112, and each support leg 111 is provided with a moving part 112 in the front and rear directions (the "four, two" mentioned above are only some embodiments of the present invention, and can also be other numbers, for example, there are eight moving parts 112, and each support leg 111 is provided with four, which is selected according to the actual situation), and the second support beam 123 is slidably connected to the support leg 111 through the moving part 112. It can be understood that when the tunnel turns, it is necessary to adjust the position of the arc steel mold trolley 1000, and the second support beam 123 abuts against the inner wall of the tunnel. Under the drive of the adjusting cylinder 122, the arc steel mold trolley 1000 can be offset as a whole, thereby adjusting the lateral position of the arc steel mold trolley 1000.
[0062] Reference Figure 8 As shown, the second support beam 123 is provided with a partition 124, which is arranged between the second support beam 123 and the support leg 111 and fixedly connected to the second support beam 123. The partition 124 is used to reduce the contact area between the second support beam 123 and the support leg 111, thereby reducing the friction force, which can improve the smoothness of sliding and reduce the phenomenon of getting stuck. In some embodiments, the partition 124 is in the shape of a long strip and is arranged along the extension direction of the second support beam 123. Two partitions 124 are arranged at each end of the second support beam 123, which can reduce the shaking of the second support beam 123. It should be noted that the partition 124 can also be other shapes, such as cylindrical, elliptical, etc. The partition 124 can also be other quantities, such as six, eight, etc.
[0063] Reference Figure 4As shown, the formwork mechanism 300 also includes an end form unit 500, which is arranged at the end of the moving direction of the formwork assembly 310. The end form unit 500 has multiple pieces and is arranged around the formwork assembly 310. The end form unit 500 is used to cooperate with the formwork assembly 310 and the tunnel wall to form a closed space for pouring concrete. It can be understood that during the first pouring process of the tunnel, the front and rear ends of the formwork assembly 310 are provided with end form units 500 to pour the first reinforced concrete structure. After the pouring is completed, the first reinforced concrete structure can act as the end form unit 500. Therefore, the end of the formwork assembly 310 close to the reinforced concrete structure does not need to be provided with the end form unit 500, and only the end of the formwork assembly 310 away from the reinforced concrete structure needs to be provided with the end form unit 500, that is, the end of the moving direction of the formwork assembly 310. It should be noted that the moving direction refers to the forward direction of the arc steel form trolley 1000 during construction.
[0064] Specifically, refer to Fig.14 As shown, the end mold unit 500 includes a first baffle 510, a second baffle 520, a stopper 530, a rotating member 540, a support rod 550 and a stopper screw 560. The first baffle 510 and the second baffle 520 are arranged at intervals along the radial direction of the template assembly 310, and a gap is formed by the interval. The embedded parts can be placed through this gap to improve the construction efficiency. The first baffle 510 and the second baffle 520 are connected by a stopper 530. There are two stoppers 530 to make the connection between the first baffle 510 and the second baffle 520 more stable. After the embedded parts are set, it is necessary to use rubber strips to block the gap, and then apply foam glue to improve the sealing effect. The stopper 530 is used to prevent the rubber strip from falling and play a role in limiting the position of the rubber strip. The first baffle 510 and the second baffle 520 are also connected by a rotating member 540, one end of the rotating member 540 is fixedly connected to any one of the first baffle 510 and the second baffle 520, and the other end of the rotating member 540 is hinged to the template assembly 310, so that the end mold unit 500 can be rotatably connected to the template assembly 310 to achieve demolding or supporting the mold. In order to fix the position of the end mold unit 500 when the end mold unit 500 is supporting the mold, a limiting screw 560 is also provided. One end of the support rod 550 is fixedly connected to the template assembly 310, and the other end of the support rod 550 is hinged to one end of the limiting screw 560, and the other end of the limiting screw 560 is hinged to any one of the first baffle 510 and the second baffle 520. The position of the end mold unit 500 can be adjusted by adjusting the length of the limiting screw 560. It should be noted that the structure of the limiting screw 560 can refer to the structure of the first adjustment screw 350.
[0065] In the arc steel mold trolley of the embodiment of the present invention, the second gantry is provided with a first station and a second station along the front-to-back direction, and the first gantry is movably sleeved on the second gantry and can move between the first station and the second station. The first station is located at the rear end along the front-to-back direction, and the second station is located at the front end along the front-to-back direction. The first station and the second station are the positions of the mold support mechanism during casting, and the first gantry can drive the mold support mechanism to move back and forth on the second gantry, thereby switching positions between the first station and the second station.
[0066] Reference Fig.15a and Fig.15b As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to an embodiment of the present invention specifically includes the following steps:
[0067] S1501: A first steel mesh frame is set up on the inner wall of the tunnel. The first steel mesh frame is formed by tying steel bars inside the tunnel segments, and the first steel mesh frame is tied according to the design of the secondary lining of the tunnel.
[0068] S1502: The first gantry moves from the first workstation to the second workstation. The first gantry can achieve relative movement with the second gantry through the cooperation of a winch and a steel wire rope, or the cooperation of a motor and a rack, which is not specifically limited here.
[0069] S1503: The lifting device drives the second gantry to descend to the first target position so that the lower template matches the partial structure corresponding to the first steel mesh frame. The first target position refers to the height position of the second gantry, so that the first gantry is descended to the height position ready for construction, that is, the position where the lower template matches the partial structure corresponding to the first steel mesh frame.
[0070] S1504: The second driving cylinder drives the second side template to move to a position that cooperates with the partial structure corresponding to the first steel bar grid.
[0071] S1505: The first driving cylinder drives the first side template to move to a position that cooperates with the partial structure corresponding to the first steel bar grid.
[0072] S1506: The third driving cylinder drives the upper template to move to a position that matches the partial structure corresponding to the first steel mesh. It should be noted that step 1505 and step 1506 can be performed simultaneously, or sequentially, or alternately according to actual working conditions, so as to achieve the formwork of the upper template and the first side template.
[0073] S1507: Install the adjusting screw and adjust the position of the upper template by adjusting the screw. Since the two ends of the third driving oil cylinder are respectively hinged to the first side template and the upper template, when the third driving oil cylinder is not driven into place, the overall length of the screw can be adjusted to adjust the distance between the upper template and the inner wall of the tunnel, so that the upper template can be moved to a position more suitable for pouring.
[0074] S1508: pouring concrete between the formwork assembly and the inner wall of the tunnel to form a reinforced concrete structure. It is understandable that a pouring port is provided on the formwork assembly, and a plurality of pouring ports may be provided as required, and the plurality of pouring ports are arranged at intervals. During pouring, the pouring port is opened and concrete is poured through the pouring port. When the liquid level of the concrete is about to reach the pouring port, the corresponding pouring port is closed, and a pouring port at a higher position is replaced for pouring. A vibrator may be provided during the pouring process to reduce the formation of bubbles inside the concrete and improve the quality of pouring.
[0075] S1509: The lifting device retracts and leaves the supporting surface of the tunnel. When the reinforced concrete structure reaches the expected strength, the lifting device retracts. At this time, the first gantry supports the second gantry. The retraction of the lifting device can reduce the situation where the lifting device hits the inner wall of the tunnel during the movement of the second gantry.
[0076] S1510: The second gantry moves along the extension direction of the tunnel, so that the first gantry switches from the second station to the first station. The second gantry moves forward to facilitate the first gantry to move forward in the subsequent steps, so as to realize the overall movement of the arc steel mold trolley, that is, from one tunnel section to the next tunnel section.
[0077] S1511: The lifting device extends and is supported on the support surface. At this time, the second door frame supports the first door frame, so that the first door frame can move forward in the subsequent steps.
[0078] S1512: Remove the adjusting screw. It is understandable that the adjusting screw needs to be removed before demoulding the template assembly to prevent the adjusting screw from affecting the rotation of the upper template.
[0079] S1513: The third driving cylinder drives the upper template to reset and demould.
[0080] S1514: The first driving cylinder drives the first side template to reset and demould.
[0081] It should be noted that step 1513 and step 1514 can be performed simultaneously, or one after the other, or alternately according to actual working conditions, so as to achieve demoulding of the upper template and the first side template.
[0082] S1515: The second driving cylinder drives the second side template to reset and demould.
[0083] S1516: The lifting device drives the second gantry to rise to the second target position to demould the lower template. The second target position refers to the height position of the second gantry. The rise of the second gantry drives the rise of the first gantry, thereby driving the template assembly to rise, and realizing demoulding of the lower template.
[0084] In the construction of the secondary lining of the tunnel, the construction method of the embodiment of the present invention adopts an arc steel mold trolley to realize the integral casting of the second lining of the cylindrical tunnel segment. The arc steel mold trolley moves along the extension direction of the tunnel and continues to cast the second lining of the remaining tunnel segments; the arc steel mold trolley includes a first gantry, a second gantry and a mold support mechanism. The second gantry is provided with a first station and a second station. The first gantry is fixedly connected to the mold support mechanism and movably sleeved on the second gantry, so that it can switch positions between the first station and the second station. The second gantry is supported on the supporting surface of the tunnel. The mold support mechanism can complete the processes of mold support, casting, and molding at the second station under the drive of the first gantry. At the same time, before demoulding, the second gantry is separated from the supporting surface and moves along the extension direction of the tunnel, so that the mold support mechanism is switched to the first station. The second gantry is supported on the supporting surface of the tunnel again. At this time, the mold support mechanism completes demoulding at the first station and moves to the second station again to realize the processes of mold support, casting, and molding of the second lining of the next tunnel segment, thereby realizing the cycle of integral casting of the second lining of the tunnel segment. The embodiment of the present invention realizes the integral casting of the secondary lining of multiple tunnel sections through the step-changing operation of the second portal and the formwork mechanism, thereby improving the secondary lining construction efficiency. The construction method of the embodiment of the present invention adopts an arc steel formwork trolley, and the formwork mechanism includes a formwork assembly, a first driving cylinder, a third driving cylinder and an adjusting screw. The formwork assembly includes an upper formwork and a first side formwork. The two ends of the first driving cylinder are respectively hinged to the first side formwork and the first gantry, and the two ends of the third driving cylinder are respectively hinged to one end of the upper formwork close to the first side formwork and one end of the first side formwork close to the upper formwork. The two ends of the adjusting screw can be respectively hinged to the first gantry and one end of the upper formwork away from the first side formwork; the connection mode of the third driving cylinder and the adjusting screw, the setting position of the first driving cylinder and the third driving cylinder enables the first side formwork and the upper formwork to be synchronously adjusted by the first driving cylinder and the third driving cylinder respectively to achieve formwork and demolding, thereby improving the efficiency of formwork and demolding. When the first side formwork and the upper formwork are synchronously demolded, no mutual interference will occur, which reduces the difficulty of demolding and further improves the efficiency of secondary lining construction of the tunnel; and the formwork assembly can be more retracted to the first gantry in the demolding state, which effectively avoids the collision of the first gantry with the inner wall of the tunnel during movement, thereby improving the safety of construction.
[0085] Reference Fig.16 As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention includes the following steps before step S1510:
[0086] S1601: Set up a second steel mesh on the inner wall in the extension direction of the tunnel. The second steel mesh is tied by tying the steel bars in the tunnel segments according to the design of the secondary lining of the tunnel. Step S1601 is generally set between steps S1508 and S1509. While waiting for the reinforced concrete to reach the expected strength, workers can continue to construct the steel mesh for the secondary lining of the next section of the tunnel, thereby shortening the downtime and improving the construction efficiency of the secondary lining of the tunnel.
[0087] Reference Fig.17 As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention includes the following steps before step S1508:
[0088] S1701: The limit cylinder drives the first support beam to support the support surface of the tunnel. Step S1701 is generally set between steps S1507 and S1508, and can also be set between S1503 and S1504. The first support beam applies a force to the inner wall of the tunnel, so that the first door frame and the formwork mechanism can be positioned more accurately with the inner wall of the tunnel, and the first door frame and the formwork mechanism are prevented from slipping when the formwork assembly and the inner wall of the tunnel are poured with concrete, thereby affecting the pouring quality.
[0089] Reference Fig.18 As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention includes the following steps before step S1516:
[0090] S1801: The limit cylinder retracts and leaves the supporting surface. Step S1801 is generally set between steps S1515 and S1516, and can also be set between S1511 and S1512. After the reinforced concrete reaches the expected strength, the formwork assembly is demoulded from the reinforced concrete. Since the demoulding of the lower formwork requires the lifting device to drive the second gantry to rise, thereby driving the first gantry and the formwork assembly to rise, the limit cylinder needs to be retracted to ensure that the limit cylinder does not interfere with the movement of the lifting device.
[0091] Reference Fig.19 As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention includes the following steps after step S1502:
[0092] S1901: Clean the outer surface of the formwork assembly. After multiple demoldings, the outer surface of the formwork assembly will have more substances that affect demolding. Cleaning can improve the demolding effect. In addition, the formwork assembly is cleaned when the formwork mechanism moves to the second station, which has a larger operating space and is more convenient for workers to clean, thereby improving the cleaning efficiency. In addition, in order to further improve the convenience and safety of workers' cleaning, the second steel mesh frame may not be erected on the inner wall in the extension direction of the tunnel. Instead, the formwork mechanism may be moved to the second station to clean the formwork assembly, and then returned to the first station after cleaning. The second steel mesh frame is then erected, and after the second steel mesh frame is erected, the second lining of the next tunnel segment may be poured.
[0093] Reference Fig. 20 As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention, step S1901 specifically includes the following steps:
[0094] S2001: Cleaning the concrete and curing agent on the outer surfaces of the upper formwork, the first side formwork, the second side formwork and the lower formwork.
[0095] S2002: Apply a release agent to the outer surfaces of the upper template, the first side template, the second side template and the lower template.
[0096] By cleaning the curing agent and concrete on the outer surfaces of the upper formwork, the first side formwork, the second side formwork and the lower formwork, the demoulding efficiency can be improved. After cleaning, applying a release agent according to the actual situation can reduce the adhesion of concrete after subsequent pouring and improve the flatness of the inner surface of the secondary lining of the tunnel after demoulding.
[0097] Reference Fig.21 As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention includes the following steps before step S1508:
[0098] S2101: Install multiple limit screws, and support multiple end form units between the formwork assembly and the inner wall of the tunnel through the multiple limit screws. Before pouring concrete, the end form units are supported by the limit screws to prevent concrete from flowing out of the end of the formwork assembly. The structure of the end form unit is conducive to improving the formwork efficiency and the pouring quality of the secondary lining.
[0099] Reference Fig. 22 As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention includes the following steps before step S1516:
[0100] S2201: Remove multiple limit screws and reset multiple end mold assemblies. When the reinforced concrete reaches the expected strength, the end mold unit can be easily reset by removing the limit screws, which improves the demoulding efficiency and facilitates the formwork for pouring the second lining of the next tunnel segment.
[0101] Reference Fig.23 As shown, a flow chart of a tunnel construction method based on an arc steel mold trolley according to another embodiment of the present invention includes the following steps after step S2201:
[0102] S2301: Install the embedded parts between the formwork assembly and the inner wall of the tunnel through the connecting port.
[0103] S2302: Use sealing strips to seal the connecting openings.
[0104] It is understandable that after the end mold unit is supported, the embedded parts can be placed through the connecting port, and placing the embedded parts through the connecting port can improve the construction efficiency of the embedded parts and reduce the construction difficulty of the embedded parts. After the embedded parts are constructed, the connecting port can be sealed with a sealing strip such as a rubber strip, or foam glue can be further applied in the gap between the sealing strip and the connecting port, thereby improving the sealing effect of the end mold unit and improving the casting quality of the secondary lining.
[0105] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A tunnel construction method based on an arc steel mold trolley, characterized in that: The arc steel mold trolley includes a first gantry, a second gantry and a mold supporting mechanism, the second gantry is provided with a lifting device at both ends along the front-to-back direction, the second gantry is provided with a first workstation and a second workstation along the front-to-back direction, the first gantry is movably mounted on the second gantry and can move between the first workstation and the second workstation; the mold supporting mechanism includes a template assembly, a first driving cylinder, a second driving cylinder, a third driving cylinder and an adjusting screw, the template assembly includes an upper template, a first side template, a second side template and a lower template; the upper template, the first side template, the lower template and the second side template are connected in sequence and arranged around the first gantry; the two ends of the first driving cylinder are respectively hinged to the first side template and the first gantry, the two ends of the second driving cylinder are respectively hinged to the second side template and the first gantry, and the two ends of the third driving cylinder are respectively hinged to one end of the upper template close to the first side template and one end of the first side template close to the upper template end; the two ends of the adjusting screw can be respectively hinged to the first door frame and the end of the upper template away from the first side template; in the front-to-back direction, the length of the second door frame is L1, and the length of the template assembly is L2, satisfying: L1 / L2≥2; the mold support mechanism also includes a plurality of end mold units, and the plurality of end mold units are arranged around the front end of the template assembly along the moving direction of the mold support mechanism, and the end mold unit includes a first baffle, a second baffle, a limiting member, a rotating member, a support rod and a limiting screw, the first baffle and the second baffle are spaced apart in the radial direction of the template assembly and form a connecting port, the first baffle and the second baffle are connected through the limiting member, one end of the rotating member is fixedly connected to the first baffle and / or the second baffle, the other end of the rotating member is hinged to the template assembly, one end of the limiting screw is fixedly connected to the template assembly through the support rod, and the other end is hinged to the first baffle or the second baffle; The construction method comprises: Setting up a first steel mesh frame on the inner wall of the tunnel; The first gantry moves from the first station to the second station; The lifting device drives the second gantry to descend to a first target position so that the lower template cooperates with a corresponding part of the structure of the first steel mesh frame; The second driving cylinder drives the second side template to move to a position matching with a partial structure corresponding to the first steel bar grid; The first driving cylinder drives the first side template to move to a position matching with a partial structure corresponding to the first steel bar grid; The third driving cylinder drives the upper template to move to a position matching with the partial structure corresponding to the first steel bar grid; Install the adjusting screw and adjust the position of the upper template by the adjusting screw; Installing a plurality of the limit screws, and supporting a plurality of the end mold units between the template assembly and the inner wall of the tunnel through the plurality of the limit screws; pouring concrete between the formwork assembly and the inner wall of the tunnel; The lifting device is retracted and separated from the supporting surface of the tunnel; The second gantry moves along the extension direction of the tunnel so that the first gantry switches from the second workstation to the first workstation; The lifting device extends out and is supported on the supporting surface; Disassembling the adjusting screw; The third driving cylinder drives the upper template to reset and demould; The first driving cylinder drives the first side template to reset and demould; The second driving cylinder drives the second side template to reset and demould; Removing a plurality of the limit screws and resetting a plurality of the end die units; The lifting device drives the second door frame to rise to a second target position to demould the lower template.
2. A tunnel construction method based on an arc steel mold trolley according to claim 1, characterized in that: Before the second gantry moves along the extension direction of the tunnel, the method comprises: A second steel mesh frame is set up on the inner wall in the extension direction of the tunnel.
3. The tunnel construction method based on the circular arc steel mold trolley according to claim 1 is characterized in that: Both ends of the first mast in the front-to-back direction are provided with a first supporting device, the first supporting device comprises a limit cylinder and a first supporting beam, and both ends of the limit cylinder are respectively connected to the first mast and the first supporting beam; Before pouring concrete between the formwork assembly and the inner wall of the tunnel, the method further comprises: The limiting oil cylinder drives the first support beam to be supported on the support surface of the tunnel; Before the lifting device drives the second gantry to rise to the second target position, the lifting device further includes: The limiting oil cylinder retracts and leaves the supporting surface.
4. The tunnel construction method based on the arc steel mold trolley according to claim 1 is characterized in that: After the first gantry moves from the first station to the second station, the method further comprises: Cleaning the outer surface of the template assembly.
5. The tunnel construction method based on the arc steel mold trolley according to claim 4 is characterized in that: The step of cleaning the outer surface of the template assembly comprises: Cleaning concrete and curing agent on the outer surfaces of the upper formwork, the first side formwork, the second side formwork, and the lower formwork; A release agent is applied to outer surfaces of the upper template, the first side template, the second side template and the lower template.
6. The tunnel construction method based on the arc steel mold trolley according to claim 1 is characterized in that: After the plurality of limit screws are installed and the plurality of end mold units are supported between the template assembly and the inner wall of the tunnel by the plurality of limit screws, the method further includes: Installing the embedded part between the formwork assembly and the inner wall of the tunnel through the communication port; The communication port is sealed with a sealing strip.