A method and system for accelerating water flow in an open water channel
By using axial flow pumps in open water channels to increase the water flow rate, the problem of insufficient water transfer capacity is solved, the channel water transfer capacity is improved, and the engineering efficiency is improved.
Patent Information
- Application Number
- CN202210141560.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-16
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-02-16
AI Technical Summary
The existing channels have insufficient water transfer capacity, especially after the roughness rate increases, resulting in a significant decrease in water transfer capacity, affecting the engineering efficiency.
Axial flow pump is used to increase the flow rate of water flow. By obtaining the change rate of design parameters, determining the current water transfer capacity, determining whether the overflow and head need to be increased, and using one-dimensional model to analyze and calculate the open channel surface line, selecting an adapted axial flow pump to improve the Channel water transfer capacity.
It effectively improves the channel water transport capacity, solves the problem of insufficient water transport capacity, improves the project work efficiency, and avoids the decline in water transport capacity due to the increase in channel roughness.
Smart Images

Figure CN114528624B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of open channel water delivery engineering, and in particular to a method and system for accelerating water flow in an open channel for water delivery. Background Art
[0002] The spatial distribution of water resources in my country is extremely uneven, with more water in the south and less water in the north. Resource-based water shortages have become an important factor restricting my country's economic and social development, especially in the northern region. Long-distance water transfer projects are important water resource optimization and allocation engineering measures to solve the uneven spatial distribution of water resources and resource-based water shortages in my country, and are an important guarantee for my country's water security.
[0003] In order to solve the problem of insufficient water conveyance capacity of the channel, the present invention takes a different approach, using the open channel design safety margin, using an axial flow pump to increase the water flow rate, increasing the water conveyance capacity of the central line project channel, and solving the problem of insufficient water conveyance capacity after the channel roughness increases. This technical step is simple, the results are reliable, and it is easy to operate. It is an effective way to improve the long-distance water conveyance capacity of the open channel. Summary of the invention
[0004] In view of the above-mentioned problems, the present invention provides a method for increasing the water flow velocity by using an axial flow pump, thereby increasing the water conveyance capacity of a channel and solving the problem of insufficient water conveyance capacity after the channel roughness increases.
[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme:
[0006] A method for accelerating water flow in a water delivery open channel comprises the following steps:
[0007] Obtain the change rate of design parameters of the water delivery open channel;
[0008] Determining the current water conveyance capacity of the water conveyance open channel based on the rate of change of the design parameter;
[0009] Determine whether the current water delivery capacity is qualified, if so, no subsequent operation is required, otherwise, determine the flow rate and water head to be increased according to the current water delivery capacity;
[0010] The one-dimensional model is used to analyze and calculate the open channel water surface curve after increasing the flow rate and head.
[0011] Preferably, obtaining the change rate of the design parameters of the water delivery open channel includes:
[0012] Collect the initial relevant design and measured data of the water diversion open channel;
[0013] Analyze the initial relevant design and measured data to determine the initial design flow, initial design water level, initial channel longitudinal slope, initial cross-sectional shape and initial roughness coefficient of the water delivery open channel, and calculate them into initial design vectors;
[0014] According to the measured data, the current design flow, current design water level, current channel longitudinal slope, current cross-section shape and current roughness coefficient of the water delivery open channel are determined, and the statistics are used as the current detection vector;
[0015] The rate of change of the design parameters of the water conveyance open channel is determined according to the ratio of the initial design vector to the current detection vector.
[0016] Preferably, determining the current water conveyance capacity of the open channel based on the design parameter change rate includes:
[0017] Using a preset hydraulic formula, calculate the uniform water flow rate of the water delivery open channel under uniform flow conditions and the water flow cross-sectional area, wetted perimeter and hydraulic radius of the cross-sectional channel to obtain a first calculation result;
[0018] Evaluating the deviation of the first calculation result according to the design parameter change rate;
[0019] Generate a second calculation result of the water conveyance open channel under the current water flow parameters according to the deviation degree of the first calculation result and the first calculation result;
[0020] The current water transfer capacity of the water transfer open channel is evaluated according to the second calculation result.
[0021] Preferably, judging whether the current water delivery capacity is qualified, if so, no subsequent operation is required, otherwise, determining the flow rate and water head to be increased according to the current water delivery capacity includes:
[0022] Comparing the current water transfer capacity with the designed water transfer capacity to obtain a comparison result;
[0023] If the comparison result is that the current water delivery capacity is greater than or equal to the designed water delivery capacity, no subsequent operation is required; if the comparison result is that the current water delivery capacity is less than the designed water delivery capacity, it is confirmed that the current water delivery capacity is unqualified;
[0024] When it is confirmed that the current water delivery capacity is unqualified, calculating the difference between the designed water delivery capacity and the current water delivery capacity;
[0025] The flow rate and water head to be increased are determined according to the difference and the maximum water flow rate of each water head.
[0026] Preferably, before judging whether the current water delivery capacity is qualified, if so, no subsequent operation is required; otherwise, after determining the flow rate and water head to be increased according to the current water delivery capacity, and before using a one-dimensional model to analyze and calculate the open channel water surface line of the water delivery open channel after the flow rate and water head are increased, the method further includes:
[0027] Determine the channel spacing for increasing the flow velocity of the water delivery open channel according to the flow rate and water head to be increased;
[0028] Obtaining the cross-sectional parameters of the water delivery open channel, and determining the target type of the axial flow pump to be set according to the cross-sectional parameters and the channel spacing for increasing the water flow velocity of the water delivery open channel;
[0029] Based on the target type, obtaining a plurality of design parameters of an axial flow pump of the type;
[0030] According to the channel spacing for increasing the water flow velocity in the water delivery open channel and the design parameters of multiple axial flow pumps of this type, an adapted target axial flow pump is selected and its quantity and size are determined.
[0031] Preferably, the one-dimensional model is used to analyze and calculate the open channel water surface line of the water delivery open channel after the flow rate and the water head are increased, including:
[0032] Retrieve hydrological data and time series files related to open channels for water transfer;
[0033] Obtaining the boundary file, parameter file, river network file and cross-section file corresponding to the water delivery open channel;
[0034] Generate a simulation file according to the boundary file, parameter file, river network file, cross-section file, hydrological data and time series file, and construct the one-dimensional model based on the simulation file;
[0035] Using the one-dimensional model to simulate the water flow state of the river or estuary passing through the water transfer open channel;
[0036] The water level and flow rate of the water delivery channel at each grid point are calculated using the six-point implicit difference format.
[0037] According to the water level and flow rate of the water delivery open channel at each grid point at different times, the open channel water surface line of the water delivery open channel after increasing the flow rate and head is drawn.
[0038] Preferably, the method further comprises:
[0039] Analyzing the open channel water surface line of the water delivery open channel to obtain analysis results;
[0040] Generating a longitudinal section pump station layout diagram and a cross-section layout diagram of the water delivery open channel according to the analysis results and the number and size of the target axial flow pumps;
[0041] The longitudinal section pump station layout diagram and the cross section layout diagram are uploaded to the staff terminal for display.
[0042] Preferably, the step of determining the number and size of target axial flow pumps comprises:
[0043] Based on the initial correlation design, a virtual channel model is established in a preset space;
[0044] Based on the measured data, a virtual water head is established in the virtual channel model to construct a virtual open channel model;
[0045] Dividing the virtual open channel into a plurality of first sub-channel sections according to the position of the virtual water head in the virtual open channel model;
[0046] Running the virtual open channel model, and generating a dynamic detection instruction when the total water flow in the virtual open channel model within a preset time period is less than a standard flow;
[0047] Based on the dynamic detection instruction, the virtual open channel model is controlled to run, and a first water level line corresponding to each first sub-channel section within the preset time period is obtained;
[0048] Based on the shape of each first sub-channel section and the first water level line, obtaining a first remaining water capacity corresponding to each first sub-channel section, and obtaining a total remaining water capacity of the virtual open channel model;
[0049] Input the total remaining water capacity into the virtual open channel model and run it to obtain the overflow water volume corresponding to each first sub-channel section;
[0050] According to the overflow water volume, a first axial flow pump of a corresponding size is matched to the corresponding first sub-channel section, and a first virtual detection model is constructed and run;
[0051] Running the first virtual detection model, adjusting the position of the first axial flow pump in the corresponding first subsection with a preset step length, and recording the first overflow water volume corresponding to each position of the first axial flow pump in the first subsection;
[0052] Obtaining the optimal position of the first axial flow pump when the first overflow water volume is minimum, and generating a first optimal result;
[0053] Based on the first optimal result, construct and run a second virtual detection model, obtain a second overflow water volume corresponding to each second sub-channel section in the second virtual detection model, and match a second axial flow pump of a corresponding size to the corresponding second sub-channel section according to the second overflow water volume;
[0054] obtaining a second optimal result of the second axial flow pump in the second subsection;
[0055] The virtual detection model is continuously corrected until the total overflow water volume of the corrected virtual open channel model is 0, the current best result is obtained, and the spacing, quantity, and size of the axial flow pumps are determined.
[0056] Preferably, the open channel is divided into a plurality of first sub-channel sections; and based on the shape of each first sub-channel section and the first water level line, the step of obtaining the first remaining water capacity corresponding to each first sub-channel section comprises:
[0057] Determine a function of capacity variation with water level and a total capacity corresponding to the first sub-channel section based on the shape of the first sub-channel section;
[0058] Determine a total water distribution volume corresponding to a preceding first sub-channel section and a total water distribution volume corresponding to a succeeding first sub-channel section adjacent to the first sub-channel section;
[0059] Based on the total water distribution corresponding to the previous first sub-channel section and the total water distribution corresponding to the next first sub-channel section corresponding to the first sub-channel section, the seepage loss corresponding to the first sub-channel section is calculated:
[0060]
[0061] Wherein, D is the seepage loss corresponding to the first sub-channel section, α is the seepage coefficient corresponding to the first sub-channel section, L is the total capacity corresponding to the first sub-channel section, δ is the land seepage coefficient around the first sub-channel section, β1 is the seepage loss correction coefficient of the first sub-channel section impacted by underground water, β2 is the seepage loss correction coefficient of the lining channel of the first sub-channel section, W1 is the total water distribution corresponding to the first sub-channel section corresponding to the first sub-channel section, W2 is the total water distribution corresponding to the next first sub-channel section corresponding to the first sub-channel section; t1 is the seepage time corresponding to the first sub-channel section; t2 is the seepage time of the land around the first sub-channel section;
[0062] Based on the function of the capacity corresponding to the first sub-channel section changing with the water level, the seepage loss, and the first water level line, the first remaining water capacity corresponding to the first sub-channel section is calculated:
[0063] D rest =D′(h)-D
[0064] Where D rest is the first remaining water capacity corresponding to the first sub-channel section, D′(h) is the initial remaining water capacity determined based on the first water level line and the function of capacity changing with water level, and h is the first water level line.
[0065] A water flow acceleration system for an open water channel, the system comprising:
[0066] An acquisition module is used to obtain the change rate of the design parameters of the water delivery open channel;
[0067] A determination module, for determining the current water conveyance capacity of the water conveyance open channel based on the change rate of the design parameter;
[0068] A judgment module, used to judge whether the current water delivery capacity is qualified, if so, no subsequent operation is required, otherwise, the flow rate and water head to be increased are determined according to the current water delivery capacity;
[0069] The calculation module is used to analyze and calculate the open channel water surface curve of the water conveyance open channel after the flow rate and the head are increased by using a one-dimensional model.
[0070] Preferably, the system further comprises: a detection module, which divides the open channel into a number of second sub-channel sections, each sub-channel section is provided with a detection module, and the detection module is used to obtain actual open channel information of the second sub-channel section where it is located, the actual open channel information comprises: actual open channel water volume information, actual open channel water quality information, and actual open channel environment information; the actual open channel water volume information comprises: actual open channel water content information, actual water level information, actual open channel water flow information, and actual open channel water flow rate information; the actual open channel environment information comprises: actual second sub-channel section obstacle information, and actual second sub-channel section boundary information;
[0071] a processing module, electrically connected to the detection module, for obtaining the open channel position information of the detection module and the corresponding open channel information; for determining the actual difficulty level of water intake in the open channel according to the actual open channel environmental information and the preset open channel environmental assessment rules; for determining the water quality level of the open channel according to the actual open channel water quality information and the preset open channel water quality assessment rules; for determining the target water intake scheme according to the actual open channel water volume information, the actual difficulty level of water intake in the open channel, the open channel water quality level and the preset water intake scheme set, wherein the target water intake scheme includes: a water intake pre-treatment scheme for the second sub-channel section, and the arrangement position of the water intake axial flow pump in the second sub-channel section;
[0072] A prediction module, used to predict the predicted open channel water content information of the next detection time period based on the actual open channel water content information of the previous detection time period, the actual open channel water content information of the current detection time period, the open channel position information and the actual open channel environment information;
[0073] A climate information acquisition module is used to acquire climate information of the environment in which the open channel is located, wherein the climate information includes: ambient wind speed and ambient temperature;
[0074] A correction module is used to correct the predicted open channel water content information of the next detection time period based on the climate information acquisition module.
[0075] The scheme determination module determines the arrangement scheme of the water intake axial flow pump and the working parameters of the axial flow pump based on the target water intake scheme, the actual open channel water content information of the current detection time period, and the corrected predicted open channel water content information of the next detection time period.
[0076] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description and the accompanying drawings.
[0077] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0078] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0079] Figure 1 A flowchart of a method for accelerating water flow in an open channel for water delivery provided by the present invention;
[0080] Figure 2 This is a typical cross-sectional schematic diagram of an open water delivery channel in an embodiment of the present invention;
[0081] Figure 3 Another working flow chart of a method for accelerating water flow in an open channel for water delivery provided by the present invention;
[0082] Figure 4 Another working flow chart of a method for accelerating water flow in an open channel for water delivery provided by the present invention;
[0083] Figure 5 This is a schematic diagram of open channel water level calculation in an embodiment of the present invention;
[0084] Figure 6 Schematic diagram of the alternating arrangement of water point locations and flow rate points during calculation of a one-dimensional hydrodynamic model in an embodiment of the present invention;
[0085] Figure 7 Schematic diagram of the process of solving the Saint-Venant equations by using the Abbott-Ionescu six-point implicit format for a one-dimensional hydrodynamic model in an embodiment of the present invention;
[0086] Figure 8 A flow chart of modeling a one-dimensional hydrodynamic model in an embodiment of the present invention;
[0087] Fig. 9 A channel water surface line diagram calculated by a one-dimensional hydrodynamic model in an embodiment of the present invention;
[0088] Fig.10 It is a schematic diagram of the longitudinal section arrangement of the channel axial flow pump in an embodiment of the present invention;
[0089] Fig.11 It is a schematic diagram of the cross-sectional arrangement of the channel axial flow pump in an embodiment of the present invention;
[0090] Fig.12 A schematic diagram of the structure of a water flow acceleration system for an open water channel provided by the present invention;
[0091] Fig.13 This is a diagram of the pump model composition. DETAILED DESCRIPTION
[0092] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0093] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes, and do not specifically refer to the order or sequence, nor are they used to limit the present invention. They are only used to distinguish components or operations described with the same technical terms, and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions and technical features between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0094] The spatial distribution of water resources in my country is extremely uneven, with more water in the south and less water in the north. Resource-based water shortage has become an important factor restricting the economic and social development of my country, especially in the northern region. According to statistics, 400 of the 669 cities in my country have insufficient water supply and 110 are seriously short of water. Long-distance water transfer projects are important water resource optimization and allocation engineering measures to solve the uneven spatial distribution of water resources and resource-based water shortage in my country, and are an important guarantee for my country's water security.
[0095] In order to solve the above problems, this embodiment discloses a method for accelerating water flow in an open water channel.
[0096] A method for accelerating water flow in an open channel, such as Figure 1 As shown, the following steps are included:
[0097] Step S101, obtaining the change rate of design parameters of the water delivery open channel;
[0098] Step S102, determining the current water transfer capacity of the water transfer open channel based on the design parameter change rate;
[0099] Step S103, judging whether the current water delivery capacity is qualified, if so, no subsequent operation is required, otherwise, determining the flow rate and water head to be increased according to the current water delivery capacity;
[0100] Step S104: using a one-dimensional model to analyze and calculate the open channel water surface curve of the water delivery open channel after the flow rate and water head are increased.
[0101] The working principle of the above technical solution is: obtain the design parameter change rate of the water conveyance open channel, determine the current water conveyance capacity of the water conveyance open channel based on the design parameter change rate, and judge whether the current water conveyance capacity is qualified. If so, no subsequent operation is required. Otherwise, determine the flow rate and head to be increased according to the current water conveyance capacity, and use a one-dimensional model to analyze and calculate the open channel water surface line of the water conveyance open channel after the flow rate and head are increased.
[0102] The beneficial effects of the above technical solution are: by evaluating the current water conveyance capacity of the open water conveyance channel and then determining the flow rate and head to be increased based on it, and then setting an axial flow pump to increase the water flow rate to intuitively improve the water transportation capacity of the open water conveyance channel, the overall engineering work efficiency and the experience of the staff are improved, and the problem of the project roughness increasing from the original design roughness of 0.014 to 0.017 due to the attachment of shellfish to the surface of the channel concrete in the existing project is solved, which greatly reduces the channel water conveyance capacity and affects the effectiveness of the project.
[0103] In one embodiment, obtaining the change rate of the design parameters of the water conveyance open channel includes:
[0104] Collecting initial relevant design parameters of the water conveyance open channel;
[0105] Analyze the initial relevant design and measured data to determine the initial design flow, initial design water level, initial channel longitudinal slope, initial cross-sectional shape and initial roughness coefficient of the water delivery open channel, and calculate them into initial design vectors;
[0106] Conducting data measurement on the water delivery open channel, determining the current design flow, current design water level, current channel longitudinal slope, current cross-sectional shape and current roughness coefficient of the water delivery open channel according to the measurement results, and statistically analyzing the results as the current detection vector;
[0107] Determine the change rate of the design parameters of the water delivery open channel according to the ratio of the initial design vector to the current detection vector;
[0108] Typical channel cross-section diagram Figure 2 shown.
[0109] The beneficial effect of the above technical solution is that by determining the design parameter change rate of the water conveyance open channel according to the ratio of the actual design parameters to the preset design parameters, the design parameter change rate of the water conveyance open channel can be determined more intuitively and objectively, thereby ensuring the practicality and accuracy of the evaluation results.
[0110] In one embodiment, Figure 3As shown, the current water conveyance capacity of the water conveyance open channel is determined based on the change rate of the design parameters, including:
[0111] Step S301, using a preset hydraulic formula to calculate the uniform water flow rate of the water delivery open channel under uniform flow conditions and the water flow cross-sectional area, wetted perimeter and hydraulic radius of the cross-sectional channel to obtain a first calculation result;
[0112] Step S302, evaluating the deviation of the first calculation result according to the design parameter change rate;
[0113] Step S303, generating a second calculation result of the water conveyance open channel under the current water flow parameters according to the deviation degree of the first calculation result combined with the first calculation result;
[0114] Step S304: Evaluate the current water delivery capacity of the water delivery open channel according to the second calculation result; in this embodiment, considering the uniform flow of the open channel, the flow expression is:
[0115] Q=VA (2-1)
[0116] According to the properties and characteristics of open channel uniform flow, the total head line, water surface line and channel bottom line of open channel constant uniform flow are parallel to each other, that is,
[0117] J = water surface slope J p =i (2-2)
[0118] The relationship between flow velocity and head loss in open channel hydraulic calculations is often expressed using the Xie Cai formula, that is, Because the hydraulic slope J = i in the open channel constant uniform flow, the problem is greatly simplified, and we get
[0119]
[0120] Open channel flow is mostly in the square resistance region. At this time, the Scheherazade coefficient C can be calculated using the Manning formula, that is,
[0121]
[0122] Substituting Manning's formula into Xie Cai's formula, we can get
[0123]
[0124] In summary, the flow expression of open channel steady uniform flow is obtained as follows:
[0125]
[0126] For a symmetrical trapezoidal channel, the cross-sectional area of the water flow is
[0127] A=(b+mh)h (2-7)
[0128] Wet periphery
[0129]
[0130] Hydraulic radius
[0131]
[0132] According to the above hydraulic formula, the current water conveyance capacity of the channel was reviewed and calculated using a typical section. The current roughness was 0.017, and the flow capacity under the condition of a design water depth of 7m was calculated to be 286m 3 / s, compared with the design flow rate of 320m 3 / s decreased by 11%. (The flow capacity calculated based on the design roughness of 0.015 under the design water depth of 7m is 324.6m 3 / s).
[0133] The beneficial effect of the above technical solution is: by using hydraulic formulas to calculate the current water conveyance parameters of the open water conveyance channel and then evaluate its water conveyance capacity, its current water conveyance capacity can be evaluated based on the current real-time water conveyance status of the open water conveyance channel, making the evaluation result more objective and error-free.
[0134] In one embodiment, Figure 4 As shown, it is determined whether the current water delivery capacity is qualified. If so, no subsequent operation is required. Otherwise, the flow rate and water head to be increased are determined according to the current water delivery capacity, including:
[0135] Step S401, comparing the current water delivery capacity with the designed water delivery capacity to obtain a comparison result;
[0136] Step S402: if the comparison result is that the current water delivery capacity is greater than or equal to the designed water delivery capacity, no subsequent operation is required; if the comparison result is that the current water delivery capacity is less than the designed water delivery capacity, it is determined that the current water delivery capacity is unqualified;
[0137] Step S403: when it is confirmed that the current water delivery capacity is unqualified, calculating the difference between the designed water delivery capacity and the current water delivery capacity;
[0138] Step S404, determining the flow rate and water head to be increased according to the difference and the maximum water flow rate of each water head;
[0139] In this embodiment, given the flow rate Q, bottom slope i, roughness n, cross-sectional shape and related dimensions, the normal water depth h0 is calculated.
[0140] From the above hydraulic formula we get
[0141]
[0142] Then the normal water depth can be solved. This is a nonlinear equation problem, which can be solved by trial and error, iteration, dichotomy, etc. In this embodiment, the trial and error algorithm is used to solve the normal water depth of the trapezoidal channel section, that is, a series of water depth values h' are assumed, and the corresponding flow Q' is calculated. The h' that satisfies Q'=Q is the normal water depth.
[0143] Through trial calculation, the design flow of the current river is 320m 3 / s corresponds to a river depth of 7.50m and an average flow velocity of 1.10m / s. If the flow rate is increased by 30%, the maximum water flow rate can be increased to 370m 3 / s. At this time, it cannot be considered as an open channel constant uniform flow, but the water depth h = h(s), the cross-sectional area A = A(h, s) and the cross-sectional average flow velocity v = v(h, s) of the open channel constant non-uniform flow change along the process flow. At this time, the hydraulic gradient J ≠ bottom slope i, and the water depth and flow rate cannot be calculated using formula (2-6), but the energy equation must be used.
[0144] According to the energy equation
[0145]
[0146] Where: z i 、z i+1 is the water level of the upstream and downstream sections (m);
[0147] v i 、v i+1 is the average flow velocity of the upstream and downstream sections (m / s);
[0148] h w is the head loss along the way.
[0149] This equation can be used to analyze and calculate the change of water level z along the open channel. The water level calculation results are as follows: Figure 4 As shown;
[0150] z=z b +h cosθ (3-3)
[0151] have to
[0152]
[0153] Subtracting the channel bottom elevation from the total water head gives the cross-sectional specific energy E. s ,Right now
[0154]
[0155] The energy equation for steady flow in an open channel is obtained in the form of cross-sectional specific energy
[0156]
[0157] The distance between upstream and downstream sections is ds, ignoring local losses, then
[0158]
[0159] h w =Jds (3-9)
[0160]
[0161] The basic differential equation for steady-state flow in an open channel is obtained
[0162]
[0163] Through trial calculation, when the flow rate is increased to 370m 3 / s, when the average flow velocity in the downstream section increases to 1.29m / s, the head size increases by 0.238m, and the section specific energy increases by 0.038m, which can make up for the head loss along the open channel with a length of 5km. That is, in order to improve the water conveyance capacity of the channel, it is necessary to increase the water flow velocity by installing pumps at a channel spacing of 5km.
[0164] The beneficial effect of the above technical solution is: by determining the flow rate and head to be increased based on the difference and the maximum water flow of each head, the loss of water flow in the water supply open channel can be accurately evaluated and the flow rate and head to be increased can be quickly determined, thereby improving practicality.
[0165] In one embodiment, it is determined whether the current water delivery capacity is qualified. If so, no subsequent operation is required. Otherwise, after the flow rate and water head to be increased are determined according to the current water delivery capacity, a one-dimensional model is used to analyze and calculate the open channel water surface line of the water delivery open channel after the flow rate and water head are increased. The method further includes:
[0166] Determine the channel spacing for increasing the flow velocity of the water delivery open channel according to the flow rate and water head to be increased;
[0167] Obtaining the cross-sectional parameters of the water delivery open channel, and determining the target type of the axial flow pump to be set according to the cross-sectional parameters and the channel spacing for increasing the water flow velocity of the water delivery open channel;
[0168] Based on the target type, obtaining a plurality of design parameters of an axial flow pump of the type;
[0169] According to the channel spacing for increasing the water flow velocity in the water delivery open channel and the design parameters of multiple axial flow pumps of this type, an adapted target axial flow pump is selected and its quantity and size are determined;
[0170] In this embodiment, an axial flow pump is used to accelerate the flow of water in an open channel. The types, models and basic parameters of the axial flow pump are compared and selected according to the provisions of "Types and Basic Parameters of Small and Medium-sized Axial Flow Pumps" (GB / T 9481-2006);
[0171] In the specification, the pump model is composed of Chinese pinyin capital letters and Arabic numerals, etc. The specific meaning is as shown in the appendix of the manual. Fig.13 ;
[0172] According to the models and basic parameters of axial flow pumps in the specifications, the following four pump types are initially selected as alternatives:
[0173] Table 4-1 Alternative axial flow pump models and basic parameters
[0174]
[0175] The current channel flow capacity in the embodiment of the present invention is 286m 3 / s, through water flow acceleration, the flow rate can be increased to 370m 3 / s, that is, the axial flow pump flow rate is required to be 84m 3 / s. The design flow rate of pumps 1 and 2 is 1.445m 3 / s, if the supplementary flow is 84m 3 / s, about 58 axial flow pumps are required, and the flow rate of pumps No. 3 and No. 4 is 2.957m 3 / s, if the supplementary flow is 84m 3 / s, about 29 axial flow pumps are required. Considering that the flow rate of pumps 3 and 4 is about twice that of pumps 1 and 2, and the shaft power is 1.5 times that of pumps 1 and 2, and the efficiency of pumps 3 and 4 is 85.8%, which is also higher than that of pumps 1 and 2, so from an economic point of view, pumps 3 and 4 are more suitable. In addition, the more axial flow pumps there are, the greater the impact on the flow pattern of the channel water. The number of axial flow pumps arranged in the channel should be reduced as much as possible;
[0176] The basic parameters of pump types 3 and 4 are completely the same, the difference is that pump type 3 is a vertical axial flow pump, and pump type 4 is a horizontal axial flow pump. Considering that the water blocking area of the vertical axial flow pump in water is larger than that of the horizontal axial flow pump, and the angle between the water outlet direction and the water flow direction is also larger, pump type 4 is selected as the pump type of the axial flow pump in the example of the present invention.
[0177] The beneficial effect of the above technical solution is that by selecting an adaptive target axial flow pump and determining its quantity and size, the most suitable axial flow pump can be selected according to the actual water delivery situation of the open water delivery channel, thereby improving the water delivery efficiency while maximizing the working efficiency of the axial flow pump.
[0178] In one embodiment, the one-dimensional model is used to analyze and calculate the open channel water surface line of the water delivery open channel after the flow rate and the water head are increased, including:
[0179] Retrieve hydrological data and time series files related to open channels for water transfer;
[0180] Obtaining the boundary file, parameter file, river network file and cross-section file corresponding to the water delivery open channel;
[0181] Generate a simulation file according to the boundary file, parameter file, river network file, cross-section file, hydrological data and time series file, and construct the one-dimensional model based on the simulation file;
[0182] Using the one-dimensional model to simulate the water flow state of the river or estuary passing through the water transfer open channel;
[0183] The water level and flow rate of the water delivery channel at each grid point are calculated using the six-point implicit difference format.
[0184] Draw the open channel water surface line of the water delivery channel after increasing the flow rate and water head according to the water level and flow rate of the water delivery channel at different grid points;
[0185] In this embodiment, MIKE 11HD simulates the flow state of a river or estuary based on the vertically integrated mass and momentum conservation equations, namely the one-dimensional unsteady flow Saint-Venant equations. The specific form of the equations is as follows:
[0186]
[0187] Where: x, t are spatial coordinates and time coordinates respectively; Q, h are cross-sectional flow and water level respectively; A, R are cross-sectional flow area and hydraulic radius respectively; B s is the river width; q is the lateral inflow; C is the Xie Cai coefficient; g is the gravity acceleration; α is the vertical velocity distribution coefficient, that is, Where u is the average flow velocity in the cross section.
[0188] Discrete method:
[0189] MIKE 11HD uses the Abbott-Ionescu six-point implicit difference format for solution. This format does not calculate the water level and flow at each grid point at the same time, but calculates the water level or flow alternately in sequence, which are called h-points and Q-points respectively. Figure 6 As shown;
[0190] In the continuity equation, Q is only partially derived with respect to x, centered on the water point h, while the momentum equation is centered on the flow point Q, such as Figure 7 As shown;
[0191] The discrete form of the continuity equation is as follows:
[0192]
[0193] The momentum equation is discretized into the following form:
[0194]
[0195] The discretized linear equations are solved using the pursuit method.
[0196] Mike 11HD's modeling process is as follows Figure 8 The water surface line calculation results are shown in Fig. 9 shown.
[0197] The beneficial effect of the above technical solution is that the open channel water surface line of the water transfer open channel can be accurately drawn according to the water level and flow rate, and the water transfer effect after adding the axial flow pump can be intuitively evaluated, providing a basis for subsequent staff to make decisions.
[0198] In one embodiment, the method further comprises:
[0199] Analyzing the open channel water surface line of the water delivery open channel to obtain analysis results;
[0200] Generating a longitudinal section pump station layout diagram and a cross-section layout diagram of the water delivery open channel according to the analysis results and the number and size of the target axial flow pumps;
[0201] Uploading the longitudinal section pump station layout schematic diagram and the cross section layout schematic diagram to the staff terminal for display;
[0202] In this embodiment, by analyzing the above calculation results, a pump acceleration should be set up every 5 km in the canal section, and 29 axial flow pumps with a diameter of about 1m and a model of 1000ZWQ-5.7 should be arranged in each section. Fig.10 The cross-sectional layout diagram is shown in Fig.11 shown.
[0203] The beneficial effect of the above technical solution is that by generating a longitudinal section pump station layout diagram and a cross-section layout diagram of the water delivery open channel, the staff can provide a reference basis for the placement of the axial flow pump, thereby improving work efficiency.
[0204] In one embodiment, the step of determining the number and size of target axial flow pumps includes:
[0205] Based on the initial correlation design, a virtual channel model is established in a preset space;
[0206] Based on the measured data, a virtual water head is established in the virtual channel model to construct a virtual open channel model;
[0207] Dividing the virtual open channel into a plurality of first sub-channel sections according to the position of the virtual water head in the virtual open channel model;
[0208] Running the virtual open channel model, and generating a dynamic detection instruction when the total water flow in the virtual open channel model within a preset time period is less than a standard flow;
[0209] Based on the dynamic detection instruction, the virtual open channel model is controlled to run, and a first water level line corresponding to each first sub-channel section within the preset time period is obtained;
[0210] Based on the shape of each first sub-channel section and the first water level line, obtaining a first remaining water capacity corresponding to each first sub-channel section, and obtaining a total remaining water capacity of the virtual open channel model;
[0211] Input the total remaining water capacity into the virtual open channel model and run it to obtain the overflow water volume corresponding to each first sub-channel section;
[0212] According to the overflow water volume, a first axial flow pump of a corresponding size is matched to the corresponding first sub-channel section, and a first virtual detection model is constructed and run;
[0213] Running the first virtual detection model, adjusting the position of the first axial flow pump in the corresponding first subsection with a preset step length, and recording the first overflow water volume corresponding to each position of the first axial flow pump in the first subsection;
[0214] Obtaining the optimal position of the first axial flow pump when the first overflow water volume is minimum, and generating a first optimal result;
[0215] Based on the first optimal result, construct and run a second virtual detection model, obtain a second overflow water volume corresponding to each second sub-channel section in the second virtual detection model, and match a second axial flow pump of a corresponding size to the corresponding second sub-channel section according to the second overflow water volume;
[0216] obtaining a second optimal result of the second axial flow pump in the second subsection;
[0217] Continuously correcting the virtual detection model until the total overflow of the corrected virtual open channel model is 0, obtaining the current best result, and determining the spacing, quantity, and size of the axial flow pumps;
[0218] In this example, the relevant design represents the external design of the open channel for water delivery;
[0219] In this example, the measured data refers to the data actually measured by the relevant personnel in the open channel for water delivery;
[0220] In this example, the virtual open channel model means that the actual open channel is scaled down according to the relevant design and measured data, and a virtual object with the same functions and properties as the actual open channel is established in the virtual space;
[0221] In this example, the first subchannel segment represents the channel between two adjacent virtual heads in the virtual open channel model;
[0222] In this example, the preset time period may be one hour, and the inspector may adjust the preset time period according to inspection requirements;
[0223] In this example, the water level line represents the height of the water in the sub-channel section;
[0224] In this example, the remaining water capacity represents the maximum amount of water that can be accommodated in the remaining space of the sub-channel section or the virtual open channel model;
[0225] In this example, a correction work is to place an axial flow pump in the corresponding sub-channel section.
[0226] The beneficial effects of the above technical solution are as follows: by establishing a virtual open channel model, the flow conditions of actual water flow are simulated in the virtual open channel model. In order to increase the water delivery of the open channel, the position of the axial flow pump on the channel body is adjusted according to the maximum water capacity of the open channel, so as to maximize the utilization of the open channel space. At the same time, axial flow pumps of different sizes are arranged on the channel body according to different overflow conditions, which not only achieves the purpose of increasing the water delivery, but also saves resources and avoids waste.
[0227] In one embodiment, the open channel is divided into a plurality of first sub-channel sections; based on the shape of each first sub-channel section and the first water level line, the step of obtaining the first remaining water capacity corresponding to each first sub-channel section comprises:
[0228] Determine a function of capacity variation with water level and a total capacity corresponding to the first sub-channel section based on the shape of the first sub-channel section;
[0229] Determine a total water distribution volume corresponding to a preceding first sub-channel section and a total water distribution volume corresponding to a succeeding first sub-channel section adjacent to the first sub-channel section;
[0230] Based on the total water distribution corresponding to the previous first sub-channel section and the total water distribution corresponding to the next first sub-channel section corresponding to the first sub-channel section, the seepage loss corresponding to the first sub-channel section is calculated:
[0231]
[0232] Wherein, D is the seepage loss corresponding to the first sub-channel section and the unit of D is liter, α is the seepage coefficient corresponding to the first sub-channel section (unit is L / min), L is the total capacity corresponding to the first sub-channel section and the unit of L is liter, δ is the land seepage coefficient around the first sub-channel section, β1 is the seepage loss correction coefficient of the first sub-channel section impacted by underground water and β1 is dimensionless, β2 is the seepage loss correction coefficient of the lining channel of the first sub-channel section and β2 is dimensionless, W1 is the total water distribution corresponding to the first sub-channel section corresponding to the first sub-channel section and the unit of W1 is liter, W2 is the total water distribution corresponding to the next first sub-channel section corresponding to the first sub-channel section and the unit of W2 is liter; t1 is the seepage time corresponding to the first sub-channel section; t2 is the seepage time of the land around the first sub-channel section;
[0233] Based on the function of the capacity corresponding to the first sub-channel section changing with the water level, the seepage loss, and the first water level line, the first remaining water capacity corresponding to the first sub-channel section is calculated:
[0234] D rest =D′(h)-D
[0235] Where D rest is the first remaining water capacity corresponding to the first sub-channel section and D rest The unit of is liter, D′(h) is the initial remaining water capacity determined based on the first water level line and the function of capacity changing with water level, and the unit of the initial water capacity is liter, h is the first water level line, and the unit of h is meter.
[0236] The beneficial effects of the above technical solution are: through the seepage coefficient corresponding to the first sub-channel section, the total capacity, the surrounding land seepage coefficient, the seepage loss correction coefficient caused by groundwater impact, and the lined channel seepage loss correction coefficient, the corresponding seepage loss amount can be accurately calculated, and the capacity corresponding to the first sub-channel section varies with the water level function, the seepage loss amount, and the first water level line, the first residual water capacity corresponding to the first sub-channel section can be accurately calculated, so that the obtained first residual water capacity takes into account the influence of the surrounding seepage effect, as well as the influence of the seepage effect caused by groundwater impact and lined channel seepage loss, thereby making the obtained first residual water capacity more accurate.
[0237] This embodiment also discloses a water flow acceleration system for an open water channel, such as Fig.12 As shown, the system includes:
[0238] An acquisition module 1201 is used to acquire a change rate of a design parameter of a water delivery open channel;
[0239] A determination module 1202, configured to determine the current water conveyance capacity of the water conveyance open channel based on the design parameter change rate;
[0240] The judging module 1203 is used to judge whether the current water delivery capacity is qualified. If so, no subsequent operation is required. Otherwise, the flow rate and water head to be increased are determined according to the current water delivery capacity.
[0241] The calculation module 1204 is used to calculate the open channel water surface curve of the water delivery open channel after the flow rate and water head are increased by using a one-dimensional model analysis.
[0242] The working principle and beneficial effects of the above technical solution have been explained in the method embodiment and will not be repeated here.
[0243] In one embodiment, the system further comprises:
[0244] A detection module is provided to divide the open channel into a plurality of second sub-channel sections, each sub-channel section is provided with a detection module, and the detection module is used to obtain actual open channel information of the second sub-channel section where the detection module is located, wherein the actual open channel information includes: actual open channel water volume information, actual open channel water quality information, and actual open channel environment information; the actual open channel water volume information includes: actual open channel water content information, actual water level information, actual open channel water flow information, and actual open channel water flow rate information; the actual open channel environment information includes: actual second sub-channel section obstacle information and actual second sub-channel section boundary information;
[0245] a processing module, electrically connected to the detection module, for obtaining the open channel position information of the detection module and the corresponding open channel information; for determining the actual difficulty level of water intake in the open channel according to the actual open channel environmental information and the preset open channel environmental assessment rules; for determining the water quality level of the open channel according to the actual open channel water quality information and the preset open channel water quality assessment rules; for determining the target water intake scheme according to the actual open channel water volume information, the actual difficulty level of water intake in the open channel, the open channel water quality level and the preset water intake scheme set, wherein the target water intake scheme includes: a water intake pre-treatment scheme for the second sub-channel section, and the arrangement position of the water intake axial flow pump in the second sub-channel section;
[0246] A prediction module, used to predict the predicted open channel water content information of the next detection time period based on the actual open channel water content information of the previous detection time period, the actual open channel water content information of the current detection time period, the open channel position information and the actual open channel environment information;
[0247] A climate information acquisition module is used to acquire climate information of the environment in which the open channel is located, wherein the climate information includes: ambient wind speed and ambient temperature;
[0248] A correction module is used to correct the predicted open channel water content information of the next detection time period based on the climate information acquisition module.
[0249] The scheme determination module determines the arrangement scheme of the water intake axial flow pump and the working parameters of the axial flow pump based on the target water intake scheme, the actual open channel water content information of the current detection time period, and the corrected predicted open channel water content information of the next detection time period.
[0250] The working principle and beneficial effects of the above technical solution are as follows: the open channel is divided into a number of second sub-channel sections, each sub-channel section is provided with a detection module, the detection module is used to obtain the actual open channel information of the second sub-channel section in which it is located, and before taking water, firstly, according to the location of the water transfer destination, the open channel information of each associated second sub-channel section is obtained, and the actual open channel information includes: actual open channel water volume information, actual open channel water quality information, actual open channel environmental information; the actual open channel water volume information includes: actual open channel water content information, actual water level information, actual open channel water flow information and actual open channel water flow rate information; the actual open channel environmental information includes: actual second sub-channel section obstacle information, actual second sub-channel section boundary information; comprehensively considering the influence of the water content information, water quality information and environmental information of the second sub-channel section, the formulated water intake plan is more reliable.
[0251] Then the processing module is used to determine the actual difficulty level of water intake in the open channel according to the actual open channel environmental information and the preset open channel environmental assessment rules; to determine the water quality grade of the open channel according to the actual open channel water quality information and the preset open channel water quality assessment rules; to determine the target water intake scheme according to the actual open channel water volume information, the actual difficulty level of water intake in the open channel, the water quality grade of the open channel and the preset water intake scheme set, the target water intake scheme including: a water intake pre-treatment scheme for the second sub-channel section, and the layout position of the water intake axial flow pump in the second sub-channel section; specifically, the target water intake scheme is determined according to the actual open channel water volume information, the actual difficulty level of water intake in the open channel, the water quality grade of the open channel and the preset water intake scheme set, the target water intake scheme including: a water intake pre-treatment scheme for the second sub-channel section, and the layout position of the water intake axial flow pump in the second sub-channel section; to achieve water intake pre-treatment corresponding to water content, water quality grade and water intake grade to ensure water intake effect, and to achieve the layout position of the axial flow pump corresponding to water content, water quality grade and water intake grade, which is more convenient for the layout of the axial flow pump.
[0252] Then the prediction module is used to predict the predicted open channel water content information of the next detection time period based on the actual open channel water content information of the previous detection time period, the actual open channel water content information of the current detection time period, the open channel location information and the actual open channel environment information; the axial flow pump is set considering the dynamic change of water content; and the correction module is used to correct the predicted open channel water content information of the next detection time period based on the climate information acquisition module. The water content is corrected according to the influence of climate to ensure the reliability of the result;
[0253] The final plan determination module determines the layout plan of the water intake axial flow pump and the working parameters of the axial flow pump based on the target water intake plan, the actual open channel water content information in the current detection time period, and the corrected predicted open channel water content information in the next detection time period, and intelligently obtains the layout plan of the axial flow pump and the working parameters of the axial flow pump that match the actual channel based on the detection.
[0254] Other embodiments of the present disclosure will be readily apparent to those skilled in the art after considering the specification and practicing the disclosure disclosed herein. This application is intended to cover any variations, uses, or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The specification and examples are to be considered exemplary only, and the true scope and spirit of the present disclosure are indicated by the following claims.
[0255] It should be understood that the present disclosure is not limited to the exact structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.
Claims
1. A method for accelerating water flow in an open water channel, characterized in that: The following steps are involved: Obtain the change rate of design parameters of the water delivery open channel; Determining the current water conveyance capacity of the water conveyance open channel based on the rate of change of the design parameter; Determine whether the current water delivery capacity is qualified, if so, no subsequent operation is required, otherwise, determine the flow rate and water head to be increased according to the current water delivery capacity; The one-dimensional model is used to analyze and calculate the open channel water surface curve after the flow rate and water head are increased; The obtaining of the change rate of the design parameters of the water delivery open channel comprises: Collect the initial relevant design and measured data of the water diversion open channel; Analyze the initial relevant design and measured data to determine the initial design flow, initial design water level, initial channel longitudinal slope, initial cross-sectional shape and initial roughness coefficient of the water delivery open channel, and calculate them into initial design vectors; According to the measured data, the current design flow, current design water level, current channel longitudinal slope, current cross-section shape and current roughness coefficient of the water delivery open channel are determined, and the statistics are used as the current detection vector; Determine the change rate of the design parameters of the water delivery open channel according to the ratio of the initial design vector to the current detection vector; Determining the current water transfer capacity of the water transfer open channel based on the design parameter change rate includes: Using a preset hydraulic formula, calculate the uniform water flow rate of the water delivery open channel under uniform flow conditions and the water flow cross-sectional area, wetted perimeter and hydraulic radius of the cross-sectional channel to obtain a first calculation result; Evaluating the deviation of the first calculation result according to the design parameter change rate; Generate a second calculation result of the water conveyance open channel under the current water flow parameters according to the deviation degree of the first calculation result and the first calculation result; Evaluate the current water transfer capacity of the water transfer open channel according to the second calculation result; The determination of whether the current water delivery capacity is qualified, if so, no subsequent operation is required, otherwise, Determining the flow rate and water head to be increased according to the current water delivery capacity includes: Comparing the current water transfer capacity with the designed water transfer capacity to obtain a comparison result; If the comparison result is that the current water delivery capacity is greater than or equal to the designed water delivery capacity, no subsequent operation is required; if the comparison result is that the current water delivery capacity is less than the designed water delivery capacity, it is confirmed that the current water delivery capacity is unqualified; When it is confirmed that the current water delivery capacity is unqualified, calculating the difference between the designed water delivery capacity and the current water delivery capacity; Determine the flow rate and water head to be increased according to the difference and the maximum water flow rate of each water head; Determine whether the current water delivery capacity is qualified. If so, no subsequent operation is required. Otherwise, after determining the flow rate and water head to be increased according to the current water delivery capacity, use a one-dimensional model to analyze and calculate the open channel water surface line of the water delivery open channel after the flow rate and water head are increased. The method also includes: Determine the channel spacing for increasing the flow velocity of the water delivery open channel according to the flow rate and water head to be increased; Obtaining the cross-sectional parameters of the water delivery open channel, and determining the target type of the axial flow pump to be set according to the cross-sectional parameters and the channel spacing for increasing the water flow velocity of the water delivery open channel; Based on the target type, obtaining a plurality of design parameters of an axial flow pump of the type; According to the channel spacing for increasing the water flow velocity in the water delivery open channel and the design parameters of multiple axial flow pumps of this type, an adapted target axial flow pump is selected and its quantity and size are determined; The one-dimensional model is used to analyze and calculate the open channel water surface line of the water delivery open channel after the flow rate and water head are increased, including: Retrieve hydrological data and time series files related to open channels for water transfer; Obtaining the boundary file, parameter file, river network file and cross-section file corresponding to the water delivery open channel; Generate a simulation file according to the boundary file, parameter file, river network file, cross-section file, hydrological data and time series file, and construct the one-dimensional model based on the simulation file; Using the one-dimensional model to simulate the water flow state of the river or estuary passing through the water transfer open channel; The water level and flow rate of the water delivery channel at each grid point are calculated using the six-point implicit difference format. According to the water level and flow rate of the water delivery open channel at each grid point at different times, the open channel water surface line of the water delivery open channel after increasing the flow rate and head is drawn.
2. The method for accelerating water flow in an open channel of water delivery according to claim 1, characterized in that: The method further comprises: Analyzing the open channel water surface line of the water delivery open channel to obtain analysis results; Generating a longitudinal section pump station layout diagram and a cross-section layout diagram of the water delivery open channel according to the analysis results and the number and size of the target axial flow pumps; The longitudinal section pump station layout diagram and the cross section layout diagram are uploaded to the staff terminal for display.
3. The method for accelerating water flow in an open channel of water delivery according to claim 1, characterized in that: The steps to determine the number and size of target axial flow pumps include: Based on the initial correlation design, a virtual channel model is established in a preset space; Based on the measured data, a virtual water head is established in the virtual channel model to construct a virtual open channel model; Dividing the virtual open channel into a plurality of first sub-channel sections according to the position of the virtual water head in the virtual open channel model; Running the virtual open channel model, and generating a dynamic detection instruction when the total water flow in the virtual open channel model within a preset time period is less than a standard flow; Based on the dynamic detection instruction, the virtual open channel model is controlled to run, and a first water level line corresponding to each first sub-channel section within the preset time period is obtained; Based on the shape of each first sub-channel section and the first water level line, obtaining a first remaining water capacity corresponding to each first sub-channel section, and obtaining a total remaining water capacity of the virtual open channel model; Input the total remaining water capacity into the virtual open channel model and run it to obtain the overflow water volume corresponding to each first sub-channel section; According to the overflow water volume, a first axial flow pump of a corresponding size is matched to the corresponding first sub-channel section, and a first virtual detection model is constructed and run; Running the first virtual detection model, adjusting the position of the first axial flow pump in the corresponding first subsection with a preset step length, and recording the first overflow water volume corresponding to each position of the first axial flow pump in the first subsection; Obtaining the optimal position of the first axial flow pump when the first overflow water volume is minimum, and generating a first optimal result; Based on the first optimal result, construct and run a second virtual detection model, obtain a second overflow water volume corresponding to each second sub-channel section in the second virtual detection model, and match a second axial flow pump of a corresponding size to the corresponding second sub-channel section according to the second overflow water volume; obtaining a second optimal result of the second axial flow pump in the second subsection; The virtual detection model is continuously corrected until the total overflow water volume of the corrected virtual open channel model is 0, the current best result is obtained, and the spacing, quantity, and size of the axial flow pumps are determined.
4. The method for accelerating water flow in an open channel of water delivery according to claim 1, characterized in that: Dividing the open channel into a number of first sub-channel sections; Based on the shape of each first sub-channel section and the first water level line, the step of obtaining the first remaining water capacity corresponding to each first sub-channel section includes: Determine a function of capacity variation with water level and a total capacity corresponding to the first sub-channel section based on the shape of the first sub-channel section; Determine a total water distribution volume corresponding to a preceding first sub-channel section and a total water distribution volume corresponding to a succeeding first sub-channel section adjacent to the first sub-channel section; Based on the total water distribution corresponding to the previous first sub-channel section and the total water distribution corresponding to the next first sub-channel section corresponding to the first sub-channel section, the seepage loss corresponding to the first sub-channel section is calculated: Wherein, D is the seepage loss corresponding to the first sub-channel section, α is the seepage coefficient corresponding to the first sub-channel section, L is the total capacity corresponding to the first sub-channel section, δ is the land seepage coefficient around the first sub-channel section, β1 is the seepage loss correction coefficient of the first sub-channel section impacted by underground water, β2 is the seepage loss correction coefficient of the lining channel of the first sub-channel section, W1 is the total water distribution corresponding to the first sub-channel section corresponding to the first sub-channel section, W2 is the total water distribution corresponding to the next first sub-channel section corresponding to the first sub-channel section; t1 is the seepage time corresponding to the first sub-channel section; t2 is the seepage time of the land around the first sub-channel section; Based on the function of the capacity corresponding to the first sub-channel section changing with the water level, the seepage loss, and the first water level line, the first remaining water capacity corresponding to the first sub-channel section is calculated: D rest =D'(h)-D Where D rest is the first remaining water capacity corresponding to the first sub-channel section, D'(h) is the initial remaining water capacity determined based on the first water level line and the function of capacity changing with water level, and h is the first water level line.
5. A water flow acceleration system for an open water channel, operating based on the method according to any one of claims 1 to 4, characterized in that: The system includes: An acquisition module is used to obtain the change rate of the design parameters of the water delivery open channel; A determination module, for determining the current water conveyance capacity of the water conveyance open channel based on the change rate of the design parameter; A judgment module, used to judge whether the current water delivery capacity is qualified, if so, no subsequent operation is required, otherwise, the flow rate and water head to be increased are determined according to the current water delivery capacity; The calculation module is used to analyze and calculate the open channel water surface curve of the water conveyance open channel after the flow rate and the head are increased by using a one-dimensional model.
6. The open channel water flow acceleration system according to claim 5, characterized in that: The system also includes: A detection module is provided to divide the open channel into a plurality of second sub-channel sections, each sub-channel section is provided with a detection module, and the detection module is used to obtain actual open channel information of the second sub-channel section where the detection module is located, wherein the actual open channel information includes: actual open channel water volume information, actual open channel water quality information, and actual open channel environment information; the actual open channel water volume information includes: actual open channel water content information, actual water level information, actual open channel water flow information, and actual open channel water flow rate information; the actual open channel environment information includes: actual second sub-channel section obstacle information and actual second sub-channel section boundary information; a processing module, electrically connected to the detection module, for obtaining the open channel position information of the detection module and the corresponding open channel information; for determining the actual difficulty level of water intake in the open channel according to the actual open channel environmental information and the preset open channel environmental assessment rules; for determining the water quality level of the open channel according to the actual open channel water quality information and the preset open channel water quality assessment rules; for determining the target water intake scheme according to the actual open channel water volume information, the actual difficulty level of water intake in the open channel, the open channel water quality level and the preset water intake scheme set, wherein the target water intake scheme includes: a water intake pre-treatment scheme for the second sub-channel section, and the arrangement position of the water intake axial flow pump in the second sub-channel section; A prediction module, used to predict the predicted open channel water content information of the next detection time period based on the actual open channel water content information of the previous detection time period, the actual open channel water content information of the current detection time period, the open channel position information and the actual open channel environment information; A climate information acquisition module is used to acquire climate information of the environment in which the open channel is located, wherein the climate information includes: ambient wind speed and ambient temperature; A correction module, used for correcting the predicted open channel water content information of the next detection time period based on the climate information acquisition module; The scheme determination module determines the arrangement scheme of the water intake axial flow pump and the working parameters of the axial flow pump based on the target water intake scheme, the actual open channel water content information of the current detection time period, and the corrected predicted open channel water content information of the next detection time period.