Automatic supervision method and device for construction work

Through automatic supervision methods and devices, abnormal projects on the construction site are identified and screened, which solves the problem of low manual inspection efficiency in power construction and improves supervision efficiency and safety.

CN114529865BActive Publication Date: 2024-10-08SHENZHEN COMTOP INFORMATION TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210017937.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-07
Publication Date
2024-10-08
Estimated Expiration
2042-01-07

AI Technical Summary

Technical Problem

In power construction, due to the low efficiency of manual verification, supervision efficiency and quality are low, making it difficult to accurately identify abnormal projects on the construction site, affecting construction safety and efficiency.

Method used

Through automatic supervision methods and devices, the target business type, supervision method and inspection items are determined, and abnormal items are judged and screened out, including inspections on site investigation, defect processing, safety measures, etc., and lines are identified using technologies such as image recognition and line map matching. Cross-crossing, equipment deficiencies, and hard hat wearing.

Benefits of technology

It improves the efficiency and accuracy of construction supervision, ensures construction safety, reduces missed inspections and mischecks in manual inspections, and improves the quality of supervision.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114529865B_ABST
    Figure CN114529865B_ABST
Patent Text Reader

Abstract

The present invention discloses an automatic supervision method and device for construction operations, the method comprising: determining a target business type of a target construction operation, determining a target supervision method of the target construction operation according to the target business type, and determining all target inspection items of the target construction operation according to the target supervision method; judging whether there are abnormal items in all the target inspection items; when judging that the abnormal items exist in all the target inspection items, screening out all the abnormal items from all the target inspection items. It can be seen that the present invention determines the items that need to be inspected based on the business supervision method of the construction operation, and then determines the abnormal items, and can accurately determine the abnormal items in the inspection items, which is conducive to realizing the automatic supervision of the construction operation and improving the efficiency and accuracy of the supervision.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction supervision, and in particular to an automatic supervision method and device for construction operations. Background Art

[0002] In power construction operations, construction workers must follow corresponding safety guidelines before starting work and during work to ensure the safety of construction workers and the normal operation of construction work.

[0003] However, due to the large amount of work, wide business scope, and many inspection points in current power construction, the inspection content is mainly checked manually, which is inefficient and prone to omissions and errors, resulting in low supervision efficiency and quality. Therefore, it is very important to improve the efficiency and accuracy of supervision of construction operations. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a method and device for automatic supervision of construction work, which determines the items that need to be inspected based on the business supervision method of the construction work, and then determines the abnormal items. The abnormal items in the inspection items can be accurately determined, which is conducive to realizing automatic supervision of construction work and improving the efficiency and accuracy of supervision.

[0005] In order to solve the above technical problems, the present invention discloses, in a first aspect, an automatic supervision method for construction work, the method comprising:

[0006] Determine a target business type for a target construction operation, determine a target supervision method for the target construction operation according to the target business type, and determine all target inspection items for the target construction operation according to the target supervision method;

[0007] Determine whether there are any abnormal items among all the target inspection items;

[0008] When it is determined that the abnormal items exist in all the target inspection items, all the abnormal items are screened out from all the target inspection items.

[0009] As an optional embodiment, in the first aspect of the present invention, all of the target inspection items include at least one of construction work plan inspection items, construction work ticket inspection items, defect handling inspection items, on-site investigation inspection items, risk assessment and grading inspection items, safety tool inspection items, hidden danger rectification inspection items, safety briefing inspection items and safety measures inspection items.

[0010] As an optional implementation, in the first aspect of the present invention, when all the target inspection items include the on-site investigation inspection items, the determining whether there are abnormal items in all the target inspection items includes:

[0011] Acquire on-site survey information of the target construction work, and determine whether there is any crossing of the lines at the construction site according to the on-site survey information;

[0012] When it is determined that there is no crossing of the line, obtaining the location information corresponding to the target construction work, and obtaining a route map matching the location information;

[0013] According to the circuit diagram, it is determined whether the circuit layout and equipment layout of the construction site correspond to and match the circuit diagram. When it is determined that there is no corresponding match, the on-site investigation and inspection item is determined to be the abnormal item; the circuit diagram includes the circuit layout and the equipment layout of the equipment in the circuit.

[0014] As an optional implementation manner, in the first aspect of the present invention, when all the target inspection items include the defect processing inspection item, the determining whether there is an abnormal item in all the target inspection items includes:

[0015] Obtaining all work contents of the target construction work;

[0016] Determine whether there are keywords corresponding to the defect elimination in all the work contents;

[0017] When it is determined that the keyword exists in all the work contents, all target work contents containing the keyword are screened out from all the work contents;

[0018] Determine whether there is defect elimination reporting information during the working hours corresponding to each of the target work contents; when it is determined that there is not defect elimination reporting information during the working hours corresponding to each of the target work contents, determine that the defect handling inspection item is the abnormal item; the defect elimination reporting information is used to report the defect information of the equipment to the supervisory unit of the target construction work.

[0019] As an optional implementation manner, in the first aspect of the present invention, when all the target inspection items include the safety measure inspection item, the determining whether there are abnormal items in all the target inspection items includes:

[0020] Acquire the construction image of the target construction work in real time, and determine whether the construction image complies with safety regulations;

[0021] When it is determined that the safety specification is not met, determining the safety measure inspection item as the abnormal item;

[0022] And, judging whether the construction image complies with safety regulations includes:

[0023] Identify the construction worker in the construction image according to the construction image, determine whether the construction worker is wearing a safety helmet correctly, and when it is determined that the construction worker is not wearing a safety helmet correctly, determine that it does not comply with safety regulations; or

[0024] It is determined based on the construction image whether there is a line crossing. When it is determined that there is a line crossing, it is determined based on the construction image whether a grounding wire or a personal safety line is installed at the construction site. When it is determined that no grounding wire or personal safety line is installed, it is determined that it does not meet safety regulations.

[0025] As an optional implementation, in the first aspect of the present invention, identifying the construction worker in the construction image according to the construction image and judging whether the construction worker wears a safety helmet correctly includes:

[0026] Get a preset helmet image;

[0027] A body image region corresponding to the body of the construction worker is identified in the construction image, a head image region corresponding to the head contour of the construction worker is divided from the body image region according to preset human body structure parameters, and a facial image region and a target image region other than the facial image region are divided from the head image region according to the head image region; the facial image region is an identified human facial image region;

[0028] The target image area is compared with the preset safety helmet image to obtain a difference degree. When the difference degree is greater than the preset difference degree, it is determined that the construction worker is not wearing the safety helmet correctly.

[0029] As an optional implementation, in the first aspect of the present invention, comparing the target image area with the preset helmet image to obtain a difference degree includes:

[0030] When the number of the preset helmet images is 1, the vector distance between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector distance is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector angle is determined as the difference degree;

[0031] When the number of the preset safety helmet images is greater than or equal to 2, the vector distance between the feature vector of the target image area and the feature vector of each of the preset safety helmet images is calculated, and the average value of all the vector distances is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of each of the preset safety helmet images is calculated, and the average value of all the vector angles is determined as the difference degree.

[0032] The second aspect of the present invention discloses an automatic supervision device for construction work, the device comprising:

[0033] A determination module, used to determine a target business type of a target construction operation, determine a target supervision method of the target construction operation according to the target business type, and determine all target inspection items of the target construction operation according to the target supervision method;

[0034] A judgment module, judging whether there are any abnormal items among all the target inspection items;

[0035] The screening module is used to screen out all the abnormal items from all the target inspection items when the judging module judges that the abnormal items exist in all the target inspection items.

[0036] As an optional embodiment, in the second aspect of the present invention, all of the target inspection items include at least one of construction work plan inspection items, construction work ticket inspection items, defect handling inspection items, on-site investigation inspection items, risk assessment and grading inspection items, safety tool inspection items, hidden danger rectification inspection items, safety briefing inspection items and safety measures inspection items.

[0037] As an optional implementation, in the second aspect of the present invention, the manner in which the judgment module judges whether there are abnormal items in all the target inspection items specifically includes:

[0038] When all the target inspection items include the on-site inspection items, obtaining on-site inspection information of the target construction work, and judging whether there is any crossing of the lines at the construction site according to the on-site inspection information;

[0039] When it is determined that there is no crossing of the line, obtaining the location information corresponding to the target construction work, and obtaining a route map matching the location information;

[0040] According to the circuit diagram, it is determined whether the circuit layout and equipment layout of the construction site correspond to and match the circuit diagram. When it is determined that there is no corresponding match, the on-site investigation and inspection item is determined to be the abnormal item; the circuit diagram includes the circuit layout and the equipment layout of the equipment in the circuit.

[0041] As an optional implementation, in the second aspect of the present invention, the manner in which the judgment module judges whether there are abnormal items in all the target inspection items specifically includes:

[0042] When all the target inspection items include the defect handling inspection item, obtaining all work contents of the target construction work;

[0043] Determine whether there are keywords corresponding to the defect elimination in all the work contents;

[0044] When it is determined that the keyword exists in all the work contents, all target work contents containing the keyword are screened out from all the work contents;

[0045] Determine whether there is defect elimination reporting information during the working hours corresponding to each of the target work contents; when it is determined that there is not defect elimination reporting information during the working hours corresponding to each of the target work contents, determine that the defect handling inspection item is the abnormal item; the defect elimination reporting information is used to report the defect information of the equipment to the supervisory unit of the target construction work.

[0046] As an optional implementation, in the second aspect of the present invention, the manner in which the judgment module judges whether there are abnormal items in all the target inspection items specifically includes:

[0047] When all the target inspection items include the safety measures inspection item, obtaining a construction image of the target construction work in real time, and judging whether the construction image complies with the safety regulations;

[0048] When it is determined that the safety specification is not met, determining the safety measure inspection item as the abnormal item;

[0049] Furthermore, the judgment module judges whether the construction image complies with the safety regulations in the following manner:

[0050] Identify the construction worker in the construction image according to the construction image, determine whether the construction worker is wearing a safety helmet correctly, and when it is determined that the construction worker is not wearing a safety helmet correctly, determine that it does not comply with safety regulations; or

[0051] It is determined based on the construction image whether there is a line crossing. When it is determined that there is a line crossing, it is determined based on the construction image whether a grounding wire or a personal safety line is installed at the construction site. When it is determined that no grounding wire or personal safety line is installed, it is determined that it does not meet safety regulations.

[0052] As an optional implementation, in the second aspect of the present invention, the judgment module identifies the construction worker in the construction image according to the construction image, and the method of judging whether the construction worker wears the safety helmet correctly specifically includes:

[0053] Get a preset helmet image;

[0054] A body image region corresponding to the body of the construction worker is identified in the construction image, a head image region corresponding to the head contour of the construction worker is divided from the body image region according to preset human body structure parameters, and a facial image region and a target image region other than the facial image region are divided from the head image region according to the head image region; the facial image region is an identified human facial image region;

[0055] The target image area is compared with the preset safety helmet image to obtain a difference degree. When the difference degree is greater than the preset difference degree, it is determined that the construction worker is not wearing the safety helmet correctly.

[0056] As an optional implementation, in the second aspect of the present invention, the judgment module compares the target image area with the preset helmet image to obtain the difference degree in a manner that specifically includes:

[0057] When the number of the preset helmet images is 1, the vector distance between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector distance is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector angle is determined as the difference degree;

[0058] When the number of the preset helmet images is greater than or equal to 2, the vector distance between the feature vector of the target image area and the feature vector of each of the preset helmet images is calculated, and the average value of all the vector distances is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of each of the preset helmet images is calculated, and the average value of all the vector angles is determined as the difference degree. A third aspect of the present invention discloses another automatic supervision device for construction work, the device comprising:

[0059] A memory storing executable program code;

[0060] a processor coupled to the memory;

[0061] The processor calls the executable program code stored in the memory to execute the automatic supervision method for construction work disclosed in the first aspect of the present invention.

[0062] The fourth aspect of the present invention discloses a computer storable medium, wherein the computer storage medium stores computer instructions, and when the computer instructions are called, they are used to execute the automatic supervision method of construction work disclosed in the first aspect of the present invention.

[0063] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0064] In an embodiment of the present invention, the target business type of the target construction operation is determined, the target supervision method of the target construction operation is determined according to the target business type, and all target inspection items of the target construction operation are determined according to the target supervision method; it is determined whether there are abnormal items in all the target inspection items; when it is determined that the abnormal items exist in all the target inspection items, all the abnormal items are screened out from all the target inspection items. It can be seen that the present invention determines the items that need to be inspected based on the business supervision method of the construction operation, and then determines the abnormal items. It can accurately determine the abnormal items in the inspection items, which is conducive to realizing the automatic supervision of the construction operation and improving the efficiency and accuracy of the supervision. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0066] Figure 1 It is a flow chart of an automatic supervision method for construction work disclosed in an embodiment of the present invention;

[0067] Figure 2 It is a flow chart of another automatic supervision method for construction work disclosed in an embodiment of the present invention;

[0068] Figure 3 It is a structural schematic diagram of an automatic supervision device for construction work disclosed in an embodiment of the present invention;

[0069] Figure 4 It is a structural schematic diagram of another automatic supervision device for construction work disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0070] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0071] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, device, product or end including a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units inherent to these processes, methods, products or ends.

[0072] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0073] The present invention discloses an automatic supervision method and device for construction work, which determines the items that need to be inspected based on the business supervision mode of the construction work, and then determines the abnormal items, and can accurately determine the abnormal items in the inspection items, which is conducive to realizing the automatic supervision of the construction work and improving the efficiency and accuracy of the supervision. The following are detailed descriptions.

[0074] Embodiment 1

[0075] See also Figure 1 , Figure 1 1 is a flow chart of an automatic supervision method for construction work disclosed in an embodiment of the present invention. Figure 1 The automatic supervision method for construction work described can be applied to a construction supervision system or a construction supervision device, and the embodiments of the present invention are not limited thereto. Figure 1 As shown, the automatic supervision method of the construction operation may include the following operations:

[0076] 101. Determine the target business type of the target construction work, determine the target supervision method of the target construction work based on the target business type, and determine all target inspection items of the target construction work based on the target supervision method.

[0077] In an embodiment of the present invention, the target business type may include at least one of emergency repair work, maintenance and overhaul, defect-fault-hidden danger management, non-stop power supply work, cross-over work, work near live bodies, expansion work, work risk assessment and operation ticket execution.

[0078] In an embodiment of the present invention, all target inspection items include at least one of construction work plan inspection items, construction work ticket inspection items, defect handling inspection items, on-site investigation inspection items, risk assessment and grading inspection items, safety tool inspection items, hidden danger rectification inspection items, safety briefing inspection items and safety measures inspection items.

[0079] In an optional embodiment, determining the target business type of the target construction operation may include:

[0080] The planned work content of the target construction work is obtained, keywords are filtered out from the planned work content, and the target business type of the target construction work is determined according to the keywords of the planned work content.

[0081] For example, when there are keywords corresponding to defect elimination in the planned work content of the target construction project, the target business type of the target construction project is determined to be defect-fault-hidden danger management; the keywords corresponding to defect elimination may include: "defect elimination", "repair" and at least one of "defect".

[0082] It can be seen that this optional embodiment determines the target business type according to the keywords of the planned work content of the construction operation, which helps to improve the accuracy and efficiency of determining the target business type.

[0083] 102. Determine whether there are any abnormal items among all target inspection items.

[0084] In another optional embodiment, when the target business type of the target construction operation is an emergency repair operation, determining whether there are abnormal items in all target inspection items may include:

[0085] Obtain the fault sheet corresponding to the target construction work, determine at least one of the faulty equipment, the location of the faulty equipment, and the estimated repair time of the fault according to the fault sheet to determine the query conditions of the repair work record corresponding to the fault sheet, query whether there is a repair work record corresponding to the fault sheet in the work record according to the query conditions, and when it is found that there is no repair work record corresponding to the fault sheet, determine that there are abnormal items in all target inspection items. Among them, the repair work record can be a repair work ticket; the data of the fault sheet can include data of permanent faults and unsuccessful reclosing.

[0086] It can be seen that this optional embodiment determines the query conditions for querying the repair work records corresponding to the trouble ticket based on the trouble ticket, and queries whether there are repair work records in the work records based on the query conditions to determine whether there are abnormal items in all target inspection items, which can improve the accuracy and efficiency of determining whether there are abnormal items in all target inspection items.

[0087] 103. When it is determined that there are abnormal items in all target inspection items, all abnormal items are screened out from all target inspection items.

[0088] It can be seen that the embodiment of the present invention determines the items that need to be inspected based on the business supervision method of the construction work, and then determines the abnormal items. It can accurately determine the abnormal items in the inspection items, which is conducive to realizing automatic supervision of construction work and improving the efficiency and accuracy of supervision.

[0089] Embodiment 2

[0090] See also Figure 2 , Figure 2 is a flow chart of another automatic supervision method for construction work disclosed in an embodiment of the present invention. Figure 2 The automatic supervision method for construction work described can be applied to a construction supervision system or a construction supervision device, and the embodiments of the present invention are not limited thereto. Figure 2 As shown, the automatic supervision method of the construction operation may include the following operations:

[0091] 201. Determine the target business type of the target construction work, determine the target supervision method of the target construction work based on the target business type, and determine all target inspection items of the target construction work based on the target supervision method.

[0092] In the embodiment of the present invention, for other descriptions of step 201, please refer to the detailed description of step 101 in the first embodiment, and the embodiment of the present invention will not be repeated.

[0093] 202. When all target inspection items include on-site investigation inspection items, obtain on-site investigation information of the target construction work, and determine whether there are any crossings of the lines at the construction site based on the on-site investigation information.

[0094] In the embodiment of the present invention, crossing over means that the transmission line intersects with other lines, and the other lines may include at least one of telecommunication lines, power lines, pipelines, cableways, railways and roads.

[0095] 203. When it is determined that there is no crossing of the line, the location information corresponding to the target construction work is obtained, and a route map matching the location information is obtained.

[0096] In the embodiment of the present invention, the line diagram includes the line layout and the equipment layout of the equipment in the line. Optionally, the line diagram can be a single-line diagram of the power distribution network GIS, which includes the location information and the line and power equipment corresponding to the location information.

[0097] 204. Determine whether the line layout and equipment layout of the construction site correspond to and match the line map based on the line map. If it is determined that there is no correspondence, determine that the on-site investigation and inspection item is an abnormal item.

[0098] 205. When it is determined that there are abnormal items in all target inspection items, all abnormal items are screened out from all target inspection items.

[0099] In the embodiment of the present invention, for other descriptions of step 205, please refer to the detailed description of step 103 in the first embodiment, and the embodiment of the present invention will not be repeated.

[0100] It can be seen that the embodiment of the present invention determines the items that need to be inspected based on the business supervision method of the construction work, and then determines the abnormal items. It can accurately determine the abnormal items in the inspection items, which is conducive to realizing automatic supervision of construction work and improving the efficiency and accuracy of supervision; when inspecting the on-site investigation and inspection items, the line crossing situation is judged according to the survey information, and whether the project is abnormal is judged according to whether the line map matches the actual construction site, which can improve the accuracy and efficiency of judging whether the on-site investigation items are abnormal.

[0101] In an optional embodiment, when all target inspection items include defect handling inspection items, determining whether there are abnormal items in all target inspection items includes:

[0102] Obtain all work contents of the target construction work;

[0103] Determine whether there are keywords corresponding to the defect elimination in all work contents;

[0104] When it is determined that the keyword exists in all the work contents, all target work contents containing the keyword are screened out from all the work contents;

[0105] Determine whether there is defect elimination reporting information during the working hours corresponding to each target work content. When it is determined that there is not defect elimination reporting information during the working hours corresponding to each target work content, determine that the defect handling inspection item is an abnormal item; the defect elimination reporting information is used to report the defect information of the equipment to the supervisory unit of the target construction work.

[0106] In this optional embodiment, the keywords corresponding to defect elimination may include at least one of: "defect elimination", "repair" and "defect".

[0107] It can be seen that this optional embodiment filters out the work content that needs to be detected according to keywords, and judges whether the defect handling inspection item is abnormal based on whether there is reporting information in the corresponding time of the work content that needs to be detected, which can improve the accuracy and efficiency of judging whether the defect handling inspection item is abnormal.

[0108] In another optional embodiment, when all target inspection items include safety measures inspection items, determining whether there are abnormal items in all target inspection items includes:

[0109] Acquire the construction images of the target construction work in real time and judge whether they meet the safety regulations according to the construction images;

[0110] When it is determined that the safety regulations are not met, the safety measure inspection item is determined to be an abnormal item;

[0111] And, judging whether the construction images comply with safety regulations, including:

[0112] Identify construction workers in the construction image based on the construction image, determine whether the construction workers are wearing safety helmets correctly, and if it is determined that the construction workers are not wearing safety helmets correctly, determine that safety regulations are not met; or

[0113] Determine whether there are any crossing lines based on the construction images. If it is determined that there are crossing lines, determine whether a grounding wire or a personal safety line should be installed at the construction site based on the construction images. If it is determined that no grounding wire or personal safety line is installed, it is determined that it does not meet safety regulations.

[0114] It can be seen that this optional embodiment determines whether the construction work complies with safety regulations based on the real-time image of the construction work, which can improve the accuracy and efficiency of determining whether the construction work complies with safety regulations, thereby improving the accuracy and efficiency of determining whether the safety measures inspection items are abnormal items.

[0115] In yet another optional embodiment, identifying construction workers in the construction image according to the construction image and determining whether the construction workers are wearing safety helmets correctly includes:

[0116] Get a preset helmet image;

[0117] A body image region corresponding to the body of the construction worker is identified in the construction image, a head image region corresponding to the head contour of the construction worker is divided in the body image region according to preset human body structure parameters, and a facial image region and a target image region other than the facial image region are divided from the head image region according to the head image region; the facial image region is the identified human facial image region;

[0118] The target image area is compared with the preset safety helmet image to obtain a difference. When the difference is greater than the preset difference, it is determined that the construction worker is not wearing the safety helmet correctly.

[0119] It can be seen that this optional embodiment identifies the head area of ​​the construction worker from the construction image, and divides the head area into the facial area and the non-facial area, and judges whether the construction worker is wearing the safety helmet correctly by comparing the difference between the image of the non-facial area and the image of the safety helmet. This can improve the accuracy and efficiency of determining whether the construction worker is wearing the safety helmet correctly.

[0120] In yet another optional embodiment, comparing the target image area with the preset helmet image to obtain the difference degree includes:

[0121] When the number of preset helmet images is 1, the vector distance between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector distance is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector angle is determined as the difference degree;

[0122] When the number of preset safety helmet images is greater than or equal to 2, the vector distance between the feature vector of the target image area and the feature vector of each preset safety helmet image is calculated, and the average value of all vector distances is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of each preset safety helmet image is calculated, and the average value of all vector angles is determined as the difference degree.

[0123] It can be seen that this optional implementation provides a method for obtaining difference by image comparison. Using different methods for determining the difference for different numbers of comparison images helps to improve the accuracy and efficiency of determining the difference, and improves the accuracy and efficiency of subsequent determination of whether construction workers are wearing safety helmets correctly based on the difference.

[0124] In yet another optional embodiment, when all target inspection items include on-site inspection items, determining whether there are abnormal items in all target inspection items may include:

[0125] Obtain operating information on the operating conditions of the power equipment at the construction site, determine whether the operating information matches the plan of the target construction work, and when it is determined that there is a mismatch, determine that the on-site inspection item is an abnormal item.

[0126] For example, in the plan, equipment A should remain connected at the planned time B to ensure construction safety or smooth construction. When the actual operating situation is that equipment A is disconnected at the planned time B, the on-site inspection item is determined to be an abnormal item.

[0127] It can be seen that this optional embodiment determines whether the on-site survey and inspection items are abnormal items based on whether the operating conditions of the electrical equipment at the construction site match the plan, which helps to improve the accuracy and efficiency of determining whether the on-site survey and inspection items are abnormal items, and helps to subsequently determine improvement plans based on the abnormal items.

[0128] Embodiment 3

[0129] See also Figure 3 , Figure 3 Schematic diagram of the structure of an automatic supervision device for construction work disclosed in an embodiment of the present invention. Figure 3 The automatic supervision device for construction work described can be applied to a construction supervision system or a construction supervision device, and the embodiments of the present invention are not limited thereto. Figure 3 As shown, the automatic supervision device for the construction operation may include:

[0130] A determination module 301 is used to determine a target business type of a target construction operation, determine a target supervision method of the target construction operation according to the target business type, and determine all target inspection items of the target construction operation according to the target supervision method;

[0131] A judgment module 302 is used to judge whether there are any abnormal items among all target inspection items;

[0132] The screening module 303 is used to screen out all abnormal items from all target inspection items when the judging module 302 judges that there are abnormal items in all target inspection items.

[0133] In an embodiment of the present invention, all target inspection items include at least one of construction work plan inspection items, construction work ticket inspection items, defect handling inspection items, on-site investigation inspection items, risk assessment and grading inspection items, safety tool inspection items, hidden danger rectification inspection items, safety briefing inspection items and safety measures inspection items.

[0134] It can be seen that the embodiment of the present invention determines the items that need to be inspected based on the business supervision method of the construction work, and then determines the abnormal items. It can accurately determine the abnormal items in the inspection items, which is conducive to realizing automatic supervision of construction work and improving the efficiency and accuracy of supervision.

[0135] In an optional embodiment, if Figure 3 As shown, the method in which the judgment module 302 judges whether there are abnormal items in all target inspection items specifically includes:

[0136] When all target inspection items include on-site inspection items, obtain on-site inspection information of the target construction work, and determine whether there is any crossing of the lines at the construction site based on the on-site inspection information;

[0137] When it is determined that there is no crossing of the line, the location information corresponding to the target construction work is obtained, and a line map matching the location information is obtained;

[0138] Determine whether the line layout and equipment layout of the construction site correspond to and match the line map based on the line map. If it is determined that there is no correspondence, determine that the on-site investigation and inspection item is an abnormal item; the line map includes the line layout and the equipment layout of the equipment in the line.

[0139] It can be seen that this optional embodiment, when checking on-site investigation and inspection items, determines the crossing of lines based on the investigation information, and determines whether the project is abnormal based on whether the line map matches the actual construction site, which can improve the accuracy and efficiency of determining whether on-site investigation projects are abnormal.

[0140] In yet another optional embodiment, Figure 3 As shown, the method in which the judgment module 302 judges whether there are abnormal items in all target inspection items specifically includes:

[0141] When all target inspection items include defect handling inspection items, all work contents of the target construction work are obtained;

[0142] Determine whether there are keywords corresponding to the defect elimination in all work contents;

[0143] When it is determined that the keyword exists in all the work contents, all target work contents containing the keyword are screened out from all the work contents;

[0144] Determine whether there is defect elimination reporting information during the working hours corresponding to each target work content. When it is determined that there is not defect elimination reporting information during the working hours corresponding to each target work content, determine that the defect handling inspection item is an abnormal item; the defect elimination reporting information is used to report the defect information of the equipment to the supervisory unit of the target construction work.

[0145] It can be seen that this optional embodiment filters out the work content that needs to be detected according to keywords, and judges whether the defect handling inspection item is abnormal based on whether there is reporting information in the corresponding time of the work content that needs to be detected, which can improve the accuracy and efficiency of judging whether the defect handling inspection item is abnormal.

[0146] In yet another optional embodiment, Figure 3 As shown, the method in which the judgment module 302 judges whether there are abnormal items in all target inspection items specifically includes:

[0147] When all target inspection items include safety measures inspection items, the construction images of the target construction work are acquired in real time, and whether the safety regulations are met is determined based on the construction images;

[0148] When it is determined that the safety regulations are not met, the safety measure inspection item is determined to be an abnormal item;

[0149] Furthermore, the determination module 302 determines whether the construction image complies with the safety regulations in the following manner:

[0150] Identify construction workers in the construction image based on the construction image, determine whether the construction workers are wearing safety helmets correctly, and if it is determined that the construction workers are not wearing safety helmets correctly, determine that safety regulations are not met; or

[0151] Determine whether there are any crossing lines based on the construction images. If it is determined that there are crossing lines, determine whether a grounding wire or a personal safety line should be installed at the construction site based on the construction images. If it is determined that no grounding wire or personal safety line is installed, it is determined that it does not meet safety regulations.

[0152] It can be seen that this optional embodiment determines whether the construction work complies with safety regulations based on the real-time image of the construction work, which can improve the accuracy and efficiency of determining whether the construction work complies with safety regulations, thereby improving the accuracy and efficiency of determining whether the safety measures inspection items are abnormal items.

[0153] In yet another optional embodiment, Figure 3 As shown, the judgment module 302 identifies the construction personnel in the construction image according to the construction image, and judges whether the construction personnel are wearing the safety helmet correctly in the following manner:

[0154] Get a preset helmet image;

[0155] A body image region corresponding to the body of the construction worker is identified in the construction image, a head image region corresponding to the head contour of the construction worker is divided in the body image region according to preset human body structure parameters, and a facial image region and a target image region other than the facial image region are divided from the head image region according to the head image region; the facial image region is the identified human facial image region;

[0156] The target image area is compared with the preset safety helmet image to obtain a difference. When the difference is greater than the preset difference, it is determined that the construction worker is not wearing the safety helmet correctly.

[0157] It can be seen that this optional embodiment identifies the head area of ​​the construction worker from the construction image, and divides the head area into the facial area and the non-facial area, and judges whether the construction worker is wearing the safety helmet correctly by comparing the difference between the image of the non-facial area and the image of the safety helmet. This can improve the accuracy and efficiency of determining whether the construction worker is wearing the safety helmet correctly.

[0158] In yet another optional embodiment, Figure 3 As shown, the judgment module 302 compares the target image area with the preset helmet image to obtain the difference degree in the following manner:

[0159] When the number of preset helmet images is 1, the vector distance between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector distance is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector angle is determined as the difference degree;

[0160] When the number of preset safety helmet images is greater than or equal to 2, the vector distance between the feature vector of the target image area and the feature vector of each preset safety helmet image is calculated, and the average value of all vector distances is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of each preset safety helmet image is calculated, and the average value of all vector angles is determined as the difference degree.

[0161] It can be seen that this optional implementation provides a method for obtaining difference by image comparison. Using different methods for determining the difference for different numbers of comparison images helps to improve the accuracy and efficiency of determining the difference, and improves the accuracy and efficiency of subsequent determination of whether construction workers are wearing safety helmets correctly based on the difference.

[0162] Embodiment 4

[0163] See also Figure 4 , Figure 4 Schematic diagram of another automatic monitoring device for construction work disclosed in an embodiment of the present invention. Figure 4 As shown, the automatic supervision device for the construction operation may include:

[0164] A memory 401 storing executable program codes;

[0165] a processor 402 coupled to the memory 401;

[0166] The processor 402 calls the executable program code stored in the memory 401 to execute the steps in the automatic supervision method for construction work described in the first embodiment of the present invention or the second embodiment of the present invention.

[0167] Embodiment 5

[0168] An embodiment of the present invention discloses a computer storable medium, which stores computer instructions. When the computer instructions are called, they are used to execute the steps in the automatic supervision method of construction work described in Embodiment 1 or Embodiment 2 of the present invention.

[0169] Embodiment 6

[0170] An embodiment of the present invention discloses a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to enable a computer to execute the steps in the automatic supervision method for construction work described in Example 1 or Example 2.

[0171] The device embodiments described above are only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, i.e., they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.

[0172] Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on such an understanding, the above technical solution can be essentially or partly contributed to the prior art in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0173] Finally, it should be noted that the automatic supervision method and device for construction operations disclosed in the embodiments of the present invention disclose only the preferred embodiments of the present invention, which are only used to illustrate the technical solution of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features therein may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for automatic supervision of construction work, characterized in that: The method comprises: Determine a target business type for a target construction operation, determine a target supervision method for the target construction operation according to the target business type, and determine all target inspection items for the target construction operation according to the target supervision method; Determine whether there are any abnormal items among all the target inspection items; When it is determined that the abnormal items exist in all the target inspection items, all the abnormal items are screened out from all the target inspection items; Wherein, all the target inspection items include safety measures inspection items, and the determining whether there are abnormal items in all the target inspection items includes: Acquire the construction image of the target construction work in real time, and determine whether the construction image complies with safety regulations; When it is determined that the safety specification is not met, determining the safety measure inspection item as the abnormal item; And, judging whether the construction image complies with safety regulations includes: Identify the construction workers in the construction image according to the construction image, determine whether the construction workers are wearing safety helmets correctly, and determine that safety regulations are not met when it is determined that the construction workers are not wearing safety helmets correctly; And, the identifying the construction worker in the construction image according to the construction image, and judging whether the construction worker wears a safety helmet correctly, comprises: Get a preset helmet image; A body image region corresponding to the body of the construction worker is identified in the construction image, a head image region corresponding to the head contour of the construction worker is divided from the body image region according to preset human body structure parameters, and a facial image region and a target image region other than the facial image region are divided from the head image region according to the head image region; the facial image region is an identified human facial image region; Comparing the target image area with the preset safety helmet image to obtain a difference, and when the difference is greater than the preset difference, determining that the construction worker is not wearing the safety helmet correctly; And, comparing the target image area with the preset helmet image to obtain a difference degree includes: When the number of the preset helmet images is 1, the vector distance between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector distance is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector angle is determined as the difference degree; When the number of the preset helmet images is greater than or equal to 2, the vector distance between the feature vector of the target image area and the feature vector of each of the preset helmet images is calculated, and the average value of all the vector distances is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of each of the preset helmet images is calculated, and the average value of all the vector angles is determined as the difference degree; Furthermore, all the target inspection items also include defect processing inspection items, and the determining whether there are abnormal items in all the target inspection items includes: Obtaining all work contents of the target construction work; Determine whether there are keywords corresponding to the defect elimination in all the work contents; When it is determined that the keyword exists in all the work contents, all target work contents containing the keyword are screened out from all the work contents; Determine whether there is defect elimination reporting information during the working hours corresponding to each of the target work contents; when it is determined that there is not defect elimination reporting information during the working hours corresponding to each of the target work contents, determine that the defect handling inspection item is the abnormal item; the defect elimination reporting information is used to report the defect information of the equipment to the supervisory unit of the target construction work.

2. The automatic supervision method for construction work according to claim 1 is characterized in that: All of the above-mentioned target inspection items also include at least one of the following: construction work plan inspection items, construction work ticket inspection items, on-site investigation inspection items, risk assessment and grading inspection items, safety tool inspection items, hidden danger rectification inspection items, and safety briefing inspection items.

3. The automatic supervision method for construction work according to claim 2 is characterized in that: All of the target inspection items include the on-site inspection items, and the determining whether there are abnormal items in all of the target inspection items includes: Acquire on-site survey information of the target construction work, and determine whether there is any crossing of the lines at the construction site according to the on-site survey information; When it is determined that there is no crossing of the line, obtaining the location information corresponding to the target construction work, and obtaining a route map matching the location information; According to the circuit diagram, it is determined whether the circuit layout and equipment layout of the construction site correspond to and match the circuit diagram. When it is determined that there is no corresponding match, the on-site investigation and inspection item is determined to be the abnormal item; the circuit diagram includes the circuit layout and the equipment layout of the equipment in the circuit.

4. The automatic supervision method for construction work according to claim 1 is characterized in that: The determining whether the construction image complies with safety regulations further includes: It is determined based on the construction image whether there is a line crossing. When it is determined that there is a line crossing, it is determined based on the construction image whether a grounding wire or a personal safety line is installed at the construction site. When it is determined that no grounding wire or personal safety line is installed, it is determined that it does not meet safety regulations.

5. An automatic supervision device for construction work, characterized in that: The device comprises: A determination module, used to determine a target business type of a target construction operation, determine a target supervision method of the target construction operation according to the target business type, and determine all target inspection items of the target construction operation according to the target supervision method; A judgment module, judging whether there are any abnormal items among all the target inspection items; A screening module, configured to screen out all the abnormal items from all the target inspection items when the judging module judges that the abnormal items exist in all the target inspection items; Furthermore, all the target inspection items include safety measures inspection items, and the judgment module judges whether there are abnormal items in all the target inspection items in a manner specifically including: Acquire the construction image of the target construction work in real time, and determine whether the construction image complies with safety regulations; When it is determined that the safety specification is not met, determining the safety measure inspection item as the abnormal item; Furthermore, the judgment module judges whether the construction image complies with the safety regulations in the following manner: Identify the construction workers in the construction image according to the construction image, determine whether the construction workers are wearing safety helmets correctly, and determine that safety regulations are not met when it is determined that the construction workers are not wearing safety helmets correctly; Furthermore, the judgment module identifies the construction worker in the construction image according to the construction image, and judges whether the construction worker wears the safety helmet correctly in the following manner: Get a preset helmet image; A body image region corresponding to the body of the construction worker is identified in the construction image, a head image region corresponding to the head contour of the construction worker is divided from the body image region according to preset human body structure parameters, and a facial image region and a target image region other than the facial image region are divided from the head image region according to the head image region; the facial image region is an identified human facial image region; Comparing the target image area with the preset safety helmet image to obtain a difference, and when the difference is greater than the preset difference, determining that the construction worker is not wearing the safety helmet correctly; And, the judgment module compares the target image area with the preset helmet image to obtain the difference degree, specifically including: When the number of the preset helmet images is 1, the vector distance between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector distance is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of the preset helmet image is calculated, and the vector angle is determined as the difference degree; When the number of the preset helmet images is greater than or equal to 2, the vector distance between the feature vector of the target image area and the feature vector of each of the preset helmet images is calculated, and the average value of all the vector distances is determined as the difference degree, or the vector angle between the feature vector of the target image area and the feature vector of each of the preset helmet images is calculated, and the average value of all the vector angles is determined as the difference degree; Furthermore, all the target inspection items also include defect handling inspection items, and the method in which the judgment module judges whether there are abnormal items in all the target inspection items specifically includes: Obtaining all work contents of the target construction work; Determine whether there are keywords corresponding to the defect elimination in all the work contents; When it is determined that the keyword exists in all the work contents, all target work contents containing the keyword are screened out from all the work contents; Determine whether there is defect elimination reporting information during the working hours corresponding to each of the target work contents; when it is determined that there is not defect elimination reporting information during the working hours corresponding to each of the target work contents, determine that the defect handling inspection item is the abnormal item; the defect elimination reporting information is used to report the defect information of the equipment to the supervisory unit of the target construction work.

6. An automatic supervision device for construction work, characterized in that: The device comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the automatic supervision method for construction work as described in any one of claims 1-4.

7. A computer storage medium, characterized in that: The computer storage medium stores computer instructions, which, when called, are used to execute the automatic supervision method for construction operations as described in any one of claims 1-4.