An optimal observation method for Beidou / GNSS mm-level satellite positioning during construction
By building a BIM model and combining it with a GNSS system to evaluate signal obstruction and optimize the position of the total station, the problem of low positioning accuracy and efficiency at the construction site was solved, and high-precision satellite positioning and construction management were achieved.
Patent Information
- Application Number
- CN202210029744.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-12
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-01-12
AI Technical Summary
At the construction site, the Beidou/GNSS global satellite navigation system cannot guarantee positioning accuracy and observation efficiency due to temporary obstruction, construction vibration, multi-path effects and other factors, making it difficult to directly apply mm-level satellite positioning results to assist construction management.
By building a BIM model, the GNSS global navigation satellite system broadcast ephemeris is used to calculate the satellite orbit, determine the maximum observation envelope, establish a 10cm square grid prediction point, evaluate the signal obstruction, determine the effective observation time and optimal position, and optimize the overall Station positioning.
It realizes the optimized observation of high-precision satellite positioning during the construction process, which is convenient and efficient, and improves the accuracy and efficiency of construction management.
Smart Images

Figure CN114545474B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of digital construction process, and in particular to an optimal observation method for Beidou / GNSS mm-level satellite positioning in a construction process. Background Art
[0002] The Beidou / GNSS global satellite navigation system can directly provide mm-level satellite positioning in an open environment, but it is difficult to ensure positioning accuracy and observation efficiency at the construction site due to temporary obstruction, construction vibration, and multipath effects, making it difficult to directly apply mm-level positioning results to assist construction management. This study proposes a scientific and convenient method to assist on-site surveyors in quickly determining the spatial position of GNSS receivers and total stations and completing on-site digital collection. Summary of the invention
[0003] Purpose of the invention: The purpose of the present invention is to solve the deficiencies in the prior art and to provide an optimal observation method for Beidou / GNSS mm-level satellite positioning during the construction process.
[0004] Technical solution: The present invention provides an optimal observation method for Beidou / GNSS mm-level satellite positioning during construction, comprising the following steps:
[0005] (1) Construction BIM model, including field layout model, adopts WGS84 absolute coordinate system;
[0006] (2) Use the GNSS global navigation satellite system broadcast ephemeris to calculate the satellite orbit of the observation day, output the GNSS satellite orbit coordinates (WGS84 coordinate system) every 1 minute, and unify the satellite orbit model with the construction BIM model;
[0007] (3) In the model of the work area to be observed, determine the maximum observation envelope 2 m inward from each side of the scaffolding;
[0008] (4) Conducting effective observation area assessment:
[0009] 1) Build a 10cm square grid within the satellite's maximum observation envelope, and use each intersection of the grid as a satellite observation estimation point;
[0010] 2) Calculate hourly whether there is any temporary obstruction of GNSS satellite signal transmission between each estimated point and the GNSS satellite at different minimum cut-off altitude angles of 15 to 35 degrees;
[0011] 3) If no obstruction is found at a certain altitude in a certain time period and there are a large number of observed satellites, then the time period and the corresponding satellite information are output;
[0012] 4) If there is always signal obstruction within the minimum cut-off elevation angle range of 15 to 35 degrees, analyze the time period with the least number of obstructed satellites and the corresponding satellite information;
[0013] 5) Within the envelope, merge all valid observation estimation points to form a valid observation area;
[0014] (5) Within the observation time calculated in step (4), analyze the time period during which observation conditions are available on site to determine the effective observation time;
[0015] (6) Based on the calculation results, determine the minimum cutoff satellite elevation angle that will be used in the final calculation;
[0016] (7) Determine the optimal position of the total station.
[0017] A further improvement of the present invention is that in step (4), a cross grid is also used to evaluate whether each intersection can meet specific requirements and whether the GNSS receiver, the total station and the double closed loop to be tested have line of sight.
[0018] A further improvement of the present invention is that, in step (4), the intersection points with full visibility are used as effective observation points.
[0019] A further improvement of the present invention is that, in step (4), all valid observation estimation points are merged to form an effective observation area of the total station.
[0020] A further improvement of the present invention is that in step (4), if there is no area on site that can meet all observation requirements without moving the total station, then it is calculated whether the two observations can meet all observation requirements after the total station is moved once, and the area for determining two observations according to the minimum moving distance principle is satisfied; if not, the calculation is performed for the case of moving twice; and the calculation is accumulated successively until all double closed-loop observation requirements are met.
[0021] A further improvement of the present invention is that, based on steps (4), (5) and (6), the optimal observation position of the total station is determined according to the position of the double closed loop to be measured and the plane characteristics of the structure.
[0022] A further improvement of the present invention is that the double closed loop position is a key node for all processes in each functional area of each flow section of the structure.
[0023] A further improvement of the present invention is that the optimal observation position of the total station is to be able to simultaneously observe the GNSS receiver and the double closed loop to be measured without moving or with a minimum number of total station movements.
[0024] Compared with the prior art, the optimal observation method for Beidou / GNSS mm-level satellite positioning during construction provided by the present invention achieves at least the following beneficial effects:
[0025] The present invention utilizes the GNSS global navigation satellite system broadcast ephemeris to record the precise position and trajectory table that changes with time, calculate the satellite orbit on the observation day, analyze the time period when the on-site observation conditions are available, determine the effective observation time, and determine the optimal position of the total station, thereby realizing optimized observation of high-precision satellite positioning during the construction process, which is convenient and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is the work flow chart of the present invention. DETAILED DESCRIPTION
[0027] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that the relative arrangement of components and steps, numerical expressions and numerical values set forth in the embodiments do not limit the scope of the present invention unless specifically stated otherwise.
[0028] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
[0029] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.
[0030] In all examples shown and discussed herein, any specific values should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.
[0031] In a construction project in the south, an optimal observation method for Beidou / GNSS mm-level satellite positioning was applied during the construction process, including the following steps:
[0032] (1) Establish a construction BIM model, which includes temporary facilities such as scaffolding and tower cranes, and convert the model into the WGS84 absolute coordinate system;
[0033] (2) Use the GNSS global navigation satellite system broadcast ephemeris to simulate the satellite orbit of the observation day, output the GNSS satellite orbit position (WGS84 coordinates) every 1 minute, and unify the construction BIM model with the orbit model;
[0034] (3) In the model of the work area to be observed, determine the maximum observation envelope 2 m inward from each side of the scaffolding;
[0035] (4) Conducting effective observation area assessment:
[0036] 1) Build a 10cm square grid within the satellite's maximum observation envelope, and use each intersection of the grid as a satellite observation estimation point;
[0037] 2) Calculate hourly whether there is any temporary obstruction of GNSS satellite signal transmission between each estimated point and the GNSS satellite at different minimum cut-off altitude angles of 15 to 35 degrees;
[0038] 3) If no obstruction is found at a certain altitude in a certain time period and there are a large number of observed satellites, then the time period and the corresponding satellite information are output;
[0039] 4) If there is always signal obstruction within the minimum cut-off elevation angle range of 15 to 35 degrees, analyze the time period with the least number of obstructed satellites and the corresponding satellite information;
[0040] 5) Within the envelope, merge all valid observation estimation points to form a valid observation area;
[0041] (5) Within the observation time calculated in step (4), analyze the time period during which observation conditions are available on site to determine the effective observation time;
[0042] (6) Based on the calculation results, determine the minimum cutoff satellite elevation angle that will be used in the final calculation;
[0043] (7) Determine the optimal position of the total station.
[0044] To further explain this embodiment, it should be noted that in step (4), a cross grid is also used to evaluate whether each intersection point meets the specific requirements, that is, whether the total station simultaneously observes the GNSS receiver and the dual closed loops to see if there is line of sight.
[0045] To further explain this embodiment, it should be noted that in step (4), the intersection points with full visibility are used as valid observation points.
[0046] To further explain this embodiment, it should be noted that in step (4), all valid observation estimation points are merged to form the effective observation area of the total station.
[0047] To further explain the present embodiment, it should be noted that in step (4), if there is no area on site that can meet all observation requirements without moving the total station, then it is calculated whether the two observations can meet all observation requirements after the total station is moved once, and the area for determining two observations based on the minimum moving distance principle is satisfied; if not, the calculation is performed for the case of moving twice; and the calculation is accumulated successively until all double closed-loop observation requirements are met.
[0048] To further explain this embodiment, it should be noted that, based on steps (4), (5), and (6), the optimal observation position of the total station is determined according to the position of the double closed loop to be measured and the structural plane characteristics.
[0049] In order to further explain the present embodiment, it should be noted that the double closed loop position is a key node of all processes in each functional area of each flow section of the structure.
[0050] To further explain the present embodiment, it should be noted that the specific requirement is that the optimal observation position of the total station is to be able to simultaneously observe the GNSS receiver and the dual closed loop to be measured without moving or with a minimum number of total station movements.
[0051] To sum up: the present invention utilizes the GNSS global navigation satellite system broadcast ephemeris to record the precise position and trajectory table that changes with time, calculate the satellite orbit of the observation day, analyze the time period when the on-site observation conditions are available, determine the effective observation time, and determine the optimal position of the total station, thereby realizing the optimized observation of high-precision satellite positioning during the construction process, which is convenient and efficient.
[0052] Although the embodiments of the present invention have been described in detail by way of example, it will be appreciated by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present invention. It will be appreciated by those skilled in the art that the above embodiments may be modified without departing from the scope and spirit of the present invention. The scope of the present invention is defined by the appended claims.
Claims
1. An optimal observation method for Beidou / GNSS mm-level satellite positioning during construction. It is characterized in that The steps include: (1) Construction BIM model, including field layout model, adopts WGS84 absolute coordinate system; (2) Use the GNSS global navigation satellite system broadcast ephemeris to calculate the satellite orbit of the observation day, output the GNSS satellite orbit coordinates every 1 minute, that is, the WGS84 coordinate system, and unify the satellite orbit model with the construction BIM model; (3) In the model of the work area to be observed, determine the maximum observation envelope 2 m inward from each side of the scaffolding; (4) Conducting effective observation area assessment: 1) Build a 10cm square grid within the satellite's maximum observation envelope, and use each intersection of the grid as a satellite observation estimation point; 2) Calculate hourly whether there is any temporary obstruction of GNSS satellite signal transmission between each estimated point and the GNSS satellite at different minimum cut-off altitude angles of 15 to 35 degrees; 3) If no obstruction is found at a certain altitude in a certain time period and there are a large number of observed satellites, then the time period and the corresponding satellite information are output; 4) If there is always signal obstruction within the minimum cut-off elevation angle range of 15 to 35 degrees, analyze the time period with the least number of obstructed satellites and the corresponding satellite information; 5) Within the envelope, merge all valid observation estimation points to form a valid observation area; (5) Within the observation time calculated in step (4), analyze the time period during which observation conditions are available on site to determine the effective observation time; (6) Based on the calculation results, determine the minimum cutoff satellite elevation angle that will be used in the final calculation; (7) Determine the optimal position of the total station.
2. According to the construction process Beidou / GNSS mm-level satellite positioning optimal observation method described in claim 1, It is characterized in that In step (4), a cross grid is also used to evaluate whether each intersection can meet specific requirements and whether the GNSS receiver, the total station and the double closed loop to be tested have line of sight.
3. According to the construction process Beidou / GNSS mm-level satellite positioning optimal observation method described in claim 2, Features , In the step (4), the intersection points with full visibility are used as effective observation points.
4. According to the construction process Beidou / GNSS mm-level satellite positioning optimal observation method described in claim 2, Features , In step (4), all valid observation estimation points are merged to form the effective observation area of the total station.
5. According to the construction process Beidou / GNSS mm-level satellite positioning optimal observation method described in claim 1, It is characterized in that In step (4), if there is no area on site that can meet all observation requirements without moving the total station, then calculate whether the two observations can meet all observation requirements after the total station is moved once, and determine the area for two observations based on the minimum moving distance principle; if not, calculate the case of moving twice; accumulate each time until all double closed-loop observation requirements are met.
6. The Beidou / GNSS mm-level satellite positioning optimal observation method for the construction process according to claim 1, It is characterized in that On the basis of steps (4), (5) and (6), the optimal observation position of the total station is determined according to the position of the double closed loop to be measured and the plane characteristics of the structure.
7. The Beidou / GNSS mm-level satellite positioning optimal observation method for the construction process according to claim 6, It is characterized in that The double closed loop position is the key node of all processes in each functional area of each flow section of the structure.
8. The Beidou / GNSS mm-level satellite positioning optimal observation method for the construction process according to claim 6, Features ,The specific requirements are as follows: the optimal observation position of the total station is ,capable of simultaneously observing the GNSS receiver and the double closed loop to be measured without ,moving or with the minimum number of total station movements.