A method for quickly installing a pipeline maintenance platform in a shield tunnel

By quickly installing platform brackets and pedals in the shield tunnel, the problems of pipeline maintenance time and safety risks are solved, and a fast and safe installation of pipeline maintenance platform is achieved.

CN114635751BActive Publication Date: 2025-08-01CHINA RAILWAY 15TH BUREAU GROUP CORPORATION LIMITED +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210299205.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-25
Publication Date
2025-08-01
Estimated Expiration
2042-03-25

AI Technical Summary

Technical Problem

The location and time of damage and leakage of pipes in the shield tunnel are uncertain, and the existing maintenance methods take a long time and pose safety risks.

Method used

Install platform brackets at both ends of the pipe, including poles, struts, pedal support and guardrails, and fasten them to the pipes and pipe sheets with ratchet components and fixtures to quickly install platform pedals and guardrails.

Benefits of technology

The pipeline maintenance process preparation time is simplified and construction safety is improved. Two workers can complete the installation in ten minutes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114635751B_ABST
    Figure CN114635751B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for quickly installing a pipeline maintenance platform in a shield tunnel. The method includes the following steps: Install a platform support at one end of the pipeline. The platform support includes a vertical pole, at least one strut, two fixing members, a pedal support, and a pedal diagonal brace. One ends of the strut, the pedal support, and the pedal diagonal brace are all movably connected to the vertical pole. A limiting mechanism is provided at the bottom of the pedal support. Lean the vertical pole against the outer wall of the pipeline and the inner wall of the segment. Open the pedal support. Through the cooperation between the pedal diagonal brace and the limiting mechanism at the bottom of the pedal support, keep the pedal support in a horizontal state. Adjust the position of the strut so that the strut supports on the inner wall of the segment. Wind the tightening belt tightly around the outer wall of the pipeline, and connect the two ends of the tightening belt to the two fixing members respectively, so as to fix the vertical pole to the pipeline and the segment. Install another platform support at the corresponding position at the other end of the pipeline. Install a platform pedal on the pedal support of the platform support. Install a guardrail on the pedal support of the platform support.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of shield tunnel construction, and in particular to a method for quickly installing a pipeline maintenance platform in a shield tunnel. Background Art

[0002] At present, for pipeline breakage and leakage in a shield tunnel, there are uncertainties in location and time. In the past, after the fault point was discovered by pipeline inspection personnel or video monitoring, maintenance personnel needed to spend a lot of time preparing maintenance materials and materials for the working platform and welding. Or simply not make a working platform and directly carry out pipeline maintenance work on the pipeline, which greatly increases the risk of falling for maintenance personnel and does not conform to the regulations of safe and civilized construction. Summary of the Invention

[0003] The purpose of the present invention is to provide a method for quickly installing a pipeline maintenance platform in a shield tunnel according to the deficiencies of the above-mentioned prior art. The platform support is fixed on the pipeline and the segment, and a platform pedal and a safety railing are installed on the platform support, effectively reducing the preparation time for pipeline maintenance processes and providing safety guarantees for workers during construction.

[0004] The realization of the purpose of the present invention is completed by the following technical solutions:

[0005] A method for quickly installing a pipeline maintenance platform in a shield tunnel, characterized in that the method comprises the following steps:

[0006] (S1) Install a platform support at one end of the pipeline. Wherein, the platform support includes a vertical pole, at least one strut, two fixing members, a pedal support and a pedal diagonal brace. One ends of the strut, the pedal support and the pedal diagonal brace are all movably connected to the vertical pole. A limiting mechanism is provided at the bottom of the pedal support. Lean the vertical pole against the outer wall of the pipeline and the inner wall of the segment, open the pedal support, and through the cooperation between the pedal diagonal brace and the limiting mechanism at the bottom of the pedal support, keep the pedal support in a horizontal state; adjust the position of the strut so that the strut supports on the inner wall of the segment; tightly wind a tightening belt around the outer wall of the pipeline, and connect the two ends of the tightening belt to the two fixing members respectively, so that the vertical pole is fixed to the pipeline and the segment;

[0007] (S2) Install another platform support at the corresponding position at the other end of the pipeline according to the installation method of step S1;

[0008] (S3) Install a platform pedal on the pedal support of the platform support;

[0009] (S4) Install a safety railing on the pedal support of the platform support.

[0010] The pedal support includes a support main body, a first stopper, a second stopper, and a guardrail socket. The first stopper and the second stopper are respectively arranged at both ends of the support main body, and the second stopper is spaced from one end of the support main body close to the vertical rod by a certain distance. A groove for placing the platform pedal is formed among the first stopper, the second stopper, and the support main body. The guardrail socket is arranged outside the first stopper, the top of the guardrail socket is higher than the top of the first stopper, and a sealing plate is provided at the bottom of the guardrail socket.

[0011] The limiting mechanism is a stepped card slot.

[0012] The platform pedal is formed by a plurality of platform pedal components. The platform pedal components are connected by hinges. The platform pedal component includes two long angle steels, two short angle steels, and an anti-slip net. The anti-slip net is arranged in a rectangular space formed by the long angle steels and the short angle steels. The long angle steels are reinforced by longitudinal reinforcing angle steels, and the short angle steels are reinforced by transverse reinforcing angle steels.

[0013] The guardrail is sequentially spliced by a guardrail first component, a guardrail second component, and a guardrail third component. The guardrail first component includes a left guardrail block, a bolt, and a bolt socket. The guardrail second component includes a middle guardrail block and a bolt. The guardrail third component includes a right guardrail block and a bolt socket. Among them, the bolt and the bolt socket of the guardrail first component are respectively arranged on both sides of the left guardrail block. The bolts of the guardrail second component are respectively arranged on both sides of the middle guardrail block. The bolt sockets of the guardrail third component are respectively arranged on both sides of the right guardrail block. The bolt sockets of the guardrail first component and the guardrail third component are matched with the bolts of the guardrail second component.

[0014] Both the left guardrail block and the right guardrail block include two cross bars, a plurality of short longitudinal bars, and a long longitudinal bar. The middle guardrail block includes two cross bars and a plurality of short longitudinal bars. The long longitudinal bars of the left guardrail block and the right guardrail block can be inserted into the guardrail sockets of the pedal support. The guardrails are connected by matching the bolts of the guardrail first component with the bolt sockets of the guardrail third component.

[0015] Protective sleeves are provided at the ends of both the support rod and the vertical rod.

[0016] The vertical rod is movably connected to the support rod, the pedal support, and the pedal diagonal brace through ratchet assemblies.

[0017] The advantages of the present invention are as follows: simple and quick operation; it can be installed by only two workers within ten minutes; effectively reducing the preparation time for pipeline maintenance and providing guarantee for the construction safety of workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 is a side view of the platform of the present invention;

[0019] Figure 2 is a front view of the platform of the present invention;

[0020] Figure 3 is a side view of the vertical pole of the present invention;

[0021] Figure 4 is a rear view of the vertical pole of the present invention;

[0022] Figure 5 is a structural diagram of the long brace of the vertical pole of the present invention;

[0023] Figure 6 is a schematic diagram of the folded state of the platform bracket of the present invention;

[0024] Figure 7 is a schematic diagram of the unfolded state of the platform pedal of the present invention;

[0025] Figure 8 is a front view of the folded state of the platform pedal of the present invention;

[0026] Figure 9 is a side view of the folded state of the platform pedal of the present invention;

[0027] Figure 10 is a structural diagram of the protective railing of the present invention;

[0028] Figure 11 is a structural diagram of the first component of the protective railing of the present invention;

[0029] Figure 12 is a structural diagram of the second component of the protective railing of the present invention;

[0030] Figure 13 is a structural diagram of the third component of the protective railing of the present invention. DETAILED DESCRIPTION OF THE INVENTION

[0031] The features of the present invention and other related features will be further described in detail below with reference to the accompanying drawings through embodiments for the understanding of those skilled in the same industry:

[0032] As Figures 1-13As shown in the figure, the markings 1-29 in the figure respectively represent: vertical pole 1, eyebolt 2, ratchet assembly 3, protective sleeve 4, pedal brace 5, first stop block 7, guardrail socket 8, card slot 10, long vertical pole brace 11, short vertical pole brace 12, pipeline 13, guardrail 14, ratchet tightening belt 15, platform pedal 16, left guardrail segment 17, pin socket 18, pipe segment 19, middle guardrail segment 20, pin 21, right guardrail segment 22, hinge 24, longitudinal reinforcing angle steel 25, long angle steel 26, short angle steel 27, transverse reinforcing angle steel 28, anti-slip net 29.

[0033] Embodiment: As Figures 1-13 shown, this embodiment relates to a method for quickly installing a pipeline maintenance platform in a shield tunnel, and the method includes the following steps:

[0034] S1: Install a platform bracket at one end of the pipeline 13.

[0035] As Figures 1-6 shown, the platform bracket is a foldable structure, and each platform bracket includes a vertical pole 1, at least one brace, two fixing parts, a pedal support, and a pedal brace 5. The vertical pole 1 is leaned against the outer wall of the pipeline 13 and the inner wall of the pipe segment 19. One end of the brace is movably connected to one side of the vertical pole 1 and is located in the middle of the vertical pole 1, and the other end of the brace can be supported on the inner wall of the pipe segment 19. The fixing parts and the brace are on the same side of the vertical pole 1, and the two fixing parts are respectively arranged at both ends of the vertical pole 1 for connecting and fixing the tightening belt. The tightening belt is tightly wound around the outer wall of the pipeline 13, and both ends of the tightening belt are respectively connected to the two fixing parts, so that the vertical pole 1 is fastened to the pipeline 13 and the pipe segment 19, and the brace is fastened to the pipe segment 19. One side of the pedal support and the pedal brace 5 are both movably connected to the other side of the vertical pole 1, and the pedal brace 5 is arranged at the bottom end of the vertical pole 1, and the pedal support is located above the pedal brace 5. A limiting device is arranged at the bottom of the pedal support, and the pedal brace 5 cooperates with the limiting device to keep the pedal support in a horizontal state for installing the platform pedal 16. In this embodiment, the fixing part is an eyebolt 2, the tightening belt is a ratchet tightening belt 15, the number of braces is two, which are the long vertical pole brace 11 and the short vertical pole brace 12 respectively. The vertical pole 1 is movably connected to the long vertical pole brace 11, the short vertical pole brace 12, the pedal support, and the pedal brace 5 respectively through the ratchet assembly 3. The support angles of the pedal brace 5, the long vertical pole brace 11, and the short vertical pole brace 12 are adjusted through the ratchet assembly 3 to adapt to different tunnel diameters and keep the pedal support horizontal, establishing a good working surface. The adjustable reverse self-locking characteristic of the ratchet assembly 3 makes the support structure more stable, and the long vertical pole brace 11 and the short vertical pole brace 12 respectively support on the inner wall of the pipe segment 19 in the directions of both sides of the pipeline 13, which can improve the stability of the platform bracket.

[0036] As Figure 3 、 Figure 4 、 Figure 5 and Figure 6As shown, protective sleeves 4 are provided at the ends of the long vertical strut 11, the short vertical strut 12, and the vertical pole 1. The protective sleeve 4 is used to protect the segment 19 and prevent the long vertical strut 11, the short vertical strut 12, and the vertical pole 1 from damaging the inner wall of the segment 19.

[0037] As Figures 6-9 shown, the pedal support includes a support body, a first stop block 7, a second stop block, and a guardrail socket 8. The first stop block 7 and the second stop block are respectively provided at both ends of the support body, and the second stop block is spaced a certain distance from the end of the support body close to the vertical pole 1. A groove for placing the platform pedal 16 is formed among the first stop block 7, the second stop block, and the support body, and the platform pedal 16 can be installed in this groove. The guardrail socket 8 is provided outside the first stop block 7. The top of the guardrail socket 8 is higher than the top of the first stop block 7 and is used for installing the guardrail 14. And a sealing plate is provided at the bottom of the guardrail socket 8 to support the guardrail 14 and keep the guardrail 14 horizontal. The limiting device is a stepped card slot 10, that is, a stepped card slot 10 is provided at the bottom of the support body. The pedal brace 5 can be clamped in the card slot 10 to keep the support body in a horizontal state. And due to the action of gravity, after maintenance personnel stand on the platform, the engagement between the pedal brace 5 and the card slot 10 will be tighter and the connection will be more stable. In this embodiment, the support body is a butt-welded angle steel, and when multiple platforms are connected in series, the pedal supports can be connected together.

[0038] Specifically, lean the vertical pole 1 against the outer wall of the pipeline 13 and the inner wall of the segment 19, open the pedal support, and make the pedal brace 5 clamped in the card slot 10 at the bottom of the pedal support to keep the pedal support in a horizontal state; adjust the positions of the long vertical strut 11 and the short vertical strut 12 through the ratchet assembly 3 to make the long vertical strut 11 and the short vertical strut 12 reliably support on the inner wall of the segment 19; wind the ratchet tightening belt 15 tightly around the outer wall of the pipeline 13, and make both ends of the ratchet tightening belt 15 connected to the two eyebolt 2 respectively, so as to fix the vertical pole 1 to the pipeline 13 and the segment 19.

[0039] S2: According to the installation method in step S1, install another platform bracket at the corresponding position at the other end of the pipeline 13.

[0040] S3: Install the platform pedal 16 on the pedal support of the platform bracket.

[0041] As Figures 7-9As shown, the platform pedal 16 is a foldable structure formed by several platform pedal components. The platform pedal components are connected by hinges 24. Each platform pedal component includes two long angle steels 26, two short angle steels 27, and an anti-slip net 29. The anti-slip net 29 is arranged in the rectangular space formed by the enclosure of the long angle steels 26 and the short angle steels 27. The long angle steels 26 are reinforced by longitudinal reinforcing angle steels 25, and the short angle steels 27 are reinforced by transverse reinforcing angle steels 28. In this embodiment, the number of platform pedal components is two. Of course, the platform pedal 16 can also be an integral structure.

[0042] Specifically, unfold the platform pedal 16 and fix it in the groove formed among the first stop block 7, the second stop block, and the butt-welded angle steel of the pedal support.

[0043] S4: Install the guardrail 14 on the pedal support of the platform bracket.

[0044] As Figures 10-13 shown, the guardrail 14 is a detachable structure, which is sequentially spliced by a first guardrail component, a second guardrail component, and a third guardrail component. The first guardrail component includes a left guardrail sub-block 17, a bolt 21, and a bolt socket 18. The second guardrail component includes a middle guardrail sub-block 20 and a bolt 21. The third guardrail component includes a right guardrail sub-block 22 and a bolt socket 18. Among them, the bolt 21 and the bolt socket 18 of the first guardrail component are respectively arranged on both sides of the left guardrail sub-block 17. The bolts 21 of the second guardrail component are respectively arranged on both sides of the middle guardrail sub-block 20. The bolt sockets 18 of the third guardrail component are respectively arranged on both sides of the right guardrail sub-block 22. The bolt sockets 18 of the first guardrail component and the third guardrail component cooperate with the bolts 21 of the second guardrail component to connect the first guardrail component, the second guardrail component, and the third guardrail component together. Both the left guardrail sub-block 17 and the right guardrail sub-block 22 include two cross bars, several short longitudinal bars, and one long longitudinal bar. The middle guardrail sub-block 20 includes two cross bars and several short longitudinal bars. The long longitudinal bars of the left guardrail sub-block 17 and the right guardrail sub-block 22 can be inserted into the guardrail sockets 8 of the pedal support to fix the guardrail 14. And when multiple platforms are connected in series, the guardrails 14 are connected by the cooperation of the bolts 21 of the first guardrail component and the bolt sockets 18 of the third guardrail component. Of course, the guardrail 14 can also be an integral structure.

[0045] Specifically, assemble the guardrail 14 and insert the long longitudinal bars of the first guardrail component and the third guardrail component on the guardrail 14 into the guardrail sockets 8 of the pedal support. After the installation of the platform is completed, the pipeline maintenance process can be carried out.

[0046] In addition, connecting multiple platforms in series can form a longer working surface to meet different working conditions and improve its practicability.

[0047] Although the above embodiments have detailed the concept and embodiments of the present invention with reference to the accompanying drawings, those of ordinary skill in the art can recognize that various improvements and transformations can still be made to the present invention without departing from the scope defined by the claims, so they will not be elaborated here one by one.

Claims

1. A method for quickly installing a pipeline maintenance platform in a shield tunnel, characterized in that, The method includes the following steps: S1: Install a platform support at one end of the pipeline. The platform support includes a vertical pole, at least one strut, two fixing members, a pedal support, and a pedal brace. One end of the strut is movably connected to one side of the vertical pole and is located in the middle of the vertical pole. The other end of the strut supports on the inner wall of the segment of the shield tunnel. The fixing members and the strut are on the same side of the vertical pole, and the two fixing members are respectively arranged at both ends of the vertical pole. One side of the pedal support and the pedal brace are both movably connected to the other side of the vertical pole, and the pedal brace is arranged at the bottom of the vertical pole, and the pedal support is located above the pedal brace. A limiting mechanism is provided at the bottom of the pedal support. Lean the vertical pole against the outer wall of the pipeline and the inner wall of the segment, open the pedal support, and through the cooperation between the pedal brace and the limiting mechanism at the bottom of the pedal support, keep the pedal support in a horizontal state. Adjust the position of the strut so that the strut supports on the inner wall of the segment. Wind the tightening belt tightly around the outer wall of the pipeline, and connect the two ends of the tightening belt to the two fixing members respectively, so that the vertical pole is fixed to the pipeline and the segment. S2: Install another platform support at the corresponding position at the other end of the pipeline according to the installation method in step S1. S3: Install a platform pedal on the pedal support of the platform support. S4: Install a guardrail on the pedal support of the platform support.

2. The method for quickly installing a pipeline maintenance platform in a shield tunnel according to claim 1, characterized in that, The pedal support includes a support body, a first stop block, a second stop block, and a guardrail socket. The first stop block and the second stop block are respectively arranged at both ends of the support body, and the second stop block is spaced a certain distance from the end of the support body close to the vertical pole. A groove for placing the platform pedal is formed between the first stop block, the second stop block, and the support body. The guardrail socket is arranged outside the first stop block, the top of the guardrail socket is higher than the top of the first stop block, and a sealing plate is provided at the bottom of the guardrail socket.

3. A method for quickly installing a pipeline maintenance platform in a shield tunnel as described in claim 1, characterized in that, The limiting mechanism is a stepped card slot.

4. The method for quickly installing a pipeline maintenance platform in a shield tunnel according to claim 1, characterized in that, The platform pedal is formed by a plurality of platform pedal components. The platform pedal components are connected by hinges. Each platform pedal component includes two long angle steels, two short angle steels, and an anti-slip net. The anti-slip net is arranged in the rectangular space formed by the long angle steels and the short angle steels. The long angle steels are reinforced by longitudinal reinforcing angle steels, and the short angle steels are reinforced by transverse reinforcing angle steels.

5. A method for quickly installing a pipeline maintenance platform in a shield tunnel as claimed in claim 1, characterized in that, The guardrail is sequentially spliced by a first guardrail component, a second guardrail component, and a third guardrail component. The first guardrail component includes a left guardrail block, a bolt, and a bolt socket. The second guardrail component includes a middle guardrail block and a bolt. The third guardrail component includes a right guardrail block and a bolt socket. Among them, the bolt and the bolt socket of the first guardrail component are respectively arranged on both sides of the left guardrail block. The bolts of the second guardrail component are respectively arranged on both sides of the middle guardrail block. The bolt sockets of the third guardrail component are respectively arranged on both sides of the right guardrail block. The bolt sockets of the first guardrail component and the third guardrail component are matched with the bolts of the second guardrail component.

6. The method for quickly installing a pipeline maintenance platform in a shield tunnel as claimed in claim 5, wherein, Both the left guardrail block and the right guardrail block include two cross bars, several short vertical bars, and one long vertical bar. The middle guardrail block includes two cross bars and several short vertical bars. The long vertical bars of the left guardrail block and the right guardrail block can be inserted into the guardrail sockets supported by the pedal. The guardrails are connected by matching the bolts of the first guardrail component with the bolt sockets of the third guardrail component.

7. A method for quickly installing a pipeline maintenance platform in a shield tunnel as claimed in claim 1, characterized in that, Protective sleeves are provided at the ends of both the support rod and the vertical rod.

8. A method for quickly installing a pipeline maintenance platform in a shield tunnel as described in claim 1, characterized in that, The vertical rod is movably connected to the support rod, the pedal support, and the pedal diagonal brace through ratchet assemblies.