A Simulation Transformer Test System
The simulated transformer testing system solves the problem that existing technologies cannot simulate operating conditions without affecting the actual operation of transformers, enabling safe and efficient oil and gas configuration and monitoring, and ensuring system safety and reliability.
Patent Information
- Application Number
- CN202210256241.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-15
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-03-15
AI Technical Summary
Existing technologies cannot simulate various operating conditions for transformer oil and gas configuration and monitoring without affecting actual transformer operation, which poses a safety hazard.
A simulated transformer testing system was designed, including components such as a cylinder, hydraulic plug, pneumatic control pipe, oil circulation pipe, and online monitoring connection pipe. The system achieves oil preparation, heating, cooling, and gas monitoring through the control of solenoid valves and circulation pumps, ensuring that the pressure and temperature are within a safe range.
It achieves safe and efficient transformer oil and gas configuration and operating condition simulation, and can monitor the oil status in real time to ensure system safety and reliability.
Smart Images

Figure CN114675211B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of transformers, and in particular to a simulation transformer testing system. Background Art
[0002] Transformer oil has a much higher dielectric strength than air. When insulating materials are immersed in oil, not only can the dielectric strength be improved, but also the materials can be protected from moisture erosion. Transformer oil can also dissipate heat for transformer coils. In addition, on oil circuit breakers and transformer on-load tap changers, arcs will be generated when contacts are switched. Since transformer oil has good thermal conductivity and can separate a large amount of gas under the high temperature of the arc, a large pressure is generated, thereby improving the arc extinguishing performance of the medium and extinguishing the arc quickly.
[0003] When an oil-immersed transformer is in use, the temperature, pressure and oil concentration of the transformer oil must be kept within the appropriate working range. Real-time online monitoring is usually achieved through an online monitoring system. The online monitoring system includes online monitoring equipment for gas in oil. During the research and development, production and testing of online monitoring equipment for gas in oil, it is impossible to directly connect it to the online monitoring system corresponding to the transformer in use for testing. On the one hand, it is impossible to simulate various working conditions, and on the other hand, it is a safety issue.
[0004] Therefore, a simulation transformer testing system is needed to solve the above technical problems. Summary of the invention
[0005] The present invention aims at solving the technical problems existing in the prior art and provides a simulation transformer testing system.
[0006] The technical solution of the present invention to solve the above technical problems is as follows: a simulated transformer test system, comprising a cylinder body, a hydraulic plug is embedded in the cylinder body, the hydraulic plug is sealed and slidably connected to the inner wall of the cylinder body, a connecting rod is arranged on the top of the hydraulic plug, a central through pipe is passed through the connecting rod and the hydraulic plug, the upper end of the connecting rod is located outside the cylinder body, the connecting rod and the cylinder body are sealed and slidably connected, an oil discharge port is arranged at the bottom of the cylinder body, and an air inlet is arranged at the top of the cylinder body;
[0007] The air inlet is connected to an air pressure control tube, the other end of which is connected to an air generator, and the air pressure control tube is connected in parallel to a pressure relief tube, on which a solenoid valve B is installed;
[0008] An oil circulation pipe is connected to the oil discharge port, and the other end of the oil circulation pipe is connected to the upper end of the middle pipe. The oil circulation pipe is sequentially installed with a solenoid valve E, a circulation pump, and a solenoid valve D in series. The oil circulation pipe is connected in parallel with a standard gas addition pipe, an oil addition pipe, an online monitoring connecting pipe, and an oil sampling pipe. The standard gas addition pipe is sequentially installed with a solenoid valve G, a flow meter, and a solenoid valve H in series. The oil addition pipe is installed with a solenoid valve N. A solenoid three-way valve C is provided at the connection between the oil sampling pipe and the oil circulation pipe. Both ends of the online monitoring connecting pipe are connected to the oil circulation pipe, one end of the online monitoring connecting pipe is connected to the front end of the solenoid valve E, and the other end of the online monitoring connecting pipe is connected to the rear end of the solenoid valve D. An online monitoring device for gas in oil is installed in series on the online monitoring connecting pipe.
[0009] Preferably, in the above-mentioned simulated transformer testing system, a pressure gauge and a pressure sensor are installed in parallel on the air pressure control tube.
[0010] Preferably, in the above-mentioned simulated transformer testing system, a pressure relief valve is installed on the top of the cylinder.
[0011] Preferably, in the above-mentioned simulated transformer testing system, a heating box is installed in series on the oil circulation pipe, and a plurality of heating rods are embedded in the interior of the heating box.
[0012] Preferably, in the above-mentioned simulated transformer testing system, an oil cooling pipe is installed in parallel on the oil circulation pipe, the oil cooling pipe is embedded in a cooling box, the cooling box is filled with cooling water, and an electromagnetic three-way valve M is provided at the connection between the oil circulation pipe and the end of the oil cooling pipe.
[0013] Preferably, in the above-mentioned simulated transformer testing system, a filter box is installed in series on the oil circulation pipe.
[0014] Preferably, in the above-mentioned simulated transformer testing system, a solenoid valve F and a solenoid valve K are installed in series on the online monitoring connecting pipe, and the online monitoring device is located between the solenoid valve F and the solenoid valve K.
[0015] Preferably, in the above-mentioned simulated transformer testing system, the oil cooling pipe is in an "S" shape.
[0016] The beneficial effects of the present invention are as follows: by setting the transformer in the form of a cylinder body, the pressure inside the cylinder body is balanced through the oil cylinder and the gas cylinder, which ensures that the pressure during simulation is within the safe pressure range, and the safety is high. The oil configuration and the standard gas configuration can be realized through the control of each solenoid valve and the circulating pump, and the manual oil extraction detection can be realized through the oil sampling tube, or the gas in the oil can be detected through the online monitoring equipment of the gas in the oil. The oil can be cooled by the cooling box, the oil cooling pipe and the circulating flow of the oil, and the oil can be heated by the heating box and the heating rod. The simulation transformer test system has high safety and can realize the oil and gas configuration of the transformer and the simulation test of various working conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall working principle of the present invention.
[0018] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0019] 1. Cylinder body, 2. Hydraulic plug, 3. Center pipe, 4. Pressure relief valve, 5. Air inlet, 6. Oil drain, 7. Cooling box, 8. Oil cooling pipe, 9. Oil circulation pipe, 10. Online monitoring connecting pipe, 11. Air pressure control pipe, 12. Oil sampling pipe, 13. Standard gas adding pipe, 14. Heating box, 15. Heating rod, 16. Oil adding pipe, 17. Pressure relief pipe, 18. Filter box. DETAILED DESCRIPTION
[0020] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0021] like Figure 1 As shown, a simulated transformer test system includes a cylinder body 1, a hydraulic plug 2 is embedded in the cylinder body 1, the hydraulic plug 2 is sealed and slidably connected to the inner wall of the cylinder body 1, a connecting rod is arranged on the top of the hydraulic plug 2, a central through pipe 3 is passed through the connecting rod and the hydraulic plug 2, the upper end of the connecting rod is located outside the cylinder body 1, the connecting rod and the cylinder body 1 are sealed and slidably connected, an oil drain port 6 is arranged at the bottom of the cylinder body 1, and an air inlet 5 is arranged at the top of the cylinder body 1. A temperature sensor is arranged at the bottom of the cylinder body 1 for monitoring the oil temperature in the cylinder body 1. A liquid level sensor is arranged on the bottom surface of the hydraulic plug 2 to monitor the oil level in real time.
[0022] The air inlet 5 is connected to an air pressure control tube 11, and the other end of the air pressure control tube 11 is connected to an air generator for introducing air into the upper end of the cylinder body 1. A one-way valve is installed at the front end of the air generator. A pressure gauge and a pressure sensor are installed in parallel on the air pressure control tube 11. A pressure relief tube 17 is connected in parallel to the air pressure control tube 11, and a solenoid valve B is installed on the pressure relief tube 17. A pressure relief valve 4 is installed on the top of the cylinder body 1 to play a role of mechanical pressure relief insurance.
[0023] The oil outlet 6 is connected to an oil circulation pipe 9, and the other end of the oil circulation pipe 9 is connected to the upper end of the middle pipe 3. The oil circulation pipe 9 is sequentially installed in series with an electromagnetic three-way valve C, a filter box 18, an electromagnetic valve E, a circulation pump, an electromagnetic valve D, a heating box 14, and an electromagnetic valve A. A plurality of heating rods 15 are embedded in the heating box 14. The filter box 18 is used to filter impurities in the oil during the oil circulation process, and the impurities can be cleaned out by opening the cover of the filter box 18.
[0024] The oil circulation pipe 9 is connected in parallel with a standard gas adding pipe 13, an oil adding pipe 16, an online monitoring connecting pipe 10, and an oil sampling pipe 12. The standard gas adding pipe 13 is sequentially connected in series with a solenoid valve G, a flow meter, and a solenoid valve H, and its end is connected to a standard gas source;
[0025] A solenoid valve N is installed on the oil adding pipe 16, and its end is connected to the oil input source;
[0026] The oil sampling tube 12 is connected to the electromagnetic three-way valve C and is used to manually take oil samples for testing;
[0027] Both ends of the online monitoring connecting pipe 10 are connected to the oil circulation pipe 9, one end of the online monitoring connecting pipe 10 is connected to the front end of the solenoid valve E, and the other end of the online monitoring connecting pipe 10 is connected to the rear end of the solenoid valve D. The solenoid valve F, the online gas in oil monitoring equipment, and the solenoid valve K are installed in series on the online monitoring connecting pipe 10.
[0028] An oil cooling pipe 8 is also installed in parallel on the oil circulation pipe 9. The oil cooling pipe 8 is "S" shaped and embedded in the cooling box 7. The cooling box 7 is filled with cooling water. An electromagnetic three-way valve M is provided at the end connection of the oil circulation pipe 9 and the oil cooling pipe 8. Each electromagnetic valve is controlled by an intelligent control unit.
[0029] Working principle:
[0030] When simulating the oil and gas configuration of the transformer, the solenoid valve N, the circulating pump, the solenoid valve D, and the solenoid valve A are opened, and the other solenoid valves are closed. At this time, the oil enters the cylinder body 1 through the oil adding pipe 16, the oil circulating pipe 9, and the middle pipe 3. When the liquid level sensor senses that the liquid level has reached the set position, it transmits the signal to the intelligent control unit. After receiving the signal, the intelligent control unit closes the solenoid valve N, the circulating pump, the solenoid valve D, and the solenoid valve A. Subsequently, the solenoid valve G and the solenoid valve H are opened, the electromagnetic three-way valve M and the electromagnetic three-way valve C are all transversely conductive, the solenoid valve E, the circulating pump, the solenoid valve D, and the solenoid valve A are opened, and the other solenoid valves are closed. The standard gas enters the oil circulating pipe 9 through the standard gas adding pipe 13, and the oil is driven by the circulating pump to circulate along the oil circulating pipe 9 and the cylinder body 1, so that the oil and the standard gas are fully and evenly mixed, thereby completing the oil and gas configuration. After the oil and gas configuration is completed, it is static for a set time until the oil concentration is constant. The concentration and volume of the standard gas are controlled by the intelligent control unit according to the set oil distribution concentration and oil distribution gas content, and are measured by the flow meter.
[0031] Through the control of the electromagnetic three-way valve C, oil is taken from the oil sampling tube 12 for offline testing to determine the concentration of the oil sample, or by opening the electromagnetic valve F, the online monitoring equipment for gas in oil, the electromagnetic valve K, the electromagnetic valve A, the transverse conduction electromagnetic three-way valve M, the electromagnetic three-way valve C, closing the remaining solenoid valves, and completing the test of the oil concentration through the online monitoring equipment for gas in oil.
[0032] When the oil temperature in the cylinder 1 is low, the heating rod 15 and the electromagnetic valves and circulation pumps connected in series on the oil circulation pipe 9 are started. While heating, the entire oil is heated by circulating the oil, so that the overall oil temperature is more uniform, and the oil temperature in the cylinder 1 is increased. When the oil temperature in the cylinder 1 is high, the electromagnetic three-way valve M conducts the end of the oil cooling pipe 8 and the rear end of the oil circulation pipe 9, and the electromagnetic valves and circulation pumps connected in series on the oil circulation pipe 9 are started. While the oil circulates, the oil is cooled by the oil cooling pipe 8 and the cooling water in the cooling box 7 until the oil temperature drops to the set value, and then the circulation pump is turned off.
[0033] In addition, during the configuration of the oil sample, the air generator, pressure sensor and solenoid valve B work together to keep the pressure in the cylinder constant. When the pressure in cylinder 1 increases, the pressure sensor detects that the pressure exceeds the upper pressure limit, and opens the solenoid valve B to release air to reduce the pressure in cylinder 1. When the pressure reaches the set normal pressure, close the solenoid valve B; when the pressure in cylinder 1 decreases, the pressure sensor detects that the pressure is lower than the lower pressure threshold, and opens the air generator to inject air into the upper side of cylinder 1 to increase the cylinder pressure. When the pressure reaches the set normal pressure, close the air generator.
[0034] In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, and a specific direction structure and operation, and therefore, cannot be understood as a limitation on the present invention. In addition, "first" and "second" are only for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0035] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0036] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A simulation transformer test system, Features: The invention comprises a cylinder body (1), wherein a hydraulic plug (2) is embedded in the cylinder body (1), wherein the hydraulic plug (2) is in sealing and sliding connection with the inner wall of the cylinder body (1), a connecting rod is arranged on the top of the hydraulic plug (2), a central through pipe (3) is passed through the connecting rod and the hydraulic plug (2), the upper end of the connecting rod is located outside the cylinder body (1), the connecting rod and the cylinder body (1) are in sealing and sliding connection, an oil discharge port (6) is arranged at the bottom of the cylinder body (1), and an air inlet (5) is arranged at the top of the cylinder body (1); The air inlet (5) is connected to an air pressure control pipe (11), the other end of the air pressure control pipe (11) is connected to an air generator, the air pressure control pipe (11) is connected in parallel to a pressure relief pipe (17), and the pressure relief pipe (17) is installed with a solenoid valve B; The oil discharge port (6) is connected to an oil circulation pipe (9), the other end of which is connected to the upper end of the central tube (3), and the oil circulation pipe (9) is sequentially connected in series with an electromagnetic valve E, a circulation pump, and an electromagnetic valve D, and the oil circulation pipe (9) is connected in parallel with a standard gas addition pipe (13), an oil addition pipe (16), an online monitoring connection pipe (10), and an oil sampling pipe (12), and the standard gas addition pipe (13) is sequentially connected in series with an electromagnetic valve G, a flow meter, and an electromagnetic valve H, and the An electromagnetic valve N is installed on the oil adding pipe (16); an electromagnetic three-way valve C is provided at the connection between the oil sampling pipe (12) and the oil circulation pipe (9); both ends of the online monitoring connecting pipe (10) are connected to the oil circulation pipe (9); one end of the online monitoring connecting pipe (10) is connected to the front end of the electromagnetic valve E, and the other end of the online monitoring connecting pipe (10) is connected to the rear end of the electromagnetic valve D; and an online monitoring device for gas in oil is installed in series on the online monitoring connecting pipe (10).
2. The analog transformer test system according to claim 1, Features: A pressure gauge and a pressure sensor are installed in parallel on the air pressure control pipe (11).
3. The analog transformer test system according to claim 1, Features: A pressure relief valve (4) is installed on the top of the cylinder body (1).
4. The analog transformer test system according to claim 1, Features: A heating box (14) is installed in series on the oil circulation pipe (9), and a plurality of heating rods (15) are embedded inside the heating box (14).
5. The analog transformer test system according to claim 1, Features: An oil cooling pipe (8) is installed in parallel on the oil circulation pipe (9), and the oil cooling pipe (8) is embedded in a cooling box (7). The cooling box (7) is filled with cooling water, and an electromagnetic three-way valve M is provided at the connection between the end of the oil circulation pipe (9) and the oil cooling pipe (8).
6. The analog transformer test system according to claim 1, Features: A filter box (18) is installed in series on the oil circulation pipe (9).
7. The analog transformer test system according to claim 1, Features: A solenoid valve F and a solenoid valve K are installed in series on the online monitoring connecting pipe (10), and the online monitoring device is located between the solenoid valve F and the solenoid valve K.
8. The simulation transformer test system according to claim 5, Features: The oil cooling pipe (8) is in an "S" shape.