LCDI power cable system and method
By using conductive center wire and phase wire shields and leakage detection circuits in power cables, the problems of increasing costs and detection difficulty of traditional power cables are solved, and rapid and accurate leakage current detection and power interruption are achieved, reducing fire risk.
Patent Information
- Application Number
- CN202111537034.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-12-31
- Filing Date
- 2021-12-13
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-12-13
AI Technical Summary
Existing power cables require additional conductors and sheaths when detecting leakage current, which increases costs, and the increase in traditional copper costs lead to increased costs of power cables, making it difficult to quickly and accurately detect leakage currents in power cables, which may be Causes fire and property damage.
An alternating power cable is designed, using conductive center wire and phase wire shielding, the conductive side is wound outward or inside, and is equipped with a conductive flexible medium, combining leakage detection circuit and shield integrity circuit to detect and interrupt the power line. The line voltage between the AC line end and the load end of the cable, if leakage current or damage to shield integrity is detected, the power supply will be interrupted.
It realizes rapid and accurate detection of leakage current in power cables without additional costs, and timely interrupting power supply in case of faults or leakage, reducing fire risks and property losses.
Smart Images

Figure CN114689986B_ABST
Abstract
Description
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This continuation-in-part application is related to the application(s) listed below (the "related applications"), claims the benefit of the earliest available effective filing date of the related applications (e.g., claims the benefit of the earliest available priority date for a patent application other than a provisional patent application; claims the benefit of 35 U.S.C. §119(e) for a provisional patent application), and incorporates by reference in its entirety all of the subject matter of the related applications to the extent that the subject matter of the related applications does not conflict with this application; this application also claims the benefit of the earliest available effective filing date of any and all parent, grandfather, great-grandfather, etc. applications of the related applications, and incorporates by reference in its entirety all of the subject matter of those applications to the extent that the subject matter of those applications does not conflict with this application:
[0003] U.S. Provisional Patent Application 63 / 013742, entitled “LCDI Shield Continuity Monitoring Circuits,” designates Victor V. Aromin as the first inventor, and was filed on April 22, 2020. And U.S. Patent Application 16,935,895, claiming priority to U.S. Provisional Patent Application 62 / 876,960, entitled “Power Cord,” designates Victor V. Aromin as the first inventor, and was filed on July 22, 2019, and U.S. Provisional Patent Application 62 / 880,970, entitled “Power Cord,” designates Victor V. Aromin as the first inventor, and was filed on July 31, 2019. Technical Field
[0004] The present invention relates to a power cable. In particular, the present invention relates to a power cable for a facility, the power cable having a built-in leakage detection and interruption (LCDI) conductor for detecting leakage current in the power cable. Background Art
[0005] With the widespread use of household electrical appliances such as air conditioners, washing machines, refrigerators, etc., more and more attention has been paid to the safety of using these appliances. The appliances generally have power cables one meter long or longer. Figure 1As shown, this power cable is made of the following components: three copper wires 11, 6 and 8 for carrying electricity; three insulating layers 10, 5 and 7 (made of rubber or plastic) surrounding the corresponding copper wires; two metal sheaths 19 and 14 (woven from thin copper wires) respectively surrounding the two insulating layers; and an outer insulating layer 1 (made of rubber or plastic) that encapsulates these conductors.
[0006] Such power cables may age due to long-term use or be damaged when the facility is moved, which may cause leakage between the phase line and the neutral line or the ground line in the cable. This leakage current may cause sparks, leading to fire and property damage. In order to quickly and accurately detect leakage current in the power cable, an additional conductor is provided and electrically connected to the metal sheath 19, 14. The leakage current can be detected by detecting the voltage on the metal sheath. The metal sheath is traditionally made by braiding thin copper wires. Due to the increase in the cost of copper, the cost of the power cable has increased.
[0007] Another prior art solution is shown in Figure 2 The power cable includes three copper wires 11, 6 and 8 for carrying power and a leakage detection conductor 3 for detecting leakage current in the power cable. As before, the three copper wires 11, 6 and 8 are surrounded by three insulating layers (made of rubber or plastic) 10, 5 and 7, respectively. The two insulating layers 10, 5 are surrounded by metal conductive layers 9, 4, respectively. The leakage detection conductor 3 is arranged adjacent to the two metal conductive layers 9, 4 and in contact with both of them. The metal sheath 2 encapsulates the three wires together with their respective insulating layers and metal conductive layers and the leakage detection conductor 3. The outer insulating layer 1 (made of rubber or plastic) is arranged outside the metal sheath 2.
[0008] The metal conductive layers 9 and 4 may be made of thin copper foil, tin foil, aluminum foil or conductive rubber. The leakage detection conductor 3 may be formed of one or more copper wires or aluminum wires. When there is leakage current between the copper wires 11 and 6, 11 and 8, or 6 and 8, the leakage detection conductor 3 may detect the leakage current via the metal conductive layer 9 or 4. Figure 2 As shown, this prior art solution requires a further conductive sheath 2 surrounding all cables as well as the detection conductor 3 . Summary of the invention
[0009] Accordingly, the present invention provides a power cable that can be used in appliances such as air conditioners, washing machines, refrigerators, etc., the power cable having a built-in leakage detection conductor for detecting leakage current in the power cable.
[0010] According to one embodiment of the present invention, an alternating current (AC) power cable is provided. The AC power cable includes a neutral line assembly having an insulated conductive neutral line and a conductive neutral line shield surrounding the insulated neutral line insulator. The conductive neutral line shield includes a conductive side and a non-conductive side, and the conductive side is wound around the insulated neutral line outwardly. The AC power cable includes a conductive flexible medium wound around the conductive side of the neutral line shield. The AC power cable also includes a phase line assembly, wherein the phase line assembly includes a conductive shield having a conductive side and a non-conductive side, and the conductive side is wound around the insulated phase line inwardly. The conductive neutral line shield and the conductive phase line shield are connected in series at one end of the AC power cable.
[0011] The present invention also relates to an alternating current (AC) power cable having an insulated neutral conductor, an insulated phase conductor, an insulated return conductor, and a ground conductor. The present invention also relates to an AC power cable having an insulated neutral conductor, an insulated phase conductor, an insulated return conductor, and a ground conductor. The present invention also relates to an AC power cable having an insulated neutral conductor, an insulated phase conductor, an insulated return conductor, and a ground conductor. The AC power cable also comprises a conductive shielding member surrounding the insulated neutral conductor, the insulated phase conductor, the insulated return conductor, and the ground conductor. The conductive shielding member comprises an outwardly conductive side and an inwardly non-conductive side. A conductive flexible medium surrounds the conductive side of the conductive shielding member. The conductive flexible medium and the return conductor are connected in series at one end of the power cable.
[0012] According to another embodiment of the present invention, an AC power cable is provided. The AC power cable includes an insulated neutral conductor, the insulated neutral conductor is surrounded by a conductive neutral conductor shield having a conductive side and a non-conductive side. The conductive side of the neutral conductor shield faces outward. Surrounding the neutral conductor shield is a conductive flexible medium. The AC power cable also includes an insulated phase conductor, the insulated phase conductor is surrounded by a conductive phase conductor shield having a conductive side and a non-conductive side. The conductive side of the phase conductor shield faces outward. Surrounding the phase conductor shield is a second conductive flexible medium. The conductive phase conductor shield and the conductive neutral conductor shield are connected in series at one end of the AC power cable.
[0013] According to another embodiment of the present invention, a leakage detection interrupter (LCDI) circuit for interrupting AC power from an AC power source is provided. The LCDI circuit is electrically connectable to an insulated neutral line surrounded by a neutral shield (NWS) and an insulated phase line surrounded by a phase shield (LWS). The LCDI circuit also includes a power supply source circuit for providing a rectified waveform and a floating load connected to the power supply source circuit. The floating load connected to the power supply source circuit includes a leakage detection circuit (LCDC) for detecting leakage current from the insulated neutral line or the insulated phase line and a shield integrity circuit (SIC) for monitoring the integrity of the NWS and LWS.
[0014] The present invention also relates to a method for constructing a power cable and circuit for detecting and interrupting a line voltage between an alternating current (AC) line end and a load end of the power cable when a fault in the power cable is detected. The method includes providing an insulated conductive neutral conductor between the load end and the AC line end of the power cable, and wrapping the insulated conductive neutral conductor with a neutral conductor shield, with the conductive side of the neutral conductor shield facing outward. The method includes wrapping a conductive flexible dielectric around the conductive side of the neutral conductor shield. The method also includes providing a phase conductor shield having a conductive side and a non-conductive side, and an insulated conductive phase conductor, and wrapping the phase conductor shield around the tinned conductor and the insulated phase conductor with the conductive side facing inward and in electrical contact with the tinned conductor. The method includes connecting the tinned conductor in series with the conductive flexible dielectric at the load end of the power cable. The method also includes interrupting the line voltage if a current is detected between the insulated phase conductor or the insulated neutral conductor and either shield; and / or includes interrupting the line voltage if the shield integrity is damaged or otherwise compromised, such as a rupture or corrosion of the shield. The method also includes providing a rectified power supply circuit for powering the neutral shield with a voltage.
[0015] According to another embodiment of the present invention, a method is provided for interrupting an AC line voltage between an AC line end and a load end of a shielded power cable when a power cable fault is detected. The method includes providing a leakage detection circuit (LCDC) for detecting an AC leakage current from the power cable and interrupting the line voltage between the AC line end and the load end of the shielded power cable if the leakage current is detected. The method includes connecting the LCDC and the SIC to the shielded power cable and providing a power supply source circuit (PSC) for energizing the LCDC, the SIC and the shielded power cable with a voltage. Providing the LCDC also includes providing a bistable latch device having an on / off state and a charge retention device connected to a control port of the bistable latch device; the control ports are, for example, transistor bases or SCR gate ports. The method includes: during normal operation, charging the charge retention device, the charge being less than a trigger charge required to trigger the bistable latch device to its conductive state, but sufficient to minimize the time required to trigger the device if a fault is detected and to minimize destructive surge current. The method also includes providing a shield integrity circuit (SIC) for monitoring the integrity of the shielded power cable and interrupting a line voltage between an AC line end and a load end of the shielded power cable if the shield integrity is compromised. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The subject matter regarded as the invention for patent protection is particularly pointed out and distinctly claimed in the claims at the end of this specification. The foregoing and other objects, features and advantages of the invention will be clearly seen from the following detailed description taken in conjunction with the accompanying drawings, in which:
[0017] Figure 1 is a cross-sectional view showing the structure of a conventional power cable;
[0018] Figure 2 is a cross-sectional view showing another conventional power cable structure with a leakage detection conductor;
[0019] Figure 3 is a cut-away side view showing a power cable structure with a leakage detection conductor according to an alternative embodiment of the present invention;
[0020] Figure 3A Yes Display Figure 3 A cross-sectional view of the power cable structure shown in;
[0021] Figure 3B is a cut-away side view showing a power cable structure with a leakage detection conductor according to an alternative embodiment of the present invention;
[0022] Figure 3C Yes Display Figure 3B A cross-sectional view of the power cable structure shown in;
[0023] Figure 3D is a cut-away side view showing a power cable structure with a leakage detection conductor according to an alternative embodiment of the present invention;
[0024] Figure 3E Yes Display Figure 3D A cross-sectional view of the power cable structure shown in;
[0025] Figure 4 is a cross-sectional view showing a power cable structure with a leakage detection conductor and a water immersion detection cable according to one embodiment of the present invention;
[0026] Figure 4A is a cross-sectional view showing a power cable structure with a leakage detection conductor and a twisted pair water intrusion detection cable according to one embodiment of the present invention;
[0027] Figure 5 is able to connect to Figure 1 , Figure 2 , Figure 3 , Figure 3A-3E A circuit block diagram of an LCDI circuit for a power cable shown in;
[0028] Figure 6 is able to connect to Figure 4 or Figure 4AA block diagram of an LCDI circuit for a power cable as shown in;
[0029] Figure 7 yes Figure 5 A detailed schematic diagram of the block diagram shown in;
[0030] Figure 8 yes Figure 5 An alternative schematic diagram of the block diagram shown in;
[0031] Fig. 9 yes Figure 5 A detailed schematic diagram of the block diagram shown in;
[0032] Fig.10 yes Figure 5 An alternative schematic diagram of the block diagram shown in;
[0033] Fig. 10A yes Figure 3B-Figure 3E A partial exploded view of the loop circuit connections shown in;
[0034] Fig.11A is for Figure 7 or Figure 8 The waveform diagram of the normal condition of the shield integrity circuit (SIC) shown in FIG.
[0035] Fig. 11B is for Figure 7 Waveform diagram of SIC fault condition shown in;
[0036] Fig. 11C is for Figure 8 Waveform diagram of SIC fault condition shown in;
[0037] Fig. 12A is for Fig. 9 or Fig.10 The waveform diagram of the normal condition of SIC is shown in FIG.
[0038] Fig. 12B is for Fig. 9 Waveform diagram of SIC fault condition shown in;
[0039] Fig. 12C is for Fig.10 Waveform diagram of SIC fault condition shown in;
[0040] Fig.13 Shown is a flow chart of a method for constructing a power cable for detecting and interrupting a line voltage between an AC line end and a load end of a power cable according to the present invention;
[0041] Fig.13A Shown is a flow chart of an alternative method for constructing a power cable for detecting and interrupting a line voltage between an AC line end and a load end of a power cable according to the present invention;
[0042] Fig. 13B Shown is a flow chart of a second alternative method for constructing a power cable for detecting and interrupting a line voltage between an AC line end and a load end of a power cable according to the present invention;
[0043] Fig.14A is for Figure 7 or Figure 8 The waveform diagram of the leakage detection circuit (LCDC) under normal conditions shown in ; and
[0044] Fig. 14B is for Fig. 9 or Fig.10 The waveform diagram of the leakage detection circuit (LCDC) under normal conditions is shown in FIG. DETAILED DESCRIPTION
[0045] The following brief definitions of terms apply throughout this application:
[0046] The term "including" means including but not limited to and should be understood in the manner in which it is commonly used in patent texts;
[0047] The phrases "in one embodiment", "according to one embodiment" and the like generally mean that the particular feature, structure or characteristic following the phrase may be included in at least one embodiment of the present invention, and may be included in more than one embodiment of the present invention (importantly, such phrases do not necessarily refer to the same embodiment);
[0048] If the specification describes something as "exemplary" or "example," it should be understood to refer to a non-exclusive example; and
[0049] If the specification says that a component or feature "may", "could", "might", "should", "preferably", "likely", "generally", "optionally", "for example" or "probably" (or other such language) be included or have a certain characteristic, then this particular component or feature is not required to be included or have that characteristic.
[0050] Now refer to the accompanying drawings Figure 3 and Figure 3A, a cut-away side view is shown, showing the structure of a power cable 400 with a leakage detection conductor according to an alternative embodiment of the present invention. In this embodiment, the power cable 400 includes a neutral wire or cable 45, a phase wire or cable 48 and a ground wire 46. Each conductor or cable is surrounded by an insulating layer 43, 49 and 492. In addition, the insulating layers 492 and 43 of the phase wire 48 and the neutral wire 45 are each surrounded by a shield; the shields are conductive media 41 and 42, respectively. It should be understood that the conductive media 41, 42 have a conductive side and a non-conductive or low-conductive side. The conductive media 41, 42 can be an aluminum foil shield including a thin layer of aluminum and polyester film composite tape. The conductive side of the conductive medium 41 faces outward, and the low-conductive or non-conductive side of the conductive medium faces inward. The conductive side of the conductive medium 42 faces outward.
[0051] Still see Figure 3 and Figure 3A , the power cable 400 also includes a solid tin copper wire 495 placed between the conductive medium 41 and the insulator 492. The conductive side of the conductive medium 42 is surrounded by a conductive flexible medium 44. The conductive flexible medium 44 can be any suitable conductive flexible medium, woven to cover 30% of the surface area of the conductive side per unit length of the conductive medium 42. At least one end of the conductive flexible medium 44 can be connected to the LCDI circuit 494. In addition, at least one end of the wire 495 can also be connected to the LCDI circuit 494. The conductive flexible medium can be any suitable conductive material, such as a conductive coating, a tape, a bandage, a braided copper flexible medium, or a conductive flexible medium woven from a conductive material such as, but not limited to, a high-performance carbon fiber / gold / copper composite wire, a conductive graphene wire, or a conductive graphene yarn.
[0052] It will be appreciated that if insulator 492 or 43 is defective and current leaks to the conductive side of conductive medium 41 or 42, the current flows through conductive flexible medium 44 or wire 495 where it is detected by LCDI circuit 494 and power between the line power supply and the load is interrupted.
[0053] See also the attached figure Figure 3B and Figure 3C , a cut-away side view is shown, showing the structure of a power cable 3B400 with a leakage detection conductor according to an alternative embodiment of the present invention. In this embodiment, the power cable 3B400 includes a neutral wire or cable 45, a phase wire or cable 48, a ground wire 46 and a return wire 3B01. Each conductor or cable is made of an insulating layer 43, 49, 492 (such as Figure 3A) and 3B49. The insulated conductors 45, 46, 48, 3B01 are surrounded or wrapped with a shield (i.e., a conductive medium 3B42). It should be understood that the conductive medium 3B42 has a conductive side and a non-conductive or low-conductive side. The conductive medium 3B42 can be an aluminum foil shield, including a thin layer of aluminum and a polyester film composite tape. The conductive side of the conductive medium 3B42 faces outward, while the low-conductive or non-conductive side of the conductive medium faces inward toward the center of the power cable 3B400.
[0054] Still see Figure 3B and Figure 3C , the conductive side of the conductive medium 3B42 is surrounded by a conductive flexible medium 3B44. The conductive flexible medium 3B44 can be any suitable conductive flexible medium, woven to cover 30% of the surface area of the conductive side of the conductive medium 3B42 per unit length. At least one end of the conductive flexible medium 3B44 can be connected to the LCDI circuit 3B494. In addition, at least one end of the return line 3B01 can also be connected to the LCDI circuit 3B494. The conductive flexible medium can be any suitable conductive material, such as a copper flexible medium, or a conductive flexible medium woven from a conductive material such as, but not limited to, a high-performance carbon fiber / gold / copper composite wire, a conductive graphene wire, or a conductive graphene yarn.
[0055] See also Figure 3D and Figure 3E , a cut-away side view is shown, showing the structure of a power cable 3C400 with a leakage detection conductor according to an alternative embodiment of the present invention. In this embodiment, the power cable 3C400 includes a neutral line or cable 45, a phase line or cable 48, a ground line 46 and a return line 3B01. Each conductor or cable is surrounded by an insulating layer 43, 49 and 492. In addition, the insulating layers 492 and 43 of the phase line 48 and the neutral line 45 are respectively surrounded by shielding members; the shielding members are conductive media 3C42 and 3C42A, respectively. It should be understood that each of the conductive media 3C42 and 3C42A has a conductive side and a non-conductive or low-conductive side. The conductive media 3C42 and 3C42A can be an aluminum foil shielding member including a thin layer of aluminum and a polyester film composite tape. The conductive side of each of the conductive media 3C42 and 3C42A faces outward.
[0056] Still see Figure 3D and Figure 3E, the conductive side of the conductive medium 3C42 and 3C42A is surrounded or wrapped by the conductive flexible medium 3C44 and 3C44A. The conductive flexible medium 3C44 and 3C44A can be any suitable conductive flexible medium, woven to cover 30% of the surface area of the conductive side of the conductive medium 3C42 and 3C42A2 per unit length. At least one end of the conductive flexible medium 3C44 and 3C44A can be connected to the LCDI circuit 3D494. In addition, at least one end of the return line 3B01 can also be connected to the LCDI circuit 3D494. The conductive flexible medium 3C44 and 3C44A can be any suitable conductive material, such as a copper flexible medium, or a conductive flexible medium woven from a conductive material such as, but not limited to, a high-performance carbon fiber / gold / copper composite wire, a conductive graphene wire, or a conductive graphene yarn.
[0057] See also Figure 4 , a cut-away side view is shown showing the structure of the power cable 401 with the aforementioned leakage detection conductor and the water detection cable 407, which includes a conductor 405 surrounded by a water-absorbing cover 406. The water-absorbing cover 406 is arranged in the power cable 401 and is in close contact with the conductive flexible medium 44 and / or the conductive medium 42. In this embodiment, the moisture absorbed by the water-absorbing cover 406 realizes the electrical connection between the conductor 405 and the conductive flexible medium 44 and / or the conductive medium 42. As described in more detail herein, the LCDI circuit 494A detects the electrical connection between the conductor 405 and the conductive flexible medium 44 and / or the conductive medium 42 and interrupts the power between the line power supply and the load.
[0058] See also Figure 4A , a cut-away side view is shown showing the structure of a power cable 401A with the aforementioned leakage detection conductor and a twisted pair water detection cable 407A according to one embodiment of the present invention. The twisted pair water detection cable 407A includes conductors 405A and 405B, each of which is surrounded by a water-absorbing cover 406A and 406B, respectively. In this embodiment, moisture absorbed by the water-absorbing cover 406A and 406B achieves electrical connection between the conductors 405A and 405B and / or between the conductor 405A or 405B and the conductive flexible medium 44 and / or the conductive medium 42, and interrupts power between the line power supply and the load. As described in more detail herein, the LCDI circuit 494 detects the electrical connection and interrupts power between the line power supply and the load.
[0059] See also Figure 5 , the figure shows that there are Figure 1 , Figure 2 , Figure 3 or Figure 3A. The LCDI circuit 50 of the power cable shown in FIG. LCDI circuit 50 includes a phase shield 513, a neutral shield 515, a switch 518, a power supply circuit 512, a leakage detection circuit (LCDC) 517, a solenoid 519 and a shield integrity circuit (SIC) 514. As shown here, LCDC 517 and SIC 514 include a floating load relative to the power supply 512. SIC 514 includes a SIC controller 514A and a SIC switch 514B. LCDC 517 includes an LCDC switch 517A. Shield 515 is constructed and provided according to any one of the shields described above. As described in more detail here, when the manual reset switch 518 is set, the line voltage is connected to the load and the power supply circuit 512 via the solenoid 519. The power supply circuit 512 supplies bias voltage to LCDC 517, SIC 514 and shields 513 and 515. Shields 513 and 515, having load terminals 513A and 515A, respectively, are connected in series at their load terminals. Power supply 512 is connected to power terminal 513B of shield 513; while LCDC 517 and SIC 514 are connected to power or line terminal 515B of shield 515. As discussed and shown in more detail herein, SIC 514 allows a small amount of solenoid current to flow through solenoid 519, but the current is less than the supply current required to power solenoid 519 to disengage manual reset switch 518. It will be appreciated that the supply current that does not start from zero allows solenoid 519 to be powered more quickly when a fault is detected.
[0060] See also Figure 6 , the figure shows that there are Figure 4 or Figure 4A . As is well known, two dissimilar metals in electrical contact (such as the conductive flexible medium 44 and the conductive layer 42) begin to electrochemically corrode in the presence of an electrolyte such as water. Thus, if the IDC 62 detects moisture, the connection of the IDC 62 to the SIC 514 causes the AC line power to be disconnected from the load. The water detection cable (IDC) can be the water detection cable 407 or the twisted pair water detection cable 407A described above.
[0061] Still see Figure 6 , LCDI circuit 60 also includes a light detection circuit (LDC) 64 connected to SIC 514. In the event that light shines on circuit 60, meaning circuit 60 is exposed to weather conditions, if LCD 64 detects light, SIC 514 disconnects the AC line power from the load.
[0062] See also Figure 7 , the figure shows Figure 5 Detailed circuit 70 of block diagram 50 is shown in FIG. LCDI circuit 70 includes phase shield 513, neutral shield 515, switch 518, power supply circuit 712, leakage detection circuit (LCDC) 717, solenoid 519 and shield integrity circuit (SIC) 714. Shield 515 includes conductive layer 42 surrounded by conductive flexible medium 44 described above. As described in more detail herein, when manual reset switch 518 is set, line voltage is connected to load and power supply circuit 712 via solenoid 519. Power supply circuit 712 supplies bias voltage to LCDC 717, SIC 714 and shields 513 and 515. As discussed and shown in more detail herein, SIC 714 allows a small amount of solenoid current to flow through solenoid 519, but less than the supply current required to energize solenoid 519 to disengage manual reset switch 518. It will be appreciated that not starting the supply current from zero allows the solenoid 519 to be energized more quickly when a fault is detected.
[0063] Still see Figure 7 and Figure 11A-11B When switch 518 is mechanically (manually) engaged, the AC line voltage is connected to the load. The 60 Hz AC line voltage is also connected to the power supply source circuit 712 via solenoid 519. The power supply source circuit 712, which includes a bridge rectifier (diodes D1-D4), outputs a rectified unsmoothed DC signal at A. The rectified unsmoothed DC signal at A is sent to LCDC 717 and SIC 714 via series-connected shields 513 and 515 through R6.
[0064] R6 reduces the amplitude of the rectified unsmoothed DC signal at A to a predetermined amplitude at B. The voltage divider R3 / R7 reduces the amplitude of the rectified unsmoothed DC signal at B to a predetermined amplitude at C. Under normal circumstances, the voltage amplitude at C, i.e., the gate of SCR2 LCDC switch 517A, is not sufficient to trigger SCR2 to enter the on state. However, it should be understood that C3 is charged to a voltage determined by R3 and R7 to maintain a minimum voltage on the gate of SCR2. (See Fig.14A Full-wave rectification and Fig. 14B) If an adverse leakage condition occurs, such as arcing from the AC line voltage to shield 513 or 515, the gate voltage at C will rise from the charge on C3, triggering SCR2 to enter the on state. With SCR2 turned on or conducting, the current flowing through solenoid 519 increases to the solenoid energization level to open the manual reset switch 518 and interrupt power between the AC line power supply and the load. Similarly, it should be understood that the gate voltage, which does not start from zero, allows SCR2 to trigger more quickly when a fault is detected compared to starting the gate voltage from zero volts. It can also be understood that the surge current may exceed the current carrying capacity of the circuit board connector and PCB traces, resulting in damage to the connectors and traces. Therefore, maintaining a minimum C3 charge can minimize surge current and potential circuit damage in the event of an arc.
[0065] Still see Figure 7 The unsmoothed DC signal after rectification at B is sent to the base of npn transistor Q1 through R2, SIC controller 514A (see Fig.11A ), biasing Q1 into conduction during the positive cycle of the rectified unsmoothed DC. When the voltage on Q1(B) drops below V BE When the unsmoothed DC signal at A swings positive, Q1 is biased on again, causing the unsmoothed DC signal at A to drop through R8, thereby keeping Q2 off during normal operation.
[0066] Still see Figure 7 , it can be appreciated that under normal conditions, the rectified unsmoothed DC signal at A drops across resistor R8, and that the size of R8 allows an amount of AC current, less than the SOL1 519 supply current, to flow through R8 and back to neutral through Q1 when Q1 is conducting. During the time that Q1 is in the off state or non-conducting state, SOL1 519 inductively blocks the current from changing until Q1 is turned on again, thereby maintaining or nearly maintaining the current flowing through SOL1 519. It can be appreciated and understood that the small amount of solenoid current flowing through solenoid SOL1 519 is less than the supply current required to power the solenoid 519 to disengage the manual reset switch 518. It should also be appreciated that the supply current that does not start from zero allows the solenoid 519 to be powered more quickly when a fault is detected.
[0067] Still see Figure 7 When the shield integrity is damaged (such damage is, for example, a rupture of the shielding members 513, 515, or a voltage drop across a corroded area within the power cable), the bias on voltage V at the base of Q1 is BE is not sufficient to keep Q1 in a conductive state (see Fig. 11B ). The voltage at the base of Q2 (Q1C) rises to the Q2 bias on voltage that turns Q2 on, sufficient to increase the current through solenoid 519, energizing solenoid 519 and disengaging manual reset switch 518. Thus, power from the AC line power to the load is interrupted. It should be understood and appreciated that during the positive or negative cycle of the input AC waveform (not shown), the full-wave bridge rectifier 712 enables the SIC to detect and disconnect the AC line power from the load when a fault is detected. In other words, for a 60 Hz AC power source, the SIC detects and interrupts power between the AC line power and the load in 1 ms or less.
[0068] See also Figure 8 , the picture shows Figure 5 An alternative circuit diagram to the SIC block diagram shown in . The rectified unsmoothed DC signal at B is sent to the base of npn transistor Q1 via R2, biasing Q1 into an on state, which in turn causes the rectified unsmoothed DC signal at A to drop across R8. As a result, the gate voltage at the gate of SCR1 is insufficient to trigger SCR1. It will be appreciated that the frequency of the rectified unsmoothed DC signal at the base of Q1 is a frequency sufficient to maintain Q1 in a substantially on state during normal operation, thereby suppressing the presence of a sufficient biased on gate voltage at the gate of SCR1. In other words, for example, when the rectified unsmoothed DC voltage signal at the base of Q1 drops below the biased on voltage of Q1, Q1 is turned off and the biased on gate voltage at the gate of SCR1 begins to rise. However, under normal circumstances, before there is sufficient biased on gate voltage at the gate of SCR1, Q1 turns back on, again reducing the gate voltage at the gate of SCR1 to below the sufficient biased on voltage (see Fig.11A ).
[0069] When Q1's V BE When the voltage drops, i.e., due to a fault such as a crack in shield 513, 515 or a voltage drop across a corroded area, the bias on voltage at the base of Q1 is insufficient to keep Q1 in its on state during the positive voltage swing of A. The gate voltage at the gate of SCR1 rises to the SCR1 gate bias on voltage (see FIG. 1 ) which triggers SCR1. Fig. 11C ), which is sufficient to increase the current flowing through the solenoid 519, energizing the solenoid 519 and disengaging the manual reset switch 518. Thus, the power from the AC line power to the load is interrupted.
[0070] See also Fig. 9 , the figure shows Figure 5An alternative detailed circuit 90 of the block diagram 50 shown in FIG. LCDI circuit 90 includes a phase shield 513, a neutral shield 515, a switch 518, a power supply circuit 912, a leakage detection circuit (LCDC) 917, a solenoid 519, and a shield integrity circuit (SIC) 914. As described in more detail herein, when the manual reset switch 518 is set, the line voltage is connected to the load and the power supply circuit 912 via the solenoid 519. The power supply circuit 912 provides a bias voltage to the LCDC 917, the SIC 914, and the shields 513 and 515. As discussed and shown in more detail herein, the SIC 914 allows a small amount of solenoid current to flow through the solenoid 519, but less than the supply current required to power the solenoid 519 so that the manual reset switch 518 is disengaged. It can be appreciated that the supply current that does not start from zero allows the solenoid 519 to be powered more quickly when a fault is detected.
[0071] Still see Fig. 9 and Figure 12A-12B When switch 518 is mechanically (manually) engaged, the AC line voltage is connected to the load. The 60 Hz AC line voltage is also connected to the power supply source circuit 912 via solenoid 519. The power supply source circuit 912, which includes a half-wave rectifier (diodes D1-D2), outputs a half-wave rectified unsmoothed DC signal at A. The rectified unsmoothed DC signal at A is sent to LCDC 917 and SIC 914 via shields 513 and 515 connected in series through R6.
[0072] R6 reduces the amplitude of the rectified unsmoothed DC signal at A to a predetermined amplitude at B. The voltage divider R3 / R7 reduces the amplitude of the rectified unsmoothed DC signal at B to a predetermined amplitude at C. Under normal circumstances, the voltage amplitude at C, i.e., at the gate of the SCR2 LCDC switch 517A, is insufficient to trigger SCR2 into the on state. However, it should be understood that C3 is charged to a voltage determined by R3 and R7 to maintain a minimum voltage on the gate of SCR2. If an adverse leakage condition occurs, such as an arc from the AC line voltage to the shield 513 or 515, the gate voltage at C will rise from the charge on C3 to trigger SCR2 into the on state. In the on or conductive state of SCR2, the current flowing through the solenoid 519 increases to the solenoid supply level, causing the manual reset switch 518 to disengage and interrupt the power between the AC line power supply and the load. Likewise, it will be appreciated that a gate voltage that does not start at zero allows the SCR 2 to fire more quickly when a fault is detected than if the gate voltage started at zero volts.
[0073] Still see Fig. 9 The half-wave rectified unsmoothed DC signal at B is sent to the base of npn transistor Q1 via R2 (see Fig.11A), biasing Q into conduction during the positive cycle of the rectified unsmoothed signal. When the voltage of Q1(B) drops below V BE When the unsmoothed DC signal at A swings positive, Q1 is biased on again, causing the unsmoothed DC signal at A to drop across R8, thus keeping Q2 off during normal operation.
[0074] Still see Fig. 9 , it can be appreciated that under normal conditions, the rectified unsmoothed signal at A drops across resistor R8, and that the size of R8 allows an amount of AC current less than the SOL1 519 supply current to flow through R8 and back to neutral through Q1 when Q1 is conducting. During the Q1 off state or non-conducting state, SOL1 519 inductively resists current changes until Q1 is turned on again, thereby maintaining or nearly maintaining the current flowing through SOL1 519. It can be appreciated and understood that the small amount of solenoid current flowing through solenoid SOL1 519 is less than the supply current required to power the solenoid 519 to disengage the manual reset switch 518. It should also be appreciated that the supply current that does not start from zero allows the solenoid 519 to be powered more quickly when a fault is detected.
[0075] Still see Fig. 9 When the shield integrity is damaged (such damage is, for example, a break in the shielding members 513, 515 or a voltage drop in a corroded area in the power cable), the bias on voltage V at the base of Q1 is BE is not enough to keep Q in a conductive state (see Fig. 12B ). The voltage at the base of Q2 (Q1C) rises to the Q2 bias on voltage, turning on Q2, sufficient to increase the current through solenoid 519, energizing solenoid 519 and disengaging manual reset switch 518. Thus, power from the AC line power to the load is interrupted.
[0076] See also Fig.10 , the picture shows Figure 5An alternative circuit diagram to the SIC block diagram shown in . The half-wave rectified unsmoothed DC signal at B is sent to the base of npn transistor Q1 via R2, biasing Q1 into an on state, which in turn causes the rectified unsmoothed DC signal at A to drop across R8. As a result, the gate voltage at the gate of SCR1 is insufficient to trigger SCR1. It will be appreciated that the frequency of the half-wave rectified unsmoothed DC signal at the base of Q1 is a frequency sufficient to keep Q1 in a substantially on state during normal operation, thereby suppressing the presence of a sufficient biased on gate voltage at the gate of SCR1. In other words, for example, when the rectified unsmoothed DC voltage signal at the base of Q1 drops below the biased on voltage of Q1, Q1 is turned off and the biased on gate voltage at the gate of SCR1 begins to rise. However, under normal circumstances, before there is sufficient biased on gate voltage at the gate of SCR1, Q1 turns back on, again reducing the gate voltage at the gate of SCR1 to below the sufficient biased on voltage (see Fig. 12A ).
[0077] When Q1's V BE When the voltage drops, i.e., due to a fault such as damage to shields 513, 515 or voltage drops across a corroded area, the bias on voltage at the base of Q1 is insufficient to keep Q1 in its on state during the positive voltage swing at A. The gate voltage at the gate of SCR1 rises to the SCR1 gate bias on voltage (see Fig. 12C ), which is sufficient to increase the current flowing through the solenoid 519, energizing the solenoid 519 and disengaging the manual reset switch 518. Thus, the power from the AC line power to the load is interrupted.
[0078] See also Fig. 10A , the figure shows Figure 3B-Figure 3E Exploded partial view of the circuit connection of the return line shown in. Those skilled in the art will understand alternative shield connections for the circuit described above.
[0079] See also Fig.13 , the figure shows a flow chart of a method according to the present invention, which is used to construct a power cable for detecting and interrupting a line voltage between an AC line end and a load end of the power cable, step 1300.
[0080] Step 1301 provides a unit length of an insulated conductive center line. Step 1302 wraps the insulated center line with a conductive wrap having a conductive side and a non-conductive side, with the conductive side facing outward. The conductive side of the wrap can be any suitable conductive material, such as aluminum foil. Step 1303 wraps a conductive flexible medium around the wrapped center line so that the flexible medium is in electrical contact with the conductive side of the conductive wrap and covers 30% of the unit length of the wrapped center line. The conductive flexible medium can be any suitable conductive material, such as a copper flexible medium, or a conductive flexible medium woven from a conductive material such as, but not limited to, a high-performance carbon fiber / gold / copper composite wire, a conductive graphene wire, or a conductive graphene yarn.
[0081] Step 1304 provides a unit length of insulated conductive phase wire, and step 1305 provides a unit length of tinned wire. The tinned wire can be any suitable wire, such as a solid wire or a stranded wire. Step 1306 wraps the tinned wire and the insulated conductive phase wire with a phase wire shield having a conductive side and a non-conductive side, with the conductive side facing inward and in electrical contact with the tinned wire (see Figure 3A-3B ).
[0082] Step 1307 connects the tinned wires to the conductive flexible dielectric or neutral shield at the load end of the power cable.
[0083] Step 1308 provides a leakage detection circuit (LCDC) for detecting leakage current from the conductive neutral or conductive phase and a shield integrity circuit (SIC) for monitoring the integrity of the neutral shield or the phase shield. The LCDC and SIC may be any of the previously described embodiments.
[0084] Step 1309 connects the LCDC and SIC to the conductive flexible medium at the line end of the neutral shield conductor. It will be appreciated that the shields described herein are connected in series at the load end of the power cable. Step 1310 provides a power supply source circuit for powering the LCDC and SIC and also powers the phase shield at the line end of the phase shield at a first voltage.
[0085] If the LCDC detects that the voltage has risen above the first voltage (eg, in the event of an arc), step 1313 interrupts the AC line voltage.
[0086] If the SIC detects that the first voltage drops below a second predetermined level, step 1314 interrupts the AC line voltage. (See Figures 11A-12C ).
[0087] See also Fig.13A , shows an illustration of a flow chart of an alternative method according to the present invention for constructing a power cable for detecting and interrupting a line voltage between an AC line end and a load end of the power cable, step 1301A.
[0088] Step 1302A provides a unit length of insulated conductive neutral, phase, return, and ground wires. Step 1303A wraps the insulated conductive neutral, phase, return, and ground wires with a shield having a conductive side and a non-conductive side, with the conductive side of the shield facing outward. (See Figure 3B-3C )The conductive side of the wrapping may be any suitable conductive material, such as aluminum foil.
[0089] Step 1304A wraps the conductive flexible medium around the shield so that the conductive flexible medium is in electrical contact with the conductive side of the shield and the conductive flexible medium covers 30% of the unit length. The conductive flexible medium can be any suitable conductive material, such as a copper flexible medium, or a conductive flexible medium woven from a conductive material such as, but not limited to, a high-performance carbon fiber / gold / copper composite wire, a conductive graphene wire, or a conductive graphene yarn.
[0090] Step 1305A connects the return line to the conductive flexible dielectric and / or shield at the load end of the power cable.
[0091] Steps 1306A and 1307A provide: a leakage detection circuit (LCDC) for detecting leakage current from the conductive neutral conductor or the conductive phase conductor; and a shield integrity circuit (SIC) for monitoring the integrity of the neutral conductor shield or the phase conductor shield. The LCDC and SIC are connected to the return conductor. The LCDC and SIC can be any of the previously described embodiments.
[0092] Step 1308A provides a leakage detection circuit (LCDC) for detecting leakage current from the conductive neutral or conductive phase and a shield integrity circuit (SIC) for monitoring the integrity of the neutral shield or the phase shield. The LCDC and SIC may be any of the previously described embodiments.
[0093] Step 1309A connects the LCDC and SIC to the conductive flexible medium via the return line. It will be appreciated that the shields described herein are connected in series at the load end of the power cable.
[0094] Step 1310A provides a power supply circuit for powering the LCDC and the SIC and also powers the phase shield at a first voltage at a line end of the phase shield.
[0095] If the LCDC detects that the voltage has risen above the first voltage (eg, in the event of an arc), step 1313A interrupts the AC line voltage.
[0096] If the SIC detects that the first voltage drops below a second predetermined level, step 1314A interrupts the AC line voltage. (See Figures 11A-12C ).
[0097] See also Fig. 13B , the figure shows an illustration of a flow chart of a second alternative method according to the present invention, the method is used to construct a power cable for detecting and interrupting the line voltage between the AC line end and the load end of the power cable, step 13C00.
[0098] Step 13C01 provides a unit length of insulated conductive center line. Step 13C02 wraps the insulated conductive center line with a center line shield having a conductive side and a non-conductive side, with the conductive side facing outward. Step 13C03 wraps a conductive flexible medium around the center line shield, such that the conductive flexible medium is in electrical contact with the conductive side of the center line shield, and the conductive flexible medium covers 30% of the unit length. The conductive flexible medium can be any suitable conductive material, such as a copper flexible medium, or a conductive flexible medium woven from a conductive material such as, but not limited to, a high-performance carbon fiber / gold / copper composite wire, a conductive graphene wire, or a conductive graphene yarn.
[0099] Steps 13C04 to 13C06 provide a unit length of insulated conductive phase line. The insulated conductive phase line is wrapped with a phase line shield having a conductive side and a non-conductive side, with the conductive side facing outward. A conductive flexible medium is wrapped around the phase line shield so that the conductive flexible medium is in electrical contact with the conductive side of the phase line shield and the conductive flexible medium covers 30% of the unit length. The conductive flexible medium can be any suitable conductive material, such as a copper flexible medium, or a conductive flexible medium woven from a conductive material such as, but not limited to, a high-performance carbon fiber / gold / copper composite wire, a conductive graphene wire, or a conductive graphene yarn. (See Figure 3D-Figure 3E ).
[0100] Step 13C07 connects the return line to the phase and neutral shields at the load end of the power cable. Steps 13C08 and 13C09 provide a leakage detection circuit (LCDC) for detecting leakage current from the conductive neutral or conductive phase and a shield integrity circuit (SIC) for monitoring the integrity of the neutral or phase shields. The LCDC and SIC are connected to the return line.
[0101] Step 13C10 provides a power supply circuit for powering the LCDC and the SIC, and also powers the phase shield at a first voltage at the line end of the phase shield. If the LCDC detects a voltage increase above the first voltage (e.g., in the event of an arc), step 13C13 interrupts the AC line voltage. If the SIC detects a drop below a second predetermined level, step 13C14 interrupts the AC line voltage. (See Figures 11A-12C ).
[0102] It should be understood that the above description is only an illustration of the present invention. Therefore, those skilled in the art may devise various substitutions and modifications without departing from the present invention. For example, the solid-state device SCR1 or Q2 may be any suitable solid-state device. Accordingly, the present invention is intended to include all such substitutions, modifications and variations that fall within the scope of the appended claims.
Claims
1. A method for constructing a power cable and circuit for detecting and interrupting a line voltage between an AC line end and a load end of a power cable when a power cable fault is detected, the method comprising: providing an insulated conductive neutral conductor between the load end and the AC line end of the power cable; providing a centerline shield having a conductive side and a non-conductive side; Wrapping the insulated conductive neutral wire with the neutral wire shield so that the conductive side faces outward; wrapping a conductive flexible dielectric around the centerline shield; Providing an insulated conductive phase line between a load end and a line end of the power cable; Tinned wire available; providing a phase conductor shield having a conductive side and a non-conductive side; Wrapping the insulated conductive phase wire and the tinned wire with the phase wire shield so that the conductive side faces inward and contacts the tinned wire; as well as The tinned wire is connected to the conductive flexible medium at the load end of the power cable.
2. The method of claim 1, wherein: Wrapping the conductive flexible medium around the neutral shield also includes wrapping a copper flexible medium including 30% copper flexible medium coverage per unit length of the power cable.
3. The method of claim 1, wherein: Winding a conductive flexible medium around the centerline shield may further include winding a conductive flexible medium selected from the group consisting of: high performance carbon fiber / gold / copper composite wire, conductive graphene wire, and conductive graphene yarn.
4. The method of claim 1, further comprising providing a water detection cable adjacent to the conductive flexible medium between a load end and a line end of the power cable.
5. The method of claim 1, further comprising providing a twisted pair water detection cable between a load end and a line end of the power cable.
6. The method of claim 1, further comprising: providing a leakage detection circuit for detecting AC leakage current from a conducting neutral conductor or a conducting phase conductor; providing a shield integrity circuit for monitoring the integrity of a neutral shield or a phase shield; connecting a leakage detection circuit and a shield integrity circuit to the conductive flexible medium at the line end of the power cable; and A rectified power supply circuit is provided for powering the leakage detection circuit, the shield integrity circuit, and the tinned wire at a first voltage.
7. The method of claim 6, wherein: Providing a shield integrity circuit for monitoring the integrity of the neutral shield or the phase shield further includes interrupting a line voltage between a load end and an AC line end of the power cable if the first voltage drops below a first predetermined level.
8. The method of claim 6, wherein: Providing a leakage detection circuit for detecting leakage current from the conductive neutral conductor or the conductive phase conductor further includes interrupting a line voltage between a load end and a line end of the power cable if the first voltage exceeds a second predetermined level.
9. A method for constructing a power cable, the power cable having a load end and an AC line end, the method comprising: providing an insulated conductive neutral conductor between the load end and the AC line end of the power cable; providing a centerline shield having a conductive side and a non-conductive side; Wrapping the insulated conductive neutral wire with the neutral wire shield so that the conductive side faces outward; wrapping a conductive flexible dielectric around the centerline shield; Providing an insulated conductive phase line between a load end and a line end of the power cable; providing a phase conductor shield having a conductive side and a non-conductive side; Wrapping the insulated conductive phase wire with the phase wire shield so that the conductive side faces inwards; and The neutral line shield and the phase line shield are connected in series at the load end.
10. The method of claim 9, wherein: Wrapping the conductive flexible medium around the neutral shield also includes wrapping a copper flexible medium including 30% copper flexible medium coverage per unit length of the power cable.
11. The method of claim 9, further comprising: providing a leakage detection circuit for detecting leakage current from a conducting neutral conductor or a conducting phase conductor; providing a shield integrity circuit for monitoring the integrity of the neutral shield or the phase shield; connecting the leakage detection circuit and the shield integrity circuit to a conductive flexible medium at a line end of the power cable; providing a power supply source circuit for powering the leakage detection circuit, the shield integrity circuit and the phase line shield at a first voltage; as well as The shield integrity circuit interrupts the line voltage between the load end and the AC line end of the power cable if the first voltage drops below a first predetermined level.
12. The method of claim 11, wherein: Providing a leakage detection circuit for detecting AC leakage current from the conductive neutral conductor or the conductive phase conductor further includes: if the first voltage exceeds a second predetermined level, the leakage detection circuit interrupts the line voltage between the load end and the AC line end of the power cable.
13. The method of claim 11 further comprising providing a light detection device connected to the shield integrity circuit.
14. The method of claim 9 further comprising providing a tinned wire placed between the phase conductor shield and the insulated phase conductor.
15. The method of claim 9, further comprising: Providing a mechanically latched double-pole switch placed between the AC line side and the load side; A solenoid is provided for unlocking the mechanical latching bipolar switch upon receipt of an unlock signal from the leakage detection circuit or the shield integrity circuit.
16. The method of claim 9, further comprising providing a water detection cable between a load end and an AC line end of the power cable.
17. The method of claim 11, wherein: Providing a power supply circuit also includes providing a full-wave bridge rectifier circuit.
18. A method for interrupting an AC line voltage between an AC line end and a load end of a shielded power cable when a power cable fault is detected, the method comprising: A leakage detection circuit is provided for detecting an AC leakage current from a power cable and interrupting a line voltage between an AC line end and a load end of the shielded power cable if a leakage current is detected, wherein providing the leakage detection circuit further comprises: Providing a bistable latching device having an on / off state; providing a charge retention device connected to the bistable latching device; charging the charge retention device to a first charge; providing a shield integrity circuit for monitoring the integrity of the shielded power cable and interrupting the line voltage between the AC line end and the load end of the shielded power cable if the shield integrity is compromised; Connecting the leakage detection circuit and the shield integrity circuit to the shielded power cable; providing a power supply circuit for supplying power to the leakage detection circuit, the shielding integrity circuit and the shielded power cable with a first voltage; and The shielded power cable is powered with a first voltage.
19. The method of claim 18, wherein: Providing a leakage detection circuit for detecting leakage current from the shielded power cable also includes: latching the bistable latching device to a conductive state and interrupting the AC line voltage between the load end and the line end of the shielded power cable if the first charge rises to a predetermined charge level.
20. The method of claim 18, wherein: A shield integrity circuit is provided for monitoring the integrity of a shielded power cable and further comprising: If the first voltage drops below a first predetermined level, an AC line voltage is interrupted between a load end and an AC line end of the power cable.
21. The method of claim 20, wherein: Providing shield integrity circuitry also includes: providing a first npn transistor; Provide solid state switching devices; connecting the first npn transistor and the solid-state switching device to a power supply; connecting the first npn transistor connector to the solid-state switching device; During a positive cycle of the AC line voltage, in the absence of a power cable fault, biasing the first npn transistor into a conductive state sufficiently to prevent the solid-state switching device from switching from an off state to an on state; and If a power cable fault is detected, the first npn transistor is biased into a non-conductive state to trigger the solid-state switching device into a conductive state.
22. The method of claim 21, wherein: Providing a solid state switching device also includes providing a second npn transistor.
23. The method of claim 21, wherein: Providing a solid state switching device also includes providing a silicon controlled rectifier.
