A distribution network line-transformer relationship identification method and terminal

By obtaining the single-line diagram topology information and real-time alarm information of the distribution network, the difference set is calculated to identify the misconnection and missing connection of the distribution transformer, which solves the problem of late identification of the distribution network line-transformation relationship and improves the accuracy and accuracy of topology analysis. Fault isolation security.

CN114696317BActive Publication Date: 2024-10-15STATE GRID FUJIAN ELECTRIC POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210249180.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-14
Publication Date
2024-10-15
Estimated Expiration
2042-03-14

AI Technical Summary

Technical Problem

There are many distribution transformer devices and frequent changes in the existing distribution network DMS system, which leads to untimely identification of distribution network line-transform relationships, affecting the correctness of topology analysis and the safety of fault isolation.

Method used

By obtaining the single-line diagram topology information and real-time alarm information, a feeder fault standard power outage information set and a real-time power outage information set are generated, and the difference set is calculated to identify the misconnection and missing connection information of the distribution transformer, thereby realizing the identification of distribution network line transformation relationships.

Benefits of technology

Based on the inversion of fault and power outage information, the distribution network line-variation relationship can be easily and reliably identified, which improves the accuracy of distribution network topology analysis and the safety of fault isolation, meets on-site needs, and has good promotion value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114696317B_ABST
    Figure CN114696317B_ABST
Patent Text Reader

Abstract

The invention discloses a method and a terminal for identifying the relationship between a line and a transformer in a distribution network; the invention obtains single-line diagram topology information from a distribution management system to generate a standard power outage information set for a feeder fault; obtains real-time alarm information from a distribution management system to generate a real-time power outage information set; generates according to a difference set between the above and the above, and generates a distribution transformer misconnection information set and a distribution transformer missing connection information set according to the difference set between the above and the above; the invention generates a feeder fault standard power outage information set and a real-time power outage information set based on the single-line diagram topology information of the distribution network and the real-time alarm information of the feeder fault of the distribution network, and finally generates a distribution transformer misconnection information set and a distribution transformer missing connection information set based on the two information sets, and based on the inversion of the fault power outage information, simply and reliably realizes the identification of the line-transformer relationship of the distribution network, can better meet the actual needs on site, and has good promotion value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of line-transformer relationship topology identification in a distribution network, and in particular to a line-transformer relationship identification method and terminal for a distribution network. Background Art

[0002] As the scale of distribution network construction gradually expands, a large number of distributed power sources are connected to the low-voltage distribution network through inverters, and form an active distribution network with the medium-voltage distribution network through distribution transformers. Building a new active distribution network is one of the key measures to achieve the goal of "carbon peak and carbon neutrality".

[0003] The distribution network has a wide variety of equipment and complex and changeable operation modes. Timely and accurate grasp of the real-time operation status of the distribution network and realization of observable, measurable and controllable distribution networks are the basis for the construction of intelligent distribution networks. At present, the State Grid and the Southern Grid companies in various cities have realized online monitoring and control of medium-voltage distribution networks through the distribution management system (DMS), effectively improving the automation level and power supply reliability of the distribution network. Good graphics and model quality are the basis for optimization analysis of the DMS system. However, due to the large number of distribution transformers and frequent changes, the addition, reconnection, and cancellation of accounts have led to untimely updates of distribution transformer models and graphics in the DMS system, which are far from the actual operation conditions on site, seriously affecting the correctness of the distribution network topology analysis, affecting the safety of distribution network fault isolation and transfer, and affecting the accuracy of distribution network line loss analysis. Therefore, it is of great significance to accurately identify and verify the connection relationship between distribution transformers and feeders.

[0004] The current topology identification methods have achieved good results in solving the subordinate relationship between the feeder and the distribution transformer of the distribution network. However, the line-transformer relationship of the distribution network not only includes the subordinate relationship between the feeder and the distribution transformer, but also includes the subordinate relationship between the trunk line and the distribution transformer, and the subordinate relationship between the branch line and the distribution transformer. The correctness of the above relationship is the basis for the topological analysis of the distribution network DMS system. Therefore, based on the topological relationship of the DMS system, it is of great practical significance to study the identification and verification of the line-transformer relationship of the distribution network. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a distribution network line-transformer relationship identification method and terminal, which can realize the identification of the distribution network line-transformer relationship based on the inversion of fault power outage information.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0007] A method for identifying line-transformer relationships in a distribution network comprises the following steps:

[0008] S1. Obtain single-line diagram topology information from the distribution management system and generate a feeder fault standard outage information set FSIS;

[0009] S2, obtain real-time alarm information from the distribution management system and generate a real-time power outage information set FRIS;

[0010] S3. Generate a distribution transformer misconnection information set TFCS according to the difference set between the FSIS and the FRIS, and generate a distribution transformer misconnection information set TMCS according to the difference set between the FRIS and the FSIS.

[0011] In order to solve the above technical problems, another technical solution adopted by the present invention is:

[0012] A distribution network line-transformer relationship identification terminal comprises a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program:

[0013] S1. Obtain single-line diagram topology information from the distribution management system and generate a feeder fault standard outage information set FSIS;

[0014] S2, obtain real-time alarm information from the distribution management system and generate a real-time power outage information set FRIS;

[0015] S3. Generate a distribution transformer misconnection information set TFCS according to the difference set between the FSIS and the FRIS, and generate a distribution transformer misconnection information set TMCS according to the difference set between the FRIS and the FSIS.

[0016] The beneficial effects of the present invention are as follows: based on the single-line diagram topology information of the distribution network and the real-time alarm information of the distribution network feeder fault, the present invention generates a feeder fault standard power outage information set FSIS and a real-time power outage information set FRIS, and finally generates a distribution transformer wrong connection information set TFCS for indicating a distribution transformer that should not be connected but is wrongly connected on a feeder, and a distribution transformer missing connection information set TMCS for indicating a distribution transformer that should be connected but is missed on a feeder based on the two information sets. Based on the inversion of the fault power outage information, the line-transformer relationship of the distribution network is simply and reliably identified, which can better meet the actual needs on site and has good promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A flow chart of a method for identifying line-transformer relationships in a distribution network according to an embodiment of the present invention;

[0018] Figure 2 This is a structural diagram of a distribution network line-transformer relationship identification terminal according to an embodiment of the present invention;

[0019] Figure 3 A schematic diagram of an exemplary power distribution network of a method for identifying line-transformer relationships in a power distribution network according to an embodiment of the present invention;

[0020] Description of labels:

[0021] 1. A distribution network line transformer relationship identification terminal; 2. A processor; 3. A memory. DETAILED DESCRIPTION

[0022] In order to explain the technical content, achieved objectives and effects of the present invention in detail, the following is an explanation in combination with the implementation modes and the accompanying drawings.

[0023] English abbreviation explanation comparison:

[0024] DMS: Distribution management system, distribution management system;

[0025] SFIS: Single Fault Outage Information Set, which represents the connection relationship between a single trip switch and the power-off distribution transformer, and is generated based on the DMS system single-line diagram topology information;

[0026] TSES: Trip switch equipment set, which represents all trip switches on the same feeder, and can be obtained from the switch trip events in the DMS system;

[0027] FSIS: Feeder Fault Standard Outage Information Set, which describes the connection relationship between all tripped switches and de-energized distribution transformers on the same feeder based on the DMS system single-line diagram topology, including all de-energized distribution transformers under feeder fault standard conditions;

[0028] FRIS: Real-time power outage information set, which describes all distribution transformers on the same feeder that report power outage events to the master station based on the real-time alarm information of the DMS system, including all power-off distribution transformers under the real-time condition of feeder faults;

[0029] TFCS: Distribution transformer misconnection information set, which describes a distribution transformer that should not be connected but is incorrectly connected on a feeder;

[0030] TMCS: Distribution transformer missing connection information set, describing a distribution transformer on a feeder that should be connected but is missing.

[0031] Please refer to Figure 1 as well as Figure 2 , a method for identifying line-transformer relationships in a distribution network, comprising the steps of:

[0032] S1. Obtain single-line diagram topology information from the distribution management system and generate a feeder fault standard outage information set FSIS;

[0033] S2, obtain real-time alarm information from the distribution management system and generate a real-time power outage information set FRIS;

[0034] S3. Generate a distribution transformer misconnection information set TFCS according to the difference set between the FSIS and the FRIS, and generate a distribution transformer misconnection information set TMCS according to the difference set between the FRIS and the FSIS.

[0035] From the above description, it can be seen that the beneficial effects of the present invention are: based on the single-line diagram topology information of the distribution network and the real-time alarm information of the distribution network feeder fault, the present invention generates a feeder fault standard power outage information set FSIS and a real-time power outage information set FRIS, and finally generates a distribution transformer wrong connection information set TFCS for representing a distribution transformer that should not be connected but is incorrectly connected on a feeder, and a distribution transformer missing connection information set TMCS for representing a distribution transformer that should be connected on a feeder but is missed, based on the two information sets. Based on the inversion of the fault power outage information, the line-transformer relationship of the distribution network is identified simply and reliably, which can better meet the actual needs of the site and has good promotion value.

[0036] Furthermore, the step S1 specifically includes the steps of:

[0037] S11. Obtain single-line diagram topology information from the power distribution management system, and generate a single fault outage information set SFIS representing the connection relationship between a single trip switch and a power-off distribution transformer:

[0038] SFIS(x)=[ss1,ss2,…,ss i ,…,ss n ];

[0039] And the trip switch set TSES representing all the trip switches on the same feeder:

[0040] TSES(y)=[ts1, ts2,…,ts j ,…,ts m ];

[0041] S12. Generate a feeder fault standard outage information set FSIS representing the connection relationship between all trip switches and the power-off distribution transformer on the same feeder according to the TSES and the SFIS:

[0042] FSIS(y)=SFIS(ts1)∪SFIS(ts2)∪…SFIS(ts m );

[0043] It is expressed as:

[0044] FSIS(y)=[fs1, fs2,…, fsk , …, fs w ];

[0045] Where SFIS(x) represents the single fault outage information set of trip switch x, ss i is the name of the i-th power-off distribution transformer in the single-fault power outage information set, i∈{1, 2, …, n}, and n is the total number of power-off distribution transformers in the single-fault power outage information set;

[0046] TSES(y) represents the tripping switchgear set of feeder y, ts j is the name of the j-th trip switch in the trip switch device set, j belongs to {1, 2, …, m}, and m is the total number of trip switches in the trip switch device set;

[0047] FSIS(y) represents the feeder fault standard outage information set of feeder y, fs k is the name of the kth power-off distribution transformer in the feeder fault standard power outage information set, k∈{1, 2, …, w}, and w is the total number of power-off distribution transformers in the feeder fault standard power outage information set.

[0048] Furthermore, the generation of the FRIS is specifically as follows:

[0049] FRIS(y)=[fr1, fr2,…, fr a , …, fr v ];

[0050] Where FRIS(y) represents the real-time outage information set of feeder y with feeder fault, fr d is the name of the ath power-off distribution transformer in the real-time power outage information set, a∈{1, 2, …, v}, and v is the total number of power-off distribution transformers in the real-time power outage information set.

[0051] Furthermore, the generation of the TFCS is specifically as follows:

[0052] TFCS(y)=FSIS(y)-FRIS(y);

[0053] It is expressed as:

[0054] TFCS(y)=[tf1,tf2,…,tf b ,…,tf p ];

[0055] Among them, TFCS(y) represents the distribution transformer misconnection information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” is the complement operator, TFCS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” represents ... real-time power outage information set of feeder fault of feeder y, “-” represents the complement operator, TF bis the name of the bth distribution transformer incorrectly connected to feeder y in the distribution transformer misconnection information set, b∈{1, 2, …, p}, and p is the total number of power-off distribution transformers in the distribution transformer misconnection information set.

[0056] Furthermore, the generation of the TMCS is specifically as follows:

[0057] TMCS(y)=FRIS(y)-FSIS(y);

[0058] It is expressed as:

[0059] TMCS(y)=[tm1,tm2,…,tm c ,…,tm q ];

[0060] Where TMCS(y) represents the distribution transformer leakage information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder y with feeder fault, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” is the complement operator, tm c is the name of the cth distribution transformer that should be connected to feeder y but is missed in the distribution transformer missed connection information set, c∈{1, 2, …, q}, q is the total number of power-off distribution transformers in the distribution transformer missed connection information set.

[0061] Please refer to Figure 2 , a distribution network line-transformer relationship identification terminal, comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program:

[0062] S1. Obtain single-line diagram topology information from the distribution management system and generate a feeder fault standard outage information set FSIS;

[0063] S2, obtain real-time alarm information from the distribution management system and generate a real-time power outage information set FRIS;

[0064] S3. Generate a distribution transformer misconnection information set TFCS according to the difference set between the FSIS and the FRIS, and generate a distribution transformer misconnection information set TMCS according to the difference set between the FRIS and the FSIS.

[0065] Furthermore, when the processor executes the computer program, step S1 specifically includes the following steps:

[0066] S11. Obtain single-line diagram topology information from the power distribution management system, and generate a single fault outage information set SFIS representing the connection relationship between a single trip switch and a power-off distribution transformer:

[0067] SFIS(x)=[ss1,ss2,…,ss i ,…,ss n ];

[0068] And the trip switch set TSES representing all the trip switches on the same feeder:

[0069] TSES(y)=[ts1, ts2,…,ts j ,…,ts m ];

[0070] S12. Generate a feeder fault standard outage information set FSIS representing the connection relationship between all trip switches and the power-off distribution transformer on the same feeder according to the TSES and the SFIS:

[0071] FSIS(y)=SFIS(ts1)∪SFIS(ts2)∪…SFIS(ts m );

[0072] It is expressed as:

[0073] FSIS(y)=[fs1, fs2,…, fs k , …, fs w ];

[0074] Where SFIS(x) represents the single fault outage information set of trip switch x, ss i is the name of the i-th power-off distribution transformer in the single-fault power outage information set, i∈{1, 2, …, n}, and n is the total number of power-off distribution transformers in the single-fault power outage information set;

[0075] TSES(y) represents the tripping switchgear set of feeder y, ts j is the name of the j-th trip switch in the trip switch device set, j belongs to {1, 2, …, m}, and m is the total number of trip switches in the trip switch device set;

[0076] FSIS(y) represents the feeder fault standard outage information set of feeder y, fs k is the name of the kth power-off distribution transformer in the feeder fault standard power outage information set, k∈{1, 2, …, w}, and w is the total number of power-off distribution transformers in the feeder fault standard power outage information set.

[0077] Furthermore, the generation of the FRIS is specifically as follows:

[0078] FRIS(y)=[fr1, fr2,…, fr a , …, fr v ];

[0079] Where FRIS(y) represents the real-time outage information set of feeder y with feeder fault, fr a is the name of the ath power-off distribution transformer in the real-time power outage information set, a∈{1, 2, …, v}, and v is the total number of power-off distribution transformers in the real-time power outage information set.

[0080] Furthermore, the generation of the TFCS is specifically as follows:

[0081] TFCS(y)=FSIS(y)-FRIS(y);

[0082] It is expressed as:

[0083] TFCS(y)=[tf1,tf2,…,tf b ,…,tf p ];

[0084] Among them, TFCS(y) represents the distribution transformer misconnection information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” is the complement operator, TFCS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” represents ... real-time power outage information set of feeder fault of feeder y, “-” represents the complement operator, TF b is the name of the bth distribution transformer incorrectly connected to feeder y in the distribution transformer misconnection information set, b∈{1, 2, …, p}, and p is the total number of power-off distribution transformers in the distribution transformer misconnection information set.

[0085] Furthermore, the generation of the TMCS is specifically as follows:

[0086] TMCS(y)=FRIS(y)-FSIS(y);

[0087] It is expressed as:

[0088] TMCS(y)=[tm1,tm2,…,tm c ,…,tm q ];

[0089] Where TMCS(y) represents the distribution transformer leakage information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder y with feeder fault, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” is the complement operator, tm c is the name of the cth distribution transformer that should be connected to feeder y but is missed in the distribution transformer missed connection information set, c∈{1, 2, …, q}, q is the total number of power-off distribution transformers in the distribution transformer missed connection information set.

[0090] A distribution network line-transformer relationship identification method and terminal of the present invention are suitable for a scenario where a distribution network under a distribution network DMS system needs to perform line-transformer relationship identification.

[0091] Please refer to Figure 1 and Figure 3 , Embodiment 1 of the present invention is:

[0092] A method for identifying line-transformer relationships in a distribution network comprises the following steps:

[0093] S1. Obtain single-line diagram topology information from the distribution management system and generate a feeder fault standard outage information set FSIS;

[0094] The step S1 specifically includes the following steps:

[0095] S11. Obtain single-line diagram topology information from the power distribution management system, and generate a single fault outage information set SFIS representing the connection relationship between a single trip switch and a power-off distribution transformer:

[0096] SFIS(x)=[ss1,ss2,…,ss i ,…,ss n ];

[0097] And the trip switch set TSES representing all the trip switches on the same feeder:

[0098] TSES(y)=[ts1, ts2,…,ts j ,…,ts m ];

[0099] S12. Generate a feeder fault standard outage information set FSIS representing the connection relationship between all trip switches and the power-off distribution transformer on the same feeder according to the TSES and the SFIS:

[0100] FSIS(y)=SFIS(ts1)∪SFIS(ts2)∪…SFIS(ts m );

[0101] It is expressed as:

[0102] FSIS(y)=[fs1, fs2,…, fs k , …, fs w ];

[0103] Where SFIS(x) represents the single fault outage information set of trip switch x, ss i is the name of the i-th power-off distribution transformer in the single-fault power outage information set, i∈{1, 2, …, n}, and n is the total number of power-off distribution transformers in the single-fault power outage information set;

[0104] TSES(y) represents the tripping switchgear set of feeder y, ts jis the name of the j-th trip switch in the trip switch device set, j belongs to {1, 2, …, m}, and m is the total number of trip switches in the trip switch device set;

[0105] FSIS(y) represents the feeder fault standard outage information set of feeder y, fs k is the name of the kth power-off distribution transformer in the feeder fault standard power outage information set, k∈{1, 2, …, w}, and w is the total number of power-off distribution transformers in the feeder fault standard power outage information set.

[0106] In this embodiment, Figure 3 In the distribution feeder shown, Bus1 is the 10kV busbar of the substation, F1 is the substation outlet switch of the feeder; S1~S8 are circuit breaker switches equipped with three-stage protection function, B1~B16 are feeder section switches not equipped with three-stage protection function, T1~T46 are distribution transformers, and D1~D46 are drop-out fuses.

[0107] In this embodiment, if the circuit breaker switches S2, S4, and S7 are tripped at the same time, the single fault outage information set of each switch can be generated according to the definition of the single fault outage information set, as shown in Table 1. Therefore, after obtaining the single line diagram topology information from the distribution management system, the single fault outage information set SFIS representing the connection relationship between a single tripped switch and a power-off distribution transformer is generated:

[0108] Table 1

[0109] Switch Name Single Fault Outage Information Set (SFIS) S2 T7, T8, T9, T10, T11, T12 S4 T14, T15, T16, T17, T18, T19, T20, T21 S7 T33, T34, T35

[0110] As shown in Table 1, when switch S2 trips due to a downstream fault, according to the single-line topology connection relationship of the DMS system, distribution transformers T7 to T12 will be powered off, and the power outage information will be sent to the master station. The analysis of switches S4 and S7 is similar and will not be repeated.

[0111] The single fault power outage information set SFIS describes the topological connection relationship between the switch and the power distribution transformer recorded in the DMS system. When the switch trips, the distribution transformer connected to it loses power, and each distribution transformer sends a power outage alarm message to the DMS master station system. If the distribution transformer that sends the power outage alarm message is inconsistent with the distribution transformer in the single fault power outage information set SFIS, it means that there is an error in the topological connection relationship between the switch and the distribution transformer in the DMS system. Based on this principle, the line-transformer relationship of the distribution network can be identified and verified.

[0112] The tripping switch equipment set TSES(y1) is established as:

[0113] TSES(y1)=[S2,S4,S7];

[0114] Since the power outage alarm events sent from the distribution transformer to the DMS master station system are delayed and the distribution transformers are not synchronized, the master station system needs to delay for a period of time (usually 30 seconds) to ensure that all distribution transformer alarm information can be collected. Multiple faults may occur on the same distribution feeder, causing multiple switches to trip.

[0115] A trip switch equipment set TSES is established to describe all the trip switches on the same feeder, which can be obtained from the switch trip events in the DMS system.

[0116] According to the TSES and the SFIS, the feeder fault standard outage information set FSIS(y1) is established as:

[0117] FSIS(y1)=[T7, T8, T9, T10, T11, T12, T14, T15, T16, T17, T18, T19, T20, T21, T33, T34, T35].

[0118] S2, obtain real-time alarm information from the distribution management system and generate a real-time power outage information set FRIS;

[0119] The generation of the FRIS is specifically as follows:

[0120] FRIS(y)=[fr1, fr2,…, fr a , …, fr v ];

[0121] Where FRIS(y) represents the real-time outage information set of feeder y with feeder fault, fr a is the name of the ath power-off distribution transformer in the real-time power outage information set, a∈{1, 2, …, v}, and v is the total number of power-off distribution transformers in the real-time power outage information set.

[0122] In this embodiment, Figure 3 For the distribution feeder y1 shown in the figure, at a certain time, the DMS system receives the tripping events of switches S2, S4, and S7, and receives the power outage alarm information of distribution transformers T7~T10, T14~T18, T33~T35, and T47~T50, as shown in Table 1:

[0123] Table 1

[0124]

[0125] In this embodiment, real-time alarm information, that is, real-time power outage alarm information, is obtained from the DMS system, thereby establishing a feeder fault real-time power outage information set FRIS(y1) as follows:

[0126] FRIS(y1)=[T7, T8, T9, T10, T14, T15, T16, T17, T18, T33, T34, T35, T47, T48, T49, T50].

[0127] S3, generating a distribution transformer misconnection information set TFCS according to the difference set between the FSIS and the FRIS, and generating a distribution transformer misconnection information set TMCS according to the difference set between the FRIS and the FSIS;

[0128] The generation of the TFCS is specifically as follows:

[0129] TFCS(y)=FSIS(y)-FRIS(y);

[0130] It is expressed as:

[0131] TFCS(y)=[tf1,tf2,…,tf b ,…,tf p ];

[0132] Among them, TFCS(y) represents the distribution transformer misconnection information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” is the complement operator, TFCS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” represents ... real-time power outage information set of feeder fault of feeder y, “-” represents the complement operator, TF b is the name of the bth distribution transformer incorrectly connected to feeder y in the distribution transformer misconnection information set, b∈{1, 2, …, p}, p is the total number of power-off distribution transformers in the distribution transformer misconnection information set;

[0133] The generation of the TMCS is specifically as follows:

[0134] TMCS(y)=FRIS(y)-FSIS(y);

[0135] It is expressed as:

[0136] TMCS(y)=[tm1,tm2,…,tm c ,…,tm q ];

[0137] Where TMCS(y) represents the distribution transformer leakage information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder y with feeder fault, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, “-” is the complement operator, tm c is the name of the cth distribution transformer that should be connected to feeder y but is missed in the distribution transformer missed connection information set, c∈{1, 2, …, q}, q is the total number of power-off distribution transformers in the distribution transformer missed connection information set.

[0138] In this embodiment, according to FSIS(y1) and FRIS(y1), the distribution transformer misconnection information set TFCS(y1) is established as follows:

[0139] TFCS(y1)=FSIS(y1)-FRIS(y1)

[0140] =[T11, T12, T19, T20, T21];

[0141] The distribution transformer leakage information set TMCS(y1) is established as:

[0142] TMCS(y1)=FRIS(y1)-FSIS(y1)

[0143] =[T47, T48, T49, T50];

[0144] It can be seen that the distribution transformers T11, T12, T19, T20, and T21 should not be connected but are mistakenly connected to the feeder y1, and the distribution transformers T47, T48, T49, and T50 should be connected but are not connected to the feeder y1.

[0145] Please refer to Figure 2 , Embodiment 2 of the present invention is:

[0146] A distribution network line-transformer relationship identification terminal 1 comprises a processor 2, a memory 3 and a computer program stored in the memory 3 and executable on the processor 2. When the processor 2 executes the computer program, the steps in the above embodiment 1 are implemented.

[0147] The main principle of the present invention is to describe the topological connection relationship of feeders, switches and distribution transformers in the distribution network and the real-time power outage alarm information in a matrix manner, and respectively establish a feeder fault standard power outage information set FSIS representing the connection relationship between all tripped switches on the same feeder and the power-off distribution transformer, and a real-time power outage information set FRIS representing the existence of a feeder fault on feeder y, so as to determine the power-off distribution transformer with a wrong connection by comparing the two information sets.

[0148] In summary, the present invention provides a distribution network line-transformer relationship identification method and terminal, firstly, establish a single fault power outage information set SFIS to obtain a distribution network line-transformer relationship identification model; then, the feeder fault standard power outage information set FSIS describes the connection relationship between all trip switches and power-off distribution transformers on the same feeder based on the DMS system single-line diagram topology; secondly, the feeder fault real-time power outage information set FRIS describes all distribution transformers on the same feeder that report the main station power outage event based on the DMS system real-time alarm information; again, the distribution transformer misconnection information set TFCS describes a distribution transformer that should not be connected but is wrongly connected on a feeder; finally, the distribution transformer missing connection information set TMCS describes a distribution transformer that should be connected on a feeder but is missed. The method can identify the line-transformer relationship of the distribution network based on the topology information and real-time fault alarm information of the DMS system, the method is simple and reliable, can better meet the actual needs of the site, and has good promotion value.

[0149] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A method for identifying the relationship between distribution network lines and transformers. It is characterized in that Includes steps: S1. Obtain single-line diagram topology information from the distribution management system and generate a feeder fault standard outage information set FSIS; The step S1 specifically includes the following steps: S11. Obtain single-line diagram topology information from the power distribution management system, and generate a single fault outage information set SFIS representing the connection relationship between a single trip switch and a power-off distribution transformer: SFIS(x)=[ss 1 ,ss 2 ,…,ss i ,…,ss n ]; And the trip switch set TSES representing all the trip switches on the same feeder: TSES(y)=[ts 1 ,ts 2 ,…,ts j ,…,ts m ]; S12. Generate a feeder fault standard outage information set FSIS representing the connection relationship between all trip switches and the de-energized distribution transformer on the same feeder according to the TSES and the SFIS: FSIS(y)=SFIS(ts 1 )∪SFIS(ts 2 )∪…SFIS(ts m ); It is expressed as: FSIS(y)=[fs 1 ,fs 2 ,…,fs k ,…,fs w ]; Where SFIS(x) represents the single fault outage information set of trip switch x, ss i is the name of the i-th power-off distribution transformer in the single-fault power outage information set, i∈{1,2,…,n}, and n is the total number of power-off distribution transformers in the single-fault power outage information set; TSES(y) represents the tripping switchgear set of feeder y, ts j is the name of the j-th trip switch in the trip switch device set, j belongs to {1,2,…,m}, and m is the total number of trip switches in the trip switch device set; FSIS(y) represents the feeder fault standard outage information set of feeder y, fs k is the name of the kth power-off distribution transformer in the feeder fault standard power outage information set, k∈{1,2,…,w}, and w is the total number of power-off distribution transformers in the feeder fault standard power outage information set; S2, obtain real-time alarm information from the distribution management system and generate a real-time power outage information set FRIS; The generation of the FRIS is specifically as follows: FRIS(y)=[fr 1 ,fr 2 ,…,fr a ,…,fr v ]; Where FRIS(y) represents the real-time outage information set of feeder y with feeder fault, fr a is the name of the ath power-off distribution transformer in the real-time power outage information set, a∈{1,2,…,v}, and v is the total number of power-off distribution transformers in the real-time power outage information set; S3, generating a distribution transformer misconnection information set TFCS according to the difference set between the FSIS and the FRIS, and generating a distribution transformer misconnection information set TMCS according to the difference set between the FRIS and the FSIS; The generation of the TFCS is specifically as follows: TFCS(y)=FSIS(y)-FRIS(y); It is expressed as: TFCS(y)=[tf 1 ,tf 2 ,…,tf b ,…,tf p ]; Among them, TFCS(y) represents the distribution transformer misconnection information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, "-" is the complement operator, TFCS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, "-" represents ... real-time power outage information set of feeder fault of feeder y, "-" represents the complement operator, TF b is the name of the bth distribution transformer incorrectly connected to feeder y in the distribution transformer misconnection information set, b∈{1,2,…,p}, and p is the total number of power-off distribution transformers in the distribution transformer misconnection information set; The generation of the TMCS is specifically as follows: TMCS(y)=FRIS(y)-FSIS(y); It is expressed as: TMCS(y)=FRIS(y)-FSIS(y); Where TMCS(y) represents the distribution transformer leakage information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, "-" is the complement operator, tm c is the name of the cth distribution transformer that should be connected to feeder y but is not connected in the distribution transformer missing connection information set, c∈{1,2,…,q}, q is the total number of power-off distribution transformers in the distribution transformer missing connection information set.

2. A distribution network line-transformer relationship identification terminal, comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the following steps are implemented: S1. Obtain single-line diagram topology information from the distribution management system and generate a feeder fault standard outage information set FSIS; When the processor executes the computer program, step S1 specifically includes the following steps: S11. Obtain single-line diagram topology information from the power distribution management system, and generate a single fault outage information set SFIS representing the connection relationship between a single trip switch and a power-off distribution transformer: SFIS(x)=[ss 1 ,ss 2 ,…,ss i ,…,ss n ]; And the trip switch set TSES representing all the trip switches on the same feeder: TSES(y)=[ts 1 ,ts 2 ,…,ts j ,…,ts m ]; S12. Generate a feeder fault standard outage information set FSIS representing the connection relationship between all trip switches and the de-energized distribution transformer on the same feeder according to the TSES and the SFIS: FSIS(y)=SFIS(ts 1 )∪SFIS(ts 2 )∪…SFIS(ts m ); It is expressed as: FSIS(y)=[fs 1 ,fs 2 ,…,fs k ,…,fs w ]; Where SFIS(x) represents the single fault outage information set of trip switch x, ss i is the name of the i-th power-off distribution transformer in the single-fault power outage information set, i∈{1,2,…,n}, and n is the total number of power-off distribution transformers in the single-fault power outage information set; TSES(y) represents the tripping switchgear set of feeder y, ts j is the name of the j-th trip switch in the trip switch device set, j belongs to {1,2,…,m}, and m is the total number of trip switches in the trip switch device set; FSIS(y) represents the feeder fault standard outage information set of feeder y, fs k is the name of the kth power-off distribution transformer in the feeder fault standard power outage information set, k∈{1,2,…,w}, and w is the total number of power-off distribution transformers in the feeder fault standard power outage information set; S2, obtain real-time alarm information from the distribution management system and generate a real-time power outage information set FRIS; The generation of the FRIS is specifically as follows: FRIS(y)=[fr 1 ,fr 2 ,…,fr a ,…,fr v ]; Where FRIS(y) represents the real-time outage information set of feeder y with feeder fault, fr a is the name of the ath power-off distribution transformer in the real-time power outage information set, a∈{1,2,…,v}, and v is the total number of power-off distribution transformers in the real-time power outage information set; S3, S3, generating a distribution transformer misconnection information set TFCS according to the difference set between the FSIS and the FRIS, and generating a distribution transformer misconnection information set TMCS according to the difference set between the FRIS and the FSIS; The generation of the TFCS is specifically as follows: TFCS(y)=FSIS(y)-FRIS(y); It is expressed as: TFCS(y)=[tf 1 ,tf 2 ,…,tf b ,…,tf p ]; Among them, TFCS(y) represents the distribution transformer misconnection information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, "-" is the complement operator, TFCS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, "-" represents ... real-time power outage information set of feeder fault of feeder y, "-" represents the complement operator, TF b is the name of the bth distribution transformer incorrectly connected to feeder y in the distribution transformer misconnection information set, b∈{1,2,…,p}, and p is the total number of power-off distribution transformers in the distribution transformer misconnection information set; The generation of the TMCS is specifically as follows: TMCS(y)=FRIS(y)-FSIS(y); It is expressed as: TMCS(y)=FRIS(y)-FSIS(y); Where TMCS(y) represents the distribution transformer leakage information set of feeder y, FRIS(y) represents the real-time power outage information set of feeder fault of feeder y, FSIS(y) represents the standard power outage information set of feeder fault of feeder y, "-" is the complement operator, tm c is the name of the cth distribution transformer that should be connected to feeder y but is not connected in the distribution transformer missing connection information set, c∈{1,2,…,q}, q is the total number of power-off distribution transformers in the distribution transformer missing connection information set.