A combined charge structure for improving deep hole blasting effect in limestone open pit mines

By adopting the main and auxiliary charge columns of front row holes, the main and auxiliary charge columns of rear row holes plus gas intervals and the auxiliary shallow hole weak charge charging structure in limestone open-pit mines, the unit consumption of explosives and hole network parameters are adjusted to form a standardized combined charge. The structure solves the problem of poor blasting effect in the existing technology and improves the blasting efficiency and ore utilization rate.

CN114705094BActive Publication Date: 2024-10-25GANSU XIGOU MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210306817.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-27
Publication Date
2024-10-25
Estimated Expiration
2042-03-27

AI Technical Summary

Technical Problem

In limestone open-pit mines, it is difficult for the existing technology to meet the four requirements of economical and reasonable explosive unit consumption, low base rate and large block rate, and high block ore rate, especially when the blast hole diameter and hole direction are fixed, and the geological conditions In complex situations, the blasting effect is poor, resulting in high blasting difficulty, low production efficiency, and high costs.

Method used

Adopt the main and auxiliary charge structure of the front row of holes, the main and auxiliary charge column of the back row of holes plus gas spacer charging structure, and add the auxiliary shallow hole weak charge structure between the medium and deep holes, and adjust the explosive unit consumption and hole network parameters. , forming a standardized combined charge structure to ensure reasonable distribution of explosion energy and reduce the risk of flying rocks and crushing phenomena.

Benefits of technology

It significantly improves the large block rate and base rate of blasted piles, improves shoveling and transportation efficiency and ore utilization, reduces production costs, and solves the problem of poor blasting effects in the existing technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114705094B_ABST
    Figure CN114705094B_ABST
Patent Text Reader

Abstract

The present invention relates to a medium- and long-hole blasting technology for limestone open-pit mines, and in particular to a combined charge structure for improving the effect of medium- and long-hole blasting in limestone open-pit mines. The design hole network parameters of the blastholes are calculated according to the reference conditions; the reference conditions are a step height of 12m and a slope inclination of 75. 0 , vertical hole diameter 200mm, front row hole over-depth 2.5m, rear row hole over-depth 2m, average explosive consumption 0.190kg / t, benchmark hole network parameters 35m 2 , where the hole grid parameters are row spacing × hole spacing, and the hole grid is arranged in a triangular pattern; the calculation method based on the benchmark conditions is: design hole grid parameters = [1 + (average explosive unit consumption ‑ design explosive unit consumption) ÷ average explosive unit consumption] × benchmark hole grid parameters, where the design explosive unit consumption is selected based on the explosiveness of the blasting area; the hole spacing and row spacing of the blast holes are determined based on the calculated design hole grid parameters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a deep hole blasting technology in a limestone open-pit mine, and in particular to a combined charge structure for improving the deep hole blasting effect in a limestone open-pit mine. Background Art

[0002] Open-pit mining operations mainly include four major processes: drilling, blasting, shoveling and transportation. Blasting is a very important part of it. The quality of blasting and the cost of the blasting process directly affect the efficiency of shoveling, transportation, crushing and other equipment and the total cost of the mine. At present, large and medium-sized open-pit mines at home and abroad generally use medium-deep hole blasting technology to carry out blasting operations on ore bodies and surrounding rocks. For flux limestone open-pit mines, a good blasting effect must simultaneously meet the four requirements of reasonable economic unit consumption of explosives, low root rate and large block rate, and high block rate. After decades of blasting practice, it has been proved that for limestone mines with fixed blasthole diameter and hole direction, complex geological conditions and high blasting difficulty, whether using conventional continuous charging structure, segmented charging structure, hole bottom interval charging structure, or by increasing super-depth, reducing hole network parameters, and increasing single hole charging amount and other blasting technical means, it is difficult to meet the above four basic requirements at the same time.

[0003] The disadvantages of the original charging structure are analyzed. The main disadvantages are as follows: without changing the bearing area of ​​the hole network, increasing the super-depth and the height of the charge column cannot increase the charge per unit area at the bottom of the blasthole, which not only fails to overcome the foundation, but also causes a thicker crushing layer on the upper part of the next step, reducing the lump rate when blasting the next step; the hole filling height of the existing continuous charging structure is usually 6-7m. The excessive filling causes a lot of large pieces on the upper part of the blast pile. In order to reduce the large pieces on the upper part of the blast pile, the segmented charging structure adopted has insufficient filling height of the hole. , which is easy to cause blasting; the front row holes adopt a continuous charging structure, and the height of the charge column is too high, resulting in a large difference between the chassis resistance line and the minimum resistance line. The explosive gas first overflows from the direction of the lowest resistance line, which is not conducive to overcoming the foundation and is also prone to flying rocks; the explosive energy of the entire blasting area is mainly concentrated in the middle and lower part of the blast hole, and the explosion energy of the upper part of the blast hole is insufficient, resulting in an unfavorable situation in which the lower part of the blast pile is over-crushed and there are more large pieces in the upper part; the mismatch between the explosiveness of the ore and rock, the unit consumption of explosives, the hole network parameters, and the charging structure makes it difficult to achieve a substantial breakthrough in the blasting effect. Summary of the invention

[0004] In order to overcome the problems existing in the above-mentioned prior art, the purpose of the present invention is to provide a combined charging structure for improving the blasting effect of medium and deep holes in limestone open-pit mines, and proposes a standardized combined charging structure of "the front row holes adopt the main and auxiliary charge column charging structure, the rear row holes adopt the main and auxiliary charge column plus gas interval charging structure, and the auxiliary shallow hole weak charge structure is added between the medium and deep holes. Under the standardized charging structure mode, the hole network parameters are adjusted based on the unit consumption of explosives". The blasting technical scheme makes the explosion energy distribution in the blasting area relatively reasonable and the peak pressure of the detonation wave is reduced. Under the premise that the comprehensive unit consumption of explosives does not increase and the blasting flying rocks are controllable, the new combined charging structure blasting technology is adopted, which can greatly reduce the large block rate and root rate of the blasting pile and greatly increase the block ore rate, thereby effectively improving the production efficiency and the comprehensive utilization rate of ore in the shoveling and transportation processes, reducing the direct consumption cost of production, and solving the problems existing in the prior art.

[0005] The technical solution adopted by the present invention is:

[0006] A combined charge structure for improving the deep hole blasting effect in limestone open pit mines, and calculating the design hole network parameters of the blasthole according to the benchmark conditions;

[0007] The reference conditions are as follows: step height 12m, slope angle 75 0 , vertical hole diameter 200mm, front row hole over-depth 2.5m, rear row hole over-depth 2m, average explosive consumption 0.190kg / t, benchmark hole network parameters 35m 2 , where the hole network parameters are row spacing × hole spacing (5m × 7m = 35m 2 ), the hole grid has triangular holes;

[0008] The calculation method according to the benchmark conditions is: Design hole network parameters = [1 + (average explosive unit consumption - design explosive unit consumption) ÷ average explosive unit consumption] × benchmark hole network parameters, where the design explosive unit consumption is selected according to the explosiveness of the blasting area, and the explosiveness of the blasting area is divided into three categories: difficult, medium and easy. The corresponding explosive unit consumption is 0.220-0.196kg / t, 0.195-0.185kg / t, and 0.184-0.168kg / t, respectively. When designing blasting, the design explosive unit consumption of the blasting area is determined based on past experience. The design explosive unit consumption can be determined while keeping the charge structure, single hole charge amount, and super-depth value fixed;

[0009] The hole spacing and row spacing of blastholes are determined based on the calculated design hole grid parameters. According to the percentage increase or decrease of the design explosive unit consumption compared with the benchmark explosive unit consumption, the hole grid parameters are designed by using the inverse proportional reduction or increase method, and the hole spacing and row spacing are determined.

[0010] Further, the blast holes include front row holes, rear row holes and auxiliary shallow holes. The front row holes are provided in one row, the rear row holes are provided in two rows, and there are multiple auxiliary shallow holes. The spacing between the front row holes and the two rows of rear row holes is the row spacing determined by the design hole network parameters, the spacing between every two blast holes in the rear row holes is the hole spacing determined by the design hole network parameters, the spacing between every two blast holes in the front row holes is the hole spacing determined by the design hole network parameters reduced by 0.5m, the auxiliary shallow holes are arranged between the front row holes and the two rows of rear row holes, and the auxiliary shallow holes are arranged at the center of gravity of three adjacent blast holes. In order to effectively overcome the chassis resistance line, the hole spacing of the front row holes needs to be reduced by 0.5m.

[0011] The front row holes further described adopt a main and auxiliary charge column charging structure. The front row holes have a hole depth of 14.5m, of which the extra depth is 2.5m. The front row holes are 2.5m away from the top of the slope, and the front row holes are 5.7m away from the bottom of the slope. The lower part of the front row holes is a main charge column with a height of 7.7m, and the upper part of the main charge column is a main filling section with a height of 4.9m. At the top of the main filling section is an auxiliary charge column with a height of 0.35m, and the upper part of the auxiliary charge column to the hole mouth is an auxiliary filling section with a height of 1.65m.

[0012] The rear-row holes further described adopt a main and auxiliary charge columns plus gas interval charging structure. The rear-row holes have a hole depth of 14m, of which the extra depth is 2m. The lower part of the rear-row holes is a main charge column with a height of 7m, the upper part of the main charge column is a gas interval section with a height of 1m, the upper part of the gas interval section is a main filling section with a height of 4m, the top of the main filling section is an auxiliary charge column with a height of 0.35m, and the upper part of the auxiliary charge column to the hole mouth is an auxiliary filling section with a height of 1.65m.

[0013] The auxiliary shallow hole further described adopts a weak charge charging structure, the auxiliary shallow hole has a depth of 2m, the auxiliary shallow hole charge column height is 0.35m, and the filling section from the upper part of the charge column to the hole mouth is 1.65m high.

[0014] The beneficial effects of the present invention are:

[0015] 1. The front row holes of the present invention adopt a segmented charging structure of main and auxiliary explosive columns. The charge of the main explosive column accounts for 95%, which is greater than the original segmented charge of 86%. The effects of throwing blasting and overcoming the chassis resistance line are more effective. The height of the main filling section is 5m, which is much greater than the original filling height of 2m. It can not only effectively avoid the occurrence of the blasting phenomenon, but also alleviate the problem of premature escape of the explosion gas of the main explosive column along the minimum resistance line to reduce the explosive force. The auxiliary explosive column is located at the top of the blasthole. The loose blasting can not only break the large pieces on the top of the blasthole, but also avoid the harm of flying stones.

[0016] 2. The rear hole design of the present invention adopts a main and auxiliary charge column plus a gas interval charge structure. The charge amount of the main charge column accounts for 91%, which is greater than the original segmented charge of 86%. The role of throwing blasting and overcoming the resistance line is more effective. The gas interval can not only reduce the peak pressure of the detonation gas to avoid excessive crushing of the ore around the blast hole, but also enhance the explosive force. The height of the main filling section is 4m, which can effectively avoid the occurrence of blasting. The auxiliary charge column is located at the top of the blast hole. The loose blasting can not only break the large pieces on the top of the blast hole, but also avoid the harm of flying stones.

[0017] 3. The present invention is designed to drill a shallow hole at the center of gravity (center line intersection) of three adjacent medium-deep holes. The concentrated charge at the bottom of the shallow hole does not exceed 10kg. The weak charge not only plays the role of loosening blasting and dividing large blocks between adjacent blast holes, but also can avoid flying stone hazards.

[0018] 4. The present invention adopts a standardized charging structure mode when designing medium-deep hole blasting, and selects the design explosive unit consumption value based on the previously accumulated blastability difficulty of the blasting area. When the charging structure remains unchanged, it is only necessary to apply the calculation formula to calculate the corresponding design hole network parameters from the design explosive unit consumption, and determine the hole spacing and row spacing. After blasting, the explosive unit consumption and hole network parameters are optimized according to the blasting effect, and finally standardized explosive unit consumption and hole network parameters are formed, making blasting design and test optimization simple and practical.

[0019] 5. The present invention adopts a standardized charging structure composed of a segmented charging structure of main and auxiliary charge columns in the front row holes, a segmented charging structure of main and auxiliary charge columns plus gas intervals in the rear row holes, and a weak charge structure for auxiliary shallow holes in the medium and deep hole blasting, so that the energy distribution of explosive explosion tends to be reasonable, and solves the problems of blasting foundation, large blocks, and low lump ore rate; in the standardized combined charging structure mode, a relationship between hole network parameters and explosive unit consumption is formed, so that the design elements of medium and deep hole blasting are transformed into the design of explosive unit consumption and hole network parameters. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the cross-sectional structure of the combined charge structure of the present invention;

[0021] Figure 2 It is a plan view of the blasthole arrangement of the combined charge structure of the present invention.

[0022] In the figure: 1. front row holes, 2. back row holes, 3. auxiliary shallow holes. DETAILED DESCRIPTION

[0023] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments:

[0024] Embodiment 1:

[0025] According to the benchmark conditions, the step height is 12m and the slope angle is 750 , vertical hole diameter 200mm, front row hole over-depth 2.5m, rear row hole over-depth 2m, average explosive consumption 0.190kg / t, benchmark hole network parameters 35m 2 , where the hole network parameters are row spacing × hole spacing (5m × 7m = 35m 2 ), the hole grid is arranged in a triangle shape, and the formula "design hole grid parameter = [1 + (average explosive unit consumption - design explosive unit consumption) ÷ average explosive unit consumption] × reference hole grid parameter" is used, where the design explosive unit consumption is selected as 0.190kg / t, and the design hole grid parameter is obtained as 35m 2 (5m×7m=35m 2 ), the following blasthole parameters are obtained:

[0026] The front row hole 1 adopts the main and auxiliary charge column charging structure. The hole depth of the front row hole 1 is 14.5m, of which the extra depth is 2.5m. The hole distance of the front row hole 1 is 7-0.5=6.5m. The front row hole 1 is 2.5m away from the top of the slope surface, and the front row hole 1 is 5.7m away from the bottom of the slope surface. The lower part of the front row hole 1 is the main charge column with a height of 7.7m and a charge of 210kg. The upper part of the main charge column is the main filling section with a height of 4.9m. At the top of the main filling section is the auxiliary charge column with a height of 0.35m and a charge of 10kg. The upper part of the auxiliary charge column to the hole mouth is the auxiliary filling section with a height of 1.65m.

[0027] The rear hole 2 adopts the main and auxiliary charge columns plus gas interval charging structure. The depth of the rear hole 2 is 14m, of which the extra depth is 2m. The hole distance of the rear hole 2 is 7m. The lower part of the rear hole 2 is the main charge column with a height of 7m and a charge of 195kg. The upper part of the main charge column is a gas interval section with a height of 1m. The upper part of the gas interval section is a main filling section with a height of 4m. The top of the main filling section is an auxiliary charge column with a height of 0.35m and a charge of 10kg. The auxiliary charge column from the upper part of the auxiliary charge column to the hole mouth is an auxiliary filling section with a height of 1.65m.

[0028] The auxiliary shallow hole 3 adopts a weak charge structure. The auxiliary shallow hole 3 is arranged at the center of gravity (center line intersection) of the three adjacent medium-deep holes. The auxiliary shallow hole is 2m deep, the auxiliary shallow hole charge column is 0.35m high, 10kg of charge is concentrated at the bottom of the hole, and the upper part of the charge column to the hole mouth is a filling section with a height of 1.65m.

[0029] Embodiment 2:

[0030] According to the benchmark conditions, the step height is 12m and the slope angle is 75 0 , vertical hole diameter 200mm, front row hole over-depth 2.5m, rear row hole over-depth 2m, average explosive consumption 0.190kg / t, benchmark hole network parameters 35m 2 , where the hole network parameters are row spacing × hole spacing (5m × 7m = 35m 2), the hole grid is arranged in a triangle shape, and the formula "design hole grid parameter = [1 + (average explosive unit consumption - design explosive unit consumption) ÷ average explosive unit consumption] × reference hole grid parameter" is used. The design explosive unit consumption is selected as 0.220 kg / t for the most difficult blasting area in the stope, and the design hole grid parameter of this area is 29.47m 2 The hole spacing of the rear row holes 2 can be designed to be 6.55m and the row spacing to be 4.5m. According to previous blasting experience, in order to effectively overcome the chassis resistance line, the hole spacing of the front row holes needs to be reduced by 0.5m. Therefore, the hole spacing of the front row holes is designed to be 6.05m, and the other parameters of each blast hole are consistent with those in Example 1.

[0031] Through experiments and verification, it is shown that after adopting the combined charge structure of the present invention, under the condition of keeping the average unit consumption of explosives unchanged, the rate of large blocks in the blast pile is reduced from the original 55 pieces / 10,000 tons to within 37 pieces / 10,000 tons, and the root rate is reduced from the original 1.32 pieces / 10,000 tons to within 0.85 pieces / 10,000 tons; the shovel loading efficiency is increased by 18%, and the fuel consumption of large vehicles is reduced by 5.8%; the rate of finished ore blocks is increased by more than 2 percentage points, and the direct mining cost is estimated to be reduced by more than 5%.

Claims

1. A combined charge structure for improving the deep hole blasting effect in limestone open pit mines, characterized in that: Calculate the design hole grid parameters of the blasthole according to the benchmark conditions; The reference conditions are as follows: step height 12m, slope angle 75 0 , vertical hole diameter 200mm, front row hole over-depth 2.5m, rear row hole over-depth 2m, average explosive consumption 0.190kg / t, benchmark hole network parameters 35m 2 , where the hole grid parameters are row spacing × hole spacing, and the hole grid is arranged in a triangle; The calculation method based on the benchmark conditions is: Design hole network parameter = [1 + (average explosive unit consumption - design explosive unit consumption) ÷ average explosive unit consumption] × benchmark hole network parameter, where the design explosive unit consumption is selected according to the explosiveness of the blasting area; Determine the hole spacing and row spacing of blastholes according to the calculated design hole network parameters; The blast holes include front row holes (1), rear row holes (2) and auxiliary shallow holes (3), wherein the front row holes (1) are arranged in one row, the rear row holes (2) are arranged in two rows, and a plurality of auxiliary shallow holes (3) are arranged. The spacing between the front row holes (1) and the two rows of rear row holes (2) is the row spacing determined by the design hole network parameters, the spacing between every two blast holes of the rear row holes (2) is the hole spacing determined by the design hole network parameters, the spacing between every two blast holes of the front row holes (1) is the hole spacing determined by the design hole network parameters reduced by 0.5 m, the auxiliary shallow holes (3) are arranged between the front row holes (1) and the two rows of rear row holes (2), the auxiliary shallow holes (3) are arranged at the center of gravity of a triangle formed by a front row hole (1) and two rear row holes (2) adjacent to the front row hole (1), or the auxiliary shallow holes (3) are arranged at the center of gravity of a triangle formed by a rear row hole (2) close to the front row hole (1) and two rear row holes (2) adjacent to the rear row hole (2); The front row holes (1) adopt a main and auxiliary charge column charging structure, the front row holes (1) have a hole depth of 14.5 m, of which the extra depth is 2.5 m, the front row holes (1) are 2.5 m away from the top of the slope, and the front row holes (1) are 5.7 m away from the bottom of the slope. The lower part of the front row holes (1) is a main charge column with a height of 7.7 m, the upper part of the main charge column is a main filling section with a height of 4.9 m, and at the top of the main filling section is an auxiliary charge column with a height of 0.35 m, and from the upper part of the auxiliary charge column to the hole mouth is an auxiliary filling section with a height of 1.65 m; The rear row holes (2) adopt a main and auxiliary charge column plus gas interval charge structure. The rear row holes (2) have a hole depth of 14m, of which the extra depth is 2m. The lower part of the rear row holes (2) is a main charge column with a height of 7m. The upper part of the main charge column is a gas interval section with a height of 1m. The upper part of the gas interval section is a main filling section with a height of 4m. The top of the main filling section is an auxiliary charge column with a height of 0.35m. The upper part of the auxiliary charge column to the hole mouth is an auxiliary filling section with a height of 1.65m.

2. A combined charge structure for improving the deep hole blasting effect in limestone open-pit mines according to claim 1, characterized in that: The auxiliary shallow hole (3) adopts a weak charge structure, the auxiliary shallow hole (3) has a hole depth of 2m, the auxiliary shallow hole (3) has a charge column height of 0.35m, and the filling section from the upper part of the charge column to the hole mouth has a height of 1.65m.