By screening and correlating the operation of overcurrent coupling devices and energy storage devices in the power grid, and using the discharge/charge distribution coefficient index determination strategy of the energy storage device, the load shedding and machine shedding problems caused by the action of the overcurrent coupling device during faults are solved , improving the stability and response efficiency of the power grid.

CN114784812BActive Publication Date: 2024-10-11STATE GRID SHANDONG ELECTRIC POWER CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210498735.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-09
Publication Date
2024-10-11
Estimated Expiration
2042-05-09

AI Technical Summary

Technical Problem

In the existing technology, under fault conditions, the action of the overcurrent coupling device causes load shedding or machine shutdown, resulting in power outages for users and a sharp reduction in power generation, affecting the stability of the power grid and market transactions.

Method used

By screening the overcurrent coupling devices and energy storage devices that need to be operated in an associated manner, the main station-substation structure is used to achieve real-time communication, and the associated operation strategy is determined based on the discharge/charge distribution coefficient index of the energy storage device, and charging or discharging is performed to alleviate the line Overcurrent, improve the reliability of the associated operation of the overcurrent coupling device and the energy storage device.

Benefits of technology

It effectively avoids the consequences of load shedding and machine shedding, improves the stability of the power grid and the response efficiency of the energy storage device, shortens the fault response time, reduces the time for the line current to rise to the critical limit, and avoids the consequences of untimely manual response. error.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114784812B_ABST
    Figure CN114784812B_ABST
Patent Text Reader

Abstract

The present invention proposes a method for associated operation of an overcurrent interlocking device and an energy storage device, comprising: screening all overcurrent interlocking devices and energy storage devices that need to be associated with each other; selecting a site where one of the energy storage devices is located as a main site, and setting the sites where the other overcurrent interlocking devices and energy storage devices are located as subsites; the subsite sends the parameters of its own line overcurrent interlocking device and the parameters of the energy storage device to the main site, the main site receives the information sent by the subsite, determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the subsite, and sends the determined associated operation strategy to the corresponding energy storage device and / or the subsite where the overcurrent interlocking device is located, the energy storage device executes charging or discharging according to the received associated operation strategy, and after the line overcurrent risk is eliminated, evaluates the effect of the execution of the associated operation strategy. The present invention also proposes an associated operation system for an overcurrent interlocking device and an energy storage device, which realizes the associated reliable operation of the overcurrent interlocking device and the energy storage device.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a method and system for associated operation of an overcurrent disconnection device and an energy storage device. Background Art

[0002] If a single component trips (N-1 fault) or a double-circuit line fault on the same tower (N-2 fault) occurs, some lines will have current over-limit problems. In order to ensure the safe and stable operation of the power grid and avoid the expansion of the fault range, overcurrent interlocking devices are installed in some stations, such as line overcurrent load shedding devices and line overcurrent machine shedding devices. The above devices will cut off the substation load or power plant unit in turns after the line current reaches the preset value and the preset time until the line current drops below the preset value. The commissioning of the energy storage device project on the power plant side (including new energy stations), the energy storage device with millisecond-level charging and discharging advantages and the overcurrent interlocking device are jointly operated through a certain logic, which has far-reaching significance for alleviating the degree of line overcurrent and reducing the impact of load shedding or machine shedding on users and power generation companies.

[0003] With the growth of electricity demand in large and medium-sized cities, there are weak links in the power grid under peak load conditions. In the event of a fault, some components may have excessive current flow. The operation of the existing overcurrent interlocking safety automatic device will lead to load shedding and machine shedding, which will have an adverse impact on the protection of people's livelihood and the interests of power generation companies. The existing power grid operation mode optimization method, or static stability control method, does not have research and practice on the joint operation of overcurrent interlocking devices and energy storage devices. The existing energy storage facilities participate in the paid peak load regulation and AGC (automatic generation control) transactions in the auxiliary service market, and do not consider the possibility of actively calling energy storage facilities in response to overcurrent interlocking devices.

[0004] In the prior art, the solution to the problem of line overcurrent and the action of the safety and automatic device in the event of a fault is: when a fault occurs, after the line overcurrent reaches the action value and action time of the safety and automatic device, the existing overcurrent load-cutting device will be operated in turns to cut off part of the direct distribution line, and the load carried by the direct distribution line will lose power. During the fault handling period, the dispatcher will restore the cut-off load to other power supply areas through communication; or the existing overcurrent unit-cutting device will be operated in turns to cut off the power plant's generator set. After the unit is cut off, the cut-off unit will be reconnected to the grid after the fault is not handled and the line resumes power supply.

[0005] However, the existing scheme has the following disadvantages: during the period from when the existing overcurrent interlocking device is actuated to cut off the load to when the load is restored, users are in a power outage state, which will affect people's livelihood electricity consumption and cause user complaints; during the period from when the existing overcurrent interlocking device is actuated to cut off the unit to when the unit is restored to the grid, the power generation of the power generation enterprise drops sharply, and the power market transaction is affected. Summary of the invention

[0006] In order to solve the problems existing in the prior art, the present invention innovatively proposes a method and system for the associated operation of an overcurrent interlocking device and an energy storage device, which effectively solves the problem that the operation of the existing overcurrent interlocking device will cause consequences such as load shedding and machine shedding due to the prior art, and realizes the associated reliable operation of the overcurrent interlocking device and the energy storage device.

[0007] A first aspect of the present invention provides a method for associated operation of an overcurrent interlocking device and an energy storage device, comprising:

[0008] According to the preset screening conditions, all overcurrent disconnection devices and energy storage devices that need to be operated in association are screened;

[0009] Select one of the stations where the energy storage device is located as the main station, and set the stations where the other overcurrent interlocking devices and energy storage devices are located as substations. The main station and the substation adopt a master station-substation structure to achieve real-time communication between the overcurrent interlocking device and the energy storage device; the substation sends the parameters of its own line overcurrent interlocking device and the energy storage device to the main station;

[0010] The main station receives the information sent by the substation, and determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substation, and sends the determined associated operation strategy to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the energy storage device performs charging or discharging according to the received associated operation strategy;

[0011] After the line overcurrent risk is eliminated, the effectiveness of the execution of the associated operation strategy is evaluated.

[0012] Optionally, according to preset screening conditions, all overcurrent interlocking devices and energy storage devices that need to be operated in association are screened, specifically including:

[0013] Obtaining a discharge / charge distribution coefficient index of each energy storage device, wherein the discharge / charge distribution coefficient index of the energy storage device is used to describe the degree of reduction of the current in the line including the overcurrent disconnection device after the energy storage device is discharged / charged;

[0014] According to the discharge / charge distribution coefficient index of each energy storage device, all energy storage devices whose discharge / charge distribution coefficient index is greater than a preset index threshold and the corresponding overcurrent interlocking devices are screened out as the overcurrent interlocking devices and energy storage devices to be operated in association.

[0015] Furthermore, the specific index of the energy storage device discharge / charge distribution coefficient is:

[0016]

[0017] Among them, S m,i P is the energy storage device discharge / charge distribution coefficient index, which represents the degree of reduction of the power flow of line m including the overcurrent disconnection device after the energy storage device i is discharged / charged; es,iis the active power discharged / charged by the energy storage device i, P es,i A positive value indicates discharge, P es,i Negative values ​​indicate charging; ΔP dec,m After the energy storage device i is discharged / charged, the active power of the line m including the overcurrent disconnection device is correspondingly reduced.

[0018] Optionally, the line overcurrent inter-cutting device parameters sent by the substation to the main station include the real-time current value of the line collected by the overcurrent inter-cutting device and the action set value of the overcurrent inter-cutting device, the overcurrent inter-cutting device action set value includes the line current risk value, the line current risk waiting time, the line current cut-off value, and the line current cut-off waiting time, the line current risk value is the current value for which an alarm signal is prompted when there is an overcurrent risk in the line, the line current risk waiting time is the time it takes for the line current to reach the circuit current risk value to prompt an alarm signal, the line current cut-off value is the current value for which the line is cut off when there is an overcurrent risk in the line, and the line current cut-off waiting time is the time it takes for the line current to reach the circuit current cut-off value to cut off the line; the energy storage device parameters sent by the substation to the main station include the current power of the energy storage device and the charging and discharging parameters of the energy storage device, and the charging and discharging parameters of the energy storage device include the maximum charging and discharging power of the energy storage device.

[0019] Furthermore, the associated operation strategy to be sent includes:

[0020] The discharge / charge state that the energy storage device should execute, the discharge / charge power value that the energy storage device should execute, the discharge / charge duration of the energy storage device corresponding to the discharge / charge power value of the energy storage device, and the load that needs to be transferred within the discharge / charge duration of the energy storage device.

[0021] Furthermore, determining the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substation specifically includes:

[0022] After the line current collected by the line overcurrent disconnection device of the substation reaches the signaling current value, it is determined whether the corresponding energy storage device should be charged or discharged according to the energy storage device discharge / charge distribution coefficient index; wherein the signaling current value is the line current value corresponding to when the substation sends a reminder message to the main station, and the signaling current value is less than the line current risk value;

[0023] If it is determined that the line A where the first overcurrent disconnection device is located corresponds to the energy storage device i A Discharge, calculate the discharge strategy, and reduce the current of line A to the current target value I crl,A Energy storage device is required when A Discharge power value like Greater than energy storage device i A The maximum discharge power P dcmax,but And get the power value Discharge duration corresponding to discharge At the same time, obtain the energy storage device i A After the discharge is completed, the load value of the substation in the area where line A is located is gradually reduced until the current of line A just reaches the current target value I crl,A When the total load reduction P of the substation in the area where line A is located is obtained load,A , then in the energy storage device i A Discharge time Within, P load,A The load is transferred out of the area where line A is located to avoid the energy storage device i A After the discharge is completed, line A will over-current again; where m = A, i = i A ;

[0024] If it is determined that the line B where the second overcurrent disconnection device is located corresponds to the energy storage device i B It should be charged, and the charging strategy calculation is started to reduce the current of line B to the current target value I crl,B Energy storage device required for the following B Charging power like Greater than energy storage device i B The maximum charging power P cmax ,but And get the power value Charging time corresponding to charging At the same time, obtain the energy storage device i B After charging is completed, the load value of the substation in the area where line B is located is gradually reduced until the current of line B just reaches the current target value I crl,B When the total load reduction P of the substation in the area where line B is located is obtained load,B , then in the energy storage device i B Discharge time Within, P load,B The load is transferred out of the area where line B is located to avoid the energy storage device i B After charging is completed, line B is overcurrent again; where m = B, i = i B .

[0025] Furthermore, the current target value I of line A where the first overcurrent tripping device is located is crl,A Specifically:

[0026] I crl,A =I lim,A ×γ×(1-α A )×(1+β),

[0027] Among them, I lim,Ais the safety current limiting of line A where the first overcurrent tripping device is located, α A is the safety margin coefficient of line A where the first overcurrent interlocking device is located, β is the allowable overcurrent level of the line after a fault as specified in the safety and stability guidelines or dispatching regulations, and γ represents the temperature coefficient;

[0028] The target current value I of line B where the second overcurrent disconnection device is located crl,B Specifically:

[0029] I crl,B =I lim,B ×γ×(1-α B )×(1+β),

[0030] Among them, I lim,B is the safety current limiting of line B where the second overcurrent tripping device is located, α B is the safety margin coefficient of line B where the second overcurrent interlocking device is located, β is the allowable overcurrent level of the line after a fault as specified in the safety and stability guidelines or dispatching regulations, and γ represents the temperature coefficient.

[0031] Furthermore, the safety margin coefficient is divided into different safety levels, which correspond to different discharge strategies or charging strategies sent by the master station to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the higher the safety level, the higher the current target value I of the line A where the first overcurrent interlocking device is located. crl,A Or the current target value I of line B where the second overcurrent disconnection device is located crl,B The smaller the value, the overcurrent level of line A where the first overcurrent tripping device is located is reduced to the current target value I crl,A The following energy storage devices are required A Discharge power Or increase the current of line B where the second overcurrent disconnection device is located to the current target value I crl,B Required energy storage device B Charging power The higher the value, the longer the discharge time. Or the corresponding charging time The shorter the load transfer amount P that needs to be adjusted load,A or P load,B The bigger.

[0032] Optionally, when the line overcurrent risk is eliminated, the effect of the associated operation strategy is evaluated, specifically including: defining the energy storage response energy efficiency index E i ,

[0033]

[0034] Among them, t exe is the start time of energy storage response, t end is the energy storage response termination time, |Pop,i (t)|dt is the integral of the discharge / charge power varying with time over time t, representing the total response power of the energy storage device i, [P load ×(t end -t exe )] is the total load transferred by the dispatcher during the energy storage discharge / charge period, E i The smaller the value, the better the response of the energy storage device i to the overcurrent disconnection device.

[0035] A second aspect of the present invention provides a system for associated operation of an overcurrent interlocking device and an energy storage device, comprising:

[0036] A screening module, which screens all overcurrent disconnection devices and energy storage devices that need to be operated in association according to preset screening conditions;

[0037] Select the communication module, select one of the stations where the energy storage device is located as the main station, and set the stations where the other overcurrent interlocking devices and energy storage devices are located as substations. The main station and the substation adopt a master-substation structure to achieve real-time communication between the overcurrent interlocking device and the energy storage device; the substation sends the parameters of its own line overcurrent interlocking device and the energy storage device to the main station;

[0038] Determination module, the main station receives the information sent by the substation, and determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substation, and sends the determined associated operation strategy to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the energy storage device performs charging or discharging according to the received associated operation strategy;

[0039] The evaluation module evaluates the effectiveness of the execution of the associated operation strategy after the line overcurrent risk is eliminated.

[0040] The technical solution adopted by the present invention includes the following technical effects:

[0041] 1. The present invention is based on screening all overcurrent interlocking devices and energy storage devices that need to be associated for operation according to preset screening conditions; selecting the site where one of the energy storage devices is located as the main site, and setting the sites where the other overcurrent interlocking devices and energy storage devices are located as substations, and the substations send the parameters of their own line overcurrent interlocking devices and energy storage devices to the main station, and the main station receives the information sent by the substations, and determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substations, which effectively solves the problem that the operation of the existing overcurrent interlocking device will cause load shedding, machine shedding and other consequences due to the existing technology, and realizes the associated reliable operation of the overcurrent interlocking device and the energy storage device.

[0042] 2. In the technical solution of the present invention, according to the preset screening conditions, screening all overcurrent interlocking devices and energy storage devices that need to be operated in association specifically includes: obtaining the discharge / charge distribution coefficient index of each energy storage device, which is used to describe the degree of reduction of the current in the line including the overcurrent interlocking device after the energy storage device is discharged / charged; according to the discharge / charge distribution coefficient index of each energy storage device, screening all energy storage devices whose discharge / charge distribution coefficient index is greater than the preset index threshold and the corresponding overcurrent interlocking devices as the overcurrent interlocking devices and energy storage devices to be operated in association, further improving the correlation between the energy storage device and the corresponding overcurrent interlocking device, and improving the reliability of the associated operation of the overcurrent interlocking device and the energy storage device.

[0043] 3. In the technical solution of the present invention, the safety margin coefficient is divided into different safety levels, which correspond to different discharge strategies or charging strategies sent by the main station to the substation where the corresponding energy storage device and / or overcurrent interlocking device is located, so as to facilitate the determination of different discharge strategies or charging strategies according to different safety margin coefficients, realize the optimal selection of discharge strategy or charging strategy, shorten the response time after a fault occurs, delay the time for the line current to rise to the critical limit, and avoid missing the opportunity to transfer the load due to untimely manual response.

[0044] 4. In the technical solution of the present invention, when the line overcurrent risk is eliminated, the effect of the associated operation strategy is evaluated to achieve a quantitative evaluation of the effect of the energy storage response interlocking device, which can be used as a settlement basis for the paid regulation of the energy storage participating in the ancillary service market.

[0045] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0047] Figure 1 This is a schematic diagram of a process of a method in Example 1 of the present invention;

[0048] Figure 2 Schematic diagram of the process of step S1 in the method of embodiment 1 of the present invention;

[0049] Figure 3 It is a schematic diagram of the associated operation of the overcurrent interlocking device and the energy storage device in the method of Example 1 of the scheme of the present invention;

[0050] Figure 4 This is a schematic diagram of communication between a master station and a substation in Embodiment 1 of the present invention;

[0051] Figure 5 It is a schematic diagram of the structure of the system of Example 1 in the solution of the present invention. DETAILED DESCRIPTION

[0052] In order to clearly illustrate the technical features of the present solution, the present invention is described in detail below through specific implementation methods and in conjunction with the accompanying drawings. The disclosure below provides many different embodiments or examples for realizing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. In addition, the present invention may repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. It should be noted that the components illustrated in the accompanying drawings are not necessarily drawn to scale. The present invention omits the description of known components and processing techniques and processes to avoid unnecessary limitations on the present invention.

[0053] Embodiment 1

[0054] like Figure 1 As shown, the present invention provides a method for associated operation of an overcurrent interlocking device and an energy storage device, comprising:

[0055] S1, according to the preset screening conditions, screening all over-current interlocking devices and energy storage devices that need to be operated in association;

[0056] S2, select one of the stations where the energy storage device is located as the main station, and set the stations where the other overcurrent interlocking devices and energy storage devices are located as substations. The main station and the substation adopt a master station-substation structure to achieve real-time communication between the overcurrent interlocking device and the energy storage device; the substation sends the parameters of its own line overcurrent interlocking device and the energy storage device to the main station;

[0057] S3, the master station receives information sent by the substation, determines the associated operation strategy between the overcurrent interlocking device and the energy storage device according to the information sent by the substation, and sends the determined associated operation strategy to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the energy storage device performs charging or discharging according to the received associated operation strategy;

[0058] S4, after the line overcurrent risk is eliminated, the effectiveness of the execution of the associated operation strategy is evaluated.

[0059] Among them, Figure 2 As shown, step S1 specifically includes:

[0060] S11, obtaining a discharge / charge distribution coefficient index of each energy storage device, wherein the discharge / charge distribution coefficient index of the energy storage device is used to describe the degree of reduction of the current in the line including the overcurrent disconnection device after the energy storage device is discharged / charged;

[0061] S12, according to the discharge / charge distribution coefficient index of each energy storage device, all energy storage devices whose discharge / charge distribution coefficient index is greater than a preset index threshold and the corresponding overcurrent interlocking devices are screened out as the overcurrent interlocking devices and energy storage devices to be operated in association.

[0062] Specifically, the discharge / charge distribution coefficient index of the energy storage device is:

[0063]

[0064] Among them, S m,i P is the energy storage device discharge / charge distribution coefficient index, which represents the degree of reduction of the power flow of line m including the overcurrent disconnection device after the energy storage device i is discharged / charged; es,i is the active power discharged / charged by the energy storage device i, P es,i A positive value indicates discharge, P es,i Negative values ​​indicate charging; ΔP dec,m After the energy storage device i is discharged / charged, the active power of the line m including the overcurrent disconnection device is correspondingly reduced.

[0065] In the process of identifying the overcurrent disconnection device and energy storage device with joint operation conditions, the N-1 and N-2 accidents of the power grid are anticipated. First, the power flow transfer distribution coefficient index W is defined. A,B , represents the proportion of the power flow on line B transferred to line A (including the overcurrent disconnection device) after the failure of line B (including the energy storage device).

[0066]

[0067] Among them, P B is the active power on line B just before the fault occurs, ΔP tr,A is the increased active power on line A after the fault occurs. W A,B The value must be less than 1. The larger the value, the stronger the degree to which lines A and B replace each other as flow transmission channels, where m includes A and B.

[0068] S m,i The larger the absolute value, the more effective the energy storage device is in alleviating the overcurrent level of the line. The higher the response requirement of the overcurrent interlocking device on the energy storage device, the more effective the energy storage device is. The energy storage device and the overcurrent interlocking device should be operated in conjunction. Specifically, the overcurrent interlocking device can be divided into the first overcurrent interlocking device and the second overcurrent interlocking device. The S corresponding to the line A where the first overcurrent interlocking device is located is A,i The value is a positive number, that is, the first overcurrent disconnection device is associated with the corresponding energy storage device i A Discharge is required; the S corresponding to line B where the second overcurrent disconnection device is located B,iThe value is negative, that is, the second overcurrent disconnection device is associated with the corresponding energy storage device i B Need to charge, that is, according to S m,i Whether it is greater than zero (or whether discharge is needed), line m can be divided into line A and line B.

[0069] Through the energy storage device discharge / charge distribution coefficient index S m,i , obtain all overcurrent disconnection devices and energy storage devices that need to be operated jointly through offline calculation, and connect the devices to the joint operation system.

[0070] In step S1, the overcurrent interlocking device is generally divided into two categories: one is the line overcurrent interlocking load cutting device, and the other is the line overcurrent interlocking unit cutting device.

[0071] Taking the line overcurrent load shedding device as an example, the signals collected by the overcurrent load shedding device are mainly: the real-time current value of the line, the direction of the line current, and the real-time load of each line cut. The action setting value of the line overcurrent shedding device with n action rounds is generally set as follows: the line current value reaches the line current risk value I sig , Line current risk waiting time T sig After 10 seconds (the current direction is positive), an alarm signal is issued to indicate that the line has an overcurrent risk and the line current value reaches the line current cut-off value I act After that, the line current cut-off waiting time T act,1 Seconds to cut off the lower level line a, line b, T act,2 Seconds to cut off the lower level line c, line d, ..., T act,n Cut off the lower-level lines x and y in seconds.

[0072] For example Figure 3 In the 220 kV line A, when the current reaches 720A, the device sends a signal after 0.5 seconds; when the current value of line A exceeds 800A: the device cuts off the 110 kV lines a and b (first round) of station A at the 10th second, and cuts off the 110 kV lines c and d (second round) of station A at the 15th second. If the current of line A has dropped below the action setting value of 800A after the first round of load shedding by the overcurrent load shedding device of line A, the second round of the device will no longer operate.

[0073] The line overcurrent joint cutting device is usually used to solve the problem that one of the transmission channels of a power plant fails and the flow of other transmission channels exceeds the limit. In this case, the line overcurrent level is usually high, and one or two large-capacity units need to be cut off to eliminate the line overcurrent problem. The setting of the action setting value is similar to the above. After the device is activated, it is not the load but the unit that is cut off.

[0074] In step S2, if Figure 4As shown, since each overcurrent interlocking device and each energy storage device are installed in different substations respectively, the information transmission between the devices adopts the "master station-substation" architecture, and the master station is set at the station where a large-capacity (capacity greater than the preset capacity threshold) energy storage device is located, and the stations where the other devices are located are set as substations.

[0075] The main station receives information sent by the substation, performs verification calculations on the joint operation strategy, displays information at the main station, and enables human-computer interaction. The main station can send the result information of autonomous program decision-making and human intervention to the substation for execution.

[0076] In step S3, if Figure 3-Figure 4 As shown, the substation sends the parameters of its own line overcurrent interlocking device and energy storage device to the main station. Specifically, the information sent by each substation to the main station mainly includes:

[0077] The line overcurrent interlocking device parameters include the real-time line current value collected by the overcurrent interlocking device, the overcurrent interlocking device action setting value (including I sig , T sig ,I act , T act,n The overcurrent tripping device action setting value includes the line current risk value I sig , Line current risk waiting time T sig , Line current cut-off value I act , Line current removal waiting time T act,n , the line current risk value I sig The current value for the line to issue an alarm signal when there is an overcurrent risk. The line current risk waiting time T sig The alarm signal is used to indicate the time when the line current reaches the circuit current risk value. The line current cut-off value I act is the current value of the line when there is an overcurrent risk in the line and the line is cut off. The line current cut-off waiting time T act,n The line is cut off for the time when the line current reaches the circuit current cut-off value; the energy storage device parameters include the current power Q of the energy storage device i 0,i and the charging and discharging parameters of the energy storage device i, which include the maximum charging and discharging power P of the energy storage device max (Maximum discharge power P dcmax And the maximum charging power P cmax ). Preferably, the charging and discharging parameters of the energy storage device may also include a rated capacity S rd , that is, the rated capacity of energy storage device i.

[0078] Furthermore, the master station receives information sent by the substation, determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substation, and displays it, and sends the determined associated operation strategy of the overcurrent interlocking device and the energy storage device to the corresponding substation, wherein the information sent to the corresponding substation mainly includes:

[0079] a. Information on overcurrent interlocking devices that are currently at risk of action (including device name, substation where it is located, action setting, and real-time value of the current on the line);

[0080] b. The current discharge / charge strategy of energy storage device i (including device name, substation where it is located, current real-time power, discharge / charge power). Multiple strategies can be given for manual selection, and strategy one will be automatically executed without manual intervention;

[0081] c. The energy storage discharge duration (in countdown form) corresponding to the energy storage device i discharge / charge strategy and the load transfer amount required to be executed within this time period.

[0082] That is, the associated operation strategies to be sent include:

[0083] Information on overcurrent interlocking devices that currently have an alarm or line removal risk, the discharge / charging strategy of the energy storage device associated with the overcurrent interlocking devices that currently have an alarm or line removal risk, the energy storage discharge duration corresponding to the energy storage device discharge / charging strategy, and the load transfer amount that needs to be executed within the energy storage discharge duration corresponding to the energy storage device discharge / charging strategy.

[0084] The associated operation strategies sent by the master station to the substation where the corresponding energy storage device and / or overcurrent interlocking device is located include:

[0085] The discharge / charge state that the energy storage device should execute, the discharge / charge power value that the energy storage device should execute, the discharge / charge duration of the energy storage device corresponding to the discharge / charge power value of the energy storage device, and the load that needs to be transferred within the discharge / charge duration of the energy storage device.

[0086] Specifically, the master station determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substation, which specifically includes:

[0087] After the line current collected by the overcurrent interlocking device in the line m of the substation is monitored to reach the signaling current value, it is determined whether the energy storage device i should be charged or discharged according to the energy storage device discharge / charge distribution coefficient index; wherein the signaling current value is the line current value corresponding to when the substation sends a reminder message to the main station, and the signaling current value is less than the line current risk value;

[0088] If it is determined that the line A where the first overcurrent disconnection device is located corresponds to the energy storage device i A Discharge, calculate the discharge strategy, and reduce the current of line A to the current target value Icrl,A Energy storage device is required when A ( Figure 3 The power value of the energy storage device 1) discharge like Greater than energy storage device i A The maximum discharge power P dcmax ,but And get the power value Discharge duration corresponding to discharge At the same time, obtain the energy storage device i A After the discharge is completed, the load value of the substation in the area where line A is located is gradually reduced until the current of line A just reaches the current target value I crl,A When the total load reduction P of the substation in the area where line A is located is obtained load,A , then in the energy storage device i A Discharge time Within, P load,A The load is transferred out of the area where line A is located to avoid the energy storage device i A After the discharge is completed, line A will over-current again; where m = A, i = i A ;

[0089] If it is determined that the line B where the second overcurrent disconnection device is located corresponds to the energy storage device i B It should be charged, and the charging strategy calculation is started to reduce the current of line B to the current target value I crl,B Energy storage device required for the following B ( Figure 3 2) Charging power of energy storage device like Greater than energy storage device i B The maximum charging power P cmax ,but And get the power value Charging time corresponding to charging At the same time, obtain the energy storage device i B After charging is completed, the load value of the substation in the area where line B is located is gradually reduced until the current of line B just reaches the current target value I crl,B When the total load reduction P of the substation in the area where line B is located is obtained load,B , then in the energy storage device i B Discharge time Within, P load,B The load is transferred out of the area where line B is located to avoid the energy storage device i B After charging is completed, line B is overcurrent again; where m = B, i = i B .

[0090] Before making a judgment, the master station first performs data initialization and calculation condition setting. Data initialization specifically includes the initialization of the power grid topology model and state quantity. The master station needs to perform fast power flow calculations. The power grid topology model and real-time state quantity used come from the dispatching automation system of the power grid and are actively updated at regular intervals.

[0091] The calculation condition settings include the load growth rate of the ultra-short-term future state flow calculation, the signaling current value I of the overcurrent disconnection device, and the load growth rate of the ultra-short-term future state flow calculation. req , target value of overcurrent interlocking device I crl .

[0092] To calculate the energy storage device i A or B The subsequent discharge / charging power, before the flow calculation, needs to estimate the load of each substation in the future ultra-short term, and the overcurrent cut-off device T act,1 (Time of the first round of load shedding) is generally less than 15s. The load growth rate of each substation in the ultra-short term is based on the load growth rate of the last four T act,1 The average value of the load growth rate during the period.

[0093] The signaling current value I of the overcurrent disconnection device req The overcurrent interlocking device in the line collects the line current value in real time. The overcurrent interlocking device in the line should be activated when the line current rises to the load shedding action set value T act,1 Previously, it was required to call the energy storage device to discharge / charge. Therefore, the current setting value of the line overcurrent cut-off device to send the energy storage call request to the master station should be set in advance, I req The smaller the value, the earlier the energy storage is called. You can select I req ≤I sig The value of .

[0094] Current target value I of overcurrent disconnection device crl After the overcurrent cut-off device in the line calls the energy storage, it is hoped that the current of the line can be reduced to I crl the following.

[0095] After the master station detects that the line current m collected by the line overcurrent cut-off device of the substation reaches the signaling current value, the energy storage device discharge / charge distribution coefficient index S m,i Determine whether the energy storage device i corresponding to line m should be charged or discharged; wherein the signaling current value is the line current value corresponding to when the substation sends a reminder message to the main station, and the signaling current value is less than the line current risk value;

[0096] If S m,i is a positive number, i.e. greater than zero, then the energy storage device i A should be discharged; if S m,i is a negative number, i.e. less than zero, then the energy storage device i B It should be charged.

[0097] If it is determined that the energy storage device i A The discharge strategy is calculated to reduce the current of line A to the target current value I crl,A Energy storage device is required when A Discharge power value like Greater than energy storage device i A The maximum discharge power P dcmax ,but And get the power value Discharge duration corresponding to discharge At the same time, obtain the energy storage device i A After the discharge is completed, the load value of the substation in the area where line A is located is gradually reduced until the current of line A just reaches the current target value I crl,A When the total load reduction P of the substation in the area where line A is located is obtained load,A , then in the energy storage device i A Discharge time Within, P load,A The load is transferred out of the area where line A is located to avoid the energy storage device i A After the discharge is completed, line A is overcurrent again;

[0098] Specifically, the energy storage discharge strategy calculation is started, and the power flow under the short-term future load level is calculated according to the comprehensive stability analysis program (existing power flow calculation program) (the historical load growth rate is used as a reference to predict the load value of each substation in the next 5 minutes. The predicted value can be provided by the existing ultra-short-term load forecasting system. Under the existing boundary conditions (the power plant startup mode and the external network interconnection line power flow are known), the Newton-Raphson method is used for power flow calculation, that is, the "comprehensive stability analysis program"). The overcurrent degree of the line is alleviated to the target value I crl,A The discharge power of the energy storage device i required for the following (First, set the energy storage device i in the power flow calculation A Discharge at maximum power, and then gradually reduce the discharge power until the line current just reaches I crl,A , the corresponding energy storage discharge power is According to the energy storage device A Current power Calculate the energy storage device i A Discharge power The discharge time is ( This time can also be calculated and provided by the energy storage device’s own EMS system).

[0099] That is, if the current value of line A needs to be reduced further, an energy storage device i is required.A Discharge at a higher power, in the energy storage device i A Under the premise of limited power, energy storage device i A The power will be discharged in a shorter time. A After the charge is reduced to 0, the current of line A may return to its original level. A Before the power of the energy storage device is reduced to 0, the dispatcher needs to load,A Load (When the energy storage is charged and discharged, the load value of the substation in the area is gradually reduced until the line current just reaches the current target value I crl,A At this time, the corresponding load reduction compared to the original load is the load that needs to be adjusted, which is P load,A , which can be calculated using the existing power flow calculation program) is adjusted by reducing the current value of line A to below the critical safety limit (the overcurrent load shedding device does not cut off the load and there is a safety margin). A The time that can be supported is reserved for the dispatcher to adjust the load P load,A time, to avoid the load shedding of the first overcurrent load shedding device due to the incomplete load adjustment operation, the exhaustion of energy storage power, and the re-overcurrent of line A; that is, in the energy storage device i A Discharge time Within, artificially (or by other means) load,A The load is transferred out of the area where line A is located to avoid the energy storage device i A After the discharge is completed, line A will over-current again; if the first over-current interlocking device is an over-current interlocking device, the corresponding need is based on the discharge power The principle of adjusting the unit output is the same as that of the overcurrent load shedding device, and the present invention will not be elaborated here.

[0100] If it is determined that the energy storage device i B Should be charged, start charging strategy calculation, obtain the energy storage device i B The current of line B is increased to the target current value I crl,B Required energy storage device B Charging power Corresponding charging time After the energy storage charging is completed, the load value of the substation in the area where the corresponding energy storage device is located will be increased step by step until the current of line B just reaches the current target value I crl,B The load transfer amount P that needs to be adjusted load,B .

[0101] Specifically, the energy storage device i is started BCharging strategy calculation, according to the comprehensive stability analysis program (existing power flow calculation program) calculates the power flow under the short-term future load level (with the historical load growth rate as a reference, predict the load value of each substation in the next 5 minutes, the predicted value can be provided by the existing ultra-short-term load forecasting system, under the existing boundary conditions (the power plant startup mode and the external network interconnection line power flow are known), the Newton-Raphson method is used for power flow calculation, that is, the "comprehensive stability analysis program"). Obtain the current of line B to the current target value I crl,B Required energy storage device B Charging power (First, set the energy storage device i in the power flow calculation B Charge at maximum power, and then gradually reduce the charging power until the current of line B just reaches I crl,B , the corresponding energy storage charging power is According to the energy storage device B Current power Calculate the energy storage device i B Charging power The charging time corresponds to ( This time can also be calculated and provided by the energy storage device’s own EMS system).

[0102] That is, if the current value of line B needs to be increased further, an energy storage device i is required. B Charging with greater power, energy storage device i B First, charge at maximum power immediately to delay the load shedding action time of the second overcurrent interlocking device of line B, so as to buy time for the dispatcher to adjust the load power. If the second overcurrent interlocking device finally acts to shear off the load, the line overcurrent is eliminated (the load power cut off is greater than the line over-limit power). In order to compensate for the loss of power generation by cutting off the entire unit of the power plant, the energy storage device i B Under the premise of ensuring that the current of line B does not exceed the limit again, the power plant energy storage device i B Start charging strategy; in energy storage device i B Under the premise of limited power, energy storage device i B The battery will be fully charged in a shorter time. B Fully charged (energy storage device i B After the rated capacity of line B is reached, the current of line B may be increased to the target current value I crl,B Therefore, in the energy storage device i B Before the power is fully charged, the dispatcher needs to store the energy storage device i B The total number of P in the power supply area load,B Load (When the energy storage is charged, the load value of the substation in the area is increased step by step until the current of line B just reaches the current target value I crl,BAt this time, the corresponding increase in load compared to the original load is the load that needs to be adjusted, which is P load,B , which can be calculated using the existing power flow calculation program), and on the basis of increasing the current value of line B to the critical safety limit (the overcurrent load shedding device does not cut off the load, and there is a safety margin), the energy storage device i B The time that can be supported is reserved for the dispatcher to adjust the load P load,B time. That is, in the energy storage device i B Discharge time Within, P load,B The load is transferred out of the area where line B is located to avoid the energy storage device i B After charging is completed, line B will overcurrent again.

[0103] Among them, the current target value I of line A where the first overcurrent tripping device is located crl,A Specifically:

[0104] I crl,A =I lim,A ×γ×(1-α A )×(1+β),

[0105] Among them, I lim,A is the safety current limit of line A where the first overcurrent tripping device is located (determined by the physical parameters of the line itself), α A is the safety margin coefficient of line A where the first overcurrent tripping device is located, β is the permissible overcurrent level of the line after a fault as specified in the safety and stability guidelines or dispatching regulations (generally 0.15), γ represents the temperature coefficient, which is less than 1 (such as 0.88) in summer, 1 in spring and autumn, and 1.12 in winter;

[0106] The target current value I of line B where the second overcurrent disconnection device is located crl,B Specifically:

[0107] I crl,B =I lim,B ×γ×(1-α B )×(1+β),

[0108] Among them, I lim,B is the safety current limit of line B where the second overcurrent tripping device is located (determined by the physical parameters of the line itself), α B is the safety margin coefficient of line B where the second overcurrent tripping device is located (generally 0.05), β is the allowable overcurrent level of the line after a fault as specified in the safety and stability guidelines or dispatching regulations (generally 0.15), γ represents the temperature coefficient, which takes a value less than 1 (such as 0.88) in summer, 1 in spring and autumn, and 1.12 in winter.

[0109] Preferably, the safety margin coefficient can be divided into different safety levels, corresponding to different discharge strategies or charging strategies sent by the master station to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the line current safety margin coefficient α is selected. The safety margin coefficient α is generally set to three levels, which can be 0.15, 0.1, and 0.05. The larger the selected safety margin coefficient α value, the lower the line current critical value.

[0110] The higher the safety level, the higher the current target value I of line A where the first overcurrent tripping device is located. crl,A Or the current target value I of line B where the second overcurrent disconnection device is located crl,B The smaller the value, the overcurrent level of line A where the first overcurrent tripping device is located is reduced to the current target value I crl,A The following energy storage devices are required A Discharge power Or increase the current of line B where the second overcurrent disconnection device is located to the current target value I crl,B Required energy storage device B Charging power The higher the value, the longer the discharge time. Or the corresponding charging time The shorter the load transfer amount P that needs to be adjusted load,A or P load,B The bigger.

[0111] Safety margin factor α A Take 0.05, 0.1, 0.15 to get three different discharge powers According to the energy storage device A Current power Calculate the energy storage device i A The above power discharge durations correspond to

[0112] To avoid the operation of the first overcurrent disconnection device of line A, the energy storage device i A The following three discharge strategies are given for the current situation:

[0113] Energy storage device A Can Power discharge After seconds, the current value of line A is reduced to the current target value I crl,A ;

[0114] Energy storage device A Can Power discharge After seconds, reduce the current value of line A to I' crl,A ;

[0115] Energy storage device A Can Power discharge After seconds, reduce the current value of line A to I" crl,A .

[0116] satisfy: I crl,A >I' crl,A >I” crl,A .

[0117] That is, if the current value of line A needs to be reduced further, the energy storage needs to be discharged at a greater power. A Under the premise of limited power, energy storage device i A The power will be discharged in a shorter time. A After the charge is reduced to 0, the current of line A may return to its original level. A Before the power of the energy storage device is reduced to 0, the dispatcher needs to load,A Load transfer.

[0118] The corresponding discharge strategy is the one with the most sufficient processing time, that is, the optimal discharge strategy, which reduces the current value of line A to the critical safety limit I crl,A Based on the following (overcurrent load shedding device does not cut off the load and there is a safety margin), the energy storage device i A It can support the longest time, leaving enough time for the dispatcher to adjust the load, to avoid the overcurrent load-cutting device shedding the load due to incomplete load adjustment operation, exhaustion of energy storage power, and re-overcurrent of line A.

[0119] Accordingly, the safety margin factor α B Take 0.05, 0.1, and 0.15 to get three different charging powers According to the energy storage device B Current power Calculate the energy storage device i B The above power discharge durations correspond to

[0120] To avoid the operation of the second overcurrent tripping device of line B, the energy storage device i B The following three charging strategies are given for the current situation:

[0121] Energy storage device B Can Power charging After seconds, the current value of line B is increased to the current target value I crl,B ;

[0122] Energy storage device B Can Power charging After seconds, the current value of line B is increased to I' crl,B ;

[0123] Energy storage device B Can Power charging After seconds, increase the current value of line B to I" crl,B .

[0124] satisfy:: I crl,B >I' crl,B >I” crl,B .

[0125] That is, if the current value of line B needs to be increased further, the energy storage device i needs to be charged with a larger power. B Under the premise of limited power, energy storage device i B The battery will be fully charged in a shorter time. B After the battery is fully charged, the current of line B may increase to its original level. B Before the power is fully charged, the dispatcher needs to store the energy storage device i B The total number of P in the power supply area load,B Load transfer.

[0126] The corresponding charging strategy is the one with the most sufficient processing time, that is, the optimal charging strategy, which increases the current value of line B to the critical safety limit I crl,B Based on (overcurrent load shedding device does not cut off the load and there is a safety margin), the energy storage device i B It can support the longest time, leaving enough time for the dispatcher to adjust the load, and avoid the overcurrent load-cutting device shedding the load due to incomplete load adjustment operation, full energy storage power, and re-overcurrent in line B.

[0127] Confirmation and implementation of discharge / charge strategy: Three safety margin factors α A or α B The master station gives three energy storage discharge / charging strategies, and the first one is executed by default (that is, the energy storage device can support the longest time). The discharge / charging strategy is sent to the substation, and the energy storage device i is Power discharge or At the same time, the discharge duration countdown (i.e. discharge duration) is given in the human-computer interaction alarm interface. ) / Charging duration countdown (i.e. charging time ), and the load required to be transferred P load,A Value / P load,B value.

[0128] The confirmation of the discharge / charge strategy can be manually intervened, and the other two strategies can be manually selected to be executed. At the same time, the discharge duration countdown / charge duration countdown corresponding to the selected strategy and the load amount that needs to be adjusted are given in the human-computer interaction alarm interface.

[0129] The discharge / charging strategy can also support real-time rolling updates. When the dispatcher implements the load transfer within the specified time according to the prompt, the current of line A will drop instantly. At this time, the joint operation strategy is recalculated to update the optimal discharge / charging strategy of energy storage and the load that needs to be continuously transferred.

[0130] The master station will visualize the associated operating strategies, the execution status of the energy storage device, the execution time of the energy storage device charging and discharging, the amount of load to be transferred, and other information, and perform real-time monitoring and alarm prompts.

[0131] Furthermore, in step S4, when the line overcurrent risk is eliminated, the effect of the associated operation strategy is evaluated, specifically including: defining the energy storage response energy efficiency index E i ,

[0132]

[0133] Among them, t exe is the start time of energy storage response, t end is the energy storage response termination time, |P op,i (t)|dt is the integral of the discharge / charge power varying with time over time t, representing the total response power of the energy storage device i, [P load ×(t end -t exe )] is the total load transferred by the dispatcher during the energy storage discharge / charge period (or the unit output that is urgently reduced), E i The smaller the value, the better the response of the energy storage device i to the overcurrent disconnection device.

[0134] The present invention utilizes the millisecond-level charging and discharging advantage of the energy storage device, allowing the energy storage device to respond promptly to the demand signal issued by the overcurrent disconnection device in the line to reduce the current of the relevant line, thereby achieving the purpose of avoiding the loss of load or unit in an accident state and ensuring the reliability of power supply of the power grid.

[0135] The present invention is based on screening all overcurrent interlocking devices and energy storage devices that need to be associated and operated according to preset screening conditions; selecting a site where one of the energy storage devices is located as the main site, and setting the sites where the other overcurrent interlocking devices and energy storage devices are located as substations, the substations send the parameters of their own line overcurrent interlocking devices and energy storage devices to the main site, the main site receives the information sent by the substations, and determines the associated operation strategy of the overcurrent interlocking devices and the energy storage devices according to the information sent by the substations, effectively solving the problem that the action of the existing overcurrent interlocking devices will cause load shedding, machine shedding and other consequences due to the prior art, and realizing the associated and reliable operation of the overcurrent interlocking devices and the energy storage devices.

[0136] In the technical solution of the present invention, according to the preset screening conditions, screening all overcurrent interlocking devices and energy storage devices that need to be associated for operation specifically includes: obtaining the discharge / charge distribution coefficient index of each energy storage device, which is used to describe the degree of reduction of the current in the line including the overcurrent interlocking device after the energy storage device is discharged / charged; according to the discharge / charge distribution coefficient index of each energy storage device, screening all energy storage devices whose discharge / charge distribution coefficient index is greater than the preset index threshold and the corresponding overcurrent interlocking devices as the overcurrent interlocking devices and energy storage devices to be associated for operation, further improving the correlation between the energy storage device and the corresponding overcurrent interlocking device, and improving the reliability of the associated operation of the overcurrent interlocking device and the energy storage device.

[0137] In the technical solution of the present invention, the safety margin coefficient is divided into different safety levels, which respectively correspond to different discharge strategies or charging strategies sent by the main station to the substation where the corresponding energy storage device and / or overcurrent interlocking device is located, so as to facilitate the determination of different discharge strategies or charging strategies according to different safety margin coefficients, realize the optimal selection of discharge strategy or charging strategy, shorten the response time after the fault occurs, delay the time for the line current to rise to the critical limit, and avoid missing the opportunity to transfer the load due to untimely manual response.

[0138] In the technical solution of the present invention, when the line overcurrent risk is eliminated, the effect of the associated operation strategy is evaluated to achieve a quantitative evaluation of the effect of the energy storage response interlocking device, which can be used as a settlement basis for the paid regulation of the energy storage participating in the ancillary service market.

[0139] Embodiment 2

[0140] like Figure 5 As shown, the technical solution of the present invention also provides an associated operation system of an overcurrent interlocking device and an energy storage device, comprising:

[0141] The screening module 101 screens all overcurrent interlocking devices and energy storage devices that need to be operated in association according to preset screening conditions;

[0142] Select the communication module 102, select one of the stations where the energy storage device is located as the main station, and set the stations where the other overcurrent interlocking devices and energy storage devices are located as substations. The main station and the substation adopt a master station-substation structure to achieve real-time communication between the overcurrent interlocking devices and the energy storage devices; the substation sends the parameters of its own line overcurrent interlocking device and the energy storage device to the main station;

[0143] Determination module 103, the main station receives the information sent by the substation, and determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substation, and sends the determined associated operation strategy to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the energy storage device performs charging or discharging according to the received associated operation strategy;

[0144] The evaluation module 104 evaluates the effect of the execution of the associated operation strategy after the line overcurrent risk is eliminated.

[0145] The present invention is based on screening all overcurrent interlocking devices and energy storage devices that need to be associated and operated according to preset screening conditions; selecting a site where one of the energy storage devices is located as the main site, and setting the sites where the other overcurrent interlocking devices and energy storage devices are located as substations, the substations send the parameters of their own line overcurrent interlocking devices and energy storage devices to the main site, the main site receives the information sent by the substations, and determines the associated operation strategy of the overcurrent interlocking devices and the energy storage devices according to the information sent by the substations, effectively solving the problem that the action of the existing overcurrent interlocking devices will cause load shedding, machine shedding and other consequences due to the prior art, and realizing the associated and reliable operation of the overcurrent interlocking devices and the energy storage devices.

[0146] In the technical solution of the present invention, according to the preset screening conditions, screening all overcurrent interlocking devices and energy storage devices that need to be associated for operation specifically includes: obtaining the discharge / charge distribution coefficient index of each energy storage device, which is used to describe the degree of reduction of the current in the line including the overcurrent interlocking device after the energy storage device is discharged / charged; according to the discharge / charge distribution coefficient index of each energy storage device, screening all energy storage devices whose discharge / charge distribution coefficient index is greater than the preset index threshold and the corresponding overcurrent interlocking devices as the overcurrent interlocking devices and energy storage devices to be associated for operation, further improving the correlation between the energy storage device and the corresponding overcurrent interlocking device, and improving the reliability of the associated operation of the overcurrent interlocking device and the energy storage device.

[0147] In the technical solution of the present invention, the safety margin coefficient is divided into different safety levels, which respectively correspond to different discharge strategies or charging strategies sent by the main station to the substation where the corresponding energy storage device and / or overcurrent interlocking device is located, so as to facilitate the determination of different discharge strategies or charging strategies according to different safety margin coefficients, realize the optimal selection of discharge strategy or charging strategy, shorten the response time after the fault occurs, delay the time for the line current to rise to the critical limit, and avoid missing the opportunity to transfer the load due to untimely manual response.

[0148] In the technical solution of the present invention, when the line overcurrent risk is eliminated, the effect of the associated operation strategy is evaluated to achieve a quantitative evaluation of the effect of the energy storage response interlocking device, which can be used as a settlement basis for the paid regulation of the energy storage participating in the ancillary service market.

[0149] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A method for associated operation of an overcurrent disconnection device and an energy storage device, characterized in that: include: According to the preset screening conditions, all overcurrent interlocking devices and energy storage devices that need to be operated in association are screened; wherein, according to the preset screening conditions, all overcurrent interlocking devices and energy storage devices that need to be operated in association are screened specifically including: Obtain the discharge / charge distribution coefficient index of each energy storage device, wherein the discharge / charge distribution coefficient index of the energy storage device is used to describe the degree of reduction of the current in the line including the overcurrent disconnection device after the energy storage device is discharged / charged; the discharge / charge distribution coefficient index of the energy storage device is specifically: , Among them, S m,i It is the energy storage device discharge / charge distribution coefficient index, which represents the degree of reduction of the power flow of line m including the overcurrent disconnection device after the energy storage device i is discharged / charged; is the active power discharged / charged by the energy storage device, A positive value indicates discharge. Negative values ​​indicate charging; The corresponding reduction in active power of line m including the overcurrent disconnection device after the energy storage device i is discharged / charged; According to the discharge / charge distribution coefficient index of each energy storage device, all energy storage devices whose discharge / charge distribution coefficient index is greater than a preset index threshold and the corresponding overcurrent interlocking devices are selected as the overcurrent interlocking devices and energy storage devices to be operated in association; Select one of the stations where the energy storage device is located as the main station, and set the stations where the other overcurrent interlocking devices and energy storage devices are located as substations. The main station and the substation adopt a master station-substation structure to achieve real-time communication between the overcurrent interlocking device and the energy storage device; the substation sends the parameters of its own line overcurrent interlocking device and the energy storage device to the main station; The main station receives the information sent by the substation, and determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substation, and sends the determined associated operation strategy to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the energy storage device performs charging or discharging according to the received associated operation strategy; After the line overcurrent risk is eliminated, the effectiveness of the execution of the associated operation strategy is evaluated.

2. The method for associated operation of an overcurrent disconnection device and an energy storage device according to claim 1, characterized in that: The line overcurrent inter-cutting device parameters sent by the substation to the main station include the real-time current value of the line collected by the overcurrent inter-cutting device and the action setting value of the overcurrent inter-cutting device. The overcurrent inter-cutting device action setting value includes the line current risk value, the line current risk waiting time, the line current removal value, and the line current removal waiting time. The line current risk value is the current value for which an alarm signal is issued when there is an overcurrent risk in the line. The line current risk waiting time is the time when the line current reaches the circuit current risk value for an alarm signal. The line current removal value is the current value for which the line is removed when there is an overcurrent risk in the line. The line current removal waiting time is the time when the line current reaches the circuit current removal value for the line removal. The energy storage device parameters sent by the substation to the main station include the current power of the energy storage device and the charging and discharging parameters of the energy storage device. The charging and discharging parameters of the energy storage device include the maximum charging and discharging power of the energy storage device.

3. The method for associated operation of an overcurrent disconnection device and an energy storage device according to claim 2, characterized in that: The associated operation policies to be sent include: The discharge / charge state that the energy storage device should execute, the discharge / charge power value that the energy storage device should execute, the discharge / charge duration of the energy storage device corresponding to the discharge / charge power value of the energy storage device, and the load that needs to be transferred within the discharge / charge duration of the energy storage device.

4. The method for associated operation of an overcurrent disconnection device and an energy storage device according to claim 3, characterized in that: Determining the associated operation strategy between the overcurrent interlocking device and the energy storage device according to the information sent by the substation specifically includes: After the line current collected by the line overcurrent disconnection device of the substation reaches the signaling current value, it is determined whether the corresponding energy storage device should be charged or discharged according to the energy storage device discharge / charge distribution coefficient index; wherein the signaling current value is the line current value corresponding to when the substation sends a reminder message to the main station, and the signaling current value is less than the line current risk value; If it is determined that the line A where the first overcurrent disconnection device is located corresponds to the energy storage device i A Discharge, calculate the discharge strategy, and reduce the current of line A to the current target value I crl,A Energy storage device is required when A Discharge power value ,like Greater than energy storage device i A The maximum discharge power P dcmax ,but = P dcmax , and obtain the power value Discharge duration corresponding to discharge ; At the same time, obtain the energy storage device i A After the discharge is completed, the load value of the substation in the area where line A is located is gradually reduced until the current of line A just reaches the current target value I crl,A When the total load reduction P of the substation in the area where line A is located is obtained load,A , then in the energy storage device i A Discharge time Within, P load,A The load is transferred out of the area where line A is located to avoid the energy storage device i A After the discharge is completed, line A will over-current again; where m=A, i=i A ; If it is determined that the line B where the second overcurrent disconnection device is located corresponds to the energy storage device i B It should be charged, and the charging strategy calculation is started to reduce the current of line B to the current target value I crl,B Energy storage device required for the following B Charging power ,like Greater than energy storage device i B Maximum charging power P cmax ,but = P cmax , and obtain the power value Charging time corresponding to charging ; At the same time, obtain the energy storage device i B After charging is completed, the load value of the substation in the area where line B is located is gradually reduced until the current of line B just reaches the current target value I crl,B When the total load reduction P of the substation in the area where line B is located is obtained load,B , then in the energy storage device i B Discharge time Within, P load,B The load is transferred out of the area where line B is located to avoid the energy storage device i B After charging is completed, line B is overcurrent again; where m=B, i=i B .

5. The method for associated operation of an overcurrent disconnection device and an energy storage device according to claim 4, characterized in that: The current target value I of line A where the first overcurrent disconnection device is located crl,A Specifically: , Among them, I lim,A is the safety current limiting of line A where the first overcurrent tripping device is located, α A is the safety margin coefficient of line A where the first overcurrent interlocking device is located, β is the allowable overcurrent level of the line after a fault as specified in the safety and stability guidelines or dispatching regulations, and γ represents the temperature coefficient; The target current value I of line B where the second overcurrent disconnection device is located crl,B Specifically: , Among them, I lim,B is the safety current limiting of line B where the second overcurrent tripping device is located, α B is the safety margin coefficient of line B where the second overcurrent interlocking device is located, β is the allowable overcurrent level of the line after a fault as specified in the safety and stability guidelines or dispatching regulations, and γ represents the temperature coefficient.

6. The method for associated operation of an overcurrent disconnection device and an energy storage device according to claim 4, characterized in that: The safety margin coefficient is divided into different safety levels, which correspond to different discharge strategies or charging strategies sent by the master station to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the higher the safety level, the higher the current target value I of the line A where the first overcurrent interlocking device is located. crl,A Or the current target value I of line B where the second overcurrent disconnection device is located crl,B The smaller the value, the overcurrent level of line A where the first overcurrent tripping device is located is reduced to the current target value I crl,A The following energy storage devices are required A Discharge power Or increase the current of line B where the second overcurrent disconnection device is located to the current target value I crl,B Required energy storage device B Charging power The higher the value, the longer the discharge time. Or the corresponding charging time The shorter the load transfer amount P that needs to be adjusted load,A or P load,B The bigger.

7. The method for associated operation of an overcurrent disconnection device and an energy storage device according to claim 1, characterized in that: When the line overcurrent risk is eliminated, the effectiveness of the associated operation strategy is evaluated, including: defining the energy storage response efficiency index E i , Among them, t exe is the start time of energy storage response, t end is the energy storage response termination time, is the integral of the discharge / charge power varying with time over time t, representing the total response capacity of the energy storage device i, is the total amount of load transferred by the dispatcher during the energy storage discharge / charge period, E i The smaller the value, the better the response of the energy storage device i to the overcurrent disconnection device.

8. A system for the associated operation of an overcurrent interlocking device and an energy storage device, characterized in that: include: The screening module screens all overcurrent interlocking devices and energy storage devices that need to be operated in association according to preset screening conditions; wherein, screening all overcurrent interlocking devices and energy storage devices that need to be operated in association according to preset screening conditions specifically includes: Obtain the discharge / charge distribution coefficient index of each energy storage device, wherein the discharge / charge distribution coefficient index of the energy storage device is used to describe the degree of reduction of the current in the line including the overcurrent disconnection device after the energy storage device is discharged / charged; the discharge / charge distribution coefficient index of the energy storage device is specifically: , Among them, S m,i It is the energy storage device discharge / charge distribution coefficient index, which represents the degree of reduction of the power flow of line m including the overcurrent disconnection device after the energy storage device i is discharged / charged; is the active power discharged / charged by the energy storage device, A positive value indicates discharge. Negative values ​​indicate charging; The corresponding reduction in active power of line m including the overcurrent disconnection device after the energy storage device i is discharged / charged; According to the discharge / charge distribution coefficient index of each energy storage device, all energy storage devices whose discharge / charge distribution coefficient index is greater than a preset index threshold and the corresponding overcurrent interlocking devices are selected as the overcurrent interlocking devices and energy storage devices to be operated in association; Select the communication module, select one of the stations where the energy storage device is located as the main station, and set the stations where the other overcurrent interlocking devices and energy storage devices are located as substations. The main station and the substation adopt a master-substation structure to achieve real-time communication between the overcurrent interlocking device and the energy storage device; the substation sends the parameters of its own line overcurrent interlocking device and the energy storage device to the main station; Determination module, the main station receives the information sent by the substation, and determines the associated operation strategy of the overcurrent interlocking device and the energy storage device according to the information sent by the substation, and sends the determined associated operation strategy to the corresponding energy storage device and / or the substation where the overcurrent interlocking device is located; the energy storage device performs charging or discharging according to the received associated operation strategy; The evaluation module evaluates the effectiveness of the execution of the associated operation strategy after the line overcurrent risk is eliminated.