Method for manufacturing a wind turbine blade

By using precast fiber stacking and dry fiber stacking mold structures in wind turbine blade manufacturing, and using vacuum filling resin, the glueing problem and resin filling difficulties in large-scale blade manufacturing are solved, and stronger and lighter Joints and more efficient manufacturing processes.

CN114786936BActive Publication Date: 2024-11-12SIEMENS GAMESA RENEWABLE ENERGY AS
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202080087903.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2019-12-19
Filing Date
2020-12-10
Publication Date
2024-11-12
Estimated Expiration
2040-12-10

AI Technical Summary

Technical Problem

Existing wind turbine blade manufacturing methods When increasing the blade size, the bonding process is difficult to achieve sufficient strength and robustness, and resin filling becomes more difficult, especially on large blades, where the composite material is encapsulated and positioned on flexible mandrels. The challenge is great.

Method used

Using an upper mold including a precast fiber stack and a lower mold of a dry fiber stack, the resin is vacuum filled to form a laminate joint, avoiding the difficulty of encapsulating and positioning the composite material on the top of the mold core, and optimizing the resin filling Path and volume, improving joint strength and lightweight.

Benefits of technology

A stronger and lighter laminate joint is achieved, avoiding the problem of glue joints different from the remaining part of the blade, simplifying the manufacturing process of large blades, and improving the quality and efficiency of resin filling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114786936B_ABST
    Figure CN114786936B_ABST
Patent Text Reader

Abstract

A method for manufacturing a wind turbine blade, comprising the steps of: - arranging an upper mould (8) comprising a precast fibre layup (9'') on a lower mould (23) comprising a dry fibre layup (24') and a mould core (46), - applying a vacuum to the upper mould (8) and the space (63) between the lower mould (23) and the mould core (46), - infusing at least the dry fibre layup (24') and the connection areas (66, 67) between the dry fibre layup (24') and the precast fibre layup (9'') with resin (65), and curing the resin (65). By having the precast fibre layup in the upper mould, encapsulation and positioning of dry composite material on top of the mould core is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for manufacturing a wind turbine blade. Background Art

[0002] One way to generate more electricity using a wind turbine under given wind conditions is to increase the size of the blades. However, the manufacture of wind turbine blades becomes increasingly difficult as the size of the blades increases.

[0003] Currently, many wind turbine blades are manufactured by prefabricating parts of the blade separately, such as the pressure side shell and the suction side shell, and gluing these parts to each other. These parts are prefabricated, for example, by infusing a composite material, such as glass fiber, with resin and allowing the resin to cure. However, the gluing process has many disadvantages. For example, it is difficult to achieve sufficient strength and robustness of the glue line. Furthermore, the method requires precise positioning of very large parts within a limited time, i.e. before the applied glue hardens.

[0004] In another method disclosed in EP 1 310 351 A1, blades are manufactured by encapsulating composite material for the entire blade or for longitudinal blade sections on a mandrel and infusing and curing the resin. Thus, glued joints are avoided. However, encapsulating and positioning the dry composite material on top of a mandrel, which is usually flexible, is challenging, especially for very large blades. In addition, as the size of the blade increases, the volume that needs to be filled with resin by vacuum infusion also increases, making resin infusion more difficult. Summary of the invention

[0005] It is an object of the present invention to provide an improved method for manufacturing a wind turbine blade.

[0006] Therefore, a method for manufacturing a wind turbine blade is proposed. The method comprises the following steps:

[0007] - placing an upper mould comprising a precast fibre layup on a lower mould comprising a dry fibre layup and a mould core,

[0008] - applying a vacuum to the upper mold and the space between the lower mold and the mold core,

[0009] - Infusing at least the dry fiber layup and the connection area between the dry fiber layup and the precast fiber layup with resin and curing the resin.

[0010] By having a pre-cast fiber layup in the upper mold, encapsulating and positioning dry composite material on top of the mold core is avoided.

[0011] Furthermore, pre-casting the fiber stack in the upper mold is preferably accomplished by encapsulating the dry fiber stack in an inverted upper mold, infusing the resin and curing. Since the upper mold is inverted, encapsulating the fiber material also proceeds in the upper mold toward a mold with a well-defined geometry rather than toward a flexible mold core.

[0012] Furthermore, with the precast fiber layup in the upper mold, the volume of resin that needs to be filled during vacuum infusion of the dry fiber layup and the connection area in the lower mold is smaller for the same blade size than in the case where the fiber layup for the upper section is not precast. Furthermore, the path that the resin needs to travel during vacuum infusion is shorter for the same blade size than in the case where the fiber layup for the upper section is not precast. For example, the resin needs to rise to a lower height above the floor level of the manufacturing site than in the case where the fiber layup for the upper section is not precast. Therefore, it is easier to infuse the fiber layup in the resin infusion process with good quality, even in the case of larger blade sizes.

[0013] One advantage over methods where the blade parts are glued together is that a laminate joint is provided here which, once cured, connects the upper precast fiber layup and the dry fiber layup in the lower mold. The laminate joint formed by resin infusion is lighter and at the same time a stronger joint than a connection using an adhesive. It is lighter because in the case of an adhesive the weight of the adhesive is added in the bond line. Furthermore, the strength of the laminate joint formed by vacuum infusion is comparable to that of the original laminate. In addition, the laminate joint formed by vacuum infusion avoids the problem of glued joints having a different material in the glue than in the rest of the blade.

[0014] A wind turbine blade is part of the rotor of a wind turbine. A wind turbine is a device that converts the kinetic energy of wind into electrical energy. For example, a wind turbine includes: a rotor having one or more blades each connected to a hub; a nacelle including a generator; and a tower that holds the nacelle at its top end. The tower of a wind turbine may be connected to a foundation of the wind turbine, such as a monopile in the seabed, via a transition piece.

[0015] The precast fiber stack in the upper mold becomes the first shell of the blade in the manufactured blade. In particular, it becomes the first half shell of the blade.

[0016] Once infused and cured, the dry fiber layup in the lower mold becomes the second shell of the blade in the manufactured blade. In particular, it becomes the second half shell of the blade.

[0017] The first and second shells are in particular fiber-reinforced resin laminates.

[0018] The first housing may comprise the pressure side (upwind side) of the blade and the second housing may comprise the suction side (downwind side) of the blade, or vice versa.

[0019] The first and second shells may each comprise the entire blade length from the blade root to the blade tip. Alternatively, the wind turbine blade may be split in the longitudinal direction. In this case, each of the first and second shells comprises a portion of the total length of the blade.

[0020] The wind turbine blade, eg a root section thereof, is eg fixedly connected to the hub.The wind turbine blade is eg bolted directly to the hub.

[0021] Alternatively, the wind turbine blade, such as a root section, is rotatably connected to the hub. For example, the wind turbine blade is connected to a pitch bearing of the wind turbine, and the pitch bearing is connected to the hub. The pitch bearing is configured to adjust the angle of attack of the blade according to the wind speed to control the rotation speed of the blade.

[0022] Apart from a (cylindrical) root section connected to the hub, a wind turbine blade is aerodynamically formed. For example, a wind turbine blade comprises a pressure side (upwind side) and a suction side (downwind side). The pressure side and the suction side are connected to each other at a leading edge and a trailing edge. The pressure side and the suction side as well as the leading edge and the trailing edge define an inner cavity of the wind turbine blade.

[0023] For example, a mold core (or mandrel) includes an inner solid core and an outer flexible portion surrounding the inner solid core.

[0024] The mold core may include two or more mold core parts. Each of the two or more mold core parts may include an inner solid core and an outer flexible part.

[0025] The upper and lower molds and the mold core define a space in which a vacuum is applied for the vacuum infusion process. Resin is poured into this space and partially fills it so as to infuse at least the dry fiber layup and the connection area. Thus, the precast fiber layup is infused with resin only in the connection area, while the rest of the precast fiber layup is not infused with resin except for the precasting process itself.

[0026] The dry fiber layup and / or the precast fiber layup comprises in particular glass fibers, carbon fibers, aramid fibers and / or natural fibers.

[0027] The precast fibers are specifically fibers that are infused with resin and cured before the step of infusing the dry fiber stack and the connection area in the lower mold with resin. In other words, the precast fibers in the upper mold are precast and cured in a first wet process (first resin infusion process), and the dry fiber stack and the connection area in the lower mold are infused with resin in a second wet process (second resin infusion process), wherein the first wet process (including curing) and the second wet process are separated in time.

[0028] A dry fiber layup comprises (only) fibers in a dry condition, in particular fibers without resin. Fibers in a dry condition are more flexible than fibers with resin, such as fibers cast in resin or pre-impregnated fibers (prepreg materials). Encapsulating fibers in a dry condition into a lower or upper mold allows matching the shape of the respective mold.

[0029] The resins include, for example, thermosets, thermoplastics, epoxies, polyurethanes, vinyl esters and / or polyesters.

[0030] The resin is infused in particular due to the vacuum created in the space between the upper and lower moulds and the mould core. The resin is cured, for example, by applying heat.

[0031] According to one embodiment, the dry fiber layup and / or the precast fiber layup comprises a fiber core material.

[0032] The fiber core material includes, for example, wood, balsa wood, PET foam and / or PVC foam.

[0033] When the fiber stack including the core material is infused with resin and cured, a fiber reinforced resin laminate having a core structure made of the core material is obtained. For example, a fiber reinforced resin laminate of a sandwich structure can be obtained in which the core material layer is arranged between the fiber reinforced resin layers.

[0034] A dry fiber layup and / or a precast fiber layup comprises, for example, an inner laminate and an outer laminate with a core material therebetween.

[0035] Having a fiber core material allows reducing the weight of the final fiber reinforced resin laminate while maintaining sufficient stiffness and / or strength of the blade.

[0036] According to a further embodiment, the connection region comprises an overlapping region in which the precast fiber layup and the dry fiber layup overlap each other.

[0037] Having an overlap area allows the pre-cast fiber layup and the dry fiber layup to be better joined to each other by infusing and curing the resin. The resulting joint can better transfer the loads in the blade shell.

[0038] The overlapping area may be smaller than the connecting area. Alternatively, the connecting area may coincide with the overlapping area.

[0039] According to another embodiment, the precast fiber layup and / or the dry fiber layup comprises fiber core material in the overlapping region.

[0040] Having the same structure of the fibre reinforced resin laminate with the core material throughout the overlapping and connecting areas allows to obtain a blade shell having homogeneous properties across the overlapping and connecting areas, such as homogeneous strength and weight.

[0041] According to a further embodiment, both the dry fiber layup and the precast fiber layup comprise at least one tapered edge portion overlapping each other in the overlap region.

[0042] Having this tapered edge portion allows for a good overlap of the dry fiber layup with the precast fiber layup and a smooth transition from one to the other.

[0043] According to a further embodiment, the precast fiber layup and the dry fiber layup are in direct contact with each other in the connection area.

[0044] In particular, the surface of the precast fiber layup and the surface of the dry fiber layup are in direct contact with each other. In the case where the tapered edge portions overlap each other, the inclined surfaces of the tapered edge portions may be in direct contact with each other.

[0045] According to another embodiment, an auxiliary material is arranged between a surface of at least one edge portion of the precast fiber layup and a surface of at least one edge portion of the dry fiber layup.

[0046] The auxiliary material is, for example, a non-fiber material. The auxiliary material is, for example, a PUR material.

[0047] Having this auxiliary material in particular allows more freedom in constructing different blade section profiles to obtain different aerodynamic profiles (airfoils).For example, the auxiliary material can be applied to form a sharp edge of an aerodynamic profile, for example at the trailing edge of an airfoil.

[0048] According to another embodiment, the dry fiber layup in the lower mold has a main portion within the cavity of the lower mold and at least one extension portion extending from the main portion beyond a side edge of the cavity of the lower mold, and wherein the method comprises the step of arranging the mold core on the dry fiber layup in the lower mold and folding the at least one extension portion of the dry fiber layup onto the mold core before the step of arranging the upper mold on the lower mold.

[0049] Having this extension and folding it onto the mould core allows to configure the connection area offset from the area where the upper mould edge and the lower mould edge contact each other. Thus, the precast fibre layup can be better arranged and positioned on the dry fibre layup. Furthermore, the connection area can be configured, for example, offset from the leading edge and / or the trailing edge. Thus, the connection area can be configured, for example, offset from the maximum curvature of the airfoil.

[0050] The lower mould comprises in particular a mould cavity for forming and casting the dry fibre layup. Furthermore, the lower mould comprises horizontal parts extending to the right and to the left from the side edges of the mould cavity, as seen in the cross-sectional view. The mould cavity in particular accommodates the main part of the dry fibre layup. The at least one extended part of the dry fibre layup is laid on the horizontal part of the lower mould, for example before folding it.

[0051] According to another embodiment, the continuous portion of the at least one extension portion has the same layer structure and / or the same thickness as the main portion, the continuous portion being continuous with the main portion.

[0052] Said continuity of the layer structure and / or thickness from the main part of the dry fiber layup to the continuous part in particular allows to ensure homogeneous properties of the main part and the continuous part, such as homogeneous strength and / or weight. The continuous part may cover the leading edge and / or the trailing edge of the airfoil. In this way, for example, a homogeneous strength and / or weight of the blade across the leading edge and / or the trailing edge may be ensured.

[0053] According to another embodiment, the method comprises, after the step of folding the at least one extension portion onto the mould core, a step of fixing the at least one folded extension portion at the mould core.

[0054] With the extension portion fixed at the mold core, the upper mold can be arranged more easily on the lower mold and the mold core.

[0055] The extension is fixed at the mold core, for example by applying a tape, such as an adhesive tape and / or a glass tape.

[0056] The dry fiber layup may comprise two extensions. Each of the two extensions may be secured at the core by tape. Alternatively, the two extensions may be secured to each other, for example using a tape laid across the core.

[0057] According to another embodiment, the method comprises, before the step of arranging the upper mould comprising the precast fiber layup on the lower mould, the step of fixing the precast fiber layup to the upper mould.

[0058] The upper mold including the fixed precast fiber stack can be arranged more easily on the lower mold. This is especially true when the upper mold is turned over.

[0059] Fixing of the precast fiber layup may be done by attaching a foil to each of the edges of the precast fiber layup and the upper mold and applying a vacuum to the space covered by the foil. Fixing may also be done by using an elongated element, such as a rod and / or a (wooden) stick clamped to the upper mold, for example to a horizontal portion of the upper mold. Fixing may also be done by bolting the precast fiber layup to the upper mold.

[0060] According to another embodiment, the method comprises, before the step of applying the vacuum, the step of covering the mould core with a vacuum bag, and wherein the vacuum is applied to the space between the upper mould and the lower mould and the vacuum bag.

[0061] Covering the mold core with a vacuum bag may include sealing the vacuum bag. The mold core may also be covered with two or more vacuum bags to increase tightness.

[0062] In this case, the mold core comprises more than one core part, each core part may be covered with one or more vacuum bags.

[0063] In an embodiment, the method may comprise the step of removing the vacuum bag and / or the core after infusion and curing of the resin. The core and / or vacuum bag is removed, for example, through the blade root section. In this case, the core comprises a flexible outer part, which may be compressed before removing the core. For example, a vacuum may be created in the space between the vacuum bag and the core, thereby compressing the flexible outer part and reducing the size of the core.

[0064] According to another embodiment, the method comprises, before the step of arranging the upper mould on the lower mould, the step of arranging one or more reinforcing beams on the dry fibre layup.

[0065] Thus, the one or more reinforcing beams may be cast together with the dry fiber layup in a wet process, ie an infusion and curing process.

[0066] The one or more reinforcement beams include, for example, a pressure side beam, a suction side beam, a leading edge beam and / or a trailing edge beam. The reinforcement beams may be dry lay-ups, precast elements or a combination of both.

[0067] A pressure side beam is in particular a beam on the pressure side of a wind turbine blade. A suction side beam is in particular a beam on the suction side of a wind turbine blade. A leading edge beam is in particular a beam on the leading edge of a wind turbine blade. A trailing edge beam is in particular a beam on the trailing edge of a wind turbine blade.

[0068] According to another embodiment, the method comprises, before the step of arranging the upper mould on the lower mould, the step of arranging a web, and wherein at least the dry fibre layup, the connection area and / or the web are infused with resin. One or more webs may be arranged, for example two webs. In an embodiment, arranging a web comprises arranging a precast web.

[0069] Thus, the web can be cast together with the fibers in a wet process. The web provides strength to the blade, for example.

[0070] According to another embodiment, the web is configured to connect the pre-cast fiber layup and the dry fiber layup laterally within the inner cavity of the blade once cured.

[0071] The web is in particular a shear web. The web is in particular a blade shell that connects the pressure side and the suction side in the inner cavity of the blade. The web provides shear strength for the blade.

[0072] Arranging the shear web and infusing the dry fiber layup, connection area and shear web with resin allows joining the shear web with the upper and lower shells in a single process step by infusing and curing the resin.The shear web may be a dry layup, a precast element or a combination of both.

[0073] Other possible implementations or alternatives of the present invention also encompass combinations of features not explicitly mentioned herein that are described above or below with respect to the embodiments. A person skilled in the art may also add individual or isolated aspects and features to the most basic form of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] Other embodiments, features and advantages of the present invention will become apparent from the following description and the dependent claims in conjunction with the accompanying drawings, in which:

[0075] Figure 1 A wind turbine according to one embodiment is shown;

[0076] Figure 2 Shows the formation Figure 1 A cross-sectional view of a precast fiber layup of a first shell of a blade of a wind turbine, the precast fiber layup being manufactured in an inverted upper mold;

[0077] Figure 3 Shows that once cast and solidified, the Figure 1 A cross-sectional view of a dry fiber layup of a second shell of a blade of a wind turbine, the dry fiber layup being arranged in a lower mold;

[0078] Figure 4 Shown with Figure 3 A similar view with the core and web arranged on a dry fiber layup in a lower mold;

[0079] Figure 5 Shown with Figure 4 A similar view with an extension of the dry fiber layup folded over a mold core;

[0080] Figure 6 shows that in the arrangement with Figure 5 The dry fiber layup on the lower mold has Figure 2 an upper mold for a precast fiber stack;

[0081] Figure 7 Shown with Figure 6 a similar view wherein the upper mould is arranged on the lower mould, wherein the precast fibre layup overlaps the dry fibre layup in an overlap region;

[0082] Figure 8 Shown with Figure 7 Similar view with resin infusion;

[0083] Fig. 9 Another embodiment of the overlay of a precast fiber layup with a dry fiber layup is shown;

[0084] Fig.10 Another embodiment showing the overlay of a precast fiber layup with a dry fiber layup; and

[0085] Fig.11 A flow chart is shown which illustrates the process for manufacturing Figure 1 A method for a wind turbine blade of a wind turbine.

[0086] In the drawings, like reference numbers indicate identical or functionally equivalent elements unless otherwise indicated. DETAILED DESCRIPTION

[0087] Figure 1 A wind turbine 1 according to an embodiment is shown. The wind turbine 1 comprises a rotor 2 having one or more blades 3 connected to a hub 4. The hub 4 is connected to a generator (not shown) arranged in a nacelle 5. During operation of the wind turbine 1, the blades 3 are driven by the wind to rotate, and the kinetic energy of the wind is converted into electrical energy by the generator in the nacelle 5. The nacelle 5 is arranged at the upper end of a tower 6 of the wind turbine 1. The tower 6 stands on a foundation 7, such as a monopile or a triple pile. The foundation 7 is connected to and / or driven into the ground or the seabed.

[0088] In the following about Figures 2 to 11 An improved method for manufacturing a wind turbine blade 3 is described.

[0089] In step S1 of the method, an upper mold 8 is provided for precasting a fiber stack 9', such as Figure 2 Once cured and assembled, the precast fiber stack 9 ″ will become the first shell 10 ( Figure 7 ). For step S1, the upper mold 8 is inverted, as shown in FIG. Figure 2 The mould cavity 11 of the upper mould 8 encloses a dry fibre layup 9'. Since the upper mould 8 is inverted, the fibre layup 9' can be enclosed towards a well-defined geometry, in contrast to the case where the fibre layup is enclosed onto a flexible mould core.

[0090] Figure 2 The fiber laminate 9', 9" in the example of FIG. 1 comprises an outer laminate 12 and an inner laminate 13. In addition, the fiber laminate 9', 9" also comprises a core material, such as a balsa core, between the outer laminate 12 and the inner laminate 13. Here, it comprises a trailing edge balsa core 14 and a leading edge balsa core 15. The outer laminate 12, the respective balsa cores 14, 15 and the inner laminate 13 form a sandwich structure.

[0091] exist Figure 2 In the embodiment of the present invention, the fiber laminate 9', 9" has a first tapered portion 17 and a second tapered portion 18 at its left and right edges. In each of these tapered portions 17, 18, the inner laminate 13, the respective balsa core 14, 15 and the outer laminate 12 are tapered. Therefore, the tapered portions 17, 18 each have a continuous inclined surface 19, 20.

[0092] Figure 2 The fiber stack 9 ′, 9 ″ in the embodiment further comprises a precast beam 16 . The beam 16 is, for example, a suction side beam or a pressure side beam of the blade 3 .

[0093] The dry fiber stack 9' is precast by a known vacuum infusion process, as described in EP 1 310 351 A1. In this vacuum infusion process, the fiber stack 9' is covered with a vacuum bag (not shown), and the vacuum bag is sealed at the horizontal parts 21, 22 of the upper mold 8 (not shown). In addition, a vacuum is created in the space covered by the vacuum bag, and a resin (not shown) is infused into the fiber stack 9' and cured, resulting in Figure 2 The precast fiber stack 9 ″ is shown in FIG.

[0094] In step S2 of the method, a lower mold 23 is provided, such as Figure 3 The lower mould 23 encloses a dry fibre lay-up 24'.

[0095] The dry fiber laminate 24' comprises an outer laminate 25 and an inner laminate 26. In addition, the dry fiber laminate 24' comprises core materials such as a leading edge balsa core 27 and a trailing edge balsa core 28. Thus, the fiber laminate 24' has a sandwich structure in which the respective balsa cores 27, 28 are sandwiched between the outer laminate 25 and the inner laminate 26.

[0096] The fiber layup 24 ′ further comprises a precast beam 29 . This beam 29 is, for example, a pressure side beam or a suction side beam of the blade 3 .

[0097] The lower mold 23 includes a mold cavity 30 and horizontal portions 31 , 32 extending from side edges 33 , 34 of the mold cavity 30 .

[0098] The dry fiber layup 24' is enclosed in the lower mold 23 by arranging a main portion 35 of the dry fiber layup 24' within the cavity 30. In this example, the main portion 35 includes a first main portion 36 and a second main portion 37. The first main portion 36 is arranged to the beam 29. Figure 3 The second main part 37 is arranged to the left side of the beam 29. Figure 3 on the right side of the .

[0099] Furthermore, the extensions 38 , 39 of the dry fibre layup 24 ′ extend from the main portion 35 , ie from the first main portion 36 and the second main portion 37 respectively beyond the side edges 33 , 34 of the cavity 30 .

[0100] The extension portion 38 includes a first continuous portion 40 and a first tapered portion 42. The extension portion 39 includes a second continuous portion 41 and a second tapered portion 43.

[0101] In this example, the continuous portion 40 has the same layer structure of outer laminate 25, leading edge balsa core 27 and inner laminate 26 as the first main portion 36 of the fiber laminate 24'. In addition, the continuous portion 40 has the same thickness d1 as the first main portion 36. In addition, the continuous portion 41 has the same layer structure of outer laminate 25, trailing edge balsa core 28 and inner laminate 26 as the second main portion 37 of the fiber laminate 24'. In addition, the continuous portion 41 has the same thickness d2 as the second main portion 37.

[0102] In each of the first and second tapered portions 42, 43, the inner laminate 26, the respective balsa core 27, 28 and the outer laminate 25 are tapered. Thus, the tapered portions 42, 43 each have a continuous inclined surface 44, 45.

[0103] In step S3 of the method, the mold core 46 is arranged on the dry fiber stack 24', such as Figure 4As shown in . The core 46 includes a first core portion 47 and a second core portion 48. For example, each of the first and second core portions 47, 48 includes a solid inner core 49, 50 and a flexible outer portion 51, 52. For example, the flexible outer portion 51, 52 includes a compressible foam material.

[0104] Before arranging the core parts 47, 48, each of them is covered with a vacuum bag 53, 54, such as Figure 4 As shown in . The vacuum bags 53, 54 are sealed.

[0105] In step S4 of the method, a shear web 55 is provided on the dry fiber layup 24' and between the first and second core parts 47 and 48. In the example shown in the figures, the web 55 is a dry layup. In other examples, the web 55 may also be precast.

[0106] Step S4 may be performed simultaneously with step S3 of arranging the core parts 47 , 48 .

[0107] In step S5 of the method, the extensions 38, 39 of the dry fiber layup 24' are folded onto the respective first and second core parts 47, 48 of the core 46, such as Figure 5 as shown in .

[0108] In step S6 of the method, the extension parts 38, 39 are fixed to the respective first and second core parts 47, 48. In detail, the extension part 38 is fixed to the first core part 47 covered with the vacuum bag 53 by means of the first adhesive tape 56. In addition, the extension part 39 is fixed to the second core part 48 covered with the vacuum bag 54 by means of the second adhesive tape 57.

[0109] In step S7 of the method, in step S1 ( Figure 2 ) is fixed to the upper mold 8. For example and as Figure 6 As shown in FIG. 1 , the pre-cast fiber layup 9 ″ is fixed to the upper mold 8 by means of attaching a first foil 58 and a second foil 59 to the pre-cast fiber layup 9 ″ and the upper mold 8 respectively. The foils 58 , 59 are sealed. Figure 6 An exemplary seal 60 is shown. A vacuum is created in the space covered by the foils 58, 59 which holds the precast fiber layup 9" in the upper mold 8, while it is turned and lowered onto the lower mold 23 in the next step.

[0110] Steps S1 and S7 may be performed before steps S2 to S6 , simultaneously with steps S2 to S6 , or after steps S2 to S6 .

[0111] In step S8 of the method, the upper mold 8 is arranged on the lower mold 23, such as Figure 6 Arranging the upper mold 8 on the lower mold 23 includes moving the upper mold 8 from Figure 2 Go to Figure 6 The position in. Figure 6 A state is shown in which the fiber layup 9 ″ has been fixed to the upper mold 8 , and the upper mold 8 is raised, turned over and lowered onto the lower mold 23 .

[0112] Figure 7 A state is shown in which the upper mould 8 has been arranged on the lower mould 23. The precast fibre layup 9" and the dry fibre layup 24' overlap each other in both the first and second overlapping regions 61,62. Figure 7 An inset is shown with an enlarged view of the overlap region 61. In particular, the tapered portion 18 of the precast fiber layup 9" and the tapered portion 42 of the dry fiber layup 24' overlap each other in the overlap region 61. Thereby, the inclined surface 20 of the tapered portion 18 and the inclined surface 44 of the tapered portion 42 are in direct contact with each other.

[0113] Similarly, the tapered portion 17 of the precast fiber layup 9" and the tapered portion 43 of the dry fiber layup 24' overlap each other in an overlap region 62. Thus, the inclined surface 19 of the tapered portion 17 and the inclined surface 45 of the tapered portion 43 are in direct contact with each other.

[0114] In this example, as in Figure 7 As can be seen in the illustration of , the layer structure of the precast fiber layup 9 ″ comprising outer and inner laminates 12 , 13 and corresponding core materials 14 , 15 matches the layer structure of the dry fiber layup 24 ′ comprising outer and inner laminates 25 , 26 and corresponding core materials 27 , 28 .

[0115] In step S9 of the method, a vacuum is created in a space 63 defined by the upper mold 8 and the lower mold 23 and the vacuum bags 53, 54 covering the core parts 47, 48, such as Figure 8 as shown in .

[0116] In step S10, resin 65 is introduced into space 63. In particular, resin 65 is introduced into that part of space 63 which includes dry fiber layup 24', connection areas 66, 67 and web 55. For example, resin 65 is introduced by a vacuum infusion process such as vacuum assisted resin transfer molding (VARTM). For further details on the generation of vacuum, infusion and curing of resin 65, reference is made to EP 1 310 351 A1.

[0117] The example shown in the figure shows the case where the web 55 is a dry lay-up. In this case, the web 55 is completely infused with resin 65, as shown.

[0118] In other examples, a precast web may be used in place of the web 55. The resin 65 will then be poured only into the upper and lower connecting portions of the web (i.e., the area where the web will connect to the beam 16 and the area where the web will connect to the beam 29), but not into the vertical portion of the web.

[0119] Figure 8 An exemplary inlet channel 64 is shown through which the infusion resin 65 is injected. With the introduced resin 65, the dry fiber layup 24', the connection areas 66, 67 (between the dry fiber layup 24' and the precast fiber layup 9") and the web 55 are cast in a single process step.

[0120] Each of the connection regions 66, 67 in particular comprises a respective overlapping region 61, 62. In this example, the connection regions 66, 67 are respectively larger than the overlapping regions 61, 62. In another embodiment, the connection regions 66, 67 and the overlapping regions 61, 62 respectively may be identical.

[0121] Since the fiber layup 9" in the upper mold 8 is pre-cast, during the vacuum infusion process in step S9, the resin 65 only needs to fill the dry fiber layup 24', the connection areas 66, 67 and the web 55, and does not need to fill the rest of the pre-cast fiber layup 9". Therefore, the resin 65 needs to travel a shorter path and fill a smaller volume than if the fiber layup in the upper mold 8 was in a dry condition, i.e. without resin.

[0122] In step S11, the poured resin 65 is cured by known processes to obtain a cured and assembled blade shell. Figure 8 As shown in the figure, the precast fiber stack 9 ″ in the upper mold 8 becomes the first half shell 10 in the manufactured blade 3. In addition, once infused and cured, the fiber stack 24 ″ in the lower mold 23 becomes the second half shell 68 in the manufactured blade 3. Once cured, the web 55 connects the first half shell 10 and the second half shell 68 laterally within the inner cavity 71 of the blade 3.

[0123] In this example, the resulting fiber reinforced resin laminates of the shells 10, 68 have the same structure, comprising inner laminates 13, 26, core materials 14, 15, 27, 28 and outer laminates 12, 25 throughout the overlapping regions 61, 62 and the connecting regions 66, 67. Thus, a blade 3 is obtained having a shell having homogeneous properties, such as homogeneous strength and weight, across the overlapping and connecting regions 61, 62, 66, 67.

[0124] In step S12 (not shown), the core parts 47 , 48 and the vacuum bags 53 , 54 are removed from the blade 3 , for example through the root section of the blade 3 .

[0125] With this method a blade is manufactured in which the first and second shells 10 , 68 are connected to each other by a laminate joint which is light and at the same time strong.

[0126] In another embodiment, if Fig. 9 As shown in FIG, the overlap region 161 of the precast fiber layup 109″ in the upper mold 108 and the dry fiber layup 124′ in the lower mold 123 does not contain the core material 115, 127. Therefore, in the overlap region 161, the outer laminate 112 and the inner laminate 113 of the precast fiber layup 109″ overlap with the outer laminate 125 and the inner laminate 126 of the fiber layups 124′, 124″ in the lower mold 123. However, the core material 115 of the precast fiber layup 109″ does not overlap with the core material 127 of the fiber layups 124′, 124″ in the lower mold 123.

[0127] In another embodiment, if Fig.10 As shown in FIG. 2 , the auxiliary material 69 is disposed in the overlapping region 262 between the precast fiber stack 209″ in the upper mold 208 and the fiber stack 224′, 224″ in the lower mold 223. For example, the auxiliary material 69 is a PUR material. Fig.10 In the example of FIG. 5 , a sharp edge 70 is formed which forms the aerodynamic profile of the blade 3 , for example at the trailing edge of the airfoil.

[0128] Supplementary material 69 Fig.10 In the example of FIG. 2 , the micro web 229 is arranged between the inclined surface 219 of the tapered edge portion 217 of the precast fiber stack 209″ and the inclined surface 245 of the tapered edge portion 243 of the fiber stacks 224′, 224″ in the lower mold 223. In addition, the micro web 229 is arranged to connect the precast fiber stack 209″, the auxiliary material 69 and the fiber stacks 224′, 224″.

[0129] Although the invention has been described in terms of preferred embodiments, it will be apparent to those skilled in the art that modifications are possible in all embodiments.

Claims

1. A method for manufacturing a wind turbine blade (3), comprising the following steps: - placing the upper mould (8) comprising the precast fibre layup (9") on the lower mould (23) comprising the dry fibre layup (24') and the mould core (46), - applying a vacuum to the space (63) between the upper mould (8) and the lower mould (23) and the mould core (46), - impregnating at least the dry fiber layup (24') and the connection areas (66, 67) between the dry fiber layup (24') and the precast fiber layup (9") with resin (65) and curing the resin (65), The connection region (66, 67) comprises an overlapping region (61, 62), in which the precast fiber stack (9") and the dry fiber stack (24') overlap each other.

2. The method according to claim 1, wherein: The dry fiber layup (24') and / or the precast fiber layup (9") comprises a core material (14, 15, 27, 28).

3. The method according to claim 2, wherein: The precast fiber layup (9") and / or the dry fiber layup (24') comprises the core material (14, 15, 27, 28) in the overlap region (61, 62).

4. The method according to any one of claims 1 to 3, wherein: Both the dry fiber layup (24') and the precast fiber layup (9") comprise at least one tapered edge portion (17, 18, 42, 43) overlapping each other in the overlap region (61, 62).

5. The method according to claim 1, wherein: The precast fiber stack (9") and the dry fiber stack (24') are in direct contact with each other in the connection area (66, 67).

6. The method according to claim 1, wherein: Auxiliary material (69) is arranged between a surface (219) of at least one edge portion (217) of the precast fiber stack (9") and a surface (245) of at least one edge portion (243) of the dry fiber stack (24').

7. The method according to claim 1, wherein: The dry fiber stack (24') in the lower mold (23) has a main portion (35) within the cavity (30) of the lower mold (23) and at least one extension portion (38, 39) extending from the main portion (35) beyond the side edges (33, 34) of the cavity (30) of the lower mold (23), and wherein the method comprises the steps of arranging the mold core (46) on the dry fiber stack (24') in the lower mold (23) and folding the at least one extension portion (38, 39) of the dry fiber stack (24') onto the mold core (46) before the step of arranging the upper mold (8) on the lower mold (23).

8. The method according to claim 7, wherein: The continuous portion (40, 41) of the at least one extended portion (38, 39) has the same layer structure and / or the same thickness (d1, d2) as the main portion (35), and the continuous portion (40, 41) is continuous with the main portion (35).

9. The method according to claim 7 or 8, comprising the step of fixing at least one folded extension portion (38, 39) at the core (46) after the step of folding the at least one extension portion (38, 39) onto the core (46).

10. The method according to claim 1, comprising the step of fixing the precast fiber layup (9") to the upper mold (8) before the step of arranging the upper mold (8) comprising the precast fiber layup (9") on the lower mold (23).

11. The method according to claim 1, comprising the step of covering the mold core (46) with a vacuum bag (53, 54) before the step of applying vacuum, and wherein: The vacuum is applied to the space (63) between the upper mould (8) and the lower mould (23) and the vacuum bags (53, 54).

12. The method according to claim 1, comprising the step of arranging one or more reinforcing beams (29) on the dry fiber layup (24') before the step of arranging the upper mold (8) on the lower mold (23).

13. The method according to claim 1, comprising the step of arranging a web (55) before the step of arranging the upper mould (8) on the lower mould (23), and wherein: At least the dry fiber layup (24'), the connection regions (66, 67) and the web (55) are infused with resin (65).

14. The method according to claim 13, wherein: The web (55) is configured to connect the precast fiber stack (9") and the dry fiber stack (24') transversely within the inner cavity (71) of the blade (3) once cured.

Citation Information

Patent Citations

  • Method for manufacturing windmill blades

    EP1310351A1

  • Mould and method for vacuum assisted resin transfer moulding

    CN101549562A

  • Method for manufacturing a composite and a wind turbine blade

    CN101909863A

  • Integrated molding process for blades for wind power generation

    CN102672976A

  • Method of producing a composite shell structure

    CN102834247A