Road subsidence monitoring and alarm method based on smart hospital operation and maintenance platform

Through the real-time monitoring and analysis functions of the smart hospital operation and maintenance platform, potential safety hazards caused by geological changes in urban roads have been solved, effective early warning and risk warnings for road surface subsidence and collapse have been achieved, and road safety has been improved.

CN114792205BActive Publication Date: 2024-10-15CHONGQING ARCHITECTURAL DESIGN INST CO LTD

Patent Information

Application Number
CN202210456152.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-27
Publication Date
2024-10-15
Estimated Expiration
2042-04-27

AI Technical Summary

Technical Problem

Problems such as uneven settlement, collapse, and uplift caused by geological changes on urban roads present potential safety hazards. Existing technologies are difficult to effectively monitor and provide early warning in real time, which may lead to accidental injuries.

Method used

The smart hospital operation and maintenance platform links pavement geological change parameter information with the operation and maintenance system, monitors and analyzes abnormal data in real time, generates high-risk areas, provides timely warnings, and prompts ahead risks through smart traffic lights, displays and fire broadcasts to ensure safety.

Benefits of technology

Real-time monitoring and early warning of road surface subsidence and collapse are achieved, effectively avoiding accidents caused by geological changes and improving road safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114792205B_ABST
    Figure CN114792205B_ABST
Patent Text Reader

Abstract

The present invention discloses a road subsidence monitoring and alarming method based on a smart hospital operation and maintenance platform, including the preparation of smart hospital basic data and smart hospital operation and maintenance platform; creation of a smart hospital three-dimensional operation and maintenance management model; comprehensive analysis of real-time monitoring terrain deformation data through the smart hospital operation and maintenance platform to find abnormal data; analysis of abnormal data, and classification and collection of analysis results in charts to generate high-risk areas for road subsidence, linkage and connection with the smart hospital three-dimensional operation and maintenance management model on the smart hospital operation and maintenance platform, timely warning, and sharing of disease information to the operation and maintenance management department; the operation and maintenance management department takes corresponding emergency measures after receiving geological alarm information. Its significant effect is that it can accurately indicate unknown risks ahead, thereby effectively avoiding accidents.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of road subsidence and collapse monitoring, and in particular to a road subsidence and collapse monitoring and alarm method based on a smart hospital operation and maintenance platform. Background Art

[0002] With the influx of a large number of people into cities, urban areas are expanding rapidly, many new large and medium-sized hospitals are being built, and roads are complicated. Generally, pipeline corridors are excavated on both sides of the road, flood control drainage ditches, sewage and rainwater drainage wells are arranged, and outdoor integrated pipelines are pre-buried. As time goes by, various problems will arise, such as uneven road settlement leading to partial collapse, partial cracking, partial uplift and other geological safety problems. Therefore, a road pavement collapse monitoring and alarm method is needed to avoid accidental personal injury caused by geological problems. Summary of the invention

[0003] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a road subsidence and collapse monitoring and alarm method based on a smart hospital operation and maintenance platform, which links the road geological change parameter information with the smart hospital operation and maintenance platform, and responds in real time to smart traffic lights, displays, fire broadcasts, etc. to alert unknown risks ahead.

[0004] To achieve the above object, the technical solution adopted by the present invention is as follows:

[0005] A road subsidence monitoring and alarm method based on a smart hospital operation and maintenance platform includes the following steps:

[0006] Step 1: Preparation of basic data of smart hospitals and smart hospital operation and maintenance platform;

[0007] Step 2: Create a three-dimensional operation and maintenance management model of a smart hospital based on the basic data of the smart hospital;

[0008] Step 3: Comprehensively analyze the real-time monitoring terrain deformation data through the smart hospital operation and maintenance platform to find abnormal data;

[0009] Step 4: Analyze the abnormal data and classify the analysis results into charts to generate high-risk areas for road collapse. Link them with the smart hospital 3D operation and maintenance management model on the smart hospital operation and maintenance platform to provide timely warnings and share the disease information with the operation and maintenance management department.

[0010] Step 5: The operation and maintenance management department takes corresponding emergency measures after receiving the geological alarm information.

[0011] Furthermore, the basic data of the smart hospital in step 1 includes a hospital model, traffic signal network system information data, and three-dimensional laser scanning deformation monitoring data.

[0012] Furthermore, the process of establishing the three-dimensional operation and maintenance management model of the smart hospital described in step 2 is as follows:

[0013] Step 2.1: Establish the scheme model: The designer uses 2D and 3D BIM design software to establish the scheme model;

[0014] Step 2.2, establish the design model: based on the scheme model, conduct pollutant diffusion analysis, horizontal and vertical traffic simulation, air duct design, sewage design, and rainwater organization design to form a design model;

[0015] Step 2.3, establish the construction model: carry out the deepening of prefabricated design, deepening of steel structure design, deepening of reserved and embedded design, deepening of complex node reinforcement, deepening of electromechanical pipe system, deepening of construction drawings, engineering quantity statistics, construction simulation, etc., to generate the construction model;

[0016] Step 2.4, establish a three-dimensional operation and maintenance management model for smart hospitals: perform lightweight processing based on the construction model input, standardize zoning, enter operation and maintenance management data, and establish a three-dimensional operation and maintenance management model.

[0017] Furthermore, in the process of establishing the three-dimensional operation and maintenance management model of the smart hospital, facilities and equipment are standardized, medical care units are standardized, fire-fighting equipment is standardized, and green areas are standardized.

[0018] Furthermore, in step 3, a comprehensive analysis of the data is performed including linear comparison, trend analysis, and mutation analysis.

[0019] Furthermore, in step 3, the data is comprehensively analyzed to realize road subsidence monitoring, road collapse risk monitoring, comprehensive display of monitoring results, collapse warning and subsidence backtracking.

[0020] Furthermore, the emergency measures described in step 5 include:

[0021] Immediately adjust the traffic lights or displays on that road section to remind pedestrians and vehicles not to enter that road, or to avoid that location;

[0022] Traffic control personnel and municipal road maintenance management personnel were mobilized to arrive at the section immediately to detect specific problems, investigate the specific causes, report the specific problems truthfully to their superiors, and take protective measures in a timely manner.

[0023] The significant effect of the present invention is that by linking the road geological change parameter information with the smart hospital operation and maintenance platform, the real-time monitored road subsidence and collapse related data are comprehensively analyzed, and the analysis results are displayed. At the same time, they are reflected to smart traffic lights, displays, fire broadcasts, etc. to prompt unknown risks ahead, thereby effectively avoiding accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 is a flow chart of the method of the present invention;

[0025] Figure 2 It is a schematic diagram of the layout of the TSP monitoring method test. DETAILED DESCRIPTION

[0026] The specific implementation manner and working principle of the present invention are further described in detail below with reference to the accompanying drawings.

[0027] like Figure 1 As shown in the figure, a road subsidence monitoring and alarm method based on the smart hospital operation and maintenance platform is provided, and the specific steps are as follows:

[0028] Step 1: Preparation of basic data of smart hospitals and smart hospital operation and maintenance platform;

[0029] The basic data of smart hospitals specifically include:

[0030] 1. Preparation of hospital model. The hospital model is designed and modeled using software such as Revit and Rhino;

[0031] 2. Prepare the traffic signal network system information by deploying smart street lights and smart traffic lights, monitoring road deformation and passenger flow status, and transmitting it to the platform through PLC power line carrier;

[0032] 3. Preparation of deformation monitoring data by 3D laser scanning. 3D laser scanning technology uses 3D coordinate measuring instruments and non-contact measurement to quickly form point cloud data on the surface of an object (environment) through electronic scanning.

[0033] 4. The preparation of the smart hospital operation and maintenance platform involves data analysis and collection based on the data transmitted by the perception layer, risk assessment, risk response, and risk control, and real-time supervision of the entire process of fire protection, security, assets, personnel flow, and emergency response plans.

[0034] Step 2: Create a three-dimensional operation and maintenance management model of a smart hospital based on the basic data of the smart hospital;

[0035] Specifically, engineers construct the basic data of smart hospitals based on GIS data + BIM data, and create a three-dimensional operation and maintenance management model through the basic data of smart hospitals. The operation and maintenance management model is based on the operation and maintenance information data to establish an organic complex of three-dimensional operation and maintenance space model and operation and maintenance information. In terms of scope, it is an organic combination of large-scale GIS data + small-scale BIM data + Internet of Things.

[0036] Compared with traditional GIS-based digital hospitals, the operation and maintenance management model refines the data granularity to an electromechanical component, a door inside a single hospital building, and an indicator light and marking line on a road, upgrading the traditional static digital hospital into a perceptible, dynamically online, and virtual-reality interactive digital twin hospital, providing a data foundation for agile management and refined governance of the hospital.

[0037] The establishment process of the three-dimensional operation and maintenance management model of the smart hospital is as follows:

[0038] Step 2.1: Establish the scheme model: The designer uses 2D and 3D BIM design software to establish the scheme model;

[0039] Step 2.2, establish the design model: based on the scheme model, conduct pollutant diffusion analysis, horizontal and vertical traffic simulation, air duct design, sewage design, and rainwater organization design to form a design model;

[0040] Step 2.3, establish the construction model: carry out the deepening of prefabricated design, deepening of steel structure design, deepening of reserved and embedded design, deepening of complex node reinforcement, deepening of electromechanical pipe system, deepening of construction drawings, engineering quantity statistics, construction simulation, etc., to generate the construction model;

[0041] Step 2.4, establish a three-dimensional operation and maintenance management model for smart hospitals: perform lightweight processing based on the construction model input, standardize zoning, enter operation and maintenance management data, and establish a three-dimensional operation and maintenance management model.

[0042] The requirements to be met during and after the establishment of the smart hospital three-dimensional operation and maintenance management model are as follows:

[0043] (1) Modeling information standardization requirements

[0044] ① Standardization of facilities and equipment

[0045] ② Standardization of medical care units;

[0046] ③ Standardization of fire-fighting equipment;

[0047] ④ Standardization of green areas;

[0048] (2) Meet the lightweight requirements of BIM models

[0049] ①Geometric transformation;

[0050] ② Rendering processing;

[0051] (3) Model application requirements

[0052] ① The model is displayed as a whole and can be displayed in detail;

[0053] ②Have component attribute data;

[0054] ③ Edit model data;

[0055] ④The model can be browsed offline.

[0056] Step 3: Use the smart hospital operation and maintenance platform to conduct comprehensive analysis such as linear comparison, trend analysis, and mutation analysis on the real-time monitoring terrain deformation data to find abnormal data;

[0057] Terrain deformation data collection methods include remote wireless monitoring of smart street lights, three-dimensional laser scanning deformation monitoring, etc.

[0058] 1) Real-time monitoring of smart street lights

[0059] The smart street light remote wireless monitoring system is mainly composed of front-end pole equipment, communication control terminal, management center, etc. The smart street light gateway is used as the core equipment to establish the data channel between the pole controller, camera, sensor and other front-end and management system, and realize the functions of real-time collection, upload, remote monitoring and control of road collapse data, bid farewell to the traditional street light management mode, and establish a digital, automated, intelligent, energy-saving and efficient street light remote wireless monitoring system. The data transmission method uses PLC power line carrier, which uses the existing power lines to transmit analog or digital signals at high speed through carrier. The biggest advantage is that there is no need to re-establish the network, as long as there are wires, data can be transmitted.

[0060] 2) 3D laser scanning deformation monitoring

[0061] Compared with traditional surveying and mapping technology, 3D laser scanning technology improves the degree of automated information extraction. It does not require the deployment of measuring points and can collect data from the survey area densely and comprehensively, which is equivalent to deploying a high-density mesh deformation monitoring network, providing more comprehensive measured data for deformation monitoring research. The large-area terrain point cloud model obtained by 3D laser scanning technology is a geometric model with discrete sampling points as primitives. It cannot be directly applied to the field of deformation monitoring. It is necessary to reconstruct the surface through digital description, graphic image expression, etc., so as to extract the deformation of the terrain surface at different periods. The 3D laser scanning technology is applied to the scope of terrain deformation monitoring, mainly using neural network methods and TSP monitoring methods.

[0062] (1) Neural network method

[0063] In view of the massive amount of point cloud data obtained by laser scanning technology, the surface reconstruction is carried out using the neural network method, and the surface of the two-phase point cloud data and the sinking surface of the two-phase point cloud data are simulated respectively. Not only can the sinking situation of the entire area be obtained, but also the sinking value of any point can be directly obtained. The surface reconstruction is carried out using the BP neural network method and implemented in Matlab. The accuracy of the surface reconstruction of this method is generally at the mm level. The larger the amount of point cloud data, the higher the accuracy, but the calculation amount is almost not affected.

[0064] (2) TSP monitoring method

[0065] The horizontal displacement monitoring reference point of the electronic total station is used as the deformation monitoring control point. The three-dimensional coordinates of the control point are transmitted by the electronic total station. One monitoring control point is set as the total station frame site, and the other monitoring control point is set as the backsighting point to establish a local coordinate system on site. A fixed base is set on the terrain surface. When performing deformation monitoring, a target ball is fixed on the base. A three-dimensional laser scanner is assumed in an area with a wide field of vision. The electronic total station measures the prism and target ball coordinates of the three-dimensional laser scanner. In this way, there is no need to protect the deformation monitoring control point, which has great advantages in terrain deformation monitoring. The point cloud data obtained from each scan is imported into the Leica software for noise reduction processing. The prism coordinates and target ball coordinates obtained by the electronic total station are jointly formed into a CSV file, imported into the Leica software, and coordinate conversion is performed to complete the coordinate registration of each point cloud data. Finally, the point cloud data is imported into the 3D Reshaper software for deformation analysis. The TSP monitoring method test plan is as follows:

[0066] Set up a 3D laser scanner and electronic total station, such as Figure 2 As shown, the TSP positioning system and the target ball are set up at the same time; the temporary control point and backsight point of the electronic total station are placed, the backsight is oriented, a temporary coordinate system is established, and the three-dimensional coordinate values ​​of the TSP positioning system prism and the target ball are measured. The vertical position of the 8 monitoring points is achieved by moving the base. The first scan is performed. In order to be close to the actual situation, the three-dimensional laser scanner and the electronic total station are relocated before the second scan.

[0067] The point cloud data obtained from the two scans and the coordinate positions of the positioning target sphere were imported into the 3D Reshaper software for coordinate matching and conversion, and then the vertical positions of the eight monitoring points were extracted, as shown in Table 1.

[0068] Table 1. Test data obtained by TSP monitoring method (unit: mm)

[0069] Base number 1 2 3 4 5 6 7 8 high 11.6 11.3 11.5 11.7 10.9 11.2 11.7 11.2

[0070] The measured height value of the target ball base is taken as the true value of the vertical displacement, and the monitoring error is the difference between the vertical displacement value measured by the 3D laser scanner and the true value. It can be calculated that the measurement error of the TSP monitoring method is 2.8 mm.

[0071] Step 4: Perform GIS positioning, fishbone diagram analysis, and solution analysis on abnormal data, classify and collect the analysis results into charts, and generate high-risk areas for road collapse. The model is linked to the smart hospital operation and maintenance management platform to provide timely warnings, and the disease information is shared with the operation and maintenance management department;

[0072] 1. Sinking monitoring

[0073] The system uses comprehensive data analysis to determine the extent of road collapse, degree of cracking, and height difference of uplift, and lists the parts that exceed the preset thresholds based on location, time, amplitude, and other information.

[0074] 2. Risk monitoring

[0075] Based on the comprehensive data in the system, high-risk areas for road collapse are determined, and the identified risk areas are displayed in a list based on location, time and other information.

[0076] When the judgment conditions change, such as the end of construction, cavity repair, etc., the risks listed in the risk monitoring list are automatically re-identified and evaluated, and the risk list is updated in real time.

[0077] 3. Comprehensive display

[0078] In the smart hospital operation and maintenance platform, collapse marks are displayed according to the actual location of the collapse. Click the mark to query the detailed data of the selected location.

[0079] The overall collapse situation of the roads in the whole hospital can be displayed according to the collapse value or collapse rate and the set color.

[0080] In the smart hospital operation and maintenance platform, high-risk sections of collapse are displayed in red. Click on a specific section to pop up detailed risk information. Risk information can be fuzzily queried according to information such as section and risk type. Click on the query result to automatically locate the specific location in the smart hospital operation and maintenance platform.

[0081] 4. Collapse warning

[0082] When high-risk events such as pipeline leakage, underground construction, and overweight vehicle running over occur in high-risk areas of collapse, they will be highlighted with a red warning sign on the smart hospital operation and maintenance platform, and a brief warning message will be displayed.

[0083] 5. Sinking back

[0084] For the monitored road collapse, the entire collapse change process of the selected part can be viewed in chronological order, and the sinking rate curve can be displayed at the same time.

[0085] Step 5: The operation and maintenance management department takes corresponding emergency measures after receiving the geological alarm information.

[0086] Specific emergency measures may include:

[0087] First, immediately adjust the traffic lights or displays on the road section to remind pedestrians and vehicles not to enter the road, or to avoid the location to avoid risks and accidents;

[0088] Second, mobilize traffic control personnel and municipal road maintenance management personnel to immediately arrive at the section of road, detect specific problems, explore specific causes, report specific problems truthfully to superiors, and take timely protective measures to prevent accidents.

[0089] Traffic control personnel and municipal road maintenance management personnel were mobilized to immediately arrive at the section of road to detect specific problems, investigate the specific causes, report the specific problems truthfully to their superiors, and take timely protective measures to prevent accidents.

[0090] This embodiment links the road geological change parameter information with the smart hospital operation and maintenance platform to conduct a comprehensive analysis of the real-time monitored road subsidence and collapse related data, and displays the analysis results. At the same time, it reacts to smart traffic lights, displays, fire broadcasts, etc. to prompt unknown risks ahead, effectively avoiding accidents caused by road subsidence or collapse.

[0091] The technical solution provided by the present invention is described in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present invention, the present invention can also be improved and modified in a number of ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims

1. A road subsidence monitoring and alarm method based on a smart hospital operation and maintenance platform, characterized in that The steps include: Step 1: Preparation of smart hospital basic data and smart hospital operation and maintenance platform, wherein the smart hospital basic data includes hospital model, traffic signal network system information data and 3D laser scanning deformation monitoring data; Step 2: Create a three-dimensional operation and maintenance management model of a smart hospital based on the basic data of the smart hospital; Step 2.1: Establish the scheme model: The designer uses 2D and 3D BIM design software to establish the scheme model; Step 2.2, establish the design model: based on the scheme model, conduct pollutant diffusion analysis, horizontal and vertical traffic simulation, air duct design, sewage design, and rainwater organization design to form a design model; Step 2.3, establish the construction model: carry out the deepening of prefabricated design, deepening of steel structure design, deepening of reserved and embedded design, deepening of complex node reinforcement, deepening of electromechanical pipe system, deepening of construction drawings, engineering quantity statistics, construction simulation, and generate the construction model; Step 2.4, establish a three-dimensional operation and maintenance management model for smart hospitals: perform lightweight processing based on the construction model input, standardize partitions, input operation and maintenance management data, and establish a three-dimensional operation and maintenance management model; Step 3: Comprehensively analyze the real-time monitoring terrain deformation data through the smart hospital operation and maintenance platform to find abnormal data; The terrain deformation data collection method includes remote wireless monitoring of smart street lights and three-dimensional laser scanning deformation monitoring. The remote wireless monitoring of smart street lights is composed of front-end pole equipment, communication control terminal, and management center. The smart street light gateway is used as the core equipment to establish a data channel between the pole controller, camera, sensor front-end equipment and management system to realize real-time collection, upload, remote monitoring and control of road collapse data. The three-dimensional laser scanning technology is applied to the terrain deformation monitoring range, using the neural network method and TSP monitoring method. (1) Neural network method In view of the massive amount of point cloud data obtained by laser scanning technology, the surface reconstruction is carried out using the neural network method, and the surface of the two-phase point cloud data and the sinking surface of the two-phase point cloud data are simulated respectively. Not only can the sinking situation of the entire area be obtained, but also the sinking value of any point can be directly obtained. The surface reconstruction is carried out using the BP neural network method and implemented in Matlab. The accuracy of the surface reconstruction of this method is at the mm level. The larger the amount of point cloud data, the higher the accuracy. (2) TSP monitoring method The horizontal displacement monitoring benchmark of the electronic total station is used as the deformation monitoring control point. The three-dimensional coordinates of the control point are transmitted by the electronic total station. One monitoring control point is set as the total station station, and the other monitoring control point is set as the backsighting point to establish the local coordinate system on site. A fixed base is set on the terrain surface. When monitoring deformation, a target ball is fixed on the base. A three-dimensional laser scanner is set in an area with a wide field of vision. The electronic total station measures the prism and target ball coordinates of the three-dimensional laser scanner. There is no need to protect the deformation monitoring control point. The point cloud data obtained from each scan is imported into the Leica software for noise reduction. The prism coordinates and target ball coordinates obtained by the electronic total station are jointly formed into a CSV file, imported into the Leica software, and coordinate conversion is performed to complete the coordinate registration of each point cloud data. Finally, the point cloud data is imported into the 3D Reshaper software for deformation analysis. The TSP monitoring method test protocol is as follows: Set up the 3D laser scanner and electronic total station, and set up the TSP positioning system and target ball at the same time; place the temporary control point and backsight point of the electronic total station, orient the backsight, establish a temporary coordinate system, measure the 3D coordinate values ​​of the TSP positioning system prism and the target ball, and realize the vertical position of the 8 monitoring points by moving the base. Perform the first scan. To be closer to the actual situation, re-place the 3D laser scanner and the electronic total station before the second scan; import the point cloud data obtained from the 2 scans and the coordinate position of the positioning target ball into the 3D Reshaper software, perform coordinate matching and conversion, and then extract the vertical positions of the 8 monitoring points. Use the measured height value of the target ball base as the true value of the vertical displacement. The monitoring error is the difference between the vertical displacement value measured by the 3D laser scanner and the true value. The comprehensive analysis includes linear comparison, trend analysis and mutation analysis; Step 4: Perform GIS positioning, fishbone diagram analysis and solution analysis on abnormal data, and classify and collect the analysis results into charts to generate high-risk areas for road subsidence. Link them with the smart hospital 3D operation and maintenance management model on the smart hospital operation and maintenance platform to issue early warnings in a timely manner, and share the disease information with the operation and maintenance management department to achieve road subsidence monitoring, road subsidence risk monitoring, comprehensive display of monitoring results, subsidence early warning and subsidence backtracking; Step 5: The operation and maintenance management department takes corresponding emergency measures after receiving the geological alarm information.

2. The road subsidence monitoring and alarm method based on the smart hospital operation and maintenance platform according to claim 1 is characterized in that: During the establishment of the three-dimensional operation and maintenance management model of the smart hospital, facilities and equipment are standardized, medical care units are standardized, fire-fighting equipment is standardized, and green areas are standardized.

3. The road subsidence monitoring and alarm method based on the smart hospital operation and maintenance platform according to claim 1 is characterized in that: The emergency measures described in step 5 include: Immediately adjust the traffic lights or displays on the corresponding road sections to remind pedestrians and vehicles not to enter the corresponding roads, or to avoid the corresponding locations; Traffic control personnel and municipal road maintenance management personnel were mobilized to immediately arrive at the corresponding road sections, detect specific problems, explore specific causes, truthfully report specific problems to superiors, and take timely protective measures.

Citation Information

Patent Citations

  • Intelligent monitoring and alarm device for subsidence of inspection well on municipal road and breakage of surrounding pavement

    AU2020100876A4

  • Compatible railroad bridge condition monitoring system based on Beidou satellite

    CN103090825A

  • Intelligent operation and maintenance management system based on BIM and applied to hospital buildings and method thereof

    CN108281176A

  • Deformation monitoring method for bridge pillar three-dimensional laser scanner

    CN109520439A

  • Pavement settlement identification method, terminal and computer readable storage medium

    CN110021008A

Cited By

  • Hospital full-process intelligent operation and maintenance command management system based on BIM Internet of Things cooperation

    CN120260862A

  • A BIM-based IoT-enabled intelligent operation and maintenance command and management system for the entire hospital process.

    CN120260862B