Lane clamping control method and system, electronic device and storage medium
By designing a liftable lane control method and system in fast-changing charging, the problem of time spent disassembly and installing the battery pack during battery swap is solved, and a more efficient battery swap process is achieved.
Patent Information
- Application Number
- CN202210602431.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-23
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2040-01-23
AI Technical Summary
The existing fast-changing charging requires disassembly and installing the battery pack during the battery swap process to take a long time and is inefficient.
By designing a lane-clamp control method and system, the liftable load plane is used to set the initial height, battery disassembly and battery installation height, and the height sensor and lifting mechanism are used to realize automatic lifting of the load plane between different heights. , optimize the relative height between the walking plane of the battery swap equipment and the load plane, and improve the battery swap efficiency.
The overall battery swap time is shortened, the battery swap efficiency is improved, and the load plane can meet the battery swap needs of each stage.
Smart Images

Figure CN114801863B_ABST
Abstract
Description
[0001] This invention is a divisional application of an invention patent with an application date of January 23, 2020, application number 202010076992.1, and name “Lane clamping control method and system, electronic device and storage medium”. Technical Field
[0002] The present invention belongs to the field of battery replacement control, and in particular relates to a lane clamping control method and system, electronic equipment and storage medium. Background Art
[0003] There are two main charging methods for existing electric vehicles, one is direct charging and the other is quick replacement. Among them, direct charging requires the installation of charging piles to charge electric vehicles, but the charging time is long and the efficiency is low. The battery replacement method requires the installation of a battery replacement station to achieve quick battery replacement by replacing the battery pack of the electric vehicle, which shortens the time compared to direct charging, but the battery replacement process includes the removal and installation of the battery pack, and there is still a problem of long battery pack replacement time and low battery replacement efficiency. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the defects of the prior art quick-change charging that the battery pack needs to be removed and installed during the battery replacement process, which takes a long time and is inefficient, and to provide a lane clamping control method and system, an electronic device and a storage medium.
[0005] The present invention solves the above technical problems through the following technical solutions:
[0006] A method for controlling a lane clamping, wherein the lane clamping has a vehicle-carrying plane for carrying electric vehicles and can be raised or lowered;
[0007] The clamped lane control method comprises:
[0008] Control the vehicle-carrying plane to rise and fall between any two heights of the initial height, the battery removal height and the battery installation height, wherein the battery removal height is a height that matches the process of removing the battery pack of the electric vehicle, and the battery installation height is a height that matches the process of installing the battery pack of the electric vehicle;
[0009] The battery removal height is set to be: higher than the initial height;
[0010] The battery installation height is set to be higher than the initial height.
[0011] Preferably, the clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs;
[0012] The battery removal height is also set as: when the vehicle loading plane is at the battery removal height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment is higher than the height of the battery exchange equipment when the battery pack is not loaded.
[0013] Preferably, the clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs;
[0014] The battery installation height is also set as follows: when the vehicle loading plane is located at the battery installation height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment is higher than the height of the battery exchange equipment after the battery pack is loaded.
[0015] Preferably, the battery removal height is less than or equal to the battery installation height.
[0016] Preferably, controlling the vehicle-carrying plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height comprises:
[0017] Before the electric vehicle is parked on the vehicle loading plane, the vehicle loading plane is controlled to be maintained at an initial height.
[0018] Preferably, controlling the vehicle-carrying plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height comprises:
[0019] After the electric vehicle is parked on the vehicle loading plane, the vehicle loading plane is controlled to reach the battery removal height.
[0020] Preferably, controlling the vehicle-carrying plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height comprises:
[0021] After the battery pack of the electric vehicle is removed, the vehicle loading plane is controlled to reach the battery loading height.
[0022] Preferably, controlling the vehicle-carrying plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height comprises:
[0023] After the battery pack is installed on the electric vehicle, the vehicle loading plane is controlled to return to the initial height.
[0024] Preferably, the clamped lane control method further includes:
[0025] The vehicle loading plane is controlled to rise and fall between a first operating height and any one of the initial height, the battery removal height and the battery installation height, wherein the first operating height is another height that cooperates with the battery pack removal process of the electric vehicle and is different from the battery removal height.
[0026] Preferably, the clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs;
[0027] The first operating height is set to: lower than the battery removal height, and when the vehicle loading plane is at the first operating height, the relative height between the vehicle loading plane and the walking plane of the battery swapping equipment meets the height condition for removing the battery pack of the battery swapping equipment.
[0028] Preferably, the clamped lane control method further includes:
[0029] The vehicle loading plane is controlled to rise and fall between a second operating height and any one of the initial height, the battery removal height and the battery installation height, wherein the second operating height is another height that cooperates with the battery pack installation process of the electric vehicle and is different from the battery installation height.
[0030] Preferably, the clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs;
[0031] The second operating height is set to: lower than the battery installation height, and when the vehicle loading plane is at the second operating height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment meets the height condition for installing the battery pack of the battery exchange equipment.
[0032] Preferably, controlling the vehicle-carrying plane to be raised or lowered between the first operating height and any one of the initial height, the battery removal height and the battery installation height comprises:
[0033] During the process of disassembling the battery pack, the vehicle loading plane is controlled to reach the first operating height.
[0034] Preferably, controlling the vehicle-carrying plane to be raised or lowered between the second operating height and any one of the initial height, the battery removal height and the battery installation height comprises:
[0035] During the process of installing the battery pack, the vehicle loading plane is controlled to reach the second operating height.
[0036] Preferably, a height sensor is respectively arranged on the vehicle loading plane and / or the plane where the lane is located, and the height sensor is used to detect the relative height between the vehicle loading plane and the reference plane; the lane control method further includes:
[0037] The height sensor is used to detect whether the vehicle loading plane reaches the initial height, the battery removal height, the battery installation height, the first operating height or the second operating height, and the lifting mechanism for controlling the height of the vehicle loading plane is controlled according to the detection result.
[0038] Preferably, a battery exchange equipment walking plane is provided on the track for the battery exchange equipment used for disassembling and assembling battery packs to walk on, and when the vehicle loading plane is at the initial height, it is on the same plane as the battery exchange equipment walking plane.
[0039] A control system for a lane clamping, wherein the lane clamping has a vehicle-carrying surface for carrying electric vehicles and can be raised or lowered;
[0040] The lane clamping control system comprises:
[0041] A height control module, used to control the vehicle-carrying plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height, wherein the battery removal height is a height that matches the process of removing the battery pack of the electric vehicle, and the battery installation height is a height that matches the process of installing the battery pack of the electric vehicle;
[0042] The battery removal height is set to be: higher than the initial height;
[0043] The battery installation height is set to be higher than the initial height.
[0044] Preferably, the clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs;
[0045] The battery removal height is also set as: when the vehicle loading plane is at the battery removal height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment is higher than the height of the battery exchange equipment when the battery pack is not loaded.
[0046] Preferably, the clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs;
[0047] The battery installation height is also set as follows: when the vehicle loading plane is located at the battery installation height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment is higher than the height of the battery exchange equipment after the battery pack is loaded.
[0048] Preferably, the battery removal height is less than or equal to the battery installation height.
[0049] Preferably, the height control module is specifically used to control the vehicle loading plane to maintain at an initial height before the electric vehicle is parked on the vehicle loading plane.
[0050] Preferably, the height control module is specifically used to control the vehicle loading plane to reach the battery removal height after the electric vehicle is parked on the vehicle loading plane.
[0051] Preferably, the height control module is specifically used to control the vehicle loading plane to reach the battery loading height after the battery pack of the electric vehicle is removed.
[0052] Preferably, the height control module is specifically used to control the vehicle-carrying plane to return to the initial height after the battery pack is installed in the electric vehicle.
[0053] Preferably, the height control module is also used to control the lifting and lowering of the vehicle carrying plane between a first operating height and any one of the initial height, the battery removal height and the battery installation height, wherein the first operating height is another height that cooperates with the battery pack removal process of the electric vehicle and is different from the battery removal height.
[0054] Preferably, the clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs;
[0055] The first operating height is set to: lower than the battery removal height, and when the vehicle loading plane is at the first operating height, the relative height between the vehicle loading plane and the walking plane of the battery swapping equipment meets the height condition for removing the battery pack of the battery swapping equipment.
[0056] Preferably, the height control module is also used to control the lifting and lowering of the vehicle loading plane between a second operating height and any one of the initial height, the battery removal height and the battery installation height, wherein the second operating height is another height that cooperates with the battery pack installation process of the electric vehicle and is different from the battery installation height.
[0057] Preferably, the clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs;
[0058] The second operating height is set to: lower than the battery installation height, and when the vehicle loading plane is at the second operating height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment meets the height condition for installing the battery pack of the battery exchange equipment.
[0059] Preferably, the height control module is specifically used to control the vehicle loading plane to reach the first operating height during the process of disassembling the battery pack.
[0060] Preferably, the height control module is specifically used to control the vehicle loading plane to reach the second operating height during the process of installing the battery pack.
[0061] Preferably, a height sensor is respectively arranged on the vehicle loading plane and / or the plane where the lane is located, and the height sensor is used to detect the relative height between the vehicle loading plane and the reference plane; the lane control system further comprises:
[0062] A height detection module is used to detect whether the vehicle loading plane reaches the initial height, the battery removal height, the battery installation height, the first operating height or the second operating height through the height sensor, and control the lifting mechanism used to control the height of the vehicle loading plane according to the detection result.
[0063] Preferably, a battery exchange equipment walking plane is provided on the track for the battery exchange equipment used for disassembling and assembling battery packs to walk on, and when the vehicle loading plane is at the initial height, it is on the same plane as the battery exchange equipment walking plane.
[0064] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the method described above is implemented when the processor executes the program.
[0065] A computer-readable storage medium stores a computer program, which implements the steps of the method described above when executed by a processor.
[0066] On the basis of being in accordance with the common sense in the art, the above-mentioned preferred conditions can be arbitrarily combined to obtain the preferred embodiments of the present invention.
[0067] The positive progressive effect of the present invention is that the present invention controls the height of the vehicle-carrying plane so that the vehicle-carrying plane can meet the battery replacement needs at each stage, shorten the overall battery replacement time, and improve the battery replacement efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0068] Figure 1 A schematic top view of the vehicle battery replacement process;
[0069] Figure 2 It is a side view of the vehicle-carrying plane reaching an initial height in Example 1;
[0070] Figure 3 A side view of the vehicle loading plane reaching the battery loading height in Example 1;
[0071] Figure 4 A side view of the vehicle loading plane reaching the height for removing the battery in Example 1;
[0072] Figure 5 A side view of the vehicle loading plane reaching a first operating height in Embodiment 1;
[0073] Figure 6 A side view of the vehicle loading plane reaching the second operating height in Embodiment 1;
[0074] Figure 7 This is a module schematic diagram of a lane clamping control system of a preferred embodiment 2 of the present invention;
[0075] Figure 8 This is a schematic diagram of the structure of an electronic device according to a preferred embodiment 3 of the present invention. DETAILED DESCRIPTION
[0076] The present invention is further described below by way of examples, but the present invention is not limited to the scope of the examples.
[0077] Before describing the various embodiments of the present invention in detail, a brief description of the lane is given first. Figure 1-6 As shown, the clamping lane 1 is a device used in disassembling and installing battery packs, usually used in battery swap stations. Its main function is to adjust the height of the vehicle for bottom battery swapping (i.e., the battery swapping equipment for disassembling and installing the battery pack is removed and installed from the bottom of the vehicle 9), thereby providing sufficient space at the bottom of the vehicle for battery swapping.
[0078] The lane 1 has a vehicle-carrying plane 11, which is used to carry the electric car 9 and can be raised and lowered in height. The lifting and lowering can be achieved by a related lifting mechanism. Since the mechanical structure of the lifting mechanism is not the focus of the present invention, it will not be described in detail here. In the figure, the vehicle-carrying plane 11 is not a continuous complete plane, but a segmented one, that is, there are two sections of vehicle-carrying planes 11 on both sides that can carry wheels 91, and the middle is hollow. In the following embodiment, the two sections of the vehicle-carrying plane 11 are synchronously controlled, that is, they rise or fall at the same time and the height is always the same.
[0079] A battery swapping device walking plane 12 is provided on the clamping lane 1 for the battery swapping device 2 to walk on. The battery swapping device 2 is a bottom battery swapping device used to remove and install the battery pack from the bottom of the vehicle. When the battery swapping device 2 reaches the bottom of the vehicle 9, the battery pack is removed and installed through the hollow area in the middle of the vehicle-carrying plane 11. Figure 1 The arrow in the figure indicates a feasible walking route for the battery swapping device 2, i.e., entering the bottom of the vehicle from one end of the walking plane 12 of the battery swapping device, and then driving out from the bottom of the vehicle from the other end. Of course, the battery swapping device 2 may also adopt other walking routes, i.e., entering the bottom of the vehicle from one end of the walking plane 12 of the battery swapping device, and then driving out from the bottom of the vehicle from the same end.
[0080] It should be noted that the above content and drawings only schematically show a type of lane clamping and battery exchange equipment that can be applicable to the following embodiments, but it does not mean that the following embodiments can only be used for lane clamping and battery exchange equipment of the above structure or style. Lane clamping and battery exchange equipment with the same or similar functions and battery exchange principles are also applicable to the following embodiments.
[0081] Example 1
[0082] This embodiment provides a method for controlling a sandwich lane, which is mainly used to control the height of a vehicle loading plane 11 of a sandwich lane 1, and includes the following steps:
[0083] The vehicle loading plane 11 is controlled to be raised or lowered between any two heights of the initial height h0, the battery removal height h1 and the battery installation height h2.
[0084] Among them, the initial height h0 is the height of the vehicle-carrying plane 11 when it is not raised or lowered. When the vehicle-carrying plane 11 is at the initial height h0, it can be located at the same plane as the walking plane 12 of the battery-changing equipment; the battery removal height h1 is the height that matches the process of removing the battery pack of the electric vehicle; the battery installation height h2 is the height that matches the process of installing the battery pack of the electric vehicle. Both the battery removal height h1 and the battery installation height h2 are different from the initial height h0.
[0085] In this embodiment, the entire battery pack removal process can roughly include the battery replacement equipment driving in stage before battery removal, the battery removal stage, and the battery replacement equipment driving out stage after battery removal is completed. The entire battery pack installation process can roughly include the battery replacement equipment driving in stage before battery installation, the battery installation stage, and the battery replacement equipment driving out stage after battery installation is completed. Among them, the battery removal height h1 can be coordinated with the battery replacement equipment driving in stage before battery removal, and is set to be higher than the initial height h0, and when the vehicle-carrying plane 11 is at the battery removal height h1, the relative height between the vehicle-carrying plane 11 and the battery replacement equipment walking plane 12 is higher than the height of the battery replacement equipment 2 when the battery pack is not loaded. The battery installation height h2 can be coordinated with the battery replacement equipment driving in stage before battery installation, and is set to be higher than the initial height h0, and when the vehicle-carrying plane 11 is at the battery installation height h2, the relative height between the vehicle-carrying plane 11 and the battery replacement equipment walking plane 12 is higher than the height of the battery replacement equipment 2 after the battery pack is loaded.
[0086] Theoretically, the battery removal height h1 can be greater than, less than or equal to the battery installation height h2. However, considering that the battery swap device 2 usually carries the battery pack on the top of the battery swap device 2, the height of the battery swap device 2 after loading the battery pack is higher than the height of the battery swap device 2 when it is not loaded with the battery pack. Therefore, in order to avoid the vehicle loading plane 11 being lifted too high during the battery pack removal process, which takes too much lifting time and affects the overall battery replacement efficiency, the preferred embodiment of the battery removal height h1 is less than or equal to the battery installation height h2. The specific values of the battery removal height h1 and the battery installation height h2 can be calculated by comprehensively considering factors such as the vehicle chassis height, the relative height of the initial height h0 and the walking plane 12 of the battery swap device, the height of the battery swap device 2 itself, and the height of the battery swap device 2 after loading the battery.
[0087] In this embodiment, the control of the vehicle plane 11 to rise and fall between any two heights of the initial height h0, the battery removal height h1 and the battery installation height h2 may include controlling the vehicle plane 11 from the initial height h0 to the battery removal height h1, from the initial height h0 to the battery installation height h2, from the battery removal height h1 to the battery installation height h2, from the battery removal height h1 to the initial height h0, from the battery installation height h2 to the initial height h0, or from the battery installation height h2 to the battery removal height h1. Which of the above-mentioned liftings is specifically controlled to be achieved by the vehicle plane 11 can be selected according to the actual needs of battery removal and installation, for example:
[0088] Before the electric vehicle is parked on the vehicle loading plane 11, the vehicle loading plane 11 is controlled to maintain an initial height h0, see Figure 2 ; Wherein, when the vehicle loading plane 11 is at the initial height h0, it can be on the same plane as the plane where the lane 1 is located, so that the vehicle can enter the vehicle loading plane 11;
[0089] After the electric vehicle is parked on the vehicle loading plane 11, the vehicle loading plane 11 is controlled to reach the battery removal height h1, see Figure 3 ; After the vehicle-carrying plane 11 reaches the battery removal height h1, the battery-changing device 2 without the battery pack loaded can drive under the bottom of the vehicle to remove the battery pack;
[0090] After the battery pack of the electric vehicle is removed, the vehicle loading plane 11 is controlled to reach the battery loading height h2, see Figure 4 ; After the vehicle loading plane 11 reaches the battery loading height h2, the battery swap device 2 loaded with the unloaded battery pack can be driven out from under the bottom of the vehicle, the unloaded battery pack is returned to the battery rack or other location, and then a new battery pack is loaded, and then it is driven under the bottom of the vehicle again to install the battery pack;
[0091] After the electric vehicle is equipped with a battery pack, the vehicle-carrying plane 11 is controlled to return to the initial height h0, see Figure 2 When the vehicle loading plane 11 is at the initial height h0, it can be on the same plane as the plane where the lane 1 is located, so that the vehicle can drive out of the vehicle loading plane 11.
[0092] In this embodiment, the lane clamping control method may further include the following steps:
[0093] The vehicle loading plane 11 is controlled to be raised or lowered between the first operating height h3 and any one of the initial height h0, the battery removal height h1 and the battery installation height h2.
[0094] The first operating height h3 is another height that matches the process of removing the battery pack of the electric vehicle and is different from the battery removal height h1.
[0095] The first operating height h3 can be coordinated with the above-mentioned battery removal stage and set to be lower than the battery removal height h1, or even lower than the initial height h0, and when the vehicle-carrying plane 11 is at the first operating height h3, the relative height between the vehicle-carrying plane 11 and the walking plane 12 of the battery-swapping device satisfies the height condition for the battery-swapping device 2 to remove the battery pack. The height condition for the battery-swapping device 2 to remove the battery pack needs to be determined according to the operation process of the battery-swapping device 2 during the battery removal stage. For example, when the battery-swapping device 2 removes the battery pack, it is necessary to lift the battery-swapping platform on it so that the battery pack unlocking mechanism on the battery-swapping platform unlocks the battery pack under the vehicle, and then the unloaded battery pack is carried by the battery-swapping platform. In order to cooperate with the lifting height of the battery-swapping platform and reduce the distance between the vehicle bottom and the battery-swapping platform, the first operating height h3 can be appropriately adjusted to change the relative height between the battery-swapping platform and the vehicle-carrying plane 11 to ensure that the battery pack unlocking mechanism is successfully unlocked and catches the unloaded battery pack.
[0096] In this embodiment, the control of the vehicle-carrying plane 11 to rise and fall between the first operating height h3 and any one of the initial height h0, the battery removal height h1 and the battery installation height h2 may include controlling the vehicle-carrying plane 11 from the initial height h0 to the first operating height h3, from the battery removal height h1 to the first operating height h3, from the battery installation height h2 to the first operating height h3, from the first operating height h3 to the initial height h0, from the first operating height h3 to the battery removal height h1, or from the first operating height h3 to the battery installation height h2. Which of the above-mentioned rise and fall is specifically controlled to be achieved by the vehicle-carrying plane 11 can be selected according to the actual needs of battery removal, for example:
[0097] During the process of removing the battery pack, the vehicle loading plane 11 is controlled to reach the first operating height h3, see Figure 5 ; When the vehicle-carrying plane 11 is at the first operating height h3, the lifted battery-swap platform can enter the bottom of the vehicle, unlock the battery pack under the vehicle and then receive the unloaded battery pack. Following the above-mentioned battery-swap equipment entry stage before battery removal, this step is to descend from the battery removal height h1 to the first operating height h3.
[0098] In this embodiment, the lane clamping control method may further include the following steps:
[0099] The vehicle loading plane 11 is controlled to be raised or lowered between the second operating height h4 and any one of the initial height h0, the battery removal height h1 and the battery installation height h2.
[0100] The second operating height h4 is another height that cooperates with the battery pack installation process of the electric vehicle and is different from the battery installation height h2.
[0101] The second operating height h4 can be coordinated with the above-mentioned battery installation stage and set to be lower than the battery installation height h2, or even lower than the initial height h0, and when the vehicle-carrying plane 11 is at the second operating height h4, the relative height between the vehicle-carrying plane 11 and the battery-swapping equipment walking plane 12 meets the height condition for installing the battery pack of the battery-swapping equipment 2. The second operating height h4 can be the same as or different from the first operating height.
[0102] The height condition for installing the battery pack on the battery swapping device 2 needs to be determined according to the operation process of the battery swapping device 2 during the battery installation stage. For example, when the battery swapping device 2 installs the battery pack, it is necessary to lift the battery swapping platform on it so that the battery pack on the battery swapping platform is placed into the battery pack outer box, and then the battery pack locking mechanism on it is used to lock the battery pack in the battery pack outer box. In order to cooperate with the lifting height of the battery swapping platform and reduce the distance between the bottom of the vehicle and the battery swapping platform, the second operating height h4 can be appropriately adjusted to change the relative height between the battery swapping platform and the vehicle loading plane 11 to ensure that the battery pack is successfully placed into the battery pack outer box and the battery pack locking mechanism locks the battery pack.
[0103] In this embodiment, the control of the vehicle-carrying plane 11 to rise and fall between the second operating height h4 and any one of the initial height h0, the battery removal height h1 and the battery installation height h2 may include controlling the vehicle-carrying plane 11 from the initial height h0 to the second operating height h4, from the battery removal height h1 to the second operating height h4, from the battery installation height h2 to the second operating height h4, from the second operating height h4 to the initial height h0, from the second operating height h4 to the battery removal height h1 or from the second operating height h4 to the battery installation height h2. Which of the above-mentioned rise and fall is specifically controlled by the vehicle-carrying plane 11 can be selected according to the actual needs of battery installation, for example:
[0104] During the installation of the battery pack, the vehicle loading plane 11 is controlled to reach the second operating height h4. Figure 6 . Following the above-mentioned battery replacement equipment driving-in stage before battery installation, this step is to descend from the battery installation height h2 to the second operating height h4.
[0105] In this embodiment, in order to accurately control the vehicle loading plane 11 to reach the above-mentioned heights, height sensors are respectively arranged on the vehicle loading plane 11 and / or on the plane where the lane 1 is located, and the height sensors are used to detect the relative height between the vehicle loading plane 11 and the reference plane. The lane control method may also include:
[0106] The height sensor is used to detect whether the vehicle-carrying plane 11 has reached the initial height h0, the battery removal height, the battery installation height h2, the first operating height h3 or the second operating height h4, and the lifting mechanism used to control the height of the vehicle-carrying plane 11 is controlled according to the detection result. For example, before the electric vehicle is parked on the vehicle-carrying plane 11, it is determined whether the vehicle-carrying plane 11 has reached the initial height h0; after the electric vehicle is parked on the vehicle-carrying plane 11, it is determined whether the vehicle-carrying plane 11 has reached the battery removal height h1; after the battery pack of the electric vehicle is removed, it is determined whether the vehicle-carrying plane 11 has reached the battery installation height h2; during the process of removing the battery pack, it is determined whether the vehicle-carrying plane 11 has reached the first operating height h3; during the process of installing the battery pack, it is determined whether the vehicle-carrying plane 11 has reached the second operating height h4. If the actual lifting height of the vehicle-carrying plane 11 is insufficient and has not reached the corresponding height, the lifting mechanism is controlled to continue lifting until it reaches the corresponding height.
[0107] The lane control method of this embodiment performs height control on the vehicle-carrying plane 11, so that the vehicle-carrying plane 11 can meet the battery replacement needs at each stage, shorten the overall battery replacement time, and improve the battery replacement efficiency.
[0108] Example 2
[0109] This embodiment provides a lane clamping control system, which is mainly used to control the height of the vehicle loading plane 11 of the lane clamping 1. Figure 7 As shown, the lane clamping control system includes: a height control module 31.
[0110] The height control module 31 is used to control the vehicle-carrying plane 11 to rise and fall between any two heights of the initial height h0, the battery removal height h1 and the battery installation height h2. The battery removal height h1 is a height that matches the process of removing the battery pack of the electric vehicle, and the battery installation height h2 is a height that matches the process of installing the battery pack of the electric vehicle.
[0111] Among them, the initial height h0 is the height of the vehicle-carrying plane 11 when it is not raised or lowered. When the vehicle-carrying plane 11 is at the initial height h0, it can be located at the same plane as the walking plane 12 of the battery-changing equipment; the battery removal height h1 is the height that matches the process of removing the battery pack of the electric vehicle; the battery installation height h2 is the height that matches the process of installing the battery pack of the electric vehicle. Both the battery removal height h1 and the battery installation height h2 are different from the initial height h0.
[0112] In this embodiment, the entire battery pack removal process can roughly include the battery replacement equipment driving in stage before battery removal, the battery removal stage, and the battery replacement equipment driving out stage after battery removal is completed. The entire battery pack installation process can roughly include the battery replacement equipment driving in stage before battery installation, the battery installation stage, and the battery replacement equipment driving out stage after battery installation is completed. Among them, the battery removal height h1 can be coordinated with the battery replacement equipment driving in stage before battery removal, and is set to be higher than the initial height h0, and when the vehicle-carrying plane 11 is at the battery removal height h1, the relative height between the vehicle-carrying plane 11 and the battery replacement equipment walking plane 12 is higher than the height of the battery replacement equipment 2 when the battery pack is not loaded. The battery installation height h2 can be coordinated with the battery replacement equipment driving in stage before battery installation, and is set to be higher than the initial height h0, and when the vehicle-carrying plane 11 is at the battery installation height h2, the relative height between the vehicle-carrying plane 11 and the battery replacement equipment walking plane 12 is higher than the height of the battery replacement equipment 2 after the battery pack is loaded.
[0113] Theoretically, the battery removal height h1 can be greater than, less than or equal to the battery installation height h2. However, considering that the battery swap device 2 usually carries the battery pack on the top of the battery swap device 2, the height of the battery swap device 2 after loading the battery pack is higher than the height of the battery swap device 2 when it is not loaded with the battery pack. Therefore, in order to avoid the vehicle loading plane 11 being lifted too high during the battery pack removal process, which takes too much lifting time and affects the overall battery replacement efficiency, the preferred embodiment of the battery removal height h1 is less than or equal to the battery installation height h2. The specific values of the battery removal height h1 and the battery installation height h2 can be calculated by comprehensively considering factors such as the vehicle chassis height, the relative height of the initial height h0 and the walking plane 12 of the battery swap device, the height of the battery swap device 2 itself, and the height of the battery swap device 2 after loading the battery.
[0114] In this embodiment, the control of the vehicle plane 11 to rise and fall between any two heights of the initial height h0, the battery removal height h1 and the battery installation height h2 may include controlling the vehicle plane 11 from the initial height h0 to the battery removal height h1, from the initial height h0 to the battery installation height h2, from the battery removal height h1 to the battery installation height h2, from the battery removal height h1 to the initial height h0, from the battery installation height h2 to the initial height h0, or from the battery installation height h2 to the battery removal height h1. Which of the above-mentioned liftings is specifically controlled to be achieved by the vehicle plane 11 can be selected according to the actual needs of battery removal and installation, for example:
[0115] The height control module 31 is specifically used to control the vehicle loading plane 11 to maintain an initial height h0 before the electric vehicle is parked on the vehicle loading plane 11. Figure 2 When the vehicle loading plane 11 is at the initial height h0 , it can be on the same plane as the plane where the lane 1 is located, so that the vehicle can enter the vehicle loading plane 11 easily.
[0116] The height control module 31 is specifically used to control the vehicle loading plane 11 to reach the battery removal height h1 after the electric vehicle is parked on the vehicle loading plane 11. Figure 3 . After the vehicle loading plane 11 reaches the battery removal height h1, the battery replacement equipment 2 without the battery pack loaded can be driven under the bottom of the vehicle to remove the battery pack.
[0117] The height control module 31 is specifically used to control the vehicle loading plane 11 to reach the battery loading height h2 after the battery pack of the electric vehicle is removed. Figure 4 After the vehicle loading plane 11 reaches the battery loading height h2, the battery exchange device 2 loaded with the unloaded battery pack can be driven out from under the bottom of the vehicle, the unloaded battery pack is returned to the battery rack or other location, and then a new battery pack is loaded and driven in from under the bottom of the vehicle again to install the battery pack.
[0118] The height control module 31 is specifically used to control the vehicle-carrying plane 11 to return to the initial height h0 after the battery pack is installed in the electric vehicle. Figure 2 When the vehicle loading plane 11 is at the initial height h0, it can be on the same plane as the plane where the lane 1 is located, so that the vehicle can drive out of the vehicle loading plane 11 easily.
[0119] In this embodiment, the height control module 31 can also be used to control the vehicle loading plane 11 to rise or fall between a first operating height h3 and any one of the initial height h0, the battery removal height h1 and the battery installation height h2. The first operating height h3 is another height that is compatible with the battery pack removal process of the electric vehicle and is different from the battery removal height h1.
[0120] The first operating height h3 can be coordinated with the above-mentioned battery removal stage and set to be lower than the battery removal height h1, or even lower than the initial height h0, and when the vehicle-carrying plane 11 is at the first operating height h3, the relative height between the vehicle-carrying plane 11 and the walking plane 12 of the battery-swapping device satisfies the height condition for the battery-swapping device 2 to remove the battery pack. The height condition for the battery-swapping device 2 to remove the battery pack needs to be determined according to the operation process of the battery-swapping device 2 during the battery removal stage. For example, when the battery-swapping device 2 removes the battery pack, it is necessary to lift the battery-swapping platform on it so that the battery pack unlocking mechanism on the battery-swapping platform unlocks the battery pack under the vehicle and then carries the unloaded battery pack through the battery-swapping platform. In order to cooperate with the lifting height of the battery-swapping platform and reduce the distance between the vehicle bottom and the battery-swapping platform, the first operating height h3 can be appropriately adjusted to change the relative height between the battery-swapping platform and the vehicle-carrying plane 11 to ensure that the battery pack unlocking mechanism is successfully unlocked and catches the unloaded battery pack.
[0121] In this embodiment, the control of the vehicle-carrying plane 11 to rise and fall between the first operating height h3 and any one of the initial height h0, the battery removal height h1 and the battery installation height h2 may include controlling the vehicle-carrying plane 11 from the initial height h0 to the first operating height h3, from the battery removal height h1 to the first operating height h3, from the battery installation height h2 to the first operating height h3, from the first operating height h3 to the initial height h0, from the first operating height h3 to the battery removal height h1, or from the first operating height h3 to the battery installation height h2. Which of the above-mentioned rise and fall is specifically controlled to be achieved by the vehicle-carrying plane 11 can be selected according to the actual needs of battery removal, for example:
[0122] The height control module 31 is specifically used to control the vehicle-carrying plane 11 to reach the first operating height h3 during the process of removing the battery pack. Figure 5 When the vehicle-carrying plane 11 is at the first operating height h3, the lifted battery-swap platform can enter the bottom of the vehicle, unlock the battery pack under the vehicle, and then receive the unloaded battery pack. Following the above-mentioned battery-swap equipment entry stage before battery removal, this step is to descend from the battery removal height h1 to the first operating height h3.
[0123] In this embodiment, the height control module 31 can also be used to control the vehicle loading plane 11 to rise and fall between the second operating height h4 and any one of the initial height h0, the battery removal height h1 and the battery installation height h2. The second operating height h4 is another height that cooperates with the battery pack installation process of the electric vehicle and is different from the battery installation height h2.
[0124] The second operating height h4 can be coordinated with the above-mentioned battery installation stage and set to be lower than the battery installation height h2, or even lower than the initial height h0, and when the vehicle-carrying plane 11 is at the second operating height h4, the relative height between the vehicle-carrying plane 11 and the battery-swapping equipment walking plane 12 meets the height condition for installing the battery pack of the battery-swapping equipment 2. The second operating height h4 can be the same as or different from the first operating height.
[0125] The height condition for installing the battery pack on the battery swapping device 2 needs to be determined according to the operation process of the battery swapping device 2 during the battery installation stage. For example, when the battery swapping device 2 installs the battery pack, it is necessary to lift the battery swapping platform on it so that the battery pack on the battery swapping platform is placed into the battery pack outer box, and then the battery pack locking mechanism on it is used to lock the battery pack in the battery pack outer box. In order to cooperate with the lifting height of the battery swapping platform and reduce the distance between the bottom of the vehicle and the battery swapping platform, the second operating height h4 can be appropriately adjusted to change the relative height between the battery swapping platform and the vehicle loading plane 11 to ensure that the battery pack is successfully placed into the battery pack outer box and the battery pack locking mechanism locks the battery pack.
[0126] In this embodiment, the control of the vehicle-carrying plane 11 to rise and fall between the second operating height h4 and any one of the initial height h0, the battery removal height h1 and the battery installation height h2 may include controlling the vehicle-carrying plane 11 from the initial height h0 to the second operating height h4, from the battery removal height h1 to the second operating height h4, from the battery installation height h2 to the second operating height h4, from the second operating height h4 to the initial height h0, from the second operating height h4 to the battery removal height h1 or from the second operating height h4 to the battery installation height h2. Which of the above-mentioned rise and fall is specifically controlled by the vehicle-carrying plane 11 can be selected according to the actual needs of battery installation, for example:
[0127] The height control module 31 is specifically used to control the vehicle-carrying plane 11 to reach the second operating height h4 during the installation of the battery pack. Figure 6 . Following the above-mentioned battery replacement equipment driving-in stage before battery installation, this step is to descend from the battery installation height h2 to the second operating height h4.
[0128] In this embodiment, in order to accurately control the vehicle loading plane 11 to reach the above-mentioned heights, height sensors are respectively arranged on the vehicle loading plane 11 and / or the plane where the lane 1 is located, and the height sensors are used to detect the relative height between the vehicle loading plane 11 and the reference plane. The lane control system may also include a height detection module 32.
[0129] The height detection module 32 is used to detect whether the vehicle-carrying plane 11 has reached the initial height h0, the battery removal height, the battery installation height h2, the first operating height h3 or the second operating height h4 through a height sensor, and control the lifting mechanism used to control the height of the vehicle-carrying plane 11 according to the detection result. For example, before the electric vehicle is parked on the vehicle-carrying plane 11, it is determined whether the vehicle-carrying plane 11 has reached the initial height h0; after the electric vehicle is parked on the vehicle-carrying plane 11, it is determined whether the vehicle-carrying plane 11 has reached the battery removal height h1; after the battery pack of the electric vehicle is removed, it is determined whether the vehicle-carrying plane 11 has reached the battery installation height h2; during the process of removing the battery pack, it is determined whether the vehicle-carrying plane 11 has reached the first operating height h3; during the process of installing the battery pack, it is determined whether the vehicle-carrying plane 11 has reached the second operating height h4. If the actual lifting height of the vehicle-carrying plane 11 is insufficient and has not reached the corresponding height, the lifting mechanism is controlled to continue lifting until it reaches the corresponding height.
[0130] The lane control system of this embodiment performs height control on the vehicle loading plane 11 so that the vehicle loading plane 11 can meet the battery replacement needs at each stage, shorten the overall battery replacement time, and improve the battery replacement efficiency.
[0131] Example 3
[0132] Figure 8This is a schematic diagram of the structure of an electronic device provided in Embodiment 3 of the present invention. The electronic device includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and the processor implements a method in Embodiment 1 when executing the program. Figure 8 The electronic device 50 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.
[0133] like Figure 8 As shown, the electronic device 50 may be in the form of a general-purpose computing device, for example, it may be a server device. The components of the electronic device 50 may include, but are not limited to: at least one processor 51, at least one memory 52, and a bus 53 connecting different system components (including the memory 52 and the processor 51).
[0134] The bus 53 includes a data bus, an address bus, and a control bus.
[0135] The memory 52 may include a volatile memory, such as a random access memory (RAM) 521 and / or a cache memory 522 , and may further include a read-only memory (ROM) 523 .
[0136] The memory 52 may also include a program / utility 525 having a set (at least one) of program modules 524, such program modules 524 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.
[0137] The processor 51 executes various functional applications and data processing by running the computer programs stored in the memory 52, such as the methods provided in embodiments 1-7 of the present invention.
[0138] The electronic device 50 may also communicate with one or more external devices 54 (e.g., keyboards, pointing devices, etc.). Such communication may be performed via an input / output (I / O) interface 55. Furthermore, the model generating device 50 may also communicate with one or more networks (e.g., a local area network (LAN), a wide area network (WAN), and / or a public network, such as the Internet) via a network adapter 56. Figure 8 As shown, the network adapter 56 communicates with other modules of the model-generated device 50 via the bus 53. It should be understood that, although not shown in the figure, other hardware and / or software modules can be used in conjunction with the model-generated device 50, including but not limited to: microcode, device drivers, redundant processors, external disk drive arrays, RAID (disk array) systems, tape drives, and data backup storage systems, etc.
[0139] It should be noted that although several units / modules or sub-units / modules of the electronic device are mentioned in the above detailed description, this division is merely exemplary and not mandatory. In fact, according to an embodiment of the present invention, the features and functions of two or more units / modules described above can be embodied in one unit / module. Conversely, the features and functions of one unit / module described above can be further divided into multiple units / modules to be embodied.
[0140] Example 4
[0141] This embodiment provides a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the steps of a method provided in Embodiment 1 are implemented.
[0142] The readable storage medium may include but is not limited to: a portable disk, a hard disk, a random access memory, a read-only memory, an erasable programmable read-only memory, an optical storage device, a magnetic storage device or any suitable combination of the above.
[0143] In a possible implementation manner, the present invention may also be implemented in the form of a program product, which includes a program code. When the program product is run on a terminal device, the program code is used to enable the terminal device to execute the steps in the method described in Embodiment 1.
[0144] The program code for executing the present invention may be written in any combination of one or more programming languages, and may be executed entirely on a user device, partially on a user device, as an independent software package, partially on a user device and partially on a remote device, or entirely on a remote device.
[0145] Although the specific embodiments of the present invention are described above, it should be understood by those skilled in the art that this is only for illustration and the protection scope of the present invention is defined by the appended claims. Those skilled in the art may make various changes or modifications to these embodiments without departing from the principles and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.
Claims
1. A method for controlling a lane clamping, It is characterized in that The lane has a vehicle-carrying surface for carrying electric vehicles and can be raised or lowered; The clamped lane control method comprises: Control the vehicle-carrying plane to rise and fall between any two heights of the initial height, the battery removal height and the battery installation height, wherein the battery removal height is a height that matches the process of removing the battery pack of the electric vehicle, and the battery installation height is a height that matches the process of installing the battery pack of the electric vehicle; The initial height is the height at which the vehicle-carrying plane is located when it is not raised or lowered. When the vehicle-carrying plane is at the initial height, it is located on the same plane as the walking plane of the battery-swapping equipment; The battery removal height is set to be: higher than the initial height; The battery installation height is set to be: higher than the initial height; Control the vehicle-carrying plane to rise and fall between a first operating height and any one of the initial height, the battery removal height and the battery installation height, wherein the first operating height is another height that matches the process of removing the battery pack of the electric vehicle and is different from the battery removal height; the first operating height is lower than the initial height; and / or; The vehicle loading plane is controlled to be raised or lowered between a second operating height and any one of the initial height, the battery removal height and the battery installation height, wherein the second operating height is another height that cooperates with the battery pack installation process of the electric vehicle and is different from the battery installation height; the second operating height is set lower than the initial height.
2. The lane clamping control method according to claim 1, It is characterized in that The clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs; The battery removal height is also set as: when the vehicle loading plane is at the battery removal height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment is higher than the height of the battery exchange equipment when the battery pack is not loaded.
3. The lane clamping control method according to claim 1, It is characterized in that The clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs; The battery installation height is also set as follows: when the vehicle loading plane is located at the battery installation height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment is higher than the height of the battery exchange equipment after the battery pack is loaded.
4. The method for controlling a lane clamping according to claim 1, It is characterized in that The battery removal height is less than or equal to the battery installation height.
5. The lane clamping control method according to claim 1, It is characterized in that Controlling the vehicle carrier plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height, including: Before the electric vehicle is parked on the vehicle loading plane, the vehicle loading plane is controlled to be maintained at an initial height.
6. The lane clamping control method according to claim 1, It is characterized in that Controlling the vehicle carrier plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height, including: After the electric vehicle is parked on the vehicle loading plane, the vehicle loading plane is controlled to reach the battery removal height.
7. The method for controlling a lane clamping as claimed in claim 1, It is characterized in that Controlling the vehicle carrier plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height, including: After the battery pack of the electric vehicle is removed, the vehicle loading plane is controlled to reach the battery loading height.
8. The method for controlling a lane clamping as claimed in claim 1, It is characterized in that Controlling the vehicle carrier plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height, including: After the battery pack is installed on the electric vehicle, the vehicle loading plane is controlled to return to the initial height.
9. The method for controlling a lane clamping as claimed in claim 1, It is characterized in that The clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs; The first operating height is set to: lower than the battery removal height, and when the vehicle loading plane is at the first operating height, the relative height between the vehicle loading plane and the walking plane of the battery swapping equipment meets the height condition for removing the battery pack of the battery swapping equipment.
10. The method for controlling a lane clamping according to claim 1, It is characterized in that The clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs; The second operating height is set to: lower than the battery installation height, and when the vehicle loading plane is at the second operating height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment meets the height condition for installing the battery pack of the battery exchange equipment.
11. The method for controlling a sandwiched lane according to claim 1, It is characterized in that Controlling the vehicle-carrying plane to rise and fall between a first operating height and any one of the initial height, the battery removal height, and the battery installation height, comprises: During the process of disassembling the battery pack, the vehicle loading plane is controlled to reach the first operating height.
12. The method for controlling a lane clamping according to claim 1, It is characterized in that Controlling the vehicle-carrying plane to rise and fall between the second operating height and any one of the initial height, the battery removal height, and the battery installation height, comprises: During the process of installing the battery pack, the vehicle loading plane is controlled to reach the second operating height.
13. The method for controlling a sandwiched lane according to claim 1 or 12, It is characterized in that A height sensor is respectively arranged on the vehicle loading plane and / or the plane where the lane is located, and the height sensor is used to detect the relative height between the vehicle loading plane and the reference plane; The clamped lane control method further includes: The height sensor is used to detect whether the vehicle loading plane reaches the initial height, the battery removal height, the battery installation height, the first operating height or the second operating height, and the lifting mechanism used to control the height of the vehicle loading plane is controlled according to the detection result.
14. The method for controlling a sandwiched lane as claimed in claim 1, It is characterized in that The clamping lane is provided with a battery exchange equipment walking plane for the battery exchange equipment used for disassembling and assembling battery packs to walk on. When the vehicle loading plane is at the initial height, it is located on the same plane as the battery exchange equipment walking plane.
15. A lane clamping control system, It is characterized in that The lane has a vehicle-carrying surface for carrying electric vehicles and can be raised or lowered; The lane clamping control system comprises: A height control module, used to control the vehicle-carrying plane to rise and fall between any two heights of an initial height, a battery removal height, and a battery installation height, wherein the battery removal height is a height that matches the process of removing the battery pack of the electric vehicle, and the battery installation height is a height that matches the process of installing the battery pack of the electric vehicle; The initial height is the height at which the vehicle-carrying plane is located when it is not raised or lowered. When the vehicle-carrying plane is at the initial height, it is located on the same plane as the walking plane of the battery-swapping equipment; The battery removal height is set to be: higher than the initial height; The battery installation height is set to be: higher than the initial height; The height control module is also used to control the vehicle-carrying plane to rise and fall between a first operating height and any one of the initial height, the battery removal height and the battery installation height, wherein the first operating height is another height that matches the battery pack removal process of the electric vehicle and is different from the battery removal height; the first operating height is lower than the initial height; and / or, The height control module is also used to control the vehicle loading plane to rise and fall between a second operating height and any one of the initial height, the battery removal height and the battery installation height, wherein the second operating height is another height that cooperates with the battery pack installation process of the electric vehicle and is different from the battery installation height; the second operating height is lower than the initial height.
16. The lane clamping control system according to claim 15, It is characterized in that The clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs; The battery removal height is also set as: when the vehicle loading plane is at the battery removal height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment is higher than the height of the battery exchange equipment when the battery pack is not loaded.
17. The lane clamping control system according to claim 15, It is characterized in that The clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs; The battery installation height is also set as follows: when the vehicle loading plane is located at the battery installation height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment is higher than the height of the battery exchange equipment after the battery pack is loaded.
18. The lane clamping control system according to claim 15, It is characterized in that The battery removal height is less than or equal to the battery installation height.
19. The lane clamping control system according to claim 15, It is characterized in that The height control module is specifically used to control the vehicle loading plane to maintain an initial height before the electric vehicle is parked on the vehicle loading plane.
20. The lane clamping control system according to claim 15, It is characterized in that The height control module is specifically used to control the vehicle loading plane to reach the battery removal height after the electric vehicle is parked on the vehicle loading plane.
21. The lane clamping control system according to claim 15, It is characterized in that The height control module is specifically used to control the vehicle loading plane to reach the battery loading height after the battery pack of the electric vehicle is removed.
22. The lane clamping control system according to claim 15, It is characterized in that The height control module is specifically used to control the vehicle-carrying plane to return to the initial height after the battery pack is installed on the electric vehicle.
23. The lane clamping control system according to claim 15, It is characterized in that The clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs; The first operating height is set to: lower than the battery removal height, and when the vehicle loading plane is at the first operating height, the relative height between the vehicle loading plane and the walking plane of the battery swapping equipment meets the height condition for removing the battery pack of the battery swapping equipment.
24. The lane clamping control system according to claim 15, It is characterized in that The clamping lane is provided with a walking plane for battery swapping equipment used for disassembling and installing battery packs; The second operating height is set to: lower than the battery installation height, and when the vehicle loading plane is at the second operating height, the relative height between the vehicle loading plane and the walking plane of the battery exchange equipment meets the height condition for installing the battery pack of the battery exchange equipment.
25. The lane clamping control system according to claim 15, It is characterized in that The height control module is specifically used to control the vehicle loading plane to reach the first operating height during the process of disassembling the battery pack.
26. The lane clamping control system according to claim 15, It is characterized in that The height control module is specifically used to control the vehicle loading plane to reach the second operating height during the installation of the battery pack.
27. The lane clamping control system according to claim 15 or 26, It is characterized in that A height sensor is respectively arranged on the vehicle loading plane and / or the plane where the lane is located, and the height sensor is used to detect the relative height between the vehicle loading plane and the reference plane; The lane clamping control system further comprises: A height detection module is used to detect whether the vehicle loading plane reaches the initial height, the battery removal height, the battery installation height, the first operating height or the second operating height through the height sensor, and control the lifting mechanism used to control the height of the vehicle loading plane according to the detection result.
28. The lane clamping control system according to claim 15, It is characterized in that The clamping lane is provided with a battery exchange equipment walking plane for the battery exchange equipment used for disassembling and assembling battery packs to walk on. When the vehicle loading plane is at the initial height, it is located on the same plane as the battery exchange equipment walking plane.
29. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the program, the method according to any one of claims 1 to 14 is implemented.
30. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the program is executed by a processor, the method according to any one of claims 1 to 14 is implemented.