Intelligent shot blasting machine and control method thereof

Through intelligent control and magnet frame recovery system, the problems of low construction efficiency of shot blasting machine and shot blasting are solved, and automatic turning control and efficient recovery are realized.

CN114808632BActive Publication Date: 2024-10-25JINJIANG XINGYI POLISHING MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210628119.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-06
Publication Date
2024-10-25
Estimated Expiration
2042-06-06

AI Technical Summary

Technical Problem

The shot blasting machine needs to make frequent turns and stops during the construction process, resulting in low construction efficiency, and the shot blasting is prone to splashing, affecting recycling.

Method used

An intelligent shot blasting machine is designed, which adopts a turning detection mechanism and a flow control mechanism, and realizes automatic control through a servo motor and a gear transmission box to ensure that the shot blasting machine automatically stops blasting when turning and restarts after returning to the straight line. Reduce manual operation time; at the same time, use the magnet frame and recovery pipe system to reduce shot splash and wear.

Benefits of technology

It improves construction efficiency, reduces manual operation time, reduces shot splash and magnet frame wear, and facilitates the recycling of shot materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114808632B_ABST
    Figure CN114808632B_ABST
Patent Text Reader

Abstract

The present application relates to an intelligent shot blasting machine and a control method thereof, which comprises a frame, a driven wheel is fixedly installed on the bottom side of the frame, a shot box is fixedly installed on the top side of the frame, a first discharge pipe is fixedly connected to the bottom side of the shot box, a flow control mechanism is installed on the first discharge pipe, a gear transmission box, a first servo motor and a blasting head are fixedly installed on one side of the frame, a handle is provided on the other side of the frame, the first servo motor drives the blasting head to open and close through the gear transmission box, the end of the first discharge pipe away from the shot box is connected to the blasting head, the blasting head is connected to the second discharge pipe, a driving wheel is rotatably installed on the bottom side of the frame, the frame is also equipped with a turning detection mechanism for detecting the rotation of the driving wheel, a controller is fixedly installed on the side of the frame close to the handle, an operation screen is fixedly installed on the handle, and the controller controls the first servo motor and the flow control mechanism according to the turning detection mechanism. The present application has the effect of improving construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of shot blasting machines, and in particular to an intelligent shot blasting machine and a control method thereof. Background Art

[0002] Shot blasting machines are generally used in construction projects such as roads, airports and bridges. Shot blasting machines will throw shot onto the road surface, thereby increasing the roughness of the road surface.

[0003] When construction workers use shot blasting machines to construct the road surface, the shot blasting machine needs to move in a straight line from one end of the road surface to the other end. The road surface is divided into multiple areas for the shot blasting machine to work. The shot blasting machine moves from one end of the road surface to the other end, so that one area on the road surface is completed. After that, the shot blasting machine needs to turn around and enter another area for construction. When turning around, the shot blasting machine needs to be manually turned off, and then the shot blasting machine is aligned with the next area on the road surface that needs to be constructed before it can be turned on again, which affects the construction efficiency. Summary of the invention

[0004] In order to improve construction efficiency, the present application provides an intelligent shot blasting machine and a control method thereof.

[0005] The present application provides an intelligent shot blasting machine and a control method thereof, which adopts the following technical solutions:

[0006] An intelligent shot blasting machine comprises a frame, a driven wheel is fixedly installed on the bottom side of the frame, a shot box is fixedly installed on the top side of the frame, a first discharge pipe is fixedly connected to the bottom side of the shot box, a flow control mechanism is installed on the first discharge pipe, a gear transmission box, a first servo motor and a blasting head are fixedly installed on one side of the frame, a handle is arranged on the other side of the frame, the first servo motor drives the blasting head to open and close through the gear transmission box, an end of the first discharge pipe away from the shot box is connected to the blasting head, the blasting head is connected to a second discharge pipe, an end of the second discharge pipe away from the blasting head is arranged obliquely downward, and the frame is close to the A support tube is fixedly installed on the side near the handle, a support rod is rotatably inserted at the bottom end of the support tube, a support plate is fixedly installed on the end of the support rod away from the support tube, a driving wheel is fixedly installed on the side of the support plate away from the support rod, the handle is fixedly installed on the support plate, a turning detection mechanism is installed between the support plate and the support tube, a controller is fixedly installed on the side of the frame close to the handle, an operation screen is fixedly installed on the handle, the operation screen, a first servo motor, a turning detection mechanism and a flow control mechanism are all electrically connected to the controller, and the controller controls the first servo motor and the flow control mechanism according to the turning detection mechanism.

[0007] By adopting the above technical solution, the construction personnel input the required first servo motor speed and the discharge speed inside the shot box on the operation screen. Then the controller starts the flow control mechanism, so that the shot inside the shot box enters the first discharge pipe at the set discharge speed and then flows into the blasting head. At the same time, the controller starts the first servo motor, the first servo motor rotates at a preset rotation speed, and the first servo motor drives the blasting head to rotate through the gear transmission box. The blasting head shoots the shot along the second discharge pipe onto the ground, thereby increasing the roughness of the ground.

[0008] After that, the construction personnel push the shot blasting machine to move on the road surface through the handle, and the driven wheel and the driving wheel are conducive to the construction personnel pushing the shot blasting machine to move. When the construction personnel need to drive the shot blasting machine to turn around, the construction personnel turn the handle, and the handle drives the support plate to rotate, so that the driving wheel changes the direction of travel. The driving wheel changes the direction of travel, so that the shot blasting machine turns around. When the shot blasting machine turns around, the turning detection mechanism detects that the shot blasting machine turns and sends a signal to the controller, and the controller turns off the first servo motor and the flow control mechanism. Turn off the first servo motor, so that the blasting head stops blasting; turn off the flow control mechanism, so that the shot material stops entering the blasting head from the shot material box. After the construction personnel push the shot blasting machine to turn around, the handle returns to the right position, so that the turning detection mechanism detects that the shot blasting machine has not turned. After that, the turning detection mechanism sends a signal to the controller, and the controller restarts the first servo motor and the flow control mechanism. When turning around, the controller automatically turns off the first servo motor and the flow control mechanism, and after the shot blasting machine returns to the right position, the controller automatically starts the first servo motor and the flow control mechanism, thereby reducing the time wasted by the construction personnel operating the shot blasting machine, thereby improving the construction efficiency.

[0009] Optionally, the flow control mechanism includes a servo, a material baffle plate and a rotating rod, the material baffle plate and the rotating rod are located inside the first discharge pipe, the rotating rod is fixedly mounted on one side of the material baffle plate, the servo is fixedly mounted on the outer wall of the first discharge pipe, the rotating shaft of the servo is fixedly connected to the rotating rod, and the servo is electrically connected to the controller.

[0010] By adopting the above technical solution, the controller drives the steering gear to start according to the discharge speed inside the shot box pre-set by the construction personnel. The steering gear drives the rotating rod to rotate, and the rotating rod drives the baffle plate to rotate. After the baffle plate rotates a certain angle, the controller turns off the steering gear, so that the shot inside the shot box enters the blasting head from the first discharge pipe at a preset discharge speed. When the controller turns off the flow control mechanism, the controller starts the steering gear, the steering gear drives the rotating rod to rotate, and the rotating rod drives the baffle plate to rotate, so that the baffle plate is reset to block the first discharge pipe, and then the flow control mechanism is turned off. By rotating the baffle plate to different angles, it is convenient to change the discharge speed of the shot box.

[0011] Optionally, the turning detection mechanism includes an infrared sensor, a blocking piece, a support seat and a limiting ring, the limiting ring being fixedly sleeved on the support tube, the limiting ring being axially provided with a first sliding opening on a side away from the support plate, the infrared sensor being slidably installed inside the first sliding opening, the support seat being fixedly installed on a side of the support plate close to the support rod, the support seat being provided with a second sliding opening, the first sliding opening being aligned with the second sliding opening, there are two blocking pieces, the blocking pieces are installed on the support seat, one of the blocking pieces is located at one end of the second sliding opening, and the other blocking piece is located at the other end of the second sliding opening, and the infrared sensor is electrically connected to the controller.

[0012] By adopting the above technical solution, when the shot blasting machine moves in a straight line on the road surface, the shielding sheet does not block the infrared sensor, so that the infrared sensor sends a signal to the controller that the shot blasting machine has not turned, thereby keeping the first servo motor and the flow control mechanism in the started state. When the shot blasting machine turns around, the construction personnel will turn the handle, and the handle will drive the support plate to rotate, so that the infrared sensor is irradiated on the shielding sheet. After that, the infrared sensor sends a signal to the controller that the shot blasting machine is turning. The controller automatically turns off the first servo motor and the flow control mechanism, thereby improving construction efficiency.

[0013] Optionally, a pill outlet box is fixedly installed on the bottom side of the frame, the pill outlet box has an opening, and the opening of the pill outlet box faces downward, the end of the second discharge pipe away from the blasting head is connected to the box body of the pill outlet box, and a magnet frame is fixedly installed on the inner wall of the pill outlet box.

[0014] By adopting the above technical solution, the pellets projected onto the road surface will be attracted by the magnetic frame and thus adsorbed onto the magnetic frame. The pellets block the gap between the magnetic frame and the ground, thereby reducing the possibility of pellets splashing when projected onto the ground and affecting the recycling of pellets.

[0015] Optionally, a recovery pipe is fixedly installed on the bottom of the pill outlet box, and one end of the recovery pipe is connected to a side wall of the pill box away from the pill outlet box, and a dust suction pipe is fixedly installed on the side of the pill box away from the recovery pipe, and the dust suction pipe is used to connect a vacuum cleaner. A box cover is matched on the top side of the pill box, and a baffle is arranged inside the pill box, and the baffle is fixedly connected to the box cover, and the baffle is located between the dust suction pipe and the recovery pipe.

[0016] By adopting the above technical solution, after the dust suction pipe is connected to the dust collector, the shot blasting machine projected on the road surface will return to the inside of the shot box from the recovery pipe, so as to facilitate the recovery of the projected shot for reuse. The baffle is used to shield the recovered shot, thereby reducing the occurrence of the shot entering the dust suction pipe.

[0017] Optionally, a side wall of the pill box is provided with a take-in / take-out port connected to the interior of the pill box, and a filter screen is passed through the take-in / take-out port, and the height of the filter screen is lower than the height of one end of the recovery pipe away from the pill outlet box.

[0018] By adopting the above technical solution, when the pellets enter the pellet box from the recovery pipe, some dust and stones may also enter the pellet box. The recovered pellets are filtered by the filter screen, thereby reducing the possibility of stones entering the first discharge pipe from the pellet box. The filter screen can be taken out from the access port, so as to facilitate the cleaning of stones on the filter screen.

[0019] Optionally, a control method for an intelligent shot blasting machine includes obtaining force information, wherein the force information is the required rotation speed of a first servo motor; obtaining flow information, wherein the flow information is the required shot blasting flow; starting the first servo motor according to the force information, and starting a flow control mechanism according to the flow information.

[0020] By adopting the above technical solution, the construction personnel input the required rotation speed of the first servo motor on the operation screen, and the operation screen sends the required rotation speed of the first servo motor to the controller, so that the controller obtains the force information. The construction personnel input the required shot blasting flow rate on the operation screen, and the operation screen sends the required shot blasting flow rate to the controller, so that the controller obtains the flow information. After that, the controller starts the first servo motor according to the force information, and allows the first servo motor to rotate at the preset rotation speed of the first servo motor; the controller controls the steering gear to drive the baffle plate to rotate to a certain angle according to the flow information, so that the shot material box entering the blasting head meets the required shot blasting flow rate. The first servo motor rotates at the preset rotation speed, and the shot material box enters the blasting head according to the preset shot blasting flow rate, thereby reducing the situation where the shot material thrown by the shot blasting machine is small, the force is insufficient, and the roughness of the road surface is insufficient, or the shot material thrown by the shot blasting machine is too much, and the force is too large to damage the road surface.

[0021] Optionally, after starting the first servo motor according to the force information and starting the flow control mechanism according to the flow information, the first turning information is obtained, the first turning information including the first blocking information or the first penetration information, the first blocking information is a signal generated when the infrared sensor is irradiated on the blocking piece, and the first penetration information is a signal generated when the infrared sensor is not irradiated on the blocking piece; determine whether the first turning information is the first blocking information; if so, turn off the first servo motor and the flow control mechanism; if not, return to obtain the first turning information.

[0022] By adopting the above technical solution, after the controller starts the first servo motor and the flow control mechanism, the controller receives the signal sent by the infrared sensor to obtain the first turning information. When the shot blasting machine turns and turns around, the shielding sheet blocks the infrared sensor, and the first turning information is the first blocking information, so that the controller turns off the first servo motor and the flow control mechanism, thereby improving the construction efficiency. When the shot blasting machine keeps moving in a straight line, the shielding sheet does not block the infrared sensor, and the first turning information is the first penetration information, so that the controller re-acquires the first turning information. The controller continuously obtains the first turning information, so that when the shot blasting machine turns and turns around, the controller can turn off the first servo motor and the flow control mechanism in time.

[0023] Optionally, after turning off the first servo motor and the flow control mechanism, second turning information is obtained, the second turning information includes second blocking information or second penetration information, the second blocking information is a signal generated when the infrared sensor is irradiated on the blocking piece, and the second penetration information is a signal generated when the infrared sensor is not irradiated on the blocking piece; determine whether the second turn information is the second blocking information; if so, return to obtain the second turn information; if not, return to start the first servo motor according to the force information, and start the flow control mechanism according to the flow information.

[0024] By adopting the above technical solution, after the shot blasting machine turns off the first servo motor and the flow control mechanism due to turning, the controller continues to receive the signal sent by the infrared sensor to obtain the second turning information. When the shot blasting machine turns, the shielding sheet blocks the infrared sensor, and the second turning information is the second blocking information, and the controller returns to obtain the second turning information. After the shot blasting machine completes the turn, the shielding sheet does not block the infrared sensor, so that the second turning information is the second penetration information. After that, the controller returns to start the first servo motor according to the force information, and starts the flow control mechanism according to the flow information, so that the shot blasting machine starts working again. The controller continuously obtains the second turning information, so that the controller can turn on the first servo motor and the flow control mechanism in time after the shot blasting machine completes the turn.

[0025] Optionally, after starting the first servo motor according to the force information and starting the flow control mechanism according to the flow information, opening and closing information is also obtained, the opening and closing information includes starting information or closing information, the starting information is a signal when the first servo motor is started, and the closing information is a signal when the first servo motor is closed; determine whether the opening and closing information is the starting information; if so, obtain the speed information, the speed information is the rotation speed of the first servo motor; if not, return to obtain the opening and closing information;

[0026] After obtaining the speed information, the speed of the first servo motor is adjusted according to the speed information and the force information; and the opening and closing information is returned.

[0027] By adopting the above technical solution, after starting the first servo motor according to the force information and starting the flow control mechanism according to the flow information, the controller will obtain the opening and closing information. When the first servo motor is started, the opening and closing information is the starting information. After that, the controller will obtain the rotation speed of the first servo motor, compare the rotation speed of the first servo motor with the pre-set force information, and then adjust the actual rotation speed of the first servo motor to be equal to the force information, thereby reducing the occurrence of low force of shot blasting in the shot blasting machine.

[0028] When the first servo motor is turned off, the opening and closing information is the closing information. The controller will reacquire the opening and closing information, thereby reducing the situation where the controller stops adjusting the rotation speed of the first servo motor after the shot blasting machine turns around and turns off the first servo motor.

[0029] In summary, the present application includes at least one of the following beneficial technical effects:

[0030] 1. When the shot blasting machine turns around, the turning detection mechanism detects that the shot blasting machine turns around, and then the controller automatically turns off the first servo motor and the flow control mechanism, so that the shot blasting machine stops blasting. After the shot blasting machine turns around and is straightened, the controller automatically starts the first servo motor and the flow control mechanism, so that the shot blasting machine starts blasting, thereby improving the construction efficiency;

[0031] 2. The shot material projected onto the road surface will be attracted by the magnetic frame and adsorbed onto the magnetic frame. Then the shot material will block the gap between the magnetic frame and the ground, thereby reducing the splashing of the shot material projected by the shot blasting machine and affecting the recovery of the shot material. At the same time, the magnetic frame does not contact the ground, thereby reducing the wear of the magnetic frame.

[0032] 3. The controller continuously obtains the first turning information, so that the controller can turn off the first servo motor and the flow control mechanism in time when the shot blasting machine turns. At the same time, the controller continuously obtains the second turning information, so that the controller can turn on the first servo motor and the flow control mechanism in time after the shot blasting machine returns to the normal position. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 is a schematic diagram of the overall structure of the first viewing angle of Example 1 of the present application;

[0034] Figure 2 is an exploded view of Example 1 of the present application;

[0035] Figure 3 is a schematic diagram of the overall structure of the second viewing angle of Example 1 of the present application;

[0036] Figure 4 yes Figure 3 Sectional view at AA;

[0037] Figure 5 11 is a structural diagram of the flow control mechanism of Example 1 of the present application;

[0038] Figure 6 is a schematic diagram of the overall structure of the third viewing angle of Example 1 of the present application;

[0039] Figure 7 It is a partial structural diagram of Example 1 of the present application, which mainly reflects the structure of the turning detection mechanism;

[0040] Figure 8 is a principle block diagram of the turning detection mechanism of Example 1 of the present application;

[0041] Fig. 9 is a principle block diagram of the first servo motor of Embodiment 1 of the present application;

[0042] Fig.10 This is a partial principle block diagram of the first servo motor of Example 2 of the present application.

[0043] Fig.11 This is another part of the principle block diagram of the first servo motor in Example 2 of the present application

[0044] Explanation of the accompanying drawings: 1. frame; 2. pill box; 3. box cover; 4. first discharge pipe; 5. second discharge pipe; 6. flow control mechanism; 61. steering gear; 62. baffle plate; 63. rotating rod; 7. gear transmission box; 8. throwing head; 9. first servo motor; 10. second servo motor; 11. pill box; 12. magnet frame; 13. recovery pipe; 14. dust suction pipe; 15. baffle plate; 16. take-in and put-out port; 17. filter screen; 18. driven wheel; 19. driving wheel; 20. support tube; 21. support rod; 22. support plate; 23. handle; 24. turning detection mechanism; 241. infrared sensor; 242. shielding plate; 243. support seat; 244. limit ring; 25. first slide; 26. second slide; 27. controller; 28. operation screen. DETAILED DESCRIPTION

[0045] The following is combined with Figure 1-11 This application is described in further detail.

[0046] Example 1.

[0047] The embodiment of the present application discloses an intelligent shot blasting machine and a control method thereof.

[0048] Reference Figure 1 , Figure 2 An intelligent shot blasting machine includes a frame 1, a shot box 2 is fixedly installed on the top side of the frame 1, the top side of the shot box 2 has an opening for placing shot materials, and the opening on the top side of the shot box 2 is matched with a box cover 3.

[0049] Reference Figure 3 , Figure 4 The bottom side of the pill box 2 is tapered, and a first discharge pipe 4 is fixedly installed on the bottom side of the pill box 2. The bottom side of the pill box 2 is tapered, so that the pills inside the pill box 2 can enter the first discharge pipe 4.

[0050] Reference Figure 4 , Figure 5 The first discharge pipe 4 is provided with a flow control mechanism 6, which includes a steering gear 61, a baffle plate 62 and a rotating rod 63. The baffle plate 62 and the rotating rod 63 are located inside the first discharge pipe 4 at one end close to the pill box 2. The rotating rod 63 is fixedly mounted on one side of the baffle plate 62, the steering gear 61 is fixedly mounted on the outer wall of the first discharge pipe 4, and the rotating shaft of the steering gear 61 is fixedly connected to the rotating rod 63. The steering gear 61 drives the rotating rod 63 to rotate, and the rotating rod 63 drives the baffle plate 62 to rotate. By rotating the baffle plate 62 at different angles, the flow rate of the pills from the pill box 2 entering the first discharge pipe 4 is controlled.

[0051] Reference Figure 2 , Figure 4 A gear transmission box 7, a first servo motor 9 and a blasting head 8 are fixedly mounted on one side of the frame 1. The first servo motor 9 and the blasting head 8 are both connected to the gear transmission box 7, so that when the first servo motor 9 is started, the first servo motor 9 drives the blasting head 8 to rotate. The end of the first discharge pipe 4 away from the shot box 2 is connected to the blasting head 8, and the shot inside the shot box 2 enters the blasting head 8 along the first discharge pipe 4.

[0052] Reference Figure 4 , Figure 6 A pill box 11 is fixedly installed on the bottom side of the frame 1, and a magnet frame 12 is fixedly installed on the inner wall of the pill box 11. The pill box 11 has an opening, and the opening faces downward. A second discharge pipe 5 is fixedly installed between the blasting head 8 and the bottom of the pill box 11, and the second discharge pipe 5 is tilted. When the first servo motor 9 drives the blasting head 8 to rotate through the gear transmission box 7, the blasting head 8 tilts the pills along the second discharge pipe 5 toward the road surface, thereby increasing the roughness of the road surface. Afterwards, part of the pills on the road surface will be adsorbed in the gap between the magnet frame 12 and the road surface, and the gap between the magnet frame 12 and the road surface will be blocked by the pills, thereby reducing the situation where the pills are projected on the ground and splashed, affecting recycling. At the same time, the magnet frame 12 does not contact the ground, thereby reducing the situation where the magnet frame 12 is damaged by friction with the ground.

[0053] Reference Figure 4A recovery pipe 13 is fixedly installed at the bottom of the pill box 11, and the recovery pipe 13 is tilted so that an angle is formed between the recovery pipe 13 and the second discharge pipe 5. After the pills are tiltedly ejected from the second discharge pipe 5 onto the road surface, the pills hit the road surface and are tilted upward and ejected into the recovery pipe 13. The recovery pipe 13 is tilted, so that the pills can easily enter the recovery pipe 13.

[0054] One end of the recovery pipe 13 away from the pill outlet box 11 is fixedly connected to one side of the pill box 2. A dust suction pipe 14 is fixedly installed on one side of the pill box 2 away from the recovery pipe 13. The dust suction pipe 14 is used to connect a vacuum cleaner. A baffle 15 is provided inside the pill box 2, and the baffle 15 is fixedly connected to the box cover 3. The baffle 15 is located between the dust suction pipe 14 and the recovery pipe 13. After the dust suction pipe 14 is connected to the vacuum cleaner, the pills projected on the ground enter the pill box 2 along the recovery pipe 13. The pills entering the pill box 2 are blocked by the baffle 15, thereby reducing the occurrence of the pills entering the dust suction pipe 14. The recovery pipe 13 is arc-shaped, so that it is convenient for the pills to move along the recovery pipe 13 into the pill box 2.

[0055] Reference Figure 2 , Figure 4 A side wall of the shot box 2 is provided with a take-in and take-out port 16 communicating with the inside of the shot box 2, and a filter screen 17 is passed through the take-in and take-out port 16. The height of the filter screen 17 is lower than the height of the end of the recovery pipe 13 away from the shot box 11, and is also lower than the height of the baffle 15. The shot entering the shot box 2 from the recovery pipe 13 will carry some stones, which are filtered by the filter screen 17, thereby reducing the occurrence of stones entering the blasting head 8 from the first discharge pipe 4.

[0056] Reference Figure 2 , Figure 7 , a driven wheel 18 is fixedly installed on the bottom side of the frame 1. A support tube 20 is fixedly installed on the side of the frame 1 away from the first servo motor 9, and a support rod 21 is rotatably inserted at the bottom end of the support tube 20. A support plate 22 is fixedly installed on the end of the support rod 21 away from the support tube 20. A driving wheel 19 is fixedly installed on the side of the support plate 22 away from the support rod 21. A second servo motor 10 is fixedly installed on the frame 1, and the second servo motor 10 is connected to the driving wheel 19, thereby driving the driving wheel 19 to rotate. The driving wheel 19 is driven to rotate by the second servo motor 10, so as to facilitate the construction personnel to push the shot blasting machine to move. A handle 23 is fixedly installed on the support plate 22. The shot blasting machine is pushed to move by the handle 23, and the driven wheel 18 and the driving wheel 19 are conducive to the construction personnel to push the shot blasting machine to move through the handle 23.

[0057] When the shot blasting machine needs to turn around, the handle 23 is pushed to rotate, and the handle 23 drives the support plate 22 to rotate. The support plate 22 drives the support rod 21 to rotate inside the support tube 20, thereby changing the traveling direction of the driving wheel 19, thereby facilitating the shot blasting machine to turn around.

[0058] Reference Figure 7 , a turning detection mechanism 24 is provided between the support plate 22 and the support tube 20. The turning detection mechanism 24 includes an infrared sensor 241, a shielding piece 242, a support seat 243 and a limiting ring 244. The limiting ring 244 is fixedly sleeved on the support tube 20, and a first sliding opening 25 is axially provided on the side of the limiting ring 244 away from the support plate 22. The infrared sensor 241 is slidably installed inside the first sliding opening 25, and the support seat 243 is fixedly installed on the side of the support plate 22 close to the support rod 21, and a second sliding opening 26 is provided on the support seat 243. The first sliding opening 25 is aligned with the second sliding opening 26, and there are two shielding pieces 242, and the shielding pieces 242 are installed on the support seat 243. One of the shielding pieces 242 is located at one end of the second sliding opening 26, and the other shielding piece 242 is located at the other end of the second sliding opening 26.

[0059] Reference Figure 1 A controller 27 is fixedly mounted on one side of the frame 1 close to the handle 23 , and an operation screen 28 is fixedly mounted on the handle 23 .

[0060] The operation panel 28, the first servo motor 9, the second servo motor 10, the steering gear 61 and the infrared sensor 241 are all electrically connected to the controller 27, and the steering gear 61 is electrically connected to the controller 27, so that the flow control mechanism 6 is electrically connected to the controller 27. The infrared sensor 241 is electrically connected to the controller 27, so that the turning detection mechanism 24 is connected to the controller 27.

[0061] The construction personnel input the required speed of the first servo motor 9 and the discharge speed inside the shot box 2 on the operation screen 28. Then the operation screen 28 sends the required speed of the first servo motor 9 and the discharge speed inside the shot box 2 to the controller 27, and the controller 27 starts the first servo motor 9 to keep the first servo motor 9 at the required rotation speed, so that the force of the shot material projected on the road surface meets the requirements, and reduces the situation where the shot material projected on the road surface is too small and the road surface is not rough enough, or the shot material projected on the road surface is too large and the road surface is damaged.

[0062] At the same time, the controller 27 starts the steering gear 61, which drives the shielding plate 15 to rotate to a certain angle, so that the flow rate of the pills from the pill box 2 entering the first discharge pipe 4 is maintained at the required discharge speed, thereby reducing the situation where a small number of pills are projected onto the road surface, making the road surface not rough enough, or a large number of pills are projected onto the road surface, damaging the road surface.

[0063] When the construction personnel need the shot blasting machine to turn around, the construction personnel rotate the handle 23, and the handle 23 drives the support plate 22 to rotate, thereby changing the direction of travel of the driving wheel 19. The direction of travel is changed by the driving wheel 19, thereby realizing the shot blasting machine turning around.

[0064] When the shot blasting machine turns around, the shielding sheet 242 shields the infrared sensor 241, and the infrared sensor 241 sends a signal to the controller 27 that the shot blasting machine is turning, and the controller 27 turns off the first servo motor 9 and the flow control mechanism 6. The first servo motor 9 is turned off, so that the blasting head 8 stops blasting; the flow control mechanism 6 is turned off, so that the shot material stops entering the blasting head 8 from the shot material box 2.

[0065] After the construction personnel push the shot blasting machine to turn around, the handle 23 is returned to the normal position, and the light emitted by the infrared sensor 241 passes through the second slide 26, so that the infrared sensor 241 transmits a signal to the controller 27 that the shot blasting machine has completed turning. Then the controller 27 restarts the first servo motor 9 and the flow control mechanism 6. When turning around, the controller 27 automatically turns off the first servo motor 9 and the flow control mechanism 6, and after the shot blasting machine returns to the normal position, the controller 27 automatically starts the first servo motor 9 and the flow control mechanism 6, thereby reducing the time wasted by the construction personnel in operating the shot blasting machine, thereby improving the construction efficiency.

[0066] Reference Figure 8 , a control method of an intelligent shot blasting machine, in order to improve the construction efficiency, this application includes the following steps:

[0067] S101: Acquiring force information. The construction worker inputs the required rotation speed of the first servo motor 9 into the operation screen 28, and then the operation screen 28 sends the preset rotation speed of the first servo motor 9 to the controller 27, so that the controller 27 acquires the force information.

[0068] S102: Obtaining flow rate information. The construction personnel input the required shot blasting flow rate into the operation panel 28, and then the operation panel 28 sends the preset shot blasting flow rate to the controller 27, so that the controller 27 obtains the flow rate information.

[0069] S103: Start the first servo motor 9 according to the force information, and start the flow control mechanism 6 according to the flow information. The controller 27 starts the first servo motor 9 according to the force information, so that the first servo motor 9 rotates at a preset rotation speed. The controller 27 starts the flow control mechanism 6 according to the flow information, so that the speed at which the shot box 2 conveys the shot to the blasting head 8 is maintained at the required shot blasting flow rate.

[0070] S104: Obtain first turning information. The first turning information includes first shielding information or first penetration information. The first shielding information is a signal generated when the infrared sensor 241 irradiates the shielding sheet 242, and the first penetration information is a signal generated when the infrared sensor 241 does not irradiate the shielding sheet 242. The signal generated by the infrared sensor 241 is sent to the controller 27, so that the controller 27 obtains the first turning information.

[0071] S105: Determine whether the first turning information is the first blocking information; if so, execute S106; if not, return to S104.

[0072] S106: Turn off the first servo motor 9 and the flow control mechanism 6. When the shot blasting machine turns, the infrared sensor 241 irradiates the shielding sheet 242, so that the first turning information is the first shielding information. Then the controller 27 turns off the first servo motor 9 and the flow control mechanism 6, so that the shot blasting machine stops projecting the shot. When the shot blasting machine turns, the projecting of the shot is automatically stopped, thereby improving the construction efficiency.

[0073] S107: Obtain second turning information. The second turning information includes second shielding information or second penetration information. The second shielding information is a signal generated when the infrared sensor 241 irradiates the shielding sheet 242, and the second penetration information is a signal generated when the infrared sensor 241 does not irradiate the shielding sheet 242. The signal generated by the infrared sensor 241 is sent to the controller 27, so that the controller 27 obtains the second turning information.

[0074] S108: Determine whether the second turning information is the second blocking information; if so, return to S107; if not, execute S109.

[0075] S109: Restore the first servo motor 9 and the flow control mechanism 6 to the state before being closed.

[0076] After the shot blasting machine turns and returns to the normal position, the infrared sensor 241 does not irradiate the shielding sheet 242, so that the second turning information is the second penetration information. Then the controller 27 restarts the first servo motor 9 and the flow control mechanism 6, and makes the power of the first servo motor 9 consistent with that before being shut down, and the state of the flow control mechanism 6 is also consistent with that before being shut down. After the shot blasting machine turns and returns to the normal position, the shot blasting material is automatically started, thereby improving the construction efficiency.

[0077] Reference Figure 8 , Fig. 9 In order to ensure that the force of the shot material projected on the road surface meets the preset shot blasting force, after executing S103, the following steps are also included:

[0078] S201: Acquire opening and closing information. The opening and closing information includes start information or closing information. The start information is a signal generated by the first servo motor 9 received by the controller 27 when the first servo motor 9 is started. The closing information is a signal generated by the first servo motor 9 received by the controller 27 when the first servo motor 9 is closed.

[0079] S202: Determine whether the opening and closing information is the start information. If yes, execute S203; otherwise, return to S201.

[0080] S203: Obtaining rotation speed information. The rotation speed information is the real-time rotation speed of the first servo motor 9. The first servo motor 9 sends the real-time rotation speed to the controller 27, so that the controller 27 obtains the rotation speed information.

[0081] S204: Adjust the rotation speed of the first servo motor 9 according to the rotation speed information and the force information, and then return to S201.

[0082] After starting the first servo motor 9 according to the force information and starting the flow control mechanism 6 according to the flow information, the pellets enter the blasting head 8, thereby reducing the rotation speed of the blasting head 8, and then reducing the rotation speed of the first servo motor 9, so that the rotation speed of the motor is not equal to the required speed.

[0083] The opening and closing information is obtained through the controller 27. When the first servo motor 9 is started, the controller 27 obtains the rotation speed of the first servo motor 9, and the controller 27 compares the rotation speed of the first servo motor 9 with the preset force information, and then adjusts the actual rotation speed of the first servo motor 9 to be equal to the force information, thereby reducing the occurrence of low force of the shot blasting machine.

[0084] When the first servo motor 9 is turned off, the opening and closing information is the closing information. The controller 27 will reacquire the opening and closing information, thereby reducing the situation where the controller 27 stops detecting after the shot blasting machine turns around and turns off the first servo motor 9.

[0085] The implementation principle of an intelligent shot blasting machine and its control method in the embodiment of the present application is as follows: when the shot blasting machine needs to turn around, the turning detection mechanism 24 detects that the shot blasting machine turns around and sends a signal to the controller 27. After receiving the signal from the turning detection mechanism 24, the controller 27 turns off the first servo motor 9 and the flow control mechanism 6. After the shot blasting machine turns around and the shot blasting machine is straightened, the turning detection mechanism 24 detects that the shot blasting machine has not turned around, so that the turning detection mechanism 24 sends a signal to the controller 27, and the controller 27 restarts the first servo motor 9 and the flow control mechanism 6. When the shot blasting machine turns around, the controller 27 automatically opens and closes the first servo motor 9 and the flow control mechanism 6, thereby improving the construction efficiency.

[0086] Example 2.

[0087] The embodiment of the present application discloses an intelligent shot blasting machine and a control method thereof.

[0088] Reference Fig.10 , Fig.11The difference between the control method of an intelligent shot blasting machine of the present application and the first embodiment is that during the use of the shot blasting machine, the stones and pills on the road surface will enter the pill box 2 together, and then be filtered through the filter screen 17, so that the pills enter the first discharge pipe 4, and the stones remain on the filter screen 17. After the stones on the filter screen 17 gradually accumulate, the stones block the filter screen 17, and the pills entering the pill box 2 from the recovery pipe 13 are blocked by the stones, thereby reducing the amount flowing through the first discharge pipe 4, thereby reducing the flow rate of the pills thrown by the shot blasting machine. In order to facilitate the construction personnel to clean the filter screen 17 in time, after executing S204, the present application includes the following steps:

[0089] S205: Obtaining first power information. The controller 27 obtains the power of the current speed of the first servo motor 9, thereby obtaining the first power information.

[0090] S206: Obtaining the second power information. The controller 27 starts the first servo motor 9 according to the force information, and when there is no shot material inside the blasting head 8, the no-load power of the first servo motor 9 is the second power information.

[0091] S207: Acquire first difference information according to the first power information and the second power information. The first difference information is the difference between the first power information and the second power information.

[0092] S208: Obtaining the third power information. The controller 27 calculates the pellets entering the blasting head 8 with the preset flow rate information, and then the first servo motor 9 drives the blasting head 8 to rotate with the required power according to the force information, so that the controller 27 obtains the third power information.

[0093] S209: Acquire second difference information according to the third power information and the second power information. The second difference information is the difference between the third power information and the second power information.

[0094] S210: Obtaining ratio information according to the first difference information and the second difference information. The controller 27 calculates the value obtained by dividing the first difference information by the second difference information as the ratio information.

[0095] S211: Determine whether the ratio information is less than the maximum threshold; if so, execute S211; if not, return to S201. The maximum threshold is a value preset inside the controller 27.

[0096] S212: Obtaining the opening information. The controller 27 obtains the current angle at which the steering gear 61 drives the baffle plate 62 to rotate, so that the controller 27 obtains the opening information. In the embodiment of the present application, the angle at which the baffle plate 62 rotates is between 0° and 90°. At 0°, the baffle plate 62 blocks the first discharge pipe 4, so that the pellets cannot enter the interior of the blasting head 8 from the pellet box 2; when the baffle plate 62 increases from 0° to 90°, the baffle plate 62 blocks the first discharge pipe 4 and then completely opens the first discharge pipe 4.

[0097] S213: Determine whether the opening information is less than 90°; if so, execute S214; if not, execute S215.

[0098] S214: Start the flow control mechanism 6 to increase the outflow speed of the pills. The controller 27 starts the steering gear 61 to drive the baffle plate 62 to rotate, so that the baffle plate 62 increases a certain angle and then closes the steering gear 61.

[0099] S215: Remind the construction personnel that the filter screen 17 is clogged, and then execute S216. The controller 27 notifies the construction personnel through the operation screen 28 that the filter screen 17 is clogged and needs to be cleaned.

[0100] After the filter plate 17 is clogged, the amount of pellets entering the blasting head 8 is reduced, thereby reducing the power required for the first servo motor 9 to maintain the speed displayed by the force information, thereby reducing the first power information. The first power information is reduced, and the second power information is the power of the first servo motor 9 calculated by the controller 27 when it is unloaded, so the second power information remains unchanged, thereby reducing the first difference information. The third power information is also the power calculated by the controller 27 when the pellets enter the blasting head 8 with the flow information and the first servo motor 9 rotates at the speed displayed by the force information, so the third power information remains unchanged, thereby keeping the second difference information unchanged. The first difference information is reduced, while the second difference information remains unchanged, thereby reducing the ratio information.

[0101] When the ratio information decreases to a certain extent, it will be less than the maximum threshold. Then the controller 27 will start the flow control mechanism 6 to increase the outflow speed of the pills, thereby compensating for the reduced pill flow rate due to the blockage of the filter screen 17, thereby reducing the frequency of cleaning the filter screen 17.

[0102] S216: Turn off the servo motor and the flow control mechanism 6. The controller 27 disconnects the servo motor and drives the flow control mechanism 6, thereby blocking the first discharge pipe 4, and then stopping the shot blasting machine. This reduces the occurrence of insufficient shot blasting material thrown by the shot blasting machine and reduces the roughness of the road surface.

[0103] The implementation principle of an intelligent shot blasting machine and its control method in the embodiment of the present application is as follows: stones blocking the filter screen 17 will reduce the amount of shot entering the blasting head 8 from the first discharge pipe 4. The flow control mechanism 6 is activated by the controller 27 to increase the opening of the first discharge pipe 4, thereby compensating for the reduced shot flow rate due to the blockage of the filter screen 17. After the controller 27 activates the flow control mechanism 6 to fully open the first discharge pipe 4, the operation screen 28 reminds the construction personnel that the filter screen 17 is blocked, and the construction of the shot blasting machine is stopped in time, thereby reducing the situation where the shot blasting machine throws out insufficient shot and reduces the roughness of the road surface.

[0104] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An intelligent shot blasting machine, Features: The invention comprises a frame (1), a driven wheel (18) is fixedly mounted on the bottom side of the frame (1), a shot box (2) is fixedly mounted on the top side of the frame (1), a first discharge pipe (4) is fixedly connected to the bottom side of the shot box (2), a flow control mechanism (6) is installed on the first discharge pipe (4), a gear transmission box (7), a first servo motor (9) and a blasting head (8) are fixedly mounted on one side of the frame (1), a handle (23) is arranged on the other side of the frame (1), the first servo motor (9) drives the blasting head (8) to open and close through the gear transmission box (7), the end of the first discharge pipe (4) away from the shot box (2) is connected to the blasting head (8), the blasting head (8) is connected to a second discharge pipe (5), the end of the second discharge pipe (5) away from the blasting head (8) is arranged to be inclined downward, and a support pipe (23) is fixedly mounted on the side of the frame (1) close to the handle (23). 0), a support rod (21) is rotatably inserted at the bottom end of the support tube (20), a support plate (22) is fixedly installed at one end of the support rod (21) away from the support tube (20), a driving wheel (19) is fixedly installed on the side of the support plate (22) away from the support rod (21), the handle (23) is fixedly installed on the support plate (22), a turning detection mechanism (24) is installed between the support plate (22) and the support tube (20), a controller (27) is fixedly installed on the side of the frame (1) close to the handle (23), an operating screen (28) is fixedly installed on the handle (23), the operating screen (28), the first servo motor (9), the turning detection mechanism (24) and the flow control mechanism (6) are all electrically connected to the controller (27), and the controller (27) controls the first servo motor (9) and the flow control mechanism (6) according to the turning detection mechanism (24); The turning detection mechanism (24) comprises an infrared sensor (241), a shielding plate (242), a support seat (243) and a limiting ring (244); the limiting ring (244) is fixedly sleeved on the support tube (20); a first sliding opening (25) is axially opened on a side of the limiting ring (244) away from the support plate (22); the infrared sensor (241) is slidably installed inside the first sliding opening (25); the support seat (243) is fixedly installed on the support plate (22) near the support plate (22). On one side of the rod (21), the support seat (243) is provided with a second sliding opening (26), the first sliding opening (25) is aligned with the second sliding opening (26), there are two shielding sheets (242), the shielding sheets (242) are installed on the support seat (243), one of the shielding sheets (242) is located at one end of the second sliding opening (26), and the other shielding sheet (242) is located at the other end of the second sliding opening (26), and the infrared sensor (241) is electrically connected to the controller (27).

2. An intelligent shot blasting machine according to claim 1, Features: The flow control mechanism (6) comprises a steering gear (61), a material baffle plate (62) and a rotating rod (63); the material baffle plate (62) and the rotating rod (63) are located inside the first discharge pipe (4); the rotating rod (63) is fixedly mounted on one side of the material baffle plate (62); the steering gear (61) is fixedly mounted on the outer wall of the first discharge pipe (4); the rotating shaft of the steering gear (61) is fixedly connected to the rotating rod (63); and the steering gear (61) is electrically connected to the controller (27).

3. The intelligent shot blasting machine according to claim 1, Features: A pill outlet box (11) is fixedly mounted on the bottom side of the frame (1), the pill outlet box (11) has an opening, and the opening of the pill outlet box (11) faces downward, the end of the second discharge pipe (5) away from the blasting head (8) is connected to the body of the pill outlet box (11), and a magnet frame (12) is fixedly mounted on the inner wall of the pill outlet box (11).

4. The intelligent shot blasting machine according to claim 3, Features: A recovery pipe (13) is fixedly installed on the bottom of the pill outlet box (11), and one end of the recovery pipe (13) away from the pill outlet box (11) is connected to a side wall of the pill box (2). A dust suction pipe (14) is fixedly installed on the side of the pill box (2) away from the recovery pipe (13), and the dust suction pipe (14) is used to connect a dust collector. A box cover (3) is matched with the top side of the pill box (2), and a baffle (15) is arranged inside the pill box (2), and the baffle (15) is fixedly connected to the box cover (3), and the baffle (15) is located between the dust suction pipe (14) and the recovery pipe (13).

5. The intelligent shot blasting machine according to claim 4, Features: A side wall of the pill box (2) is provided with a take-in / take-out opening (16) communicating with the interior of the pill box (2), and a filter screen (17) is passed through the take-in / take-out opening (16). The height of the filter screen (17) is lower than the height of the end of the recovery pipe (13) away from the pill outlet box (11).

6. A control method for an intelligent shot blasting machine, applied to the intelligent shot blasting machine according to claim 1, Features: Acquire force information, the force information being the required rotation speed of the first servo motor (9); acquire flow information, the flow information being the required shot blasting flow; start the first servo motor (9) according to the force information, and start the flow control mechanism (6) according to the flow information.

7. A control method for an intelligent shot blasting machine according to claim 6, Features: After starting the first servo motor (9) according to the force information and starting the flow control mechanism (6) according to the flow information, first turning information is obtained, wherein the first turning information includes first blocking information or first penetration information, wherein the first blocking information is a signal generated when the infrared sensor (241) irradiates the blocking sheet (242), and the first penetration information is a signal generated when the infrared sensor (241) does not irradiate the blocking sheet (242); determining whether the first turning information is the first blocking information; if so, turning off the first servo motor (9) and the flow control mechanism (6); if not, returning to obtain the first turning information.

8. The control method of an intelligent shot blasting machine according to claim 7, Features: After the first servo motor (9) and the flow control mechanism (6) are turned off, second turning information is obtained, the second turning information including second shielding information or second penetration information, the second shielding information being a signal generated when the infrared sensor (241) irradiates the shielding sheet (242), and the second penetration information being a signal generated when the infrared sensor (241) does not irradiate the shielding sheet (242); determining whether the second turning information is the second shielding information; if so, returning to obtain the second turning information; if not, returning to start the first servo motor (9) according to the force information, and starting the flow control mechanism (6) according to the flow information.

9. The control method of an intelligent shot blasting machine according to claim 8, Features: After the first servo motor (9) is started according to the force information and the flow control mechanism (6) is started according to the flow information, opening and closing information is also obtained, the opening and closing information includes starting information or closing information, the starting information is a signal when the first servo motor (9) is started, and the closing information is a signal when the first servo motor (9) is closed; judging whether the opening and closing information is the starting information; if so, obtaining the rotation speed information, the rotation speed information is the rotation speed of the first servo motor (9); if not, returning to obtain the opening and closing information; After the rotation speed information is obtained, the rotation speed of the first servo motor (9) is adjusted according to the rotation speed information and the force information; and the opening and closing information is returned to be obtained.