Construction method of drilling and blasting tunnel in soft and water-rich strata using dry ice freezing
By using solid dry ice and pointed cone column design in weak water-rich formations, the problems of uneven freezing and high energy consumption in the frozen soil method are solved, and the freezing effect of efficient and low energy consumption is achieved, ensuring tunnel excavation is carried out. Security and ecological protection.
Patent Information
- Application Number
- CN202210492995.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-11
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-11-11
AI Technical Summary
In weak and water-rich formations, the existing frozen soil method is uneven due to the uneven cooling efficiency of the low-temperature liquid from top to bottom during construction, resulting in uneven freezing intensity of soil above the tunnel, increasing energy consumption and it is difficult to effectively prevent soil from freezing together. This will affect the safety and ecology of tunnel excavation.
A drilling and blasting boring device is adopted, using solid dry ice as a cold source, and the dry ice is broken and piled up on the bottom of the outer tube through the design of a pointed cone column and discharge tube to form a freezing protective layer to ensure that the freezing strength decreases from bottom to top, and Optimize the freezing process through structures such as support joints and polyurethane foam to reduce energy consumption and the integrity of the frozen layer.
The formation of a freezing protective layer with high efficiency and low energy consumption in weak and water-rich formations is achieved, which reduces the integrity of the freezing layer, improves the freezing strength and the safety of tunnel excavation, and reduces the damage to the soil layer ecology.
Smart Images

Figure CN114810094B_ABST
Abstract
Description
[0001] This application is a divisional application with the application date of November 11, 2021, application number 2021113332185, and the invention name being “Drilling and blasting device and drilling and blasting method for soft and water-rich formations”. Technical Field
[0002] The invention relates to the field of engineering machinery, and in particular to a drilling and blasting tunneling device and a drilling and blasting tunneling method for soft and water-rich formations. Background Art
[0003] Drilling and blasting is a commonly used tunnel construction method in current engineering projects. However, this construction method is only used in rock formations. For formations with high sediment and water content (also known as soft and water-rich formations), direct drilling and blasting operations will cause tunnel collapse. Therefore, before tunnel excavation in soft and water-rich formations, it is necessary to use the permafrost method to freeze part of the soil and water together, and use the permafrost method to form a frozen protective layer above the soil layer of the pre-excavated tunnel, and then carry out tunnel drilling and blasting operations below the frozen protective layer.
[0004] At present, the method for freezing the soil layer is to first drive two steel pipes into the soil layer on the ground. The two steel pipes are divided into an inner pipe and an outer pipe. The inner pipe is arranged inside the outer pipe. When performing the freezing operation, firstly, a low-temperature liquid (the freezing temperature is much lower than the freezing temperature of pure water) is filled into the outer pipe. After reaching the bottom of the outer pipe, the low-temperature liquid enters the inner pipe, and then overflows from the bottom of the inner pipe to the top of the pipe for recovery, cooling and reuse. During the reflux process from top to bottom and then from bottom to top, the low-temperature liquid exchanges heat with the water in the soil layer, and the water temperature in the soil layer decreases and freezes, thereby forming a frozen soil layer. The problem with this frozen soil is that, since the low-temperature liquid flows from top to bottom at the beginning, the cooling effect of the low-temperature liquid on the upper soil layer is greater than the cooling effect on the lower soil layer. In fact, the upper soil layer freezes before the lower soil layer during freezing. Therefore, this freezing method freezes all the soil layers above the tunnel together, and freezing all the soil layers above the tunnel will result in higher energy consumption. Summary of the invention
[0005] In view of the above problems, the present invention provides a drilling and blasting excavation device and a drilling and blasting excavation method for soft and water-rich strata.
[0006] The technical solution adopted by the present invention is as follows:
[0007] A drilling and blasting device for soft, water-rich strata comprises a base, a clamping hole is arranged on the base, and the device comprises an outer tube and an inner tube, one tube opening of the outer tube is in a closed state, and both tube openings of the inner tube are in an open state, the inner tube is fixedly arranged in the outer tube, a gap exists between the tube wall of the inner tube and the tube wall of the outer tube, the outer wall of the inner tube is in a corrugated shape, a supporting node is arranged between the outer tube and the inner tube, the central axis of the inner tube coincides with the central axis of the outer tube, the outer tube cooperates with the clamping hole of the base, a truncated cone-shaped discharge pipe is connected to the inner tube, a pointed cone column is arranged at the bottom of the outer tube, and the top of the pointed cone column is located at the tube opening of the discharge pipe.
[0008] Specifically, this type of excavation device is only a machine for freezing the soil layer. The entire equipment also includes a pile driver and a drilling machine. The method of using this device is as follows:
[0009] First, the pile driver drills a hole in the ground, and then the pile driver drives the outer tube (with the inner tube) into the soil. Finally, the base is fixed on the soil surface, and then the outer tube is clamped on the base, and the section of the outer tube outside the soil is fixed on the ground, which plays a clamping and fixing role on the outer tube. After the outer tube is clamped and fixed, the manipulator is used to put solid dry ice particles into the inner tube, and the solid dry ice particles fall down in the inner tube. Since a pointed cone column is placed at the bottom of the outer tube, and a discharge pipe is connected to the mouth of the inner tube, the discharge pipe is located above the pointed cone column. Under the guidance of the discharge pipe, the dry ice will hit the pointed cone column. The impact will cause the dry ice to break and accumulate at the bottom of the outer tube. As the dry ice is continuously released, the broken dry ice will form a dry ice pile around the pointed cone column. In this way, the cold source of the entire tube is located at the bottom, so the soil around the bottom of the tube is frozen to the highest degree. The closer to the ground, the higher the temperature of the tube. Therefore, the freezing strength of the soil is the highest point at the bottom of the tube, and it decreases from bottom to top. In this way, a frozen protective layer can be formed above the pre-excavated tunnel. And because the freezing strength of the soil above the frozen protective layer is relatively weaker or not frozen together at all, it is easier to pull out the outer tube, with lower energy consumption and relatively less damage to the soil ecology.
[0010] Because the temperature of dry ice is generally minus 78°C, even when vaporizing, the temperature of gaseous carbon dioxide is still only minus 20°C. And because the relative molecular mass of carbon dioxide (44) is greater than that of air (29), the carbon dioxide gas produced by the vaporization of dry ice will not naturally rise, but will only accumulate and escape as the dry ice continues to vaporize. Under this temperature condition, the water and soil can be frozen together, and the cold energy of the dry ice can be fully utilized to avoid the waste of cold energy.
[0011] The outer wall of the inner tube is wavy, so that a curved airway is formed between the outer tube and the inner tube. When the dry ice vaporizes, the upstream carbon dioxide gas can stay in the curved airway longer, so that the cold energy of the carbon dioxide gas can be fully utilized. And because the airway is curved, when a high-speed airflow flows through the airway (dry ice sprayed with hot water can generate a high-speed airflow of carbon dioxide in a short time), the high-speed airflow will cause the inner tube and the outer tube to shake, and the shaking of the outer tube will cause the soil to vibrate. The vibration can make part of the gas in the soil escape, reduce the presence of bubbles in the frozen soil layer, and increase the freezing strength of the soil. The vibration can prevent the soil and the outer tube from freezing together, so that the difficulty of removing the outer tube from the soil can be reduced after the freezing operation is completed.
[0012] Optionally, the support joint includes a support tube and an ellipsoidal ball, the support tube wall is provided with air holes, the ellipsoidal ball is slidably fitted with the inner tube wall of the support tube, springs are arranged at both ends of the ellipsoidal ball, the support tube is perpendicular to the outer tube, and there are multiple support tubes, which are staggered between the inner tube and the outer tube.
[0013] In this support section, the support tube is used to support the outer tube and the inner tube. Specifically, the support tube, the outer tube and the inner tube are welded and fixed together. A hole is opened on the support tube, and a spring with an elliptical ball is arranged in the support tube. Such a design has the following effects. First, when there is a rapid airflow passing between the inner tube and the outer tube, the existence of the support tube can reduce the speed of the airflow. At the same time, due to the hole in the support tube, the airflow can drive the elliptical ball in the support tube to move, thereby causing the elliptical ball to collide with the inner tube and the outer tube, causing the inner tube and the outer tube to vibrate. At the same time, when it is necessary to speed up the sublimation speed of dry ice and spray an appropriate amount of water on the dry ice, due to the existence of the support tube with holes, water can be directly sprayed between the inner tube and the outer tube. Due to the existence of the support tube with holes, the support tube can buffer the water and make the water flow gradually drip onto the dry ice in the form of droplets, ensuring that a large amount of liquid will not drip onto the dry ice instantly in a short period of time, thereby causing a large amount of dry ice to vaporize instantly and waste a lot of cold energy. Similarly, when water drops and hits the ellipsoidal sphere, the impact force of the water will cause the ellipsoidal sphere to move and continuously hit the outer tube and the inner tube, causing vibration.
[0014] Optionally, a clamping block is elastically mounted on the base through a spring, and the clamping blocks are distributed around the clamping hole, and an embedded rod is hingedly arranged on the base.
[0015] Because the outer tube may vibrate continuously during the freezing process of the soil, in order to ensure that the outer tube does not deviate due to the vibration, the outer tube is fixed outside the soil layer. The specific fixing method is as follows: first, the outer tube is clamped between the clamping blocks, and then the embedding rod is embedded in the soil. Since the embedding rod is embedded in the soil, the base can be prevented from moving, and the outer tube is elastically clamped together by the clamping blocks, so it has good adaptability to the vibration received by the outer tube during use.
[0016] Optionally, it also includes a core barrel, which is arranged in the inner tube, the space between the core barrel and the inner tube is filled with polyurethane foam, and an end cover is slidably arranged in the core barrel.
[0017] The core is the falling channel of dry ice. The function of the end cap is to block the gas upstream channel after the dry ice is placed on the core, so that the gas can only go through the channel between the inner tube and the outer tube, thereby making full use of the cold energy of carbon dioxide. Similarly, the polyurethane foam is arranged between the core and the inner tube to utilize the heat insulation effect of the polyurethane foam, so that the cold energy of carbon dioxide is transferred to the core as little as possible. The end cap is also connected to a rope, which can take the end cap out of the core at any time as needed.
[0018] Optionally, it also includes an annular tube, which is arranged on the inner tube wall of the outer tube, and has water leakage holes arranged in an array on the annular tube.
[0019] The ring tube with water leakage holes is set to facilitate the spraying of water at the bottom of the outer tube, because sometimes dry ice needs to be vaporized quickly or icicles are formed at the bottom of the tube. At this time, water can be sprayed through the ring tube with water leakage holes, because dry ice will vaporize quickly when it meets water, and a large amount of low-temperature carbon dioxide gas will be generated in a short time.
[0020] Optionally, a collecting end tube is further included, wherein the collecting end tube is detachably arranged on the outer tube and has an hourglass shape.
[0021] The purpose of setting up the collecting end pipe is to collect the carbon dioxide gas escaping from the outer pipe, so that the carbon dioxide can be recycled and reused, and at the same time, it can also prevent the carbon dioxide from causing harm to ground operators and animals and plants on the ground. The specific collecting end pipe is made of silicone. Since the collecting end pipe is in the shape of an hourglass, when the collecting end pipe is clamped and fixed in the outer pipe, pipes of other calibers can be inserted into the collecting end pipe to collect the gas escaping from the outer pipe.
[0022] A drilling and blasting excavation method of the drilling and blasting excavation device is characterized by comprising the following steps:
[0023] S1: Drill a hole above the ground, and after drilling is completed, insert the outer tube and the inner tube into the hole;
[0024] S2: Use a robot to insert dry ice particles into the inner tube, and the dry ice particles fall through the inner tube into the bottom of the outer tube. The dry ice particles are crushed by the sharp cone column and then distributed around the sharp cone column;
[0025] S3: After placing the dry ice, the inner tube is blocked; and the gas leaking out of the outer tube is collected at the mouth of the outer tube;
[0026] S4: After the freezing protection layer is formed, mortises are dug and explosives are buried in the mortises;
[0027] S5: Use explosives to blow out the tunnel.
[0028] In this freezing method, dry ice is suspended at the freezing protection layer to be formed, and heat exchange is carried out between the dry ice and water and soil. This solid-liquid heat exchange cooling method is highly efficient, and only dry ice particles need to be placed to freeze. After freezing, only a freezing protection layer is formed above the tunnel to be excavated. The existence of this freezing protection layer can ensure that the tunnel will not collapse after the tunnel is blasted out. It should be particularly noted that after the tunnel is blasted out, in order to avoid the collapse of the tunnel due to the melting of the freezing protection layer, a supporting structure needs to be quickly built above the tunnel after the tunnel is blasted out (the supporting structure can be an arched reinforced concrete casting ring, a steel arch frame, a steel grille or other temporary reinforcement measures) to prevent the tunnel from collapsing.
[0029] In this freezing method, dry ice is used as the cryogen. Compared with the liquid nitrogen freezing method, the requirements for equipment are greatly reduced, and the soil above the tunnel will not be completely frozen, which can avoid damage to the microbial diversity of the soil above the tunnel. Using liquid nitrogen (and low-temperature brine) to freeze the soil above the tunnel will cause irreparable damage to the microbial diversity of the soil above the tunnel.
[0030] Moreover, the freezing protection layer formed by this freezing method has a high freezing strength in the middle and a low freezing strength on both sides. Under the premise of meeting the protection strength, the energy consumption of such a protection layer will be relatively low.
[0031] Similarly, this freezing method uses dry ice which is solid at normal pressure and will automatically evaporate at normal pressure. This does not require transportation equipment like the liquid freezing method, and the requirements for the sealing of pipeline equipment are greatly reduced.
[0032] Optionally, water is sprayed on the dry ice after the dry ice reaches the bottom of the outer tube.
[0033] Optionally, the bottom of the outer tube is in the shape of a bullet head.
[0034] The bottom of the outer tube is in the shape of a bullet head. The first reason is to increase the contact area between the soil and the outer tube (at the bottom of the tube), which can accelerate the formation of the freezing protection layer. Secondly, because the bottom of the outer tube is in the shape of a bullet head, during the formation of the freezing protection layer, the volume of the frozen soil layer will expand compared to the unfrozen state. Since the bottom of the tube is in the shape of a bullet head, the frozen soil layer will form an upward force on the bottom of the bullet head, so the force has a tendency to push the entire outer tube upward. Therefore, the existence of this force can prevent the bottom of the outer tube from freezing together with the frozen soil layer, so that it can be quickly and smoothly removed after the freezing operation is completed.
[0035] Specifically, an aluminum alloy block is directly welded to the bottom of the outer tube, which is used to seal the tube mouth of the outer tube. One end of the aluminum alloy block is bullet-shaped, and the other end of the aluminum alloy block is cone-shaped. The cone-shaped end of the aluminum alloy block is located inside the outer tube, and the bullet-shaped end of the aluminum alloy block is located outside the outer tube.
[0036] Optionally, there are multiple outer tubes, and the outer tubes are arranged in parallel.
[0037] Specifically, there are multiple outer pipes, and the bottoms of the multiple outer pipes form an arch shape at a cross section below the ground. The arrangement design of the arch shape can form a roughly circular arch-shaped freezing protection layer.
[0038] The beneficial effects of the present invention are that the soil layer can be frozen, and after freezing, a tunnel can be excavated by drilling and blasting. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 This is a schematic diagram of the drilling and blasting device for soft and water-rich formations.
[0040] Figure 2 This is a schematic diagram of the structure of the base.
[0041] Figure 3 This is a schematic diagram of the position relationship between the inner tube and the outer tube in the soil.
[0042] Figure 4 yes Figure 3 An enlarged schematic diagram of point A in the middle.
[0043] The reference numerals in the figure are: 1, end cover; 2, core tube; 3, inner tube; 4, outer tube; 5, bottom of outer tube; 501, pointed cone column; 6, collecting end tube; 7, base; 8, clamping block; 9, embedded column; 10, ring tube; 11, polyurethane foam; 12, discharge pipe; 13, support tube; 14, spring; 15, ellipsoidal ball. DETAILED DESCRIPTION
[0044] The present invention is described in detail below in conjunction with the accompanying drawings.
[0045] Example 1
[0046] See attached Figure 1 ~Attached Figure 4 A drilling and blasting device for a soft and water-rich stratum comprises a base 7, a clamping hole is arranged on the base 7, an outer tube 4 and an inner tube 3, one tube opening of the outer tube 4 is in a closed state, and two tube openings of the inner tube 3 are in an open state, the inner tube 3 is fixedly arranged in the outer tube 4, there is a gap between the tube wall of the inner tube 3 and the tube wall of the outer tube 4, the outer wall of the inner tube 3 is in a corrugated shape, a supporting node is arranged between the outer tube 4 and the inner tube 3, the central axis of the inner tube 3 coincides with the central axis of the outer tube 4, the outer tube 4 cooperates with the clamping hole of the base 7, a truncated cone-shaped discharge pipe 12 is connected to the inner tube 3, a pointed cone column 501 is arranged at the bottom of the outer tube 4, and the top of the pointed cone column 501 is located at the tube opening of the discharge pipe 12.
[0047] Specifically, this type of excavation device is only a machine for freezing the soil layer. The entire equipment also includes a pile driver and a drilling machine. The method of using this device is as follows:
[0048] First, the pile driver drills a hole in the ground, and then the pile driver drives the outer tube 4 (with the inner tube 3) into the soil, and finally fixes the base 7 on the soil surface, and then clamps the outer tube 4 on the base 7, fixes a section of the outer tube 4 outside the soil on the ground, and clamps the outer tube 4. After the outer tube 4 is clamped and fixed, a manipulator is used to put solid dry ice particles into the inner tube 3, and the solid dry ice particles fall downward in the inner tube 3. Since a pointed cone column 501 is placed at the bottom of the outer tube 4, and a discharge pipe 12 is connected to the pipe mouth of the inner tube 3, the discharge pipe 12 is located at the pointed cone. Above the column 501, under the guidance of the discharge pipe 12, the dry ice will hit the pointed cone column 501, and the collision will cause the dry ice to break and accumulate at the bottom of the outer tube 4. As the dry ice is continuously put in, the broken dry ice will form a dry ice pile around the pointed cone column 501, so that the cold source of the entire tube is located at the bottom, so the soil around the bottom of the tube is frozen to the highest degree. The closer to the ground, the higher the temperature of the tube, so the freezing strength of the soil is the highest point at the bottom of the tube, and it decreases from bottom to top, so that a freezing protection layer can be formed above the pre-excavated tunnel. And because the freezing strength of the soil above the freezing protection layer is relatively weaker or not frozen together at all, it is easier to pull out the outer tube 4, the energy consumption is lower, and the damage to the soil ecology is relatively small.
[0049] Because the temperature of dry ice is generally minus 78°C, even when vaporizing, the temperature of gaseous carbon dioxide is still only minus 20°C. And because the relative molecular mass of carbon dioxide (44) is greater than that of air (29), the carbon dioxide gas produced by the vaporization of dry ice will not naturally rise, but will only accumulate and escape as the dry ice continues to vaporize. Under this temperature condition, the water and soil can be frozen together, and the cold energy of the dry ice can be fully utilized to avoid the waste of cold energy.
[0050] The outer wall of the inner tube 3 is in a corrugated shape, so that a curved airway is formed between the outer tube 4 and the inner tube 3. When the dry ice vaporizes, the upstream carbon dioxide gas can stay in the curved airway for a longer time, so that the cold energy of the carbon dioxide gas can be fully utilized. Moreover, since the airway is curved, when a high-speed airflow flows through the airway (dry ice sprayed with hot water can generate a high-speed airflow of carbon dioxide in a short time), the high-speed airflow will cause the inner tube 3 and the outer tube 4 to shake, and the shaking of the outer tube 4 will cause the soil to vibrate. The vibration can make part of the gas in the soil escape, reduce the presence of bubbles in the frozen soil layer, and increase the freezing strength of the soil. Moreover, the vibration can prevent the soil and the outer tube 4 from freezing together, so that the difficulty of removing the outer tube 4 from the soil can be reduced after the freezing operation is completed.
[0051] The support section includes a support tube 13 and an ellipsoidal ball. The tube wall of the support tube 13 is provided with air holes. The ellipsoidal ball and the inner tube 3 wall of the support tube 13 are slidably matched together. Springs 14 are provided at both ends of the ellipsoidal ball. The support tube 13 is perpendicular to the outer tube 4, and there are multiple support tubes 13. The support tubes 13 are staggered between the inner tube 3 and the outer tube 4.
[0052] In this support section, the support tube 13 is used to support the outer tube 4 and the inner tube. Specifically, the support tube 13, the outer tube 4 and the inner tube 3 are all welded and fixed together. A hole is opened on the support tube 13, and a spring 14 with an elliptical ball is arranged in the support tube 13. Such a design has the following effects. First, when a rapid airflow passes through between the inner tube 3 and the outer tube 4, the existence of the support tube 13 can slow down the airflow. At the same time, due to the hole in the support tube 13, the airflow can drive the elliptical ball in the support tube 13 to move, thereby causing the elliptical ball to collide with the inner tube 3 and the outer tube 4, causing the inner tube 3 and the outer tube 4 to vibrate. At the same time, when it is necessary to speed up the sublimation speed of dry ice and spray an appropriate amount of water on the dry ice, due to the presence of the perforated support tube 13, water can be directly sprayed between the inner tube 3 and the outer tube 4. Due to the presence of the perforated support tube 13, the support tube 13 can buffer the water and make the water gradually drip onto the dry ice in the form of droplets, ensuring that a large amount of liquid will not instantly drip onto the dry ice in a short period of time, thereby causing a large amount of dry ice to instantly vaporize and waste a lot of cold energy. Similarly, when water drips and hits the ellipsoid, under the impact of the water, the ellipsoid will move and continuously hit the outer tube 4 and the inner tube 3, causing vibration.
[0053] A clamping block 8 is elastically mounted on the base 7 via a spring 14 , and the clamping blocks 8 are distributed around the clamping holes. An embedded rod is hingedly arranged on the base 7 .
[0054] Because the outer tube 4 may continue to vibrate during the freezing of the soil, in order to ensure that the outer tube 4 does not deviate due to the vibration, the outer tube 4 is fixed outside the soil layer. The specific fixing method is as follows: first, the outer tube 4 is clamped between the clamping blocks 8, and then the embedding rod is embedded in the soil. Since the embedding rod is embedded in the soil, the base 7 can be prevented from moving, and the outer tube 4 is elastically clamped together by the clamping blocks 8, so it has good adaptability to the vibration received by the outer tube 4 during use.
[0055] It also includes a core barrel 2, which is arranged in the inner tube 3, and the space between the core barrel 2 and the inner tube 3 is filled with polyurethane foam 11, and an end cover 1 is slidably arranged in the core barrel 2.
[0056] The core barrel 2 is a falling channel for dry ice, and the function of the end cap 1 is to place the end cap 1 on the core barrel 2 to block the upstream channel of the gas after the dry ice is placed, so that the gas can only go through the channel between the inner tube 3 and the outer tube 4, thereby making full use of the cold energy of carbon dioxide. Similarly, the polyurethane foam 11 is arranged between the core barrel 2 and the inner tube 3 to utilize the heat insulation effect of the polyurethane foam 11, so that the cold energy of carbon dioxide is transferred to the core barrel 2 as little as possible. The end cap 1 is also connected to a rope, and the rope can take the end cap 1 out of the core barrel 2 at any time as needed.
[0057] It also includes an annular tube 10 , which is arranged on the wall of the inner tube 3 of the outer tube 4 , and has water leakage holes arranged in an array on the annular tube 10 .
[0058] The purpose of providing the ring tube with a leaking hole is to facilitate the spraying of water on the bottom of the outer tube 4, because sometimes the dry ice needs to be vaporized quickly or an icicle is formed at the bottom of the tube. At this time, water can be sprayed through the ring tube with a leaking hole, because the dry ice will vaporize quickly when it encounters water, and a large amount of low-temperature carbon dioxide gas will be generated in a short time.
[0059] It also includes a collecting end pipe 6, which is detachably arranged on the outer pipe 4 and has an hourglass shape.
[0060] The collecting end pipe 6 is provided to collect the carbon dioxide gas escaping from the outer pipe 4, so that the carbon dioxide can be recycled and reused, and at the same time, the carbon dioxide can be prevented from causing harm to ground operators and animals and plants on the ground. The collecting end pipe 6 is made of silicone. Since the collecting end pipe 6 is in an hourglass shape, when the collecting end pipe 6 is clamped and fixed in the outer pipe 4, pipes of other calibers can be inserted into the collecting end pipe 6 to collect the gas escaping from the outer pipe 4.
[0061] Need to attach Figure 1 ~Attached Figure 4 To illustrate, the attached Figure 1In order to display all parts in the drawing, each part is enlarged or reduced. The outer tube and the inner tube are reduced, while the collecting end tube is enlarged.
[0062] In this embodiment, the inner and outer tubes are used to reduce (this reduction is relative to the use of a single outer tube) the flow area of carbon dioxide gas in the outer tube, so that the gas can contact the outer tube wall as much as possible, thereby transferring cold energy to the soil layer.
[0063] In this embodiment, the inner tube and the core tube are two stainless steel tubes, which are tightened together with polyurethane foam. The inner tube, the outer tube and the support tube are welded together. During assembly, the support tube is first welded to the inner tube, and then a section of the outer tube is put on the outer side of the inner tube, the outer tube and the support tube are welded together, and then another section of the outer tube is put on the inner tube and welded. After welding is completed, the sections of the outer tube are welded together, and finally a layer of waterproof paint is applied to the outer tube.
[0064] Example 2
[0065] A drilling and blasting excavation method using the drilling and blasting excavation device described in Example 1 comprises the following steps:
[0066] S1: Drill a hole above the ground, and after the drilling is completed, insert the outer tube 4 and the inner tube 3 into the hole; the outer tube 4 is fixed by a base 7;
[0067] S2: Use a manipulator to insert dry ice particles into the inner tube 3, and the dry ice particles fall into the bottom of the outer tube 4 through the inner tube 3. The dry ice particles are crushed by the pointed cone column 501 and then distributed around the pointed cone column 501;
[0068] S3: After placing the dry ice, the inner tube 3 is blocked; and the gas overflowing from the outer tube 4 is collected at the tube mouth of the outer tube 4;
[0069] S4: After the freezing protection layer is formed, mortises are dug and explosives are buried in the mortises;
[0070] S5: Use explosives to blow out the tunnel.
[0071] In this freezing method, dry ice is suspended at the freezing protection layer to be formed, and heat exchange is carried out between the dry ice and water and soil. This solid-liquid heat exchange cooling method is highly efficient, and only dry ice particles need to be placed to freeze. After freezing, only a freezing protection layer is formed above the tunnel to be excavated. The existence of this freezing protection layer can ensure that the tunnel will not collapse after the tunnel is blasted out. It should be particularly noted that after the tunnel is blasted out, in order to avoid the collapse of the tunnel due to the melting of the freezing protection layer, a supporting structure needs to be quickly built above the tunnel after the tunnel is blasted out (the supporting structure can be an arched reinforced concrete casting ring, a steel arch frame, a steel grille or other temporary reinforcement measures) to prevent the tunnel from collapsing.
[0072] In this freezing method, dry ice is used as the cryogen. Compared with the liquid nitrogen freezing method, the requirements for equipment are greatly reduced, and the soil above the tunnel will not be completely frozen, which can avoid damage to the microbial diversity of the soil above the tunnel. Using liquid nitrogen (and low-temperature brine) to freeze the soil above the tunnel will cause irreparable damage to the microbial diversity of the soil above the tunnel.
[0073] Moreover, the freezing protection layer formed by this freezing method has a high freezing strength in the middle and a low freezing strength on both sides. Such a protection layer has relatively low energy consumption while meeting the protection strength requirements.
[0074] Similarly, this freezing method uses dry ice which is solid at normal pressure and will automatically evaporate at normal pressure. This does not require transportation equipment like the liquid freezing method, and the requirements for the sealing of pipeline equipment are greatly reduced.
[0075] When the dry ice reaches the bottom of the outer tube 4, water is sprayed on the dry ice.
[0076] The bottom of the outer tube 4 is in the shape of a bullet head.
[0077] The bottom of the outer tube 4 is in the shape of a bullet head. The first reason is to increase the contact area between the soil and the outer tube 4 (at the bottom of the tube), which can accelerate the formation of the freezing protection layer. Secondly, since the bottom of the outer tube 4 is in the shape of a bullet head, during the formation of the freezing protection layer, the volume of the frozen soil layer will expand compared to the unfrozen state. Since the bottom of the tube is in the shape of a bullet head, the frozen soil layer will form an upward force on the bottom of the bullet head, so the force has a tendency to push the entire outer tube 4 upward. Therefore, the existence of this force can prevent the bottom of the outer tube 4 from freezing together with the frozen soil layer, so that it can be quickly and smoothly removed after the freezing operation is completed.
[0078] Specifically, an aluminum alloy block is directly welded to the bottom of the outer tube 4, and the aluminum alloy block is used to seal the tube mouth of the outer tube 4. One end of the aluminum alloy block is in the shape of a bullet head, and the other end of the aluminum alloy block is in the shape of a pointed cone. The pointed cone-shaped end of the aluminum alloy block is located inside the outer tube 4, and the bullet-shaped end of the aluminum alloy block is located outside the outer tube 4.
[0079] There are multiple outer tubes 4, the outer tubes have the same diameter, and the outer tubes 4 are arranged in parallel. The distance between two adjacent outer tubes is about 1 times the outer diameter of the outer tube.
[0080] Specifically, there are multiple outer tubes 4, and the bottoms of the multiple outer tubes 4 form an arch shape at a cross section below the ground. The arrangement design of the arch shape can form a roughly circular arch-shaped freezing protection layer.
[0081] It should be noted that the depth of the tunnel to be drilled and blasted in this embodiment from the ground is 10m to 20m.
[0082] Moreover, the explosive equivalent of the explosives used in this embodiment cannot be too high, otherwise the frozen protective layer may be directly collapsed. It only needs to blast the soil below the frozen protective layer to produce greater fluidity, and then excavation can be carried out. Similarly, when the width of the tunnel is relatively small, excavation can be carried out directly after the frozen protective layer is formed, rather than using explosives for drilling and blasting operations.
[0083] Example 3
[0084] A method for drilling and blasting an underwater tunnel, firstly transporting various equipment to a ship, then driving the ship to a predetermined position, then sinking an outer pipe (with an inner pipe) into a soil layer below the water surface, and then performing operations according to steps S2 to S4 in implementation 2.
[0085] The above description is only a preferred embodiment of the present invention, and does not limit the patent protection scope of the present invention. Any equivalent transformations made using the specification of the present invention, directly or indirectly used in other related technical fields, are also included in the protection scope of the present invention.
Claims
1. A construction method for drilling and blasting a dry ice frozen tunnel in a soft water-rich stratum, characterized in that: A drilling and blasting device for soft and water-rich formations is used, the drilling and blasting device for soft and water-rich formations comprising a base, a clamping hole is arranged on the base, comprising an outer tube and an inner tube, one tube opening of the outer tube is in a closed state, and both tube openings of the inner tube are in an open state, the inner tube is fixedly arranged in the outer tube, there is a gap between the tube wall of the inner tube and the tube wall of the outer tube, the outer wall of the inner tube is in a corrugated shape, a support node is arranged between the outer tube and the inner tube, the central axis of the inner tube coincides with the central axis of the outer tube, the outer tube is matched with the clamping hole of the base, a truncated cone-shaped discharge tube is connected to the inner tube, a pointed cone column is arranged at the bottom of the outer tube, and the top of the pointed cone column is located at the tube opening of the discharge tube; The support joint includes a support tube and an elliptical ball, the tube wall of the support tube is provided with air holes, the elliptical ball is slidably matched with the inner tube wall of the support tube, springs are arranged at both ends of the elliptical ball, the support tube is perpendicular to the outer tube, and there are multiple support tubes, the support tubes are staggered between the inner tube and the outer tube, and also includes an annular tube, the annular tube is arranged on the inner tube wall of the outer tube, and the annular tube is arranged with water leakage holes, including the following steps: S1: First, transport each device to the ship, then drive the ship to the predetermined location, and then sink the outer tube together with the inner tube into the soil layer below the water surface; S2: Use a manipulator to insert dry ice particles into the inner tube. The dry ice particles fall through the inner tube into the bottom of the outer tube. The dry ice particles are crushed by the sharp cone column and then distributed around the sharp cone column. S3: After placing the dry ice, the inner tube is blocked; and the gas leaking out of the outer tube is collected at the mouth of the outer tube; S4: After the freezing protection layer is formed, mortises are dug and explosives are buried in the mortises; S5: Use explosives to blow out the tunnel.