Prefabricated transition section for steel-concrete wind turbine tower
Through the design of the composite structure of concrete ring pieces and steel ring pieces, and the use of steel strand channels and screw holes for connection, the problem of mismatched connection accuracy of steel-concrete structures in the existing technology is solved, the manufacturing and maintenance costs are reduced, and the reliability is achieved. Replacement of disassembled bolts improves the maintenance efficiency of wind power towers.
Patent Information
- Application Number
- CN202110141367.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-02
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-02-02
AI Technical Summary
The transition section connection nodes of existing steel-concrete wind power towers are complicated to manufacture and have mismatched accuracy, resulting in long manufacturing time, high cost, and difficult maintenance. The embedded anchor bolts cannot be replaced online, which increases maintenance time and cost.
It adopts a composite structure of concrete ring piece and steel ring piece. The concrete ring piece is provided with steel strand channels and the steel ring piece is provided with screw holes. Precision matching is achieved through bolt connection. It is designed as a detachable structure to reduce material use and maintenance complexity.
It simplifies the manufacturing process, reduces manufacturing costs and operation and maintenance costs, solves the accuracy mismatch problem of concrete and steel structure connections, and allows online replacement of damaged bolts, improving maintenance efficiency.
Smart Images

Figure CN114837896B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a steel-concrete structure wind power tower, in particular to a prefabricated transition section cylinder segment for a steel-concrete structure wind power tower. Background Art
[0002] As a clean energy technology, wind power generation is gradually developing inland areas. Due to the low wind speed in inland areas and the increasing power of wind turbines, the diameter of the wind rotor is constantly increasing, and the tower height is also constantly increasing. At present, the tower height of wind turbines on the road in China can reach 120~160m. If all wind turbine towers are made of steel towers with low rigidity, the tower body is prone to resonance and thus damage. Wind turbine towers with steel-concrete structure have been widely used. This structure uses a concrete tower at the bottom of the cylinder and a steel tower at the top of the cylinder. The steel-concrete structure can effectively improve the rigidity of the tower and avoid resonance of the tower. Concrete towers are generally prefabricated in sections and pieces, that is, the tower is divided into several sections along the height direction, and the sections are divided into several ring pieces along the circumference. The ring pieces are prefabricated in the factory and transported to the site for assembly. After the assembly is completed, the whole section is hoisted. After the hoisting is completed, the concrete tower is prestressed with steel strands to form a whole.
[0003] Generally speaking, the highest section of a concrete tower is used as a transition section, and the top of the section needs to be directly connected to the flange at the bottom of the steel tower, so its stress condition is relatively complex. Chinese patent 202010399351.X discloses a prefabricated and assembled composite tower connection node and its installation method. Although this patent solves the problem of overweight and overwidth transportation of sections, it still has the following problems:
[0004] 1. Nearly 100 prestressed steel bars and dozens of prestressed embedded parts are arranged in the connection node (as the transition section cylinder section). The prestressed steel bars are equivalent to embedded anchor bolts, and the prestressed embedded parts are equivalent to embedded steel strand pipes. In addition, the connection node also includes other components such as upper and lower flanges, which makes the manufacturing process complicated and takes a long time. At the same time, special tooling must be relied on to position the anchor bolts and upper and lower flanges.
[0005] 2. Concrete needs to be vibrated and compacted during pouring, which can easily cause the embedded anchor bolts to shift. At the same time, the assembly of the cylinder segments will also cause a large error between the actual position and the design of the embedded anchor bolts. The flange at the bottom of the steel tower is obtained through precision manufacturing, and the position error of its bolt holes is very small. Therefore, in actual projects, it is very easy for the flange at the bottom of the steel tower to fail to cooperate smoothly with the embedded anchor bolts. The steel tower needs to be returned to the factory to enlarge the bolt holes on the flange, delaying the construction period and increasing costs.
[0006] 3. Considering fatigue performance, these pre-buried anchor bolts are all 1~2m long, and the corresponding material cost is relatively high. At the same time, during the operation of the wind turbine, if some pre-buried anchor bolts are damaged due to fatigue and other reasons, they cannot be replaced online separately. The wind turbine and steel tower can only be disassembled, and the steel tower and wind turbine can be hoisted after the connection nodes are replaced, which greatly increases the maintenance time and maintenance cost. Summary of the invention
[0007] The purpose of the present invention is to provide a prefabricated transition section cylinder segment for a steel-concrete structure wind turbine tower. The composite structure of the concrete ring segments and the steel ring segments is provided in the inner and outer layers. The concrete ring segments are provided with steel strand channels and the steel ring segments are provided with screw holes. This can solve the problem of precision mismatch when connecting the concrete structure and the steel structure, and can reduce the manufacturing cost and the operation and maintenance cost.
[0008] The present invention is achieved in that:
[0009] A prefabricated transition section for a steel-concrete wind power tower, comprising a ring segment and a ring segment connecting plate, wherein two identical ring segments are spliced together to form a hollow truncated cone, wherein the ring segment comprises a concrete ring segment and a steel ring segment, wherein the steel ring segment is attached to the outer surface of the concrete ring segment, wherein the bottom surface of the concrete ring segment is flush with the bottom surface of the steel ring segment, and the height of the steel ring segment is greater than the height of the concrete ring segment;
[0010] A plurality of steel strand holes are arranged in the circumferential direction in the side wall of the concrete ring piece, each of which is arranged parallel to the direction of the truncated cone generatrix and passes through the side wall of the concrete ring piece;
[0011] A flange is arranged on the top of the steel ring piece, a plurality of first screw holes are arranged on the flange, a flange connecting plate is arranged at the joint of two steel ring pieces, and a second screw hole is arranged on the flange connecting plate; a plurality of circles of stiffening ribs are fixedly arranged on the inner wall of the steel ring piece in the horizontal direction, the stiffening rib at the highest axial position is arranged on the top surface of the concrete ring piece, the stiffening rib at the lowest axial position is arranged on the bottom surface of the concrete ring piece, and the remaining stiffening ribs are embedded in the side wall of the concrete ring piece; a plurality of third screw holes are arranged on the outer wall of the steel ring piece near the vertical joint;
[0012] The length of the ring piece connecting plate is adapted to the height of the steel ring piece, and two vertical rows of fourth screw holes are arranged on the ring piece connecting plate and correspond to the third screw holes respectively.
[0013] The concrete ring piece is provided with a keyway at the vertical joint surface, the keyway extends along the joint surface, and a grouting groove is provided between the top of the keyway and the top surface of the concrete ring piece.
[0014] A plurality of U-shaped steel bars are arranged vertically in the keyway, and the height of the U-shaped steel bars extending out of the vertical splicing surface is less than the depth of the keyway.
[0015] The opening area of the keyway gradually decreases from the keyway opening to the keyway bottom surface.
[0016] A conical surface is arranged on the inner wall of the lower end of the concrete ring piece, and the conical surface is located below the bottom of the keyway. The lower end opening of the steel strand channel is arranged on the conical surface.
[0017] The plurality of steel strand holes are evenly distributed along the circumference or evenly distributed in groups.
[0018] The plurality of stiffening ribs are evenly arranged vertically.
[0019] The stiffening rib is an annular steel plate.
[0020] The diameter of the steel strand hole is 1.5 to 2 times the diameter of the steel strand.
[0021] The prefabricated transition section barrel section for the steel-concrete structure wind turbine tower of the present invention, firstly, only the steel strand hole is set on the concrete ring piece, and no pre-buried anchor bolts are required, which simplifies the manufacturing process of the concrete ring piece and reduces the manufacturing process requirements. Secondly, screw holes are set on the flange of the steel ring piece, which is precisely manufactured by the factory like the flange at the bottom of the steel tower, and the two can be well matched in terms of precision, thereby solving the problem of precision mismatch when the concrete structure and the steel structure are connected. Furthermore, the bolts used to connect the steel ring piece and the steel tower are detachable structures, which not only greatly reduces the bolt length, but also helps to reduce material costs. If individual bolts are damaged during the operation of the wind turbine, only the damaged bolts need to be replaced, which helps to reduce operation and maintenance costs. In addition, the diameter of the steel strand hole is set to 1.5 to 2 times the diameter of the steel strand, so that the steel strand hole of the transition section barrel section can be well matched with the reserved steel strand hole on the basis of the wind turbine tower when the steel strand is tensioned.
[0022] Compared with the prior art, the present invention has the following beneficial effects: the transition section cylinder segment structure is simple and reliable, which effectively solves the problem of precision mismatch when connecting the concrete structure and the steel structure, and reduces material cost, manufacturing cost and operation and maintenance cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a three-dimensional structural schematic diagram of a prefabricated transition section cylinder segment for a steel-concrete structure wind power tower of the present invention;
[0024] Figure 2 It is a top view schematic diagram of the present invention after the steel strands are bundled;
[0025] Figure 3 It is a schematic diagram of the internal three-dimensional structure of the ring piece of the present invention;
[0026] Figure 4 It is a schematic diagram of the axial cross-sectional structure of the ring segment of the present invention.
[0027] In the figure, 1 is a concrete ring piece, 11 is a steel strand hole, 12 is a keyway, 13 is a grouting groove, 14 is a U-shaped steel bar, 15 is a grouting hole, 16 is an anchor plate, 17 is a conical surface, 2 is a steel ring piece, 21 is a flange, 22 is a first screw hole, 23 is a flange connecting plate, 24 is a stiffening rib, 25 is a second screw hole, 3 is a ring piece connecting plate, and 31 is a bolt. DETAILED DESCRIPTION
[0028] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0029] See also Figure 1 and Figure 2 A prefabricated transition section for a steel-concrete wind power tower includes a ring segment and a ring segment connecting plate 3. Two identical ring segments are spliced together to form a hollow truncated cone. The ring segment includes a concrete ring segment 1 and a steel ring segment 2. The steel ring segment 2 is attached to the outer surface of the concrete ring segment 1. The bottom surface of the concrete ring segment 1 is flush with the bottom surface of the steel ring segment 2. The height of the steel ring segment 2 is greater than that of the concrete ring segment 1.
[0030] See also Figure 3 and Figure 4 A plurality of steel strand holes 11 are arranged in the circumferential direction in the side wall of the concrete ring segment 1. Each steel strand hole 11 is arranged parallel to the direction of the truncated cone generatrix and penetrates the side wall of the concrete ring segment 1. The plurality of steel strand holes 11 are evenly distributed or evenly distributed in groups along the circumferential direction. The diameter of the steel strand hole 11 is 1.5 to 2 times the diameter of the steel strand. When the steel strand is bundled, the upper end of the steel strand passes through the steel strand hole and is anchored on the top surface of the concrete ring segment 1 through the anchor plate 15, see Figure 2 The concrete ring piece 1 is provided with a keyway 12 at the vertical joint surface. The keyway 12 extends along the joint surface. A grouting groove 13 is provided between the top of the keyway 12 and the top surface of the concrete ring piece 1. The grouting grooves 13 of the two concrete ring pieces 1 form a grouting hole 15 after being joined. The grouting hole 15 is preferably circular. A plurality of U-shaped steel bars 14 are arranged vertically in the keyway 12. The height of the U-shaped steel bars 14 extending out of the vertical joint surface is less than the depth of the keyway 12. The opening area of the keyway 12 gradually decreases from the opening of the keyway 12 to the bottom surface of the keyway 12.
[0031] A conical surface 17 is arranged on the inner wall of the lower end of the concrete ring segment 1. The conical surface 17 is located below the bottom of the keyway 12, and the lower end opening of the steel strand channel 11 is arranged on the conical surface 17. The top wall thickness of the concrete ring segment 1 is greater than the bottom wall thickness of the concrete ring segment 1. The conical surface 17 makes the lower end wall thickness of the concrete ring segment 1 gradually transition from the top wall thickness to the bottom wall thickness. The lower end opening of the concrete steel strand channel 11 is arranged on the conical surface 17, that is, the steel strand channel 11 is arranged close to the inner wall of the concrete ring segment 1. This is because the transition section barrel segment needs to anchor the steel strand, and its wall thickness is generally thicker, while the wall thickness of the concrete tower barrel segment located below is smaller than the wall thickness of the transition section barrel segment. At the same time, the steel strand must be located on the inner side of the concrete tower barrel segment. Through the structure of the conical surface, the wall thickness of the transition section barrel segment can be gradually transitioned to the wall thickness of the concrete tower barrel segment, avoiding a sudden change in stiffness and ensuring a good force effect.
[0032] A flange 21 is provided at the top of the steel ring piece 2, and a plurality of first screw holes 22 are provided on the flange 21 for bolt connection with the steel tower above. A flange connection plate 23 is provided at the joint of two steel ring pieces 2 on the flange 21, and second screw holes 25 are provided on the flange connection plate 23. The second screw holes 25 are aligned with the first screw holes 22 at the joint of the two steel ring pieces 2, and the first screw holes 22 and the second screw holes 25 are fixedly connected by bolts and nuts.
[0033] Several circles of stiffening ribs 24 are fixedly arranged on the inner wall of the steel ring piece 2 in the horizontal direction, and the steel ring piece 2 is connected to the concrete ring piece 1 through the stiffening ribs 24. Preferably, the stiffening ribs 24 are annular steel plates and are fixed to the inner wall of the steel ring piece 2 through double-sided fillet welds. The stiffening ribs 24 at the highest axial position are arranged on the top surface of the concrete ring piece 1, the stiffening ribs 24 at the lowest axial position are arranged on the bottom surface of the concrete ring piece 1, and the remaining stiffening ribs 24 are embedded in the side wall of the concrete ring piece 1, so that the concrete ring piece 1 and the steel ring piece 2 are firmly connected and subjected to force as a whole. Preferably, several stiffening ribs 24 are evenly arranged vertically.
[0034] The outer wall of the steel ring piece 2 is provided with a plurality of third screw holes near the vertical joint. Preferably, the third screw holes are evenly arranged along the vertical joint. Figure 1 The length of the ring plate connecting plate 3 is adapted to the height of the steel ring plate 2. Two rows of fourth screw holes are vertically arranged on the ring plate connecting plate 3 and correspond to the third screw holes respectively. The third screw hole and the fourth screw hole are fixedly connected by bolts 31 and nuts.
[0035] Preferably, in the size setting of the transition section cylinder segment, the top outer diameter of the transition section cylinder segment is 3~6m and the maximum value of the bottom outer diameter can be 7m, the height of the concrete ring segment is 1.0~2.5m, the height of the steel ring segment is 1.0~2.0m more than the height of the concrete ring segment, the top wall thickness of the concrete ring segment is 500~800mm, and the bottom wall thickness of the concrete ring segment is 250~350mm. The number of stranded wire channels is 12~36. The radius of the grouting hole is 5~10cm, and the depth of the grouting hole is 20~50cm. The opening length of the keyway is 0.8~2.0m, the opening width of the keyway is 300~400mm, the bottom length of the keyway is 0.1m less than the opening length, the bottom width of the keyway is 100mm less than the opening width of the keyway, and the depth of the keyway is 0.2~0.6m. The distance between adjacent U-shaped steel bars is 100~200mm. The wall thickness of the steel ring is 15~40mm, the length of the stiffening rib in the radial direction is 150~400mm, the plate thickness of the stiffening rib is 10~30mm, and the spacing between adjacent stiffening ribs in the axial direction is about 50cm.
[0036] In this embodiment, the height of the concrete ring piece is 2.0m, the height of the steel ring piece is 3.2m, the top surface thickness of the concrete ring piece is 600mm, and the bottom surface thickness of the concrete ring piece is 300mm. The number of steel strand holes is 16, and they are evenly distributed in groups along the circumference, and the diameter of the steel strand hole is 180mm. The diameter of the grouting hole is 5cm, and the depth of the grouting hole is 25cm. The opening length of the keyway is 1.5m, the opening width is 350mm, the bottom length is 1.4m, the bottom width is 250mm, and the depth is 0.25m. The spacing of the U-shaped steel bars is 150mm, and the height of the U-shaped steel bars extending out of the vertical splicing surface is 0.2m. The wall thickness of the steel ring piece is 25mm, and the number of screw holes is 100. The length of the stiffening rib in the radial direction is 200mm, and the plate thickness of the stiffening rib is 20mm. The spacing between adjacent third screw holes is about 100mm.
[0037] During the construction process, the ring segments are transported to the site and assembled on a special assembly platform. After the initial assembly is completed, high-strength grouting material is poured from the grouting holes into the key slots and vibrated to make them dense. Then, the fourth screw hole of the ring segment connecting plate and the third screw hole on the two ring segments are aligned and bolted. Next, the transition section cylinder segment is hoisted to the top of the concrete tower to thread and tension the steel strands. After all the steel strands are tensioned, the steel tower can be hoisted, the anchor holes on the flange at the bottom of the steel tower are aligned with the screw holes on the steel ring segment flange, and the flange connecting plate is placed at the flange joint. After the bolts are inserted and prestress is applied as required, the nuts are tightened to complete the work.
[0038] The prefabricated transition section cylinder segment for the steel-concrete structure wind turbine tower of the present invention solves the problem of precision matching when connecting the concrete tower and the steel tower through the combined structure of the concrete ring segment and the steel ring segment. At the same time, there is no need to embed anchor bolts in the concrete ring segment, and only damaged bolts need to be replaced during operation and maintenance, which can make a positive contribution to reducing material costs, manufacturing costs and operation and maintenance costs.
[0039] The above are only preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A prefabricated transition section for a steel-concrete wind power tower, characterized in that: It comprises a ring piece and a ring piece connecting plate (3), wherein two identical ring pieces are spliced together to form a hollow truncated cone, wherein the ring piece comprises a concrete ring piece (1) and a steel ring piece (2), wherein the steel ring piece (2) is attached to the outer surface of the concrete ring piece (1), the bottom surface of the concrete ring piece (1) is flush with the bottom surface of the steel ring piece (2), and the height of the steel ring piece (2) is greater than the height of the concrete ring piece (1); A plurality of steel strand holes (11) are arranged in the circumferential direction in the side wall of the concrete ring piece (1), and each steel strand hole (11) is arranged parallel to the direction of the truncated cone generatrix and penetrates the side wall of the concrete ring piece (1); A flange (21) is provided on the top of the steel ring piece (2), a plurality of first screw holes (22) are provided on the flange (21), a flange connecting plate (23) is provided on the flange (21) at the joint of two steel ring pieces (2), and a second screw hole (25) is provided on the flange connecting plate (23); a plurality of circles of stiffening ribs (24) are fixedly provided in a horizontal direction on the inner wall of the steel ring piece (2), the stiffening rib (24) at the highest axial position is provided on the top surface of the concrete ring piece (1), the stiffening rib (24) at the lowest axial position is provided on the bottom surface of the concrete ring piece (1), and the remaining stiffening ribs (24) are embedded in the side wall of the concrete ring piece (1); a plurality of third screw holes are provided on the outer wall of the steel ring piece (2) near the vertical joint; The length of the ring piece connecting plate (3) is adapted to the height of the steel ring piece (2), and two vertical rows of fourth screw holes are arranged on the ring piece connecting plate (3) and correspond to the third screw holes respectively.
2. The prefabricated transition section cylinder segment for a steel-concrete structure wind power tower according to claim 1 is characterized in that: The concrete ring piece (1) is provided with a keyway (12) at the vertical joint surface, the keyway (12) extending along the joint surface, and a grouting groove (13) is provided between the top of the keyway (12) and the top surface of the concrete ring piece (1).
3. The prefabricated transition section cylinder segment for a steel-concrete structure wind power tower according to claim 2 is characterized in that: A plurality of U-shaped steel bars (14) are arranged vertically in the keyway (12), and the height of the U-shaped steel bars (14) extending out of the vertical splicing surface is less than the depth of the keyway (12).
4. The prefabricated transition section cylinder segment for a steel-concrete structure wind power tower according to claim 2 is characterized in that: The opening area of the key slot (12) gradually decreases from the opening of the key slot (12) to the bottom surface of the key slot (12).
5. The prefabricated transition section cylinder segment for a steel-concrete structure wind power tower according to claim 1 is characterized in that: A conical surface (17) is provided on the inner wall of the lower end of the concrete ring piece (1), the conical surface (17) is located below the bottom of the keyway (12), and the lower end opening of the steel strand hole (11) is provided on the conical surface (17).
6. The prefabricated transition section cylinder segment for a steel-concrete structure wind power tower according to claim 1 is characterized in that: The plurality of steel strand holes (11) are evenly distributed along the circumferential direction or evenly distributed in groups.
7. The prefabricated transition section cylinder segment for a steel-concrete structure wind power tower according to claim 1 is characterized in that: The plurality of stiffening ribs (24) are evenly arranged vertically.
8. The prefabricated transition section cylinder segment for a steel-concrete structure wind power tower according to claim 1 is characterized in that: The stiffening rib (24) is an annular steel plate.