A kind of frame structure building and construction technology
By using plate columns and beam assembly and casting technology in low-rise buildings, an integrated casting structure is formed, which solves the problems of component scale optimization and performance improvement of traditional frame structures in low-rise buildings, and achieves high prefabrication and seismic resistance and improve leakage resistance, while reducing construction costs.
Patent Information
- Application Number
- CN202110177848.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-09
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional framework structures have space for reasonable component optimization in low-rise buildings, which is difficult to improve the safety performance, seismic resistance, and leakage resistance of the building at the same time, and reduce costs and industrialization rates.
Plate columns and plate beams are used as main components to form an integral wall panel and floor slab through assembly, and concrete is poured in the casting channel between them to form post-pouring columns and post-pouring beams to achieve an integrated casting structure.
It improves the integrity and seismic resistance of the building, enhances the leakage resistance, reduces construction costs, and improves construction efficiency.
Smart Images

Figure CN114908869B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of low-rise building structures in prefabricated buildings, and more specifically to a frame-like structure building and a construction process, which is particularly suitable for low-rise large-span buildings in prefabricated buildings. Background Art
[0002] In the current building construction system, the frame structure is one of the main building systems in high-rise and multi-story mainstream buildings. The traditional standard frame structure building is to first install and assemble the concrete prefabricated beams and columns (or steel structure beams and columns) on site to form a load-bearing frame, or to assemble the formwork on site as required and then pour concrete to form a load-bearing frame, and then attach and install the prefabricated wall panels and prefabricated floor slabs on it, and make effective connections, and finally build a frame structure building. In other words, the traditional standard frame structure building is a frame structure building that is built by assembling and effectively connecting several main independent components such as independent beams, independent columns, independent wall panels, and independent floor slabs. However, when this traditional frame structure is applied to low-rise buildings, there is still a large scale of reasonable optimization space for its frame structure and component varieties to ensure that while improving the safety performance, seismic performance, and anti-leakage performance of the building, the industrialization rate, prefabrication rate, and assembly rate are improved, and the cost of low-rise housing construction is greatly reduced. Summary of the invention
[0003] The purpose of the present invention is to provide a quasi-frame structure building and construction process to address the deficiencies of the above-mentioned prior art. The quasi-frame structure building provided by the present invention is a cast-integral building formed by assembling and pouring slab columns and slab beams as the main components. Compared with traditional frame structure buildings, it has the advantages of high prefabrication rate, high assembly rate, high standardization, high industrialization, high scale, and low cost. The construction process provided by the present invention is to first use slab columns and slab beams to assemble corresponding integral wall panels and integral floor slabs respectively, and then pour concrete slurry into the pouring channels of the post-cast columns and the pouring channels of the post-cast beams to form post-cast columns and post-cast beams respectively, and also pour and connect them into an integral building. This construction process greatly improves the integrity and earthquake resistance of the building, greatly improves the anti-leakage property of the building, greatly improves the construction efficiency, and greatly reduces the construction cost.
[0004] The purpose of the present invention can be achieved by the following technical measures:
[0005] A frame-like structure building of the present invention is an integral frame-like structure building with slab columns and slab beams as main components, and a post-cast column pouring channel and a post-cast beam pouring channel are formed respectively while the slab columns are used to assemble the integral wall panels and the slab beams are used to assemble the integral floor panels, and finally concrete slurry is poured inside and poured to form the integral frame-like structure building; the slab columns are based on strip wall panels, and semi-square column grooves extending in the longitudinal direction are arranged on both sides of the width of the strip wall panels to form a wall panel with column groove structure, and the semi-square column grooves of every two adjacent slab columns are buckled to form a vertically arranged post-cast column pouring channel; the slab beam is based on the strip double-staircase floor slab , and the floor slab with beam groove structure formed by cooperating with the floor bottom cover plate and the two end cover plates, each slab column forms a separate horizontally arranged post-cast beam pouring channel in the middle part of itself, and the left and right wings of the slab column are respectively assembled with the side wings of the adjacent slab columns to form a horizontally combined post-cast beam pouring channel, and a pouring port is provided at one end of each post-cast beam pouring channel; the top ends of the vertically arranged post-cast column pouring channels are connected with the bottom ends of the horizontally arranged post-cast beam pouring channels at the corresponding intersection positions, and after all the post-cast column pouring channels and the post-cast beam pouring channels are connected, an integral pouring channel for all the post-cast columns and post-cast beams in this floor of the building is formed.
[0006] The strip wall panel described in the present invention is a single-plane strip wall panel.
[0007] The strip wall panel described in the present invention is a straight-corner double-plane strip wall panel.
[0008] The strip-type double-staircase floor slab described in the present invention is a prestressed concrete double T-slab that meets the design requirements of the national architectural design atlas 18G432-1.
[0009] The construction process of a frame-like structure building of the present invention is achieved through the following steps:
[0010] A. Arrangement of post-cast column reinforcement cage: Arrange post-cast column reinforcement cage at each predetermined post-cast column position;
[0011] B. Assembling integral wall panels: The semi-square column grooves in each of the two adjacent vertically placed slab columns are sequentially buckled on the periphery of each post-cast column reinforcement cage, and the slab columns with single-plane strip wall panels are combined with the slab columns with straight-corner double-plane strip wall panels to assemble the integral wall panels required for a single-story building. At the same time, every two buckled semi-square column grooves are combined to form a vertically arranged post-cast column casting channel;
[0012] C. Laying the floor bottom sealing plate: Laying the floor bottom sealing plate on the top of the integral wall panel, the floor bottom sealing plate blocks all the top surface areas covering the integral wall panel except the pouring channel of the post-cast column;
[0013] D. Make post-cast beam reinforcement cage: Arrange the post-cast beam reinforcement cage at each predetermined post-cast column position;
[0014] E. Assembling the whole floor: erect the strip double staircase floor side by side on the top surface of the whole wall panel, seal the two ends, and assemble the whole floor with the floor bottom sealing plate; at the same time, form a separate horizontally arranged post-cast beam pouring channel in the middle of each slab column, and assemble the left and right wings of the slab column with the side wings of the adjacent slab column to form a horizontally combined post-cast beam pouring channel, and a pouring port is set at one end of each post-cast beam pouring channel;
[0015] F. Integral pouring: the tops of all the above-mentioned vertically arranged post-casting column pouring channels are connected to the bottoms of the horizontally arranged post-casting beam pouring channels at the corresponding intersection positions, and all the post-casting column pouring channels and the post-casting beam pouring channels are connected to form an integral pouring channel for all the post-casting columns and post-casting columns in the building on this floor; concrete slurry is injected from each pouring port described in step E, and the concrete slurry flows along the integral pouring channel until all the interconnected post-casting beam pouring channels and post-casting column pouring channels are filled, and finally the building on this floor is poured into an integral frame-like structure building;
[0016] G. Repeat the above steps: Repeat the same steps until the next floor is reached.
[0017] The principle of the present invention is as follows:
[0018] The quasi-frame structure building provided by the present invention is a cast-integral building with slab columns and slab beams as main components, and a post-cast column casting channel and a post-cast beam casting channel are formed when the integral wall panels and the integral floor panels are assembled, and then concrete slurry is cast to form a cast-integral building. Compared with traditional frame structure buildings composed of independent beams, independent columns, independent wall panels, independent floor panels and other components, the frame structure building simplifies and unifies the independent components into two types - slab columns and slab beams, which not only greatly reduces the types and costs of corresponding prefabricated molds, but also can achieve high prefabrication rate, high standardization, high industrialization, and high-scale prefabrication production, and also greatly improves assembly efficiency.
[0019] The construction process provided by the present invention is to first assemble the slab columns into an integral wall panel, assemble the slab beams into an integral floor slab, and then pour concrete slurry into the pouring channels formed during the assembling process to respectively form post-cast columns and post-cast beams, and also to pour and connect them into an integral building. Since the frame-like structure building constructed using the construction process of the present invention is an integrally cast building, the integrity and earthquake resistance of the building are greatly improved, the anti-leakage property of the building is greatly improved, the construction efficiency is greatly improved, and the construction cost is greatly reduced.
[0020] The beneficial effects of the present invention are as follows:
[0021] The frame-like structure building provided by the present invention is a cast-integrated building formed by assembling and pouring slab columns and slab beams as main components. Compared with traditional frame structure buildings, it has the advantages of high prefabrication rate, high assembly rate, high standardization, high industrialization, high scale, low cost, etc.; the construction process provided by the present invention is to first use slab columns and slab beams to assemble corresponding integral wall panels and integral floor slabs respectively, and then pour concrete slurry into the post-cast column pouring channel and the post-cast beam pouring channel to form post-cast columns and post-cast beams respectively, and also pour and connect them into an integral building. This construction process greatly improves the integrity and earthquake resistance of the building, greatly improves the anti-leakage property of the building, greatly improves the construction efficiency, and greatly reduces the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of a frame-like structure building of the present invention.
[0023] Figure 2 yes Figure 1 Left view of .
[0024] Figure 3 yes Figure 1 Top view of the .
[0025] Figure 4 yes Figure 3 A partial enlarged view of point M in the middle.
[0026] Figure 5 It is a structural schematic diagram of the plate column in the present invention.
[0027] Figure 6 yes Figure 3 Top view of Structure 1 (single plane strip wall panel).
[0028] Figure 7 yes Figure 3 Top view of structure 2 (straight corner double-plane strip wall panel).
[0029] Serial numbers in the figure: 1. integral wall panel, 2. integral floor slab, 3. plate column, 3-1. strip wall panel, 3-1-1. single-plane strip wall panel, 3-1-2. straight-corner double-plane strip wall panel, 3-2. semi-square column groove, 4. plate beam, 4-1. strip double-staircase floor slab, 4-2. floor bottom sealing plate, 4-3. sealing plates at both ends, 5. post-cast column pouring channel, 6. post-cast beam pouring channel. DETAILED DESCRIPTION
[0030] The present invention will be further described below in conjunction with the accompanying drawings:
[0031] like Figure 1 to Figure 7As shown, a frame-like structure building of the present invention is an integral frame-like structure building with plate columns 3 and plate beams 4 as main components, and post-cast columns and post-cast column casting channels are formed respectively while the plate columns are used to assemble the integral wall panels 1 and the plate beams are used to assemble the integral floor panels 2, and finally the concrete slurry is poured inside and then cast into a composite structure; the plate columns 3 are based on the strip wall panels 3-1, and semi-square column grooves 3-2 extending in the longitudinal direction are arranged on both sides of the width of the strip wall panels to form a wall panel with column groove structure, and the semi-square column grooves 3-2 of each two adjacent plate columns 3 are buckled to form a vertically arranged post-cast column casting channel 5; the plate beams 4 are based on the strip double ladder floor panels 4- 1 is a base, and the floor beam groove structure is formed by cooperating with the floor bottom sealing plate 4-2 and the two end sealing plates 4-3. Each slab column 3 forms a single horizontally arranged post-cast beam pouring channel 6 in the middle of itself, and the left and right wings of the slab column 3 are respectively assembled with the side wings of the adjacent slab columns 3 to form a horizontally combined post-cast beam pouring channel 6, and a pouring port is arranged at one end of each post-cast beam pouring channel 6; the top ends of the vertically arranged post-cast column pouring channels 5 are connected to the bottoms of the horizontally arranged post-cast beam pouring channels 6 at the corresponding intersection positions, and all the post-cast column pouring channels 5 and the post-cast beam pouring channels 6 are connected to form an integral pouring channel for all the post-cast columns and post-cast columns in the building of this floor.
[0032] The strip wall panel 3-1 described in the present invention is a single-plane strip wall panel 3-1-1.
[0033] The strip wall panel 3-1 described in the present invention is a straight-corner double-plane strip wall panel 3-1-2.
[0034] The strip-type double-staircase floor slab (4-1) described in the present invention is a prestressed concrete double T-slab that meets the design requirements of the National Building Design Atlas 18G432-1.
[0035] The construction process of a frame-like structure building of the present invention is achieved through the following steps:
[0036] A. Arrangement of post-cast column reinforcement cage: Arrange post-cast column reinforcement cage at each predetermined post-cast column position;
[0037] B. Assembling integral wall panels: the semi-square column grooves 3-2 in each two adjacent vertically placed slab columns 3 are sequentially buckled on the periphery of each post-cast column reinforcement cage, and the slab columns 3 with single-plane strip wall panels 3-1-1 and the slab columns 3 with straight-corner double-plane strip wall panels 3-1-2 are assembled into the integral wall panels required for the single-story building, and at the same time, every two buckled semi-square column grooves 3-2 are combined to form a vertically arranged post-cast column pouring channel 5;
[0038] C. Laying the floor bottom sealing plate: Laying the floor bottom sealing plate 4-2 on the top of the integral wall panel, the floor bottom sealing plate 4-2 blocks all the top surface areas covering the integral wall panel except the post-casting column pouring channel 5;
[0039] D. Make post-cast beam reinforcement cage: Arrange the post-cast beam reinforcement cage at each predetermined post-cast column position;
[0040] E. Assembling the whole floor: erect the strip-type double staircase floor 4-1 side by side on the top surface of the whole wall panel, seal both ends, and assemble the whole floor with the floor bottom sealing plate 4-2; at the same time, form a single horizontally arranged post-casting beam pouring channel 6 in the middle of each slab column 3, and assemble the left and right wings of the slab column 3 with the side wings of the adjacent slab column 3 to form a horizontally combined post-casting beam pouring channel 6, and a pouring port is provided at one end of each post-casting beam pouring channel 6;
[0041] F. Integral pouring: the tops of all the vertically arranged post-casting column pouring channels 5 are connected to the bottoms of the horizontally arranged post-casting beam pouring channels 6 at the corresponding intersection positions, and all the post-casting column pouring channels 5 and the post-casting beam pouring channels 6 are connected to form an integral pouring channel for all the post-casting columns and post-casting columns in the building on this floor; concrete slurry is injected from each pouring port described in step E, and the concrete slurry flows along the integral pouring channel until all the interconnected post-casting beam pouring channels 6 and post-casting column pouring channels 5 are filled, and finally the building on this floor is poured into an integral frame-like structure building;
[0042] G. Repeat the above steps: Repeat the same steps until the next floor is reached.
Claims
1. A frame-like building. Features: The invention relates to an integral frame-like structure building, which is composed of slab columns (3) and slab beams (4) as main components, and forms a post-cast column pouring channel (5) and a post-cast beam pouring channel (6) respectively while assembling an integral wall panel (1) with the slab columns and assembling an integral floor panel (2) with the slab beams, and finally pours concrete slurry inside and then pours it into the structure. The slab columns (3) are a wall panel with column groove structure formed by arranging semi-square column grooves (3-2) extending in the longitudinal direction on both sides of the width of the strip wall panel, and the semi-square column grooves (3-2) of each two adjacent slab columns (3) are buckled to form a vertically arranged post-cast column pouring channel (5). The slab beams (4) are a floor panel with beam groove structure formed by cooperating with a floor panel bottom cover plate (4-2) and two end cover plates (4-3) with a strip double-staircase floor panel (4-1) as the base, and each slab column (3) has a column groove in the middle. The left and right wings of the slab column (3) are respectively assembled with the side wings of the adjacent slab column (3) to form a horizontally combined slab beam pouring channel (6), and a pouring port is provided at one end of each slab beam pouring channel (6); the tops of the vertically arranged slab column pouring channels (5) are connected to the bottoms of the horizontally arranged slab beam pouring channels (6) at the corresponding intersection positions, and all the slab column pouring channels (5) and the slab beam pouring channels (6) are connected to form an integral pouring channel for all the slab columns and slab beams in the building on this floor; the strip wall panels (3-1) are single-plane strip wall panels (3-1-1) and straight-corner double-plane strip wall panels (3-1-2); the strip double-staircase floor panels (4-1) are prestressed concrete double T-plates that meet the design requirements of the National Building Design Atlas 18G432-1.
2. A construction process for a frame-like structure building according to claim 1, Features: The construction process is achieved through the following steps: A. Arrangement of post-cast column reinforcement cage: Arrange post-cast column reinforcement cage at each predetermined post-cast column position; B. Assembling integral wall panels: the semi-square column grooves (3-2) in each of two adjacent vertically placed slab columns (3) are sequentially buckled on the periphery of each post-cast column reinforcement cage, and the slab columns (3) with single-plane strip wall panels (3-1-1) and the slab columns (3) with straight-corner double-plane strip wall panels (3-1-2) are assembled into integral wall panels required for a single-story building, and at the same time, each two buckled semi-square column grooves (3-2) are combined to form a vertically arranged post-cast column pouring channel (5); C. Laying the floor bottom sealing plate: Laying the floor bottom sealing plate (4-2) on the top of the integral wall panel, wherein the floor bottom sealing plate (4-2) blocks all the top surface areas covering the integral wall panel except the post-casting column pouring channel (5); D. Make post-cast beam reinforcement cage: Arrange the post-cast beam reinforcement cage at each predetermined post-cast beam position; E. Assembling the integral floor slab: erecting the strip-type double-staircase floor slabs (4-1) side by side on the top surface of the integral wall slab, sealing both ends, and assembling the integral floor slab after cooperating with the floor slab bottom sealing plate (4-2); at the same time, forming a single horizontally arranged post-casting beam pouring channel (6) in the middle of each slab column (3), and assembling a horizontally combined post-casting beam pouring channel (6) on the left and right wings of the slab column (3) with the side wings of the adjacent slab column (3), and a pouring port is provided at one end of each post-casting beam pouring channel (6); F. Integral pouring: the tops of all the vertically arranged post-casting column pouring channels (5) are connected to the bottoms of the horizontally arranged post-casting beam pouring channels (6) at the corresponding intersection positions, and all the post-casting column pouring channels (5) and the post-casting beam pouring channels (6) are connected to form an integral pouring channel for all the post-casting columns and post-casting beams in the building on this floor; concrete slurry is injected from each pouring port described in step E, and the concrete slurry flows along the integral pouring channel until all the interconnected post-casting beam pouring channels (6) and post-casting column pouring channels (5) are filled, and finally the building on this floor is poured into an integral frame-like structure building; G. Repeat the above steps: Repeat the same steps until the next floor is reached.
Citation Information
Patent Citations
Lightweight composite prefabricated panel combined type house and building method thereof
CN103669905A
Building with prefabricated reinforced concrete support seat
CN109372112A
Full-dry-type prefabricated concrete slab column structure system
CN109440992A
Frame-like structure building
CN214884353U
Method of constructing a multi-storey building using prefabricated modular panels
US20100058687A1