An integrated optimization method for assembly shop scheduling based on discrete flower pollination algorithm

Through the integrated optimization method of assembly workshop scheduling based on the discrete flower pollination algorithm, the part processing sequence, assembly sequence and worker allocation plan are optimized, which solves the problem of ignoring the worker flexibility factor in the traditional method, achieves an improvement in production efficiency and cost, and enhances manufacturing competitiveness of enterprises.

CN114967615BInactive Publication Date: 2024-10-29UNIV OF ELECTRONICS SCI & TECH OF CHINA
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210547805.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-18
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional assembly workshop scheduling method ignores the flexibility factor of workers, resulting in low production efficiency and high cost. It is difficult to optimize parts processing and assembly sequences and worker allocation plans, which affects the competitiveness of manufacturing enterprises.

Method used

An integrated optimization method for assembly workshop scheduling based on discrete flower pollination algorithm is adopted. By establishing a mathematical model of fitness function and constraint conditions, an improved discrete flower pollination algorithm is proposed, using mixed pollen encoding and redefined cross-pollination and self-pollination methods. , design a mutation operator based on assembly sequence, and optimize the part processing sequence, product assembly sequence and worker allocation plan.

Benefits of technology

It effectively shortens the maximum completion time of products, reduces labor costs and parts inventory time, and improves the production efficiency and competitiveness of manufacturing enterprises.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114967615B_ABST
    Figure CN114967615B_ABST
Patent Text Reader

Abstract

The present invention discloses an assembly workshop scheduling integrated optimization method based on a discrete flower pollination algorithm, comprising the following steps: S1, for the assembly workshop scheduling integrated optimization problem considering worker flexibility, establish a fitness function and constraint condition and other mathematical models; S2, propose an improved discrete flower pollination algorithm, discretize pollen individuals, adopt a mixed pollen encoding adapted to the problem, redefine cross-pollination and self-pollination, design a mutation operator based on assembly sequence, simulate with case studies, and compare with the NSGA-II algorithm operation results to verify the effectiveness of the algorithm. The assembly workshop scheduling integrated optimization method based on the discrete flower pollination algorithm proposed by the present invention can simultaneously optimize the parts processing sequence, product assembly sequence and worker allocation scheme, take the maximum completion time, worker cost and parts inventory time as optimization targets, reduce product production time, reduce production costs, and enhance enterprise competitiveness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of intelligent manufacturing, and in particular relates to an assembly workshop scheduling integrated optimization method based on a discrete flower pollination algorithm. Background Art

[0002] Nowadays, due to the intensified competition among manufacturing enterprises, the previous small-variety and large-batch production method has gradually been unable to meet the personalized needs of customers, and the customized production method based on orders has gradually become one of the main production methods of manufacturing enterprises. Especially for some mechanical products, such as large steam turbines, they are produced by customized production methods with small batches and multiple varieties. Customized production methods are generally carried out in discrete production workshops. Changes in production methods will make the actual workshop production process more unpredictable, and then many problems will arise, such as more parts and complex processes. Discrete manufacturing mainly includes two important stages: parts processing and product assembly. Generally, the best workshop scheduling plan, that is, the parts processing and assembly plan, is generated through the method of assembly workshop scheduling, and the machines are reasonably allocated to different processes, thereby reducing the production completion time of the product and enhancing the competitiveness of discrete manufacturing enterprises.

[0003] At present, the traditional assembly workshop scheduling problem is usually studied based on a given product assembly sequence. However, in the production process of large-scale mechanical products, a production method of parallel parts processing and product assembly is often adopted. Different product assembly sequences will affect the parts inventory time, etc. On the other hand, traditional assembly workshop scheduling often only considers the constraints of processes and machines, but ignores the constraints of workers in the production workshop. In the actual parts processing or assembly process, if the workers lack the required ability to operate the machine or the workers leave their posts, this will make the operation impossible. In addition, different workers often have different types of skills and proficiency, which will also lead to different time and economic costs for different workers to operate the same equipment, thus affecting production efficiency.

[0004] Therefore, it is necessary to study the integrated optimization problem of assembly workshop scheduling considering worker flexibility, and propose an integrated optimization method for assembly workshop scheduling based on discrete flower pollination algorithm, which simultaneously optimizes workshop processing scheduling, product assembly sequence and worker allocation plan, thereby improving the production efficiency of manufacturing enterprises, shortening product manufacturing cycle and reducing production costs.

[0005] The integrated optimization problem of assembly workshop scheduling considering worker flexibility is described as follows: A product consists of N parts and is processed on M machines. i The processing step is Rp iEach processing step is handled by a machine. Each machine has a corresponding set of operators. A worker can be assigned to operate the machine to perform processing operations, but the operation time varies due to the different proficiency of different workers. The production process of the product adopts a production method in which parts processing and product assembly are parallel. After the parts to be assembled are processed, the assembly of the parts can begin. Each part assembly process has a corresponding set of operators, and the assembly time will be different for different operators. In the entire production process, the same worker can only participate in one process at the same time. This problem needs to consider three issues: (a) worker allocation; (b) processing process sorting; (c) assembly sequence planning. Summary of the invention

[0006] The purpose of the present invention is to solve the above problems. In order to improve the production efficiency of manufacturing enterprises and reduce manufacturing costs, an integrated optimization method for assembly workshop scheduling based on discrete flower pollination algorithm is proposed, so that the parts processing sequence, product assembly sequence and worker allocation plan can be optimized at the same time.

[0007] To solve the above problems, the technical solution of the present invention is: an assembly workshop scheduling integrated optimization method based on discrete flower pollination algorithm, comprising the following steps:

[0008] S1: Based on the integrated optimization problem of assembly workshop scheduling considering worker flexibility, a fitness function and a mathematical model of constraints are established.

[0009] S2: In the integrated optimization model of assembly workshop scheduling considering worker flexibility, an improved discrete flower pollination algorithm is proposed, which discretizes pollen individuals, adopts mixed pollen coding suitable for solving this problem, redefines cross-pollination and self-pollination, and designs a mutation operator based on assembly sequence. Combined with case simulation, the effectiveness of the algorithm is verified by comparing it with the NSGA-II algorithm.

[0010] Among them, in step S1, the fitness function and mathematical models such as constraint conditions established according to the integrated optimization problem of assembly workshop scheduling considering worker flexibility are specifically:

[0011] S11: Establishing a fitness function for the integrated optimization problem of assembly shop scheduling considering worker flexibility

[0012] S12: Propose constraints for this problem

[0013] S13: Evaluate the feasibility of the assembly sequence

[0014] In step S2, an improved discrete flower pollination algorithm is proposed, which discretizes pollen individuals, adopts mixed pollen coding suitable for solving the problem, redefines cross-pollination and self-pollination, and designs a mutation operator based on assembly sequence. The specific steps are as follows:

[0015] S21: Design of hybrid pollen encoding method

[0016] S22: Self-pollination

[0017] S23: Cross-pollination

[0018] S24: Mutation operator based on assembly sequence

[0019] The beneficial effects of the present invention are as follows: for the production process of an assembly workshop taking into account worker flexibility, in order to minimize the maximum completion time of the product, minimize the worker cost and minimize the parts inventory time, an assembly workshop scheduling integrated optimization method based on a discrete pollen pollination algorithm is proposed, so that the parts processing sequence, product assembly sequence and worker allocation scheme can be optimized simultaneously. This invention studies the impact of different worker allocation schemes on product production completion time and parts inventory time during the production process of the product, and proposes a mathematical model of the problem based on the integrated optimization problem of assembly workshop scheduling taking into account worker flexibility, and sets the constraints and objective function under the model. In order to solve the problem, an improved discrete flower pollination algorithm is proposed, which adopts a mixed pollen encoding suitable for solving the problem, redefines the cross-pollination and self-pollination methods, and designs a mutation operator based on the assembly sequence. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 Encoding structure for mixed pollen

[0021] Figure 2 Cross-pollination of process codes

[0022] Figure 3 Cross-pollination of worker codes

[0023] Figure 4 Reverse operation for self-pollination

[0024] Figure 5 Insertion operation for self-pollination

[0025] Figure 6 is a mutation operator based on assembly sequence

[0026] Figure 7 Gantt chart for decision making

[0027] Figure 8 Figure 1 for the abstract DETAILED DESCRIPTION

[0028] S1: An integrated optimization mathematical model for assembly workshop scheduling considering worker flexibility is established, and the fitness function and constraints of the model are proposed.

[0029] S11: If there is no assembly interference in the assembly sequence, then the sequence is feasible, and three objective functions MinF1, Min F2 and Min F3 are proposed.

[0030] The objective function F1 is the maximum completion time of the product, which can be expressed by formula (1):

[0031] F1=Ca i (1)

[0032] The objective function F2 is the labor cost in the product production process, which can be expressed by formula (2):

[0033]

[0034] The objective function F3 is the inventory time of parts. The larger the F3, the greater the inventory cost, which can be expressed by formula (3):

[0035]

[0036] Fn i It is part P i Inventory time.

[0037] If assembly interference occurs in the assembly sequence, the three objective functions Min F1, Min F2 and Min F3 can be expressed as:

[0038] F1=Ca i ×10×k (4)

[0039]

[0040]

[0041] k is the number of interferences in the assembly sequence. During the assembly process, if interference occurs in the assembly sequence, the formula will be penalized by increasing the fitness value.

[0042] In the parallel method of part processing and product assembly considering worker flexibility, when the assembly sequence is: {X1,X2,...,Xi,...,Xn}, part P Xi All processing steps have been completed. If part P X(i-1) The assembly operation has not been completed or assigned to part P Xi The workers in the assembly process are currently involved in other processes. Xi They will be temporarily stored in the warehouse, increasing inventory pressure.

[0043] Parts Xi The formula for calculating inventory time is as follows:

[0044] Fn i =max(Xa i -Fp i ,0) (7)

[0045] When assembling parts, when the assembly direction, operation type and assembly tools change. Assembly time will increase, part P i The calculation formula for assembly completion time is as follows:

[0046] Ca i =Xa i +mop i ×T opi +mt i ×T ti +md i ×T di (8)

[0047] S12: In order to solve the integrated optimization problem of assembly shop scheduling considering worker flexibility, in addition to establishing the objective function, the following constraints must also be met in the parallel mode of parts processing and product assembly considering worker flexibility:

[0048] The processing of products needs to ensure the process constraints of parts, which can be obtained:

[0049]

[0050] At the same time, a machine can only process one process, so:

[0051]

[0052] At the same time, a process is only operated on one machine, and we can get:

[0053]

[0054] In the part P i Before assembly, all processing steps of the part have been completed, and we can get:

[0055]

[0056] When the assembly sequence is {X1,X2,...,Xi,...,Xn}, part P X(i-1) The assembly operation of part P can be started only after the assembly operation of part P is completed. Xi After assembly, we can get:

[0057]

[0058] For a machine in a parts processing process that can only be operated by one worker, we can get:

[0059]

[0060] A worker can only operate one processing or assembly process at the same time, so:

[0061]

[0062] One assembly process can only be performed by one worker, so:

[0063]

[0064] S13: In the proposed integrated optimization mathematical model for assembly workshop scheduling considering worker flexibility, in order to obtain the three evaluation function values, it is also necessary to obtain the number of assembly interferences and the feasibility evaluation indicators of the assembly sequence, such as the number of assembly direction changes, the number of assembly method changes, and the number of assembly tool changes. The interference matrix can be obtained through a three-dimensional CAD system. In the spatial rectangular coordinate system, the six basic directions (+x, -x, +y, -y, +z, -z) are feasible assembly directions.

[0065] If a product is assembled from n parts, the interference matrix As shown below.

[0066]

[0067] Among them, element a ij It is part P i Assemble to another part P along a feasible direction k j The interference relationship of is as follows:

[0068]

[0069] During assembly, parts cannot interfere with themselves, so a ii = 0. Part P i When assembled along direction k, it is connected to part P. j The interference relationship between the part P j Assembled to part P along direction -k i The interference relationship is the same. i During assembly, if P i If there is an interference relationship with the assembled parts in the six assembly directions, then the assembly sequence is not feasible. Otherwise, there is a feasible assembly direction so that part P i Assemble to a completed subassembly.

[0070] The interference matrix can also be used to calculate the number of assembly direction changes for a given feasible assembly sequence. If a product is assembled from n parts, let the assembly direction D i (i∈[1,n]) is part P i Assembly direction to the subassembly. For a feasible assembly sequence {X1,X2,...,Xi,...,Xn}, the number of assembly direction changes can be calculated by the following steps:

[0071] Step 1: Let i = 1, q = 1, md i =0, where md i is the number of assembly direction changes.

[0072] Step 2: If D i ∩D i+1 ∩…∩D i+q ≠Φ, and D i ∩D i+1 ∩…D i+q ∩D i+q+1 =Φ, then the part to be assembled P i+q+1 The assembly direction needs to be changed, md i =md i +1, and execute step 3, if not, q=q+1, if i+q+1<m, continue to execute step 2; otherwise, execute step 4.

[0073] Step 3: Assume i=i+q+1, q=1. If i<m, proceed to step 2; if not, proceed to step 4.

[0074] Step 4: End.

[0075] For a set of assembly sequences, calculate the part P i Assembly method and tool change times and solution md i The steps are similar.

[0076] S2: Aiming at the integrated optimization problem of assembly workshop scheduling considering worker flexibility, an improved discrete flower pollination algorithm is proposed. The pollen individuals are discretized, and a mixed pollen encoding suitable for solving this problem is adopted. The cross-pollination and self-pollination methods are redefined, and a mutation operator based on assembly sequence is designed, which is solved by combining cases.

[0077] S21: Hybrid pollen coding mechanism

[0078] In order to solve the problem of integrated optimization of assembly workshop scheduling considering worker flexibility, a two-layer coding based on process and worker is adopted. A hybrid pollen coding mechanism is designed for process sequence, which includes processing sequence and assembly sequence. In the processing sequence part of pollen, each processing process of a part is encoded as an integer at the process layer, and the number of times it appears represents the process number of the part. In the assembly sequence part, the assembly process of the part is also encoded as an integer at the process layer, and the corresponding process at the last appearance of different integers at the process layer represents the assembly process. The order in which the assembly processes appear in the pollen individuals represents the assembly order of the product. If a product consists of n parts, and part P i Before assembly, it needs to be O i The mixed pollen contains ∑O i +n genes, and the processing steps have ∑O i There are n genes in the assembly process, and P in the part i O appears in mixed pollen codes i +1 times.

[0079] The second part is the code for assigning workers. The integer represents the worker number. This part is also composed of ∑O i +n genes, each integer represents the operator number assigned to the process.

[0080] like Figure 1 As shown in the figure, pollen is composed of 4 parts, each part has 2 processing steps. In the process layer coding, the first integer "2" in the pollen coding process layer represents the first process of part 2, the second "2" represents the second process of part 2, and the third "2" represents the assembly process of part 2. The same is true for other parts. In the worker coding, "2-3-3-1-4-2-1-4-2-1-1-3" appears in sequence. The first integer "2" represents the first process of part 1. 11 Assigned to worker 2 for processing, the second "3" represents the second process O of part 1 12 It is assigned to worker 3 for processing. The third "3" represents that the third process P1 of 1, i.e. the assembly process, is assigned to worker 3 for processing, and the same applies to subsequent integers.

[0081] S22: Cross-pollination

[0082] The cross-pollination in the flower pollination algorithm corresponds to the global search in the algorithm. For discrete problems such as assembly workshop scheduling, the cross-pollination strategy in the flower pollination algorithm cannot be directly used to process the iterative update of pollen coding. The cross-pollination method of the flower pollination algorithm is redesigned. During the operation of the algorithm, at the i-th iteration, the pollen individual gbest with the best solution in the population is selected and the pollen X iCross with gbest to generate pollen X i+1 .

[0083] Select the best pollen individual gbest and pollen X in the pollen population i Perform crossover operations. The crossover operations of process codes are as follows: Figure 2 As shown, the specific steps are as follows:

[0084] Step 1: Process the process layer code and randomly generate a part set. For example, if the part set is {2, 3}, determine the process sequence corresponding to the workpiece {2, 3} in gbest and remove X i The process sequence corresponding to the workpiece is {2, 3}.

[0085] Step 2: Copy the gbest corresponding sequence selected in step 1 to X i+1 Corresponding position process.

[0086] Step 3: Select X i The remaining process sequence is copied to X from left to right. i+1 .

[0087] The cross-coding of worker assignments is as follows Figure 3 As shown, the steps are as follows:

[0088] Step 1: Randomly generate a set of binary digits, the length of which is the mixed pollen code length ∑O i +n.

[0089] Step 2: Determine the worker code position number corresponding to the binary number 1, and copy the code value of the corresponding position of gbest to X i+1 .

[0090] Step 3: Determine the worker code position number corresponding to the binary number 0, and set X i The coded value of the corresponding position is copied to X i+1 .

[0091] Step 4: Check the feasibility of worker allocation. After the worker allocation codes are cross-updated, due to the different skills of the workers, if the worker assigned to a process lacks the skills to operate the job and cannot perform the work on the process, it is necessary to reallocate a worker from the available workers in the process to perform the work.

[0092] S22: Self-pollination

[0093] Self-pollination corresponds to the local search process in the algorithm. In the self-pollination link, two kinds of neighborhood structure search methods are introduced to realize the local search of the population for the better pollen individuals in the population. The process of the two neighborhood structures is as follows:

[0094] (1) Reverse order: Randomly select two processes, rearrange the processes between the two processes in the process coding layer in reverse order, and randomly assign workers to perform the reversed processes in the optional worker set, such as Figure 4 shown.

[0095] (2) Insertion: Select a process and insert it into any position in the pollen individual. Assign the process to the worker with the shortest operation time. For the remaining processes, randomly select a worker from the corresponding worker set to perform the operation. Figure 5 shown.

[0096] S23: Mutation operator based on assembly sequence

[0097] The designed self-pollination and cross-pollination strategies are used to handle the two-level coding based on process and worker. At the process level, since the assembly sequence can only be obtained after calculating the position of each assembly process at the process level, for example, a product consists of 4 parts, and each part needs to go through two processing steps before assembly. Its process coding is [132214 2 43 341 ], it can be seen that the corresponding assembly sequence is

[2341] . After the code is iteratively updated, the new process code is [12234 2 3 3 41 41 ], it can be seen that the order of the processing steps and the assembly steps has changed significantly, but the assembly sequence of the pollen individual is still

[2341] . The evaluation indicators of the assembly sequence, such as the number of changes in the assembly method, remain unchanged. In order to maintain the diversity of the assembly sequence, a mutation operator based on the assembly sequence is designed.

[0098] The operation steps of the mutation operator based on the assembly sequence are as follows:

[0099] Step 1: Find the position and sequence of each assembly process in the mixed pollen code to determine the assembly sequence of the pollen individual.

[0100] Step 2: Randomly select two assembly processes from the assembly processes of all parts, and exchange the two assembly processes according to their positions in the process code.

[0101] Step 3: Update the position and sequence of each part assembly process in the generated process code to obtain the iterated assembly sequence.

[0102] Step 4: Randomly assign a worker from the corresponding worker set to operate the two assembly processes selected in step 2 and the process between the two processes.

[0103] like Figure 6As shown in the figure, the assembly sequence of the initial process is 2-4-1-3. Select assembly processes '2' and '3', and exchange the two assembly processes according to their positions in the process code. The processing process remains unchanged. In the generated process code, the position and order of appearance of each assembly process are re-determined. It can be seen that the assembly sequence after iteration is 4-3-1-2. During the iteration process, the position of the processing process between the assembly processes may also change, such as process O 32 By moving forward four bits in the process code, the diversity of the assembly sequence can be maintained through this mutation operator.

[0104] The optimization method proposed in the present invention is described below in conjunction with a specific case to verify the feasibility of the proposed optimization method: Taking the die forging press parts as an example, MATLAB R2014B is used for simulation calculation, and the specific steps are as follows:

[0105] S1: Determine the component composition of the component. The processing and worker allocation information of the parts is shown in Table 1, the assembly and worker allocation information of the parts is shown in Table 2, and the wage rate of each worker is shown in Table 3.

[0106] Table 1

[0107]

[0108]

[0109]

[0110] Table 2

[0111] Part Number 1 2 3 4 5 6 7 8 Worker <![CDATA[W2,W3]]> <![CDATA[W1,W3]]> <![CDATA[W2,W4]]> <![CDATA[W1,W5]]> <![CDATA[W2,W5]]> <![CDATA[W3,W4]]> <![CDATA[W1,W4]]> <![CDATA[W1,W5]]> Operation time 16,11 22,16 16,21 32,39 16,10 19,16 24,30 16,22 Tool Type 1 2 2 1 3 2 2 2 How it works 1 0 0 0 1 2 0 2 Part Number 9 10 11 12 13 14 15 Worker <![CDATA[W3,W5]]> <![CDATA[W1,W4]]> <![CDATA[W2,W5]]> <![CDATA[W3,W4]]> <![CDATA[W1,W2]]> <![CDATA[W3,W5]]> <![CDATA[W2,W4]]> Operation time 16,12 8,12 8,13 24,31 17,24 16,20 16,12 Tool Type 3 3 3 4 4 3 2 How it works 0 2 2 3 3 0 2

[0112] Table 3

[0113] Worker <![CDATA[W1]]> <![CDATA[W2]]> <![CDATA[W3]]> <![CDATA[W4]]> <![CDATA[W5]]> Wage Rate 21 23 25 20 26

[0114] S2: The assembly interference matrix of the components is shown in Tables 4 to 9. Combined with the interference matrix, the feasibility of the assembly sequence is determined.

[0115] Table 4 Part interference matrix in the positive direction of X axis

[0116]

[0117] Table 5 Part interference matrix in the negative direction of the X axis

[0118]

[0119]

[0120] Table 6 Part interference matrix in the positive direction of the Y axis

[0121]

[0122] Table 7 Part interference matrix in the negative direction of the Y axis

[0123]

[0124]

[0125] Table 8 Part interference matrix in the positive direction of Z axis

[0126]

[0127] Table 9 Part interference matrix in the negative direction of the Z axis

[0128]

[0129]

[0130] S3: During the assembly process of the product, when the assembly operation type changes, the setup time increases to 3h, when the assembly tool changes, the setup time increases to 2h, and when the assembly direction changes, the setup time increases to 5h. In the proposed integrated optimization method for assembly workshop scheduling based on discrete flower pollination algorithm, after parameter analysis, the population size is set to 150, the switching probability is set to 0.6, the mutation probability is set to 0.15, and the maximum number of iterations is set to 200.

[0131] Scheduling Gantt results are as follows Figure 7 As shown, the Gantt chart of the production plan contains two parts, the processing scheduling Gantt chart and the assembly scheduling Gantt chart. The processing scheduling Gantt chart expresses the processing sequence of each part by the workers operating the machine. It can be seen that the processing sequence of machine 4 is: 1301-401-1402-1201-1002-902-503-1102. At the same time, the scheduling Gantt chart can be used to know the information of the workers involved in the process operation. For example, process 1301 is the first process of part 13. W5 above 1301 indicates that worker 5 operates machine 4 to process the process. Similarly, it can be seen from the Gantt chart that 401 is the first process of part 4, and worker 1 operates machine 4 to process the process. 1402 is the second process of part 14, and worker 1 operates machine 4 to process the process. According to Figure 7From the processing sequence of the Gantt chart, we can know the start and end time of different workers operating the machine to perform different processing procedures on the workpiece. The research case of the present invention is a die forging press component composed of 15 parts. Each part includes 3 processing procedures. Each part can undergo an assembly process after processing. The fourth process of each part represents the assembly process of the part. The information of the workers involved in the assembly process can be seen from the Gantt chart. For example, 104 is the fourth process of part 1, i.e., the assembly process, which is completed by worker 3. 804 represents the assembly process of part 8, which is completed by worker 1, and 204 represents the assembly process of part 2, which is completed by worker 1. Through the assembly scheduling Gantt chart, the assembly sequence of the product and the assembly start and end time of all workpieces during the assembly process can also be obtained.

[0132] The scheduling plan obtained by calculation optimizes three optimization objectives, namely the maximum completion time of the product, the worker cost and the inventory time of the parts. In the optimal solution obtained, the values ​​of the three optimization objectives are the product completion time of 731h, the worker cost of 37,982 yuan, and the inventory time of the parts of 458h. In this production plan, 109 hours after the start of part processing, the assembly process of part 1 is started by worker 3. After that, the processing and assembly processes of the parts will also be carried out at the same time. The same worker can only operate one processing process or assembly process at the same time. From the assembly sequence of the Gantt chart, it can be seen that the assembly sequence of the production plan is: 1-8-2-14-13-12-3-6-7-4-9-5-11-10-15. According to the assembly interference matrix calculation, during the production process,

[0133] The assembly direction changed 4 times, the assembly tools changed 7 times, and the assembly method changed 8 times.

[0134] In order to verify the performance of the discrete flower pollination algorithm in calculating the integrated optimization problem of assembly workshop scheduling considering worker flexibility, two performance indicators are used: the number of non-dominated solutions W np and the ratio of non-dominated solutions W rd . Let M j is the set of non-dominated solutions calculated by algorithm j. Reference set M p It is the Pareto solution obtained by merging the Pareto solutions obtained by the algorithms involved in the comparison and then performing non-dominated sorting on the merged solutions, that is, M p =∪M j The descriptions of the two indicators are as follows:

[0135] 1. Number of non-dominated solutions

[0136] The number of non-dominated solutions is the number of solutions that are not included in the reference set M in the Pareto solution set obtained. p The number of solutions dominated by the solution set is calculated as follows:

[0137]

[0138] 2. Proportion of Non-dominated Solutions

[0139] The proportion of non-dominated solutions refers to the number of non-dominated solutions W in the Pareto solution set. np The proportion of the total number of non-dominated solutions is calculated as follows:

[0140]

[0141] The larger the above two indicators are, the better the performance of the algorithm is. The discrete flower pollination algorithm and the NSGA-II algorithm are used to calculate and solve this case. The population size of the NSGA-II algorithm is 150, the crossover rate is 0.6, and the mutation rate is 0.15. The two algorithms are iterated 200 times each. The results of the two performance indicators of the algorithm are shown in Table 10.

[0142] Table 10

[0143] Algorithms\Performance Indicators <![CDATA[Number of non-dominated solutions W np > <![CDATA[Non-dominated solution proportion W rd > Discrete Flower Pollination Algorithm 20 0.741 NSGA-II 15 0.577

[0144] And the non-dominated solution set obtained by the final iteration can be obtained from Table 11. Among them, the optimal values ​​of the three optimization objectives of maximum completion time, total parts inventory time and worker cost are 596, 169h and 37982 yuan respectively. In the non-dominated solution set obtained by solving this case using the NSGA-II algorithm, the optimal values ​​of the three optimization objectives of maximum completion time, total parts inventory time and worker cost are 658h, 245h and 38127 yuan respectively. According to the above analysis, the proposed discrete flower pollination algorithm has better performance in solving the integrated optimization problem of assembly workshop scheduling considering worker flexibility.

[0145] Table 11

[0146]

[0147] In order to solve the problem of integrated optimization of assembly workshop scheduling considering worker flexibility, an integrated optimization method for assembly workshop scheduling based on discrete flower pollination algorithm is proposed, which optimizes the parts processing sequence, worker allocation scheme and product assembly sequence at the same time, so as to shorten the total production completion time, worker cost and total parts inventory time in the production process. The present invention studies the influence of worker allocation scheme on the production completion time and parts inventory time of the product, and establishes mathematical models such as fitness function and constraint conditions under this problem. On this basis, an integrated optimization method for assembly workshop scheduling based on discrete flower pollination algorithm is proposed for solution. The method proposed by the invention can effectively shorten the production time of assembly workshop products, reduce production costs and enhance enterprise competitiveness.

Claims

1. An integrated optimization method for assembly shop scheduling based on discrete flower pollination algorithm, characterized by: The following steps are involved: S1: Establish the fitness function and constraint mathematical model for the integrated optimization problem of assembly workshop scheduling considering worker flexibility; S2: To solve the above problems, an improved discrete flower pollination algorithm is proposed. A mixed pollen encoding method suitable for solving this problem is adopted, the self-pollination and cross-pollination methods of the flower pollination algorithm are redefined, and a mutation operator based on assembly sequence is designed. The feasibility of the proposed algorithm is proved by comparing it with the NSGA-II algorithm. The assembly workshop scheduling integrated optimization method based on discrete flower pollination algorithm considers the assembly workshop scheduling integrated optimization problem of worker flexibility, establishes a fitness function and a constraint condition mathematical model, and is characterized in that: the step S1 specifically includes the following contents: S11: If the given assembly sequence does not have assembly interference, then the sequence is feasible, and the objective functions MinF1, Min F2 and Min F3 are established: The objective function Min F1 is the maximum completion time of the product, expressed by formula (1): F1=Ca i (1) The objective function Min F2 is the worker's operating cost, expressed by formula (2): The objective function Min F3 is the inventory time of parts, expressed by formula (3): If assembly interference occurs in the assembly sequence, the objective functions Min F1, Min F2 and Min F3 can be expressed as: F1=Ca i ×10×k (4) k is the number of interferences in the assembly sequence. When assembly interference occurs, it is penalized by increasing the fitness value; S12: In order to solve the integrated optimization problem of assembly shop scheduling considering worker flexibility, in addition to establishing the optimization objective function, the following constraints also need to be met during the parallel parts processing and assembly process: Part processing needs to meet process constraints: At the same time, each machine can only process one process: Each process of the part is performed on only one machine: In the part P i Before assembly, all processing steps of the part have been completed: When the assembly sequence is {X1,X2,...,Xi,...,Xn}, part P X(i-1) Only after the assembly operation of part P is completed can the Xi To assemble: For a machine that processes parts, only one worker can operate it: Any worker can only operate one processing or assembly process at the same time: An assembly process can only be performed by one worker: S13: In the proposed integrated optimization mathematical model for assembly workshop scheduling considering worker flexibility, in order to obtain the three evaluation function values, it is also necessary to obtain the number of assembly interferences and the feasibility evaluation index of the assembly sequence, including the number of assembly direction changes, the number of assembly method changes, and the number of assembly tool changes; the interference matrix can be obtained through the three-dimensional CAD system. In the spatial rectangular coordinate system, the six basic directions (+x, -x, +y, -y, +z, -z) are feasible assembly directions; If a product is assembled from n parts, the interference matrix As shown below: Among them, element a ij It is part P i Assemble to another part P along a feasible direction k j The interference relationship is as follows: During assembly, parts cannot interfere with themselves, so a ii =0; Part P i When assembled along direction k, it is connected to part P. j The interference relationship between the part P j Assembled to part P along direction -k i The interference relationship is the same; when part P i During assembly, if P i If there is an interference relationship with the assembled parts in the six assembly directions, then the assembly sequence is not feasible. Otherwise, there is a feasible assembly direction so that part P i Assemble to a completed subassembly; Through the interference matrix, the number of assembly direction changes for a given feasible assembly sequence can be calculated; if the product is assembled from n parts, let the assembly direction D i (i∈[1,n]) is part P i Assembly direction to the subassembly. For a feasible assembly sequence {X1,X2,...,Xi,...,Xn}, the number of assembly direction changes can be calculated by the following steps: Step 1: Let i = 1, q = 1, md i =0, where md i is the number of assembly direction changes; Step 2: If D i ∩D i+1 ∩…∩D i+q ≠Φ, and D i ∩D i+1 ∩…D i+q ∩D i+q+1 =Φ, then the part to be assembled P i+q+1 The assembly direction needs to be changed, md i =md i +1, and execute step 3, if not, then q=q+1, if i+q+1<m, continue to execute step 2; otherwise, execute step 4; Step 3: Let i = i + q + 1, q = 1, if i < m, proceed to step 2; if not, proceed to step 4; Step 4: End; For a set of assembly sequences, calculate the part P i Assembly method and tool change times and solution md i The steps are similar; The assembly workshop scheduling integrated optimization method based on discrete flower pollination algorithm proposes an improved discrete flower pollination algorithm, discretizes pollen individuals, adopts mixed pollen coding suitable for solving the problem, redefines cross-pollination and self-pollination, designs a mutation operator based on assembly sequence, and solves the problem in combination with cases, characterized in that: step S2 includes the following contents: S21: Hybrid pollen coding mechanism based on processing and assembly procedures In order to solve the integrated optimization problem of assembly workshop scheduling considering worker flexibility, a double-layer coding based on process and worker is used to represent individual flowers. At the process layer, a mixed pollen coding mechanism based on processing and assembly processes is designed. In the processing sequence part of pollen, each processing process of a part is encoded as an integer at the process layer, and the number of times it appears represents the process number of the part. In the assembly sequence part, the assembly process of the part is also encoded as an integer at the process layer, and the corresponding process at the last appearance of different integers at the process layer represents the assembly process. The order in which the assembly processes appear in the pollen individual represents the assembly order of the product. If a product consists of n parts and part P i Before assembly, it needs to be O i The mixed pollen contains ∑O i +n genes, and the processing steps have ∑O i There are n genes in the assembly process, and n genes in the part P i O appears in mixed pollen codes i +1 times; The second part is the code for assigning workers. The integer represents the worker number. This part is also composed of ∑O i +n genes, each integer represents the operator number assigned to the process; Pollen is composed of 4 parts, each of which has 2 processing steps. In the process layer coding, the first integer "2" in the pollen coding process layer represents the first process of part 2, the second "2" represents the second process of part 2, and the third "2" represents the assembly process of part 2. The same is true for other parts. In the worker coding, "2-3-3-1-4-2-1-4-2-1-1-3" appears in sequence; the first integer "2" represents the first process of part 1. 11 Assigned to worker 2 for processing, the second "3" represents the second process O of part 1 12 Assigned to worker 3 for processing. The third "3" represents that the third process P1 of 1, i.e. the assembly process, is assigned to worker 3 for processing. The same applies to the subsequent integers. S22: Cross-pollination The cross-pollination in the flower pollination algorithm corresponds to the global search in the algorithm. For discrete problems such as assembly workshop scheduling, the cross-pollination strategy in the flower pollination algorithm cannot be directly used to process the iterative update of pollen coding. The cross-pollination method of the flower pollination algorithm is redesigned. During the operation of the algorithm, at the i-th iteration, the pollen individual gbest with the best solution in the population is selected and the pollen X i Cross with gbest to generate pollen X i+1 ; Select the best pollen individual gbest and pollen X in the pollen population i To perform crossover operation, the specific steps of crossover operation of process coding are as follows: Step 1: Process the process layer code and randomly generate a part set. When the part set is {2, 3}, determine the process sequence corresponding to the workpiece {2, 3} in gbest and remove X i The process sequence corresponding to the workpiece is {2, 3}; Step 2: Copy the gbest corresponding sequence selected in step 1 to X i+1 Corresponding position process; Step 3: Select X i The remaining process sequence is copied to X from left to right. i+1 ; The cross-step operation of worker allocation coding is as follows: Step 1: Randomly generate a set of binary digits, the length of which is the mixed pollen code length ∑O i + n; Step 2: Determine the worker code position number corresponding to the binary number 1, and copy the code value of the corresponding position of gbest to X i+1 ; Step 3: Determine the worker code position number corresponding to the binary number 0, and set X i The coded value of the corresponding position is copied to X i+1 ; Step 4: Check the feasibility of worker allocation. After the worker allocation codes are cross-updated, due to the different skills of the workers, if the worker assigned to a process lacks the skills to operate the process and cannot operate the process, it is necessary to reallocate a worker from the available workers in the process to operate the process. S23: Self-pollination Self-pollination corresponds to the local search process in the algorithm. In the self-pollination link, two kinds of neighborhood structure search methods are introduced to realize the local search of the population for the better pollen individuals in the population. The process of the two neighborhood structures is as follows: (1) Reverse order: Randomly select two processes, rearrange the processes between the two processes in the process coding layer in reverse order, and randomly assign workers in the optional worker set to perform the reversed processes; (2) Insertion: Select a process and insert it into an arbitrary position in the pollen individual. Assign the process to the worker with the shortest operation time. For the remaining processes, randomly select a worker from the corresponding worker set to operate. S24: Mutation operator based on assembly sequence The improved self-pollination and cross-pollination strategies are used to deal with the double-layer coding based on processes and workers. At the process layer, since the assembly sequence can only be obtained after calculating the position of each assembly process at the process layer, when a product consists of 4 parts, each part needs to go through two processing steps before assembly. The process code is [132214243341]. It can be seen that the corresponding assembly sequence is [2341]. After the code is iteratively updated, the new process code is [122342334141]. It can be seen that the order of the processing and assembly processes has changed significantly, but the assembly sequence of the pollen individual is still [2341]. The evaluation index of the assembly sequence remains unchanged. In order to maintain the diversity of the assembly sequence, a mutation operator based on the assembly sequence is designed. The operation steps of the mutation operator based on the assembly sequence are as follows: Step 1: Find the position and sequence of each assembly process in the mixed pollen code to determine the assembly sequence of the pollen individual; Step 2: Randomly select two assembly processes from all the parts assembly processes, and exchange the two assembly processes according to their positions in the process code; Step 3: Update the position and sequence of each part assembly process in the generated process code to obtain the iterated assembly sequence; Step 4: Randomly assign a worker from the corresponding worker set to operate the two assembly processes selected in step 2 and the process between the two processes; The assembly sequence of the initial process is 2-4-1-3. Select assembly processes '2' and '3', and exchange the two assembly processes according to their positions in the process code. The processing process remains unchanged. In the generated process code, the position and order of appearance of each assembly process are re-determined. It can be seen that the assembly sequence after iteration is 4-3-1-2. During the iteration process, the position of the processing process between assembly processes may also change. Through this mutation operator, the diversity of the assembly sequence can be maintained.

Citation Information

Patent Citations

  • Method for designing remote control maintenance assembly sequence of radiation parts based on cat swarm algorithm

    CN104361180A

  • Assembly sequence planning method and assembly sequence planning system

    CN104504471A