A technical method for diagnosing and rectifying sewage collection efficiency problems in urban drainage pipe network systems

Through the comprehensive diagnosis and improvement methods of the urban drainage system, including data accounting, pipe network census and water quality testing, problems in the sewage system are identified and rectified, the problem of low BOD concentration and collection rate of the incoming water of the sewage treatment plant is solved, and the problem of sewage treatment is realized Processing improves quality and efficiency.

CN114997555BActive Publication Date: 2024-10-22CHINA ACAD OF URBAN PLANNING & DESIGN
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210297667.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-23
Publication Date
2024-10-22
Estimated Expiration
2042-03-23

AI Technical Summary

Technical Problem

The sewage collection efficiency of urban drainage systems is low, resulting in low BOD concentration in sewage treatment plants and centralized sewage collection rates. It is difficult to comprehensively diagnose and rectify the entire drainage system with existing technology, and lacks the potential to improve the quality and efficiency of sewage treatment. Assessment and determination of factors affecting collection performance.

Method used

A complete set of urban drainage system sewage collection efficiency diagnosis and improvement methods are adopted, including current basic data accounting, collection efficiency improvement potential assessment, drainage pipe network census, water quality testing and analysis, current problem identification, and remediation measure selection and plan implementation. Through the robot detection system, GPS measuring instruments and other equipment conduct pipeline inspections, combined with continuous measurement and analysis of representative indicators of water quality, to formulate short-term and long-term treatment measures to improve sewage treatment efficiency.

Benefits of technology

It has achieved a comprehensive analysis and holistic diagnosis of the urban drainage system. Through the process design with clear logical chain, it has improved the BOD concentration of the incoming water of the sewage treatment plant, improved the sewage collection efficiency, and has good replicability and promotion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0003560995750000011
    Figure BDA0003560995750000011
  • Figure BDA0003560995750000021
    Figure BDA0003560995750000021
  • Figure BDA0003560995750000022
    Figure BDA0003560995750000022
Patent Text Reader

Abstract

A technical method for diagnosing and remediating sewage collection efficiency problems in urban drainage pipe network systems, belonging to the technical field of municipal engineering drainage systems. A comprehensive analysis of the hydraulic and water quality conditions of the drainage system is conducted; quality and efficiency improvement work is carried out in a problem-oriented and goal-oriented manner. This method combines theoretical analysis with investigation practice, and can break through the obstacles to problem diagnosis caused by the invisibility and complexity of the drainage system itself, identify the main reasons and specific locations that affect the influent concentration of the sewage plant, and improve the sewage collection efficiency of the drainage system through comprehensive treatment measures.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a technical method for diagnosing and rectifying sewage collection efficiency problems in a town drainage pipe network system, and belongs to the technical field of municipal engineering drainage systems. Background Art

[0002] In recent years, with the popularization of sewage treatment facilities and the improvement of sewage treatment capacity, the urban sewage treatment rate in my country has been significantly improved. However, due to the problems of insufficient pre-construction planning, serious corrosion and damage of pipes, backflow of combined rainwater outlets, and relatively weak operation and maintenance management in some urban drainage systems, a large amount of surface water, groundwater, construction precipitation, foundation pit drainage, aquaculture wastewater, and industrial wastewater are mixed in the sewage, resulting in the BOD concentration of sewage treatment plant influent and the centralized sewage collection rate are still low, and sewage treatment has not achieved the expected benefits.

[0003] The underground drainage system is invisible and complex. In order to improve the quality and efficiency of sewage treatment, it is necessary to break through the obstacles caused by the characteristics of the drainage system itself to the diagnosis of current problems, identify the main reasons and specific locations that affect the influent concentration of the sewage treatment plant, and take effective countermeasures. At present, there are some methods for diagnosing and remediating drainage system problems. For example, the drainage network is surveyed and archived; the sewage direct discharge outlets are investigated and blocked; the pollutant concentration is analyzed; and the flow of the pump station is counted. However, these methods are mostly aimed at a specific problem such as pipeline defects, mixed and wrong connections in the diversion system network, or are carried out for a single object such as the pipeline network, the outlet, and the pump station, which breaks the connection between the entire drainage system, lacks the evaluation of the potential for improving the quality and efficiency of sewage treatment, and the determination of the primary and secondary factors affecting the collection efficiency, making it difficult to form a holistic understanding of the urban drainage system. Therefore, the research on the diagnosis and remediation technology of sewage collection efficiency problems in urban drainage systems needs to be further deepened. Summary of the invention

[0004] In view of the above background, the purpose of the present invention is to provide a complete set of methods for diagnosing and improving the sewage collection efficiency of urban drainage systems, which integrates the current basic data accounting, collection efficiency improvement potential assessment, drainage network census, water quality testing and analysis, current problem identification, remediation measure selection, and remediation plan implementation, in response to the actual situation that the sewage collection efficiency of some urban drainage systems in China is low, so as to better improve the quality and efficiency of sewage treatment.

[0005] The technical process of the present invention is as follows:

[0006] Step one: Calculation of current basic data.

[0007] (1) Water consumption calculation

[0008] Using the marketing data obtained from the city water company throughout the year, the users within the service area of ​​the drainage system are classified and the water consumption of each user type is counted in order to estimate the sewage discharge;

[0009] The marketing data of the water company usually includes user ID, user address, meter reading time, water consumption, water fee paid, name of the business office responsible for the user, etc. Common user types include residential comprehensive domestic water, industrial water, special industry water, etc. If the user types can be distinguished according to the secondary business office under the water company, the water consumption of each type of user can be directly counted based on this; if the user types cannot be distinguished according to the business office, the unit water price paid is calculated based on the water consumption and water fee paid by each user, and it is compared with the actual local charging standard to determine the user's water type; if the user type cannot be distinguished according to the business office, and the unit water price calculated cannot match the actual local charging standard due to errors in the marketing data records, the user's water type is determined according to the user address. In this way, the water consumption of each type of user is obtained.

[0010] (2) Calculation of water-using population

[0011] According to the statistical annual report of the water company, the total water-using population within the service area of ​​the drainage system can be directly known; however, since the drainage system collection efficiency is low in most small and medium-sized towns, and the population outflow rate in small and medium-sized towns is usually high, further verification of the water-using population is required.

[0012] The distribution analysis of the average daily water consumption of all residential users is carried out, and the corresponding number of users when the average daily water consumption is below 50 liters / household / day, 50-100 liters / household / day, 100-200 liters / household / day, and above 200 liters / household / day is calculated as {x1, x2, x3, x4} respectively; at the same time, the corresponding water-using population of each household is set as {p1, p2, p3, p4} respectively; the total water-using population is approved

[0013]

[0014] Where P is the total water-using population; x m Selected from {x1, x2, x3, x4}, p m Selected from {p1, p2, p3, p4};

[0015] (3) Calculation of centralized sewage collection rate

[0016] The centralized sewage collection rate is an important indicator to measure the sewage collection efficiency of urban drainage systems. In order to form an overall understanding of the current status of sewage collection efficiency within the service area of ​​the drainage system, the centralized sewage collection rate within the service area of ​​the drainage system is calculated using the following formula:

[0017]

[0018] Where, η is the centralized sewage collection rate; C 01 is the current per capita BOD concentration, g / person·d; C 02 is the standard per capita BOD concentration, which is determined to be 45 g / person / day according to the "Outdoor Drainage Design Code"; i is the number of sewage treatment plants; v is the standard per capita BOD concentration, which is ... i is the annual treatment capacity of the ith sewage treatment plant, 10,000 tons / year; c i is the influent BOD concentration of the ith sewage treatment plant, mg / L.

[0019] Step 2: Collect performance improvement potential assessment

[0020] The charged water volume is obtained from the water volume marketing data provided by the water company, and the free water volume is calculated as 0.15 of the charged water volume; the theoretical sewage volume is calculated using the total water supply of the water company, and compared with the total water intake obtained from the sewage treatment plant, the theoretical external water volume and the external water inflow ratio are calculated.

[0021]

[0022] Q3=Q2-Q1 (4)

[0023]

[0024] In the formula, Q1 is the theoretical pollution production; Q2 is the actual water intake of the sewage treatment plant; Q3 is the theoretical external water volume; is the proportion of external water inflow; j is the number of water use types; q j is the water consumption of the jth category; j is the pollution coefficient of water used in the jth category, of which the pollution coefficient of comprehensive domestic water used by residents can be calculated as 0.8, and the pollution coefficient of industrial water used and water used by special industries can be calculated as 0.9;

[0025] At the same time, by taking measures to improve quality and efficiency, the proportion of external water inflow will be controlled within The achievable BOD concentration of the sewage plant influent is

[0026]

[0027]

[0028] In the formula, C2 is the BOD concentration of the sewage plant influent before taking measures; C2' and Q2' are the theoretical values ​​of the BOD concentration of the sewage plant influent and the total water intake of the sewage plant after taking measures, respectively;

[0029] Step 3: Drainage network survey

[0030] Conduct a drainage network survey within the service area of ​​the drainage system, use robot (such as CCTV robot) detection system, sonar system and other equipment to detect pipelines, use GPS measuring instruments, total stations and other equipment to map pipelines, and obtain the network topology, pipe materials, pipe diameters, buried depths, water flow directions, pump station water collection ranges, facility status and maintenance conditions; based on the survey results, improve the drawings of the urban drainage system, and collect statistics on the types, levels and locations of pipeline defects;

[0031] Step 4: Water quality testing and analysis.

[0032] (1) Analysis of water quality at the source-sink level

[0033] Source: Analyze the urban drainage background, select 1-2 representative residential areas, hotels, schools, and government buildings, and continuously measure the changes in COD, BOD, ammonia nitrogen, chloride ions and other representative water quality indicators within 24 hours a day to learn the drainage background of different building types; select several representative industrial enterprises, and continuously measure the changes in COD, ammonia nitrogen, total nitrogen, total phosphorus and other representative water quality indicators within 24 hours a day to learn the drainage background of different industrial enterprises;

[0034] Summary: Continuously measure the changes in representative water quality indicators such as COD, BOD, ammonia nitrogen, and chloride ions at the water inlet of each sewage treatment plant within 24 hours a day to obtain the water quality of the sewage treatment plant;

[0035] (2) Analysis of water quality of environmental water bodies

[0036] Select 1-2 representative water bodies such as rivers, lakes, wetlands, etc. around the building, measure representative water quality indicators such as chloride ions, and compare them with the urban drainage background to confirm whether there is obvious influx of external water;

[0037] (3) Analysis of water quality transmitted by pumping stations

[0038] According to the results of the drainage network survey, with the sewage treatment plant as the final destination of sewage, draw the upstream and downstream transmission relationship diagram between each pumping station; take samples at the water inlet well of each pumping station, measure the representative water quality index values ​​such as COD, BOD, ammonia nitrogen, chloride ion, etc., analyze the water quality changes of each transmission path, and determine the source range of external water;

[0039] (4) Analysis of water quality in the drainage network

[0040] Several points are selected in the drainage network for sampling, and the values ​​of representative water quality indicators such as COD, BOD, ammonia nitrogen, and chloride ions are measured. A map containing a bar chart of representative water quality indicators is drawn to determine the specific location where external water flows in.

[0041] (5) Analysis of sewage treatment plant influent water quality testing operation

[0042] Different sampling locations, sampling times and operation methods of sewage treatment plant inlet water quality testing may affect the judgment of sewage collection efficiency of urban drainage systems. Therefore, the operation of sewage treatment plant inlet water quality testing should be analyzed;

[0043] For the sampling location, verify whether it is set at the main water inlet of the sewage treatment plant to avoid the impact of the plant's return water, backwash water, process control, etc. on water quality testing; for the sampling time, draw a 24-hour COD and BOD change chart for the sewage treatment plant's influent to verify whether sampling is performed when COD and BOD are at their highest level of the day; for the operation method, compare the differences in the results of automatic online testing, laboratory testing, and testing by a third-party environmental protection company to verify the standardization of the operation process;

[0044] Step 5: Identify current issues

[0045] Identify and summarize the problems found when implementing steps 1 to 4, analyze the root causes of the problems, and determine whether they are major or minor;

[0046] Step 6: Select measures and implement solutions

[0047] (1) Selection of measures.

[0048] The measures for improving the efficiency of sewage collection in urban drainage systems are divided into short-term and long-term measures. Long-term measures focus on solving the problem of external water inflow from the root. Since the external water inflow points are relatively scattered and difficult to find, it takes a process to improve the management mode of the drainage network. Therefore, short-term measures are taken to increase the BOD concentration of the sewage treatment plant inlet water to a reasonable range first, and then systematically check and seal the leaks in the network to achieve the effect of treating both the symptoms and the root causes.

[0049] At present, there are five main remediation measures: "control", "adjustment", "blocking", "drainage" and "supplementation". "Control" means reducing the amount of clean water entering the sewage treatment plant by controlling the water diversion area and water diversion flow of the pump station; "adjustment" means adjusting the direction of water flow in the pipe network to clarify the drainage division; "blocking" means disconnecting unreasonable connection positions to make the drainage division clearer; "drainage" means removing silt from the pipe network to ensure good water flow capacity of the pipe network; "supplementation" means repairing water leaks in the pipe network to prevent external water from entering; among the five measures, "control", "adjustment", "blocking" and "drainage" are short-term governance measures, and "supplementation" is a long-term governance measure; among them, "control", "adjustment" and "blocking" focus more on the operation and management of the drainage system as a whole, while "drainage" and "supplementation" focus more on engineering governance of local key locations; when formulating quality improvement and efficiency enhancement plans, the above five measures should be reasonably selected;

[0050] (2) Implementation of the plan

[0051] According to the current problems identified in step 5, formulate and implement work plans such as "one plant, one policy" for sewage treatment plants, optimization of drainage zones, repair of problematic pipe networks, renovation of old pipe networks, dredging of silted pipes, and drainage law enforcement inspections;

[0052] In the "one plant, one policy" plan for sewage treatment plants, the water collection areas of different sewage treatment plants are clearly defined, the water intake of sewage treatment plants is rationally allocated, and management responsibilities are differentiated; in the drainage zoning optimization plan, the existing drainage zoning is optimized according to the water collection areas of pump stations based on the divided water collection areas of each sewage treatment plant; in the problem pipeline repair plan, the pipeline leakage points are repaired, and the box culverts for river water backflow and the outlets for industrial wastewater are blocked to prevent clean water from entering the sewage drainage system; in the old pipeline renovation plan, the problems of unconnected pipelines and no outlet for sewage are solved through the construction and reconstruction of pipelines, and the connectivity of the system is enhanced; in the siltation pipeline clearing plan, the accumulated pipelines are cleaned to remove impurities, mud and road dust accumulated in the pipelines; in the drainage law enforcement inspection plan, the phenomena of illegal connection of pipelines and arbitrary discharge of aquaculture wastewater are investigated and dealt with, the drainage behavior of drainage households is standardized, and citizens are guided to develop simple and moderate green living habits.

[0053] Compared with other methods for improving the quality and efficiency of sewage treatment, the effects of the present invention are mainly reflected in: (1) It has a complete set of sewage collection efficiency problem diagnosis and remediation process design, which can comprehensively analyze the hydraulic and water quality conditions of urban drainage systems; (2) Through basic data accounting and collection efficiency improvement potential assessment, the overall situation of the drainage system is theoretically analyzed; through drainage network census and water quality detection and analysis, the specific situation of the drainage system is practically investigated; on the basis of identifying and summarizing the current problems, remediation measures and plans are formed. Its logical chain is clear and it is replicable and popularizable. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 A diagram showing the upstream and downstream transmission relationship of a pump station according to an embodiment of the present invention;

[0055] (a) The water receiving area of ​​the western sewage treatment plant; (b) The water receiving area of ​​the eastern sewage treatment plant

[0056] Figure 2 A columnar map of representative water quality indicators according to an embodiment of the present invention.

[0057] (a) BOD content bar map; (b) Chloride ion content bar map DETAILED DESCRIPTION

[0058] In order to better understand the present invention, the drainage system in the main urban area of ​​Y city in my country is taken as an example to further illustrate the present invention, but the present invention is not limited to the following examples.

[0059] Example 1

[0060] Step one: Calculation of current basic data.

[0061] (1) Calculation of water consumption.

[0062] Using the marketing data obtained from the city water company throughout the year, the users within the service area of ​​the drainage system are classified and the water consumption of each user type is counted in order to estimate the sewage discharge.

[0063] The marketing data of the local water company includes user ID, user address, meter reading time, water consumption, water fee paid, name of the business office responsible for the user, etc. User types include comprehensive residential water, industrial water, special industry water, etc. Some secondary business offices under the water company, such as "Second Company Resident Business Office" and "Fourth Company Resident Business Office", are divided according to user types, so the water consumption of users of the corresponding types is directly counted based on this; some secondary business offices such as "Business Management Department" are not divided according to user types, so the unit water price paid is deduced based on the water consumption and water fee paid by each user, and it is compared with the actual local charging standards to determine the user's water type; in some secondary business offices that are not divided according to user types, a small amount of marketing data is recorded incorrectly, resulting in the deduced unit water price not matching the actual local charging standards, so the user's water type is determined based on the user address. In this way, the water consumption of each type of user is obtained.

[0064] Finally, the average water consumption of users in this embodiment is 118,000 tons / day, of which the comprehensive living water consumption of residents is 64,000 tons / day, the industrial water consumption is 53,000 tons / day, and the special industry water consumption is 1,000 tons / day.

[0065] (2) Calculation of water-using population.

[0066] According to the annual statistical report of the water company, the total water-using population within the service area of ​​the drainage system is about 600,000. However, since the sewage collection efficiency of the drainage system is low in most small and medium-sized towns, and the population outflow rate in small and medium-sized towns is usually high, further verification of the water-using population is required.

[0067] The average daily water consumption of all residential users is analyzed for distribution, and the corresponding number of households when the average daily water consumption is below 50 liters / household / day, 50-100 liters / household / day, 100-200 liters / household / day, and above 200 liters / household / day is {x1, x2, x3, x4} respectively; at the same time, the corresponding number of water users in each household is set to {p1, p2, p3, p4} respectively.

[0068]

[0069] Where P is the total population using water; {p1, p2, p3, p4} can take values ​​of {0, 1, 2, 3} respectively.

[0070] Finally, the water-using population in this embodiment is obtained to be 520,000.

[0071] (3) Calculation of centralized sewage collection rate.

[0072] The centralized sewage collection rate is an important indicator to measure the sewage collection efficiency of urban drainage systems. In order to form an overall understanding of the current status of sewage collection efficiency within the service area of ​​the drainage system, the centralized sewage collection rate within the service area of ​​the drainage system can be calculated using the following formula:

[0073]

[0074] Where, η is the centralized sewage collection rate; C 01 is the current per capita BOD concentration, g / person·d; C 02 is the standard per capita BOD concentration, which is determined to be 45 g / person / day according to the "Outdoor Drainage Design Code"; i is the number of sewage treatment plants; v is the standard per capita BOD concentration, which is ... i is the annual treatment capacity of the ith sewage treatment plant, 10,000 tons / year; c i is the influent BOD concentration of the ith sewage treatment plant, mg / L.

[0075] Finally, it was found that when the BOD concentration of the sewage plant influent was 80.7 mg / l before quality improvement and efficiency enhancement, the corresponding centralized sewage collection rate was 68.5%.

[0076] Step 2: Collect performance improvement potential assessment.

[0077] The water volume is calculated based on the water volume marketing data provided by the water company, and the free water volume is calculated based on 0.15 of the charged water volume. The theoretical sewage volume is calculated using the total water supply of the water company, and compared with the total water intake from the sewage treatment plant to calculate the theoretical external water volume and the external water inflow ratio.

[0078]

[0079] Q3=Q2-Q1 (4)

[0080]

[0081] In the formula, Q1 is the theoretical pollution production; Q2 is the actual water intake of the sewage treatment plant; Q3 is the theoretical external water volume; is the proportion of external water inflow; j is the number of water use types; q j is the water consumption of the jth category; j It is the pollution coefficient of water use of category j, among which the pollution coefficient of comprehensive domestic water use can be calculated as 0.8, and the pollution coefficient of industrial water use and water use in special industries can be calculated as 0.9.

[0082] At the same time, by taking measures to improve quality and efficiency, the proportion of external water inflow will be controlled within The achievable BOD concentration of the sewage plant influent is

[0083]

[0084]

[0085] Where, C2 is the BOD concentration of the sewage treatment plant influent before taking measures; C2' and Q2' are the theoretical values ​​of the BOD concentration of the sewage treatment plant influent and the total water intake of the sewage treatment plant after taking measures, respectively.

[0086] Finally, the theoretical external water volume of this embodiment is 100,000 tons / day, and the external water inflow ratio is 46.4%. If the external water inflow ratio is controlled at 42.9%, the BOD concentration of the sewage plant influent can reach the stage target requirement of 86.0 mg / l; if the external water inflow ratio is controlled at 33.6%, the BOD concentration of the sewage plant influent can reach the national requirement of 100.0 mg / l.

[0087] Step 3: Survey of drainage network.

[0088] Conduct a drainage network survey within the service area of ​​the drainage system, use CCTV robot detection systems, sonar systems and other equipment to detect pipelines, use GPS measuring instruments, total stations and other equipment to map pipelines, and learn about the network topology, pipe materials, pipe diameters, buried depths, water flow directions, pump station water collection ranges, facility status and maintenance conditions, etc. Based on the survey results, improve the drawings of the urban drainage system, and collect statistics on the types, levels and locations of pipeline defects.

[0089] In this example, a total of 476,533 meters of pipelines were tested and 548,127 meters of pipelines were mapped. 920 structural defects and 5,196 functional defects were found. Among them, 35 leakage defects related to the influx of external water were found, and the length of siltation was 64,069 meters. In addition, there are cases of enterprises secretly discharging external water.

[0090] Step 4: Water quality testing and analysis.

[0091] (1) Analysis of water quality between source and sink.

[0092] Source: Analyze the urban drainage background, select 1 to 2 representative residential areas, hotels, schools, and government buildings, and continuously measure the changes in representative water quality indicators such as COD, BOD, ammonia nitrogen, and chloride ions within 24 hours a day to learn about the drainage background of different building types; select several representative industrial enterprises, and continuously measure the changes in representative water quality indicators such as COD, ammonia nitrogen, total nitrogen, and total phosphorus within 24 hours a day to learn about the drainage background of different industrial enterprises.

[0093] Summary: Continuously measure the changes in representative water quality indicators such as COD, BOD, ammonia nitrogen, and chloride ions at the water inlet of each sewage treatment plant within 24 hours a day to obtain the water quality of the sewage treatment plant.

[0094] In this embodiment, the average values ​​of COD, BOD, ammonia nitrogen and chloride ion in the representative residential area are {375mg / l, 149mg / l, 89mg / l, 105mg / l}; the representative hotels are {344mg / l, 132mg / l, 24mg / l, 234mg / l}; the representative schools are {202mg / l, 92mg / l, 34mg / l, 58mg / l}; the government buildings are {183mg / l, 86mg / l, 34mg / l, 88mg / l}. The approximate ranges of the four indicators of COD, BOD, ammonia nitrogen and chloride ion in the sewage plant are {286-360mg / l, 78-101mg / l, 5-21mg / l, 430-3900mg / l}.

[0095] (2) Analysis of water quality of environmental water bodies.

[0096] Select 1 to 2 representative environmental water bodies such as rivers, lakes, wetlands, etc. around the building, measure representative water quality indicators such as chloride ions, and compare them with the background conditions of urban drainage to confirm whether there is obvious influx of external water.

[0097] In this example, the chloride ion concentrations of river 1, river 2, wetland, and groundwater were measured to be {9000 mg / l, 2500 mg / l, 26000 mg / l, 16000 mg / l} respectively. Combined with the "source-sink" water quality analysis results, it was found that the chloride ion concentration of the drainage water of various users was low, while the chloride ion concentration of the sewage treatment plant inlet was high, close to the concentration of urban environmental water bodies, indicating that the inflow of environmental water bodies was serious.

[0098] (3) Analysis of water quality transmitted by the pumping station.

[0099] According to the results of the drainage network survey, with the sewage treatment plant as the final destination of sewage, the upstream and downstream transmission relationship diagram between each pumping station is drawn. Sampling is carried out at the water inlet well of each pumping station to measure the representative water quality index values ​​such as COD, BOD, ammonia nitrogen, and chloride ions, analyze the changes in water quality of each transmission path, and determine the source range of external water.

[0100] In this embodiment, the upstream and downstream transmission relationship between the pumping stations is as follows: Figure 1 By sampling and measuring the representative indicators of each pumping station, it is determined that the source of external water is in the water receiving area of ​​the third pumping station and the water receiving area of ​​the tenth pumping station.

[0101] (4) Analysis of water quality in the drainage network.

[0102] Several points are selected in the drainage network for sampling, and the values ​​of representative water quality indicators such as COD, BOD, ammonia nitrogen, and chloride ions are measured. A columnar map of representative water quality indicators is drawn to determine the specific location where external water flows in.

[0103] In this embodiment, the bar graphs of the two water quality representative indicators of BOD and chloride ion are as follows: Figure 2 Through the column map, the specific location of the external water inflow was determined.

[0104] (5) Analysis of sewage treatment plant inlet water quality testing operations.

[0105] Different sampling locations, sampling times and operation methods for sewage treatment plant inlet water quality testing may affect the judgment of sewage collection efficiency of urban drainage systems. Therefore, the operation of sewage treatment plant inlet water quality testing should be analyzed.

[0106] For the sampling location, verify whether it is set at the main water inlet of the sewage treatment plant to avoid the impact of return water, backwash water, process control, etc. on water quality detection; for the sampling time, draw a COD and BOD change chart of the sewage treatment plant inlet within 24 hours a day to verify whether sampling is carried out when COD and BOD are at the highest level of the day; for the operation method, compare the differences in the results of automatic online detection, laboratory detection and detection by a third-party environmental protection company to verify the standardization of the operation process.

[0107] In this embodiment, the standardization of the operating process was verified by field investigation and comparison of the results of automatic online testing, laboratory testing and testing by a third-party environmental protection company.

[0108] Step 5: Identify current problems.

[0109] Identify and summarize the problems found when implementing steps one to four, analyze the root causes of the problems, and determine their primary and secondary importance.

[0110] In this embodiment, the existing problems mainly include: 1) a large amount of external water flows in, causing mixed flow of clean and polluted water; 2) the slope of the pipe network is small and the flow rate is low, so pollutants are easily accumulated; 3) the pipe network is connected in a ring shape, which is not easy to manage in a regionalized manner; 4) the water level in the pipe network is high and close to full pipe flow, so "empty pipes are needed to wait for floods" before rain; 5) the sampling of water in the sewage treatment plant is not standardized, and the detection data needs to be verified.

[0111] Step 6: Selection of measures and implementation of plans.

[0112] (1) Selection of measures.

[0113] Measures to improve the efficiency of sewage collection in urban drainage systems can be divided into short-term and long-term measures. Long-term measures focus on solving the problem of external water inflow from the root. However, since the points of external water inflow are relatively scattered and difficult to find, it takes a process to improve the management model of the drainage network. Therefore, short-term measures can be taken to increase the BOD concentration of the sewage treatment plant inlet water to a reasonable range, and then systematically check and seal the leaks in the network to achieve the effect of treating both the symptoms and the root causes.

[0114] At present, there are five main remediation measures: "control", "adjustment", "blocking", "draining" and "supplementing". "Control" means reducing the amount of clean water entering the sewage treatment plant by controlling the water diversion area and water diversion flow of the pump station; "adjustment" means adjusting the direction of water flow in the pipe network to clarify the drainage division; "blocking" means disconnecting unreasonable connection positions to make the drainage division clearer; "draining" means removing the silt in the pipe network to ensure the good water flow capacity of the pipe network; "supplementing" means repairing the leaking points in the pipe network to prevent external water from entering. Among the five measures, "control", "adjustment", "blocking" and "draining" are short-term governance measures, and "supplementing" is a long-term governance measure. Among them, "control", "adjustment" and "blocking" focus more on the operation and management of the drainage system as a whole, while "draining" and "supplementing" focus more on engineering governance of local key locations. When formulating quality and efficiency improvement plans, the above five measures should be reasonably selected.

[0115] (2) Implementation of the plan.

[0116] Based on the current problems identified in the fifth step, formulate and implement work plans such as "one plant, one policy" for sewage treatment plants, optimization of drainage zoning, repair of problematic pipelines, renovation of old pipelines, clearing of silted pipelines, and drainage law enforcement inspections.

[0117] In the "one plant, one policy" plan for sewage treatment plants, the water collection areas of different sewage treatment plants are clearly defined, the water intake of sewage treatment plants is rationally allocated, and management responsibilities are differentiated; in the drainage zoning optimization plan, the existing drainage zoning is optimized according to the water collection areas of pump stations based on the divided water collection areas of each sewage treatment plant; in the problem pipeline repair plan, the pipeline leakage points are repaired, and the box culverts for river water backflow and the outlets for industrial wastewater are blocked to prevent clean water from entering the sewage drainage system; in the old pipeline renovation plan, the problems of unconnected pipelines and no outlet for sewage are solved through the construction and reconstruction of pipelines, and the connectivity of the system is enhanced; in the siltation pipeline clearing plan, the accumulated pipelines are cleaned to remove impurities, mud and road dust accumulated in the pipelines; in the drainage law enforcement inspection plan, the phenomena of illegal connection of pipelines and arbitrary discharge of aquaculture wastewater are investigated and dealt with, the drainage behavior of drainage households is standardized, and citizens are guided to develop simple and moderate green living habits.

[0118] In this embodiment, by applying the five remediation measures of "control", "adjustment", "blocking", "drainage" and "supplementation", a series of remediation plans were implemented, including "one plant, one policy" for sewage treatment plants, drainage zoning optimization, repair of problematic pipelines, renovation of old pipelines, dredging of silted pipelines, drainage law enforcement inspections, etc., the BOD concentration of the influent of the sewage treatment plant in City Y reached the stage target requirement of 86.0 mg / l.

Claims

1. A technical method for diagnosing and remediating sewage collection efficiency problems in urban drainage pipe network systems, characterized in that: The following steps are involved: Step 1: Calculation of current basic data; (1) Water consumption calculation Using the marketing data obtained from the city water company throughout the year, the users within the service area of ​​the drainage system are classified and the water consumption of each user type is counted in order to estimate the sewage discharge; The marketing data of the water company includes user ID, user address, meter reading time, water consumption, water fee paid, and the name of the business office responsible for the user; common user types include comprehensive domestic water use for residents, industrial water use, and water use for special industries; if the user types can be distinguished according to the secondary business office under the water company, the water consumption of each type of user can be directly counted based on this; if the user types cannot be distinguished according to the business office, the unit water price paid is deduced based on the water consumption and water fee paid by each user, and it is compared with the actual local charging standards to determine the user's water use type; if the user types cannot be distinguished according to the business office, and the deduced unit water price cannot match the actual local charging standards due to errors in the marketing data records, the user's water use type is determined based on the user address; in this way, the water consumption of each type of user is obtained; (2) Calculation of water-using population According to the annual statistical report of the water company, the total water-using population within the service area of ​​the drainage system can be directly known; however, since the drainage system collection efficiency is low in most small and medium-sized towns, and the population outflow rate in small and medium-sized towns is relatively high, further verification of the water-using population is required; The distribution analysis of the average daily water consumption of all residential users is carried out, and the corresponding number of users when the average daily water consumption is below 50 liters / household / day, 50-100 liters / household / day, 100-200 liters / household / day, and above 200 liters / household / day is calculated as {x1, x2, x3, x4} respectively; at the same time, the corresponding water-using population of each household is set as {p1, p2, p3, p4} respectively; the total water-using population is approved Where P is the total water-using population; x m Selected from {x1, x2, x3, x4}, p m Selected from {p1, p2, p3, p4}; (3) Calculation of centralized sewage collection rate The centralized sewage collection rate is an important indicator to measure the sewage collection efficiency of urban drainage systems. In order to form an overall understanding of the current status of sewage collection efficiency within the service area of ​​the drainage system, the centralized sewage collection rate within the service area of ​​the drainage system is calculated using the following formula: Where, η is the centralized sewage collection rate; C 01 is the current per capita BOD concentration, g / person·d; C 02 is the standard per capita BOD concentration, which is determined to be 45 g / person / day according to the "Outdoor Drainage Design Code"; i is the number of sewage treatment plants; v is the standard per capita BOD concentration, which is ... i is the annual treatment capacity of the ith sewage treatment plant, 10,000 tons / year; c i is the influent BOD concentration of the i-th sewage treatment plant, mg / L; Step 2: Collect performance improvement potential assessment The water volume marketing data provided by the water company is used to obtain the charged water volume, and the free water volume is calculated as 0.15 of the charged water volume; The total water supply of the water company is used to estimate the theoretical sewage volume, and compared with the total water intake from the sewage treatment plant, the theoretical external water volume and the external water inflow ratio are estimated. Q3=Q2-Q1 (4) In the formula, Q1 is the theoretical pollution production; Q2 is the actual water intake of the sewage treatment plant; Q3 is the theoretical external water volume; is the proportion of external water inflow; j is the number of water use types; q j is the water consumption of the jth category; j is the pollution coefficient of water used in the jth category, of which the pollution coefficient of comprehensive domestic water used by residents can be calculated as 0.8, and the pollution coefficient of industrial water used and water used by special industries can be calculated as 0.9; At the same time, by taking measures to improve quality and efficiency, the proportion of external water inflow will be controlled within The achievable BOD concentration of the sewage plant influent is In the formula, C2 is the BOD concentration of the sewage plant influent before taking measures; C2' and Q2' are the theoretical values ​​of the BOD concentration of the sewage plant influent and the total water intake of the sewage plant after taking measures, respectively; Step 3: Drainage network survey Conduct a drainage network survey within the service area of ​​the drainage system, use robot detection systems and sonar system equipment to conduct pipeline inspections, and use GPS measuring instruments and total station equipment to conduct pipeline mapping, so as to obtain the network topology, pipe materials, pipe diameters, buried depths, water flow directions, pump station water collection ranges, facility status and maintenance conditions; based on the survey results, improve the drawings of the urban drainage system, and compile statistics on the types, levels and locations of pipeline defects; Step 4: Water quality testing and analysis; (1) Analysis of water quality in the source-sink region Source: Analyze the urban drainage background, select 1-2 representative residential areas, hotels, schools, and government buildings, and continuously measure the changes in COD, BOD, ammonia nitrogen, and chloride ion water quality representative indicators within 24 hours a day to learn the drainage background of different building types; select several representative industrial enterprises, and continuously measure the changes in COD, ammonia nitrogen, total nitrogen, and total phosphorus water quality representative indicators within 24 hours a day to learn the drainage background of different industrial enterprises; Summary: Continuously measure the changes in COD, BOD, ammonia nitrogen, and chloride ion water quality representative indicators at the water inlet of each sewage treatment plant within 24 hours a day to obtain the water quality of the sewage treatment plant; (2) Analysis of water quality of environmental water bodies Select 1-2 representative water bodies in rivers, lakes, and wetlands around the building, measure representative indicators of chloride ion water quality, and compare them with the urban drainage background to confirm whether there is obvious influx of external water; (3) Analysis of water quality transmitted by pumping stations According to the results of the drainage network survey, with the sewage treatment plant as the final destination of sewage, draw the upstream and downstream transmission relationship diagram between each pumping station; take samples at the water inlet well of each pumping station, measure the representative water quality index values ​​of COD, BOD, ammonia nitrogen, and chloride ion, analyze the water quality changes of each transmission path, and determine the source range of external water; (4) Analysis of water quality in the drainage network Select several points in the drainage network for sampling, measure the representative water quality index values ​​of COD, BOD, ammonia nitrogen, and chloride ion, and draw a map containing a bar chart of representative water quality indicators to determine the specific location where external water flows in; (5) Analysis of sewage treatment plant influent water quality testing operation Different sampling locations, sampling times and operation methods of sewage treatment plant inlet water quality testing may affect the judgment of sewage collection efficiency of urban drainage systems. Therefore, the operation of sewage treatment plant inlet water quality testing should be analyzed; For the sampling location, verify whether it is set at the main water inlet of the sewage treatment plant to avoid the impact of the plant's return water, backwash water, and process control on water quality testing; for the sampling time, draw a 24-hour COD and BOD change chart for the sewage treatment plant's influent to verify whether sampling is performed when COD and BOD are at their highest level of the day; for the operation method, compare the differences in the results of automatic online testing, laboratory testing, and testing by a third-party environmental protection company to verify the standardization of the operation process; Step 5: Identify current issues Identify and summarize the problems found when implementing steps 1 to 4, analyze the root causes of the problems, and determine whether they are major or minor; Step 6: Select measures and implement solutions (1) Selection of measures; The measures for improving the efficiency of sewage collection in urban drainage systems are divided into short-term and long-term measures. Long-term measures focus on solving the problem of external water inflow from the root. Since the external water inflow points are relatively scattered and difficult to find, it takes a process to improve the management mode of the drainage network. Therefore, short-term measures are taken to increase the BOD concentration of the sewage treatment plant inlet water to a reasonable range first, and then systematically check and seal the leaks in the network to achieve the effect of treating both the symptoms and the root causes. At present, there are five main remediation measures, namely "control", "adjustment", "blocking", "drainage" and "supplementation". "Control" means reducing the amount of clean water entering the sewage treatment plant by controlling the water diversion area and water diversion flow of the pump station. "Adjustment" means adjusting the water flow direction of the pipe network to clarify the drainage division. "Blocking" means disconnecting unreasonable connection positions to make the drainage division clearer. "Drainage" means removing the silt in the pipe network to ensure the good water flow capacity of the pipe network. "Supplementation" means repairing the leaking points in the pipe network to prevent external water from entering. Among the five measures, "control", "adjustment", "blocking" and "drainage" are short-term treatment measures, and "supplementation" is a long-term treatment measure. Among them, "control", "adjustment" and "blocking" focus more on the operation and management of the drainage system as a whole, while "drainage" and "supplementation" focus more on engineering treatment of local key locations. When formulating quality improvement and efficiency enhancement plans, the above five measures should be reasonably selected. (2) Implementation of the plan According to the current problems identified in step 5, formulate and implement a work plan for "one plant, one policy" for sewage treatment plants, optimization of drainage zones, repair of problematic pipe networks, renovation of old pipe networks, dredging of silted pipes, and drainage law enforcement inspections; In the "one plant, one policy" plan for sewage treatment plants, the water collection areas of different sewage treatment plants are clearly defined, the water intake of sewage treatment plants is rationally allocated, and management responsibilities are differentiated; in the drainage zoning optimization plan, the existing drainage zoning is optimized according to the water collection areas of pump stations based on the divided water collection areas of each sewage treatment plant; in the problem pipeline repair plan, the pipeline leakage points are repaired, and the box culverts for river water backflow and the outlets for industrial wastewater are blocked to prevent clean water from entering the sewage drainage system; in the old pipeline renovation plan, the problems of unconnected pipelines and no outlet for sewage are solved through the construction and reconstruction of pipelines, and the connectivity of the system is enhanced; in the siltation pipeline clearing plan, the accumulated pipelines are cleaned to remove impurities, mud and road dust accumulated in the pipelines; in the drainage law enforcement inspection plan, the illegal connection of pipelines and the arbitrary discharge of aquaculture wastewater are investigated and dealt with, the drainage behavior of drainage households is standardized, and citizens are guided to develop simple and moderate green living habits.

Citation Information

Patent Citations

  • A method for evaluating and calculating urban sewage treatment rate

    CN109242367A

  • Urban sewage pipe network and water environment quality improvement and efficiency improvement technology integration method

    CN111932403A

  • Sewage treatment system classification method and system

    CN113284005A