A two-tier scheduling method for energy management system of steel integrated enterprise
By adopting a double-layer dispatching method and an optimized cycle mechanism in the steel complex, the problem of unsatisfactory energy dispatch in the energy management system is solved, rational and efficient use of energy is achieved, and the energy saving and carbon reduction goals of the steel industry are supported.
Patent Information
- Application Number
- CN202210756100.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-30
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-06-30
AI Technical Summary
Due to the lack of practical dispatching methods and highly implementable software systems in the energy management system of the steel complex enterprises, the energy dispatching effect is not ideal, and the logical relationship between energy dispatching is unclear, making it impossible to effectively carry out energy management.
The dual-layer dispatching method of the energy management system of the iron and steel complex is used to establish a dual-layer energy optimal dispatch model, including the energy dispatch model of the energy environment department and each branch factory and the energy optimal distribution model within the branch factory. Through optimizing the cycle mechanism, energy is used in production. Consumable equipment rooms are utilized rationally and efficiently.
It realizes the rational and efficient utilization of energy in the steel complex, improves the dispatching effect of the energy management center, contributes to the energy conservation and carbon reduction work of the steel industry, and meets the needs of enterprises for a feasible and well-implemented energy dispatching system.
Smart Images

Figure CN114997719B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of industrial artificial intelligence for metallurgical automation, and specifically relates to a double-layer scheduling method for the energy management system of a steel joint venture, which can guide the energy management of a steel joint venture, enable energy to be reasonably and efficiently utilized among energy-producing and consuming equipment, and contribute to the effective implementation of energy conservation and carbon reduction work in the industry. Background Art
[0002] The steel production process system is complex, with many energy generation and use nodes. The huge energy demand and the production rhythm of various types of energy-producing and consuming equipment have made energy scheduling a problem that plagues the industry. To this end, each plant has built an energy management center in order to coordinate the complex energy scheduling management of the steel joint enterprise through the energy management system. The branches of the steel joint enterprise that need to implement energy management uniformly include sintering plants, pelletizing plants, coking plants, ironmaking plants, steelmaking plants, rolling mills, power plants, lime plants, power plants, water treatment plants, oxygen plants, solid waste treatment plants, spare parts repair plants, transportation companies and office and living areas. The energy-consuming equipment of each branch is different, and the types of energy consumed are also different from each other. The energy generated includes blast furnace gas, coke oven gas, converter gas, steam, electricity, etc. Taking the ironmaking plant as an example, the production equipment includes various blast furnaces and TRT generator sets, and the energy generated mainly includes blast furnace gas and electricity; the energy-consuming equipment is mainly hot blast furnace groups and blast furnace production systems, etc., and the types of energy consumed are gas, air, compressed air, oxygen, nitrogen, water, and electricity. How to globally optimize and dispatch the energy generation, consumption, buffering and other processes of more than a dozen types of branches is the biggest challenge facing the energy management system of steel integrated enterprises. It is also the main reason why the energy management center fails to play a reasonable role in steel integrated enterprises.
[0003] At present, the energy management work of the steel industry lacks practical scheduling methods and a strong energy scheduling support software system, so the energy scheduling effect in the steel industry has not been ideal. In addition, the scheduling logic relationship between the energy and environmental department, various branches, major energy-consuming equipment systems and more than a dozen types of energy in the steel industry is not clear, which makes it impossible to effectively carry out the energy scheduling of the steel industry. Therefore, it is necessary to improve the energy scheduling system of the existing steel industry. Summary of the invention
[0004] The present invention aims to solve the above-mentioned problems and provides a two-tier scheduling method for the energy management system of a steel enterprise, which can guide the energy management of a steel enterprise, enable energy to be reasonably and efficiently utilized among energy-producing and consuming equipment, and contribute to the effective implementation of energy conservation and carbon reduction work in the industry.
[0005] The technical solution adopted by the present invention is: the double-layer scheduling method of the energy management system of the steel joint enterprise comprises the following steps:
[0006] Step 1: Establish a two-layer energy optimization and scheduling model for steel joint enterprises; the first layer is the energy scheduling model of the Energy and Environmental Department and each branch, which solves the scheduling problem of plant-level energy in each branch; the second layer is the energy optimization allocation process between the internal equipment groups of each branch after each branch receives the energy dispatched by the Energy and Environmental Department;
[0007] Step 2: Establish an energy dispatch model for each process by the Energy and Environmental Department; the energy dispatch process is divided into three categories. The first category is the main process of sintering, pelletizing, coking, ironmaking, steelmaking, and steel rolling; the second category is the auxiliary process of oxygen plant, power plant, lime plant, lime plant, and water treatment plant; the third category is the buffer user power plant, spare parts repair plant, solid waste treatment plant, transportation company, and office and living area; among them, the main process needs to provide energy according to its energy demand to ensure production;
[0008] Step 3: Establish the branch plant energy dispatch model; the Energy and Environmental Department distributes all energy to each branch plant through the first-level dispatch function of the energy management system; the branch plant energy management system then continues to implement the second-level optimal dispatch of the plant energy, which needs to comprehensively consider the energy quality, equipment status and other issues within the branch plant;
[0009] Step 4. Establish an optimized circulation mechanism for efficient energy utilization in steel joint enterprises; divide all energy users of steel joint enterprises into three categories according to their production characteristics: the first category of users has product plans, and the product has a functional relationship with energy consumption; the second category of users has product plans, but there is no obvious functional relationship between the product and energy consumption process; the third category of users has no product plans, and the energy used by this category of users is waste heat and waste energy.
[0010] In the second step, the model used includes the total amount of energy available for dispatch by the steel joint venture; Formula (1) represents the total amount of energy purchased and recycled by the steel joint venture, that is, the total amount of various types of energy that can be dispatched by the Ministry of Energy and Environment;
[0011] V i,总 =V i,外购 +V i,二次 (1)
[0012] Where: i—energy type, representing the 12 types of energy media commonly used in steel enterprises;
[0013] V i,总 —The total amount of Class I energy that can be dispatched by the Ministry of Energy;
[0014] V i,外购 —Total energy of type i energy purchased by the enterprise;
[0015] V i,二次 —The total amount of Class I secondary energy produced by the enterprise itself.
[0016] In the step 2, the model adopted also includes the energy scheduling supply of the main process;
[0017]
[0018]
[0019] Where: —Energy demand of process j;
[0020] M j —Product volume of process j, the main processes include ironmaking, steelmaking, steel rolling, sintering and coking;
[0021] g i,j —The energy consumption required for unit product of process j;
[0022] V i,j,请求 — In the event of a special event, process j sends a dispatch request to the Energy and Environment Department to increase energy demand;
[0023] When a request occurs, the branch plant first proposes the energy replenishment demand and duration, and the Energy and Environmental Department conducts a comprehensive analysis of the entire plant, generates a scheduling plan and sends it to the power plant for implementation, so as to provide the corresponding energy amount for the process that makes the energy request.
[0024] In step 2, the model used also includes the energy scheduling supply of auxiliary processes; auxiliary processes include power plants, oxygen plants, lime plants, lime plants, and water treatment plants. Such users provide auxiliary materials and power to ensure the stable operation of the main process;
[0025] The supply calculation function of the auxiliary process energy demand is shown in formula (3):
[0026]
[0027] Where: —Energy demand and supply for auxiliary processes;
[0028] M j —Product output corresponding to process j;
[0029] T 状态 —Operational health status of main equipment in auxiliary process j;
[0030] P 计划 —Implementation of the branch’s production plan.
[0031] The second step is to buffer the energy supply of the users; the users of buffer energy consumption include power plants, spare parts repair plants, solid waste treatment plants, transportation companies and office and living areas; the energy demand of spare parts repair plants, solid waste treatment plants, transportation companies and office and living areas is related to the products processed and maintained, or has a certain degree of planning; therefore, the energy supply model is established as shown in formula (4):
[0032]
[0033] Where: —The most reasonable energy supply for buffer user j, excluding power plants;
[0034] Moreover, among the buffer users, power plants are different from other users. The role of power plants in steel joint ventures is to absorb the remaining gas resources. Therefore, all the remaining gas is supplied to power plants. The energy utilization of power plants is completely passive. Its energy supply model is shown in formula (5):
[0035]
[0036] In the formula, i is the energy type as gas.
[0037] In the second step, the Energy and Environment Department optimizes the allocation model of the energy supply of each process; the total energy of the iron and steel joint venture has a certain degree of planning, and the energy is not infinite; therefore, after each process proposes its most reasonable energy demand, the Energy and Environment Department optimizes the allocation based on the existing energy resources and generates an optimal allocation plan to guide the energy scheduling problem between each process; the established energy management system optimization scheduling model of the Energy and Environment Department is shown in formula (6):
[0038]
[0039] Constraints:
[0040] Where: α ij , β ij , γ ij , ij They represent the economic loss caused by unit energy when the energy medium of type i in type j process deviates from the required value;
[0041] V i,j,主 、V i,j,辅助 、V i,j,缓冲 、V i,j,发电厂 They represent the supply of energy i for each main process, auxiliary process, buffer user and power plant respectively;
[0042] Y represents the economic losses of all energy-consuming processes in the entire iron and steel enterprise.
[0043] In the step 3, the energy dispatching process of the main process branch of the ironmaking plant establishes the energy demand according to the operating characteristics of each energy-consuming equipment; the relationship between the total energy supply branch and each energy-consuming equipment is shown in equations (7) to (13); each equipment has its own unique production characteristics, and the energy required for different production rhythms is different. It is necessary to establish a relationship for allocation according to the actual production process and equipment process requirements;
[0044]
[0045]
[0046]
[0047]
[0048]
[0049]
[0050]
[0051] Where: They respectively represent the amount of gas, air, compressed air, nitrogen, oxygen, industrial water and electricity dispatched by the Energy and Environmental Protection Department to the iron and steel plant;
[0052] They represent the gas, air, compressed air, nitrogen and electricity required for the production of blast furnace i respectively;
[0053] They represent the gas, air, oxygen and electricity required for the hot blast stove j corresponding to blast furnace i respectively;
[0054] They represent the gas and electricity required for the production of heating furnace h respectively;
[0055] They represent the air volume, industrial water volume and electricity volume required for the production of dust collector c respectively;
[0056] They represent the industrial water and electricity required by coal mill m respectively;
[0057] Indicates the amount of electricity required for production by other energy-consuming equipment.
[0058] In the step 3, the oxygen, nitrogen and argon produced by the auxiliary process branch of the oxygen plant are proportional, and the corresponding equipment is an air separator; wherein the oxygen production is determined by the energy production plan of the whole plant, and the energy consumption of the oxygen plant is directly determined by the energy demand of the air separator and its system;
[0059]
[0060]
[0061] Where: They respectively represent the amount of electricity and new water resources dispatched by the Ministry of Energy and Environment to the oxygen plant;
[0062] They represent the electricity and water required for the production of the i-th air separation unit, respectively, and are obtained from the production plan.
[0063] In step 3, the buffer user power plant of the steel complex is different from the production system. The production and energy supply of the power plant are not stable. Instead, the power plant is provided with fuel according to the remaining coal gas of the steel complex. In addition to coal gas, the power plant needs combustion air, water, and electricity. The model is established as shown in equations (16) to (19):
[0064]
[0065]
[0066]
[0067]
[0068] Where: They represent the amount of gas, air, fresh water and electricity allocated to the power plant by the Ministry of Energy and Environment respectively;
[0069] They respectively represent the amount of gas, air, water and electricity of the boiler and its corresponding system in the power plant.
[0070] In step 4, the first type of users have clear main products, formulate production plans based on enterprise needs, and there is a clear functional relationship between product output and energy consumption; this type of users can directly establish the functional relationship between product quantity and energy quantity, and establish a model as shown in formula (20):
[0071]
[0072] Where: —The amount of energy i required by the first category user j;
[0073] P j —jUser product output;
[0074] The second type of users is more special than the first type of users. Although this type of users has a production plan, there is no clear functional relationship between product output and energy consumption. A correlation model between energy consumption and equipment status is established, as shown in formula (21):
[0075]
[0076] Where: —The amount of energy i required by the second category user k;
[0077] S0, S1, S2—represent the three operating states of the equipment;
[0078] The third type of users do not have a clear product plan, and their energy use is only for waste heat and waste energy. The model is shown in formula (22):
[0079]
[0080] Where: —Energy i supply to third category user l;
[0081] f 余能 —The remaining energy of energy source i is consumed and utilized by the third type of user l.
[0082] Beneficial effects of the present invention: The double-layer dispatching method of the energy management system of the steel joint enterprise guides the chaotic energy management problems of the current steel joint enterprise by establishing a double-layer energy optimization dispatching model for the steel joint enterprise; and utilizes the establishment of an energy efficient utilization optimization circulation mechanism for the steel joint enterprise to enable energy to be efficiently utilized between energy-producing and consuming equipment. This enables steel enterprises to truly realize the optimal dispatching of the entire plant's energy under the organization of the energy management center, so that energy can be reasonably and efficiently utilized, and contribute to the carbon emission reduction work of the steel industry, helping the industry to effectively carry out energy conservation and carbon reduction work; and meet the urgent needs of steel enterprises for a feasible and well-implemented energy dispatching system. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] Figure 1 It is a modeling diagram of the overall energy and environmental model of the present invention.
[0084] Figure 2 This is the first-level scheduling division diagram of the energy management system for a steel joint enterprise of the present invention.
[0085] Figure 3 It is a regional division diagram of each branch factory of the iron and steel joint enterprise of the present invention.
[0086] Figure 4 It is a diagram of the energy distribution process of the ironworks of the present invention.
[0087] Figure 5This is a diagram of an optimized cycle mechanism for efficient energy utilization of the first category of users of the present invention.
[0088] Figure 6 This is a diagram of an optimized cycle mechanism for efficient energy utilization for the second category of users of the present invention.
[0089] Figure 7 It is the overall diagram of the energy efficient utilization optimization process of the present invention. DETAILED DESCRIPTION
[0090] The energy scheduling problem has always been a difficult problem that has plagued steel joint ventures, which have numerous energy-producing and consuming equipment and complex pipe network systems. The energy management of steel joint ventures involves dozens of production furnaces, more than a dozen types of energy medium generation and purchase, and hundreds of energy-consuming equipment, which has resulted in the energy management effect of the enterprise being unable to meet the target requirements of meeting the needs of users within the factory. After a large number of actual enterprise surveys, it was learned that steel enterprises are in urgent need of feasible and well-implemented energy scheduling systems. The present invention proposes a two-layer scheduling method for the energy management system of a steel joint venture, which enables steel enterprises to truly realize the optimal scheduling of the entire plant's energy under the organization of the energy management center, so that energy can be used reasonably and efficiently, and contribute to carbon emission reduction in the steel industry.
[0091] The specific steps of the present invention are described in detail. The double-layer scheduling method of the energy management system of the steel joint enterprise includes:
[0092] Step 1: Establish a two-layer energy optimization scheduling model for a steel joint venture. The energy and environmental department of a steel joint venture is responsible for the energy optimization management of multiple (for example, 15) branches. The two-layer energy optimization scheduling model for a steel joint venture constructed by the present invention is shown in the figure below: Figure 1 As shown, the figure takes sintering plants and ironmaking plants as examples to list the main energy-consuming equipment, materials, energy consumption types and energy recovery types of the branch plants. The two-layer energy modeling adopted by the present invention is that the first layer is the energy scheduling model of the energy and environmental department and each branch plant, which solves the scheduling problem of plant-level energy in each branch plant; the second layer is the energy optimization allocation process between the internal equipment groups of each branch plant after each branch plant obtains the energy scheduled by the energy and environmental department.
[0093] The first level of energy optimization management is at the level of the Energy and Environment Department and each branch, involving purchased energy and self-produced secondary energy, including blast furnace gas (BFG), coke oven gas (COG), converter gas (LDG), oxygen, nitrogen, argon, hydrogen, natural gas, compressed air, steam, water, and electricity.
[0094] The second level of energy optimization management is implemented within each branch, specifically involving the branch's main equipment, main materials, various types of secondary energy generation and various types of energy consumption, to solve the problem of energy optimization utilization in each branch.
[0095] Step 2: Establish an energy scheduling model for each process by the Energy and Environment Department. The Energy and Environment Department provides various types of energy in response to the needs of each branch. The time step of energy-related calculations carried out by the present invention is uniformly set to hours. Since it involves multiple types of energy media and multiple types of branches, the unit output and unit consumption method commonly used in the steel industry cannot completely solve this type of problem.
[0096] The first-level scheduling division diagram designed by the present invention is as follows Figure 2 As shown. The actual process involves 12 types of energy media and 15 types of sub-plants. The sub-plants involve 6 main processes: sintering, pelletizing, coking, ironmaking, steelmaking, and steel rolling; 5 auxiliary processes: oxygen plant, power plant, lime plant, lime plant, and water treatment plant; and 5 types of buffer consumption users: power plant, spare parts repair plant, solid waste treatment plant, transportation company, and office and living area. For the convenience of expression, the process and the sub-plant are specified to be at the same level; in actual application, it needs to be determined according to the actual situation of the steel joint enterprise.
[0097] The energy dispatch process is divided into three categories. The first category is the main process of sintering, pelletizing, coking, ironmaking, steelmaking, and steel rolling; the second category is the auxiliary process of oxygen plant, power plant, lime plant, lime plant, and water treatment plant; the third category is the buffer user power plant, spare parts repair plant, solid waste treatment plant, transportation company, and office and living area; among them, the main process needs to provide energy according to its energy demand to ensure production. The adopted model is shown in equations (1) to (6).
[0098] ① The total amount of energy available for dispatch in the steel industry
[0099] Formula (1) represents the total amount of energy purchased and secondary energy recovered by the iron and steel joint venture, that is, the total amount of various types of energy that can be dispatched by the Energy and Environmental Protection Department.
[0100] V i,总 =V i,外购 +V i,二次 (1)
[0101] Where: i—energy type, representing the 12 types of energy media commonly used in steel enterprises;
[0102] V i,总 —The total amount of Class I energy that can be dispatched by the Ministry of Energy;
[0103] V i,外购 —Total energy of type i energy purchased by the enterprise;
[0104] V i,二次 —The total amount of Class I secondary energy produced by the enterprise itself.
[0105] ② Main process energy scheduling and supply
[0106]
[0107]
[0108] Where: —Energy demand of process j;
[0109] M j —Product volume of process j, the main processes include ironmaking, steelmaking, steel rolling, sintering and coking;
[0110] g i,j —The energy consumption required for unit product of process j;
[0111] V i,j,请求 —Process j sends a scheduling request to the Energy and Environment Department to increase energy demand in the event of a special event.
[0112] When a request occurs, the branch plant first proposes the energy replenishment demand and duration, and the Energy and Environmental Department conducts a comprehensive analysis of the entire plant, generates a scheduling plan and sends it to the power plant for implementation, so as to provide the corresponding energy amount for the process that makes the energy request.
[0113] ③Energy scheduling and supply for auxiliary processes
[0114] Auxiliary processes include power plants, oxygen plants, lime plants, lime plants, and water treatment plants. These users provide auxiliary materials and power to ensure the stable operation of the main processes. Iron and steel joint ventures need to make judgments and selectively provide energy supply for them. This can be achieved by establishing corresponding energy scheduling rules.
[0115] The supply calculation function of the auxiliary process energy demand is shown in formula (3):
[0116]
[0117] Where: —Energy demand and supply for auxiliary processes;
[0118] M j —Product output corresponding to process j; the products of the auxiliary process provide guarantee for the production process of the main process, so the amount of products produced by the auxiliary process has a certain functional relationship with the amount of products produced by the main process, which can be obtained through the fitting formula;
[0119] T 状态 —Operational health status of main equipment in auxiliary process j;
[0120] P 计划 —The implementation of the production plan of the branch factory; if the execution of the production plan is not ideal, it is necessary to strengthen production and increase output.
[0121] ④ Buffering the energy supply of users
[0122] Users of buffered energy include power plants, spare parts repair plants, solid waste treatment plants, transportation companies, and office and living areas. Some of these users are end-users of the production system, while others are not. Therefore, it is necessary to provide them with surplus energy while ensuring the energy needs of the main and auxiliary production processes.
[0123] Among them, the energy demand of spare parts repair plants, solid waste treatment plants, transportation companies and office and living areas is related to the products being processed and maintained, or has a certain degree of planning; therefore, the energy supply model is established as shown in formula (4):
[0124]
[0125] Where: —The most reasonable energy supply for buffer user j, excluding power plants.
[0126] Among buffer users, power plants are different from other users. The role of power plants in steel joint ventures is to absorb the remaining gas resources. Therefore, all the remaining gas is supplied to power plants. The energy utilization of power plants is completely passive. The energy supply model is shown in formula (5):
[0127]
[0128] In the formula, i is the energy type as gas.
[0129] ⑤ The energy and environment department optimizes the allocation model of energy supply for each process
[0130] Since the total amount of energy in the iron and steel joint venture is planned to a certain extent, it is not infinite; therefore, after each process proposes its most reasonable energy demand, the Energy and Environmental Department optimizes the allocation based on the existing energy resources and generates an optimized allocation plan to guide the energy scheduling problem between each process. The optimization scheduling model of the energy management system of the Energy and Environmental Department established by the present invention is shown in formula (6):
[0131]
[0132] Constraints:
[0133] Where: α ij , β ij , γ ij , ij They represent the economic loss caused by unit energy when the energy medium of type i in type j process deviates from the required value;
[0134] V i,j,主 、V i,j,辅助 、V i,j,缓冲 、V i,j,发电厂They represent the supply of energy i for each main process, auxiliary process, buffer user and power plant respectively;
[0135] Y represents the economic loss of all energy-consuming processes in the entire steel industry. This function strives to minimize this value, that is, minimize the loss and make the energy distribution among the processes most reasonable.
[0136] Step 3: Establish a branch plant energy scheduling model.
[0137] The Energy and Environmental Department distributes all energy to each branch through the first-level dispatching function of the energy management system; the branch energy management system then continues to implement the second-level optimization dispatching of the energy within the plant, which needs to comprehensively consider the energy quality, equipment status and other issues within the branch. This process is the second-level dispatching function of the energy management system of the steel joint enterprise. Figure 3 shown.
[0138] Three representative plants are selected for introduction. The iron and steel plant is taken as an example of the main process, the oxygen plant is taken as an example of the auxiliary process, and the power plant is taken as an example of the buffer user.
[0139] ① Main process energy scheduling model
[0140] The energy dispatch process of the main process takes the ironmaking plant as an example. The energy distribution process is shown in the figure below: Figure 4 As shown. The ironmaking plant is the core process of the steel joint venture. The energy-consuming furnaces and kiln equipment include blast furnaces, hot blast furnaces, heating furnaces, coal mills, dust collectors, etc.; the types of energy used include coal gas, combustion air, compressed air, nitrogen, oxygen, industrial water and electricity. According to the production characteristics of each equipment, the energy consumed by the blast furnace includes coal gas, air, compressed air, nitrogen, and electricity; the energy consumed by the hot blast furnace includes coal gas, air, oxygen, and electricity; the energy consumed by the heating furnace includes coal gas and electricity; the energy consumed by the coal mill includes industrial water and electricity; the energy consumed by the dust collector includes air, industrial water and electricity.
[0141] The energy dispatch process of the ironmaking plant establishes energy demand based on the operating characteristics of each energy-consuming equipment; the relationship between the total energy supply to the branch plant and each energy-consuming equipment is shown in equations (7) to (13). Each equipment has its own unique production characteristics, and the amount of energy required for different production rhythms is different. It is necessary to establish a relationship for allocation based on the actual production process and equipment process requirements.
[0142]
[0143]
[0144]
[0145]
[0146]
[0147]
[0148]
[0149] Where: They respectively represent the amount of gas, air, compressed air, nitrogen, oxygen, industrial water and electricity dispatched by the Energy and Environmental Protection Department to the iron and steel plant;
[0150] They represent the gas, air, compressed air, nitrogen and electricity required for the production of blast furnace i respectively;
[0151] They represent the gas volume, air volume, oxygen volume and electricity volume required for the production of hot blast stove j corresponding to blast furnace i respectively;
[0152] They represent the gas and electricity required for the production of heating furnace h respectively;
[0153] They represent the air volume, industrial water volume and electricity volume required for the production of dust collector c respectively;
[0154] They represent the industrial water and electricity required by coal mill m respectively;
[0155] Indicates the amount of electricity required for production by other energy-consuming equipment.
[0156] ②Auxiliary process energy scheduling model
[0157] Take the oxygen plant as an example of the auxiliary process; the oxygen, nitrogen and argon produced are proportional, and the corresponding equipment is the air separation unit; among them, the oxygen production is determined by the energy production plan of the whole plant, and the energy consumption of the oxygen plant is directly determined by the energy demand of the air separation unit and its system.
[0158]
[0159]
[0160] Where: They respectively represent the amount of electricity and new water resources dispatched by the Ministry of Energy and Environment to the oxygen plant;
[0161] They represent the electricity and water required for the production of the i-th air separation unit, respectively, and are obtained from the production plan.
[0162] ③ Buffer user energy scheduling model
[0163] Take the power plant as an example of a buffer user. The power plant of the iron and steel joint venture is different from the production system. The production and energy supply of the power plant are not stable. Instead, the iron and steel joint venture provides fuel to the power plant based on the surplus coal gas. The operation of the boiler of the power plant that uses the surplus coal gas of the iron and steel joint venture as fuel is relatively passive, and the power plant has multiple boilers running at the same time. Therefore, it is necessary to consider both the distribution of coal gas between boilers and the optimal operation of a single boiler. In addition to coal gas, the types of energy required by the power plant include combustion air, water, and electricity. The model is established as shown in equations (16) to (19):
[0164]
[0165]
[0166]
[0167]
[0168] Where: They represent the amount of gas, air, fresh water and electricity allocated to the power plant by the Ministry of Energy and Environment respectively;
[0169] They represent the gas volume, air volume, water volume and electricity volume of the boilers and their corresponding systems in the power plant. The gas volume needs to take into account the operating characteristics of each boiler; while the air, water and electricity volume are provided based on the gas volume allocated to each boiler to ensure the operating effect of each boiler.
[0170] Step 4: Establish an optimized circulation mechanism for efficient energy utilization in steel joint enterprises.
[0171] At present, the energy dispatch strategy adopted by the energy management system of the steel joint enterprise is relatively rough and inefficient. When unreasonable situations are found, the algorithm cannot be improved in time. After the dispatch is completed, the dispatch algorithm is not updated in time, resulting in the failure to generate a response strategy in time when similar problems occur next time.
[0172] By establishing an energy efficient utilization optimization cycle mechanism for steel joint enterprises, it is possible to solve the scheduling optimization under accident conditions and realize the improvement of energy scheduling methods and modes. Compared with the current problems of relying on delayed analysis by personnel and then implementing scheduling through telephone contact, and failing to generate improved algorithms in a timely manner, the present invention can solve all these problems.
[0173] The basis for establishing the energy efficient utilization optimization cycle mechanism is to divide all energy users of the steel joint enterprise into three categories according to their production characteristics: the first category of users has a production characteristic of product planning, and the product and energy consumption are in a functional relationship; the second category of users has a production characteristic of product planning, but there is no obvious functional relationship between the product and energy consumption process; the third category of users has a production characteristic of no product planning, and the energy used by this category of users is waste heat and waste energy. The process of the energy efficient utilization optimization cycle mechanism proposed by the present invention is as follows Figure 5 and Figure 6 shown.
[0174] Figure 5 The first type of users is shown in Figure 2. This type of users has clear main products, such as blast furnaces in iron and steel plants, sintering machines in sintering plants, heating furnaces in steel rolling mills, etc. They formulate production plans based on enterprise needs, and there is a clear functional relationship between product output and energy consumption. This type of users can directly establish a functional relationship between product quantity and energy quantity, and establish a model as shown in formula (20):
[0175]
[0176] Where: —The amount of energy i required by the first category user j;
[0177] P j —jUser product output.
[0178] The system can automatically read product output and determine whether the product quantity is normal. If the production is normal, the energy consumption of energy-consuming users can be directly calculated based on the system model to guide production. If the production is abnormal, it is necessary to fit the functional relationship between product quantity and energy quantity based on the event situation, and attach it to the original model system to enrich the original functional relationship system to meet actual needs. Repeat the above process to calculate the energy consumption of energy-consuming users.
[0179] The second type of users is more special than the first type of users. Although this type of users has a production plan, there is no clear functional relationship between product output and energy consumption, such as coke ovens in coking plants, converters in steel plants, hot blast furnaces in iron plants, etc. Figure 6 As shown. Now take the coke oven as an example; the relationship between the gas consumption produced by the coke oven and the coke output of the coke oven is: after each carbonization chamber of the coke oven is loaded with coke once, it takes about 20 hours of smelting, which is called the smelting and coking cycle, before the carbonization chamber of the hole can perform a coke pushing operation; therefore, there is no clear functional relationship between the coke output of the coke oven and the gas consumption. To solve this problem, the present invention establishes a correlation model between energy quantity and equipment status, as shown in formula (21):
[0180]
[0181] Where: —The amount of energy i required by the second category user k;
[0182] S0, S1, S2—represent the three operating states of the equipment.
[0183] The third type of users do not have a clear product plan, and their energy use is only for waste heat and waste energy, such as sintering plant waste heat boilers, steel plant waste heat recovery systems, self-provided power plant boilers, etc. The model is established as shown in formula (22):
[0184]
[0185] Where: — the energy supply i of the third category of users l;
[0186] f 余能 —The remaining energy of energy source i is consumed and utilized by the third type of user l.
[0187] Establish an overall flow chart for optimizing energy efficient utilization Figure 7 As shown in the figure, by establishing the relationship between product output, equipment production status, and energy consumption, the optimized energy consumption of various users is finally obtained. Guide the optimal operation of the energy system.
Claims
1. A two-tier scheduling method for an energy management system of a steel joint venture, characterized in that: The steps include: Step 1: Establish a two-layer energy optimization and scheduling model for steel joint enterprises; the first layer is the energy scheduling model of the Energy and Environmental Department and each branch, which solves the scheduling problem of plant-level energy in each branch; the second layer is the energy optimization allocation process between the internal equipment groups of each branch after each branch receives the energy dispatched by the Energy and Environmental Department; Step 2: Establish an energy dispatch model for each process by the Energy and Environmental Department; the energy dispatch process is divided into three categories. The first category is the main process of sintering, pelletizing, coking, ironmaking, steelmaking, and steel rolling; the second category is the auxiliary process of oxygen plant, power plant, lime plant, lime plant, and water treatment plant; the third category is the buffer user power plant, spare parts repair plant, solid waste treatment plant, transportation company, and office and living area; among them, the main process needs to provide energy according to its energy demand to ensure production; Step 3: Establish the branch plant energy dispatch model; the Energy and Environmental Department distributes all energy to each branch plant through the first-level dispatch function of the energy management system; the branch plant energy management system then continues to implement the second-level optimal dispatch of the plant energy, which needs to comprehensively consider the energy quality and equipment status issues within the branch plant; Step 4: Establish an energy efficient utilization optimization cycle mechanism for the steel joint enterprise; divide all energy users of the steel joint enterprise into three categories according to their production characteristics: the first category of users has a product plan, and the product and energy consumption are in a functional relationship; the second category of users has a product plan, but there is no obvious functional relationship between the product and energy consumption process; the third category of users has no product plan, and the energy used by this category of users is waste heat and waste energy; In the second step, the model used includes the total amount of energy available for dispatch by the steel joint venture; Formula (1) represents the total amount of energy purchased and recycled by the steel joint venture, that is, the total amount of various types of energy that can be dispatched by the Ministry of Energy and Environment; V i,总 =V i,外购 +V i,二次 (1) Where: i—energy type, representing the 12 types of energy media commonly used in steel enterprises; V i,总 —The total amount of Class I energy that can be dispatched by the Ministry of Energy; V i,外购 —Total energy of type i energy purchased by the enterprise; V i,二次 —The total amount of Class I secondary energy produced by the enterprise; In the step 2, the model adopted also includes the energy scheduling supply of the main process; Where: —Energy demand of process j; M j —Product quantity of process j; g i,j —The energy consumption required for unit product of process j; V i,j,请求 — In the event of a special event, process j sends a dispatch request to the Energy and Environment Department to increase energy demand; When a request occurs, the branch plant first proposes the energy replenishment demand and duration, and the Energy and Environmental Department conducts a comprehensive analysis of the entire plant, generates a scheduling plan and sends it to the power plant for implementation, so as to provide the corresponding energy for the process that has made the energy request; In step 2, the model used also includes the energy scheduling supply of auxiliary processes; auxiliary processes include power plants, oxygen plants, lime plants, lime plants, and water treatment plants. Such users provide auxiliary materials and power to ensure the stable operation of the main process; The supply calculation function of the auxiliary process energy demand is shown in formula (3): Where: —Energy demand and supply for auxiliary processes; M j —Product output corresponding to process j; T 状态 —Operational health status of main equipment in auxiliary process j; P 计划 —The implementation of the production plan of the branch factory; In the second step, the Energy and Environment Department optimizes the allocation model of the energy supply of each process; the total energy of the iron and steel joint venture has a certain degree of planning, and the energy is not infinite; therefore, after each process proposes its most reasonable energy demand, the Energy and Environment Department optimizes the allocation based on the existing energy resources and generates an optimal allocation plan to guide the energy scheduling problem between each process; the established energy management system optimization scheduling model of the Energy and Environment Department is shown in formula (6): Constraints: Where: α ij , β ij , γ ij , ij They represent the economic loss caused by unit energy when the energy medium of type i in type j process deviates from the required value; V i,j,主 、V i,j,辅助 、V i,j,缓冲 、V i,j,发电厂 They represent the supply of energy i for each main process, auxiliary process, buffer user and power plant respectively; Y represents the economic losses of all energy-consuming processes in the entire steel complex; In the step 3, the energy dispatching process of the main process branch of the ironmaking plant establishes the energy demand according to the operating characteristics of each energy-consuming equipment; the relationship between the total energy supply branch and each energy-consuming equipment is shown in equations (7) to (13); each equipment has its own unique production characteristics, and the energy required for different production rhythms is different. It is necessary to establish a relationship for allocation according to the actual production process and equipment process requirements; Where: They respectively represent the amount of gas, air, compressed air, nitrogen, oxygen, industrial water and electricity dispatched by the Energy and Environmental Protection Department to the iron and steel plant; They represent the gas, air, compressed air, nitrogen and electricity required for the production of blast furnace i respectively; They represent the gas, air, oxygen and electricity required for the hot blast stove j corresponding to blast furnace i respectively; They represent the gas and electricity required for the production of heating furnace h respectively; They represent the air volume, industrial water volume and electricity volume required for the production of dust collector c respectively; They represent the industrial water and electricity required by coal mill m respectively; Indicates the amount of electricity required for production by other energy-consuming equipment.
2. The double-layer scheduling method for the energy management system of a steel joint enterprise according to claim 1 is characterized in that: The second step is to buffer the energy supply of the users; the users of buffer energy consumption include power plants, spare parts repair plants, solid waste treatment plants, transportation companies and office and living areas; the energy demand of spare parts repair plants, solid waste treatment plants, transportation companies and office and living areas is related to the products processed and maintained, or has a certain degree of planning; therefore, the energy supply model is established as shown in formula (4): Where: — The most reasonable energy supply for buffer user j, excluding power plants; Moreover, among the buffer users, power plants are different from other users. The role of power plants in steel joint ventures is to absorb the remaining gas resources. Therefore, all the remaining gas is supplied to power plants. The energy utilization of power plants is completely passive. Its energy supply model is shown in formula (5): In the formula, i is the energy type as gas.
3. The double-layer scheduling method for the energy management system of a steel joint enterprise according to claim 1 is characterized in that: In the step 3, the oxygen, nitrogen and argon produced by the auxiliary process branch of the oxygen plant are proportional, and the corresponding equipment is an air separator; wherein the oxygen production is determined by the energy production plan of the whole plant, and the energy consumption of the oxygen plant is directly determined by the energy demand of the air separator and its system; Where: They respectively represent the amount of electricity and new water resources dispatched by the Ministry of Energy and Environment to the oxygen plant; They represent the electricity and water required for the production of the i-th air separation unit, respectively, and are obtained from the production plan.
4. The double-layer scheduling method for the energy management system of a steel joint enterprise according to claim 1 is characterized in that: In step 3, the buffer user power plant of the steel complex is different from the production system. The production and energy supply of the power plant are not stable. Instead, the power plant is provided with fuel according to the remaining coal gas of the steel complex. In addition to coal gas, the power plant needs combustion air, water, and electricity. The model is established as shown in equations (16) to (19): Where: They represent the amount of gas, air, fresh water and electricity allocated to the power plant by the Ministry of Energy and Environment respectively; They respectively represent the amount of gas, air, water and electricity of the boiler and its corresponding system in the power plant.
5. The double-layer scheduling method for the energy management system of a steel joint enterprise according to claim 1 is characterized in that: In step 4, the first type of users have clear main products, formulate production plans based on enterprise needs, and there is a clear functional relationship between product output and energy consumption; this type of users can directly establish the functional relationship between product quantity and energy quantity, and establish a model as shown in formula (20): Where: —The amount of energy i required by the first category user j; P j —jUser product output; The second type of users is more special than the first type of users. Although this type of users has a production plan, there is no clear functional relationship between product output and energy consumption. A correlation model between energy consumption and equipment status is established, as shown in formula (21): Where: —The amount of energy i required by the second category user k; S0, S1, S2—represent the three operating states of the equipment; The third type of users do not have a clear product plan, and their energy use is only for waste heat and waste energy. The model is shown in formula (22): Where: — the energy supply i of the third category of users l; f 余能 —The remaining energy of energy source i is consumed and utilized by the third type of user l.