A universal intelligent scheduling engine and device for satellite mission scheduling
By introducing a general intelligent scheduling engine into satellite mission scheduling and using modular modeling and combined optimization algorithms, the problems of constraint simplification and insufficient algorithm compatibility in the existing technology are solved, and diversified and integrated satellite mission scheduling is achieved. , which improves system efficiency and promotes the development of domestic software.
Patent Information
- Application Number
- CN202210673419.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-15
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-06-15
AI Technical Summary
The existing technology suffers from oversimplification of constraints, insufficient compatibility of model algorithms, lack of intelligent and efficient algorithms and domestic software technology in satellite mission scheduling, making it difficult to adapt to complex and diversified satellite application requirements.
A universal intelligent scheduling engine for satellite mission scheduling is proposed, which includes a satellite mission scheduling modular modeling and solving layer, an adaptive parallel meme evolution layer and a distributed dynamic rolling decision-making layer. It adopts 0-1 mixed integer programming, element A combinatorial optimization algorithm that combines heuristics and machine learning to achieve universal modeling and solution methods.
It breaks through the oversimplification and incompatibility problems of model constraints in traditional research, solves the bottleneck of combinatorial optimization under complex constraints, realizes diversified and integrated satellite mission scheduling, improves system efficiency, and promotes the development of domestic satellite mission scheduling software. develop.
Smart Images

Figure CN115017814B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the fields of computer data processing and satellite mission scheduling, and in particular to a generalized modeling and optimization method for satellite mission scheduling problems. Background Art
[0002] Satellite mission scheduling refers to building a combined optimization model of task and resource scheduling driven by satellite missions and control requirements to avoid constraint conflicts during satellite mission execution and maximize the satellite's mission and control benefits. In recent years, satellite mission scheduling research and practice have yielded rich results, but also exposed some problems and bottlenecks:
[0003] 1. Constraints are oversimplified, making it difficult to meet new requirements for complex and diverse applications. With the improvement of satellite payloads and maneuverability, the constraints on their on-orbit operation are becoming increasingly complex and diverse. However, there is a widespread phenomenon of oversimplified constraints in traditional research and business systems, which changes the properties of the problem to varying degrees, affects the applicability of the results, and makes it difficult to adapt to the new application requirements of the continuous changes in satellite and payload technology.
[0004] 2. The model algorithm is not compatible enough. Each type and category of satellites is a separate system that is difficult to be compatible with each other, making it difficult to meet the diversified and integrated satellite application and development needs. Traditional research and business systems are usually only aimed at one or a few satellites of the same type. The model algorithm is rigid, has a narrow scope of application, and lacks integration and expansion capabilities, resulting in "chimney-style" and "one satellite, one system" management and control barriers. Under this pattern, the new system has high R&D costs and long cycles, and is incompatible with the old system, forming a vicious cycle, which makes it difficult to adapt to the current diversified and integrated satellite application needs.
[0005] 3. The lack of intelligent and efficient algorithms makes it difficult to resolve the multiple contradictions between ground routine dispatch and emergency dispatch, centralized control and autonomous coordination on board. With the continuous improvement of onboard computing power, a comprehensive control pattern of "ground + on board" and "routine + emergency" is emerging. On the one hand, the two have different requirements for algorithm optimization efficiency and self-organization; on the other hand, complex constraints also put forward higher requirements on algorithm performance. The currently commonly used single metaheuristic, machine learning and other algorithms are difficult to adapt to multiple comprehensive application needs at the same time.
[0006] 4. There is currently no alternative and competitive domestic software technology. Summary of the invention
[0007] In order to solve the above problems, further coordinate the in-orbit satellites and control resources with continuously growing scale, different model constraints and complex application environment, and maximize the benefits of satellite systems, the present invention focuses on the diversified and integrated satellite control requirements to realize an intelligent task scheduling engine, focusing on realizing a universal satellite task scheduling modeling and solution method.
[0008] Specifically, the present invention provides the following technical solutions:
[0009] On the one hand, the present invention provides a generalized intelligent scheduling engine for satellite mission scheduling, comprising:
[0010] Satellite mission scheduling modular modeling and solution layer, satellite mission scheduling constraint satisfaction optimization layer, adaptive parallel meme evolution layer, distributed dynamic rolling decision layer;
[0011] The satellite task scheduling modular modeling and solution layer includes a satellite task scheduling generalized modeling module, a generalized solution module for satellite conventional task scheduling, and a generalized solution module for satellite emergency task scheduling;
[0012] The satellite task scheduling universal modeling module is connected to the satellite task scheduling constraint satisfaction optimization layer, and provides a universal basic model and task scheduling problem description for the satellite task scheduling constraint satisfaction optimization layer; the satellite task scheduling universal modeling module includes a universal model interface and a benefit calculation interface;
[0013] The generalized solution module for satellite conventional task scheduling is connected to the adaptive parallel meme evolution layer and provides a conventional scheduling core algorithm for the adaptive parallel meme evolution layer; the generalized solution module for satellite conventional task scheduling optimizes the satellite task scheduling scheme based on the model interface;
[0014] The generalized solution module for satellite emergency task scheduling is connected to the distributed dynamic rolling decision layer and provides an emergency scheduling core algorithm for the distributed dynamic rolling decision layer; the generalized solution module for satellite emergency task scheduling performs real-time emergency optimization of the current task scheduling plan through an intelligent agent.
[0015] Preferably, the satellite mission scheduling constraint satisfaction optimization layer describes satellite mission scheduling as a unified constraint satisfaction problem, including:
[0016] The satellite task scheduling problem description module is used to convert the satellite task scheduling problem into a four-tuple containing a task set, a resource set, and a scoring set decision matrix, and to construct a resource structure by taking the execution timing of the satellite task as the lowest level abstract resource;
[0017] A satellite task scheduling 0-1 mixed integer decision module, based on the result of the problem description module, constructs a decision model between satellite tasks and execution timing through 0-1 mixed integer decision variables and decision matrices;
[0018] Satellite mission scheduling network constraint module, used to build a unified constraint model and incremental constraint algorithm based on constraint templates and constraint networks;
[0019] The satellite mission scheduling time-dependent benefit model obtains a benefit function based on the 0-1 mixed integer decision variables and the decision matrix.
[0020] Preferably, the adaptive parallel meme evolution layer includes:
[0021] A heuristic strategy module is used to solve the initial solution set for the input data based on a heuristic rule method;
[0022] A parallel local optimization module obtains the initial solution set, enables one or more threads in parallel based on a local search algorithm and operator usage probability, and obtains at least one local optimization solution set based on at least one local search algorithm;
[0023] An adaptive selection module obtains a local optimization set based on the at least one local optimization solution set, obtains the contribution of each local search algorithm and operator based on the optimization effect of at least one local search algorithm, and updates the local search algorithm and operator use probability based on the algorithm and operator contribution;
[0024] The population evolution module repairs infeasible solutions and updates the local optimization solution set through the global optimization method of population evolution. When the termination condition is met, the updated local optimization solution set is output as the optimal solution, otherwise it returns to the parallel local optimization module and solves the problem again based on the updated local search algorithm and operator usage probability.
[0025] Preferably, the distributed dynamic rolling decision layer includes:
[0026] The task negotiation allocation module allocates satellite tasks based on the negotiation allocation strategy, combined with historical window data, current window data, and future window data;
[0027] The rolling scheduling module dynamically updates the single-satellite mission scheduling plan in the continuous time domain based on window rolling and funding scheduling for the assigned satellite missions.
[0028] The conflict resolution module selects and quickly inserts satellite missions based on deep reinforcement learning;
[0029] The conflict resolution module, based on the task insertion strategy provided by the conflict resolution module, calculates the task conflict degree based on the constraint network, and preferentially removes tasks with conflict degrees higher than the threshold to achieve conflict resolution.
[0030] Preferably, in the generalized solution module for satellite conventional task scheduling, the optimization algorithm is a meta-heuristic method, specifically:
[0031] Step 1: Initialize the decision matrix X0 and set all decision variables to 0, that is, {x ij |xij =0,0≤i≤|T|,0≤j≤|E i |};x ij is the decision variable in the decision matrix;
[0032] Step 2: traverse the task set T;
[0033] Step 3: For task t in task set T i , traverse task t i The event set E i ;
[0034] Step 4: For the empty satellite or station set i, record the number of event execution opportunities; this set can be expressed as: P: {p m |p m =0,0≤m≤|P|}; p represents the number of event execution opportunities provided by the satellite or station;
[0035] Step 5: Traverse event set E i Events in ij The execution timing set EO ij ;
[0036] Step 6: Obtain the satellite or station ID for the mth execution opportunity. Preferably, the ID can be expressed as That is, the satellite or station ID of the mth time;
[0037] Step 7: The number of event execution opportunities provided by the satellite or station + 1, that is, p m =p m +1;
[0038] Step 8: Based on the result of step 6, a pre-assigned satellite or station ID is obtained. The obtaining process may be implemented by, for example, a roulette wheel.
[0039] Step 9: Traverse event e again ij The execution timing set EO ij ; and assign values to the decision variables: x ij =k / |EO ij |;
[0040] Step 10: If the execution timing belongs to the satellite or station ID pre-assigned in step 8 and meets the constraint condition F H (X), the planning is successful and returns to step 3;
[0041] Otherwise, the decision variable x ij Reset to 0 and return to step 9.
[0042] Preferably, the generalized solution module for satellite emergency task scheduling uses an intelligent agent to optimize the current task scheduling scheme in real time, including the execution timing selection and insertion of single-satellite tasks, specifically in the following manner:
[0043] Step 1: From the task set T to be inserted X Randomly select a band of insertion tasks t i ;
[0044] Step 2: If the task t i If it is an unscheduled task in the task set T, then get the task t i Task number Id(t i ), go to step 5; if the task t i If the task does not belong to the task set T, then the task t i Merge into task set T and execute step 3;
[0045] Step 3: Add a row of decision variables to the decision matrix. Preferably, all decision variables in the added row are 0.
[0046] Step 4: Assign the task t i The current maximum number;
[0047] Step 5: Traverse the task t i The event set E i And initialize the schedulability prediction set;
[0048] Step 6: Traverse the task t i The event set E i The execution timing set EO of each event in ij , and predict the schedulability of each event at the corresponding execution time, that is,
[0049] Step 7: Based on the result of step 6, the number k of the execution timing of the event with the highest schedulability is counted;
[0050] Step 8: Assign a value to the decision variable, that is, x ij =k / |EO ij |;
[0051] Step 9: From the task set T to be inserted X Delete the task t i .
[0052] Step 10: Determine the task set T to be inserted X Is it empty? If it is empty, the insertion is completed and the current decision matrix X is output; if it is not empty, return to step 1.
[0053] Preferably, the decision matrix is:
[0054]
[0055] The 0-1 mixed integer decision variables are represented as follows:
[0056]
[0057] Among them, T represents the task set, E i represents the event set of the i-th task; e ij represents the jth event of the i-th task; EO ij Indicates event e ij The execution timing set; Represents the execution opportunity set EO ij The kth execution time.
[0058] Preferably, the constraint model is:
[0059] Among them, c i H is the constraint condition f i H Constraint object; y i H is the constraint condition f i H The constraint threshold of i H is the constraint condition f i H The constraint relationship;
[0060] The incremental constraint algorithm is implemented as follows:
[0061] Step 1: Solve the original solution F H (X) is assigned to F H (X');
[0062] Step 2: Traverse the constraint set F H ;
[0063] Step 3: For each item in the constraint set in step 2, traverse the decision subsets |Z that may be involved in the i-th constraint i (X)|;Z i (X) is X ij Z Collection of;
[0064] Step 4: Change the decision variable x through the operator. If the changed decision variable x belongs to the subset X ij Z , then first subtract the subset X from the original solution X ij Z The constraint value, plus the corresponding subset X' in the new solution X'ij Z Constraint value; x∈X ij Z ;
[0065] Step 5: Determine the traversal constraint set F H Is it finished? If it is finished, go to step 6, otherwise return to step 2;
[0066] Step 6. Return to F H (X').
[0067] Preferably, the current task scheduling scheme is optimized in real time by the intelligent agent, and a fast conflict calculation method is also included, specifically:
[0068] Step 1: Define the task conflict set C, let C = {c k |c k =0,0≤k≤|T|}, where the conflict degree of the task c k The initial values are all set to 0;
[0069] Step 2: Traverse the constraint set F H ;
[0070] Step 3: Traverse the decision subset Z that may be involved in the i-th constraint condition i (X);
[0071] Step 4: If the decision subset Z i X in (X) ij Z If the i-th constraint is violated, then the X in the decision subset is traversed. ij Z Decision variables, get the task number involved in the decision variable x;
[0072] Step 5: Accumulate the conflict degree c of the corresponding task k =c k +|f i H (X ij Z )|, and update the conflict set C;
[0073] Step 6: Determine the constraint set F H Is the traversal complete? If yes, go to step 7, otherwise return to step 2;
[0074] Step 7: Return the updated conflict set C.
[0075] Preferably, the current task scheduling scheme is optimized in real time by the intelligent agent, and also includes a conflict resolution heuristic method, specifically:
[0076] Step 1: Get the task number i with the highest current conflict degree in the task conflict set C;
[0077] Step 2: Determine the corresponding task t i Whether it belongs to the locked task set T X ; If it does, then end and return a signal that the conflict resolution cannot be performed; otherwise, execute step 3; the signal that the conflict resolution cannot be performed can be, for example, returning a related reason, such as "conflict resolution cannot be performed due to a conflict with a task locked by the user."
[0078] Step 3: Traverse task t i The relevant decision variables x ij , clear the decision variable. The clearing operation can be, for example, setting the decision variable to 0 and setting the corresponding conflict degree c i Set to 0;
[0079] Step 4: Based on the result of step 3, recalculate the constraint value F of the current task scheduling solution H (X); if all constraints are met, then F H (X) = 0 (equivalent to no conflict), then execute step 5; otherwise, return to step 1;
[0080] Step 5: Output the current solution X, that is, the decision matrix X after the current solution.
[0081] Preferably, the operator and algorithm contribution are obtained in the following manner:
[0082]
[0083] Among them, P X is the current optimal solution set; A and O are the algorithm and operator pool respectively; The algorithm, the i-th algorithm in the operator pool, and the operator in P X The number of solutions contributed by ; The algorithm, the i-th algorithm in the operator pool, and the operator in P X The contribution of .
[0084] Preferably, the method for obtaining the operator and algorithm usage probability is as follows: for the ith operator, the method for updating the k+1th generation thereof is:
[0085]
[0086] In the formula, The contribution of the i-th algorithm and operator in the k-th generation, algorithm and operator pool respectively; They are the kth generation, algorithm, and usage probability of the i-th algorithm and operator in the operator pool, respectively.
[0087] Preferably, the negotiation allocation strategy is:
[0088] Step 1: Dynamic bidding: In MAS, the agent that receives the task to be assigned automatically acts as the bidding agent and broadcasts the task bidding information to all agents in MAS through the communication blackboard;
[0089] Step 2: All Agents Bid: The Agent that receives the task bidding information will act as a bidding agent, start the bidding process, and evaluate based on its current status, formulate a bid and feedback to the bidding agent;
[0090] Step 3: Differentiated bid evaluation: After receiving bids from all bidding agents or exceeding the scheduled deadline, the bidding agent will end the bidding and start the bid evaluation, assigning the task to the winning agent;
[0091] Step 4, contract signing: After receiving the winning notification, the winning agent notifies the bidding agent to remove the task and confirm the task assignment. At the same time, the winning agent merges the task into its task pool, starts a rescheduling, and updates the task plan it is executing.
[0092] Preferably, the scheduling engine further includes an evaluation of the scheduling scheme of the satellite mission, and the evaluation method is: the score value F(X) of the decision matrix X corresponding to the scheduling scheme is:
[0093] F(X)={F H (X),f(X),F S (X)}
[0094] Among them, F H (X) is the constraint value; f(X) is the benefit value; F S (X) is the soft constraint value; for decision matrices X1 and X2, the comparison is made as follows:
[0095] If F H (X1)>F H (X2), then F(X1)>F(X2);
[0096] If F H (X1)=F H (X2) and f(X1)>f(X2), then F(X1)>F(X2);
[0097] If F H (X1)=F H (X2) and f(X1)=f(X2), then if F S (X1)>F S (X2), then F(X1)>F(X2);
[0098] If F H (X1)=F H (X2) and f(X1)=f(X2), then if F S (X1)=F S (X2), then F(X1)=F(X2);
[0099] In other cases, F(X1) <F(X2)。
[0100] On the other hand, the present invention also provides a general-purpose intelligent scheduling device for satellite task scheduling, which includes a processor and a storage device, wherein the storage device stores instructions readable by the processor; the device is equipped with the general-purpose intelligent scheduling engine for satellite task scheduling as described above.
[0101] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:
[0102] 1. Innovative modeling methods and invention of new universal modeling processes. The present invention innovates the universal modeling method and process for satellite mission scheduling, which can break through the bottleneck of satellite system integrated management and control modeling, solve the problems of over-simplification and incompatibility of model constraints in traditional research and business systems, and provide guidance for revealing the common combinatorial optimization relationships in various types of satellite mission scheduling and building an integrated and universal combinatorial optimization model.
[0103] 2. Innovative solution method, inventing a new hybrid optimization algorithm. The invention innovates the combined optimization algorithm combining metaheuristics and machine learning, centralized and distributed, which can break through the bottleneck of combined optimization under complex constraints and solve the multiple demand contradictions between conventional scheduling and emergency scheduling, centralized optimization and distributed optimization at this stage.
[0104] 3. Innovate application models and implement new ideas for integrated management and control
[0105] Based on the innovation of modeling and algorithm theory, the present invention can break through the application barriers of satellite mission scheduling systems, fundamentally solve the "chimney-style" and "one satellite, one system" problems of each system being independent and difficult to be compatible with each other, adapt to the normal and new requirements of diversified and integrated management and control, and provide a practical basis for promoting the engineering transformation of current satellite mission scheduling research results and the "incremental" iteration of new and old systems, and achieving the goal of diversified and integrated management and control of satellite systems.
[0106] 4. Create domestic technology and open up a new path for independent research and development
[0107] The present invention can solve the problem of the lack of universal and cutting-edge technology core in satellite control systems, and provide necessary technical support for the development of domestic satellite mission scheduling software and the acceleration of the deep integration and integrated development of satellite systems. BRIEF DESCRIPTION OF THE DRAWINGS
[0108] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0109] Figure 1 A relationship diagram of various parts of a generalized intelligent scheduling engine for satellite mission scheduling problems according to an embodiment of the present invention;
[0110] Figure 2 A schematic diagram of a constraint satisfaction optimization model based on 0-1 mixed integer programming according to an embodiment of the present invention;
[0111] Figure 3 A schematic diagram of a meta-heuristic method based on adaptive parallel meme evolution according to an embodiment of the present invention;
[0112] Figure 4 A schematic diagram of a machine learning method based on distributed dynamic rolling decision according to an embodiment of the present invention;
[0113] Figure 5 An example of the composition and interrelationship of a task set in a satellite task scheduling problem according to an embodiment of the present invention;
[0114] Figure 6 An example of the composition and relationship of resource sets in a satellite mission scheduling problem according to an embodiment of the present invention;
[0115] Figure 7 A flow chart of a global optimization strategy based on population evolution according to an embodiment of the present invention;
[0116] Figure 8 The task negotiation and allocation process based on the dynamic contract network in an embodiment of the present invention;
[0117] Fig. 9 This is a single-platform task rescheduling strategy process based on a rolling time domain according to an embodiment of the present invention. DETAILED DESCRIPTION
[0118] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0119] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0120] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0121] The present invention is further explained below in conjunction with specific implementation modes.
[0122] In the computer field, an engine refers to the core component of a program or system developed on a computer platform. Using an engine, developers can quickly build and lay out the functions required by a program or system. Common engines include game engines, search engines, antivirus engines, etc.
[0123] Scheduling Engine, also known as Scheduler, refers to a general solver for solving certain types of scheduling problems, such as Alibaba's distributed task scheduling engine TBSchedule, Huawei's high-performance task scheduling engine Volcano, etc. At the same time, there are many general mathematical programming and combinatorial optimization solvers (Solver) that can be used to solve scheduling problems in related fields, such as IBM's mathematical programming solver CPLEX, Gurobi's mathematical programming solver, Google's operations research optimization solver OR Tools, Red Hat's combinatorial optimization solver OptaPlanner, and Sunshu Technology's mathematical optimization solver COPT.
[0124] The present invention defines the satellite mission scheduling engine as:
[0125] Satellite Task Scheduler / Scheduling Engine: A general solver that solves various types of satellite task scheduling problems through general combinatorial optimization models and algorithms, supporting the development of scheduling systems.
[0126] like Figure 1 As shown, the technical solution provided by this embodiment mainly realizes a universal intelligent scheduling method through four parts, including: 1. modular satellite task scheduling modeling and solution process with decoupling of model-conventional scheduling-emergency scheduling, 2. satellite task scheduling constraint satisfaction optimization model based on 0-1 mixed integer programming, 3. meta-heuristic algorithm for adaptive parallel meme evolution for satellite conventional task scheduling, and 4. machine learning algorithm for distributed dynamic rolling decision for satellite emergency task scheduling, which are interrelated as shown in the figure. Figure 1 As shown, contents 2, 3 and 4 are refinements of the model, conventional scheduling and emergency scheduling modules in the general modeling and solving process of content 1, and provide specific implementation methods.
[0127] 1. Modeling and solution process of modular satellite mission scheduling with decoupling of conventional scheduling and emergency scheduling
[0128] According to the definition of satellite task scheduling engine in the present invention, the functional requirements of satellite task scheduling engine are: ① optimization requirements, that is, the fundamental embodiment of satellite task scheduling problem as a type of combinatorial optimization problem; ② universal application requirements of models and algorithms, to realize integrated scheduling of various types of satellites, breaking through the "chimney-style" and "one satellite one system" barriers; ③ dual application requirements of conventional scheduling and emergency scheduling, that is, the "conventional-emergency" demand contradiction explained in the project establishment basis; ④ management requirements for flexible adjustment of models in the long-term control process, and subjective application requirements for flexible adjustment of task scheduling results manually, to meet the flexible and autonomous control needs of satellite control departments. In this regard, the present invention designs a modular unified process of satellite task scheduling modeling and solving according to the ideas in Table 1, realizes the loosely coupled top-level framework of "model-conventional scheduling-emergency scheduling", points out specific directions for subsequent model and algorithm inventions, and provides a basic framework for the realization of satellite task scheduling engine.
[0129] Table 1 Satellite mission scheduling engine functional requirements and framework design ideas
[0130]
[0131]
[0132] 1. Satellite mission scheduling general modeling module
[0133] Design a general modeling module for satellite task scheduling. As the first module in the satellite task scheduling engine, it is mainly responsible for: ① Problem description, describing the tasks, resources, constraints, etc. in the task scheduling problem; ② Decision model construction, sorting out the decision relationship between "task-resource" in the satellite task scheduling problem, building a general model, and providing a general model interface for subsequent algorithm design; ③ Constraint model construction, providing a constraint calculation interface for subsequent algorithms; ④ Benefit model construction, providing a benefit calculation interface for the algorithm. Among them, the general decision model will serve as the "key coupling point" between the model and the algorithm in this framework, forming a "loosely coupled" data flow connection method, meeting the needs of general construction and flexible management of satellite task scheduling models, and providing general and flexible model support for subsequent algorithms.
[0134] 2. Generalized solution module for satellite routine mission scheduling
[0135] Design a generalized solution module for satellite routine task scheduling as the first problem-solving module in the satellite task scheduling engine. Aiming at the problem of satellite routine task scheduling, based on the generalized modeling method of satellite task scheduling and the model interface it provides, this module optimizes the satellite task scheduling plan through generalized algorithms and operators. This module builds a meta-heuristic algorithm (also known as a heuristic rule algorithm) of adaptive parallel memetic evolution for satellite routine task scheduling, providing a general and efficient solution to the problem of satellite routine task scheduling, outputting high-quality scheduling plans, and meeting the basic optimization needs of the control department for daily and weekly plans for satellite task scheduling under normal circumstances.
[0136] 3. Generalized solution module for satellite emergency mission scheduling
[0137] A generalized solution module for satellite emergency task scheduling is designed. As the second problem-solving module in the satellite task scheduling engine, it is a solution module specifically used to solve the satellite emergency task scheduling problem. The emergency task is generally a temporary task, which can be specifically defined by, for example, a user business process. Although the generalized solution module (i.e., the above 2) can solve the satellite conventional task scheduling problem, in the long-term satellite control process, dynamic events such as adding and reducing tasks and satellite failures occur frequently, and the timeliness of the solution method of the generalized solution module is insufficient. Therefore, for the satellite emergency task scheduling problem, this module uses an agent to perform real-time emergency optimization of the current task scheduling plan to provide a feasible scheduling plan for the emergency task. This module builds a machine learning method for distributed dynamic rolling decision-making for satellite emergency task scheduling, provides a general and flexible solution for the satellite emergency task scheduling problem, and outputs a feasible and satisfactory emergency scheduling plan; it meets the emergency optimization needs of the control department for the scheduling plan under special circumstances, and the self-optimization needs of some satellites for the scheduling plan during autonomous operation.
[0138] Based on this, facing the needs of satellite routine and emergency task scheduling, this technology has three advantages: ① At the overall framework level, it can achieve the decoupling of "model-algorithm", breaking the design idea of "model is algorithm", which is conducive to the flexible management and flexible expansion of models and algorithms. ② At the model level, it can achieve the decoupling of "decision-constraint-benefit", and further highlight the flexibility and practicality of model management, especially constraint management. ③ At the algorithm level, it can achieve the organic unity of "routine-emergency" optimization, taking into account the design positioning and application scenarios of daily management and emergency response, and ensuring the feasibility and effectiveness in different scenarios.
[0139] In summary, this technology solves demand conflicts and achieves demand unification through a satellite mission scheduling engine framework that decouples "model-conventional algorithm-emergency algorithm", provides a universal and modular modeling and solution idea for various satellite mission scheduling problems, points out the specific direction for subsequent model and algorithm invention work, and provides a basic framework for the realization of satellite mission scheduling engines.
[0140] 2. Satellite mission scheduling constraint satisfaction optimization model based on 0-1 mixed integer programming
[0141] How to systematically and integratedly establish a combinatorial optimization model and explore the combinatorial optimization relationship existing in satellite mission scheduling is the key to the present invention. According to the current status of relevant research, the task scheduling modeling of the present invention requires: 1. Systematicity, authenticity and integrity, and should not over-simplify problems and complex constraints; 2. Unity and scalability to support integrated satellite management and scheduling; 3. Flexibility in constraint modeling and management to support "flexible configuration" of constraints; 4. Rationality of the benefit function to meet the objective needs of resource optimization. In this regard, the present invention is based on Figure 3 The idea describes satellite mission scheduling in a detailed and unified manner as a type of constraint satisfaction problem (CSP), and adopts a "decision-constraint-benefit" loosely coupled 0-1 mixed integer programming modeling idea to realize model construction, providing important modeling method basic support for the present invention and the satellite mission scheduling engine implementation.
[0142] 1. Detailed description of satellite mission scheduling problem
[0143] First, the satellite task scheduling problem is described in a refined and hierarchical manner, covering remote sensing, relay communication, navigation, and satellite measurement and control, etc., to meet the modeling requirements of systematicity, authenticity, and integrity. This problem belongs to a combinatorial optimization problem, which is inseparable from the four elements of tasks, resources, constraints, benefits, and decision-making relationships. Therefore, the problem can be uniformly described as a quaternion containing a task set, a resource set, a scoring set, and a decision matrix. Among them, in view of the complexity and diversity of resources, the "execution opportunity" of the satellite task (i.e., an opportunity for the task to be executed within the time window) is taken as the most basic and direct abstract resource in the problem, and a "bottom-up" resource structure relationship is constructed to provide a premise for the subsequent decision, constraint, and benefit model construction. At the same time, following the instantiation and object-oriented modeling ideas, a realization basis is provided for the design and application of the scheduling system based on the results of the present invention.
[0144] The task set is denoted as T, which can be expressed by the following formula:
[0145] T={t i |i=1,2,...}
[0146] t i ={E i ,P i C ,P i V}
[0147] Among them, t i Indicates the i-th task, where i is the task number (usually starting from 1); E i Represents task t i The event set; Represents task t i The property set of (constant); Represents task t i Variable set.
[0148] To intuitively illustrate the event set E in the formula i , attribute set and interface set etc., see Figure 5 Taking a remote sensing satellite mission scheduling problem as an example, an example of satellite mission composition and their relationship is given.
[0149] Resource set, denoted as R, can be further divided into platform set, load / device set, window set and event execution timing set:
[0150] R={P,Q,W,EO}
[0151] Among them, P represents the platform set; Q represents the load / equipment set; W represents the window set; EO represents the event execution opportunity set.
[0152] An example of a satellite mission scheduling problem platform set, payload / equipment set, window set and event execution timing set is as follows: Figure 6 shown.
[0153] The scoring set, denoted as F, can be further divided into constraint set, benefit function and soft constraint set, such as:
[0154] F={F H ,f,F S}
[0155] Among them, F H represents the set of constraints; f represents the profit function; F S Represents a set of soft constraints.
[0156] Based on the constraint value F H (X), benefit value f(X) and soft constraint value F S (X), and F(X) is denoted as the score value, which serves as the evaluation basis for the satellite mission scheduling solution (i.e., the final solution).
[0157] F(X)={F H (X),f(X),F S (X)}
[0158] In a more specific implementation, given two satellite mission scheduling schemes, whose decision matrices are X1 and X2, respectively, in the process of comparing the score values F(X1) and F(X2) of the two schemes, we can set the constraint value to have the highest priority, the benefit value to be the second, and the soft constraint value to have the lowest priority. Here, it is agreed that the satellite mission scheduling problem is a maximization problem, so the comparison method of the score values F(X1) and F(X2) is as follows:
[0159] The input values of the algorithm are the scoring values F(X1) and F(X2) corresponding to the two decision matrices.
[0160] If F H (X1)>F H (X2), then F(X1)>F(X2);
[0161] If F H (X1)=F H (X2) and f(X1)>f(X2), then F(X1)>F(X2);
[0162] If F H (X1)=F H (X2) and f(X1)=f(X2), then if F S (X1)>F S (X2), then F(X1)>F(X2);
[0163] If F H (X1)=F H (X2) and f(X1)=f(X2), then if F S (X1)=F S (X2), then F(X1)=F(X2);
[0164] In other cases, F(X1) <F(X2)。
[0165] 2. Satellite mission scheduling 0-1 mixed integer decision model
[0166] Secondly, through the 0-1 mixed integer decision model, the commonly existing combinatorial optimization relationship between the problem "task set-resource set" is revealed to meet the compatibility and scalability requirements of the satellite task scheduling model. In view of the problem of insufficient universality of the traditional model, on the basis of the refined problem description, the commonly existing decision relationship between "task set-resource set", that is, "task-execution timing" is further analyzed and revealed, and a unified 0-1 mixed integer decision variable and decision matrix are designed. Based on this, task scheduling decision models such as remote sensing, relay communication, navigation satellite and satellite measurement and control are constructed, which provides a unified decision basis for the satellite task scheduling of the present invention, and also provides a unified interface and implementation path for the subsequent constraint and benefit model construction and algorithm design.
[0167] In a preferred embodiment, the 0-1 mixed integer decision variable is represented by the following formula:
[0168]
[0169] Among them, T represents the task set, E i represents the event set of the i-th task; e ij represents the jth event of the i-th task; EO ij Indicates event e ij The execution timing set; Represents the execution opportunity set EO ij The kth execution time.
[0170] On this basis, the decision matrix X of the satellite mission scheduling problem can be expressed as follows. As one of the four tuples of the satellite mission scheduling problem, the decision matrix X can determine a satellite mission scheduling solution.
[0171]
[0172] 3. Incremental Networked Constraint Model for Satellite Mission Scheduling
[0173] Starting from the two levels of model construction and model calculation, an incremental constraint method for satellite mission scheduling is designed based on constraint templates and constraint networks to meet the objective needs of constraint modeling and management. ① At the model construction level, various types of satellite constraints are systematically analyzed and classified, and formatted and unified descriptions are achieved through standard constraint templates, breaking through the traditional "chimney-style" and "one satellite, one model" constraint barriers, and providing incremental constraint modeling and management methods; ② At the model calculation level, in response to the high complexity and low efficiency of integrated calculation of various constraint models, an incremental constraint fast calculation method based on constraint networks is designed to provide strong support for efficient calculation and algorithm adaptation of satellite mission scheduling constraint models.
[0174] In a preferred implementation, the constraints can be uniformly divided into the following four categories: ① Resource availability constraints, which are mainly used to ensure that satellites, stations and other resources are visible and available. ② Logical constraints, which are mainly used to ensure the logical rationality of the task execution process, follow the basic factual logic and the business process of satellite management and control. ③ Resource capacity constraints, which reflect the ability of resources to perform tasks, are "bottleneck" constraints that limit the upper limit of task scheduling. ④ Resource protection constraints, which are mainly used to protect satellites and their payloads, extend the service life of satellites, and prevent satellites from being in extreme use for a long time. Based on the above four types of constraints, taking a remote sensing satellite as an example, the following table further gives a more detailed constraint classification for a specific remote sensing satellite, illustrating the feasibility of the classification method of this project.
[0175] Based on this, in a more preferred implementation, the constraints in the satellite mission scheduling problem are divided into constraint objects, constraint thresholds, and constraint relationships in a templated manner, and the three are defined as follows:
[0176] Definition 1: Constrained Object: In a constraint condition, the constrained instantiated object or functionalized indicator.
[0177] Definition 2: Constraint Threshold: The threshold of the constraint object, that is, the value when the constraint object just meets the constraint condition.
[0178] Definition 3: Constraint Relationship: In a constraint condition, the object matching relationship or indicator size relationship that the constraint object and the constraint threshold must satisfy.
[0179] Therefore, in the satellite mission scheduling problem constraint set F H In the above example, any constraint f i H It can be expressed in a template as:
[0180]
[0181] Among them, c i H is the constraint condition f i H Constraint object; y i H is the constraint condition f i H The constraint threshold of i H is the constraint condition f i H constraint relationship.
[0182] As shown in the example of Table 2, among the different constraint types of a remote sensing satellite, the various constraint classification methods can be set as shown in Table 2:
[0183]
[0184]
[0185] In a more preferred embodiment, the incremental constraint fast calculation method can be adopted as follows: wherein X ij Z is the jth subset of the decision matrix X that may be involved in the i-th constraint, Z i (X) is X ij Z i and j are counting variables. It is clear to those skilled in the art that other letters can be used here. The characteristics of the constraint calculation algorithm are reflected in step 3-4: Taking the neighborhood operator as an example, since the neighborhood operator Move(x) only changes the value of a decision variable x in the decision matrix X, it is only necessary to recalculate the decision subset X related to it. ij Z (x∈X ij Z ) constraint value; on the contrary, other decision subsets do not contain the changed decision variable x, and the constraint value will not change and does not need to be recalculated. In this way, repeated constraint calculation operations can be avoided during the neighborhood construction process, saving calculation time and greatly improving the calculation efficiency of each neighborhood construction.
[0186] In this incremental constraint value calculation method, the input is the original solution X, the new solution X', and the constraint condition set F H , the original solution constraint value F H (X), neighborhood operator Move(x), output is the new solution constraint value F H (X').
[0187] Step 1: Solve the original solution F H (X) is assigned to F H (X');
[0188] Step 2: Traverse the constraint set F H ;
[0189] Step 3: For each item in the constraint set in step 2, traverse the decision subsets |Z that may be involved in the i-th constraint i (X)|;Z i (X) is X ij Z Collection of;
[0190] Step 4: Change the decision variable x through the operator. If the changed decision variable x belongs to the subset X ij Z , then first subtract the subset X from the original solution X ij Z The constraint value, plus the corresponding subset X' in the new solution X' ij Z The constraint value of
[0191] Step 5: Determine the traversal constraint set F H Is it finished? If it is finished, go to step 6, otherwise return to step 2;
[0192] Step 6. Return to F H (X').
[0193] 4. Time-dependent benefit model for satellite mission scheduling
[0194] Finally, the benefit function is described by decision variables, and a benefit model is constructed to meet the optimization needs of actual management and control, and the satellite task scheduling constraint satisfaction optimization model is constructed. Taking the scheduling of satellite resource tasks such as remote sensing, relay communication, navigation satellites, and satellite measurement and control as an example, the optimization needs in the actual management and control process are comprehensively considered, and the benefit function is designed through the 0-1 mixed integer decision variables and decision matrices in the decision model to construct a comprehensive benefit model. In particular, a special design is made for the time-dependent characteristics of agile remote sensing satellites (which can pitch forward and backward, but the imaging quality is different) and navigation satellites in the delay calculation, which provides an evaluation basis for the satellite task scheduling plan and indicates the optimization direction for the next step of algorithm design.
[0195] In a more specific implementation, taking an agile remote sensing satellite as an example, constructing a revenue model can be achieved by constructing a revenue function. The task scheduling revenue function can be expressed as:
[0196]
[0197] Among them, x i1 represents the decision variable of the first event (i.e., imaging event) of the i-th task, T is the task set, and f i is the initial benefit value of the i-th task, θ(xi1 ) is the satellite's elevation angle (radians) when the imaging event is executed.
[0198] It can be seen that the above formula The term is the penalty coefficient, which is related to the pitch angle θ(x i1 ). When the pitch angle is 0, the image quality is the highest and the penalty coefficient is 0, that is, there is no penalty; as the pitch angle increases, the penalty coefficient increases and the mission benefit value decreases; when the pitch angle reaches 0.5π (90°), the penalty coefficient reaches 1 and the benefit value drops to 0. This processing method directly quantifies the impact of imaging quality on mission benefits and is suitable for agile remote sensing satellite mission scheduling problems that have strict optimization requirements for imaging quality.
[0199] In another embodiment, for navigation satellites, with the goal of minimizing the average value of the overseas satellite delay in the navigation system in each time slot (referred to as average delay), the benefit function of the navigation satellite task scheduling problem can be expressed by the following formula, reflecting the optimization needs of the management and control department to reduce the navigation data delay and improve the navigation accuracy.
[0200] Maximize:
[0201] Among them, x ij is the decision variable, a(x ij ) is a 0-1 variable, indicating the satellite s in the i-th time slot j Whether it is a domestic star, f(x ij ) represents the satellite s in the i-th time slot j The delay is calculated by the following formula:
[0202]
[0203] Among them, T is the mission set, S is the satellite set, EO ij is the set of execution timings of the jth event of the i-th task.
[0204] In summary, the decision model, constraint model and benefit model will jointly form a set of constraint satisfaction optimization models, forming a loosely coupled and unified satellite mission scheduling modeling method of "decision-constraint-benefit", which will provide important modeling method basic support for the implementation of satellite mission scheduling engine.
[0205] 3. Metaheuristic Algorithm of Adaptive Parallel Memetic Evolution for Satellite Conventional Task Scheduling
[0206] That is, the adaptive parallel meme evolution layer. How to design an efficient optimization algorithm is an unchanging theme in the research of resource scheduling and combinatorial optimization. Exact solution algorithms and rule-based heuristic algorithms are difficult to meet the needs of satellite mission scheduling under complex constraints, so the present invention is based on meta-heuristic algorithms to develop algorithm inventions. According to demand analysis, the performance requirements of the meta-heuristic algorithm of the present invention are: ① initial solution quality, ② local optimization capability, ③ global optimization capability, ④ adaptability, and ⑤ time complexity. Taking into account the local optimization advantages of local search algorithms and the global optimization characteristics of evolutionary algorithms, a meme algorithm that combines the two is designed, providing a new idea for hybrid algorithm design that takes into account both local optimization and global optimization.
[0207] In this regard, Table 3 lists several feasible optimization algorithm design ideas and countermeasures, and Figure 3 An adaptive parallel meme evolution framework and algorithm are designed to provide core optimization method support for the present invention and satellite mission scheduling engine implementation.
[0208] Table 3 Design requirements and countermeasures for centralized high-performance optimization algorithms for satellite mission scheduling
[0209]
[0210]
[0211] 1. Rule-based fast initial solution construction strategy
[0212] Based on heuristic rules, a fast initial solution construction strategy is designed to provide the algorithm with a fast and high-quality initial solution to meet the algorithm's needs for the quality of the initial solution. In a large number of engineering practices, heuristic rules such as pre-allocation and tight front sorting can often obtain feasible solutions that meet constraints at a low time cost. They are commonly used by industrial departments to solve complex task scheduling problems and are widely used in many active satellite task scheduling systems. Therefore, based on heuristic rules such as pre-allocation and tight front sorting, quantitative comparative analysis and usage suggestions are carried out, and efficient and fast hybrid heuristic rules are invented to help the algorithm quickly enter the feasible domain space, providing an important optimization basis for meta-heuristic algorithms to solve satellite task scheduling under complex constraints.
[0213] In a preferred embodiment, the specific process of the above hybrid heuristic rule is as follows. The input of the algorithm is the task set T, the event execution time set EO, and the constraint condition function F H (X); the output is the initial solution X0.
[0214] Step 1: Initialize the decision matrix X0 and set all decision variables to 0, that is, {x ij |x ij =0,0≤i≤|T|,0≤j≤|E i |};xij is the decision variable in the decision matrix;
[0215] Step 2: traverse the task set T;
[0216] Step 3: For task t in task set T i , traverse task t i The event set E i ;
[0217] Step 4: For the empty satellite or station set i, record the number of event execution opportunities; this set can be expressed as: P: {p m |p m =0,0≤m≤|P|}; p represents the number of event execution opportunities provided by the satellite or station;
[0218] Step 5: Traverse event set E i Events in ij The execution timing set EO ij ;
[0219] Step 6: Obtain the satellite or station ID for the mth execution opportunity. Preferably, the ID can be expressed as That is, the satellite or station ID of the mth time;
[0220] Step 7: The number of event execution opportunities provided by the satellite or station + 1, that is, p m =p m +1;
[0221] Step 8: Based on the result of step 6, a pre-assigned satellite or station ID is obtained. The obtaining process may be implemented by, for example, a roulette wheel.
[0222] Step 9: Traverse event e again ij The execution timing set EO ij ; and assign values to the decision variables: x ij =k / |EO ij |;
[0223] Step 10: If the execution timing belongs to the satellite or station ID pre-assigned in step 8 and meets the constraint condition F H (X), the planning is successful and returns to step 3;
[0224] Otherwise, the decision variable x ij Reset to 0 and return to step 9.
[0225] In this algorithm, steps 4 to 8 are "pre-allocation" steps: steps 4 to 7 count the total number of event execution opportunities provided by each satellite or station for the current event in turn; step 8 selects a satellite or station "pre-allocated" for the event by methods such as "roulette" or random selection. Here, the total number of event execution opportunities provided by satellites and stations reflects their ability to perform tasks. The more the total number, the greater the ability, and the greater the probability of being selected in the above algorithm. Steps 9 to 10 are "immediately preceding arrangement" steps, which traverse the execution opportunity set of the current event in turn and assign values to decision variables. In step 10, if the execution opportunity belongs to the "pre-allocated" satellite or station and meets the constraints, the event is successfully arranged, and the algorithm returns to step 3 to continue arranging other task events; otherwise, the decision variable is reset to 0, and the algorithm returns to step 9 to continue traversing other execution opportunities for the event.
[0226] 2. Local optimization strategy based on parallel search
[0227] Based on the parallel mechanism, a local optimization strategy is designed (as the first step of the algorithm's inner loop) to help accelerate the algorithm, give the algorithm good local optimization ability, diversity and scalability, and meet the algorithm's needs for local optimization ability and time complexity. First, different local search algorithms can run in parallel, which greatly reduces the algorithm's time consumption and gives full play to the local optimization ability of the local search algorithm. Secondly, the differentiated search trajectories of different algorithms also help to obtain diverse and rich solutions, meeting the algorithm's needs for population diversity. At the same time, a new algorithm or operator can be added and expanded by simply adding new threads, and the algorithm is highly flexible and easy to use. In other words, this strategy will be an important strategy to give full play to computer computing power and enhance algorithm advantages through hardware means.
[0228] In a more preferred embodiment, the present invention designs two basic operators: ① Move operator. The Move operator is the most basic and simplest neighborhood operation operator. The actual function of the Move operator is to change the imaging execution timing or the data transmission execution timing of a decision task. ② Swap operator, which refers to exchanging the values of decision variables, can be further divided into the following three types: the same-position Swap operator, that is, exchanging the execution timing of the same type of events of two decision tasks; the random Swap operator. That is, exchanging the execution timing of the same or different types of events of two decision tasks; the whole-position Swap operator, that is, exchanging the execution timing of imaging events and the execution timing of data transmission events of two decision tasks.
[0229] In addition, this strategy can also be combined with the subsequent algorithm operator adaptive selection strategy to run different local search algorithms according to the use probability of algorithms and operators, call different neighborhood operators, and conduct faster and more efficient search optimization through different search trajectories to obtain more diverse optimization results. At the same time, this strategy will also record the historical optimization of each algorithm and operator, providing a quantitative evaluation basis for the subsequent algorithm, operator competition and global optimization strategy.
[0230] 3. Competition-based algorithm operator adaptive selection strategy
[0231] Based on the competition mechanism, an algorithm operator adaptive strategy is designed (as the second step of the algorithm inner loop), which gives the algorithm good adaptability, realizes the "survival of the fittest" at the algorithm and operator levels, and meets the algorithm's need for adaptive capabilities. Based on the previous strategy's record of the historical optimization of each algorithm and operator, this strategy quantitatively evaluates the contribution of different algorithms and operators, updates their usage probability, retains and uses high-contribution algorithms and operators more frequently, and gradually eliminates low-contribution ones, that is, "the capable ones go up, the lazy ones go down". Therefore, this strategy can realize mutual competition and "survival of the fittest" at the algorithm and operator levels in the algorithm's large loop, giving the algorithm the ability to self-organize and adapt, and providing an important guarantee for optimizing the overall performance of the algorithm.
[0232] In a more preferred embodiment, the algorithm, operator contribution and usage probability calculation method are as follows. X , quantitatively evaluate the algorithms and operators, and update their probability of use in the next "parallel" strategy. Let the i-th algorithm in the algorithm pool A be the current optimal solution set P X Contributed There are P solutions, and the i-th operator in the operator pool O is X Contributed solutions, then the contribution of the ith algorithm and operator and They can be expressed by the following formulas:
[0233]
[0234] Among them, P X is the current optimal solution set; A and O are the algorithm and operator pool respectively; The algorithm, the i-th algorithm in the operator pool, and the operator in P X The number of solutions contributed by ; The algorithm, the i-th algorithm in the operator pool, and the operator in P X The contribution (ratio) in .
[0235] Furthermore, the usage probability of the algorithm and operator is updated by their contribution. In a preferred embodiment, considering the randomness of the optimization process, it may not be possible to objectively evaluate the algorithm and operator based on the optimization result of the "parallel" strategy only once. Therefore, for the ith algorithm and operator, this section updates the usage probability of the k+1th generation algorithm and operator. and When, take their current usage probability ( and ) and contribution ( and ), that is:
[0236]
[0237] In the formula, The contribution of the i-th algorithm and operator in the k-th generation, algorithm and operator pool respectively; Here, in a more preferred implementation, we can agree that the initial usage probabilities of each algorithm and operator are equal, that is,
[0238] In addition, this strategy can also introduce learning methods such as knowledge accumulation and transfer learning, and continuously accumulate algorithms, operator competition and learning results based on a large amount of computing data, further improve the scientificity and accuracy of algorithms, operator competition and selection, and provide an important technical approach for the intelligent and data-based application of this algorithm.
[0239] 4. Global optimization strategy based on population evolution
[0240] Based on the evolutionary mechanism, a global optimization strategy is designed (as the last step of the algorithm's inner loop) to help the algorithm jump out of the local optimum, open up a larger solution space, and meet the algorithm's need for global optimization capabilities. In the traditional memetic algorithm (MA) with the evolutionary algorithm as the main loop and the local search as the improvement operator, the time complexity of the local search and the evolutionary algorithm is superimposed, and the running time of each generation of the algorithm surges; at the same time, the optimization ability of the evolutionary algorithm under complex constraints is not as good as that of the local search algorithm, so the traditional MA is not suitable for the satellite task scheduling problem under complex constraints of the present invention. To overcome this problem, this algorithm (i.e., the global optimization algorithm) uses local search as the main loop and the population evolution strategy as the improvement operator. It can inherit the comprehensive local and global optimization capabilities of MA, meet the algorithm's need for global optimization capabilities, and avoid the superposition of time complexity. It is more suitable for solving the satellite task scheduling problem under complex constraints of the present invention, and can provide another guarantee for the algorithm performance. After this strategy, if the termination condition is met, the optimal solution is output; otherwise, the local optimization strategy is returned, and the algorithm will start a new round of inner loop. Here, a preferred implementation is that the above-mentioned termination condition can be set to the maximum number of iterations, for example, 100 times the total number of tasks is taken as the maximum number of iterations, and the termination condition is determined by judging whether the number of iterations reaches the maximum number of iterations.
[0241] This strategy is similar to the commonly used evolutionary algorithm process. Figure 7 As shown, it mainly includes the following four steps:
[0242] Step 1: Construct the parent population. The current optimal solution set obtained by the "competition" strategy is used as the parent population, and the population size is n P , and randomly pair the individuals (solutions) in the parent population.
[0243] Step 2: Crossover and repair. According to the crossover probability, the crossover operator is applied to the paired individuals in the parent population to obtain the offspring individuals. If the offspring individuals violate the constraints, the repair operator is used to repair them.
[0244] Step 3: Construct the offspring population. Store the offspring individuals obtained in step 2 into the offspring population one by one.
[0245] Step 4: Update the current optimal solution set. Merge the parent and child populations and select the n with the highest scores. P individuals and construct a new current optimal solution set.
[0246] In summary, under the framework of the adaptive parallel memetic evolution algorithm, the four strategies of initial solution construction, local optimization, global optimization and algorithm operator adaptation can work together to complement each other's advantages, meet the needs of algorithm design, and provide a high-performance and effective solution for conventional task scheduling in the satellite task scheduling engine of the present invention.
[0247] 4. Machine Learning Algorithm for Distributed Dynamic Rolling Decision-making for Satellite Emergency Mission Scheduling
[0248] That is, a distributed dynamic rolling decision-making layer. During the operation of satellites in orbit, some dynamic events will inevitably occur, affecting the original mission plan, requiring the control department or satellite to spontaneously make effective and timely responses. From the perspective of task scheduling problems, dynamic events can be simply divided into: ① increase and decrease of resources, ② increase and decrease of tasks, ③ change of constraints, etc. Among them, the increase of resources and the reduction of tasks will make resources more abundant, reduce the degree of constraints and the scale of tasks, and be more conducive to scheduling and solving. On the contrary, the reduction of resources and the increase of tasks will lead to more scarce resources, increase the degree of constraints and the scale of tasks, which is not conducive to solving. Therefore, the requirements for the design of the satellite distributed task scheduling algorithm of the present invention can be summarized as follows: ① the real-time, rapid scheduling and conflict resolution requirements for new tasks under the adverse effects of resource reduction, task increase, and constraint violation; ② the continuous optimization requirements for the original plan under the favorable effects of resource increase and task reduction; ③ the business requirements for less changes to the original plan during the rescheduling process; ④ the intelligent control requirements for multi-satellite and multi-station task negotiation and allocation under the development trend of satellite system autonomy.
[0249] Table 4 Design ideas and countermeasures of distributed collaborative optimization algorithm for satellite mission scheduling
[0250]
[0251] In this regard, Table 4 lists several feasible algorithm design ideas and countermeasures, and Figure 4 The invention designs a distributed dynamic rolling optimization algorithm framework and algorithm based on multi-agent system (MAS), which provides another method support for the present invention and the satellite task scheduling engine.
[0252] 1. Task negotiation and allocation strategy based on dynamic contract network
[0253] Based on the dynamic contract network mechanism, a task negotiation and allocation strategy is designed to build a distributed autonomous optimization environment to meet the intelligent and collaborative management and control needs of multiple satellites and multiple stations under the new trend. By simulating the communication and negotiation mechanism of bidding, tendering, evaluation and winning in the contract network protocol, combined with the needs of satellite autonomous task scheduling, new improvement strategies such as dynamic bidding, full-staff bidding, and differentiated evaluation are introduced to design flexible and self-organizing task negotiation and allocation strategies, providing an important negotiation environment for distributed satellite task scheduling under complex constraints.
[0254] Combination Figure 8 In a preferred implementation, this strategy mainly includes the following four steps:
[0255] Step 1 (Round 1 Communication): Dynamic Bidding. In MAS, the agent that receives the task to be assigned automatically acts as the bidding agent, broadcasts the task bidding information to all agents in MAS (including itself) through the communication blackboard, and sets the bidding deadline.
[0256] Step 2 (Round 2 of Communication): All Agents Bid. The Agent that receives the task bidding information will act as a bidding agent, start the bidding process, and conduct an evaluation: that is, based on its current state information such as the task pool, yield rate, and constraint margin, it will formulate a bid and feedback it to the bidding agent. If the bidding task must be executed, the bidding agent will also initiate a simulated rescheduling (without changing the task plan it is executing), that is, simulate the impact of inserting the task into the current task plan in real time and adjust the bid accordingly. The specific bid content and rescheduling strategy will be introduced below.
[0257] Step 3 (the third round of communication): Differentiated bid evaluation. After receiving bids from all bidding agents or exceeding the scheduled deadline, the bidding agent will end the bidding and start the bid evaluation process: that is, according to the bids of each bidding agent, the winning agent will be determined and notified through the bid evaluation algorithm, and the task will be assigned to the winning agent.
[0258] Step 4 (4th round of communication): Contract signing. After receiving the winning notice, the winning agent notifies the bidding agent to remove the task, and the two parties reach an agreement and confirm the task allocation. At the same time, the winning agent merges the task into its task pool, starts a real rescheduling, and updates the task plan it is executing.
[0259] 2. Real-time scheduling strategy for single-satellite missions based on rolling time domain
[0260] A single-satellite real-time scheduling strategy is designed based on the rolling scheduling mechanism to meet the needs of continuous autonomous optimization and minor changes of single satellites in complex dynamic environments. Rolling time domain scheduling, also known as rolling / sliding window scheduling, is a strategy for handling complex long-cycle task scheduling. Through two steps, window rolling and autonomous scheduling, continuous iterative response is achieved in the continuous time domain, and the single-satellite task scheduling scheme is dynamically updated, providing a flexible and long-term operation mechanism for task scheduling at the single-satellite level under a distributed framework.
[0261] This strategy mainly includes the following four steps. The general process is as follows Fig. 9 As shown:
[0262] Step 1: Determine the window rolling preconditions. Use a mixed rolling trigger condition of "task trigger" and "cycle trigger". The former is applicable to the situation where the agent wins the bid and obtains a new task in the task negotiation and allocation link above, and the latter is applicable to the situation where the control department presets the rolling cycle.
[0263] Step 2: Window rolling. Perform a window rolling to update the start and end time of each window and the tasks it contains. Here, the continuous time domain of a single platform is divided into three continuous, non-overlapping windows: the locked window, the real-time window, and the future window.
[0264] Step 3: Rescheduling: Perform a real-time and fast rescheduling of the tasks in the task pool and the real-time window to update the tasks in the task pool and the real-time window.
[0265] Step 4: The platform continues to execute the task. Based on the latest task scheduling plan, the satellite or station continues to execute the task and returns to step 1, waiting for the next window scrolling trigger.
[0266] 3. Rapid Task Insertion Strategy Based on Deep Reinforcement Learning
[0267] A task insertion strategy is designed based on deep learning models and reinforcement learning algorithms to meet the needs of distributed real-time autonomy and rapid response. Taking advantage of the loose coupling characteristics of machine learning method models and algorithms, under the unified decision-making model and rolling scheduling mechanism of the present invention, the deep reinforcement learning model of "task-execution timing" decision and the evolutionary neural network training algorithm are used to carry out schedulability prediction, and based on the schedulability prediction results, the execution timing of single-satellite tasks is accurately selected and quickly inserted. Supported by a large amount of historical data and machine learning methods from the satellite application department, this strategy can enhance the scientificity and accuracy of task insertion, and provide a scientific and effective solution for single-satellite autonomous task scheduling under a distributed framework.
[0268] In a specific implementation, the process of the fast task insertion algorithm based on schedulability is as follows. The input of the algorithm is the current solution X (i.e., the decision matrix), the task set T, and the task set to be inserted T X ,Schedulability prediction model Pre; the output is the current solution X after the task is inserted.
[0269] Step 1: From the task set T to be inserted X Randomly select a band of insertion tasks t i ;
[0270] Step 2: If the task t i If it is an unscheduled task in the task set T, then get the task t i Task number Id(t i ), go to step 5; if the task t i If the task does not belong to the task set T, then the task t i Merge into task set T and execute step 3;
[0271] Step 3: Add a row of decision variables to the decision matrix. Preferably, all decision variables in the added row are 0.
[0272] Step 4: Assign the task t i The current maximum number;
[0273] Step 5: Traverse the task t i The event set E i And initialize the schedulability prediction set;
[0274] Step 6: Traverse the task t i The event set E i The execution timing set EO of each event in ij , and predict the schedulability of each event at the corresponding execution time, that is,
[0275] Step 7: Based on the result of step 6, the number k of the execution timing of the event with the highest schedulability is counted;
[0276] Step 8: Assign a value to the decision variable, that is, x ij =k / |EO ij |;
[0277] Step 9: From the task set T to be inserted X Delete the task t i .
[0278] Step 10: Determine the task set T to be inserted X Is it empty? If it is empty, the insertion is completed and the current decision matrix X is output; if it is not empty, return to step 1.
[0279] In steps 1-5 of the algorithm, two situations are first considered: ① The task to be inserted is a task that already exists in the task set T but has not been successfully scheduled, and has an existing task number (id); ② The task to be inserted is a brand new task that needs to be incorporated into the task set and given a new number. Therefore, the task is t i In steps 6-8, the algorithm traverses the event set E of the task i And the execution time set EO of each event ij , predict and record the schedulability in turn; then assign the most schedulable execution time to each event, which is the decision variable x ij Assignment, to achieve task insertion. Thereafter, in steps 9-10, the algorithm selects the task set T to be inserted X Remove the inserted tasks and return to step 1 to loop through the above steps until the task set T to be inserted is X All tasks have been inserted.
[0280] 4. Rapid conflict resolution strategy based on constraint model
[0281] Based on the constraint network and constraint propagation technology constructed by the constraint model, a fast conflict resolution strategy is designed to ensure the feasibility of the solution in real time. Based on the machine learning task insertion strategy, the task conflict degree is quickly calculated through the constraint network, and high-conflict tasks are preferentially removed according to the constraint propagation method, so as to achieve fast and effective conflict resolution with little impact on the original solution.
[0282] In a preferred embodiment, in view of the satellite task scheduling constraint model constructed in the present invention, a task conflict degree calculation algorithm based on the constraint model is provided here:
[0283] The input of this algorithm is the current solution X (i.e., decision matrix), the task set T, and the constraint value calculation function F H (X) and constraint network; the output is the task conflict degree set C.
[0284] Step 1: Define the task conflict set C, let C = {c k |c k =0,0≤k≤|T|}, where the conflict degree of the task c k The initial values are all set to 0;
[0285] Step 2: Traverse the constraint set F H ;
[0286] Step 3: Traverse the decision subset Z that may be involved in the i-th constraint condition i (X);
[0287] Step 4: If the decision subset Z i X in (X) ij Z If the i-th constraint is violated, then the X in the decision subset is traversed. ij Z Decision variables, get the task number involved in the decision variable x;
[0288] Step 5: Accumulate the conflict degree c of the corresponding task k =c k +|f i H (X ij Z )|, and update the conflict set C;
[0289] Step 6: Determine the constraint set F H Is the traversal complete? If yes, go to step 7, otherwise return to step 2;
[0290] Step 7: Return the updated conflict set C.
[0291] Furthermore, the present invention also provides a fast conflict resolution heuristic algorithm. The algorithm removes the tasks that cause conflicts in order from high to low conflict levels until the current task scheduling scheme satisfies all constraints. The specific implementation is as follows:
[0292] The input of the algorithm is the current solution X, the task set T, and the locked task set T X , constraint value calculation function F H (X), the task conflict degree set C; the output is the solution X (i.e., the decision matrix) after the conflict is resolved.
[0293] Step 1: Get the task number i with the highest current conflict degree in the task conflict set C;
[0294] Step 2: Determine the corresponding task t i Whether it belongs to the locked task set T X ; If yes, then end. At this time, you can return the relevant signal that the conflict cannot be resolved, for example, directly return the reason for the end: "Because it conflicts with the task locked by the user, the conflict cannot be resolved"; otherwise, execute step 3;
[0295] Step 3: Traverse task t i The relevant decision variables x ij , clear the decision variable. The clearing operation can be, for example, setting the decision variable to 0 and setting the corresponding conflict degree c i Set to 0;
[0296] Step 4: Based on the result of step 3, recalculate the constraint value F of the current task scheduling solution H (X); if all constraints are met, then F H (X) = 0 (equivalent to no conflict), then execute step 5; otherwise, return to step 1;
[0297] Step 5: Output the current solution X, that is, the decision matrix X after the current solution.
[0298] It should be noted that in order to meet the actual business needs of satellite control, the above algorithm takes into account the locked task set T X (i.e., the set of tasks that the control department does not allow to be modified). In step 2, the unadjustable tasks are skipped and not removed. The reason is returned: "It conflicts with the user's locked tasks and cannot be resolved." Here, the locked task set T XPre-given by the control department, such as special tasks scheduled by the user department, temporary tasks manually adjusted by the control personnel, and newly inserted tasks based on schedulability prediction in the previous section. If such situations are not considered, when the control personnel manually adjust a task and cause a conflict, the conflict resolution algorithm may remove the task unexpectedly. It can be seen that the design of this algorithm fully considers the business needs of satellite control and is closer to actual application situations.
[0299] In summary, the four strategies can realize real-time and dynamic optimization of task plans under a distributed framework, provide general and flexible solution methods, meet the requirements of autonomous development of satellite systems, and provide another algorithm support for the satellite task scheduling engine of the present invention.
[0300] In another embodiment, the present solution can be implemented by means of a device, which may include a corresponding module that performs each or several functions in the above-mentioned various embodiments. Therefore, each step or several steps of the above-mentioned various embodiments can be performed by a corresponding module, and the device may include one or more of these modules. The module may be one or more hardware modules specially configured to perform the corresponding steps, or implemented by a processor configured to perform the corresponding steps, or stored in a computer-readable medium for implementation by a processor, or implemented by some combination.
[0301] The device can be implemented using a bus architecture. The bus architecture can include any number of interconnecting buses and bridges, depending on the specific application and overall design constraints of the hardware. The bus connects various circuits including one or more processors, memories, and / or hardware modules together. The bus can also connect various other circuits such as peripherals, voltage regulators, power management circuits, external antennas, etc.
[0302] Any process or method description in the flowchart or otherwise described herein can be understood as a module, fragment or portion of a code representing one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiment of the present solution includes other implementations, in which the functions may not be performed in the order shown or discussed, including performing the functions in a substantially simultaneous manner or in a reverse order according to the functions involved, which should be understood by a person skilled in the art of the present solution. The processor performs the various methods and processes described above. For example, the method implementation in the present solution can be implemented as a software program, which is tangibly contained in a machine-readable medium, such as a memory. In some embodiments, part or all of the software program can be loaded and / or installed via a memory and / or a communication interface. When the software program is loaded into the memory and executed by the processor, one or more steps in the method described above can be performed. Alternatively, in other embodiments, the processor can be configured to perform one of the above methods in any other appropriate manner (e.g., by means of firmware).
[0303] The logic and / or steps represented in the flowchart or otherwise described herein may be embodied in any readable storage medium for use by an instruction execution system, apparatus, or device (such as a computer-based system, a system including a processor, or other system that can fetch instructions from and execute instructions on an instruction execution system, apparatus, or device), or in combination with such instruction execution systems, apparatuses, or devices.
[0304] A person skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.
[0305] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A generalized intelligent scheduling engine for satellite mission scheduling, characterized in that: include: Satellite mission scheduling modular modeling and solution layer, satellite mission scheduling constraint satisfaction optimization layer, adaptive parallel meme evolution layer, distributed dynamic rolling decision layer; The satellite task scheduling modular modeling and solution layer includes a satellite task scheduling generalized modeling module, a generalized solution module for satellite conventional task scheduling, and a generalized solution module for satellite emergency task scheduling; The satellite task scheduling universal modeling module is connected to the satellite task scheduling constraint satisfaction optimization layer, and provides a universal basic model and task scheduling problem description for the satellite task scheduling constraint satisfaction optimization layer; the satellite task scheduling universal modeling module includes a universal model interface and a benefit calculation interface; The generalized solution module for satellite conventional task scheduling is connected to the adaptive parallel meme evolution layer and provides a conventional scheduling core algorithm for the adaptive parallel meme evolution layer; the generalized solution module for satellite conventional task scheduling optimizes the satellite task scheduling scheme based on the model interface; The generalized solution module for satellite emergency task scheduling is connected to the distributed dynamic rolling decision layer and provides an emergency scheduling core algorithm for the distributed dynamic rolling decision layer; the generalized solution module for satellite emergency task scheduling performs real-time emergency optimization of the current task scheduling plan through an intelligent agent; In the generalized solution module for satellite routine task scheduling, the optimization algorithm is a heuristic rule method, specifically: Step 1: Initialize the decision matrix X0 and set all decision variables to 0, that is, {x ij |x ij =0,0≤i≤|T|,0≤j≤|E i |};x ij is the decision variable in the decision matrix; Step 2: traverse the task set T; Step 3: For task t in task set T i , traverse task t i The event set E i ; Step 4: For the empty satellite or station set i, record the number of event execution opportunities; this set can be expressed as: P: {p m |p m =0,0≤m≤|P|}; p represents the number of event execution opportunities provided by the satellite or station; Step 5: Traverse event set E i Events in ij The execution timing set EO ij ; Step 6: Obtain the satellite or station ID for the mth execution opportunity. The ID can be expressed as Id(p( )), i.e., the satellite or station ID of the mth opportunity; Step 7: The number of event execution opportunities provided by the satellite or station + 1, that is, p m =p m +1; Step 8: Based on the result of step 6, the pre-assigned satellite or station ID is obtained, and the obtaining process is implemented by a roulette wheel method; Step 9: Traverse event e again ij The execution timing set EO ij ; and assign values to the decision variables: x ij =k / |EO ij |; Step 10: If the execution timing belongs to the satellite or station ID pre-assigned in step 8 and meets the constraint condition F H (X), the planning is successful and returns to step 3; Otherwise, the decision variable x ij Reset to 0 and return to step 9.
2. The scheduling engine according to claim 1, characterized in that: The satellite mission scheduling constraint satisfaction optimization layer describes satellite mission scheduling as a unified constraint satisfaction problem, including: The satellite task scheduling problem description module is used to convert the satellite task scheduling problem into a four-tuple containing a task set, a resource set, and a scoring set decision matrix, and to construct a resource structure by taking the execution timing of the satellite task as the lowest level abstract resource; A satellite task scheduling 0-1 mixed integer decision module, based on the result of the problem description module, constructs a decision model between satellite tasks and execution timing through 0-1 mixed integer decision variables and decision matrices; Satellite mission scheduling network constraint module, used to build a unified constraint model and incremental constraint algorithm based on constraint templates and constraint networks; The satellite mission scheduling time-dependent benefit model obtains a benefit function based on the 0-1 mixed integer decision variables and the decision matrix.
3. The scheduling engine according to claim 1, characterized in that: The adaptive parallel meme evolution layer includes: A heuristic strategy module is used to solve the initial solution set for the input data based on a heuristic rule method; A parallel local optimization module obtains the initial solution set, enables one or more threads in parallel based on a local search algorithm and operator usage probability, and obtains at least one local optimization solution set based on at least one local search algorithm; An adaptive selection module obtains a local optimization set based on the at least one local optimization solution set, obtains the contribution of each local search algorithm and operator based on the optimization effect of at least one local search algorithm, and updates the local search algorithm and operator use probability based on the algorithm and operator contribution; The population evolution module repairs infeasible solutions and updates the local optimization solution set through the global optimization method of population evolution. When the termination condition is met, the updated local optimization solution set is output as the optimal solution, otherwise it returns to the parallel local optimization module and solves the problem again based on the updated local search algorithm and operator usage probability.
4. The scheduling engine according to claim 2, characterized in that: The distributed dynamic rolling decision layer includes: The task negotiation allocation module allocates satellite tasks based on the negotiation allocation strategy, combined with historical window data, current window data, and future window data; The rolling scheduling module dynamically updates the single-satellite mission scheduling plan in the continuous time domain based on window rolling and funding scheduling for the assigned satellite missions. The conflict resolution module selects and quickly inserts satellite missions based on deep reinforcement learning; The conflict resolution module, based on the task insertion strategy provided by the conflict resolution module, calculates the task conflict degree based on the constraint network, and preferentially removes tasks with conflict degrees higher than the threshold to achieve conflict resolution.
5. The scheduling engine according to claim 1, characterized in that: The generalized solution module for satellite emergency task scheduling uses intelligent agents to optimize the current task scheduling scheme in real time, including the execution timing selection and insertion of single-satellite tasks. The specific methods are as follows: Step 1: From the task set T to be inserted X Randomly select a band of insertion tasks t i ; Step 2: If the task t i If it is an unscheduled task in the task set T, then get the task t i Task number Id(t i ), go to step 5; if the task t i If the task does not belong to the task set T, then the task t i Merge into task set T and execute step 3; Step 3: Add a row of decision variables to the decision matrix, and all the decision variables in the added row are 0; Step 4: Assign the task t i The current maximum number; Step 5: Traverse the task t i The event set E i And initialize the schedulability prediction set; Step 6: Traverse the task t i The event set E i The execution timing set EO of each event in ij , and predict the schedulability of each event at the corresponding execution time, that is, p k =Pre(X,t i , ); Step 7: Based on the result of step 6, the number k of the execution timing of the event with the highest schedulability is counted; Step 8: Assign a value to the decision variable, that is, x ij =k / |EO ij |; Step 9: From the task set T to be inserted X Delete the task t i ; Step 10: Determine the task set T to be inserted X Is it empty? If it is empty, the insertion is completed and the current decision matrix X is output; if it is not empty, return to step 1.
6. The scheduling engine according to claim 2, characterized in that: The decision matrix is: The 0-1 mixed integer decision variables are represented as follows: Among them, T represents the task set, E i represents the event set of the i-th task; e ij represents the jth event of the i-th task; EO ij Indicates event e ij The execution timing set; Represents the execution opportunity set EO ij The kth execution time.
7. The scheduling engine according to claim 2, characterized in that: The constraint model is: Among them, c i H For constraints Constraint object; y i H For constraints The constraint threshold of i H For constraints The constraint relationship; The incremental constraint algorithm is implemented as follows: Step 1: Solve the original solution F H (X) is assigned to F H (X'); Step 2: Traverse the constraint set F H ; Step 3: For each item in the constraint set in step 2, traverse the decision subsets |Z that may be involved in the i-th constraint i (X)|; Z i (X) is X ij Z Collection of; Step 4: Change the decision variable x through the operator. If the changed decision variable x belongs to the subset X ij Z , then first subtract the subset X from the original solution X ij Z The constraint value, plus the corresponding subset X' in the new solution X' ij Z Constraint value; x∈X ij Z ; Step 5: Determine the traversal constraint set F H Is it finished? If it is finished, go to step 6, otherwise return to step 2; Step 6. Return to F H (X').
8. The scheduling engine according to claim 5, characterized in that: The current task scheduling scheme is optimized in real time through the intelligent agent, and a fast conflict calculation method is also included, specifically: Step 1: Define the task conflict set C, let C = {c k |c k =0,0≤k≤|T|}, where the conflict degree of the task c k The initial values are all set to 0; Step 2: Traverse the constraint set F H ; Step 3: Traverse the decision subset Z that may be involved in the i-th constraint condition i (X); Step 4: If the decision subset Z i X in (X) ij Z If the i-th constraint is violated, then the X in the decision subset is traversed. ij Z Decision variables, get the task number involved in the decision variable x; Step 5: Accumulate the conflict degree of the corresponding tasks And update the conflict set C; Step 6: Determine the constraint set F H Is the traversal complete? If yes, go to step 7, otherwise return to step 2; Step 7: Return the updated conflict set C.
9. The scheduling engine according to claim 5, characterized in that: The current task scheduling scheme is optimized in real time through the intelligent agent, including conflict resolution heuristic methods, specifically: Step 1: Get the task number i with the highest current conflict degree in the task conflict set C; Step 2: Determine the corresponding task t i Whether it belongs to the locked task set T X ; If it does, then end and return a signal that the conflict resolution cannot be performed; Otherwise, go to step 3; Step 3: Traverse task t i The relevant decision variables x ij , clear the decision variable. The clearing operation is to set the decision variable to 0 and set the corresponding conflict degree c i Set to 0; Step 4: Based on the result of step 3, recalculate the constraint value F of the current task scheduling solution H (X); if all constraints are met, then F H (X) = 0, then go to step 5; otherwise, return to step 1; Step 5: Output the current solution X, that is, the decision matrix X after the current solution.
10. The scheduling engine according to claim 3, characterized in that: The method for obtaining the contribution of the operator and algorithm is as follows: Among them, P X is the current optimal solution set; A and O are the algorithm and operator pool respectively; The algorithm, the i-th algorithm in the operator pool, and the operator in P X The number of solutions contributed by ; The algorithm, the i-th algorithm in the operator pool, and the operator in P X The contribution of .
11. The scheduling engine according to claim 10, characterized in that: The method for obtaining the operator and algorithm usage probability is as follows: for the ith operator, the method for updating the k+1th generation is: In the formula, The contribution of the i-th algorithm and operator in the k-th generation, algorithm and operator pool respectively; The usage probabilities of the i-th algorithm and operator in the algorithm and operator pool are the k-th generation, respectively; it is agreed that the initial usage probabilities of each algorithm and operator are equal, that is, 12. The scheduling engine according to claim 4, characterized in that: The negotiation allocation strategy is: Step 1: Dynamic bidding: In MAS, the agent that receives the task to be assigned automatically acts as the bidding agent and broadcasts the task bidding information to all agents in MAS through the communication blackboard; Step 2: All Agents Bid: The Agent that receives the task bidding information will act as a bidding agent, start the bidding process, and evaluate based on its current status, formulate a bid and feedback to the bidding agent; Step 3: Differentiated bid evaluation: After receiving bids from all bidding agents or exceeding the scheduled deadline, the bidding agent will end the bidding and start the bid evaluation, assigning the task to the winning agent; Step 4, contract signing: After receiving the winning notification, the winning agent notifies the bidding agent to remove the task and confirm the task assignment. At the same time, the winning agent merges the task into its task pool, starts a rescheduling, and updates the task plan it is executing.
13. The scheduling engine according to claim 1, characterized in that: The scheduling engine also includes an evaluation of the scheduling scheme of the satellite mission, and the evaluation method is: the score value F(X) of the decision matrix X corresponding to the scheduling scheme is: F(X)={F H (X),f(X),F S (X)} Among them, F H (X) is the constraint value; f(X) is the benefit value; F S (X) is the soft constraint value; for decision matrices X1 and X2, the comparison is made as follows: If F H (X1)>F H (X2), then F(X1)>F(X2); If F H (X1)=F H (X2) and f(X1)>f(X2), then F(X1)>F(X2); If F H (X1)=F H (X2) and f(X1)=f(X2), then if F S (X1)>F S (X2), then F(X1)>F(X2); If F H (X1)=F H (X2) and f(X1)=f(X2), then if F S (X1)=F S (X2), then F(X1)=F(X2); In other cases, F(X1) <F(X2)。 14. A universal intelligent scheduling device for satellite mission scheduling, characterized in that: The device includes a processor and a storage device, wherein the storage device stores instructions readable by the processor; the device is equipped with a generalized intelligent scheduling engine for satellite mission scheduling as described in any one of claims 1-13.