A standardized workload assessment method, device and storage medium

By automating the collection and evaluation of on-site data from operators, the efficiency and accuracy issues of workload assessment for power industry operators have been resolved, achieving efficient workload assessment and management.

CN115018252BActive Publication Date: 2024-11-08GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210464904.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-29
Publication Date
2024-11-08
Estimated Expiration
2042-04-29

AI Technical Summary

Technical Problem

In existing technologies, the workload assessment of power industry workers suffers from problems such as discontinuous data entry, large data volume leading to high human resource consumption, long assessment cycle, and inability to formulate work tasks in a timely manner.

Method used

The system uses an automated approach to collect on-site data from workers, updates workload assessment factors by matching them with work form templates, uses standardized workload assessment rules to determine workers' workload, and automatically provides feedback on the assessment results.

Benefits of technology

It improved the efficiency and accuracy of workload assessment, reduced the consumption of human resources, and improved the work efficiency of both operational and management personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115018252B_ABST
    Figure CN115018252B_ABST
Patent Text Reader

Abstract

The present invention discloses a standardized workload assessment method, device and storage medium, the method comprising the following steps: collecting on-site operation data of target operators; matching and improving the operation form template corresponding to the target operators in the database according to the on-site operation data, updating the operation form according to the on-site operation data, and updating the workload assessment factors; identifying the workload of the target operators based on the improved operation form; presetting the workload standardization assessment rule, and presetting the standardization condition according to the workload standardization assessment rule; judging whether the workload of the target operators meets the preset standardization condition, if it meets the standardization condition, then feeding back the workload assessment result of the target operators, if it does not meet the standardization condition, then correcting the operation form according to the workload standardization assessment rule and feeding back the corrected operation form. The present invention adopts an automatic assessment mode throughout the process, which helps to improve the work efficiency of standardized workload assessment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of standard operation evaluation, and in particular to a standardized workload evaluation method, device and storage medium. Background Art

[0002] The work of frontline personnel in the power industry is characterized by many equipment, heavy tasks, cumbersome operations, and high safety and compliance requirements. In the current operation process, operators will inevitably have typical violations such as habitual violations of regulations, irregular operation form records, non-compliant operations, and lack of attention to safety briefings.

[0003] In the prior art, typical violations of rules by operators are generally detected by collecting data of each operation task, and managers compare and analyze the operation data to evaluate the workload of operators, and determine whether the operators have typical violations of rules based on the workload evaluation results. However, in the evaluation process, there are often omissions and discontinuities in the reporting of operation data, or the data volume is large, which consumes a lot of human resources and has a long evaluation cycle, resulting in serious problems such as the inability of subsequent managers to formulate work tasks and even the operators having to do repetitive work. Summary of the invention

[0004] In order to overcome the defects and shortcomings of the prior art, the present invention provides a standardized workload assessment method. The present invention adopts an automatic assessment mode throughout the process, which helps to improve the work efficiency of standardized workload assessment.

[0005] A second object of the present invention is to provide a standardized workload assessment device.

[0006] A third object of the present invention is to provide a computing device.

[0007] In order to achieve the above object, the present invention adopts the following technical solutions:

[0008] The present invention provides a standardized workload assessment method, comprising the following steps:

[0009] Collecting on-site operation data of target operators, wherein the on-site operation data is provided with identification information for matching the operation form template corresponding to the target operator in the database;

[0010] According to the on-site operation data, the operation form template corresponding to the target operation personnel in the database is matched and improved, and the operation form is updated and set according to the on-site operation data, and the workload assessment factors are updated. The workload assessment factors include operation safety, operation completion and operation saturation;

[0011] Identify the workload of the target operator based on the improved work form;

[0012] Preset workload standardization evaluation rules, and preset standardization conditions according to the workload standardization evaluation rules, wherein the evaluation standardization condition types of the workload standardization evaluation rules include: workload saturation class, work structure class, and work intensity class;

[0013] Determine whether the workload of the target operator meets the preset standardization conditions. If it meets the standardization conditions, the workload assessment result of the target operator is fed back. If it does not meet the standardization conditions, the work form is corrected according to the workload standardization assessment rules and the corrected work form is fed back.

[0014] As a preferred technical solution, the on-site operation data includes byte data and media stream data of on-site operating equipment, extracts operation characteristics of the byte data and media stream data, determines the operation content of the operator, and determines the operation briefing data based on the operation content of the operator.

[0015] As a preferred technical solution, the operation form is updated and set according to the on-site operation data, and the workload evaluation factors are updated. The specific steps include:

[0016] Matching the work form template corresponding to the target operator in the database according to the identification information carried by the field work data, the work form template being set according to the work flow guidance corresponding to the field work data;

[0017] After the byte data and media stream data included in the field operation data are imported into the operation form template, the settings of the target operator's operation form are updated, and the workload assessment factors are updated.

[0018] As a preferred technical solution, the workload saturation class is set as the ratio of the effective time of the position to the normal working time, the work structure class is set as daily work, phased and temporary work, and the work intensity class is set as the workload concentration of a position.

[0019] As a preferred technical solution, the field operation data includes captured images and video information of the field operation equipment, and the field operation data of the target operator is generated after extracting image and video feature information based on the captured images and video information.

[0020] As an optimal technical solution, a classification and storage step is also provided. After the on-site operation data is imported into the operation form template, the operation form of the target operator is updated, the operation form is associated with the operation data and then classified, and the improved operation form is stored in the database.

[0021] In order to achieve the above second purpose, the present invention adopts the following technical solutions:

[0022] The present invention provides a standardized workload assessment device, comprising: a field operation data acquisition unit, a matching and improvement unit, a workload identification unit, a standardized preset unit, a standardized judgment unit, an output unit and a correction unit;

[0023] The field operation data collection unit is used to collect the field operation data of the target operator, and the field operation data is provided with identification information for matching the operation form template corresponding to the target operator in the database;

[0024] The matching and improving unit is used to match and improve the work form template corresponding to the target operator in the database according to the on-site work data, and the work form is updated and set according to the on-site work data, and the workload assessment factors are updated. The workload assessment factors include work safety, work completion and work saturation;

[0025] The workload identification unit is used to identify the workload of the target operator based on the improved operation form;

[0026] The standardization preset unit is used to preset workload standardization evaluation rules, and preset standardization conditions according to the workload standardization evaluation rules. The evaluation standardization condition types of the workload standardization evaluation rules include: workload saturation class, work structure class and work intensity class;

[0027] The standardization judgment unit is used to judge whether the workload of the target operator meets the preset standardization conditions;

[0028] The output unit is used to output the workload evaluation result of the target operator when the standardized conditions are met;

[0029] The correction unit is used to correct the work form according to the workload standardization evaluation rule when the standardization condition is not met and to feed back the corrected work form.

[0030] As a preferred technical solution, the field operation data acquisition unit includes a data acquisition module and a generation module, the data acquisition module is used to use the byte data and media stream data of the field operation equipment, and the generation module is used to generate the field operation data of the target operator according to the byte data and media stream data of the field operation equipment;

[0031] The matching and perfecting unit includes a matching module and an updating module, wherein the matching module is used to match the operation form template corresponding to the target operator in the database according to the identification information carried by the on-site operation data, and the operation form template is set according to the operation process guidance corresponding to the on-site operation data;

[0032] The updating module is used to update the workload evaluation factor of the target operator's work form after importing the byte data and media stream data included in the field work data into the work form template;

[0033] The standardization judgment unit includes an acquisition module and a calculation module. The acquisition module is used to acquire workload standardization evaluation rules, and the calculation module is used to calculate whether the workload of the target operator meets the standardization conditions based on the workload standardization evaluation rules.

[0034] As a preferred technical solution, a classification unit and a storage unit are also provided. The classification unit is used to import the on-site operation data into the operation form template, update the operation form of the target operator, and classify the operation form after associating it with the operation data. The storage unit is used to store the improved operation form in the database.

[0035] In order to achieve the third objective, the present invention adopts the following technical solutions:

[0036] The present invention provides a computer device, comprising a processor and a memory for storing a program executable by the processor, wherein when the processor executes the program stored in the memory, the above-mentioned standardized workload assessment method is implemented.

[0037] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0038] After acquiring the job data of the target operator, the present invention improves the corresponding job form of the target operator in the database according to the job data, wherein the job data includes job content data, job efficiency data and job quality data, and the job form is updated and set according to the job data, and the workload of the target operator is determined based on the improved job form. Finally, the workload of the operator is judged whether it meets the standardization conditions through the workload evaluation algorithm. The system automatic evaluation mode is adopted throughout the process, and the workload evaluation results of the current operator within a certain period of time can be directly viewed through the terminal, and the next work plan or technical dynamic adjustment can be formulated according to the evaluation results, thereby effectively improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 This is a schematic diagram of the process of the standardized workload evaluation method of Example 1;

[0040] Figure 2 Schematic diagram of the process of standardized workload assessment method in Example 2

[0041] Figure 3 This is a schematic diagram of the architecture of a standardized workload assessment device according to Example 3;

[0042] Figure 4This is a schematic diagram of the architecture of a standardized workload assessment device according to Example 4. DETAILED DESCRIPTION

[0043] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0044] Example 1

[0045] like Figure 1 As shown, this embodiment provides a standardized workload assessment method, comprising the following steps:

[0046] S1: Collect the on-site operation data of the target operator, which includes the byte data of the on-site operation equipment and the media stream data;

[0047] In this embodiment, the operator wears a smart terminal when performing work on site. The smart terminal can take photos and videos of the on-site work equipment and the surrounding environment. The smart terminal is connected to the system and deployed, and the captured images and video stream data information can be directly obtained from the smart terminal. The difference analogy data and feature library are constructed by extracting the key frames of the acquired images and video streams, that is, byte data and media stream data, where the on-site work data may include work content data or work briefing data, etc. For example, the byte data and media stream data collected by the system are characteristics of the wind farm, that is, the work content of the operator can be determined as a wind farm work point. After determining the work content data, the work briefing data can be determined, that is, including the basic environmental information of the wind farm, which may include information such as lines, tower numbers, equipment types, and equipment numbers.

[0048] Compared with the actual application in which the operators or managers fill in the current work briefing content, after collecting the current on-site operation data of the operators, this embodiment uses the on-site operation data as the data basis to further automate the workload assessment of the operators, effectively improving the work efficiency in the workload assessment process and the accuracy of the workload assessment, so that the next task plan can be adjusted and optimized.

[0049] S2: Improve the work form corresponding to the target operator in the database according to the on-site work data. The work form is updated and set according to the on-site work data. The specific steps include:

[0050] Matching the job form template corresponding to the target operator in the database according to the identification information carried by the job data, and the job form template is set according to the job flow guidance corresponding to the job data;

[0051] After the byte data and media stream data included in the job data are imported into the job form template, the job form of the target job personnel is updated.

[0052] In this embodiment, after collecting the on-site operation data, the corresponding operation form in the database can be searched according to the data information fed back by the on-site operation data. For example, if the current operation scene of the operator is a wind farm, the system can find the operation form associated with the wind farm, where the operation form includes basic information such as operation equipment information, operation risks, operation task details, equipment operation requirements and on-site requirements. After finding the operation form, the system updates the operation form corresponding to the current operation site according to the on-site operation data. For example, if the current operation scene is a wind farm, the voltage and current of the corresponding operation equipment in the operation form must be updated accordingly, and the wind farm operation is affected by wind speed and operation risk information such as electric shock must also be updated accordingly.

[0053] S3: Determine the workload of the target operator based on the improved work form;

[0054] In this embodiment, the current operation data of the operator is filled in the operation form and then the corresponding operation form is updated. The updated operation form can clearly identify the workload of the target operator, where the workload content may include information such as operation safety, operation completion, operation saturation, operation intensity, and operation quality. In addition, the operation form contains the workload evaluation factors included in all power grid operation scenarios. The system can extract the corresponding factors from the operation form according to the evaluation requirements of the management personnel to confirm the workload of the target operator.

[0055] S4: Determine whether the workload of the target operator meets the standardization conditions. The specific steps include:

[0056] Obtain workload standardization evaluation rules, which are obtained based on job data identification;

[0057] Based on the workload standardization evaluation rules, calculate whether the workload of the target operator meets the standardization conditions.

[0058] The standardized condition types evaluated by the workload standardization evaluation rule in this embodiment include: workload saturation type, work structure type, and work intensity type.

[0059] In this embodiment, the workload identified on the work form is used to determine whether it meets the standardization conditions. For example, the workload saturation is set as the ratio of the effective time of the position to the normal working time. The work structure is set to divide the work into daily work, phased work and temporary work. Daily work refers to the work repeated every day, phased work refers to the work done every week / month / quarter / year, temporary work refers to the work temporarily arranged by the superior or relevant departments, and the work intensity is set to the concentration of the workload of a position. After receiving the workload evaluation algorithm rules set by the management personnel, the system compares the workload of the target operator to obtain whether the workload meets the standardization conditions. For example, the standardization conditions of the workload saturation are set as the standard that the saturation reaches more than 90%, the index of the work structure is greater than 60%, and the work intensity accounts for more than 30% of the effective working time throughout the year. The workload of the target operator meets the standardization conditions.

[0060] S5: When the workload of the target operator meets the standardization conditions, the system will feedback the workload assessment result of the target operator.

[0061] If not, customize and revise the work form according to the workload standardization assessment rules and provide feedback on the revised work form.

[0062] In this embodiment, when the workload of the target operator meets the standardized conditions, that is, the workload saturation reaches more than 90% as the standard, the work structure index is greater than 60% as the standard, the work intensity accounts for more than 30% of the effective working time throughout the year, and other factors meet the standardized conditions, the system will feedback the workload assessment results of the target operator to the smart terminal worn by the operator and the WEB server managed by the manager, so that the manager can adjust and optimize the next task plan based on the assessment results. The system automatically evaluates the current work status of the target operator throughout the process, and there is no need for operators and managers to manually fill in relevant data information, which effectively improves the operating efficiency of the operators and the work efficiency of the managers.

[0063] Example 2

[0064] like Figure 2 As shown, this embodiment provides a standardized workload assessment method, comprising the following steps:

[0065] S1: Collecting images and video information of the target operator’s on-site operation equipment;

[0066] In this embodiment, the operators will wear smart terminals during the operation. The smart terminals can capture equipment components and the surrounding environment of the operation in a specific scene multiple times and from multiple angles. The smart terminals share data after taking photos and videos. The system can send acquisition instructions. The smart terminals are associated with the system and deployed. The system can then transmit the operator's operation images and video information through the smart terminals.

[0067] S2: Generate on-site operation data of the target operator after extracting image and video feature information based on the image and video information;

[0068] In this embodiment, after obtaining the current work image and video information of the target operator, the difference analogy data and feature library are constructed according to the image key frame extraction technology, and the on-site work data of the target operator is generated through the recognition technology of specific equipment parts and image and video recognition technology.

[0069] S3: Matching the corresponding job form template of the target operator in the database according to the identification information carried by the job data, and the job form template is set according to the job flow guidance corresponding to the job data;

[0070] In this embodiment, according to the job operation manual, the form templates required for the corresponding job content and related links are stored. The operator only needs to match the required form template, and the system will automatically fill in the relevant information and generate the job form for the current job.

[0071] In this embodiment, when the operation data is obtained, the identification information in the operation data will be identified. For example, when the operator is working in a wind farm, the identification information presented in the operation data is generally wind farm-related data. The system can automatically match the wind farm-related form template according to the identification information, and the corresponding form has been filled in with the operation manual for the wind farm.

[0072] S4: After importing the operation data into the operation form template, the operation form of the target operator is updated;

[0073] The relevant project columns in the form template in step S3 have been set according to the operation process manual, but some variable influencing factors need to be obtained according to the on-site operation conditions of the operators, that is, the operation data. After matching the form template, the system will automatically import the on-site operation data of the target operator into the form template, fill in some required project columns, and finally update the operation form corresponding to the target operator's relevant operation data on the wind farm at a certain time and location.

[0074] S5: Associating the work form with the work data and classifying them;

[0075] In this embodiment, according to the selected form template, the existing relevant data materials are associated, and the work form of the current operation is automatically filled in and generated. Some information is entered and improved through the work tool based on the on-site work data, and the entered information will also be automatically associated and classified by the system. At the same time, the data files, model scenes, etc. related to this operation are also associated with each other in the system in advance, and the management personnel can set them in advance to provide complete work auxiliary materials for the operators.

[0076] S6: storing the completed work form in the database;

[0077] The server integrates and stores the audio and video streams of all parties involved through cloud-based mixing technology, realizing the audio and video flow of the entire troubleshooting process, in preparation for subsequent video analysis and work tracing, and realizing communication technology based on low-latency audio and video; at the same time, the materials, data, and information generated in all module processes will be processed, classified, structured, stored, counted, and analyzed one by one.

[0078] S7: Determine the workload of the target operator based on the improved work form;

[0079] In this embodiment, after the work sheet about the target operator is automatically generated, the work sheet of the target operator includes the workload of the target operator.

[0080] S8: Obtain workload standardization evaluation rules, where the workload standardization evaluation rules are identified based on the job data;

[0081] In this embodiment, managers will also formulate different standardized evaluation rules for different construction scenarios, time and work plans. When calculating the workload, the identification information in the work data must be obtained first to determine which standardized evaluation rule is matched.

[0082] S9: Calculate whether the workload of the target operator meets the standardization conditions based on the workload standardization evaluation rules;

[0083] In this embodiment, after obtaining the workload standardization assessment rules, the workload of the target operator is calculated based on the workload standardization assessment rules to see whether it meets the standardization conditions. For example: the algorithm for workload saturation is the ratio of the effective time of the position to the normal working time. The work structure is to divide the work into daily work, phased work and temporary work, and then calculate the daily workload / total workload ratio. The work intensity is calculated based on the time ratio, and the workload saturation standardization rule is that if the fullness reaches more than 90%, it means that the workload of this position is very full; if the fullness reaches 70%-90%, it means that the workload of this position is full; if the fullness reaches 50%-70%, it means that the workload of this position is basically full; if the fullness is below 50%, it means that the workload of this position is not full; and the work result is not full. The standardization rule of the structure is to use the daily workload and the total workload as an indicator to measure whether the workload is saturated. If this indicator is greater than 60%, then the position is relatively saturated. If this indicator is below 50%, then the workload is unstable and some adjustments need to be made. The standardization of work intensity mainly considers the concentration of a position's workload. If the total amount of a position's workload is normal over a period of time, but it is mainly concentrated in a certain period of time, causing the workload to peak during this period and troughs in the rest of the time, the proportion of working days with peaks to working days throughout the year can be used as a standard for judging whether the work intensity is uniform. If the continuous working time per day is more than 10 hours, and such working days account for more than 30% of the effective time throughout the year, it should be considered that the work intensity is unevenly distributed and certain adjustments should be made.

[0084] S10: When the workload of the target operator meets the standardization conditions, the system feeds back the workload assessment result of the target operator.

[0085] Step S10 in this embodiment is similar to step S5 in the aforementioned embodiment 1, and will not be described in detail here.

[0086] S11: When the workload of the target operator does not meet the standardization conditions, the system customizes and modifies the work form according to the workload standardization evaluation rules and feeds back the modified work form.

[0087] In this embodiment, when the workload of the target operator does not meet the standardized conditions, for example: the workload saturation is below 50%, the measurement index of the work structure is below 50%, or the work intensity is unevenly distributed, the system will make corresponding modifications based on the standardized requirements of the workload, that is, the workload saturation reaches more than 90%, the measurement index of the work structure is greater than 60%, or the work intensity is evenly distributed, and feedback is sent to the terminal of the manager and the smart terminal of the operator, so that the operator can receive the evaluation results in time and make further corrections to the current operation or future operation plan, so as to achieve the effect of improving work efficiency.

[0088] Example 3

[0089] like Figure 3 As shown, this embodiment provides a standardized workload assessment device, including: a field operation data collection unit, a matching and improvement unit, a workload identification unit, a standardized preset unit, a standardized judgment unit, an output unit and a correction unit;

[0090] In this embodiment, the field operation data collection unit is used to collect the field operation data of the target operator, and the field operation data is provided with identification information, which is used to match the operation form template corresponding to the target operator in the database;

[0091] In this embodiment, the field operation data collection unit includes a data collection module and a generation module, the data collection module is used to use the byte data and media stream data of the field operation device, and the generation module is used to generate the field operation data of the target operator according to the byte data and media stream data of the field operation device;

[0092] In this embodiment, the matching and improvement unit is used to match and improve the work form template corresponding to the target operator in the database according to the on-site work data, and the work form is updated and set according to the on-site work data, and the workload assessment factors are updated. The workload assessment factors include the safety of the work, the degree of completion of the work, and the degree of saturation of the work;

[0093] In this embodiment, the matching and perfecting unit includes a matching module and an updating module. The matching module is used to match the job form template corresponding to the target operator in the database according to the identification information carried by the on-site operation data. The job form template is set according to the job flow guide corresponding to the on-site operation data.

[0094] The updating module is used to update the workload evaluation factor of the target operator's job form after importing the byte data and media stream data included in the field operation data into the job form template;

[0095] In this embodiment, the workload identification unit is used to identify the workload of the target operator based on the improved operation form;

[0096] In this embodiment, the standardization preset unit is used to preset a workload standardization evaluation rule, and preset a standardization condition according to the workload standardization evaluation rule. The evaluation standardization condition types of the workload standardization evaluation rule include: workload saturation class, work structure class, and work intensity class;

[0097] In this embodiment, the standardization judgment unit is used to judge whether the workload of the target operator meets the preset standardization conditions;

[0098] The standardization judgment unit includes an acquisition module and a calculation module, wherein the acquisition module is used to acquire a workload standardization evaluation rule, and the calculation module is used to calculate whether the workload of the target operator meets the standardization condition based on the workload standardization evaluation rule;

[0099] In this embodiment, the output unit is used to output the workload evaluation result of the target operator when the standardized conditions are met;

[0100] In this embodiment, the correction unit is used to correct the work form according to the workload standardization evaluation rule when the standardization condition is not met and to feed back the corrected work form.

[0101] In this embodiment, the on-site operation data collection unit collects the on-site operation data of the target operator, wherein the on-site operation data includes the byte data and media stream data of the on-site operating equipment. The matching and improvement unit improves the collected operation data in the database to obtain the operation form corresponding to the target operator, wherein the operation form is updated and set according to the collected on-site operation data. Then, the workload identification unit determines the workload of the target operator based on the improved operation form. The standardization judgment unit judges whether the workload of the target operator meets the standard conditions according to the determined workload. If so, the output unit will feedback the standardization of the workload of the target operator. The workload evaluation of the target operator is automatically completed throughout the process. The workload of the current operator can be evaluated based on the collected current operation data of the operator, without the need for the operator and the management personnel to fill in the report in real time on the system, which effectively improves the work efficiency of the operators and the management personnel.

[0102] Example 4

[0103] like Figure 4 As shown, this embodiment provides a standardized workload assessment device, including:

[0104] A field operation data collection unit is used to collect field operation data of target operators, the field operation data includes byte data of field operation equipment and media stream data;

[0105] A matching and improvement unit is used to improve the operation form corresponding to the target operator in the database according to the on-site operation data, and the operation form is updated and set according to the on-site operation data;

[0106] A classification unit is used to classify the operation form after associating it with the operation data;

[0107] A storage unit, used for storing the completed work form in a database;

[0108] A determination unit, used to determine the workload of target operators based on the improved operation form;

[0109] A standardization judgment unit is used to judge whether the workload of the target operator meets the standardization conditions;

[0110] The output unit is used to feedback the workload evaluation result of the target operator when the workload of the target operator meets the standardized conditions.

[0111] The correction unit is used to customize and correct the work form according to the workload standardization evaluation rules and feedback the corrected work form when the workload of the target operator does not meet the standardization conditions.

[0112] In this embodiment, the field operation data collection unit includes a data collection module and a generation module:

[0113] A data acquisition module is used to collect images and video information of the target operator's on-site operating equipment;

[0114] The generation module is used to generate on-site operation data of the target operator after extracting image and video feature information based on the image and video information.

[0115] In this embodiment, the matching and perfecting unit includes a matching module and an updating module:

[0116] A matching module, used to match the job form template corresponding to the target operator in the database according to the identification information carried by the job data, and the job form template is set according to the job flow guide corresponding to the job data;

[0117] The updating module is used to import the byte data and media stream data contained in the job data into the job form template to generate a job form for the target operator.

[0118] In this embodiment, the standardization judgment unit includes an acquisition module and a calculation module:

[0119] An acquisition module is used to acquire workload standardization evaluation rules, where the workload standardization evaluation rules are obtained based on job data identification;

[0120] The calculation module calculates whether the workload of the target operator meets the standardization conditions based on the workload standardization evaluation rules.

[0121] Example 5

[0122] This embodiment provides a computing device, which can be a desktop computer, a laptop computer, a smart phone, a PDA handheld terminal, a tablet computer or other terminal device with a display function. The computing device includes a processor and a memory, and the memory stores one or more programs. When the processor executes the program stored in the memory, the standardized workload assessment method of embodiment 1 or embodiment 2 is implemented.

[0123] The above embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited to the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principles of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.

Claims

1. A standardized workload assessment method, characterized in that: The steps include: Collecting on-site operation data of target operators, wherein the on-site operation data is provided with identification information for matching the operation form template corresponding to the target operator in the database; The on-site operation data includes byte data and media stream data of the on-site operation equipment, extracts the operation characteristics of the byte data and the media stream data, determines the operation content of the operator, and determines the operation briefing data according to the operation content of the operator; Match and improve the work form template corresponding to the target operator in the database according to the on-site work data, update the work form settings according to the on-site work data, and update the workload assessment factors, which include work safety, work completion and work saturation; The operation form is updated according to the field operation data to update the workload assessment factors, and the specific steps include: Matching the work form template corresponding to the target operator in the database according to the identification information carried by the field work data, the work form template being set according to the work flow guidance corresponding to the field work data; After importing the byte data and media stream data included in the field operation data into the operation form template, updating the settings of the target operator's operation form and updating the workload assessment factors; The field operation data includes the captured images and video information of the field operation equipment, and the field operation data of the target operator is generated after the image and video feature information is extracted from the captured images and video information; Identify the workload of the target operator based on the improved work form; Preset workload standardization evaluation rules, and preset standardization conditions according to the workload standardization evaluation rules, wherein the evaluation standardization condition types of the workload standardization evaluation rules include: workload saturation class, work structure class, and work intensity class; The workload saturation category is set as the ratio of effective time of a position to normal working time, the work structure category is set as daily work, phased work and temporary work, and the work intensity category is set as the workload concentration of a position; Determine whether the workload of the target operator meets the preset standardization conditions. If so, feedback the workload evaluation result of the target operator. If not, correct the work form according to the workload standardization evaluation rules and feedback the corrected work form. There are also classification and storage steps. After the on-site operation data is imported into the operation form template, the operation form of the target operator is updated, the operation form is associated with the operation data and then classified, and the improved operation form is stored in the database.

2. A standardized workload assessment device, characterized in that: Used to implement the standardized workload assessment method described in claim 1, the device comprises: a field operation data acquisition unit, a matching and improvement unit, a workload identification unit, a standardized preset unit, a standardized judgment unit, an output unit and a correction unit; The field operation data collection unit is used to collect the field operation data of the target operator, and the field operation data is provided with identification information for matching the operation form template corresponding to the target operator in the database; The field operation data acquisition unit includes a data acquisition module and a generation module, wherein the data acquisition module is used to use the byte data and media stream data of the field operation device, and the generation module is used to generate the field operation data of the target operator according to the byte data and media stream data of the field operation device; The matching and improving unit is used to match and improve the work form template corresponding to the target operator in the database according to the on-site work data, and the work form is updated and set according to the on-site work data, and the workload assessment factors are updated. The workload assessment factors include work safety, work completion and work saturation; The matching and perfecting unit includes a matching module and an updating module, wherein the matching module is used to match the operation form template corresponding to the target operator in the database according to the identification information carried by the on-site operation data, and the operation form template is set according to the operation process guidance corresponding to the on-site operation data; The updating module is used to update the workload evaluation factor of the target operator's work form after importing the byte data and media stream data included in the field work data into the work form template; The workload identification unit is used to identify the workload of the target operator based on the improved operation form; The standardization preset unit is used to preset workload standardization evaluation rules, and preset standardization conditions according to the workload standardization evaluation rules. The evaluation standardization condition types of the workload standardization evaluation rules include: workload saturation class, work structure class and work intensity class; The standardization judgment unit is used to judge whether the workload of the target operator meets the preset standardization conditions; The standardization judgment unit includes an acquisition module and a calculation module, wherein the acquisition module is used to acquire a workload standardization evaluation rule, and the calculation module is used to calculate whether the workload of the target operator meets the standardization condition based on the workload standardization evaluation rule; The output unit is used to output the workload evaluation result of the target operator when the standardized conditions are met; The correction unit is used to correct the work form according to the workload standardization evaluation rule when the standardization condition is not met and to feed back the corrected work form; A classification unit and a storage unit are also provided. The classification unit is used to import the on-site operation data into the operation form template, update the operation form of the target operator, and classify the operation form after associating it with the operation data. The storage unit is used to store the improved operation form in the database.

3. A computer device comprising a processor and a memory for storing a program executable by the processor, characterized in that: When the processor executes the program stored in the memory, the standardized workload assessment method as claimed in claim 1 is implemented.