A new energy battery welding production line and process

By designing the new energy battery welding production line, including loading and unloading manipulators, side seam welding fixtures, galvanometer welding equipment and weld grinding equipment, the close fit and welding of battery modules, side plates and end plates was achieved, solving the problem The problems of low production efficiency and low welding stability in the existing technology guarantee the quality of the battery.

CN115055917BActive Publication Date: 2024-10-08GUANGZHOU MINO AUTOMOTIVE EQUIP CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202210678865.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-16
Publication Date
2024-10-08
Estimated Expiration
2042-06-16

AI Technical Summary

Technical Problem

The existing new energy battery production line does not realize full automation from the assembly and shaping of cell modules, side plates, and end plates to welding and polishing, resulting in low production efficiency, low welding stability, and inability to guarantee battery quality.

Method used

A new energy battery welding production line is designed, including loading and unloading manipulators, side seam welding fixtures, galvanometer welding equipment and weld grinding equipment. The battery modules, side plates and terminals are realized through shaping components and pole pressing components. The plates are closely fitted and calibrated using galvanometer welding equipment for welding, and welding seam grinding equipment for polishing, forming a fully automatic production process.

Benefits of technology

It improves the production efficiency and welding stability of new energy batteries, ensures battery quality, and realizes a complete automated process from raw material splicing to welding to polishing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115055917B_ABST
    Figure CN115055917B_ABST
Patent Text Reader

Abstract

The present invention provides a new energy battery welding production line and its process. The welding production line includes: loading and unloading manipulators, side seam welding fixtures, galvanometer welding equipment, weld grinding equipment, etc. The present invention realizes the assembly and shaping of battery modules, side plates and end plates through the coordinated use of shaping components on the side seam welding fixture and the pole clamping components, ensures the close fit and calibration of the end plates and the side plates and the battery modules, and welds the aligned battery modules, side plates and end plates through galvanometer welding equipment, and clamps the new energy battery through the loading and unloading grippers and grinds it through the weld grinding equipment, forming an automated production process for welding of new energy battery modules from raw material splicing to welding and then to grinding, which improves the efficiency of new energy battery production while improving the stability of the welding process and ensuring the quality of new energy batteries.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of new energy battery processing, and specifically relates to a new energy battery welding production line and a process thereof. Background Art

[0002] New energy batteries are power batteries. Power batteries refer to batteries that provide power for transportation vehicles, generally in contrast to small batteries that provide energy for portable electronic devices. According to the different battery reaction principles, they can be divided into lead-acid power batteries, nickel-hydrogen power batteries, lithium-ion power batteries, and so on. Today, as the world focuses on the development of new energy industries such as electric vehicles and energy storage batteries, lithium batteries, as recognized ideal energy storage components, have received higher attention. The existing new energy battery production lines and processes have not achieved complete automation from the assembly, shaping, welding, and polishing of battery modules, side panels, and end panels. The efficiency of new energy battery production is low, the welding stability is low, and the battery quality cannot be guaranteed. Summary of the invention

[0003] In order to overcome the shortcomings of the prior art, the present invention provides a new energy battery welding production line and a process thereof to realize the assembly and shaping of battery cell modules, side plates and end plates, ensure the close fit and alignment of the end plates with the side plates and battery cell modules, and weld the aligned battery cell modules, side plates and end plates through a galvanometer welding device. The structure is simple, and the new energy battery is clamped by loading and unloading grippers and polished through a weld grinding device, forming a fully automatic production process for new energy battery welding from raw material splicing to welding and then to polishing, thereby improving the production efficiency of new energy batteries while improving the stability of the welding process and ensuring battery quality.

[0004] One of the embodiments of the present invention provides a new energy battery welding production line, which includes: a loading and unloading manipulator, including a robot and a gripper, wherein the gripper is installed on the robot; a side seam welding fixture, including a shaping component and a pole clamping component, wherein the pole clamping component is installed above the shaping component, and the side seam welding fixture is arranged between the loading and unloading manipulators; a galvanometer welding device, wherein the galvanometer welding device is located between the loading and unloading manipulator and the side seam welding fixture; a weld grinding device, which is located on the side of one group of loading and unloading manipulators that is different from the galvanometer welding device; a trolley, which is used to transport battery modules damaged during the processing of new energy batteries; wherein the loading and unloading manipulator is used to grab the battery module, the side plate and the end plate onto the side seam welding fixture for shaping, and place the welded new energy battery on the weld grinding device for grinding, the galvanometer welding device is used to weld the shaped battery module, and the weld grinding device is used to grind the weld of the welded new energy battery.

[0005] In one embodiment, the gripper includes: a top plate, including a first side surface and a second side surface, a connecting frame is provided on the first side surface for installing the gripper and the robot; a first clamping assembly, located below the second side surface, including a side clamping plate and a first clamping cylinder, the side clamping plate is connected to the output shaft of the first clamping cylinder, and is used to clamp the battery module; a first adjustment assembly, installed on the first side surface, including a first screw rod and a first mounting portion, one end of the first screw rod is rotatably connected to the connecting frame, the first mounting portion is threadedly connected to the first screw rod, and the first mounting portion passes through the top plate, the first clamping cylinder is installed on the first mounting portion, and a through hole is opened on the top plate for the first mounting portion to move.

[0006] In one embodiment, the side clamping plate includes: a first clamping plate, which is connected to the output shaft of the first clamping cylinder; a second clamping plate, which is movably connected to the first clamping plate, and an elastic buffer mechanism is provided between the upper part of the second clamping plate and the lower part of the first clamping plate.

[0007] In one of the embodiments, the gripper also includes: a second clamping assembly, including an end face clamping plate and a second clamping cylinder, the end face clamping plate has two parts, one of which is fixedly connected to the second side surface of the top plate, and the other is fixedly connected to the output shaft of the second clamping cylinder; a second adjustment assembly, including a second screw rod and a second mounting portion, the second screw rod is rotatably mounted on the first side surface, the second mounting portion is threadedly connected to the second screw rod, the second mounting portion passes through the top plate, and a slide groove is provided on the top plate for the second mounting portion to move, and the second screw rod is mounted on the second mounting portion; wherein, the second screw rod passes through the connecting frame.

[0008] In one of the embodiments, a latch cylinder is installed on the first clamping plate on one side, and the output shaft of the latch cylinder passes through the top plate and is movably connected to the upper part of the first mounting portion.

[0009] In one of the embodiments, the gripper also includes: a side panel gripper, including a side panel grabbing cylinder, used to clamp the side panel, the side panel grabbing cylinder is installed on a first clamping plate, a mounting strip is movably installed on the first clamping plate, the side panel grabbing cylinder is movably installed on the mounting strip by bolts, and the mounting strip is provided with a plurality of threaded holes for adjusting the side panel grabbing cylinder.

[0010] In one embodiment, the shaping assembly includes: a frame assembly, located between the loading and unloading robots, the frame assembly is connected with a first movable plate, a second movable plate and a fixed plate, the first movable plate is located between the second movable plate and the fixed plate, and a first electric cylinder for driving the second movable plate is installed inside the frame assembly; a material discharge platform, installed in the middle of the first movable plate, for placing battery modules; end plate clamping assemblies, respectively installed in the middle of the second movable plate and the fixed plate, corresponding to the material discharge platform; side panel clamping assemblies, installed on the first movable plate, located on both sides of the material discharge platform; side panel shaping assemblies, including a first side panel shaping assembly and a second side panel shaping assembly, respectively installed on the frame assembly and the fixed plate; a positioning assembly, installed on the second movable plate, for fixing the side panel, the positioning assembly is installed on the second movable plate, and the positioning assembly is located between the first side panel shaping assembly and the end plate clamping assembly.

[0011] In one of the embodiments, the end plate clamping assembly includes: an end plate clamping electric cylinder, which is installed in the middle of the second movable plate; a fixed support platform, which is located on one side of the end plate clamping electric cylinder; a connecting rod, the middle part of which is rotatably connected to the fixed support platform, and one end of the connecting rod is connected to the end plate clamping electric cylinder; an end plate upper clamping block, which is connected to the other end of the connecting rod; and an end plate clamping block, which is installed on the side of the fixed support platform facing the discharge platform.

[0012] In one embodiment, the side panel clamping assembly includes: a second electric cylinder mounted on the first movable plate; a third movable plate slidably mounted on the first movable plate through a slide rail and fixedly connected to the output shaft of the second electric cylinder, a welding support and a pushing cylinder are mounted on the third movable plate, and the pushing cylinder is located on both sides of the welding support; a side panel shaping substrate is mounted on the side of the welding support facing the material discharge platform, and a vacuum suction cup is installed in the side panel shaping substrate for adsorbing the side panel; a side panel shaping positioning block is slidably mounted on the third movable plate through a slide rail, and The side panel shaping hook and the side panel upper clamping block are both L-shaped, and the side panel shaping hook and the side panel upper clamping block are both located above the side panel shaping substrate.

[0013] In one of the embodiments, the first side panel shaping assembly includes: a fourth movable plate, which is movably connected to the frame assembly, and a length limit adjustment mechanism is provided at the connection; a first shaping bracket, which is movably connected to the fourth movable plate, and a width limit adjustment mechanism is provided at the connection; a first shaping end plate, which is movably mounted on the side of the first shaping bracket toward the side panel clamping assembly through a slide rail; a first shaping cylinder, which is mounted on the first shaping bracket, and the first shaping cylinder is on the same side as the first shaping end plate, and the output shaft of the first shaping cylinder is connected to the first shaping end plate.

[0014] In one of the embodiments, the second side panel shaping assembly includes: a fifth movable plate, which is slidably mounted on the fixed plate through a slide rail, and a side panel shaping seam adjustment mechanism is provided between the fifth movable plate and the fixed plate; a second shaping bracket, which is mounted on the fifth movable plate; a second shaping end plate, which is movably mounted on the side of the second shaping bracket facing the side panel clamping assembly through a slide rail; a second shaping cylinder, which is mounted on the second shaping bracket, and the second shaping cylinder is on the same side as the second shaping bracket, and the output shaft of the second shaping cylinder is connected to the second shaping end plate; and a first welding baffle, which is mounted on the second shaping end plate.

[0015] In one of the embodiments, the positioning assembly includes: a copper nozzle support frame, which is connected to the second movable plate through a slide rail, and a side plate shaping seam adjustment mechanism is provided between the connection between the copper nozzle support frame and the second movable plate; a second welding baffle, which is installed on the side of the copper nozzle support frame facing the end plate clamping assembly through a slide rail; a copper nozzle clamping cylinder, which is installed on the side of the copper nozzle support frame that is different from the second welding baffle, one end of the second welding baffle passes through the copper nozzle support frame and is fixedly connected to the output shaft of the copper nozzle clamping cylinder, and a through hole is provided on the copper nozzle support frame for the second welding baffle to move.

[0016] In one embodiment, the pole clamping assembly includes: an assembly bracket, mounted on a frame assembly; a movable mounting plate, the movable mounting plate is mounted on the assembly bracket via a slide rail and driven by a screw rod; a pole clamping limit assembly, including a pole clamping cylinder and a roller mounting plate, the pole clamping cylinder is mounted on the movable mounting plate, the roller mounting plate is fixedly connected to the output shaft of the pole clamping cylinder, and a pole roller assembly is fixedly mounted on one side of the roller mounting plate different from the pole clamping cylinder; a module side shaping mechanism is mounted on the movable mounting plate and is located on both sides of the pole clamping limit assembly.

[0017] In one embodiment, the pole roller assembly includes a plurality of rollers, the rollers are mounted on a roller mounting plate, and a spring is provided between the rollers and the roller mounting plate.

[0018] In one of the embodiments, the module side shaping mechanism includes: a bracket pushing cylinder, which is mounted on a movable mounting plate; a side shaping bracket, which is mounted on the movable mounting plate through a slide rail, and the side shaping bracket is on the same side as the bracket pushing cylinder, and the output shaft of the bracket pushing cylinder is fixedly connected to the side shaping bracket; a cylinder mounting plate, which is movably mounted on a side of the side shaping bracket that is different from the output shaft of the bracket pushing cylinder, and a module side shaping adjustment mechanism is provided between the cylinder mounting plate and the side shaping bracket for adjusting the cylinder mounting plate; a side shaping cylinder, which is mounted on the cylinder mounting plate; a side clamping module, which is fixedly connected to the output shaft of the side plate shaping cylinder, and the side clamping module is slidably connected to the cylinder mounting plate; a latch cylinder, which is mounted on the cylinder mounting plate for fixing the side clamping module.

[0019] In one embodiment, the galvanometer welding equipment includes: an equipment bracket with a slide assembly installed at the bottom; a welding galvanometer installed on the equipment bracket; a first adjustment component installed on the equipment bracket, used to adjust the slide assembly along the Y-axis direction; a second adjustment component installed on the equipment bracket, used to adjust the welding galvanometer along the Z-axis direction; a third adjustment component installed on the second adjustment component, used to adjust the welding galvanometer along the X-axis direction; a CCD vision component installed on the third adjustment component, used to take pictures of the weld.

[0020] In one embodiment, the first adjustment component includes: a ground rail, which is installed between the side seam welding fixture and the loading and unloading robot, and the slide assembly slides along the ground rail, and a rack is installed on one side of the ground rail; a first motor, which is installed on one side of the equipment bracket, and the output shaft of the first motor extends downward and passes through the slide assembly, and a gear is fixedly connected to the output shaft of the first motor, and the gear is meshed with the rack.

[0021] In one embodiment, the second adjustment component includes: a second motor, which is installed on a side of the equipment bracket different from the first motor, and the output shaft of the second motor extends upward; a fourth screw rod, which is rotatably installed on a side of the equipment bracket different from the first motor, and the output shaft of the second motor is fixedly connected to one end of the fourth screw rod; a movable plate, which is slidably connected to the side of the equipment bracket different from the first motor through a slide rail, the movable plate is threadedly connected to the fourth screw rod, and one end of the movable plate extends to the outside of the equipment bracket.

[0022] In one embodiment, the third adjustment mechanism includes: a third motor, which is mounted on the movable plate, and the output shaft of the third motor extends along the extension direction of the movable plate; a fifth screw rod, which is rotatably mounted on the movable plate, and the output shaft of the third motor is fixedly connected to one end of the fifth screw rod; a mounting frame, which is in the form of a right-angled triangle, one of the right-angled sides of the mounting frame is connected to a protrusion, and the mounting frame is threadedly connected to the fifth screw rod through the protrusion, and the welding galvanometer is mounted on the other right-angled side of the mounting frame.

[0023] In one of the embodiments, the CCD vision component is mounted on a mounting frame, and a fourth adjustment component is provided at the connection between the CCD vision component and the mounting frame, and the welding galvanometer is located between the CCD vision component and the movable plate.

[0024] In one embodiment, the fourth adjustment component includes: a fixed block, which is mounted on a mounting frame and has a recessed portion; a third screw rod, which is rotatably connected in the recessed portion, and one end of the third screw rod extends to the outside of the fixed block and is fixedly connected to a handwheel, a fastener is installed on the fixed block, and the fastener is sleeved between the fixed block and the handwheel; a mounting seat, the CCD vision component is installed on the mounting seat, the lower part of one end of the mounting seat is connected to the two protruding ends of the fixed block via a slide rail, and a protrusion is installed at the lower part of one end of the mounting seat, and the protrusion is threadedly connected to the third screw rod.

[0025] In one of the embodiments, the weld grinding equipment includes: a grinding frame; a grinding dust removal assembly, including a dust removal mechanism and a grinding mechanism, wherein the grinding mechanism is located above the grinding frame, and the dust removal mechanism is located inside the grinding frame.

[0026] 23. A new energy battery welding production line as described in claim 22, characterized in that the dust removal mechanism includes: an exhaust pipe, the exhaust pipe runs through the interior of the grinding frame, the air outlet end of the exhaust pipe is connected to the air inlet end of the exhaust fan, a plurality of grinding wheel shells are provided above the side seam welding grinding frame, the exhaust pipe is provided with an air inlet end corresponding to the grinding wheel shell, and the grinding wheel shell is connected to the corresponding air inlet end on the exhaust pipe.

[0027] In one embodiment, the grinding mechanism includes: a grinding wheel, the grinding wheel corresponds to the grinding wheel shell, the grinding wheel is rotatably connected in the cavity of the corresponding grinding wheel shell, and the grinding wheels on the same side are movably connected through a rotating rod, the two rotating rods are arranged in parallel, the rotating rods penetrate the corresponding grinding wheel shell, and one end of the two rotating rods is respectively fixedly connected to a first motor and a second motor, wherein the first motor is fixedly mounted on the side seam welding grinding frame through a partition.

[0028] One embodiment of the present invention also provides a new energy battery welding process, including:

[0029] Step 1: The loading and unloading robot controls the gripper to load the battery module, side panel and end panel onto the unloading platform on the side seam welding fixture;

[0030] Step 2: Reshape the battery module, side plate and end plate through the shaping assembly and the pole pressing assembly, and fix the position of the battery module, side plate and end plate, waiting for welding;

[0031] Step 3: Use the CCD vision component on the galvanometer welding equipment to measure the distance and take pictures of the gaps between the battery module, side plate and end plate, and drive the welding galvanometer to weld the weld to form a new energy battery;

[0032] Step 4: The loading and unloading robot removes the new energy battery and grinds it through the weld grinding equipment. After grinding, the finished new energy battery is sent to the next production line.

[0033] In one of the embodiments, in step one: the side clamping plates and the end clamping plates are pre-adjusted by the first adjustment assembly and the second adjustment assembly on the top plate, the positions between the side plate grabbing cylinders are adjusted by bolts, the battery module and the end plate are clamped from the side and end faces by the first clamping cylinder and the second clamping cylinder, the side plate is clamped by the side plate grabbing cylinder, and the battery module, the side plate and the end plate are placed on the discharge platform in the side seam welding fixture.

[0034] In one of the embodiments, in step two: the battery module, side plate and end plate are placed on the discharge platform in the side seam welding fixture, the movable mounting plate moves the pole clamping limit assembly and the module side shaping mechanism to the top of the battery module, and the battery module is shaped by the module side shaping mechanism. After the shaping is completed, the battery module is fixed by the pole clamping limit assembly; the end plate and side plate are adjusted by the end plate clamping electric cylinder and the side plate clamping electric cylinder in the end plate clamping assembly and the side plate clamping assembly, and the adjusted end plate and side plate are fitted to the battery module by the positioning assembly, waiting for the galvanometer welding equipment to perform welding.

[0035] In one of the embodiments, in step three: the CCD vision component is adjusted along the Y-axis, Z-axis and X-axis directions by the first adjustment component, the second adjustment component and the third adjustment component, the weld on the side seam welding fixture is photographed and positioned, and then the welding galvanometer is adjusted along the Y-axis, Z-axis and X-axis directions by the first adjustment component, the second adjustment component and the third adjustment component to weld the weld.

[0036] In one of the embodiments, in step four: the loading and unloading gripper removes the welded new energy battery and moves it above the weld grinding equipment, the weld on the new energy battery is grinded by the grinding mechanism, and the debris generated during grinding is recovered by the dust removal mechanism. After grinding is completed, the new energy battery is transported to the next production line by the loading and unloading robot.

[0037] The welding production line provided in the above embodiments has the following beneficial effects:

[0038] 1. The present invention realizes the assembly and shaping of the battery module, the side plate and the end plate through the coordinated use of the shaping component on the side seam welding fixture and the pole clamping component, ensures the close fit and alignment of the end plate, the side plate and the battery module, and welds the aligned battery module, the side plate and the end plate through the galvanometer welding equipment. The structure is simple, and the new energy battery is clamped by the loading and unloading grippers and polished by the weld grinding equipment, forming a complete production line process for new energy battery welding from raw material splicing to welding and then to polishing, thereby improving the efficiency of new energy battery production and the accuracy of new energy battery assembly.

[0039] 2. According to different models of battery modules, the first clamping assembly is pre-adjusted by the first adjustment assembly, and the maximum value of the side clamping plate is preset to improve the clamping efficiency of the battery module. According to different models of battery modules, the second clamping assembly is pre-adjusted by the second adjustment assembly, and the maximum value of the end clamping plate is preset to improve the clamping efficiency of the battery module. The position between the two side plate grabbing cylinders is adjusted according to the width of the side plate, and the position of the side plate and the battery module are ensured to be adapted. Before clamping the side plate, the position of the side plate clamping cylinder is preferentially adjusted according to the length of the side plate and the position of the battery module, so as to facilitate the matching of side plates of different lengths according to the sizes of different battery modules and ensure the corresponding position of the side plate and the battery module.

[0040] 3. The positions of the material discharging platform and the side panel clamping assembly can be adjusted by the movable connection between the first movable plate and the frame assembly. The positions of the first side panel shaping assembly and the positioning assembly can be adjusted by the movable connection between the second movable plate and the frame assembly. By changing the distance between the first movable plate, the second movable plate and the fixed plate, it is convenient to weld side panels and battery modules of different sizes. The distance between the first movable plate, the second movable plate and the fixed plate is pre-adjusted according to the size of the battery module. The battery module is placed on the material discharging platform by the loading and unloading gripper. The side panel on the loading and unloading manipulator is clamped by the side panel clamping assembly. The end panel on the loading and unloading manipulator is clamped and shaped by the end panel clamping assembly. The shaping component reshapes the position of the side panel to ensure that the side panel and the end panel can match and fit with the battery module. The positioning component is set to ensure the stability of the side panel during welding. The side panel shaping component and the end panel shaping component are set to ensure that the side panel and the end panel are aligned with the battery module before welding to avoid deviation during welding. The positioning component is set to ensure the stability of the battery module, side panel and end panel during welding and the quality of new energy batteries. The module side shaping mechanism reshapes the battery module from the side to ensure that the battery module will not be misaligned during welding and fits better with the side panel. The pole clamping cylinder controls the up and down movement of the roller mounting plate to make the pole roller assembly fit with the upper surface of the battery module, making it convenient to fix the shaped battery module.

[0041] 4. Through the setting of the first adjustment component, the second adjustment component, the third adjustment component and the third adjustment component, the welding galvanometer and the CCD vision component can move along the Y-axis, X-axis and Z-axis along the side seam welding fixture. Through the setting of the CCD vision component, the welds between the battery modules, side panels and end panels after splicing on the side seam welding fixture can be photographed and measured. The welds after photographing and measuring can be welded by the welding galvanometer, making the galvanometer welding process more accurate.

[0042] 5. The grinding wheel housing is connected to the corresponding air inlet end on the exhaust pipe through a bellows. The debris and dust generated by the grinding wheel housing when grinding the workpiece are transported to the exhaust pipe through the bellows through the exhaust fan, and impurities such as debris and dust are centrally processed. A rotating rod is movably connected between the grinding wheels on the same side. The two rotating rods are arranged in parallel. The grinding wheel can slide on the rotating rod through the through connection between the grinding wheel and the rotating rod, so that the distance between the two grinding wheels can be changed according to the width of the workpiece. One end of the two rotating rods is fixedly connected with a first motor and a second motor respectively. The rotating rod is driven to rotate by the first motor and the second motor, which facilitates the rotation of the grinding wheel to grind the weld of the workpiece. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0044] Figure 1 It is a structural schematic diagram of the present invention;

[0045] Figure 2 It is a structural schematic diagram of the loading and unloading manipulator in the present invention;

[0046] Figure 3 It is a structural schematic diagram of the gripper in the present invention;

[0047] Figure 4 is a schematic structural diagram of the second clamping assembly in the present invention;

[0048] Figure 5 It is a structural schematic diagram of the first clamping assembly in the present invention;

[0049] Figure 6 It is a schematic diagram of the structure of the side panel gripper in the present invention;

[0050] Figure 7 It is a structural schematic diagram of the side seam welding fixture in the present invention;

[0051] Figure 8 It is a schematic diagram of the structure of the shaping component in the present invention;

[0052] Fig. 9 It is a structural schematic diagram of the rack assembly in the present invention;

[0053] Fig.10 for Fig. 9 A schematic diagram of the enlarged structure at A in the middle;

[0054] Fig.11 It is a structural schematic diagram of the side plate clamping assembly in the present invention;

[0055] Fig.12 It is a structural schematic diagram of the first side panel shaping assembly in the present invention;

[0056] Fig.13 It is a structural schematic diagram of the second side plate shaping assembly in the present invention;

[0057] Fig.14 It is a structural schematic diagram of the positioning component in the present invention;

[0058] Fig.15 It is a structural schematic diagram of the pole pressing assembly in the present invention;

[0059] Fig.16 It is a structural schematic diagram of the module side shaping mechanism in the present invention;

[0060] Fig.17 It is a schematic structural diagram of the pole roller assembly in the present invention;

[0061] Fig.18 It is a structural schematic diagram of the galvanometer welding equipment in the present invention;

[0062] Fig.19 It is a structural schematic diagram of the equipment bracket in the present invention;

[0063] Fig. 20 is a schematic structural diagram of the first adjustment component in the present invention;

[0064] Fig.21 is a schematic structural diagram of the second adjustment component in the present invention;

[0065] Fig. 22 is a schematic structural diagram of the third adjustment component in the present invention;

[0066] Fig.23 Schematic diagram of the connection structure between the fourth adjustment component and the CCD vision component in the present invention;

[0067] Fig.24 It is a structural schematic diagram of the weld grinding equipment in the present invention;

[0068] Fig.25 It is a structural schematic diagram of the dust removal mechanism in the present invention;

[0069] Fig.26 It is a structural schematic diagram of the grinding mechanism in the present invention;

[0070] In the figure: 1, welding production line; 11, loading and unloading manipulator; 111, robot; 112, gripper; 1121, top plate; 11211, first side; 11212, second side; 11213, connecting frame; 11214, ruler; 11215, slide; 1122, first clamping assembly; 11221, side clamping plate; 11222, first clamping cylinder; 11223, first clamping plate; 11224, top limit rod; 1123, first adjustment assembly; 11231, first mounting part; 11232, first screw rod; 1124, second clamping assembly; 11241, end clamping plate; 11242, second clamping cylinder; 1125, second adjustment assembly; 11251, second screw rod; 11252, second mounting part; 1126, side plate gripper; 11261, side plate grabbing cylinder; 11262, mounting strip; 12, side seam welding fixture; 121, shaping assembly; 1211, frame assembly; 12111, first movable plate; 12112, second movable plate; 12113, fixed plate; 12114, first electric cylinder; 1212, unloading platform; 1213, end plate clamping assembly; 12131, end plate clamping electric cylinder; 12132, fixed support platform; 12133, connecting rod; 12134, upper end plate clamping block; 12135, end plate clamping block; 1214, side plate clamping assembly; 12141, second electric cylinder; 12142, third movable plate; 12143, welding support; 12 144, push cylinder; 12145, side plate shaping substrate; 12146, vacuum suction cup; 12147, side plate pressing electric cylinder; 121471, side plate upper pressing block; 12148, side plate hook electric cylinder; 121481, side plate shaping hook; 12149, side plate shaping positioning block; 1215, side plate shaping assembly; 12151, first side plate shaping assembly; 121511, fourth movable plate; 121512, length limit adjustment mechanism; 121513, first shaping bracket; 121514, width limit adjustment mechanism; 121515, first shaping end plate; 121516, first shaping cylinder; 12152, second side plate shaping assembly; 121521, fifth movable plate; 12152 2. Side plate shaping seam adjustment mechanism; 121523. Second shaping bracket; 121524. Second shaping end plate; 121525. Second shaping cylinder; 121526. First welding baffle; 1216. Positioning assembly; 12161. Copper nozzle support frame; 12162. Second welding baffle; 12163. Copper nozzle clamping cylinder; 122. Pole clamping assembly; 1221. Assembly bracket; 1222. Movable mounting plate; 1223. Pole clamping limit assembly; 12231. Pole clamping cylinder; 12232. Roller mounting plate; 12233. Pole roller assembly; 12234. Spring; 1224. Module side shaping mechanism; 12241. Bracket pushing cylinder; 12242. Side shaping bracket;12243, cylinder mounting plate; 12244, module side shaping adjustment mechanism; 12245, side shaping cylinder; 12246, side pressing module; 13, galvanometer welding equipment; 131, equipment bracket; 1311, slide assembly; 132, welding galvanometer; 133, first adjustment assembly; 1331, ground rail; 1332, first motor; 1333, gear; 1334, rack; 134, second adjustment assembly; 1341, second motor; 1342, fourth screw rod; 1343, movable plate; 135, The third adjustment component; 1351, the third motor; 1352, the fifth screw rod; 1353, the mounting frame; 136, the CCD visual component; 137, the fourth adjustment component; 1371, the fixing block; 1372, the third screw rod; 1373, the mounting seat; 14, the weld grinding equipment; 141, the grinding frame; 142, the grinding dust removal component; 1421, the dust removal mechanism; 14211, the exhaust pipe; 14212, the grinding wheel housing; 1422, the grinding mechanism; 14221, the grinding wheel; 14222, the rotating rod; 15, the trolley. ; DETAILED DESCRIPTION

[0071] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0072] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.

[0073] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features limited to "first" and "second" may explicitly or implicitly include at least one of the features. In addition, if "and / or" or "and / or" appears in the full text, its meaning includes three parallel solutions. Taking "A and / or B" as an example, it includes solution A, solution B, or solutions that satisfy both A and B. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0074] One embodiment of the present invention provides a new energy battery welding production line 1, including: a loading and unloading manipulator 11, including a robot 111 and a gripper 112, the gripper 112 is installed on the robot 111; a side seam welding fixture 12, including a shaping component 121 and a pole clamping component 122, the pole clamping component 122 is installed above the shaping component 121, and the side seam welding fixture 12 is arranged between the loading and unloading manipulator 11; a galvanometer welding device 13, the galvanometer welding device 13 is located between the loading and unloading manipulator 11 and the side seam welding fixture 12 ; The weld grinding equipment 14 is located on the side of one group of loading and unloading manipulators 11 which is different from the galvanometer welding equipment 13; the trolley 15 is used to transport the battery modules damaged during the processing of new energy batteries; wherein, the loading and unloading manipulators 11 are used to grab the battery modules, side panels and end panels onto the side seam welding fixture 12 for shaping, and place the welded new energy batteries on the weld grinding equipment 14 for grinding, the galvanometer welding equipment 13 is used to weld the shaped battery modules, and the weld grinding equipment 14 is used to grind the welds of the welded new energy batteries.

[0075] The present invention realizes the assembly and shaping of the battery module, the side plate and the end plate through the coordinated use of the shaping component 121 on the side seam welding fixture 12 and the pole clamping component 122, ensures the close fit and alignment of the end plate, the side plate and the battery module, and welds the aligned battery module, the side plate and the end plate through the galvanometer welding equipment 13. The structure is simple, and the new energy battery is clamped by the loading and unloading gripper 112 and polished by the weld seam polishing equipment 14, forming a complete production line process for new energy battery welding from raw material splicing to welding and then to polishing, thereby improving the efficiency of new energy battery production and the accuracy of new energy battery assembly.

[0076] In one embodiment, the gripper 112 includes: a top plate 1121, including a first side surface 11211 and a second side surface 11212, the first side surface 11211 is provided with a connecting frame 11213 for mounting the gripper 112 and the robot 111; a first clamping assembly 1122, located below the second side surface 11212, including a side clamping plate 11221 and a first clamping cylinder 11222, the side clamping plate 11221 is connected to the output shaft of the first clamping cylinder 11222, and is used to clamp the battery module. Hold; the first adjustment component 1123 is installed on the first side surface 11211, and includes a first screw rod 11232 and a first mounting portion 11231, one end of the first screw rod 11232 is rotatably connected to the connecting frame 11213, the first mounting portion 11231 is threadedly connected to the first screw rod 11232, and the first mounting portion 11231 passes through the top plate 1121, the first clamping cylinder 11222 is installed on the first mounting portion 11231, and the top plate 1121 is provided with a through hole for the first mounting portion 11231 to move.

[0077] In this embodiment, a scale 11214 corresponding to the first mounting portion 11231 is installed on the top plate 1121, and the scale 11214 is located on one side of the through hole. The first screw rod 11232 is rotatably connected to the first side surface 11211 of the top plate 1121. One end of the first screw rod 11232 is rotatably connected to the connecting frame 11213, and the other end is rotatably connected to the first side surface 11211. A hand wheel and a fastener are installed at one end of the screw rod rotatably connected to the first side surface 11211, which is used for the rotation and fixation of the screw rod. The rod 11232 rotates, and the position of the first mounting portion 11231 is preferentially adjusted according to the scale on the ruler 11214. After the adjustment, the side clamping plate 11221 is pushed by the first clamping cylinder 11222 on the first mounting seat 1373 to clamp the battery module from the side. According to different types of battery modules, the first clamping cylinder 11222 is pre-adjusted by the first screw rod 11232, and the maximum value of the side clamping plate 11221 is preset to improve the clamping efficiency of the battery module.

[0078] In one embodiment, the side clamping plate 11221 includes: a first clamping plate 11223 , and the first clamping plate 11223 is connected to the output shaft of the first clamping cylinder 11222 .

[0079] In this embodiment, a scale 11214 is provided at one end of the first clamping plate 11223, which is adjusted according to the height of the battery module to ensure the stability of the battery module clamping. An elastic buffer mechanism is provided on the first clamping plate 11223, and a movable rod is provided in the elastic buffer mechanism. A torsion spring is sleeved on the movable end of the movable rod. Through the adaptation of the movable rod and the torsion spring, the vibration generated during the clamping process of the first clamping plate 11223 and the battery module is absorbed, thereby providing a certain protection for the battery module.

[0080] In one embodiment, the gripper 112 also includes: a second clamping assembly 1124, including an end face clamping plate 11241 and a second clamping cylinder 11242, the end face clamping plate 11241 has two pieces, one of which is fixedly connected to the second side surface 11212 of the top plate 1121, and the other is fixedly connected to the output shaft of the second clamping cylinder 11242; a second adjustment assembly 1125, including a second screw rod 11251 and a second mounting portion 11252, the second screw rod 11251 is rotatably mounted on the first side surface 11211, the second mounting portion 11252 is threadedly connected to the second screw rod 11251, the second mounting portion 11252 passes through the top plate 1121, and the top plate 1121 is provided with a slide groove 11215 for the second mounting portion 11252 to move, and the second screw rod 11251 is mounted on the second mounting portion 11252; wherein, the second screw rod 11251 passes through the connecting frame 11213.

[0081] In this embodiment, the slide groove 11215 opened on the top plate 1121 is located between the through holes, and a scale 11214 is provided on one side of the slide groove 11215. Both ends of the second screw rod 11251 are rotatably connected to the first side surface 11211 on the top plate 1121, and a handwheel and a fastener are provided on one end to control the rotation and limiting of the second screw rod 11251. Through the rotation of the second screw rod 11251, the second mounting portion 11252 is preferentially adjusted according to the scale corresponding to the scale 11214. After the adjustment is completed, the battery module is clamped by the second clamping cylinder 11242. According to different models of battery modules, the second clamping cylinder 11242 is pre-adjusted by the second screw rod 11251 to preset the maximum value of the end face clamping plate 11241, thereby improving the clamping efficiency of the battery module.

[0082] In one embodiment, the gripper 112 also includes: a side panel gripper 1126, including a side panel grabbing cylinder 11261, for clamping the side panel, the side panel grabbing cylinder 11261 is installed on a first clamping plate 11223, and a mounting strip 11262 is movably installed on the first clamping plate 11223, the side panel grabbing cylinder 11261 is movably installed on the mounting strip 11262 by bolts, and the mounting strip 11262 is provided with a plurality of threaded holes for adjusting the side panel grabbing cylinder 11261.

[0083] In this embodiment, a scale 11214 is provided on the side of the first clamping plate 11223 which is different from the second clamping plate 11224, and the scale 11214 corresponds to the movable mounting bar 11262. The height of the movable mounting bar 11262 is adjusted according to the height of the side panel to ensure the stability of the side panel grabbing cylinder 11261. The side panel grabbing cylinder 11261 is movably mounted on the mounting bar 11262 through bolts and threaded holes. The position between the two side panel grabbing cylinders 11261 is adjusted according to the width of the side panel to ensure that the position of the side panel and the battery module are adapted. Before clamping the side panel, the position of the side panel clamping cylinder is preferentially adjusted according to the length of the side panel and the position of the battery module, so as to facilitate the matching of side panels of different lengths according to the sizes of different battery modules and ensure that the position of the side panel and the battery module correspond.

[0084] In one embodiment, the shaping component 121 includes: a frame component 1211, located between the loading and unloading manipulators 11, the frame component 1211 is connected with a first movable plate 12111, a second movable plate 12112 and a fixed plate 12113, the first movable plate 12111 is located between the second movable plate 12112 and the fixed plate 12113, and a first electric cylinder 12114 for driving the second movable plate 12112 is installed inside the frame component 1211; a material discharge platform 1212 is installed in the middle of the first movable plate 12111 for placing the battery module; an end plate clamping component 1213 is respectively installed on the second movable plate 1211 2 and the middle of the fixed plate 12113, corresponding to the discharge platform 1212; the side panel clamping assembly 1214, installed on the first movable plate 12111, located on both sides of the discharge platform 1212; the side panel shaping assembly 1215, including the first side panel shaping assembly 12151 and the second side panel shaping assembly 12152, respectively installed on the frame assembly 1211 and the fixed plate 12113; the positioning assembly 1216, installed on the second movable plate 12112, is used to fix the side panel, and the positioning assembly 1216 is installed on the second movable plate 12112, and the positioning assembly 1216 is located between the first side panel shaping assembly 12151 and the end plate clamping assembly 1213.

[0085] In this embodiment, the positions of the discharge platform 1212 and the side panel clamping assembly 1214 can be adjusted by the active connection between the first movable plate 12111 and the frame assembly 1211, and the positions of the first side panel shaping assembly 12151 and the positioning assembly 1216 can be adjusted by the active connection between the second movable plate 12112 and the frame assembly 1211. By changing the distance between the first movable plate 12111 and the second movable plate 12112 and the fixed plate 12113, it is convenient to weld side panels and battery modules of different sizes. The distance between the first movable plate 12111 and the second movable plate 12112 and the fixed plate 12113 is pre-adjusted according to the size of the battery module, and the battery module is placed on the discharge platform by the loading and unloading gripper 112. On 1212, the side plate on the loading and unloading robot 11 is clamped by the side plate clamping assembly 1214, and the end plate on the loading and unloading robot 11 is clamped and shaped by the end plate clamping assembly 1213. The position of the side plate is shaped by the first side plate shaping assembly 12151 and the second side plate shaping assembly 12152 to ensure that the side plate and the end plate can match and fit with the battery module. The positioning assembly 1216 is set to ensure the stability of the side plate during the welding process. The side plate shaping assembly 1215 and the end plate shaping assembly 121 are set to ensure that the side plate and the end plate are aligned with the battery module before welding to avoid deviation during welding. The positioning assembly 1216 is set to ensure the stability of the battery module, the side plate and the end plate during the welding process, and the quality of the new energy battery is guaranteed.

[0086] In one embodiment, the end plate clamping assembly 1213 includes: an end plate clamping electric cylinder 12131, which is installed in the middle of the second movable plate 12112; a fixed support platform 12132, which is located on one side of the end plate clamping electric cylinder 12131; a connecting rod 12133, the middle part of which is rotatably connected to the fixed support platform 12132, and one end of the connecting rod 12133 is connected to the end plate clamping electric cylinder 12131; an end plate upper clamping block 12134, which is connected to the other end of the connecting rod 12133; and an end plate clamping block 12135, which is installed on the side of the fixed support platform 12132 facing the discharge platform 1212.

[0087] In this embodiment, the upper clamping block 12134 of the end plate is L-shaped, and one end of the upper clamping block 12134 of the end plate is provided with an inclined slope, which is convenient for fixing the end plate. Through the movement of the second movable plate 12112, the end plate clamping block 12135 fits the end plate and the battery module. It can be understood that when the connecting rod 12133 is rotatably connected to the fixed support platform 12132, the end plate clamping electric cylinder 12131 drives one end of the connecting rod 12133 to move, and the other end to move, driving the upper clamping block 12134 of the end plate to clamp the end plate, which is convenient for correcting the position of the end plate and ensuring the stable connection between the end plate and the battery module during welding.

[0088] In one embodiment, the side panel clamping assembly 1214 includes: a second electric cylinder 12141, which is installed on the first movable plate 12111; a third movable plate 12142, which is slidably installed on the first movable plate 12111 through a slide rail and is fixedly connected to the output shaft of the second electric cylinder 12141, and a welding support 12143 and a pushing cylinder 12144 are installed on the third movable plate 12142, and the pushing cylinder 12144 is located on both sides of the welding support 12143; a side panel shaping substrate 12145, which is installed on the side of the welding support 12143 facing the material discharge platform 1212, and a vacuum suction cup 12146 is installed in the side panel shaping substrate 12145 for adsorbing the side panel; a side panel shaping positioning block 12149, which is slidably installed on the third movable plate 12142 through a slide rail and is fixedly connected to the output shaft of the second electric cylinder 12141 The output shaft of the cylinder 12144 is fixedly connected, the side of the side plate shaping positioning block 12149 away from the welding support 12143 is installed with a side plate clamping electric cylinder 12147, the output shaft of the side plate clamping electric cylinder 12147 is installed with a side plate upper clamping block 121471, and the side of the side plate shaping positioning block 12149 facing the welding support 12143 is installed with a side plate hook electric cylinder 12148. A side panel shaping hook 121481 is also connected to the shaped positioning block 12149, and the side panel shaping hook electric cylinder 12148 is used to drive the side panel shaping hook 121481; wherein, the side panel shaping hook 121481 and the upper side panel clamping block 121471 are both L-shaped, and the side panel shaping hook 121481 and the upper side panel clamping block 121471 are both located above the side panel shaping substrate 12145.

[0089] In this embodiment, the side panel upper clamping block 121471 and the side panel shaping hook 121481 are both L-shaped. By setting the side panel upper clamping block 121471 and the side panel shaping hook 121481 to an L-shape, it is convenient to clamp and fix the side panel, and by changing the position of the welding support 12143 and the side panel shaping positioning block 12149, the distance between the side panel upper clamping block 121471 and the side panel shaping hook 121481 and the side panel shaping base plate 12145 is changed, which is convenient for using side panels of different thicknesses. The third movable plate 12142 is movably connected to the first movable plate 12111 through a slide rail, and the distance between the third movable plate 12142 and the material discharging platform 1212 is changed by the second electric cylinder 12141, so that the side panel shaping base plate 12145 is fitted with the side panel, which is convenient for adjusting the material according to different sizes. The battery module is adjusted, a side panel shaping positioning block 12149 is installed on the third movable plate 12142, and a side panel shaping hook 121481 and a side panel upper clamping block 121471 are installed on the side panel shaping positioning block 12149 to shape and fix the side panel, the position of the side panel shaping positioning block 12149 on the third movable plate 12142 is changed by pushing the electric cylinder, and the distance between the side panel shaping hook 121481 and the side panel upper clamping block 121471 and the side panel shaping substrate 12145 is changed to facilitate the use of side panels of different thicknesses, the side panel shaping hook 121481 is used to ensure that the side panel and the side panel shaping substrate 12145 are in contact with each other, and the side panel is fixed and clamped by the side panel upper clamping block 121471. After the shaping is completed, the vacuum suction cup 12146 adsorbs and fixes the side panel.

[0090] In one embodiment, the first side plate shaping assembly 12151 comprises: a fourth movable plate 121511, the fourth movable plate 121511 is movably connected to the frame assembly 1211, and a length limit adjustment mechanism 121512 is provided at the connection; a first shaping bracket 121513, the first shaping bracket 121513 is movably connected to the fourth movable plate 121511, and a width limit adjustment mechanism 121514 is provided at the connection; a first shaping end plate 121 515, the first shaping end plate 121515 is movably installed on the side of the first shaping bracket 121513 facing the side plate clamping assembly 1214 through a sliding rail; the first shaping cylinder 121516, the first shaping cylinder 121516 is installed on the first shaping bracket 121513, and the first shaping cylinder 121516 and the first shaping end plate 121515 are on the same side, and the output shaft of the first shaping cylinder 121516 is connected to the first shaping end plate 121515.

[0091] In this embodiment, the width limit adjustment mechanism 121514 includes a screw rod, which is rotatably connected to the fourth movable plate 121511, and the shaping bracket is slidably connected to the fourth movable plate 121511 through a slide rail. The screw rod is threadedly connected to the shaping bracket, and the position of the shaping bracket is changed by the screw rod. It can be understood that when the shaping bracket moves, the slide rail ensures the stability of the shaping bracket during movement; the movement of the shaping end plate is controlled by the shaping cylinder installed on the shaping bracket, and the position of the side plate is adjusted to ensure the stability of the side plate when connected to the battery module.

[0092] In one embodiment, the second side panel shaping assembly 12152 includes: a fifth movable plate 121521, the fifth movable plate 121521 is slidably mounted on the fixed plate 12113 via a slide rail, and a side panel shaping seam adjustment mechanism 121522 is provided between the fifth movable plate 121521 and the fixed plate 12113; a second shaping bracket 121523, the second shaping bracket 121523 is mounted on the fifth movable plate 121521;

[0093] A second shaping end plate 121524, wherein the second shaping end plate 121524 is movably mounted on the side of the second shaping bracket 121523 facing the side plate clamping assembly 1214 through a slide rail; a second shaping cylinder 121525, wherein the second shaping cylinder 121525 is mounted on the second shaping bracket 121523, and the second shaping cylinder 121525 is on the same side as the second shaping bracket 121523, and the output shaft of the second shaping cylinder 121525 is connected to the second shaping end plate 121524; a first welding baffle plate 121526, wherein the first welding baffle plate 121526 is mounted on the second shaping end plate 121524.

[0094] In this embodiment, the side panel shaping and seam adjustment mechanism 121522 includes a screw rod, which is rotatably connected to the frame assembly 1211. The fifth movable plate 121521 is slidably connected to the frame assembly 1211 via a slide rail. The fifth movable plate 121521 is adjusted by rotating the screw rod to facilitate adjustment of the second side panel shaping assembly 12152. The shaping end plate is pushed by the shaping cylinder to slide along the shaping bracket to shape the side panel, and one end of the side panel is extended into the welding baffle to facilitate welding of the side panel and the battery module.

[0095] In one embodiment, the positioning assembly 1216 includes: a copper nozzle support frame 12161, which is connected to the second movable plate 12112 through a slide rail, and a side plate shaping seam adjustment mechanism 121522 is provided between the copper nozzle support frame 12161 and the second movable plate 12112; a second welding baffle 12162, which is installed on the side of the copper nozzle support frame 12161 facing the end plate clamping assembly 1213 through a slide rail; a copper nozzle clamping cylinder 12163, which is installed on the side of the copper nozzle support frame 12161 that is different from the second welding baffle 12162, one end of the second welding baffle 12162 passes through the copper nozzle support frame 12161 and is fixedly connected to the output shaft of the copper nozzle clamping cylinder 12163, and a through hole is provided on the copper nozzle support frame 12161 for the second welding baffle 12162 to move.

[0096] In this embodiment, the side panel shaping seam adjustment mechanism 121522 includes a screw rod, which is rotatably connected to the second movable plate 12112, and the screw rod is threadedly connected to the copper nozzle support frame 12161. The copper nozzle support frame 12161 is slidably connected to the second movable plate 12112 through a slide rail. When the screw rod rotates, the copper nozzle support frame 12161 is adjusted along the slide rail, which is convenient for fine adjustment according to the side panel;

[0097] The welding baffle is adjusted by the copper nozzle clamping cylinder 12163, which is convenient for adjusting the welding baffle according to side panels of different sizes. A through hole for the welding baffle to move is opened on the copper nozzle support frame 12161, which is convenient for adjusting the welding baffle according to the size of the side panel under the control of the copper nozzle clamping cylinder 12163.

[0098] In one embodiment, the pole clamping assembly 122 includes: an assembly bracket 1221, which is installed on the frame assembly 1211; a movable mounting plate 1222, which is installed on the assembly bracket 1221 through a slide rail and driven by a screw rod; a pole clamping and limiting assembly 1223, which includes a pole clamping cylinder 12231 and a roller mounting plate 12232, the pole clamping cylinder 12231 is installed on the movable mounting plate 1222, the roller mounting plate 12232 is fixedly connected to the output shaft of the pole clamping cylinder 12231, and the roller mounting plate 12232 is fixedly installed with a pole roller assembly 12233 on one side different from the pole clamping cylinder 12231; a module side shaping mechanism 1224, which is installed on the movable mounting plate 1222 and is located on both sides of the pole clamping and limiting assembly 1223.

[0099] In this embodiment, the movable mounting plate 1222 is slidably connected to the component bracket 1221, and a screw rod is installed on one side of the component bracket 1221. One side of the movable mounting plate 1222 is threadedly connected to the screw rod. Through the rotation of the screw rod, the movable mounting plate 1222 is moved along the component bracket 1221, which is convenient for the loading and unloading robot 11 to place the battery module on the discharge component. The module side shaping mechanism 1224 shapes the battery module from the side to ensure that the battery module will not be misaligned during welding and better fit with the side plate. The up and down movement of the roller mounting plate 12232 is controlled by the pole clamping cylinder 12231, so that the pole roller assembly 12233 fits with the upper surface of the battery module, which is convenient for fixing the shaped battery module.

[0100] In one embodiment, the pole roller assembly 12233 includes a plurality of rollers, and the rollers are mounted on a roller mounting plate 12232 . A spring 12234 is provided between the rollers and the roller mounting plate 12232 .

[0101] In this embodiment, a spring 12234 is provided between the roller and the roller mounting plate 12232 . It can be understood that when the roller contacts the battery module, the spring 12234 contracts, and the battery module is fixed by the repulsive force of the spring 12234 .

[0102] In one embodiment, the module side shaping mechanism 1224 includes: a support pushing cylinder 12241, the support pushing cylinder 12241 is installed on the movable mounting plate 1222; a side shaping support 12242, the side shaping support 12242 is installed on the movable mounting plate 1222 through a slide rail, and the side shaping support 12242 is on the same side as the support pushing cylinder 12241, and the output shaft of the support pushing cylinder 12241 is fixedly connected to the side shaping support 12242; a cylinder mounting plate 12243, the cylinder mounting plate 12243 is movably mounted on the side shaping support 12242 and is different from the support pushing cylinder 12241 On one side of the output shaft, a module side shaping adjustment mechanism 12244 is provided between the cylinder mounting plate 12243 and the side shaping bracket 12242, which is used to adjust the cylinder mounting plate 12243; a side shaping cylinder 12245, which is mounted on the cylinder mounting plate 12243; a side clamping module 12246, which is fixedly connected to the output shaft of the side plate shaping cylinder, and the side clamping module 12246 is slidably connected to the cylinder mounting plate 12243; a latch cylinder 11227, which is mounted on the cylinder mounting plate 12243, and is used to fix the side clamping module 12246.

[0103] In this embodiment, the side pressing module 12246 is connected to the module side shaping adjustment mechanism 12244 through a slide rail and includes a screw rod, the screw rod is rotatably connected to the side shaping bracket 12242, the screw rod is threadedly connected to the cylinder mounting plate 12243, the cylinder mounting plate 12243 and the side shaping bracket 12242 are slidably connected through the slide rail, and the position of the cylinder mounting plate 12243 is adjusted by rotating the screw rod; when the battery module is placed on the discharge platform 1212, the bracket pushes the cylinder 12241 to push the side shaping bracket 122 42 moves up and down along the slide rail, driving the side clamping module 12246 to move up and down, and the side shaping cylinder 12245 on the cylinder mounting plate 12243 pushes the side clamping module 12246 to move along the slide rail to shape the battery module, and the side clamping module 12246 is locked by the latch cylinder 11227 to facilitate the side clamping module 12246 to shape the battery cell, and the side shaping bracket 12242 is pushed to move up and down along the slide rail through the bracket pushing cylinder 12241 to adjust the height of the side clamping module 12246.

[0104] In one embodiment, the galvanometer welding equipment 13 includes: an equipment bracket 131, with a slide assembly 1311 installed at the bottom; a welding galvanometer 132, installed on the equipment bracket 131; a first adjustment assembly 133, installed on the equipment bracket 131, used to adjust the slide assembly 1311 along the Y-axis direction; a second adjustment assembly 134, installed on the equipment bracket 131, used to adjust the welding galvanometer 132 along the Z-axis direction; a third adjustment assembly 135, installed on the second adjustment assembly 134, used to adjust the welding galvanometer 132 along the X-axis direction; a CCD vision assembly 136, installed on the third adjustment assembly 135, used to take pictures of the weld.

[0105] In this embodiment, by setting the first adjustment component 133, the second adjustment component 134, the third adjustment component 135 and the third adjustment component 135, the welding galvanometer 132 and the CCD vision component 136 can move along the Y-axis, X-axis and Z-axis along the side seam welding fixture 12. By setting the CCD vision component 136, the welds between the battery modules, side plates and end plates after splicing on the side seam welding fixture 12 can be photographed and measured, and the welds after photographing and measuring can be welded by the welding galvanometer 132, so that the galvanometer welding process is more accurate.

[0106] In one embodiment, the first adjustment component 133 includes: a ground rail 1331, which is installed between the side seam welding fixture 12 and the loading and unloading robot 11, and the slide assembly 1311 slides along the ground rail 1331, and a rack 1334 is installed on one side of the ground rail 1331; a first motor 1332, which is installed on one side of the equipment bracket 131, and the output shaft of the first motor 1332 extends downward and passes through the slide assembly 1311, and a gear 1333 is fixedly connected to the output shaft of the first motor 1332, and the gear 1333 is meshed with the rack 1334.

[0107] In this embodiment, through the engagement of gear 1333 and rack 1334, the first motor 1332 drives gear 1333 to rotate, so that the slide assembly 1311 can move along the ground rail 1331, so that the equipment bracket 131 can move along the side seam welding fixture 12, and the CCD vision component 136 and the welding galvanometer 132 are transported to each welding position of the side seam welding fixture 12 for side seam welding.

[0108] In one embodiment, the second adjustment component 134 includes: a second motor 1341, which is installed on a side of the equipment bracket 131 different from the first motor 1332, and the output shaft of the second motor 1341 extends upward; a fourth screw rod 1342, which is rotatably installed on a side of the equipment bracket 131 different from the first motor 1332, and the output shaft of the second motor 1341 is fixedly connected to one end of the fourth screw rod 1342; a movable plate 1343, which is slidably connected to the side of the equipment bracket 131 different from the first motor 1332 through a slide rail, the movable plate 1343 is threadedly connected to the fourth screw rod 1342, and one end of the movable plate 1343 extends to the outside of the equipment bracket 131.

[0109] In this embodiment, the fourth screw rod 1342 is driven to rotate by the second motor 1341, and the movable plate 1343 is adjusted along the Z-axis direction, so that the CCD vision component 136 and the welding galvanometer 132 are transported to the same height as the weld, ensuring that the CCD vision component 136 can take pictures of the welds between the spliced ​​battery module and the end plate and the side plate, and the welding galvanometer 132 can weld the welds normally.

[0110] In one embodiment, the third adjustment mechanism includes: a third motor 1351, which is installed on the movable plate 1343, and the output shaft of the third motor 1351 extends along the extension direction of the movable plate 1343; a fifth screw rod 1352, which is rotatably installed on the movable plate 1343, and the output shaft of the third motor 1351 is fixedly connected to one end of the fifth screw rod 1352; a mounting frame 1353, which is in the form of a right-angled triangle, and a protrusion is connected to one of the right-angled sides of the mounting frame 1353, and the mounting frame 1353 is threadedly connected to the fifth screw rod 1352 through the protrusion, and the welding galvanometer 132 is installed on the other right-angled side of the mounting frame 1353.

[0111] In this embodiment, the fifth screw rod 1352 is driven to rotate by the third motor 1351, driving the mounting frame 1353 to adjust along the X-axis direction, and transporting the CCD vision component 136 and the welding galvanometer 132 to the inside of the side seam welding fixture 12, ensuring that the CCD vision component 136 can take pictures of the welds between the spliced ​​battery module and the end plate and the side plate, and enabling the welding galvanometer 132 to weld the welds normally.

[0112] In one embodiment, the CCD vision component 136 is mounted on the mounting frame 1353 , and a fourth adjustment component 137 is provided at the connection between the CCD vision component 136 and the mounting frame 1353 , and the welding galvanometer 132 is located between the CCD vision component 136 and the movable plate 1343 .

[0113] In this embodiment, the fourth adjustment component 137 is used to finely adjust the distance between the CCD vision component 136 and the welding galvanometer 132 according to the distance of the weld and the size of the battery module, so as to facilitate taking pictures of the weld.

[0114] In one embodiment, the fourth adjustment component 137 includes: a fixed block 1371, which is installed on the mounting frame 1353, and a recessed portion is provided on the fixed block 1371; a third screw rod 1372, which is rotatably connected in the recessed portion, and one end of the third screw rod 1372 extends to the outside of the fixed block 1371 and is fixedly connected to a handwheel, a fastener is installed on the fixed block 1371, and the fastener is sleeved between the fixed block 1371 and the handwheel; a mounting seat 1373, the CCD vision component 136 is installed on the mounting seat 1373, the lower part of one end of the mounting seat 1373 is connected to the two protruding ends of the fixed block 1371 by a slide rail, and a protrusion is installed at the lower part of one end of the mounting seat 1373, and the protrusion is threadedly connected to the third screw rod 1372.

[0115] In this embodiment, the hand wheel is turned to drive the rotation of the third screw rod 1372, so that the mounting seat 1373 moves along the slide rail on the fixed block 1371, and the CCD vision component 136 is pre-adjusted. By installing fasteners on the fixed block 1371, the fasteners are sleeved on the third screw rod 1372 to limit the rotation of the third screw rod 1372.

[0116] In one embodiment, the weld grinding equipment 14 includes: a grinding frame 141; a grinding dust removal assembly 142, including a dust removal mechanism 1421 and a grinding mechanism 1422, the grinding mechanism 1422 is located above the grinding frame 141, and the dust removal mechanism 1421 is located inside the grinding frame 141.

[0117] In this embodiment, the welding seam on the new energy battery is polished by the polishing mechanism 1422 , and the debris generated during the polishing is recovered by the dust removal mechanism 1421 .

[0118] In one embodiment, the dust removal mechanism 1421 includes: an exhaust pipe 14211, the exhaust pipe 14211 runs through the interior of the grinding frame 141, the air outlet end of the exhaust pipe 14211 is connected to the air inlet end of the exhaust fan, a plurality of grinding wheel housings 14212 are provided above the side seam welding grinding frame 141, and an air inlet end corresponding to the grinding wheel housing 14212 is opened on the exhaust pipe 14211, and the grinding wheel housing 14212 is connected to the corresponding air inlet end on the exhaust pipe 14211.

[0119] In this embodiment, four grinding wheel housings 14212 are provided, and the air outlets of the four grinding wheel housings 14212 are connected to the air inlet end of the exhaust pipe 14211 through a bellows, which is the optimal technical solution of this embodiment. The air outlet end of the exhaust pipe 14211 is connected to the air inlet end of the exhaust fan, and the grinding wheel housing 14212 is connected to the corresponding air inlet end of the exhaust pipe 14211 through a bellows. Through the exhaust fan, the debris and dust generated when the grinding wheel housing 14212 grinds the workpiece are transported to the exhaust pipe 14211 through the bellows, and the impurities such as the debris and dust are centrally processed, so that the distance between the grinding wheel housings 14212 can be adjusted conveniently and the relative stability of the positional relationship between the four grinding wheel housings 14212 can be ensured.

[0120] In one embodiment, the grinding mechanism 1422 includes: a grinding wheel 14221, the grinding wheel 14221 corresponds to the grinding wheel housing 14212, the grinding wheel 14221 is rotatably connected in the cavity of the corresponding grinding wheel housing 14212, and the grinding wheels 14221 on the same side are movably connected through a rotating rod 14222, the two rotating rods 14222 are arranged in parallel, the rotating rod 14222 penetrates the corresponding grinding wheel housing 14212, and one end of the two rotating rods 14222 is respectively fixedly connected to a motor, one of the motors is fixedly mounted on the side seam welding grinding frame 141 through a partition.

[0121] In this embodiment, a rotating rod 14222 is movably connected between the grinding wheels 14221 on the same side, and the two rotating rods 14222 are arranged in parallel. Through the through connection between the grinding wheel 14221 and the rotating rod 14222, the grinding wheel 14221 can slide on the rotating rod 14222, so that the distance between the two grinding wheels 14221 can be changed according to the width of the workpiece. One end of the two rotating rods 14222 is respectively fixedly connected with a first motor 1332 and a second motor 1341. The rotating rod 14222 is driven to rotate by the first motor 1332 and the second motor 1341, so that the grinding wheel 14221 can rotate and the weld of the workpiece can be polished.

[0122] One of the embodiments of the present invention provides a new energy battery welding process, including: step one: the loading and unloading robot 111 controls the gripper 112 to load the battery module, side panel and end panel onto the discharge platform 1212 on the side seam welding fixture 12; step two: the battery module, side panel and end panel are shaped by the shaping component 121 and the pole clamping component 122, and the positions of the battery module, side panel and end panel are fixed, waiting for welding; step three: the gap between the battery module, side panel and end panel is measured and photographed by the CCD vision component 136 on the galvanometer welding equipment 13, and the welding galvanometer 132 is driven to weld the weld to form a new energy battery; step four: the loading and unloading manipulator 11 removes the new energy battery, and grinds it through the weld grinding equipment 14. After grinding, the finished new energy battery is sent to the next production line.

[0123] In step one: pre-adjust the side clamping plate 11221 and the end clamping plate 11241 through the first adjustment component 1123 and the second adjustment component 1125 on the top plate 1121, adjust the position between the side plate grabbing cylinders 11261 through bolts, clamp the battery module and the end plate from the side and end face through the first clamping cylinder 11222 and the second clamping cylinder 11242, clamp the side plate through the side plate grabbing cylinder 11261, and place the battery module, side plate and end plate on the discharge platform 1212 in the side seam welding fixture 12.

[0124] In step 2: the battery module, the side plate and the end plate are placed on the discharge platform 1212 in the side seam welding fixture 12, the movable mounting plate 1222 moves the pole clamping and limiting assembly 1223 and the module side shaping mechanism 1224 to the top of the battery module, and the battery module is shaped by the module side shaping mechanism 1224. After the shaping is completed, the battery module is fixed by the pole clamping and limiting assembly 1223;

[0125] The end plate and the side plate are adjusted by the end plate clamping electric cylinder 12131 and the side plate clamping electric cylinder 12147 in the end plate clamping assembly 1213 and the side plate clamping electric cylinder 1214, and the adjusted end plate and side plate are fitted to the battery module through the positioning assembly 1216, waiting for the galvanometer welding equipment 13 to perform welding.

[0126] In step three: the CCD vision component 136 is adjusted along the Y-axis, Z-axis and X-axis directions through the first adjustment component 133, the second adjustment component 134 and the third adjustment component 135, the weld on the side seam welding fixture 12 is photographed and positioned, and then the welding galvanometer 132 is adjusted along the Y-axis, Z-axis and X-axis directions through the first adjustment component 133, the second adjustment component 134 and the third adjustment component 135 to weld the weld.

[0127] In step four: the loading and unloading gripper 112 removes the welded new energy battery and moves it above the weld grinding equipment 14, grinds the weld on the new energy battery through the grinding mechanism 1422, and recycles the debris generated during grinding through the dust removal mechanism 1421. After grinding, the new energy battery is transported to the next production line through the loading and unloading robot 111.

[0128] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A new energy battery welding production line, It is characterized in that include: A loading and unloading manipulator, comprising a robot and a gripper, wherein the gripper is mounted on the robot; The side seam welding fixture comprises a shaping component and a pole pressing component, wherein the pole pressing component is installed above the shaping component, and the side seam welding fixture is arranged between the loading and unloading manipulators; The shaping assembly includes: a frame assembly, which is located between the loading and unloading manipulators, the frame assembly is connected to a first movable plate, a second movable plate and a fixed plate, the first movable plate is located between the second movable plate and the fixed plate, and a first electric cylinder for driving the second movable plate is installed inside the frame assembly; a material discharge platform is installed in the middle of the first movable plate for placing battery modules; end plate clamping assemblies are respectively installed in the middle of the second movable plate and the fixed plate, corresponding to the material discharge platform; side plate clamping assemblies are installed on the first movable plate and located on both sides of the material discharge platform; side plate shaping assembly, including a first side plate shaping assembly and a second side plate shaping assembly, which are respectively installed on the frame assembly and the fixed plate; a positioning assembly is installed on the second movable plate for fixing the side plate, the positioning assembly is installed on the second movable plate, and the positioning assembly is located between the first side plate shaping assembly and the end plate clamping assembly; The pole clamping assembly comprises: an assembly bracket, which is mounted on the frame assembly; a movable mounting plate, which is mounted on the assembly bracket through a slide rail and driven by a screw rod; a pole clamping and limiting assembly, which comprises a pole clamping cylinder and a roller mounting plate, wherein the pole clamping cylinder is mounted on the movable mounting plate, the roller mounting plate is fixedly connected to the output shaft of the pole clamping cylinder, and a pole roller assembly is fixedly mounted on one side of the roller mounting plate different from the pole clamping cylinder; a module side shaping mechanism, which is mounted on the movable mounting plate and is located on both sides of the pole clamping and limiting assembly; A galvanometer welding device, wherein the galvanometer welding device is located between the loading and unloading manipulator and the side seam welding fixture; The weld grinding equipment is located on one side of one of the loading and unloading manipulators that is different from the galvanometer welding equipment; A small car is used to transport damaged battery modules during the processing of new energy batteries; Among them, the loading and unloading manipulator is used to grab the battery module, side plate and end plate to the side seam welding fixture for shaping, and place the welded new energy battery on the weld seam grinding equipment for grinding; The galvanometer welding equipment is used to weld the battery modules after shaping; Weld grinding equipment is used to grind the welds of new energy batteries after welding.

2. A new energy battery welding production line as claimed in claim 1, It is characterized in that The gripper comprises: A top plate, comprising a first side surface and a second side surface, wherein a connecting frame is provided on the first side surface for mounting the gripper and the robot; A first clamping assembly, located below the second side surface, comprises a side clamping plate and a first clamping cylinder, wherein the side clamping plate is connected to an output shaft of the first clamping cylinder and is used to clamp the battery module; The first adjustment assembly is installed on the first side surface, and includes a first screw rod and a first mounting portion. One end of the first screw rod is rotatably connected to the connecting frame, the first mounting portion is threadedly connected to the first screw rod, and the first mounting portion passes through the top plate. The first clamping cylinder is installed on the first mounting portion, and a through hole is opened on the top plate for the first mounting portion to move.

3. A new energy battery welding production line as claimed in claim 2, It is characterized in that The side clamping plate comprises: A first clamping plate is connected to an output shaft of a first clamping cylinder.

4. A new energy battery welding production line as claimed in claim 2, It is characterized in that The gripper also includes: The second clamping assembly comprises an end face clamping plate and a second clamping cylinder, wherein the end face clamping plate has two pieces, one of which is fixedly connected to the second side surface of the top plate, and the other is fixedly connected to the output shaft of the second clamping cylinder; The second adjustment assembly includes a second screw and a second mounting portion, wherein the second screw is rotatably mounted on the first side surface, the second mounting portion is threadedly connected to the second screw, the second mounting portion passes through the top plate, and a slide groove is provided on the top plate for the second mounting portion to move, and the second screw is mounted on the second mounting portion; Wherein, the second screw rod passes through the connecting frame.

5. A new energy battery welding production line as claimed in claim 2, It is characterized in that The gripper also includes: The side panel gripper includes a side panel grabbing cylinder for clamping the side panel. The side panel grabbing cylinder is installed on a first clamping plate, a mounting strip is movably installed on the first clamping plate, the side panel grabbing cylinder is movably installed on the mounting strip by bolts, and the mounting strip is provided with a plurality of threaded holes for adjusting the side panel grabbing cylinder.

6. A new energy battery welding production line as claimed in claim 1, It is characterized in that The end plate clamping assembly comprises: An end plate pressing electric cylinder, wherein the end plate pressing electric cylinder is installed in the middle of the second movable plate; The fixed support platform is located on one side of the end plate pressing the electric cylinder; A connecting rod, the middle portion of which is rotatably connected to the fixed support platform, and one end of which is connected to the end plate pressing electric cylinder; The upper end plate pressing block is connected to the other end of the connecting rod; The end plate clamping block is installed on a side of the fixed support platform facing the material discharge platform.

7. A new energy battery welding production line as claimed in claim 1, It is characterized in that The side panel clamping assembly comprises: A second electric cylinder is mounted on the first movable plate; The third movable plate is slidably mounted on the first movable plate through a slide rail and is fixedly connected to the output shaft of the second electric cylinder. A welding support and a pushing cylinder are mounted on the third movable plate, and the pushing cylinder is located on both sides of the welding support. The side plate shaping substrate is installed on the side of the welding support facing the material discharging platform, and a vacuum suction cup is installed in the side plate shaping substrate for adsorbing the side plate; The side panel shaping positioning block is slidably installed on the third movable plate through a slide rail and is fixedly connected to the output shaft of the pushing cylinder. A side panel clamping electric cylinder is installed on the side of the side panel shaping positioning block away from the welding support, and a side panel upper clamping block is installed on the output shaft of the side panel clamping electric cylinder. A side panel hook electric cylinder is installed on the side of the side panel shaping positioning block facing the welding support, and a side panel shaping hook is also connected to the side panel shaping positioning block. The side panel hook electric cylinder is used to drive the side panel shaping hook.

8. A new energy battery welding production line as claimed in claim 1, It is characterized in that The first side panel shaping assembly comprises: A fourth movable plate, the fourth movable plate is movably connected to the frame assembly, and a length limit adjustment mechanism is provided at the connection; A first shaping bracket, wherein the first shaping bracket is movably connected to the fourth movable plate, and a width limiting adjustment mechanism is provided at the connection; A first shaping end plate, wherein the first shaping end plate is movably mounted on a side of the first shaping bracket facing the side plate clamping assembly through a slide rail; The first shaping cylinder is installed on the first shaping bracket, and the first shaping cylinder and the first shaping end plate are on the same side, and the output shaft of the first shaping cylinder is connected to the first shaping end plate.

9. A new energy battery welding production line as claimed in claim 1, It is characterized in that The second side panel shaping assembly comprises: A fifth movable plate, wherein the fifth movable plate is slidably mounted on the fixed plate via a slide rail, and a side plate shaping and seam adjustment mechanism is provided between the fifth movable plate and the fixed plate; a second shaping bracket, wherein the second shaping bracket is mounted on the fifth movable plate; A second shaping end plate, the second shaping end plate being movably mounted on a side of the second shaping bracket facing the side plate clamping assembly through a slide rail; A second shaping cylinder, wherein the second shaping cylinder is mounted on a second shaping bracket, and the second shaping cylinder and the second shaping bracket are on the same side, and an output shaft of the second shaping cylinder is connected to a second shaping end plate; A first welding baffle is installed on the second shaping end plate.

10. A new energy battery welding production line as claimed in claim 1, It is characterized in that The positioning component also includes: A copper nozzle support frame, wherein the copper nozzle support frame is connected to the second movable plate through a slide rail, and a side plate shaping and seam adjustment mechanism is provided between the copper nozzle support frame and the second movable plate; A second welding baffle, the second welding baffle being mounted on a side of the copper nozzle support frame facing the end plate clamping assembly through a slide rail; A copper nozzle clamping cylinder is installed on a copper nozzle support frame on a side different from the second welding baffle. One end of the second welding baffle passes through the copper nozzle support frame and is fixedly connected to the output shaft of the copper nozzle clamping cylinder. A through hole is opened on the copper nozzle support frame for the second welding baffle to move.

11. A new energy battery welding production line as claimed in claim 1, It is characterized in that The pole roller assembly comprises a plurality of rollers, the rollers are mounted on a roller mounting plate, and a spring is arranged between the rollers and the roller mounting plate.

12. A new energy battery welding production line as claimed in claim 1, It is characterized in that The module side shaping mechanism comprises: A support push cylinder, wherein the support push cylinder is mounted on a movable mounting plate; A side shaping bracket, wherein the side shaping bracket is mounted on a movable mounting plate through a slide rail, and the side shaping bracket and the bracket pushing cylinder are on the same side, and the output shaft of the bracket pushing cylinder is fixedly connected to the side shaping bracket; A cylinder mounting plate, the cylinder mounting plate is movably mounted on a side of the side shaping bracket that is different from the side of the bracket that pushes the cylinder output shaft, and a module side shaping adjustment mechanism is provided between the cylinder mounting plate and the side shaping bracket for adjusting the cylinder mounting plate; A side shaping cylinder, wherein the side shaping cylinder is mounted on a cylinder mounting plate; A side pressing module, wherein the side pressing module is fixedly connected to the output shaft of the side plate shaping cylinder, and the side pressing module is slidably connected to the cylinder mounting plate; The latch cylinder is installed on the cylinder mounting plate and is used to fix the side clamping module.

13. A new energy battery welding production line as claimed in claim 1, It is characterized in that The galvanometer welding equipment comprises: Equipment bracket, with a slide assembly installed at the bottom; Welding galvanometer, installed on the equipment bracket; A first adjustment component is installed on the equipment bracket and is used to adjust the slide assembly along the Y-axis direction; The second adjustment component is installed on the equipment bracket and is used to adjust the welding galvanometer along the Z-axis direction; A third adjustment component is installed on the second adjustment component and is used to adjust the welding galvanometer along the X-axis direction; The CCD visual component is installed on the third adjustment component and is used to take pictures of the weld.

14. A new energy battery welding production line as claimed in claim 13, It is characterized in that The first adjustment component comprises: A ground rail, which is installed between the side seam welding fixture and the loading and unloading manipulator, and the slide assembly slides along the ground rail, and a rack is installed on one side of the ground rail; The first motor is installed on one side of the equipment bracket, the output shaft of the first motor extends downward and passes through the slide assembly, and a gear is fixedly connected to the output shaft of the first motor, and the gear is meshed with the rack.

15. A new energy battery welding production line as claimed in claim 14, It is characterized in that The second adjustment component comprises: A second motor, the second motor is mounted on a side of the equipment bracket different from the first motor, and the output shaft of the second motor extends upward; A fourth screw rod, the fourth screw rod being rotatably mounted on a side of the equipment bracket different from the first motor, and an output shaft of the second motor being fixedly connected to one end of the fourth screw rod; A movable plate is slidably connected to a side of the equipment bracket different from the first motor through a slide rail, the movable plate is threadedly connected to the fourth screw rod, and one end of the movable plate extends to the outside of the equipment bracket.

16. A new energy battery welding production line as claimed in claim 15, It is characterized in that The third adjustment component comprises: a third motor, wherein the third motor is mounted on the movable plate, and an output shaft of the third motor extends along an extension direction of the movable plate; a fifth screw rod, the fifth screw rod being rotatably mounted on the movable plate, and an output shaft of the third motor being fixedly connected to one end of the fifth screw rod; The mounting frame is in the shape of a right triangle, one of the right-angled sides of the mounting frame is connected with a protrusion, the mounting frame is threadedly connected to the fifth screw rod through the protrusion, and the welding galvanometer is mounted on the other right-angled side of the mounting frame.

17. A new energy battery welding production line as claimed in claim 16, It is characterized in that The CCD vision component is installed on the mounting frame, and a fourth adjustment component is provided at the connection between the CCD vision component and the mounting frame, and the welding galvanometer is located between the CCD vision component and the movable plate.

18. A new energy battery welding production line as claimed in claim 17, It is characterized in that The fourth adjustment component comprises: A fixing block, the fixing block is installed on the mounting frame, and a recessed portion is formed on the fixing block; A third screw rod, the third screw rod is rotatably connected in the recessed portion, and one end of the third screw rod extends to the outside of the fixed block and is fixedly connected to a hand wheel, a fastener is installed on the fixed block, and the fastener is sleeved between the fixed block and the hand wheel; The mounting seat, the CCD visual component is mounted on the mounting seat, the lower part of one end of the mounting seat is connected to the two protruding ends of the fixed block through a slide rail, and a protrusion is installed at the lower part of one end of the mounting seat, and the protrusion is threadedly connected to the third screw rod.

19. A new energy battery welding production line as claimed in claim 1, It is characterized in that The weld grinding equipment comprises: Grinding the frame; The grinding and dust removal component comprises a dust removal mechanism and a grinding mechanism, wherein the grinding mechanism is located above a grinding machine frame, and the dust removal mechanism is located inside the grinding machine frame.

20. A new energy battery welding production line as claimed in claim 19, It is characterized in that The dust removal mechanism comprises: An exhaust pipe runs through the interior of the grinding machine frame, an air outlet end of the exhaust pipe is connected to an air inlet end of an exhaust fan, a plurality of grinding wheel shells are arranged above the side seam welding grinding machine frame, an air inlet end corresponding to the grinding wheel shell is opened on the exhaust pipe, and the grinding wheel shell is connected to the corresponding air inlet end on the exhaust pipe.

21. A new energy battery welding production line as claimed in claim 19 or 20, It is characterized in that The grinding mechanism comprises: A grinding wheel, the grinding wheel corresponds to the grinding wheel shell, the grinding wheel is rotatably connected in the cavity of the corresponding grinding wheel shell, and a rotating rod is movably connected between the grinding wheels on the same side, the two rotating rods are arranged in parallel, the rotating rods penetrate the corresponding grinding wheel shell, and one end of the two rotating rods is respectively fixedly connected to a first motor and a second motor, wherein the first motor is fixedly installed on the side seam welding grinding frame through a partition.

22. A new energy battery welding process, applied to the new energy battery welding production line as claimed in any one of claims 1 to 21, It is characterized in that include Step 1: The loading and unloading robot loads the battery module, side plate and end plate onto the unloading platform on the side seam welding fixture; Step 2: Reshape the battery module, side plate and end plate through the shaping assembly and the pole pressing assembly, and fix the position of the battery module, side plate and end plate, waiting for welding; Step 3: Use the CCD vision component on the galvanometer welding equipment to measure the distance and take pictures of the gaps between the battery module, side plate and end plate, and drive the welding galvanometer to weld the weld to form a new energy battery; Step 4: The loading and unloading robot removes the new energy battery and grinds it through the weld grinding equipment. After grinding, the finished new energy battery is sent to the next production line.

23. A new energy battery welding process as claimed in claim 22, It is characterized in that In step one: The side clamping plate and the end clamping plate are pre-adjusted by the first adjustment assembly and the second adjustment assembly on the top plate, the position between the side plate grabbing cylinders is adjusted by bolts, the battery module and the end plate are clamped from the side and end face by the first clamping cylinder and the second clamping cylinder, the side plate is clamped by the side plate grabbing cylinder, and the battery module, side plate and end plate are placed on the discharge platform in the side seam welding fixture.

24. A new energy battery welding process as claimed in claim 22, It is characterized in that In step 2: The battery module, the side plate and the end plate are placed on the unloading platform in the side seam welding fixture, and the movable mounting plate moves the pole clamping and limiting assembly and the module side shaping mechanism to the top of the battery module, and the battery module is shaped by the module side shaping mechanism. After the shaping is completed, the battery module is fixed by the pole clamping and limiting assembly; The end plate and side plate are adjusted by the end plate clamping electric cylinder and the side plate clamping electric cylinder in the end plate clamping assembly, and the adjusted end plate and side plate are fitted to the battery module through the positioning assembly, waiting for the galvanometer welding equipment to perform welding.

25. A new energy battery welding process as claimed in claim 22, It is characterized in that In step three: The CCD vision component is adjusted along the Y-axis, Z-axis and X-axis directions through the first adjustment component, the second adjustment component and the third adjustment component, the weld on the side seam welding fixture is photographed and positioned, and then the welding galvanometer is adjusted along the Y-axis, Z-axis and X-axis directions through the first adjustment component, the second adjustment component and the third adjustment component to weld the weld.

26. A new energy battery welding process as claimed in claim 22, It is characterized in that In step four: The loading and unloading gripper removes the welded new energy battery and moves it above the weld grinding equipment. The weld on the new energy battery is grinded by the grinding mechanism, and the debris generated during grinding is recovered by the dust removal mechanism. After grinding, the new energy battery is transported to the next production line by the loading and unloading robot.

Citation Information

Patent Citations

  • Battery welding machine

    CN107262954A

  • Battery module shaping side welding and positioning mechanism and assembling and shaping device

    CN112658567A

  • Energy storage battery automatic production line

    CN112676836A

  • Battery module welding and fixing device and fixing method

    CN113547263A

  • Battery module assembling device

    CN209078181U