A finished product protection device for special-shaped curved surface plain concrete cylinder and implementation method thereof
Through the combination of elastic cushions and adsorption components, the applicability and integrity problems of the special-shaped curved concrete cylinder protection device are solved, and efficient finished product protection and construction convenience are achieved.
Patent Information
- Application Number
- CN202210850911.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-20
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-07-20
AI Technical Summary
In the existing technology, the finished product protection device for a special-shaped curved fair-faced concrete cylinder is not suitable for concrete cylinders with irregular curved surfaces, and installation through screws or other connectors will destroy the integrity of the concrete cylinder, and it needs to be repaired after disassembly.
Elastic soft pads are used to adsorb and connect to the concrete cylinder through adsorption components. Multiple soft pads are connected in pairs to cover the cylinder. There are energy-consuming cavities and bump grooves to ensure sealing and stability, and pass The suction cups and pull rods realize negative pressure adsorption, reducing manual adjustments.
It improves the applicability and protection effect of the special-shaped curved concrete cylinder, ensures the integrity and sealing of the cylinder, simplifies the installation and disassembly process, reduces manpower requirements, and avoids sewage and concrete falling during construction.
Smart Images

Figure CN115059313B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a finished product protection device for a special-shaped curved surface plain concrete cylinder and an implementation method thereof. Background Art
[0002] Fair-faced concrete can show the beauty of the original ecology and is currently widely used in large public buildings. Fair-faced concrete buildings save on tedious processes such as coating and finishing, but the construction technology is more difficult and the process requirements are higher. On-site pouring needs to be formed in one go, and cracks and stains are not allowed. Especially for the special-shaped curved surface fair-faced concrete cylinder, after the construction of the lower cylinder is completed, other welding, pouring concrete and other work are required on its upper part, so it is necessary to protect the finished product of the special-shaped curved surface fair-faced concrete cylinder; most of the existing technologies use plywood or plastic film for covering and protection. Although some of them are equipped with anti-impact functions, they are generally only suitable for flat concrete cylinders, but not for special-shaped curved surface concrete cylinders with irregular curved shapes. In addition, most of the existing technologies use screws or other connectors to install protective devices such as nine plywood on the surface of the cylinder, which has poor protection effect, screws and other connectors will destroy the integrity of the concrete cylinder, and the protective devices such as nine plywood need to be repaired after removal.
[0003] Therefore, it is necessary to propose a protective device for a finished product of a special-shaped curved surface plain concrete cylinder and an implementation method to solve the above problems. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a protective device for a finished product of a special-shaped curved surface plain concrete cylinder and an implementation method, so as to solve the problem that the protective device in the prior art is not suitable for special-shaped curved surface concrete cylinders with irregular surface shapes, and the protective device is installed on the surface of the cylinder by screws or other connecting parts, which destroys the integrity of the concrete cylinder.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] The present invention provides a protective device for a finished product of a special-shaped curved surface clear-faced concrete cylinder, comprising: an elastic soft pad, wherein the elastic soft pad is adsorbed and connected to the concrete cylinder through an adsorption component, a plurality of the elastic soft pads are clamped in pairs to cover the concrete cylinder, an energy-absorbing cavity is provided in the elastic soft pad, a plurality of energy-absorbing components are arranged in an array in the energy-absorbing cavity, arc-shaped grooves and protrusions are arranged around the side wall of the elastic soft pad in an offset manner, and the grooves and the protrusions cooperate to clamp adjacent elastic soft pads.
[0007] Furthermore, the elastic soft pad is provided with a sliding cavity for the sliding of the protrusion, and the protrusion includes: a mounting seat, the mounting seat is limitedly slidably connected in the sliding cavity, the mounting seat is symmetrically provided with a cavity in the axial direction of the mounting seat, an arc plate matching the arc of the groove is slidably connected in the cavity, a first spring is fixedly connected between the arc plate and the inner wall of the cavity, and the arc plates on both sides are engaged with the groove after being bounced open; the axial direction of the arc plate is parallel to the axial direction of the energy-absorbing component.
[0008] Further, the adsorption assembly includes: a suction cup, a pull rod, a piston, and an operating handle, the suction cup is installed on the elastic soft pad, a vacuum cavity is reserved between the suction cup and the concrete cylinder, an air cavity connected to the vacuum cavity is provided in the elastic soft pad, the first end of the pull rod is slidably connected in the air cavity, the second end of the pull rod extends out of the air cavity and is fixedly connected to the operating handle, and the piston is fixedly connected to the first end of the pull rod;
[0009] The sliding cavity is connected to the air cavity, and the sliding cavity is connected to a first valve ball via a third spring near the air cavity. The first valve ball is used to open or close the sliding cavity. The air cavity is connected to a second valve ball via a fourth spring near the vacuum cavity. The second valve ball is used to open or close the vacuum cavity.
[0010] Furthermore, the energy-absorbing component includes: a fixed cylinder, a first end of the fixed cylinder is connected to the inner wall of the energy-absorbing chamber by a ball joint, a second end of the fixed cylinder is provided with a slide groove, a slide rod is slidably connected in the slide groove, the slide rod is connected to the inner wall of the energy-absorbing chamber by a ball joint away from the fixed cylinder end, and a second spring is connected between the fixed cylinder and the slide rod.
[0011] Furthermore, a fifth spring is sleeved on the pull rod, and the fifth spring is located between the piston and the top wall of the air cavity.
[0012] Furthermore, the elastic cushion is provided with a mounting groove, a handle is installed in the mounting groove, and the operating handle is located on the inner side of the handle.
[0013] Furthermore, the suction cup is provided with an adhesive block near the concrete cylinder, and the adhesive block is made of viscoelastic material.
[0014] Furthermore, an elastic sealing cover is installed on the side wall of the elastic cushion, and the elastic sealing cover is located at the sliding cavity and is used for sealing the sliding cavity.
[0015] Furthermore, the elastic cushion is provided with a parallel section connected to the groove, and the inner wall of the parallel section is provided with a smooth plate, and the smooth plate is used to reduce friction when the protrusion slides into the groove.
[0016] The present invention also provides a method for implementing a finished product protection device for a special-shaped curved surface plain concrete cylinder, comprising the following steps:
[0017] S1: According to the shapes and sizes of the concrete cylinder and the elastic cushion, the elastic cushion is installed on the concrete cylinder at the preset positions through the modeling software;
[0018] S2: Mark the areas on the concrete cylinder according to the modeling software;
[0019] S3: After the elastic cushion is pre-installed at the marked position, the elastic cushion is adsorbed and connected to the concrete cylinder through an adsorption component;
[0020] S4: Check the sealing between adjacent elastic cushions. If the protrusion is completely engaged in the groove, it is qualified. If the protrusion is not completely engaged in the groove, the operation protrusion is completely engaged in the groove.
[0021] The beneficial effects of the present invention are:
[0022] The present invention provides an elastic pad, and through the elastic deformation ability of the elastic pad, the elastic pad is suitable for concrete cylinders with irregular curved shapes, thereby improving applicability; by arranging a plurality of elastic pads for splicing, it is convenient to install and disassemble the protective device, saving manpower; by arranging an adsorption component, the elastic pad is adsorbed and connected to the concrete cylinder, thereby ensuring the integrity of the concrete cylinder; by arranging a convex block and cooperating with a groove, it is ensured that the connection of a plurality of elastic pads after being spliced together is more stable, thereby ensuring the integrity of the protective device; by arranging an energy-absorbing cavity, the elastic pad is compressed during impact, which causes side bending, thereby causing the convex block to be further squeezed into the groove, thereby ensuring the sealing between adjacent elastic pads; the groove and the convex block are arranged in a staggered manner around the side wall of the elastic pad, so that when splicing the elastic pads, there is no need to manually adjust the direction, thereby reducing manual judgment and saving manpower.
[0023] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:
[0025] Figure 1 This is a schematic diagram of installing an elastic cushion according to an embodiment of the present invention;
[0026] Figure 2 This is a schematic diagram of the structure of an elastic cushion according to an embodiment of the present invention;
[0027] Figure 3 is a cross-sectional view of an elastic cushion according to an embodiment of the present invention;
[0028] Figure 4 It is a schematic diagram of the installation of the adsorption component according to an embodiment of the present invention;
[0029] Figure 5 For the embodiment of the present invention Figure 4 A magnified view of the part A in the middle;
[0030] Figure 6 For the embodiment of the present invention Figure 4 A magnified view of the part B in the middle;
[0031] Figure 7 For the embodiment of the present invention Figure 4 A magnified view of the local C in the middle;
[0032] Figure 8 For the embodiment of the present invention Figure 4 A magnified view of the local D in the middle;
[0033] Fig. 9 It is a schematic diagram of the structure of the energy consumption component of an embodiment of the present invention;
[0034] Fig.10 This is a schematic structural diagram of an elastic cushion covering a concrete cylinder according to an embodiment of the present invention.
[0035] The markings in the attached drawings are as follows: 1. concrete cylinder; 2. elastic cushion; 201. energy-consuming cavity; 202. groove; 203. bump; 204. sliding cavity; 205. mounting seat; 206. cavity; 207. arc plate; 208. first spring; 209. air cavity; 210. mounting groove; 211. handle; 212. smooth plate; 3. adsorption component; 301. suction cup; 302. pull rod; 303. piston; 304. operating handle; 305. vacuum cavity; 306. third spring; 307. first valve ball; 308. fourth spring; 309. second valve ball; 310. fifth spring; 4. energy-consuming component; 401. fixed cylinder; 402. slide groove; 403. slide rod; 404. second spring; 5. elastic sealing cover. DETAILED DESCRIPTION
[0036] like Figures 1 to 10As shown, the present invention provides a protective device for a finished product of a special-shaped curved surface plain concrete cylinder, comprising: an elastic soft pad 2, the elastic soft pad 2 is adsorbed and connected to the concrete cylinder 1 through an adsorption component 3, a plurality of the elastic soft pads 2 are clamped in pairs to cover the concrete cylinder 1, an energy-absorbing cavity 201 is opened in the elastic soft pad 2, a plurality of energy-absorbing components 4 are arrayed in the energy-absorbing cavity 201, arc-shaped grooves 202 and protrusions 203 are staggered around the side wall of the elastic soft pad 2, and the grooves 202 and the protrusions 203 cooperate to clamp adjacent elastic soft pads 2.
[0037] The working principle of the above technical solution is as follows: Figure 1 When installing the elastic pad 2, the elastic pad 2 is installed at a preset position of the concrete cylinder 1. The preset position is divided by the modeling software and the size of the elastic pad 2 to ensure that the complete concrete cylinder 1 is covered with a minimum amount of the elastic pad 2. The air between the elastic pad 2 and the concrete cylinder 1 is extracted by the adsorption component 3 to generate a negative pressure between the elastic pad 2 and the concrete cylinder 1, so that the elastic pad 2 adheres to the concrete cylinder 1. When splicing the elastic pads 2, the groove 202 on one of the elastic pads 2 cooperates with the protrusion 203 on the other elastic pad 2 to make the adjacent elastic pads 2 snap together, so that the connection of multiple elastic pads 2 is more stable after being spliced together, such as Fig.10 After the multiple elastic pads 2 are installed, they cover the concrete cylinder 1. According to the actual situation, the elastic pads 2 are installed on the inner and outer sides of the concrete cylinder 1. Figure 3 and 4 When an impact occurs, the energy dissipation component 4 arranged in the energy dissipation cavity 201 is used to dissipate energy. Since the elastic cushion 2 is elastic and has an energy dissipation cavity 201 inside, the elastic cushion 2 is compressed during an impact, causing the side to bend toward the elastic cushion 2 on the other side, thereby causing the protrusion 203 to be further squeezed into the groove 202, thereby ensuring the sealing between adjacent elastic cushions 2; the grooves 202 and the protrusions 203 are arranged around and staggered on the side walls of the elastic cushion 2. The elastic cushion 2 is square, and each side wall is provided with a group of grooves 202 and protrusions 203, so that when the elastic cushion 2 is spliced, no matter from which direction the elastic cushion 2 is spliced, the grooves 202 can cooperate with the protrusions 203.
[0038] The beneficial effects of the above technical solution are as follows: by setting the elastic pad 2, the elastic pad 2 is adapted to the concrete cylinder 1 with irregular curved shapes through its elastic deformation ability, thereby improving its applicability; and after the elastic pads 2 are spliced together, due to the elastic effect, the connection between adjacent elastic pads 2 is tight, and the gap is smaller than that of ordinary rigid connecting plates, which can effectively prevent water and concrete from flowing into the gap during construction, thereby enhancing the protective effect on the concrete cylinder 1; by setting a plurality of elastic pads 2 for splicing, the elastic pad 2 can be disassembled by injecting gas only during disassembly, thereby facilitating the installation and disassembly of the protective device and saving manpower; by setting the adsorption component 3, the elastic pad 2 is adsorbed and connected to the concrete cylinder 1, thereby ensuring The integrity of the concrete cylinder is ensured, and no repair is required after disassembly; by setting the protrusion 203 to cooperate with the groove 202, it is ensured that the connection of multiple elastic cushions 2 after being spliced together is more stable, and the integrity of the protective device is ensured; by setting the energy-absorbing cavity 201, the elastic cushion 2 is compressed during impact, which will cause the side to bend, so that the protrusion 203 is further squeezed into the groove 202, thereby ensuring the sealing between adjacent elastic cushions 2, and preventing sewage and concrete from falling during upper construction operations to damage the formed clear-water concrete cylinder 1; the groove 202 and the protrusion 203 are arranged around the side wall of the elastic cushion 2 in an offset manner, so that when splicing the elastic cushion 2, there is no need to manually adjust the direction, which reduces manual judgment and saves manpower.
[0039] In one embodiment of the present invention, the elastic cushion 2 is provided with a sliding cavity 204 for the sliding of the protrusion 203, and the protrusion 203 includes: a mounting seat 205, the mounting seat 205 is limitedly slidably connected in the sliding cavity 204, a cavity 206 is symmetrically arranged on the mounting seat 205 in the axial direction of the mounting seat 205, an arc plate 207 matching the arc of the groove 202 is slidably connected in the cavity 206, a first spring 208 is fixedly connected between the arc plate 207 and the inner wall of the cavity 206, and the arc plates 207 on both sides are engaged with the groove 202 after being bounced open.
[0040] The working principle of the above technical solution is as follows: Figure 7 When splicing adjacent elastic cushions 2, the mounting seat 205 is slid in along the direction of the groove 202. Initially, under the limiting action of the sliding cavity 204, the arc plates 207 on both sides are located in the cavity 206, and the first spring 208 is in a compressed state. When the mounting seat 205 slides into the groove 202, since the groove 202 is arc-shaped, the arc plate 207 slides out of the sliding cavity 204. At this time, the arc plate 207 loses the limiting effect of the sliding cavity 204. At this time, the first spring 208 releases the elastic potential energy to pop the arc plate 207 out of the cavity 206, so that the arc plates 207 on both sides cooperate with the groove 202 to realize the clamping of the protrusion 203 and the groove 202.
[0041] The beneficial effects of the above technical solution are as follows: by setting the sliding cavity 204, the arc plate 207 is limited when sliding, ensuring that the mounting seat 205 can slide smoothly into the groove 202; by setting the arc plate 207, the arc plate 207 slides into the groove 202 and cooperates with the groove 202, and is not easy to slide out, thereby ensuring the stability of the connection between adjacent elastic cushions 2.
[0042] In one embodiment of the present invention, the adsorption assembly 3 includes: a suction cup 301, a pull rod 302, a piston 303, and an operating handle 304. The suction cup 301 is installed on the elastic cushion 2. A vacuum chamber 305 is reserved between the suction cup 301 and the concrete cylinder 1. An air chamber 209 communicating with the vacuum chamber 305 is provided in the elastic cushion 2. The first end of the pull rod 302 is slidably connected in the air chamber 209. The second end of the pull rod 302 extends out of the air chamber 209 and is fixedly connected to the operating handle 304. The piston 303 is fixedly connected to the first end of the pull rod 302.
[0043] The sliding cavity 204 is connected to the air cavity 209. The sliding cavity 204 is connected to a first valve ball 307 via a third spring 306 near the air cavity 209. The first valve ball 307 is used to open or close the sliding cavity 204. The air cavity 209 is connected to a second valve ball 309 via a fourth spring 308 near the vacuum cavity 305. The second valve ball 309 is used to open or close the vacuum cavity 305.
[0044] The working principle of the above technical solution is as follows: Figure 5 When installing the elastic cushion 2, the elastic cushion 2 is pre-installed on the concrete cylinder 1 through the suction cup 301, and then the operating handle 304 is pulled to drive the pull rod 302 to slide in the air cavity 209, thereby driving the piston 303 to slide, thereby extracting the air in the vacuum cavity 305, so that the suction cup 301 and the concrete cylinder 1 form a negative pressure, so that the suction cup 301 is firmly adsorbed and connected to the concrete cylinder 1, and when the pull rod 302 is pulled, the gas in the vacuum cavity 305 is extracted by sliding the piston 303, as shown in FIG. 7. At this time, under the action of the air pressure in the air cavity 209, the second valve ball 309 slides in a direction away from the vacuum cavity 305, so that the vacuum cavity 305 is opened, thereby realizing the extraction of the gas in the vacuum cavity 305. At the same time, under the action of the air pressure in the air cavity 209, the first valve ball 307 is driven to slide in a direction close to the air cavity 209, thereby blocking the sliding cavity 204 and ensuring that the air pressure in the air cavity 209 is stable. When the pull rod 302 is pushed, as shown in FIG. Figure 8 At this time, under the action of the air pressure in the air cavity 209, the second valve ball 309 slides toward the vacuum cavity 305, so that the vacuum cavity 305 is closed. Figure 7At the same time, the air pressure steadily pushes the first valve ball 307 to slide away from the air cavity 209, so that the extracted air flows into the sliding cavity 204 to push the mounting seat 205, causing the mounting seat 205 to slide so that the arc plate 207 is clamped in the groove 202.
[0045] The beneficial effects of the above technical solution are as follows: by setting the suction cup 301, the gas in the vacuum chamber 305 can be extracted during the reciprocating movement of the pull rod 302, so that the suction cup 301 is more firmly adsorbed on the concrete cylinder 1 through vacuum; and in the process of reciprocating the pull rod 302, the extracted gas flows into the sliding chamber 204, so that the arc plate 207 is clamped in the groove 202, saving the assembly process of the elastic cushion 2, and realizing the automatic splicing of adjacent elastic cushions 2 by reciprocating the pull rod 302.
[0046] In one embodiment of the present invention, the energy absorbing component 4 comprises: a fixed cylinder 401, a first end of the fixed cylinder 401 being connected to the inner wall of the energy absorbing chamber 201 by a ball joint, a second end of the fixed cylinder 401 being provided with a slide groove 402, a slide rod 403 being slidably connected in the slide groove 402, an end of the slide rod 403 being connected to the inner wall of the energy absorbing chamber 201 by a ball joint away from the fixed cylinder 401, and a second spring 404 being connected between the fixed cylinder 401 and the slide rod 403.
[0047] The working principle and beneficial effects of the above technical solution are as follows: Fig. 9 When the elastic cushion 2 collides, the elastic cushions 2 on both sides of the energy absorbing chamber 201 contract, and the impact energy absorbing effect is realized through the energy absorbing chamber 201. At this time, the sliding rod 403 slides into the fixed cylinder 401, and the second spring 404 is compressed. At this time, further impact energy absorbing effect is realized. The fixed cylinder 401 and the sliding rod 403 are connected to the inner wall of the energy absorbing chamber 201 by a ball hinge. Since the concrete cylinder 1 is an irregular curved surface, when the elastic cushion 2 of the pile foundation is pressed from any direction, the fixed cylinder 401 and the sliding rod 403 can rotate in any direction through the ball hinge point, and the impact energy absorbing effect in any direction is realized through the energy absorbing component 4.
[0048] In one embodiment of the present invention, a fifth spring 310 is sleeved on the pull rod 302 , and the fifth spring 310 is located between the piston 303 and the top wall of the air cavity 209 .
[0049] The working principle of the above technical solution is: by providing the fifth spring 310 , after the pull rod 301 is pulled, the pull rod 301 is automatically reset by the fifth spring 310 without pushing the pull rod 302 .
[0050] The beneficial effects of the above technical solution are as follows: automatic resetting after pulling the pull rod 301 is realized, and during operation, the pull rod 301 can be reciprocated by simply pulling the pull rod 301, thus saving manpower.
[0051] In one embodiment of the present invention, a mounting groove 210 is formed on the elastic cushion 2 , a handle 211 is installed in the mounting groove 210 , and the operating handle 304 is located inside the handle 211 .
[0052] The working principle of the above technical solution is as follows: Figure 5 During operation, the user places his / her hand on the handle 211 and pulls the operating handle 304 with his / her fingers to drive the pull rod 302 to move. When installing the elastic cushion 2, the user holds the handle 211 to drive the elastic cushion 2 to move and install.
[0053] The beneficial effect of the above technical solution is that by providing the handle 211, it is convenient to pull the operating handle 304, move and install the elastic cushion 2, and save manpower.
[0054] In one embodiment of the present invention, a bonding block is provided on the side of the suction cup 301 close to the concrete cylinder 1, and the bonding block is made of a viscoelastic material.
[0055] The working principle of the above technical solution is as follows: when installing the elastic cushion 2, the suction cup 301 is bonded to the concrete cylinder 1 through the bonding block to complete the pre-installation of the elastic cushion 2, and then the suction cup 301 is adsorbed and connected to the concrete cylinder 1 through the adsorption component 3.
[0056] The beneficial effects of the above technical solution are as follows: when installing the elastic cushion 2, pre-installation is completed through the adhesive block, saving manpower during adsorption; the adhesive block is made of viscoelastic material, so that after adsorption, the suction cup 301 is more firmly adsorbed on the concrete cylinder 1.
[0057] In one embodiment of the present invention, an elastic sealing cover 5 is installed on the side wall of the elastic cushion 2 , and the elastic sealing cover 5 is located at the sliding cavity 204 and is used to seal the sliding cavity 204 .
[0058] The working principle of the above technical solution is as follows: Figure 7 The elastic sealing cover 5 has elastic deformation ability. After the mounting seat 205 slides out of the sliding cavity 204, it drives the elastic sealing cover 5 to elastically deform. When the arc plate 207 slides into the groove 202, the arc plate 207 pops out of the cavity 206 to further drive the elastic sealing cover 5 to elastically deform, so that the elastic sealing cover 5 cooperates with the groove 202.
[0059] The beneficial effects of the above technical solution are as follows: by setting up the elastic sealing cover 5, the sealing of the sliding cavity 204 is ensured, and external dust, large garbage, etc. are prevented from falling into the sliding cavity 204 and affecting the sliding of the mounting seat 205; the elastic sealing cover 5 is elastically deformed by the sliding of the mounting seat 205 and the sliding of the arc plate 207, so that when the arc plate 207 cooperates with the groove 202, the elastic sealing cover 5 also cooperates with the groove 202. Since the elastic material of the elastic sealing cover 5 generates a large friction with the groove 202, the arc plate 207 is not easy to slide out of the groove 202, thereby ensuring the stability of the connection between the adjacent elastic cushions 2.
[0060] In one embodiment of the present invention, the elastic cushion 2 is provided with a parallel section connected to the groove 202 , and the inner wall of the parallel section is provided with a smooth plate 212 , and the smooth plate 212 is used to reduce the friction when the protrusion 203 slides into the groove 202 .
[0061] The working principle and beneficial effects of the above technical solution are as follows: Figure 6 A parallel section is provided on the side of the groove 202 near the protrusion 203. When the mounting seat 205 slides into the groove 202, it slides in along the smooth plate 212. The smooth plate 212 reduces the friction between the mounting seat 205 and the groove 202, making it easier for the mounting seat 205 to slide into the groove 202, thereby ensuring the smooth splicing of adjacent elastic cushions 2.
[0062] In one embodiment of the present invention, the axial direction of the arc plate 207 is parallel to the axial direction of the energy dissipation component 4 .
[0063] The working principle of the above technical solution is as follows: Figure 4 By setting the axial direction of the arc plate 207 to be parallel to the axial direction of the energy dissipation component 4, after the arc plates 207 on both sides pop out, when the elastic cushion 2 collides, the arc plates 207 on both sides and the first spring 208 can play an impact energy dissipation role, thereby avoiding the joints of adjacent elastic cushions 2 being reduced in impact energy dissipation effect due to the lack of energy dissipation component 4.
[0064] The beneficial effects of the above technical solution are as follows: by setting the axial direction of the arc plate 207 to be parallel to the axial direction of the energy absorbing component 4, it is ensured that after the elastic cushion 2 covers the concrete cylinder 1, the arc plate 207 and the first spring 208 can play an impact energy absorbing role, thereby avoiding the impact energy absorbing effect of the joint of the elastic cushion 2 being reduced due to the lack of the energy absorbing component 4 at the joint of adjacent elastic cushions 2, thereby ensuring the uniformity of energy absorption and full coverage.
[0065] In one embodiment of the present invention, an air inlet is provided on the operating handle 304, and the air inlet passes through the pull rod and the piston in sequence to communicate with the air cavity 209, and a cover is installed on the air inlet.
[0066] The working principle of the above technical solution is: an air inlet is provided on the operating handle 304, and a cover body (not shown in the figure) is installed on the air inlet. When the elastic cushion 2 is installed, the cover body blocks the air inlet. At this time, the air pressure in the air cavity 209 is constant. By operating the operating handle 304, the gas in the vacuum cavity 305 can be sucked in to make the elastic cushion 2 adsorbed on the concrete cylinder 1. When the elastic cushion 2 is removed, the cover body is opened to allow external air to enter the air cavity 209 and the vacuum cavity 305. At this time, the vacuum adsorption state between the elastic cushion 2 and the concrete cylinder 1 disappears.
[0067] The beneficial effect of the above technical solution is that the air inlet and the cover are provided to facilitate the installation and removal of the elastic cushion 2.
[0068] The present invention also provides a method for implementing a finished product protection device for a special-shaped curved surface plain concrete cylinder, comprising the following steps:
[0069] S1: According to the shapes and sizes of the concrete cylinder 1 and the elastic cushion 2, the elastic cushion 2 is installed on the concrete cylinder 1 and divided at a preset position by using a modeling software;
[0070] S2: Marking the areas on the concrete cylinder 1 according to the modeling software;
[0071] S3: After the elastic cushion 2 is pre-installed at the marked position, the elastic cushion 2 is adsorbed and connected to the concrete cylinder 1 through the adsorption component 3;
[0072] S4: Check the sealing between adjacent elastic cushions 2. If the protrusion 203 is completely engaged in the groove 202, it is qualified. If the protrusion 203 is not completely engaged in the groove 202, operate the protrusion 203 to be completely engaged in the groove 202.
[0073] The principle and beneficial effects of the above technical solution are as follows: the elastic pad 2 is installed after the preset installation position of the elastic pad 2 is divided by the modeling software, so as to avoid waste of materials and confusion of position caused by direct installation; the elastic pad 2 is pre-installed and then adsorbed on the concrete cylinder 1, wherein the pre-installation is realized by bonding with the bonding block, so as to ensure the installation stability of the elastic pad 2; by manually detecting the sealing between adjacent elastic pads 2, it can be judged by naked eye whether the gap between adjacent elastic pads 2 exceeds the preset value, and if it exceeds, it means that the protrusion 203 is not completely engaged in the groove 202, and the sealing between the elastic pads 2 is ensured by the detection step, so as to avoid sewage and concrete from the construction operation on the upper part of the concrete cylinder 1 flowing into the gap and polluting the formed clear water concrete cylinder 1.
[0074] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. A finished product protection device for a special-shaped curved surface concrete cylinder, characterized in that: include: An elastic soft pad, wherein the elastic soft pad is adsorbed and connected to the concrete cylinder through an adsorption component, and a plurality of the elastic soft pads are clamped in pairs to cover the concrete cylinder, an energy-absorbing cavity is provided in the elastic soft pad, and a plurality of energy-absorbing components are arranged in an array in the energy-absorbing cavity, and arc-shaped grooves and protrusions are arranged around the side wall of the elastic soft pad in an offset manner, and the grooves and the protrusions cooperate to clamp adjacent elastic soft pads; The elastic cushion is provided with a sliding cavity for the protrusion to slide, and the protrusion comprises: a mounting seat, the mounting seat is limitedly slidably connected in the sliding cavity, a cavity is symmetrically arranged on the mounting seat in the axial direction of the mounting seat, an arc plate matching the arc of the groove is slidably connected in the cavity, a first spring is fixedly connected between the arc plate and the inner wall of the cavity, and the arc plates on both sides are engaged with the groove after being ejected; the axial direction of the arc plate is parallel to the axial direction of the energy-absorbing component; The adsorption assembly comprises: a suction cup, a pull rod, a piston, and an operating handle. The suction cup is mounted on the elastic cushion. A vacuum cavity is reserved between the suction cup and the concrete cylinder. An air cavity connected to the vacuum cavity is provided in the elastic cushion. The first end of the pull rod is slidably connected in the air cavity. The second end of the pull rod extends out of the air cavity and is fixedly connected to the operating handle. The piston is fixedly connected to the first end of the pull rod. The operating handle is provided with an air inlet, the air inlet passes through the pull rod and the piston in sequence and is communicated with the air cavity, and a cover is installed on the air inlet; The sliding cavity is communicated with the air cavity, the sliding cavity near the air cavity is connected to a first valve ball through a third spring, the first valve ball is used to open or close the sliding cavity, the air cavity near the vacuum cavity is connected to a second valve ball through a fourth spring, the second valve ball is used to open or close the vacuum cavity; The energy dissipation assembly comprises: a fixed cylinder, a first end of the fixed cylinder is connected to the inner wall of the energy dissipation chamber by a ball joint, a second end of the fixed cylinder is provided with a slide groove, a slide rod is slidably connected in the slide groove, the slide rod is connected to the inner wall of the energy dissipation chamber by a ball joint away from the fixed cylinder end, and a second spring is connected between the fixed cylinder and the slide rod; The elastic cushion is provided with a parallel section connected to the groove, and the inner wall of the parallel section is provided with a smooth plate, and the smooth plate is used to reduce the friction when the protrusion slides into the groove; The side wall of the elastic cushion is installed with an elastic sealing cover, which is located at the sliding cavity and is used to seal the sliding cavity; A fifth spring is sleeved on the pull rod, and the fifth spring is located between the piston and the top wall of the air cavity; The elastic cushion is provided with a mounting groove, a handle is installed in the mounting groove, and the operating handle is located inside the handle; The suction cup is provided with an adhesive block near the concrete cylinder, and the adhesive block is made of viscoelastic material; The implementation method of the finished product protection device of the special-shaped curved surface plain concrete cylinder comprises the following steps: S1: According to the shapes and sizes of the concrete cylinder and the elastic cushion, the elastic cushion is installed on the concrete cylinder at the preset positions through the modeling software; S2: Mark the areas on the concrete cylinder according to the modeling software; S3: After the elastic cushion is pre-installed at the marked position, the elastic cushion is adsorbed and connected to the concrete cylinder through an adsorption component; S4: Check the sealing between adjacent elastic cushions. If the protrusion is completely engaged in the groove, it is qualified. If the protrusion is not completely engaged in the groove, the operation protrusion is completely engaged in the groove.
Citation Information
Patent Citations
Modular flexible pier anti-collision device
CN112647408A
Anti -collision bridge pier
CN207700039U
Splicing type thermal insulation wallboard for civil engineering
CN216516456U
Bridge anti-collision device
CN216615470U
Fence device facilitating elevator maintenance
CN216641683U