Optimal scheduling method of distributed resources in active distribution network based on virtual power plant
By building virtual power plant and market cleaning models and optimizing scheduling solutions, the problem of virtual power plant scheduling plans cannot be delivered is solved, visualization and coordinated control of the distribution system is realized, and uncertainty of distributed energy on the distribution system is reduced. The system has a reliable operation and clean development.
Patent Information
- Application Number
- CN202210654759.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-10
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-06-10
AI Technical Summary
In the distribution network, the dispatching plan of the virtual power plant cannot be delivered due to the randomness of internal resources, causing the distribution system to deviate from the optimal operating state, and even threatens the safe operation of the system. The lack of a transparent distribution-level market mechanism leads to the VPP spontaneously Setting the boot price for DSO affects the reliable power supply of the system.
Adopt the distributed resource optimization scheduling method of active distribution network based on virtual power plants, and determine the optimal scheduling by constructing a virtual power plant operation model and market cleaning model, combining the double-layer optimization scheduling model to perform single-layer reconstruction and linearization processing to determine the optimal scheduling The solution is to maximize the interests of virtual power plants and minimize the operating costs of active distribution networks, and realize the visibility and controllability of distributed resources.
Effectively respond to the operational control challenges in distributed energy management, reduce the impact of power generation uncertainty on the distribution system, ensure the reliable operation of the distribution system, improve the system operation efficiency, and promote the clean development and integration of distributed energy.
Smart Images

Figure CN115062835B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of active distribution network resource scheduling, and in particular to an active distribution network distributed resource optimization scheduling method based on a virtual power plant. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] With the development of power electronics technology and the popularization of advanced measurement systems, the penetration rate of various types of distributed energy resources (DERs) in distribution networks has continued to increase. On the one hand, different types of distributed resources have great potential value in promoting the low-carbon and clean development of the system, improving operating efficiency, peak shaving and valley filling, congestion management, and delaying network equipment upgrades. On the other hand, the randomness of distributed renewable energy and the large-scale disordered access of demand-side resources have also increased the uncertainty of the system's power flow distribution, affecting the safe operation and reliable power supply of the system.
[0004] Virtual Power Plant (VPP) is a flexible and effective method for aggregating small-capacity DERs. Current research on virtual power plants can be divided into two categories. The first category considers VPPs directly participating in wholesale markets operated by ISOs. In these studies, the roles played by VPPs in the market can be divided into two types: price takers and price makers. VPPs predict the clearing price of the market and optimally schedule the output of DERs, thereby making the optimal bid quantity in the market. With the development of distributed resources, VPP capacity has been greatly improved. Therefore, VPPs have a certain market power, and as price makers, they can influence the market clearing results through their strategic behavior.
[0005] The second type of research defines local markets to coordinate the market participation of VPPs, focusing on the coordination between VPPs and distribution system operators. This type of problem is essentially a non-cooperative game between VPPs and distribution system operators (DSOs) (the two have different goals and both pursue their own operating benefit maximization / operating cost minimization), and is usually modeled as a two-level programming problem for solution.
[0006] However, in these studies, the transparent distribution-level market mechanism is not involved; therefore, the VPP spontaneously responds to the guidance price set by the DSO. When the VPP's dispatch plan cannot be delivered due to the randomness of internal resources, it will cause the entire distribution system to deviate from the optimal operating state, and in serious cases, even threaten the safe operation of the system. Summary of the invention
[0007] In order to solve the above problems, the present invention proposes an optimization scheduling method for distributed resources of an active distribution network based on a virtual power plant, which improves the visibility and controllability of various types of distributed resources in optimization scheduling and promotes the integrated operation of multiple types of distributed resource entities.
[0008] In order to achieve the above object, the present invention adopts the following technical solution:
[0009] In a first aspect, the present invention provides a method for optimizing and scheduling distributed resources of an active distribution network based on a virtual power plant, comprising:
[0010] With the goal of maximizing the benefits of the virtual power plant, the active and reactive power of controllable distributed power sources, the charging and discharging power and surplus power of distributed energy storage, the active and reactive power of renewable energy, the active and reactive power of demand response, the active and reactive power of flexible loads, and the bids and quotations of the active and reactive power of the virtual power plant are used as decision variables, and the constraints are determined based on this, and a virtual power plant operation model is constructed;
[0011] With the goal of minimizing the operating cost of the active distribution network, the active output and absorbed power of the virtual power plant, the reactive output and absorbed power of the virtual power plant, the active and reactive power of the active distribution network, the charging and discharging power and surplus power of the energy storage, the reactive power of the static VAR compensator, and the active and reactive power of the distributed generation are used as decision variables, and the constraints are determined based on this, and a market clearing model for the active distribution network is constructed;
[0012] Taking the virtual power plant operation model as the upper model and the market clearing model of the active distribution network as the lower model, an optimal scheduling model among distributed resources, virtual power plants and active distribution networks is constructed. The two-layer optimal scheduling model is solved after single-layer reconstruction and linearization processing to obtain the optimal scheduling plan.
[0013] As an optional implementation, the objective function of the virtual power plant operation model includes:
[0014]
[0015] in, k is the node where the virtual power plant is located, T is the total number of nodes; For Node k The active / reactive power market clearing price; They are the active output / absorbed power and reactive output / absorbed power of the virtual power plant respectively; They are the unit operating costs of distributed energy storage, controllable distributed power sources, and renewable energy respectively; They are the charging power of distributed energy storage, the discharging power of distributed energy storage, the active output power of controllable distributed power sources, and the active output power of distributed renewable energy sources; The load for demand response; is the utility function.
[0016] As an optional implementation, the constraints of the virtual power plant operation model include power balance constraints, controllable distributed power constraints, distributed energy storage constraints, distributed renewable energy constraints, demand response aggregator constraints and flexible load aggregator constraints;
[0017] Among them, the power balance constraint is that the active / reactive power flowing into the virtual power plant node is equal to the active / reactive power flowing out of the virtual power plant node;
[0018] The controllable distributed power constraints include active output constraints, reactive output constraints, active ramp power constraints and apparent power constraints of the controllable distributed power.
[0019] Distributed energy storage constraints include charging and discharging power constraints, state of charge constraints, and inter-period dynamic constraints;
[0020] Distributed renewable energy generation constraints include active output constraints and apparent power constraints;
[0021] Demand response aggregator constraints include active power constraints for each demand segment and total dispatch demand constraints;
[0022] Flexible load aggregator constraints include active power constraints.
[0023] As an optional implementation, the objective function of the market clearing model of the active distribution network is:
[0024]
[0025] in, k is the node where the virtual power plant is located, T is the total number of nodes; They are active power quotation, active power bid, reactive power quotation, and reactive power bid; They are respectively the active output power, active absorption power, reactive output power, and reactive absorption power of the virtual power plant; Active power price and reactive power price for the main grid; The active power and reactive power of the main grid; Bid for charging and discharging energy storage; is the charging and discharging power of energy storage; Quotation for reactive power compensation for static VAR compensators; and is the absolute value of the reactive power output by the static VAR compensator and distributed power source; Provide active power and reactive power quotations for distributed power sources; It is the active power output of distributed power sources; are the energy storage quantity and the indication subscript respectively; is the number and indication subscript of DG.
[0026] As an optional implementation, the constraints of the market clearing model of the active distribution network include: power flow constraints, bus voltage constraints, line thermal constraints and market participant constraints.
[0027] As an optional implementation, the market participant constraints include: forcing the virtual power plant to sell / purchase active / reactive power between zero and its maximum amount; after the virtual power plant is connected to the active distribution network, the exchange power with the active distribution network satisfies the rated capacity constraint; tie line constraints; large-capacity energy storage constraints; output reactive power constraints of static VAR compensators, reactive and active power limit constraints of distributed power sources; active output ramping constraints of distributed power sources; and active and reactive power coupling constraints of distributed power sources.
[0028] As an optional implementation method, the solution process of the two-layer optimization scheduling model includes: linearizing the quadratic constraints of the upper model and the lower model, then using the KKT condition to reconstruct the two-layer planning problem into an equivalent single-layer planning problem with equilibrium constraints, and finally linearizing the bilinear terms in the single-layer reconstructed planning problem.
[0029] In a second aspect, the present invention provides an active distribution network distributed resource optimization scheduling system based on a virtual power plant, comprising:
[0030] The upper model building module is configured to maximize the benefits of the virtual power plant, taking the active and reactive power of controllable distributed generation, the charging and discharging power and surplus power of distributed energy storage, the active and reactive power of renewable energy, the active and reactive power of demand response, the active and reactive power of flexible loads, and the bids and quotations of the active and reactive power of the virtual power plant as decision variables, and thereby determining the constraints and building the virtual power plant operation model;
[0031] The lower model building module is configured to minimize the operating cost of the active distribution network, with the active output and absorption power of the virtual power plant, the reactive output and absorption power of the virtual power plant, the active and reactive power of the active distribution network, the charging and discharging power and surplus power of the energy storage, the reactive power of the static VAR compensator, and the active and reactive power of the distributed generation as decision variables, and to determine the constraints and build a market clearing model for the active distribution network;
[0032] The two-layer model solving module is configured to use the virtual power plant operation model as the upper-layer model and the market clearing model of the active distribution network as the lower-layer model to construct an optimal scheduling model between distributed resources, virtual power plants and active distribution networks. The two-layer optimal scheduling model is solved after single-layer reconstruction and linearization processing to obtain the optimal scheduling plan.
[0033] In a third aspect, the present invention provides an electronic device comprising a memory and a processor, and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the method described in the first aspect is performed.
[0034] In a fourth aspect, the present invention provides a computer-readable storage medium for storing computer instructions, wherein when the computer instructions are executed by a processor, the method described in the first aspect is performed.
[0035] Compared with the prior art, the present invention has the following beneficial effects:
[0036] The present invention proposes a distributed resource optimization scheduling method for an active distribution network based on a virtual power plant. In terms of distributed energy management, distributed power sources are aggregated through virtual power plants to achieve hierarchical management of distributed power sources, effectively responding to the operational control challenges brought by massive distributed energy.
[0037] The present invention proposes a distributed resource optimization scheduling method for active distribution network based on virtual power plant. In terms of dealing with uncertainty, the uncertainty risk is dispersed to DERs through market mechanism, reducing the impact of distributed generation uncertainty on the distribution system. In addition, the establishment of local ancillary service market further ensures the reliable operation of the distribution system.
[0038] The present invention proposes an active distribution network distributed resource optimization scheduling method based on a virtual power plant. In terms of improving system operation efficiency, the distribution system realizes visualization and coordinated control of DERs through a market mechanism.
[0039] The present invention proposes an optimization scheduling method for distributed resources in an active distribution network based on a virtual power plant. In terms of promoting the clean development of the system, it promotes the integration of distributed energy in the distribution system. The market mechanism guarantees the opportunity for distributed energy, especially small-capacity DERs, to participate in the power market to seek benefits, which is conducive to promoting the further development of distributed resources.
[0040] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0042] Figure 1 A distribution-level electricity market framework diagram provided in Example 1 of the present invention;
[0043] Figure 2 A modified IEEE-33 node power distribution system single-line diagram provided in Embodiment 1 of the present invention;
[0044] Figure 3 A schematic diagram of the active net output and composition of the VPP provided in Example 1 of the present invention;
[0045] Figure 4 A schematic diagram of the reactive net output and composition of the VPP provided in Example 1 of the present invention;
[0046] Figure 5 (a)-Figure 5 (b) are schematic diagrams of the main grid and VPP bids and bus #18 voltage amplitude provided in Example 1 of the present invention;
[0047] Figure 6 An active power balance diagram of an active power distribution network provided in Embodiment 1 of the present invention;
[0048] Figure 7 A reactive power balance diagram of an active power distribution network provided in Embodiment 1 of the present invention;
[0049] FIG8 (a)-FIG8 (b) are distribution diagrams of marginal prices for active power distribution and marginal prices for reactive power distribution provided in Example 1 of the present invention;
[0050] FIG. 9 (a) and FIG. 9 (b) are distribution diagrams of bus voltage and branch power provided in Example 1 of the present invention. DETAILED DESCRIPTION
[0051] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0052] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in this embodiment have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0053] It should be noted that the terms used herein are only for describing specific embodiments, and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that the terms "include" and "have" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0054] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.
[0055] Example 1
[0056] In order to improve the visibility and controllability of various types of distributed resources in optimal scheduling, this embodiment proposes an optimal scheduling method for distributed resources in an active distribution network based on a virtual power plant, constructs a thorough distribution market, and considers the direct participation of distributed resources (including VPP) on the distribution side. The following points are mainly considered: 1) The capacity of distributed resources on the distribution side is usually not comparable to the capacity of centralized resources in the wholesale market; 2) The direct participation of distributed resources in the distribution market reduces the calculation burden of wholesale market clearing and promotes the integration of resources in the power system; 3) A transparent and thorough distribution market mechanism can more widely inspire distributed resource owners to actively provide reliable and stable power services for the system and obtain income from it, which is conducive to promoting the further development of distributed resources and smart grid technology.
[0057] Specifically include:
[0058] With the goal of maximizing the benefits of the virtual power plant, the active and reactive power of controllable distributed power sources, the charging and discharging power and surplus power of distributed energy storage, the active and reactive power of renewable energy, the active and reactive power of demand response, the active and reactive power of flexible loads, and the bids and quotations of the active and reactive power of the virtual power plant are used as decision variables, and the constraints are determined based on this, and a virtual power plant operation model is constructed;
[0059] With the goal of minimizing the operating cost of the active distribution network, the active output and absorbed power of the virtual power plant, the reactive output and absorbed power of the virtual power plant, the active and reactive power of the active distribution network, the charging and discharging power and surplus power of the energy storage, the reactive power of the static VAR compensator, and the active and reactive power of the distributed generation are used as decision variables, and the constraints are determined based on this, and a market clearing model for the active distribution network is constructed;
[0060] Taking the virtual power plant operation model as the upper model and the market clearing model of the active distribution network as the lower model, an optimal scheduling model among distributed resources, virtual power plants and active distribution networks is constructed. The two-layer optimal scheduling model is solved after single-layer reconstruction and linearization processing to obtain the optimal scheduling plan.
[0061] In this embodiment, firstly, a large number of small-scale distributed resources are aggregated based on the virtual power plant. The VPP is a separate entity that aggregates and connects a variety of distributed resources, including: controllable distributed power sources (CDG, such as micro gas turbines, diesel generators), distributed energy storage (DES), distributed renewable energy (DRG, such as wind power, photovoltaics), demand response (Demand Response, DR) aggregators, flexible load (Load Aggregator, LA) aggregators, etc.
[0062] In this embodiment, it is assumed that the VPP adopts a direct control strategy and can directly communicate and control the DERs therein. There is available point-to-point communication between the VPP and the DSO. Since this embodiment takes into account the distribution network topology in the distribution-level market clearing process, the market settlement results will depend on the network location of the market participants. Therefore, in this embodiment, the aggregation of DERs will be limited to resources connected to the same distribution bus. By participating in the local distribution-level market operated by the DSO, the VPP realizes the visualization and controllability of distributed resources for system operators. In this sense, the VPP will effectively improve the problems of overcapacity and low utilization of assets faced by the current system, as well as the problem of low system operation efficiency. On the other hand, the existence of the VPP realizes hierarchical control of the distribution system, reduces the computing burden of the system operator, and effectively coordinates and manages a large number of small-capacity DERs.
[0063] like Figure 1 As shown in the figure, the distribution-level market is operated by the DSO, and the participants in the distribution-level market include virtual power plants and other large-capacity distributed resources. In order to participate in the distribution-level market, participants need to submit their quotations or bids to the DSO. The DSO is regarded as neutral and clears the market with the goal of maximizing social welfare (consumer surplus minus producer surplus). In order to ensure the security and efficient operation of the network and the correct incentives for distributed resources, a unified pricing mechanism based on the Distribution Locational Marginal Price (DLMP) is adopted to pay market participants.
[0064] At the same time, the adopted distribution-level market framework is compatible with the current wholesale market framework. The interaction between the distribution system and the transmission network wholesale market is also included in this framework. Therefore, DSO can upload bids or quotations to the ISO to participate in the wholesale market (including the energy market and ancillary service market). In this sense, DSO, as an intermediary, enables the indirect participation of DERs resources on the distribution side in the wholesale market. Therefore, the overall efficiency of the power system can be further improved.
[0065] It is worth noting that in this embodiment, the DSO is regarded as a price taker in the wholesale market. The clearing of the distribution-level market is based on the substation transmission LMP predicted by the DSO. Therefore, the clearing results of the proposed distribution-level market framework include both the dispatch volume of local VPPs and large-capacity DERs, as well as the optimal bidding decision of the DSO in the wholesale market.
[0066] In this embodiment, based on the distribution-level market, a two-layer optimization scheduling model among distributed resources, virtual power plants and active distribution networks is constructed. The upper layer is a virtual power plant operation model including a variety of distributed resources, and the lower layer is a market clearing model of the active distribution network. First, a linear branch flow model in a radial distribution network is constructed; secondly, the strategic behavior of the virtual power plant in the distribution-level market is modeled, which is the upper-level problem; finally, a clearing model of the distribution-level energy and ancillary service market is given, which is the lower-level problem.
[0067] In this embodiment, a virtual power plant operation model is constructed; the virtual power plant agent is profit-oriented, so it will seek to maximize its benefits in the distribution-level market through its own strategic behavior. The virtual power plant operation model takes maximizing the net benefit of each VPP as the objective function, including: the income / cost corresponding to the sale / purchase of electricity, the income from providing auxiliary services to the active distribution network, the income from selling electricity to users, and the operating costs of distributed power sources owned by other VPPs;
[0068] (1)
[0069] in, Represent the upper-level problem and the upper-level decision variable respectively; k is the node where the VPP is located, and T is the total number of nodes; Representation Node k The active / reactive power market clearing price; They are the active output / absorbed power and reactive output / absorbed power of VPP respectively; are the unit operating costs of DES, CDG, and renewable energy (RES), respectively; They are respectively the charging power of DES, the discharging power of DES, the active output power of CDG, and the active output power of DRG; Indicates the load of DR; is the utility function of the price-sensitive demand response user, and this embodiment uses a piecewise linear function to represent it, as follows:
[0070] (2)
[0071] in, It is the first demand response aggregator n The marginal utility coefficient of the segment and satisfies the law of gradual decline, that is, , which reflects the economic law of diminishing marginal returns.
[0072] In this example, the constraints of the virtual power plant operation model include power balance constraints, controllable distributed power constraints, distributed energy storage constraints, distributed renewable energy constraints, demand response aggregator constraints and flexible load aggregator constraints; specifically, they include:
[0073] (1) Power balance constraints:
[0074] The active / reactive power sold / purchased by VPP in the market is an investment portfolio of the active / reactive output curves of various regulating resources in VPP; it is essentially a power balance equation, that is, the active / reactive power flowing into the VPP node is equal to the active / reactive power flowing out of the VPP node, as shown in equations (3)-(4), where the variables is the active / reactive power sold / purchased by the VPP operator in the day-ahead energy market, which is the market clearing quantity. Therefore, these variables are the decision variables of the lower-level problem.
[0075] (3)
[0076] (4)
[0077] In the formula, They are the active powers of VPP flexible load and fixed load respectively; are the reactive output powers of CDG and RES in VPP respectively; is the reactive power of DR, FL and fixed load in VPP.
[0078] (2) Controllable distributed power generation constraints include active output constraints, reactive output constraints, active ramp power constraints, and apparent power constraints of controllable distributed power generation; specifically:
[0079] (5)
[0080] (6)
[0081] (7)
[0082] (8)
[0083] (9)
[0084] Among them, equations (5) and (6) are the active output constraints and reactive output constraints of CDG; equations (7) and (8) are the active climbing power constraints of CDG. Considering the physical constraints and safety of the generator, the scheduling value of CDG at two adjacent time intervals should not exceed the upper and lower climbing rate limits of the equipment; equation (9) is that the apparent power of CDG should not exceed the rated capacity of the equipment.
[0085] (3) Distributed energy storage constraints:
[0086] Formula (10)-Formula (13) are the charge and discharge power constraints of DES, ensuring that the charge and discharge power of energy storage does not exceed the maximum charge and discharge power limit. In this embodiment, no additional 0-1 variables are added to limit the uniqueness of the charge and discharge state of energy storage. This is because the charge and discharge costs of energy storage are included in the VPP objective function, which makes the charge and discharge state of energy storage determined by the optimal solution to the problem unique, and the phenomenon of DES charging and discharging will not occur, because this is not economical for VPP; Formula (12) is the charge state constraint of energy storage. The lower / upper limit of the charge state ensures that the energy storage will not be in an over-discharge / over-charge state. These two states will accelerate the aging of energy storage and damage the normal service life of energy storage; Formula (13) is the inter-period dynamic constraint of energy storage, which shows that the power of energy storage in the next scheduling time interval is equal to the storage power at this moment plus / minus the charge / discharge power at this moment, which depends on the charge / discharge power / efficiency of energy storage and the size of the time interval.
[0087] (10)
[0088] (11)
[0089] (12)
[0090] (13)
[0091] In the formula, is the remaining power of DES.
[0092] (4) Distributed renewable energy generation constraints:
[0093]
[0094] Wherein, formula (14) is the active output constraint of DRG. Assuming that DRG is dispatched at the time tThe active output of is subject to a normal distribution with the predicted value as the center. This embodiment adopts a chance constraint model to describe the output uncertainty of DRG. Formula (15) is the apparent power constraint of DRG. This embodiment assumes that DRG is connected to the active distribution network (ADN) through an inverter. Therefore, DRG has a certain reactive power regulation capability and can provide reactive power support services for the power grid.
[0095] (5) Demand response aggregator constraints: This embodiment adopts the piecewise linearization model of the DR aggregator, as shown in (16)-(18);
[0096]
[0097] In the formula, is the minimum / maximum active power of DR; For the n Segment DR t Active load at any moment; is the DR power factor.
[0098] Among them, formula (16) is the active power constraint of each demand segment of the DR aggregator; formula (17) is that the total dispatch demand of the DR aggregator is the sum of the powers of all demand segments; formula (18) indicates that the power factor of the DR aggregator is fixed.
[0099] (6) Flexible load aggregator constraints:
[0100]
[0101] In the formula, is the minimum / maximum active power of FL; The usage time of FL; is the total active power demand of FL; is the power factor of FL.
[0102] Among them, formula (19) is the active power constraint of the FL aggregator; formula (20) ensures that the specific power demand of the FL user is met; similar to the DR aggregator, this embodiment assumes that the power factor of the FL aggregator is also fixed, so the reactive power consumption of FL is proportional to the active power consumption, as shown in formula (21).
[0103] In this embodiment, the decision variables of the upper virtual power plant operation model include:
[0104]
[0105] Among them, the active / reactive bidding / quoting decision variables in the upper problem are Passed to the underlying problem as a connection variable and processed as a parameter.
[0106] In this embodiment, in the market clearing model of the active distribution network at the lower level, the distribution-level active and reactive markets are modeled, and the markets are operated by the DSO and cleared simultaneously. Market participants include VPPs and other large-capacity distributed resources that meet the market capacity threshold. These large-capacity distributed resources can be invested and constructed by public power companies, or they can be the economic behavior of other participants. The goal of the DSO is to minimize the operating cost of the active distribution network system based on the quotations and bids of market participants.
[0107] The objective function of the market clearing model of the lower active distribution network is shown in formula (22); the first term is the cost of VPP providing active power, the second term is the expenditure of VPP purchasing active power, the third term is the cost of VPP providing reactive power services, the fourth term is the expenditure of VPP purchasing reactive power, and the fifth and sixth terms are the costs of providing active power and reactive power services to ADN. The seventh and eighth terms are the costs of large-capacity DER providing active and reactive power services. After receiving and integrating the quotation / bid information of VPP, large-capacity DER and the main grid, DSO optimizes and clears the market, minimizing the system operation cost and energy delivery.
[0108] (twenty two)
[0109] in, Active / reactive power price for the main grid; Is the active / reactive power of the main grid; Bid for charging and discharging energy storage; is the charging and discharging power of energy storage; Quotation for reactive power compensation for static VAR compensators (SVCs); and The absolute value of reactive power output by SVC and distributed generation (DG) is because both generating and absorbing reactive power will cause additional operating costs for DERs; Provide active and reactive power quotes for DG; is the absolute value of active and reactive power output of DG; are the energy storage quantity and the indication subscript respectively; is the number and index of DG.
[0110] When DSO clears the market, in order to ensure the deliverability of energy, it also needs to consider the distribution network constraints and the behavioral constraints of market participants, including: power flow constraints, bus voltage constraints and line thermal constraints, and market participant constraints; the dual variables corresponding to the constraints are represented by the symbol " "After that; specifically:
[0111] (1) Power flow equation constraints, which reflect the physical laws of power transmission and voltage distribution in the distribution network:
[0112] (twenty three)
[0113]
[0114] In the formula, Indicates connection j A collection of distributed resource indicators of nodes; They are the indicative subscripts of VPP, main grid, energy storage, distributed generation DG and static VAR compensator SVC. are the active and reactive powers corresponding to the distributed resources respectively; is the node active / reactive load.
[0115] (2) Bus voltage constraint and line thermal constraint; where equation (28) is the bus voltage constraint of the distribution network. Usually, the bus voltage amplitude is forced to be between 0.95 and 1.05. Equation (29) is the line thermal constraint. In order to ensure the normal operation of the transmission line, the line transmission power should not exceed the rated nominal value.
[0116]
[0117] (3) Constraints on market participants:
[0118] In addition to the aforementioned distribution network constraints and security constraints, DSO should also consider the delivery capabilities of market participants when clearing in the market. Therefore, it is necessary to quantitatively describe the behavior of VPP, main grid, and large-capacity DER. Specifically, as shown in equations (30) to (51);
[0119] Among them, equations (31)-(33) indicate that the active / reactive power sold / purchased by the VPP is forced to be between zero and its maximum amount. Equation (34) indicates that the VPP is connected to the distribution network through a tie line or feeder, and its exchange power with the ADN satisfies the corresponding rated capacity constraint. Equation (37) is similar to equation (34). Equations (35)-(37) are tie line constraints, representing the restrictions on the exchange power between the ADN and the main grid. Equations (38)-(41) are large-capacity energy storage constraints. Equations (42)-(44) are the output reactive power constraints of the SVC. Equations (42)-(43) are the relationships The exact linear relaxation of as well as It is a minimization problem. The constraints of DGs (45)-(46) are similar to those of SVC. (47)-(48) are the reactive and active power limit constraints of DG. (49)-(50) are the ramp constraints of DG active output. (51) is the active and reactive power coupling constraint of DG, which forces the apparent power of DG not to exceed its rated capacity.
[0120] (30)
[0121] (31)
[0122] (32)
[0123] (33)
[0124] (34)
[0125] (35)
[0126] (36)
[0127] (37)
[0128] (38)
[0129] (39)
[0130] (40)
[0131] (41)
[0132] (42)
[0133] (43)
[0134] (44)
[0135] (45)
[0136] (46)
[0137] (47)
[0138] (48)
[0139] (49)
[0140] (50)
[0141] (51)
[0142] In the formula, They are the interconnection line power capacity of VPP and main grid respectively; is the maximum charging and discharging power of energy storage; The remaining power of the energy storage; They are the up and down climbing constraints and rated capacity of DG respectively.
[0143] In this embodiment, the decision variables of the market clearing model of the lower active distribution network include:
[0144]
[0145] is the dual variable, corresponding to the equality constraint in the lower problem, The dual variable corresponding to the inequality constraint in the lower problem is defined as .
[0146] In this embodiment, the process of solving the two-layer optimization scheduling model includes:
[0147] (1) Quadratic Constrained Linearization
[0148] The quadratic constraints in the lower problem are linearized. This is because: on the one hand, even for the two-level linear programming problem, it is NP-hard, so under the premise of satisfying the accuracy, The quadratic constraints in (i.e., Equations (29), (34), (37), and (51)) are linearized to improve the computational speed. On the other hand, the quadratic constraints will lead to the appearance of new bilinear terms in the KKT conditions, resulting in non-convex nonlinearity of the KKT conditions of the lower problem. Note that the quadratic constraints in the problem appear in the form of a circle, which can be approximated by a regular polygon. The linearized formulas are shown in Equations (52) to (55). The same operation is applied to the quadratic constraints in the upper problem, converting the problem into a mixed integer programming problem that can be solved efficiently.
[0149] (2) Single-layer reconstruction of a two-layer problem
[0150] So far, a complete mathematical model has been established to accurately describe the strategic behavior of VPP in the distribution-level market, which is a two-level programming problem as follows:
[0151]
[0152] It is worth pointing out that the above model is non-convex, nonlinear and quite implicit. In order to make the model more tractable, the original two-level programming problem is recast as an equivalent single-level mathematical programming problem with equilibrium constraints (MPEC) using the KKT conditions of the lower-level problem. This method is based on the fact that the decision variables of the upper-level problem can be treated as parameters in the lower-level problem, which makes becomes a convex optimization problem. In addition, the parameterization problem satisfies the Slater criterion. Therefore, the strong duality theorem holds. Therefore, The KKT optimal condition of is a necessary and sufficient condition for its optimal solution. Therefore, we can use The KKT condition replaces the optimization problem in the upper problem This solution transforms the original implicit two-level programming problem into a more tractable, explicit single-level optimization problem, as shown in Equation (57).
[0153]
[0154] in, Representing optimization problems The KKT condition of For nonlinear programming.
[0155] (3) Linearization of bilinear terms
[0156] The bilinear term in the objective function, that is, And the disjunctive constraints are nonlinear. For nonlinear disjunctive constraints, Fortuny-Amat and McCarl proposed a linearization method (FAM variation) of disjunctive constraints by introducing additional 0-1 variables; as described below:
[0157]
[0158] Wherein, M is a sufficiently large constant.
[0159] For the bilinear terms in the objective function, the following method is used for linearization. First, rewrite the variable The relevant stationary point condition constraints are as follows:
[0160]
[0161] Next, add the left and right sides of the equation together to get:
[0162] The above formula can be further simplified by using the complementary relaxation condition:
[0163] (64)
[0164] Further arrangement of the strong duality theorem can give a linear expression of the bilinear term, as shown below:
[0165] (65)
[0166] By using FAM transformation and replacing the bilinear term in the objective function with equation (65), the original nonlinear MPEC problem can be converted into a MILP problem, and the optimal scheduling solution can be obtained after solving it.
[0167] This embodiment is modified on the basis of the standard IEEE 33-node power distribution system, adding a large number of distributed resources to adapt to the characteristics of the current new power distribution system. Figure 2 A case analysis is performed on the modified IEEE 33-node system to verify the effectiveness of the model proposed in this embodiment.
[0168] The basic active load of the standard IEEE33-node distribution system is 3.715MW, the basic reactive load is 2.3MVar, the safe operating range of the system bus voltage is set to [0.95,1.05] pu, the rated capacity of the line and the tie line is set to 5MVA, the confidence level of renewable energy output is set to 95%, and the virtual power plant includes PV (1MW), MT (1MW), ES (1.5MWh, 500kW), DR (800kW) and LA (800kWh). The parameters of other distributed resources are as follows: ES1 (1.2MWh, 600kW), ES2 (1MWh, 500kW), SVC (500kVar), DG (500kVA), PV1 (1.25MW), PV2 (500kW) and WT capacity are all 500kVA.
[0169] The simulation results are as follows Figure 3 As shown in Figure 9. Figure 3 and Figure 4The net active / reactive output of the virtual power plant and the output of its internal distributed resources are shown respectively. It can be seen that when the market electricity price is low, the VPP has load characteristics (1:00-7:00 and 23:00-24:00). Flexible loads will be transferred to these periods for electricity consumption first. In addition, demand response loads will also tend to consume electricity during these periods and reduce electricity consumption when the electricity price is higher. The performance of energy storage will be more dependent on the system electricity price. It can be seen that it charges when the electricity price is the lowest (4:00-6:00) and discharges when the electricity price is the highest (17:00-18:00), taking advantage of the price difference to arbitrage. PV, as a low-cost active source, is always in the maximum power state. Overall, VPP can keenly capture changes in electricity prices and flexibly adjust the power generation and consumption behavior of its internal components, so as to flexibly choose the "source-load" nature in the market and increase overall welfare.
[0170] In contrast to the VPP active power situation, Figure 4 As shown in Figure 5(a), VPP basically acts as a reactive source in the reactive market (except at 11:00), and its internal reactive load is compensated by the output of RES and CDG, and reactive power is injected into ADN. This is because the reactive supply cost of both is ignored in this model. Therefore, VPP can earn extra profit by providing reactive power when the system active load is light (low electricity price, low PV active output). At 11:00, VPP purchased more reactive power in the distribution market instead of selling it, because the active power of PV2 reached the maximum at this time, and there was a risk of overvoltage in the system, as shown in Figure 5(b), so VPP could not inject reactive power into the network. Instead, it would purchase reactive power to reduce the system voltage. Through this strategic behavior, VPP can inject more active power into the network, and its profit is actually increased, considering that the active power price is greater than the reactive power price.
[0171] The behavior of VPP in the distribution market is determined by its bid and quotation of active / reactive power, as shown in Figure 5(a). It is worth pointing out that: 1) the curves reflect the active / reactive power prices of the main grid at the same time under different vertical axes; 2) the active / reactive power prices of VPP simultaneously represent the optimal bid / quotation of VPP in the market and the market clearing power price (i.e. DLMP) of the VPP node (i.e. bus #11). It can be seen that in the time periods of 1:00-3:00, 8:00-9:00 and 23:00-24:00, the VPP power price is the same as the main grid. However, in other time periods, the VPP power price increases or decreases based on the main grid power price, which depends entirely on the system network topology and load status. For example, at 4:00-7:00, the VPP reactive power price is higher than the main grid reactive LMP. This is because the VPP node can improve the low voltage operating conditions of bus #18 by injecting reactive power. Therefore, when clearing the market, DSO will increase the reactive power price of the node to encourage market participants to generate reactive power. Similarly, during the period of 10:00-22:00, DSO will reduce the reactive power price of the VPP node to alleviate the overvoltage of the system. The same analysis also applies to the active power price of VPP. In fact, DLMP is not only related to network topology and voltage conditions, but also to line congestion and network loss.
[0172] The results of active / reactive power clearing in the distribution market are as follows: Figure 6 to Figure 7 As shown. The analysis of the active power output status of distributed resources is similar to that of VPP. Renewable energy (PV, WT) will be fully called as a low-cost active source. The energy storage system will charge when the electricity price is low and discharge for arbitrage when the electricity price is high. DG basically inputs active power to the distribution network as a stable active source, which is determined by its profitable attributes and the fact that its installation location is close to the heavy load point of the system. By providing active power nearby, the network loss in the system can be significantly reduced. For the same reason, during the peak load period (12:00-22:00), DG will further provide reactive power to increase the voltage. At 12:00-15:00, SVC1 and PV2 will absorb reactive power to avoid overvoltage on bus #18.
[0173] It can also be seen that ADN can sell active power to the main grid during 10:00-17:00. This is because the active LMP is high during these periods and RES resources are abundant in ADN. During 18:00-21:00, when the electricity price is also high, ADN needs to purchase active power from the main grid due to the scarcity of RES resources. In contrast to the active power situation, ADN needs to purchase reactive power from the main grid when RES resources are abundant, and provide reactive support services to the system when RES active output is low. This is because large-capacity distributed resources (PV, WT, VPP, DG, SVC) can use idle capacity to inject reactive power into the system to earn additional profits during these times (19:00-22:00, when the reactive power price is relatively high). This is exactly why the bus voltage is higher during these periods, as shown in Figure 5(b).
[0174] Figure 8 (a)-Figure 8 (b) shows the clearing prices of the distribution-level market, namely the active distribution locational marginal price (ADLMP) and the reactive distribution locational marginal price (RDLMP). Overall, the change trends of ADLMP and RDLMP are the same, but the change of RDLMP is more significant. Specifically, during 1:00-3:00, 8:00-9:00 and 23:00-24:00, the electricity prices (ADLMP / RDLMP) of all nodes in the system are the same. During the period of 4:00-7:00, the electricity price increases as the electrical distance between the node and the root node (bus #1) increases. The reason for this phenomenon is that during this period, the voltage of bus #18 is too low, so the DSO needs to increase DLMP to encourage market players to increase power generation and reduce load consumption to increase voltage. Similarly, from 10:00 to 22:00, the electricity price decreases as the electrical distance between the node and the root node increases, in order to encourage market participants to reduce power generation and increase power consumption to avoid system overvoltage. This is consistent with the previous analysis of the DLMP of the VPP node. In particular, during the period when the system PV output is high, the RDLMP of some nodes in the system is negative. The negative node electricity price reflects the correct value of the product (reactive power absorption) that reduces the risk of system overvoltage. This shows that users (sources and loads) at these nodes can get additional income by absorbing reactive power.
[0175] The system bus voltage distribution and branch power distribution are shown in Figure 9 (a)-Figure 9 (b). It can be seen that all node voltages and branch powers are within the safe operation range of the system. In short, the proposed method can correctly evaluate the value of DER power service, guide DER to provide auxiliary services, and ensure the safe operation of the system.
[0176] Example 2
[0177] This embodiment provides an active distribution network distributed resource optimization scheduling system based on a virtual power plant, including:
[0178] The upper model building module is configured to maximize the benefits of the virtual power plant, taking the active and reactive power of controllable distributed generation, the charging and discharging power and surplus power of distributed energy storage, the active and reactive power of renewable energy, the active and reactive power of demand response, the active and reactive power of flexible loads, and the bids and quotations of the active and reactive power of the virtual power plant as decision variables, and thereby determining the constraints and building the virtual power plant operation model;
[0179] The lower model building module is configured to minimize the operating cost of the active distribution network, with the active output and absorption power of the virtual power plant, the reactive output and absorption power of the virtual power plant, the active and reactive power of the active distribution network, the charging and discharging power and surplus power of the energy storage, the reactive power of the static VAR compensator, and the active and reactive power of the distributed generation as decision variables, and to determine the constraints and build a market clearing model for the active distribution network;
[0180] The two-layer model solving module is configured to use the virtual power plant operation model as the upper-layer model and the market clearing model of the active distribution network as the lower-layer model to construct an optimal scheduling model between distributed resources, virtual power plants and active distribution networks. The two-layer optimal scheduling model is solved after single-layer reconstruction and linearization processing to obtain the optimal scheduling plan.
[0181] It should be noted that the above modules correspond to the steps described in Example 1, and the examples and application scenarios implemented by the above modules and the corresponding steps are the same, but are not limited to the contents disclosed in the above Example 1. It should be noted that the above modules, as part of the system, can be executed in a computer system such as a set of computer executable instructions.
[0182] In further embodiments, there is also provided:
[0183] An electronic device includes a memory and a processor, and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the method described in Embodiment 1 is performed. For the sake of brevity, it will not be described in detail here.
[0184] It should be understood that in this embodiment, the processor may be a central processing unit CPU, and the processor may also be other general-purpose processors, digital signal processors DSP, application-specific integrated circuits ASIC, off-the-shelf programmable gate arrays FPGA or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0185] The memory may include a read-only memory and a random access memory, and provide instructions and data to the processor. A portion of the memory may also include a non-volatile random access memory. For example, the memory may also store information about the device type.
[0186] A computer-readable storage medium is used to store computer instructions, and when the computer instructions are executed by a processor, the method described in Example 1 is completed.
[0187] The method in Example 1 can be directly embodied as a hardware processor, or a combination of hardware and software modules in the processor. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory, and the processor reads the information in the memory and completes the steps of the above method in combination with its hardware. To avoid repetition, it is not described in detail here.
[0188] Those skilled in the art will appreciate that the units, i.e., algorithm steps, of the various examples described in conjunction with this embodiment can be implemented in electronic hardware or in a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0189] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. An active distribution network distributed resource optimization scheduling method based on a virtual power plant, characterized in that: include: With the goal of maximizing the benefits of the virtual power plant, the active and reactive power of controllable distributed power sources, the charging and discharging power and surplus power of distributed energy storage, the active and reactive power of renewable energy, the active and reactive power of demand response, the active and reactive power of flexible loads, and the bids and quotations of the active and reactive power of the virtual power plant are used as decision variables, and the constraints are determined based on this, and a virtual power plant operation model is constructed; With the goal of minimizing the operating cost of the active distribution network, the active output and absorbed power of the virtual power plant, the reactive output and absorbed power of the virtual power plant, the active and reactive power of the active distribution network, the charging and discharging power and surplus power of the energy storage, the reactive power of the static VAR compensator, and the active and reactive power of the distributed generation are used as decision variables, and the constraints are determined based on this, and a market clearing model for the active distribution network is constructed; Taking the virtual power plant operation model as the upper model and the market clearing model of the active distribution network as the lower model, an optimal dispatching model among distributed resources, virtual power plants and active distribution networks is constructed. The two-layer optimal dispatching model is solved after single-layer reconstruction and linearization to obtain the optimal dispatching solution. The constraints of the virtual power plant operation model include power balance constraints, controllable distributed power constraints, distributed energy storage constraints, distributed renewable energy constraints, demand response aggregator constraints and flexible load aggregator constraints; Among them, the power balance constraint is that the active / reactive power flowing into the virtual power plant node is equal to the active / reactive power flowing out of the virtual power plant node; The controllable distributed power constraints include active output constraints, reactive output constraints, active ramp power constraints and apparent power constraints of the controllable distributed power. Distributed energy storage constraints include charging and discharging power constraints, state of charge constraints, and inter-period dynamic constraints; Distributed renewable energy generation constraints include active output constraints and apparent power constraints; Demand response aggregator constraints include active power constraints for each demand segment and total dispatch demand constraints; Flexible load aggregator constraints include active power constraints; The constraints of the market clearing model of the active distribution network include: power flow constraints, bus voltage constraints, line thermal constraints and market participant constraints; The objective function of the virtual power plant operation model includes: in, k is the node where the virtual power plant is located, T is the total number of nodes; For Node k The active / reactive power market clearing price; They are respectively the active output power, active absorption power, reactive output power, and reactive absorption power of the virtual power plant; They are the unit operating costs of distributed energy storage, controllable distributed power sources, and renewable energy respectively; They are the charging power of distributed energy storage, the discharging power of distributed energy storage, the active output power of controllable distributed power sources, and the active output power of distributed renewable energy sources; The load for demand response; is the utility function; The objective function of the market clearing model of the active distribution network is: in, k is the node where the virtual power plant is located, T is the total number of nodes; They are active power quotation, active power bid, reactive power quotation, and reactive power bid; They are respectively the active output power, active absorption power, reactive output power, and reactive absorption power of the virtual power plant; Active power price and reactive power price for the main grid; The active power and reactive power of the main grid; Bid for charging and discharging energy storage; is the charging or discharging power of the energy storage; Quotation for reactive power compensation for static VAR compensators; and is the absolute value of the reactive power output by the static VAR compensator and distributed power source; Provide active power and reactive power quotations for distributed power sources; It is the active power output of distributed power sources; are the energy storage quantity and the indication subscript respectively; are the number and indicative subscript of DG respectively.
2. The method for optimizing and dispatching distributed resources of active distribution network based on virtual power plant according to claim 1, characterized in that: The market participant constraints include: forcing the virtual power plant to sell / purchase active / reactive power between zero and its maximum amount; after the virtual power plant is connected to the active distribution network, the exchange power with the active distribution network meets the rated capacity constraint; tie line constraint; large-capacity energy storage constraint; output reactive power constraint of the static VAR compensator, reactive and active power limit constraints of distributed power sources; active output ramping constraint of distributed power sources; active and reactive power coupling constraint of distributed power sources.
3. The method for optimizing and dispatching distributed resources of active distribution network based on virtual power plant according to claim 1, characterized in that: The solution process of the two-level optimization scheduling model includes: linearizing the quadratic constraints of the upper and lower models, then reconstructing the two-level planning problem into an equivalent single-level planning problem with equilibrium constraints using the KKT condition, and finally linearizing the bilinear terms in the single-level reconstructed planning problem.
4. Active distribution network distributed resource optimization dispatching system based on virtual power plant, characterized in that: include: The upper model building module is configured to maximize the benefits of the virtual power plant, taking the active and reactive power of controllable distributed generation, the charging and discharging power and surplus power of distributed energy storage, the active and reactive power of renewable energy, the active and reactive power of demand response, the active and reactive power of flexible loads, and the bids and quotations of the active and reactive power of the virtual power plant as decision variables, and thereby determining the constraints and building the virtual power plant operation model; The lower model building module is configured to minimize the operating cost of the active distribution network, with the active output and absorption power of the virtual power plant, the reactive output and absorption power of the virtual power plant, the active and reactive power of the active distribution network, the charging and discharging power and surplus power of the energy storage, the reactive power of the static VAR compensator, and the active and reactive power of the distributed generation as decision variables, and to determine the constraints and build a market clearing model for the active distribution network; The two-layer model solving module is configured to use the virtual power plant operation model as the upper model and the market clearing model of the active distribution network as the lower model to build an optimal scheduling model between distributed resources, virtual power plants and active distribution networks. The two-layer optimal scheduling model is solved after single-layer reconstruction and linearization to obtain the optimal scheduling solution. The constraints of the virtual power plant operation model include power balance constraints, controllable distributed power constraints, distributed energy storage constraints, distributed renewable energy constraints, demand response aggregator constraints and flexible load aggregator constraints; Among them, the power balance constraint is that the active / reactive power flowing into the virtual power plant node is equal to the active / reactive power flowing out of the virtual power plant node; The controllable distributed power constraints include active output constraints, reactive output constraints, active ramp power constraints and apparent power constraints of the controllable distributed power. Distributed energy storage constraints include charging and discharging power constraints, state of charge constraints, and inter-period dynamic constraints; Distributed renewable energy generation constraints include active output constraints and apparent power constraints; Demand response aggregator constraints include active power constraints for each demand segment and total dispatch demand constraints; Flexible load aggregator constraints include active power constraints; The constraints of the market clearing model of the active distribution network include: power flow constraints, bus voltage constraints, line thermal constraints and market participant constraints; The objective function of the virtual power plant operation model includes: in, k is the node where the virtual power plant is located, T is the total number of nodes; For Node k The active / reactive power market clearing price; They are respectively the active output power, active absorption power, reactive output power, and reactive absorption power of the virtual power plant; They are the unit operating costs of distributed energy storage, controllable distributed power sources, and renewable energy respectively; They are the charging power of distributed energy storage, the discharging power of distributed energy storage, the active output power of controllable distributed power sources, and the active output power of distributed renewable energy sources; The load for demand response; is the utility function; The objective function of the market clearing model of the active distribution network is: in, k is the node where the virtual power plant is located, T is the total number of nodes; They are active power quotation, active power bid, reactive power quotation, and reactive power bid; They are respectively the active output power, active absorption power, reactive output power, and reactive absorption power of the virtual power plant; Active power price and reactive power price for the main grid; The active power and reactive power of the main grid; Bid for charging and discharging energy storage; is the charging or discharging power of the energy storage; Quotation for reactive power compensation for static VAR compensators; and is the absolute value of the reactive power output by the static VAR compensator and distributed power source; Provide active power and reactive power quotations for distributed power sources; It is the active power output of distributed power sources; are the energy storage quantity and the indication subscript respectively; are the number and indicative subscript of DG respectively.
5. An electronic device, characterized in that: The method comprises a memory and a processor and computer instructions stored in the memory and executed on the processor, wherein when the computer instructions are executed by the processor, the method according to any one of claims 1 to 3 is completed.
6. A computer-readable storage medium, characterized in that: Used to store computer instructions, which, when executed by a processor, complete the method described in any one of claims 1 to 3.