Pipeline installation operating platform and installation method thereof

By designing an adjustable pipeline installation operation platform, the problem that the operating platform cannot avoid pipelines during construction is solved, a safe, stable and simplified construction process is achieved, and the temporary protection demolition steps are avoided, which is in line with the concept of green construction.

CN115095126BActive Publication Date: 2024-11-22CHINA CONSTR EIGHTH ENG BUREAU TECH CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210931921.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-04
Publication Date
2024-11-22
Estimated Expiration
2042-08-04

AI Technical Summary

Technical Problem

During construction, there are safety protection problems during pipeline installation and the problem that the operating platform cannot avoid pipelines, resulting in inconvenience in construction and safety hazards.

Method used

A pipeline installation operation platform is designed, including a first annular guide rail, a second annular guide rail, a cross rod and a cover plate. The cross rod can be slidably installed between the guide rails to form an adjustable operating platform, which can be directly covered in the pipeline well. , avoid the pipe and fix it on the inner wall of the pipeline well through support to ensure the stability and safety of the platform.

Benefits of technology

The safety and stability of the operating platform are achieved, the steps of removing temporary protection during construction are avoided, the installation process is simplified, and the construction efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115095126B_ABST
    Figure CN115095126B_ABST
Patent Text Reader

Abstract

The present invention discloses a pipeline installation operation platform and an installation method thereof. The operation platform is used to be installed in a pipeline well and has the same elevation as a floor slab. The operation platform includes a first annular guide rail for laying along the inner circumference of the pipeline well, a second annular guide rail fixed at intervals on the inner side of the first annular guide rail, a plurality of cross bars slidably installed between the first annular guide rail and the second annular guide rail, and a cover plate located in the area enclosed by the second annular guide rail and the floor slab and mounted on the second annular guide rail. The cover plate is formed with an overlapping section for overlapping the floor slab. The distance between the first annular guide rail and the second annular guide rail is not less than the outer diameter of the pipeline. The present invention solves the technical problem in the prior art that the pipeline installation platform cannot avoid the pipeline. After the present invention is installed, there is no need to install additional protection. When construction personnel need to carry out construction, they can directly stand on the cover plate to carry out construction without having to remove the protection for construction operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to a pipeline installation operation platform and an installation method thereof. Background Art

[0002] Under normal circumstances, the installation of water and electricity pipelines needs to be carried out after the main structure is completed. Due to the large number of pipelines in high-rise buildings, vertical wells for vertical equipment pipelines are generally arranged inside the building for the requirements of functionality, safety and aesthetics. There are two situations in the construction process of the pipeline well:

[0003] 1. Safety protection issues. During the construction of the main structure, the openings are exposed, and fences and horizontal protections need to be set up around the openings on each floor. During the subsequent pipeline installation, temporary protections need to be removed to facilitate construction, resulting in labor waste and not in line with the concept of green construction.

[0004] 2. Pipeline installation and operation problems. When installing the pipeline, workers need to install the pipeline vertically section by section. When constructing the pipeline interface, a safe operation platform is required. In a confined space, setting up a steel pipe floor-standing or cantilevered operation platform will result in the problem of being unable to avoid the pipeline, and the amount of work is large. The use of rope suspension operation is prone to safety hazards. Summary of the invention

[0005] In view of the shortcomings existing in the above-mentioned prior art, the present invention provides a pipeline installation operation platform and an installation method thereof, which solves the technical problem in the prior art that the pipeline installation platform cannot avoid the pipeline.

[0006] In the first aspect, the present invention discloses a pipeline installation operation platform, which is used to be installed in a pipeline shaft and has the same elevation as a floor, including a first annular guide rail for laying along the inner circumference of the pipeline shaft, a second annular guide rail fixed at intervals on the inner side of the first annular guide rail, a plurality of cross bars slidably installed between the first annular guide rail and the second annular guide rail, and a cover plate located in the area enclosed by the second annular guide rail and the floor and spanned on the second annular guide rail, the cover plate forming a overlapping section for overlapping the floor, the distance between the first annular guide rail and the second annular guide rail is not less than the outer diameter of the pipeline, and a support member for fixing the second annular guide rail to the inner wall of the pipeline shaft is fixed on the second annular guide rail.

[0007] The pipeline installation operation platform of the present invention is further improved in that the first annular guide rail and the second annular guide rail are both channel steels, the openings of the first annular guide rail and the second annular guide rail are arranged opposite to each other, and the two ends of each cross bar are slidably installed in the grooves of the first annular guide rail and the second annular guide rail.

[0008] A further improvement of the pipeline installation operation platform of the present invention is that the cross-section of the pipeline shaft is rectangular, the second annular guide rail includes two supporting rails whose first ends are used to be fixed to the floor slab, and an installation rail fixed between the two supporting rails, and the second end of each of the supporting rails extends out of the installation rail and forms an extension section fixed to the first annular rail.

[0009] A further improvement of the pipeline installation operation platform of the present invention is that the support member is an oblique support for fixing to the inner wall of the pipeline well and the bottom of the second annular guide rail.

[0010] A further improvement of the pipeline installation operation platform of the present invention is that the cover plate is a grid plate.

[0011] In a second aspect, the present invention further provides a method for installing a pipeline installation operation platform, comprising the following steps:

[0012] Laying a first annular guide rail on the inner periphery of the pipeline well;

[0013] A support is used to fix the second annular guide rail on the inner wall of the pipeline well, and the second annular guide rail is spaced inside the first annular guide rail, and the distance between the first annular guide rail and the second annular guide rail is not less than the outer diameter of the pipeline;

[0014] A plurality of cross bars are slidably mounted between the first annular guide rail and the second annular guide rail, and the distance between two adjacent cross bars is not less than the outer diameter of the pipe;

[0015] A cover plate is set up in the area enclosed by the floor plate and the second annular guide rail.

[0016] Compared with the prior art, the present invention has a positive and obvious effect. The present invention solves the technical problem that the pipeline installation platform in the prior art cannot avoid the pipeline by adjusting the distance between the cross bars to avoid the pipeline and directly cover the operating platform inside the pipeline well. After the installation of the present invention, there is no need to install additional protection. When the construction personnel need to carry out construction, they can directly stand on the cover plate to carry out construction without removing the protection for construction operation. The structure is simple and the installation is convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 It is a plan view of the pipeline installation operation platform of the present invention.

[0019] Figure 2 This is a cross-sectional view of the installation of the first annular guide rail of the pipeline installation operation platform of the present invention. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] like Figure 1 and Figure 2 As shown, the present invention provides a pipeline 3 installation operation platform, which is used to be installed in the pipeline well 2 and has the same elevation as the floor 6, including a first annular guide rail 4 for laying along the inner periphery of the pipeline well 2, a second annular guide rail 7 fixed at intervals inside the first annular guide rail 4, a plurality of cross bars 1 slidably installed between the first annular guide rail 4 and the second annular guide rail 7, and a cover plate located in the area enclosed by the second annular guide rail and the floor and mounted on the second guide rail, the cover plate is formed with an overlap section for overlapping the floor 6, the distance between the first annular guide rail 4 and the second annular guide rail 7 is not less than the outer diameter of the pipeline 3, and a support member for fixing the second annular guide rail 7 to the inner wall of the pipeline well 2 is fixed on the second annular guide rail 7. The plurality of cross bars 1 can slide between the first annular guide rail 4 and the second annular guide rail 7, so as to facilitate avoiding the pipeline 3, thereby providing effective support for the operation platform, avoiding the use of rope suspension to make the operation platform, and having high safety and strong stability.

[0022] Preferably, the first annular guide rail 4 and the second annular guide rail 7 are both channel steels, the openings of the first annular guide rail 4 and the second annular guide rail 7 are arranged opposite to each other, and the two ends of each cross bar 1 are slidably mounted in the grooves of the first annular guide rail 4 and the second annular guide rail 7. The first annular guide rail 4 uses bolts to fix the web of the channel steel to the inner wall of the pipeline well 2, and the openings of the channel steels are arranged opposite to each other, so that a track for the two ends of the cross bar 1 to be slidably mounted is naturally formed without the need to make an additional track structure.

[0023] Preferably, the cross section of the pipe shaft 2 is rectangular, and the second annular guide rail 7 includes two support rails whose first ends are used to be fixed to the floor 6, and a mounting rail fixed between the two support rails, and the second end of each support rail extends out of the mounting rail and forms an extension section fixed to the first annular rail 4. The support rails are fixed to the floor 6 and the pipe shaft 2, which increases the supporting parts and greatly improves the stability of the entire second rail.

[0024] Preferably, the support member is a diagonal brace for fixing to the inner wall of the pipe well 2 and the bottom of the second annular guide rail 7. When installing, the diagonal brace should be installed away from the pipe 3, so that the force of the second annular guide rail 7 can be effectively transferred to the wall of the pipe well 2.

[0025] Preferably, the cover plate 5 is a grid plate. Using a grid plate as the cover plate 5 can greatly reduce the mass of the cover plate 5, reduce the force on the supporting member, and improve the stability of the entire operating platform.

[0026] On the other hand, the present invention also provides a method for installing a pipeline 3 installation operation platform, comprising the following steps:

[0027] A first annular guide rail 4 is laid on the inner periphery of the pipeline well 2;

[0028] A second annular guide rail 7 is fixed on the inner wall of the pipeline well 2 by using a support member, and the second annular guide rail 7 is spaced and horizontally parallel to the first annular guide rail 4, and the distance between the first annular guide rail 4 and the second annular guide rail 7 is not less than the outer diameter of the pipeline 3;

[0029] A plurality of cross bars 1 are slidably mounted between the first annular guide rail 4 and the second annular guide rail 7, and the distance between two adjacent cross bars 1 is not less than the outer diameter of the pipe 3;

[0030] A cover plate 5 is set up in the area enclosed by the floor plate 6 and the second annular guide rail 7 .

[0031] First, a channel steel rail is made according to the size of the pipe well 2, and the channel steel is fixed to the inner wall of the pipe well 2 with bolts. The length of the crossbar 1 is determined according to the size of the pipe 3. In this embodiment, the length of the crossbar 1 is 200 mm; the crossbar 1 is installed between the first annular rail 4 and the second annular rail 7, and can be increased or decreased according to the number of pipes 3. A grille cover plate 5 is made in the middle of the second annular rail 7 according to the size of the inner keel, and the grille cover plate 5 is placed on the inner keel and the floor slab 6, and is welded and fixed to the floor slab 6.

[0032] The present invention avoids the pipeline by adjusting the distance between the cross bars and directly covers the operating platform inside the pipeline well, thus solving the technical problem that the pipeline installation platform in the prior art cannot avoid the pipeline. After the installation of the present invention, no additional protection is required. When construction personnel need to carry out construction, they can directly stand on the cover plate to carry out construction without removing the protection for construction operation. The present invention has a simple structure and is easy to install.

[0033] The parts not involved in the present invention are the same as the prior art or can be implemented by the prior art. The above is only the preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as the preferred embodiment, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modify the technical content disclosed above to an equivalent embodiment of equivalent changes without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiment according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still belongs to the scope of the technical solution of the present invention.

Claims

1. A pipeline installation operation platform, characterized in that: Used to be installed in a pipeline well and at the same elevation as the floor, comprising a first annular guide rail for laying along the inner circumference of the pipeline well, a second annular guide rail fixed at intervals on the inner side of the first annular guide rail, a plurality of cross bars slidably mounted between the first annular guide rail and the second annular guide rail, and a cover plate located in the area enclosed by the second annular guide rail and the floor slab and mounted on the second annular guide rail, the cover plate being formed with an overlapping section for overlapping the floor slab, the distance between the first annular guide rail and the second annular guide rail being not less than the outer diameter of the pipeline, and a support member for fixing the second annular guide rail to the inner wall of the pipeline well being fixed on the second annular guide rail; The first annular guide rail and the second annular guide rail are both channel steels, the openings of the first annular guide rail and the second annular guide rail are arranged opposite to each other, and the two ends of each of the cross bars are slidably mounted in the grooves of the first annular guide rail and the second annular guide rail; The support member is an oblique support used to be fixed to the inner wall of the pipeline well and the bottom of the second annular guide rail.

2. The pipeline installation operation platform according to claim 1, characterized in that: The cross-section of the pipe shaft is rectangular, and the second annular guide rail includes two supporting rails whose first ends are used to be fixed on the floor slab, and a mounting rail fixed between the two supporting rails, and the second end of each of the supporting rails extends out of the mounting rail and forms an extension section fixed to the first annular guide rail.

3. The pipeline installation operation platform according to claim 1, characterized in that: The cover plate is a grid plate.

4. A method for installing a pipeline installation operation platform according to any one of claims 1 to 3, characterized in that: The method comprises the following steps: Laying a first annular guide rail on the inner periphery of the pipeline well; A support is used to fix the second annular guide rail on the inner wall of the pipeline well, and the second annular guide rail is spaced inside the first annular guide rail, and the distance between the first annular guide rail and the second annular guide rail is not less than the outer diameter of the pipeline; A plurality of cross bars are slidably installed between the first annular guide rail and the second annular guide rail, and the distance between two adjacent cross bars is not less than the outer diameter of the pipe; A cover plate is set up in the area enclosed by the floor slab and the second annular guide rail.