An anchor support structure for controlling surrounding rock of strong flow-variable tunnel in deep mines
By using multiple central anchors, attachment nets, end grouting solidification components and middle fulcrum construction components in deep mine tunnels, combined with external support devices, a high-strength anchoring support structure is formed, which solves the problem of rheological changes in the surrounding rock of the tunnel. solve the problem and achieve stable support and improvement of self-stabilizing ability of the surrounding rock of the tunnel.
Patent Information
- Application Number
- CN202210933282.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-04
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-08-04
AI Technical Summary
Due to diagenesis and high ground stress, the surrounding rock of deep mine tunnels is prone to looseness and fragmentation, making it difficult for bolt support to form a stable structure. Moreover, after the plastic zone of the tunnel deteriorates, the surrounding rock undergoes significant rheology, resulting in continuous deformation and serious damage.
Multiple central anchors are installed vertically and equipped with attachment nets, and end grouting solidification components and middle fulcrum construction components are set up. High-strength support is formed through sliding adjustment and lever principles, combined with external frame support devices and surrounding rock fastening. Form a stable anchoring structure.
It effectively copes with the large deformation of the flow and crushing zone of the tunnel surrounding rock, improves the support strength and stability, enhances the self-stabilizing ability of the surrounding rock, and improves the passive support effect.
Smart Images

Figure CN115095367B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel support, in particular to an anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties. Background Art
[0002] Due to the influence of diagenesis and high ground stress, deep coal seams are often in a loose and broken state. Such coal seams have low strength, weak cementation, and fine particle size. Due to the low strength of loose coal seams, it is difficult for anchor support to form a stable anchoring structure, and it is very easy to separate the interface between the anchor and the surrounding rock. Due to the high ground stress, the self-stabilization ability of the coal seam is poor, and the passive support effect is poor. The currently used anchor joint control method uses a single ordinary anchor structure, which is difficult to cope with the significant rheological conditions of the surrounding rock after the plastic zone of the roadway deteriorates. The surrounding rock near the surface of the roadway still shows strong continuous deformation, large deformation, and severe damage.
[0003] Therefore, those skilled in the art provide an anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties to solve the problems raised in the above-mentioned background technology. Summary of the invention
[0004] To achieve the above object, the present invention provides the following technical solution: an anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties, comprising:
[0005] A plurality of central anchor rods are arranged in an array, each of which is vertically inserted in the surrounding rock tunnel;
[0006] The attachment net is connected to the inner wall of the surrounding rock tunnel by fitting cover;
[0007] The end grouting and curing assembly is relatively slidably arranged on the central anchor rod, wherein grouting holes are preferentially drilled in the flow and crushing zone of the surrounding rock tunnel, and the end grouting and curing assembly can be inserted to the corresponding hole depth for grouting and anchoring;
[0008] An external support device is co-centeredly arranged on a side of the central anchor rod away from the end grouting and curing assembly, and the external support device is in tight contact with the inner wall of the surrounding rock tunnel through an attachment net;
[0009] The middle fulcrum construction component can be relatively slidably adjusted and arranged on the central anchor rod near the middle thereof. The middle fulcrum construction component can expand the grouting in the plastic zone of the surrounding rock tunnel and form a lever fulcrum.
[0010] Further, as a preference, the end grouting and curing assembly comprises:
[0011] An inner shaft tube vertically slides in the central anchor rod, and a sealing seat is fixed at one end of the inner shaft tube;
[0012] The reinforcing ribs are arranged in a circumferential direction, and the central anchor rod is provided with a plurality of strip grooves correspondingly, and each of the reinforcing ribs can be relatively slidably vertically connected to the inner shaft tube;
[0013] A fitting piece, fixed on each of the reinforcing ribs and located inside the inner shaft tube;
[0014] An inner spring, sleeved on the reinforcing rib and abutting against the fitting;
[0015] An inner grouting pipe is vertically and relatively slidably arranged in the inner shaft pipe, a rubber ring is arranged in the sealing seat, and the inner grouting pipe seals and slides in the rubber ring; and
[0016] The flow-blocking ring is sleeved outside the inner shaft tube and is tightly fitted with the central anchor rod.
[0017] Furthermore, preferably, one end of the inner grouting pipe is connected to an external cement pump, and the other end thereof is arranged as a multi-section stepped pipe structure, and a slope structure is arranged on one side of the end face of each of the fittings facing the middle fulcrum construction component.
[0018] Furthermore, preferably, the reinforcing ribs are also provided with a plurality of sets of thread structures.
[0019] Further, as a preference, the middle fulcrum construction assembly comprises:
[0020] An inner pipe is co-centrically slidably sleeved outside the end grouting and curing assembly and is located inside the central anchor rod;
[0021] A guide sleeve, coaxially fixed on the inner tube and slidably disposed in the central anchor rod;
[0022] The expansion and contraction sac is sleeved outside the guide sleeve, the side wall of the central anchor rod is correspondingly provided with an outer notch, and the plastic zone of the surrounding rock tunnel is correspondingly provided with an inner ball cavity, and the expansion and contraction sac can form a spherical expansion state at the inner ball cavity of the plastic zone of the surrounding rock tunnel through the outer notch under continuous air supply expansion;
[0023] An inner air flow tube is arranged in the inner pipe and is connected with the expansion and contraction bladder;
[0024] An oblique flow hole is obliquely opened in the plastic zone of the surrounding rock tunnel and is connected with the inner ball cavity;
[0025] A plurality of flow-aiding holes are arranged circumferentially, and each of the flow-aiding holes is evenly arranged on the inner pipe and located below the expansion and contraction bladder body; and
[0026] A transfer pipe is connected to one end of the inner pipe, and one end of the transfer pipe is connected to the flow supply tank.
[0027] Furthermore, as a preference, the oblique flow holes can be preferentially grouted internally to form an outer annular layer, the expansion and contraction bladder exhausts air and shrinks inwardly after the outer annular layer solidifies, and then the inner pipe grouts and fills the outer annular layer through the flow-aiding holes to form a columnar sphere.
[0028] Further, preferably, the consistency of the grouting material used for grouting and filling the outer annular layer is less than the consistency of the grouting material used for grouting and filling the column sphere.
[0029] Further, preferably, the external support device comprises:
[0030] fixed end base;
[0031] Abutment plate, sleeved outside the central anchor rod;
[0032] An elastic contact layer is arranged on a side of the abutment disk away from the fixed end seat;
[0033] A receiving spring is obliquely connected between the fixed end seat and the abutment disk, and the receiving spring is a plurality of springs arranged in a circumferential direction.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] In the present invention, multiple center anchor rods are vertically inserted inside the mine tunnel, and each center anchor rod can be inserted into the flow and crushing zone of the surrounding rock tunnel accordingly, and cooperate with the attachment net to realize anchoring support of the tunnel surrounding rock; in particular, a middle fulcrum construction component is arranged on each center anchor rod, and the middle fulcrum construction component can form a lever fulcrum in the plastic zone of the surrounding rock tunnel. When the flow and crushing zone of the surrounding rock tunnel presents a continuous large deformation, at this time, on the one hand, by controlling the spatial position of the lever fulcrum, the external support device can further support the inner wall of the tunnel surrounding rock; on the other hand, after adjusting the spatial position of the lever fulcrum, the end of the center anchor rod can effectively cope with the deformation of the flow and crushing zone of the surrounding rock tunnel, thereby realizing high-strength support with the cooperation of multiple center anchor rods. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a structural schematic diagram of the present invention;
[0037] Figure 2 It is a structural schematic diagram of the end grouting and curing assembly in the present invention;
[0038] Figure 3 It is a structural schematic diagram of the middle fulcrum construction assembly in the present invention;
[0039] Figure 4 It is a schematic diagram of the structure formed by the outer ring layer and the columnar sphere in the present invention;
[0040] Figure 5 It is a schematic diagram of the structure of the external support device in the present invention;
[0041] In the figure: 1 center anchor rod, 11 attachment net, 2 end grouting curing assembly, 21 inner shaft tube, 22 reinforcing ribs, 23 rubber ring, 24 inner spring, 25 inner grouting tube, 26 fitting, 27 baffle ring, 3 middle fulcrum construction assembly, 31 inner tube, 32 guide sleeve, 33 expansion and contraction bladder, 34 oblique flow hole, 35 transfer tube, 4 outer support device, 41 fixed end seat, 42 abutment plate, 43 elastic contact layer, 44 receiving spring. DETAILED DESCRIPTION
[0042] See also Figure 1 In an embodiment of the present invention, an anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties comprises:
[0043] A plurality of central anchor rods 1 are arranged in an array, and each central anchor rod 1 is vertically inserted in the surrounding rock tunnel;
[0044] The attachment net 11 is connected to the inner wall of the surrounding rock tunnel by fitting cover;
[0045] The end grouting and curing component 2 is relatively slidably arranged on the central anchor rod 1, wherein grouting holes are preferentially drilled in the flow and crushing zone of the surrounding rock tunnel, and the end grouting and curing component 2 can be inserted to the corresponding hole depth for grouting and anchoring;
[0046] An external support device 4 is co-centeredly arranged on a side of the central anchor rod 1 away from the end grouting and curing assembly 2, and the external support device 4 is in tight contact with the inner wall of the surrounding rock tunnel through an attachment net 11;
[0047] The middle fulcrum construction component 3 can be relatively slidably adjusted and arranged on the central anchor rod 1 near the middle position thereof. The middle fulcrum construction component 3 can expand the grouting in the plastic zone of the surrounding rock tunnel and form a lever fulcrum, wherein the central anchor rod should be made of high-hardness steel material. Through the lever fulcrum formed in the plastic zone of the surrounding rock tunnel, the central anchor rod can deflect around the fulcrum, so that in the case of continuous large deformation in the flow and crushing zone of the tunnel, multiple central anchor rods can be effectively supported by the external support device through the lever principle for the deformation of the flow and crushing zone of the tunnel.
[0048] In this embodiment, the end grouting and curing assembly 2 includes:
[0049] An inner shaft tube 21 vertically slides in the central anchor rod 1, and a sealing seat is fixed at one end of the inner shaft tube 21;
[0050] The reinforcing ribs 22 are arranged in a circumferential direction, and the central anchor rod 1 is provided with a plurality of strip grooves correspondingly, and each of the reinforcing ribs 22 can be relatively slidably vertically connected to the inner shaft tube 21;
[0051] A fitting 26 is fixed on each of the reinforcing ribs 22 and is located inside the inner shaft tube 21;
[0052] The inner spring 24 is sleeved on the reinforcing rib 22 and abuts against the fitting 26;
[0053] The inner grouting pipe 25 is vertically and relatively slidably arranged in the inner shaft tube 21. The sealing seat is provided with a rubber ring 23. The inner grouting pipe 25 seals and slides in the rubber ring 23. Each reinforcing rib can be horizontally received in the inner shaft tube under the elastic force of the inner spring, and the inner grouting pipe can contact with the fittings on each reinforcing rib, so that each reinforcing rib is synchronously pushed to slide outward through the inner grouting pipe; and
[0054] The flow blocking ring 27 is sleeved outside the inner shaft tube 21 and fits tightly with the central anchor rod 1 to prevent the grouting cement from flowing out from the gap between the central anchor rod and the inner shaft tube.
[0055] As a preferred embodiment, one end of the inner grouting pipe 25 is connected to an external cement pump (not shown in the figure), and the other end thereof is configured as a multi-section stepped pipe structure, and each of the fittings 26 is provided with an inclined structure on one side of the end face facing the middle fulcrum construction component 3, and in particular, the cross-section of each grouting hole is configured as an inverted trapezoidal structure, so that when the inner grouting pipe continues to slide in, the reinforcing ribs can partially or completely extend into the grouting hole, significantly improving the overall structural strength after the grouting solidifies.
[0056] In this embodiment, the reinforcing rib 22 is further provided with a plurality of sets of thread structures to further improve the firmness.
[0057] In this embodiment, the middle support point construction component 3 includes:
[0058] The inner pipe 31 is co-centrically slidably sleeved outside the end grouting and curing assembly 2 and is located inside the central anchor rod;
[0059] A guide sleeve 32, coaxially fixed on the inner pipe 31, and slidably disposed in the central anchor rod 1;
[0060] The expansion and contraction bladder 33 is sleeved on the outside of the guide sleeve 32. An outer notch is correspondingly opened on the side wall of the central anchor rod 1, and an inner ball cavity is opened at the corresponding position of the plastic zone of the surrounding rock tunnel. The expansion and contraction bladder 33 can form a spherical expansion state at the inner ball cavity position of the plastic zone of the surrounding rock tunnel through the outer notch under continuous air supply expansion;
[0061] An inner air flow pipe is provided in the inner pipe 31 and is connected with the expansion and contraction bladder 33;
[0062] The oblique flow hole 34 is obliquely opened in the plastic zone of the surrounding rock tunnel and is connected with the inner ball cavity;
[0063] A plurality of flow-aiding holes are arranged circumferentially, and each of the flow-aiding holes is evenly arranged on the inner tube 31 and located below the expansion and contraction bladder 33; and
[0064] The transfer tube 35 is connected to one end of the inner tube 31, and one end of the transfer tube 35 is connected to the flow supply tank, that is, the inner ball cavity of the plastic zone of the surrounding rock tunnel is preferentially expanded and supported centrally by the expansion and contraction action of the expansion and contraction bladder (not in contact with the inner wall of the plastic zone of the surrounding rock tunnel). At this time, the grouting liquid can be injected into the outer injection tube through the oblique flow hole. After the grouting liquid is solidified and formed, the expansion and contraction bladder can shrink, and the flow-aiding hole is controlled by the vertical displacement of the inner tube to slide to the middle of the inner ball cavity, and then the inner tube is subjected to secondary grouting.
[0065] In this embodiment, the oblique flow holes can be preferentially used for internal grouting to form an outer ring layer. The expansion and contraction bladder 33 is exhausted and retracted after the outer ring layer is solidified. Then the inner pipe 31 is used for grouting and filling the outer ring layer through the flow-aiding holes to form a columnar sphere. In particular, during the deflection of the center anchor rod, the center of the outer ring layer can be used as the center of the circle and as a fulcrum. When the outer ring layer is squeezed and broken, the columnar sphere controls the deflection of the center anchor rod relative to the outer ring layer.
[0066] As a preferred embodiment, the consistency of the grouting material used for grouting and filling the outer ring layer is less than the consistency of the grouting material used for grouting and filling the column sphere. In particular, after the outer ring layer is squeezed and crushed, when the column sphere is continuously deflected during the large deformation of the surrounding rock, the outer ring layer can be squeezed to achieve a grinding effect, thereby forming a soft layer protection outside the column sphere, and at the same time, it can effectively increase the structural firmness of the plastic zone of the column sphere and the surrounding rock tunnel.
[0067] In this embodiment, the external support device 4 includes:
[0068] Fixed end base 41;
[0069] The abutment plate 42 is sleeved outside the central anchor rod 1;
[0070] An elastic contact layer 43 is arranged on a side of the abutting plate 42 away from the fixed end seat 41;
[0071] The receiving spring 44 is obliquely connected between the fixed end seat 41 and the abutting plate 42 , and the receiving spring 44 is a plurality of springs arranged in a circumferential direction.
[0072] Specifically, in use, drilling is performed on the surrounding rock tunnel first, and multiple center anchor rods can be vertically inserted into the flow and crushing zone of the surrounding rock tunnel. At this time, under the sliding action of the inner grouting pipe, the reinforcing ribs can extend into the grouting holes, and at the same time, the expansion and contraction action of the expansion and contraction bladder expands the center of the inner ball cavity in the plastic zone of the surrounding rock tunnel. The inner grouting pipe and the oblique flow hole are used to perform internal grouting simultaneously. When the outer ring layer grouting is solidified, the expansion and contraction bladder can shrink, and the flow-aiding hole is controlled by the vertical displacement of the inner pipe to slide to the middle of the inner ball cavity, which is convenient for secondary grouting to form a columnar sphere. At this time, the lever fulcrum formed in the plastic zone of the surrounding rock tunnel enables the center anchor rod to deflect around the fulcrum. Multiple center anchor rods can be used by the external support device to effectively support the deformation of the flow and crushing zone of the tunnel through the lever principle, wherein the main support function of the center anchor rod can be adjusted by adjusting the relative displacement of the fulcrum.
[0073] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties, characterized by: It includes: A plurality of central anchor rods (1) are arranged in an array, and each central anchor rod (1) is vertically inserted in the surrounding rock tunnel; The attachment net (11) is connected to the inner wall of the surrounding rock tunnel by a fitting cover; The end grouting and curing component (2) is relatively slidably arranged on the central anchor rod (1), wherein grouting holes are preferentially drilled in the flow and crushing zone of the surrounding rock tunnel, and the end grouting and curing component (2) can be inserted to a corresponding hole depth for grouting and anchoring; An external support device (4) is co-centrically arranged on a side of the central anchor rod (1) away from the end grouting and curing assembly (2), and the external support device (4) is in tight contact with the inner wall of the surrounding rock tunnel through an attachment net (11); The middle support construction component (3) is relatively slidably adjustable and arranged on the central anchor rod (1) near its middle position. The middle support construction component (3) can expand the grouting in the plastic zone of the surrounding rock tunnel and form a lever support.
2. The anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties according to claim 1 is characterized by: The end grouting and curing assembly (2) comprises: An inner shaft tube (21) vertically slides in the central anchor rod (1), and a sealing seat is fixed at one end of the inner shaft tube (21); The reinforcing ribs (22) are arranged in a circumferential direction, and the central anchor rod (1) is provided with a plurality of strip grooves correspondingly, and each of the reinforcing ribs (22) can be relatively slidably vertically connected to the inner shaft tube (21); A fitting member (26) is fixed on each of the reinforcing ribs (22) and is located inside the inner shaft tube (21); An inner spring (24) is sleeved on the reinforcing rib (22) and abuts against the fitting (26); An inner grouting pipe (25) is vertically and relatively slidably arranged in the inner shaft pipe (21), a rubber ring (23) is arranged in the sealing seat, and the inner grouting pipe (25) seals and slides in the rubber ring (23); and The flow blocking ring (27) is sleeved outside the inner shaft tube (21) and is tightly fitted with the central anchor rod (1).
3. The anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties according to claim 2 is characterized by: One end of the inner grouting pipe (25) is connected to an external cement pump, and the other end is configured as a multi-stage stepped pipe structure. An inclined surface structure is provided on one side of the end surface of each of the fittings (26) facing the middle fulcrum construction component (3).
4. The anchor support structure for controlling surrounding rock of a deep mine strong rheological tunnel according to claim 3 is characterized by: The reinforcing rib (22) is also provided with a plurality of sets of thread structures.
5. The anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties according to claim 1 is characterized by: The middle support point construction component (3) comprises: An inner pipe (31) is co-centrically slidably sleeved outside the end grouting and curing assembly (2) and is located inside the central anchor rod; A guide sleeve (32) is coaxially fixed on the inner pipe (31) and slidably disposed in the central anchor rod (1); The expansion and contraction sac (33) is sleeved on the outside of the guide sleeve (32), the side wall of the central anchor rod (1) is provided with an outer notch correspondingly, and an inner ball cavity is provided at a corresponding position of the plastic zone of the surrounding rock tunnel, and the expansion and contraction sac (33) can form a spherical expansion state at the inner ball cavity position of the plastic zone of the surrounding rock tunnel through the outer notch under continuous air supply expansion; An internal air flow pipe is inserted into the internal pipe (31) and is connected to the expansion and contraction bladder (33); An oblique flow hole (34) is obliquely opened in the plastic zone of the surrounding rock tunnel and is connected to the inner ball cavity; A plurality of flow-aiding holes are arranged circumferentially, each of the flow-aiding holes being evenly arranged on the inner pipe (31) and located below the expansion and contraction bladder (33); and A transfer pipe (35) is connected to one end of the inner pipe (31), and one end of the transfer pipe (35) is connected to the flow supply tank.
6. The anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties according to claim 5, characterized in that: The oblique flow holes can preferentially perform internal grouting to form an outer ring layer, the expansion and contraction bladder (33) exhausts air and contracts inward after the outer ring layer solidifies, and then the inner pipe (31) performs grouting to fill the outer ring layer through the flow-aiding holes to form a columnar sphere.
7. The anchor support structure for controlling surrounding rock of a deep mine strong rheological tunnel according to claim 6 is characterized by: The consistency of the grouting material used for grouting and filling the outer annular layer is less than the consistency of the grouting material used for grouting and filling the column sphere.
8. The anchor support structure for controlling surrounding rock of a deep mine tunnel with strong rheological properties according to claim 1 is characterized by: The external support device (4) comprises: Fixed end base (41); A support plate (42) is sleeved outside the central anchor rod (1); An elastic contact layer (43) is arranged on a side of the abutment plate (42) away from the fixed end seat (41); A receiving spring (44) is obliquely connected between the fixed end seat (41) and the abutting plate (42), and a plurality of the receiving springs (44) are arranged in a circumferential direction.
Citation Information
Patent Citations
Combined supporting structure for large-section tunneling roadway of coal mine
CN114458357A
Antiskid slip casting stock
CN205477690U
