Intelligent control system and method for tunnel air compressor unit based on artificial intelligence
By adopting an artificial intelligence control system in the tunnel air compressor unit and using sensor data and prediction models to automatically control the start and stop of the air compressor, the problems of high labor costs and waste of electricity in the existing technology are solved, and more efficient control is achieved. and energy saving effect.
Patent Information
- Application Number
- CN202210871924.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-19
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-07-19
AI Technical Summary
The existing tunnel air compressor unit control method has problems such as high labor costs, multiple communication links, large interference factors, delayed notification of shutdown, and idling of the air compressor, which wastes electric energy.
An intelligent control system for tunnel air compressor units based on artificial intelligence is adopted, including a data acquisition module, a central control calculation module, a database module and a PLC output module. It collects data through sensors, uses a prediction model to calculate the number of air compressors required, and manually Intelligent control of the start and stop of the air compressor to achieve automated control.
Reduce labor costs, avoid idling operation of the air compressor, save electricity, and improve control efficiency and accuracy.
Smart Images

Figure CN115095512B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent control systems, and in particular to an intelligent control system for a tunnel air compressor unit based on artificial intelligence. Background Art
[0002] During the excavation process of tunnel construction, multiple rock drills are often used to work simultaneously. Rock drills require high-pressure gas to drive the motor to generate power to work. According to the number of rock drills in operation, a corresponding number of air compressors need to be configured to supply high-pressure gas; in addition, during excavation construction, different amounts of compressed gas are required in different time periods, and the number of air compressors that need to be turned on is also different.
[0003] The existing air compressor control method requires the appointment of a dedicated air compressor operator, who will notify the dispatcher from the tunnel construction team, and then notify the air compressor driver. This has problems such as high labor costs, multiple communication links, large interference factors (the mobile phone signal is often poor in the tunnel), untimely notification of shutdown, and waste of electricity due to idling of the air compressor. Summary of the invention
[0004] The present invention aims to at least solve the technical problems existing in the prior art, and in particular innovatively proposes an intelligent control system and method for a tunnel air compressor unit based on artificial intelligence.
[0005] In order to achieve the above-mentioned object of the present invention, the present invention provides an intelligent control system for a tunnel air compressor unit based on artificial intelligence, comprising: a data acquisition module, a central control calculation module, a database module and a PLC output module.
[0006] Data acquisition module: collects data through sensors, including parameters such as air compressor operating current, voltage, air pressure, ambient temperature, etc., which are used to calculate the number of air compressors;
[0007] Central control calculation module: used to receive and process data from the acquisition module, use the prediction model to calculate the required number of ventilators, control the start and stop of the air compressor through artificial intelligence, and output the calculation results to the PLC output module;
[0008] Database module: used to store collected data, system initial setting data, system setting parameters, and record the operating parameters and operating status of the air compressor unit.
[0009] PLC control module: According to the data calculated by the central calculation module, it sequentially controls the start and stop of the air compressor unit and the closing of the valve.
[0010] The data output end of the data acquisition module is connected to the data input end of the database module and the data input end of the central control calculation module respectively, the data output end of the database module is connected to the data input end of the central control calculation module, and the data output end of the central control calculation module is connected to the PLC output module.
[0011] Furthermore, the data acquisition module includes:
[0012] The air pressure sensor, atmospheric pressure sensor, temperature sensor, current sensor, and voltage sensor are used to collect information about the air supply pressure, atmospheric pressure, air temperature, air compressor operating current, and voltage, and upload the data to the central control calculation module. The air pressure sensor is used to detect the high-pressure gas of the air compressor.
[0013] Furthermore, the database module includes:
[0014] Unit operation record sheet: project number, recording time, tunnel footage, high-pressure air duct diameter, air supply pressure, average operating current of the air compressor, unit operating time, number of air compressors in operation, air temperature, atmospheric pressure, and air compressor operation record;
[0015] The air compressor operation record is used to record the start and stop of the air compressor. The value of the air compressor operation record is the difference between the number of air compressor operations in each sampling cycle and the number of air compressor operations in the previous sampling cycle.
[0016] Air compressor specification model table: air compressor number, port address, specification model, start sequence, shutdown sequence;
[0017] System initial setting table: project number, tunnel footage, footage per cycle, high-pressure air duct diameter, cycle sampling time, system password, minimum air supply pressure, maximum air supply pressure;
[0018] Air compressor status table: air compressor number, status value, the status value 0 indicates shutdown status, 1 indicates startup status, and 2 indicates fault status.
[0019] The air compressor operation data and password adopt cloud storage mode. The system automatically uploads the data to the cloud server at a fixed time. The local database only temporarily stores part of the operation data and does not save the data uploaded to the cloud server. It also has background monitoring function, and the remote monitoring center can centrally monitor the operation of the air compressor.
[0020] Furthermore, the tunnel footage is updated automatically and manually in two ways. Automatic update: when the number of air compressors running simultaneously is greater than 3 or 4, the tunnel footage is updated by one cycle on the original basis; when the initial setting or the accumulated error after a period of time is large, manual update is performed.
[0021] The present invention provides an intelligent control method for a tunnel air compressor unit based on artificial intelligence, comprising the following steps:
[0022] S6, read the system setting parameters, and then execute step S8;
[0023] S8, determine whether there is a prediction model, if yes, execute step S10; if no, execute the next step;
[0024] S9, generating a prediction model, and then jumping to step S8;
[0025] S10, collects air supply pressure, air compressor operating current, atmospheric pressure, outdoor air temperature, and reads system setting parameters;
[0026] S11, predicting the operation of the air compressor using the prediction model, and calculating the operation value x; if x is a positive value, executing step S12; if the calculation result is a negative value, executing step S25; if the calculation result is a zero value, executing step S22;
[0027] S12, the positive counter is incremented by 1 and the corresponding operation value x is recorded; the negative counter is reset to zero;
[0028] S13, determine whether the positive counter is equal to 3, if so, execute the next step; if not, execute step S22;
[0029] S14, determining whether the numerical values of the operation values x obtained by the three calculations are equal, if so, executing the next step; if not, executing step S18;
[0030] S15, determine whether the operation value x + the running value ≤ the total number of air compressors - the number of faulty air compressors. If so, proceed to the next step; if not, proceed to step S19;
[0031] S16, the number of air compressor starts is x;
[0032] S17, read the unit startup sequence, query the operation status of each air compressor in turn, if the air compressor is in the "stop" state, start the machine, otherwise, query the next air compressor; then execute step S20;
[0033] S18, the number of air compressor startups is 1, and then step S17 is executed;
[0034] S19, the number of air compressor startups = the total number of air compressors - the number of faulty air compressors - the number of running air compressors, and then execute step S17;
[0035] S20, start the air compressor, close the pressure relief solenoid valve, and open the air supply solenoid valve; and after the x air compressors are started, the positive count is cleared;
[0036] S21, judging whether the air compressor starts normally by the running current, if so, executing the next step; if not, executing step S34;
[0037] S22, the air compressor unit operates normally;
[0038] S23, determining whether the number of air compressors in operation is 0, if so, executing the next step; if not, executing step S10;
[0039] S24, the program stops;
[0040] S25, the negative value counter is incremented by 1, and the corresponding operation value x is recorded at the same time; the positive value counter is reset to zero;
[0041] S26, determine whether the negative value counter is equal to 3, if so, execute the next step; if not, execute step S22;
[0042] S27, determining whether the numerical values of the operation values x obtained by the three calculations are equal, if so, executing the next step; if not, executing step S32;
[0043] S28, determine whether the operation value x≤the total number of air compressors. If so, proceed to the next step; if not, proceed to step S33;
[0044] S29, the number of air compressor shutdowns is -x;
[0045] S30, read the unit shutdown sequence, query the operation status of each air compressor in turn, if the air compressor is in the "running" state, stop the machine, otherwise query the next air compressor;
[0046] S31, the air compressor stops and the negative value counter is reset; then step S23 is executed;
[0047] S32, the number of air compressor shutdowns is 1, and then step S30 is executed;
[0048] S33, the number of air compressor shutdowns = the number of running air compressors, and then execute step S30;
[0049] S34, start the next air compressor in the sequence, and then execute step S22.
[0050] Furthermore, it also includes: controlling the air compressor by the following judgment:
[0051] When collecting the gas supply pressure, determine whether the current pressure is lower than the minimum gas supply pressure, higher than the maximum gas supply pressure, or between the minimum gas supply pressure and the maximum gas supply pressure;
[0052] If the current pressure is lower than the minimum air supply pressure, the system starts one air compressor according to the set air compressor start sequence, and then makes another judgment;
[0053] If the current air supply pressure is higher than the maximum air supply pressure, the control system stops one air compressor according to the set shutdown sequence, and then makes another judgment;
[0054] If the air supply pressure is between the minimum air supply pressure and the maximum air supply pressure, the air compressor unit continues to operate normally.
[0055] This method can be carried out simultaneously with the prediction model. Through simple judgment, one air compressor can be quickly started and stopped, and the prediction model can then make a final judgment on how many air compressors need to be started and stopped.
[0056] Furthermore, the S11 further includes:
[0057] The operation value x obtained by subtracting the current required number of air compressor operations obtained by the prediction model from the number of air compressor operations in the previous sampling cycle is assigned to the air compressor operation record of the previous sampling cycle, and then the sampling data of the previous cycle is stored in the database.
[0058] Furthermore, it also includes:
[0059] Verify by entering the password, modify the password or set system parameters or eliminate the air compressor fault status;
[0060] The collected air compressor unit voltage is used to determine whether the air compressor unit voltage is normal.
[0061] Furthermore, the prediction model includes:
[0062] Tunnel footage, duct diameter, average operating current of the air compressor, air temperature, unit operating time, number of operating air compressors, air supply pressure, number of operating air compressors, and atmospheric pressure are read from the unit operation record table in the database as input fields, and air compressor operation records are used as output fields. Based on this, a data matrix is compiled, and a prediction model is established using a neural network. The air compressor operation is calculated based on the established prediction model.
[0063] Furthermore, it also includes:
[0064] The operation status of the air compressor is uploaded to the equipment terminal, which includes a PC and a mobile phone; it is used to monitor the operation status of the air compressor in real time.
[0065] In summary, due to the adoption of the above-mentioned technical scheme, the present invention can utilize artificial intelligence, big data and automatic control technology to realize intelligent control of the air compressor, thereby reducing labor costs, avoiding idling of the air compressor and saving electricity.
[0066] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0067] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0068] Figure 1 is a flow chart of the method of the present invention. DETAILED DESCRIPTION
[0069] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0070] The invention provides an intelligent control system for a tunnel air compressor unit based on artificial intelligence, comprising: a data acquisition module, a central control calculation module, a database module and a PLC output module.
[0071] The data acquisition module is composed of air pressure sensor, atmospheric pressure sensor, temperature sensor, current sensor, voltage sensor, etc. It is responsible for collecting information such as air supply pressure, atmospheric pressure, air temperature, air compressor operating current, voltage, etc., and uploading the data to the central control calculation module. Among them, atmospheric pressure and air temperature will also affect the air supply pressure, so they also need to be collected; the air compressor operating current is used to control the power of the air compressor, and the voltage detection is to prevent the air compressor voltage from being too high. If the voltage is too high, it will stop using.
[0072] The central control calculation module is mainly composed of a computer, which is responsible for receiving and processing the data from the acquisition module and storing it in the database. Through the data in the database, an intelligent prediction model is established. According to the real-time data collected by the acquisition module, the number of currently turned on air compressors is judged according to the automatic program design to determine whether the number of air compressors meets the demand. The prediction model is used to calculate the required number of ventilators, and the start and stop of the air compressors are controlled by artificial intelligence, and the calculation results are output to the PLC output module.
[0073] The database module is mainly used to store collected data, system initial setting data, system setting parameters, and record the operating parameters and operating status of the air compressor unit. The structure of each data table is as follows:
[0074] 1. Unit operation record sheet, including: project number, recording time, tunnel footage (m), high-pressure air duct diameter (mm), air supply pressure (MPa), average operating current of air compressor (A), unit operation time (min), number of air compressors in operation, air temperature (℃), atmospheric pressure (KPa), air compressor operation record (positive value means increase in number of operations; 0-number of operations remains unchanged; negative value means decrease in number of operations).
[0075] This machine records the operating conditions of the air compressor unit at different time periods during operation. After the unit starts running, it samples at fixed time intervals and stores them in the database to provide a basis for the operation analysis and training model of the air compressor unit. The project number and high-pressure air duct diameter are automatically filled in according to the system settings. The air supply pressure is automatically filled in according to the value collected by the air pressure sensor. The average operating current of the air compressor is the sum of the operating currents of all running air compressors divided by the number of running units.
[0076] There are two ways to update the tunnel footage: automatic update and manual update. Automatic update: A maximum of 5 or 6 air compressors can be placed in the tunnel. Therefore, when the number of air compressors running at the same time is greater than 3 or 4, the tunnel footage will be increased by one cycle. After a period of automatic update, the cumulative error is large and error correction is required. Manual update can be performed by manually measuring the initial footage distance or directly after a period of time.
[0077] The number of operating air compressors is obtained by adding the number of air compressors in the on state with a status value of 1 in the air compressor operation status table.
[0078] The air compressor operation record is used to record the start and stop of the air compressor. The number of air compressors running in each sampling cycle is subtracted from the number of air compressors running in the previous sampling cycle to obtain the operation value x. The operation value has three cases: positive, negative, and zero. A negative value means stopping the air compressor, and the number of shutdowns is equal to the absolute value of the negative value. A positive value means starting the air compressor, and the number of starts is equal to the positive value. 0 means keeping it as it is. And the sum of the current number of running air compressors and the operation value shall not be greater than the total number of air compressors in the unit. The operation value x obtained by subtracting the number of air compressors running in each sampling cycle from the number of air compressors running in the previous sampling cycle is assigned to the air compressor operation record of the previous sampling cycle, and then the sampling data of the previous cycle is stored in the database.
[0079] 2. Air compressor specification model table, including: air compressor number, port address, specification model (m3 / min), start sequence, shutdown sequence. The air compressor specification model table is part of the system initial settings and must be set by personnel with operation authority.
[0080] 3. System initial setting table, including: project number, tunnel footage (m), footage per cycle (m), high-pressure air duct diameter (mm), cycle sampling time, system password, minimum air supply pressure (MPa), maximum air supply pressure (MPa). The system initial setting table must be set by personnel with operation authority; there are two ways to update the tunnel footage: automatic update and manual update. Automatic update: when the number of air compressors running at the same time is greater than 3 or 4, the tunnel footage is increased by one cycle footage on the original basis; when the initial setting or the accumulated error after a period of time is large, manual update is performed.
[0081] 4. Air compressor status table, including: air compressor number, status value, the status value 0 indicates the shutdown state, 1 indicates the startup state, and 2 indicates the fault state.
[0082] When the air compressor operating current is greater than 0 and it is operating normally, it is turned on; when the status value is equal to 0, it is turned off; if the unit stops due to a fault, the central control system will automatically alarm and set the status value to 2. After the fault is repaired, the air compressor status value is manually restored to 0.
[0083] PLC control module: According to the data calculated by the central calculation module, it sequentially controls the start and stop of the air compressor unit and the closing of the valve.
[0084] The control method of this system is a combination of manual control and automatic control, with automatic control as the main method and manual control as the auxiliary method. Manual control plays a major role when there is insufficient data in the initial stage of model establishment and automatic control cannot be established, or when automatic control cannot meet on-site needs. Manual control is used to correct automatic control during operation.
[0085] Automatic control: When the program starts, the central control system reads parameters such as project number, tunnel footage, high-pressure air duct diameter and cycle sampling time from the database, and records the time when the unit starts supplying gas. At the beginning of each sampling cycle, the central control system automatically collects the gas supply pressure, air compressor operating current, atmospheric pressure, outdoor air temperature, and reads the system setting parameters; reads the air compressor status from the database and calculates the number of running air compressors minus the number of running air compressors in the previous sampling cycle, and assigns the difference to the air compressor operation record of the previous sampling cycle; subtracts the start time of the unit from the current time to obtain the running time of the unit, and then organizes the data of the previous cycle into the database. At the same time, organize the data of this cycle (tunnel footage, air duct diameter, average operating current of the air compressor, air temperature, unit operating time, number of running air compressors, gas supply pressure, number of running air compressors, atmospheric pressure), and use the artificial intelligence model to Figure 1 The prediction model in the calculation calculates the number of air compressors to be added / maintained / reduced in operation, and at the same time, it should determine whether the conditions for adding / reducing the number of air compressors in operation are met (the same signal appears three times in a row to perform addition / reduction, and the counter is cleared at the same time, otherwise the unit operates normally; the counter does not have a cumulative function), and then the air compressor is operated through the PLC execution module according to the start / stop sequence, and the air compressor operation status is modified at the same time. The system enters the next cycle until the number of air compressors in operation is 0. The average operating current of the air compressor is the average of the working currents of all air compressors.
[0086] The central control system reads the gas supply pressure through the gas supply pressure sensor, and first determines whether the current pressure is lower than the set minimum gas supply pressure. If it is lower, the system starts the air compressor according to the set air compressor start sequence, otherwise it checks whether the current gas supply pressure is higher than the set maximum gas supply pressure. If it is greater than or equal to the maximum gas supply pressure, the control system stops the air compressor according to the set shutdown sequence, otherwise the unit continues to run. As the tunnel footage changes, the corresponding minimum and maximum gas supply pressures will change accordingly.
[0087] In addition, a fault alarm system is set up. If the unit stops due to a fault, the central control system will automatically alarm and set the unit status to "fault status". After the fault is repaired, the air compressor status will be manually restored to "stop status".
[0088] Manual control: When the initial data is incomplete or special circumstances occur, during the automatic operation process, if the automatic control cannot meet the needs, the air compressor must be started and stopped manually, and the air compressor startup condition record sheet and air compressor operation record sheet must be filled in before starting the air compressor.
[0089] The steps for establishing the calculation model of air compressor operation, i.e. the prediction model, in this system are as follows:
[0090] 1. Establish the acquisition data set and target data set: read the tunnel footage, duct diameter, average operating current of the air compressor, air temperature, unit operating time, number of operating air compressors, air supply pressure, atmospheric pressure, air compressor operation record and other fields from the unit operation record table in the database as the acquisition data set, and compile the data matrix based on this. Where H1 represents the matrix with time period 1, H2 represents the matrix with time period 2, and H n represents a matrix with time period n; H i ∈H, i=1,2,...n,H i =[Q i ,P i ], Q i Represents the air pressure data set, including: air supply pressure, tunnel footage, air duct diameter, average operating current of the air compressor, air temperature, and atmospheric pressure; P i represents the operating parameter data set, including: unit operating time, number of operating air compressors, and air compressor operation records; then the data matrix H is divided, and the divided matrix H is obtained. i =[Q i ,P i ′,T i ], T i Indicates the target data set with air compressor operation record field. i ′Includes: unit operating time and number of operating air compressors.
[0091] 2. Dataset division: Use the data set splitting tool to split the data matrix H into training sets H according to a certain ratio train and the test set H test .
[0092] 3. Data standardization: Using data standardization function f StandarScaler For the training set H train and the test set H test Perform standardization and save f StandarScaler Function model to the local computer.
[0093]
[0094] Where N1 represents the amount of data in the data area with a window width of m;
[0095] N2 represents the amount of data in the data area with a window width of l;
[0096] H i Represents the coordinates of the i-th row point of the matrix H;
[0097] H j Represents the coordinates of the j-th column point of the matrix H;
[0098] C represents the center coordinate of the target window;
[0099] m represents the window width of the area where the data is located;
[0100] l represents the window width of the area where the data is located;
[0101] k1(·) and k2(·) are both kernel functions;
[0102] ||·|| represents the norm.
[0103] 4. Establish a prediction model: Use a neural network based on multi-layer perception and grid search to establish a prediction model.
[0104] ①. Establish a multi-layer perceptron model and set parameters such as channels, hidden layer size, random state, etc.;
[0105] O perception =σ(L P (L Q +ψ1)+ψ 2 2+L T ψ3)
[0106] Among them, perception Represents the data results after the multi-layer perceptron;
[0107] σ(·) is the activation function;
[0108] L PA vector representation of the air pressure dataset;
[0109] L Q A vector representation of the running parameter data set;
[0110] L T A vector representation of the target dataset;
[0111] ψ1 represents the bias corresponding to the operating parameter data set;
[0112] ψ2 represents the bias corresponding to the air pressure dataset;
[0113] ψ3 represents the bias corresponding to the target data set;
[0114] ② Set the grid search parameters and use the grid search method to find the optimal solution:
[0115] Y=w1f1(Q,P)+w2f2(Q,P)+…+w s f s (Q,P)
[0116] w i Denotes the objective function f i The weight of , i = 1, 2, ..., s;
[0117] f i (Q,P) represents the objective function of the i-th layer.
[0118] 5. Model evaluation:
[0119] ①. Calculate target_predict using the training model and test set, target_predict = estimastor.predict(data_test);
[0120] ② Use the linear regression determination coefficient to score and evaluate the prediction model;
[0121] scores=SSR / SST=1-SSE / SST
[0122] Where SST is the total sum of squares, SSR is the regression sum of squares, and SSE is the residual sum of squares. When scores < 0.8, you need to readjust the parameters such as estimastor, param_dict parameters, and data fields. If scores < 0.8 is not satisfied, continue to train the model until scores meet the requirements.
[0123] ③. Save the model.
[0124] In order to make the results calculated by the computer more in line with on-site needs, the system regularly updates each prediction model, and the update time interval is set by personnel with operating authority.
[0125] Before running this system, system parameters need to be set: After the program is running, open the system settings by entering the password, and manually set the project number, tunnel footage, footage per cycle, duct diameter, high and low air supply pressures, maximum air supply pressure, sampling cycle time and other system initial parameter settings.
[0126] The specific implementation steps of the intelligent control method for tunnel air compressor units based on artificial intelligence are as follows: Figure 1 As shown:
[0127] S1, the program starts, and any of steps S2 or S4 is executed;
[0128] S2, input a password; the password is a dynamic password, and the dynamic password includes one or any combination of numbers, uppercase letters, and lowercase letters; the dynamic password is generated by the dynamic password management center platform and sent to the mobile smart handheld terminal (mobile phone). The method for generating a dynamic password by the dynamic password management center platform includes the following steps:
[0129] S21, the dynamic password management center platform determines whether a trigger signal for obtaining a dynamic password is received:
[0130] If the dynamic password management center platform receives a trigger signal for obtaining a dynamic password, the next step is executed;
[0131] If the dynamic password management center platform does not receive the dynamic password acquisition trigger signal, it continues to wait and returns to step S21;
[0132] S22, the dynamic password management center platform obtains the user information of the user who wants to obtain the dynamic password and the time when the dynamic password management center platform receives the trigger signal for obtaining the dynamic password; the storage code is calculated based on the obtained user information and time, and the calculation method of the storage code is:
[0133]
[0134] Among them, MD5 calculation method() indicates the use of the md5 hash algorithm;
[0135] storageID represents the storage code;
[0136] Represents the string to be calculated;
[0137]
[0138] Among them, Q user Indicates the user information of the user who wants to obtain the dynamic password;
[0139] Qtime Indicates the moment when the dynamic password management center platform receives the trigger signal for obtaining the dynamic password;
[0140] & represents the string concatenation operator;
[0141] The calculated storage code is converted into a sixty-binary storage code, which is beneficial to reducing the length of the dynamic password and improving the transmission speed, storing it in the verification database, and sending it (the sixty-binary storage code) as a dynamic password to the mobile smart handheld terminal;
[0142] For example, the user information of the user who wants to obtain the dynamic password is ID_12345ABCab, and the time when the dynamic password management center platform receives the trigger signal for obtaining the dynamic password is 07:07:07:007 on July 7, 2022, and the obtained time is processed into the general format 2022070707070707007;
[0143]
[0144] Among them, → represents the sixty-binary conversion character;
[0145] S23, the mobile intelligent handheld terminal converts the received dynamic password sent by the dynamic password management center platform into a QR code; by converting the dynamic password into a QR code, there is no need for manual input of the dynamic password, which reduces the tediousness of inputting the dynamic password and enhances the user experience.
[0146] S24, by scanning the QR code on the mobile smart handheld terminal, the scanned dynamic password can be obtained, and the scanned dynamic password obtained is transmitted to the dynamic password management center platform for query:
[0147] If the scanned dynamic password exists in the verification database, the stored code in the verification database is deleted and a verification pass is sent to the device;
[0148] If the scanned dynamic password does not exist in the verification database, the verification fails.
[0149] S3, modify the password or set the system parameters or eliminate the air compressor fault state, and then execute step S24;
[0150] S4, determine whether the voltage of the air compressor unit is normal, if it is normal, execute step S6; if it is not normal, execute the next step;
[0151] S5, send out an alarm signal, and then execute step S24;
[0152] S6, read the system setting parameters, and then execute any one of steps S7 or S8;
[0153] S7, manually determine whether the current air supply pressure meets the demand and manually start or stop the air compressor, the control system continues sampling according to the sampling cycle time set by the system, and records the operation status of the unit; then execute step S24;
[0154] S8, determine whether there is a prediction model, if yes, execute step S10; if no, execute the next step;
[0155] S9, generating a prediction model, and then jumping to step S8;
[0156] S10, collects air supply pressure, air compressor operating current, atmospheric pressure, outdoor air temperature, and reads system setting parameters;
[0157] S11, predicting the operation of the air compressor using the prediction model, and calculating the operation value x; if x is a positive value, executing step S12; if the calculation result is a negative value, executing step S25; if the calculation result is a zero value, executing step S22;
[0158] S12, the positive counter is incremented by 1 and the corresponding operation value x is recorded; the negative counter is reset to zero;
[0159] S13, determine whether the positive counter is equal to 3, if so, execute the next step; if not, execute step S22;
[0160] S14, determining whether the numerical values of the operation values x obtained by the three calculations are equal, if so, executing the next step; if not, executing step S18;
[0161] S15, determine whether the operation value x + the running value ≤ the total number of air compressors - the number of faulty air compressors. If so, proceed to the next step; if not, proceed to step S19;
[0162] S16, the number of air compressor starts is x;
[0163] S17, read the unit startup sequence, query the operation status of each air compressor in turn, if the air compressor is in the "stop" state, start the machine, otherwise, query the next air compressor; then execute step S20;
[0164] S18, the number of air compressor startups is 1, and then step S17 is executed;
[0165] S19, the number of air compressor startups = the total number of air compressors - the number of faulty air compressors - the number of running air compressors, and then execute step S17;
[0166] S20, start the air compressor, close the pressure relief solenoid valve, and open the air supply solenoid valve; and after the x air compressors are started, the positive count is cleared;
[0167] S21, judging whether the air compressor starts normally by the running current, if so, executing the next step; if not, executing step S34;
[0168] S22, the air compressor unit operates normally;
[0169] S23, determining whether the number of air compressors in operation is 0, if so, executing the next step; if not, executing step S10;
[0170] S24, the program stops.
[0171] S25, the negative value counter is incremented by 1, and the corresponding operation value x is recorded at the same time; the positive value counter is reset to zero;
[0172] S26, determine whether the negative value counter is equal to 3, if so, execute the next step; if not, execute step S22;
[0173] S27, determining whether the numerical values of the operation values x obtained by the three calculations are equal, if so, executing the next step; if not, executing step S32;
[0174] S28, determine whether the operation value x + the running value ≤ the total number of air compressors - the number of faulty air compressors. If so, proceed to the next step; if not, proceed to step S33;
[0175] S29, the number of air compressor shutdowns is -x;
[0176] S30, read the unit shutdown sequence, query the operation status of each air compressor in turn, if the air compressor is in the "running" state, stop the machine, otherwise query the next air compressor;
[0177] S31, the air compressor stops and the negative value counter is reset; then step S23 is executed;
[0178] S32, the number of air compressor shutdowns is 1, and then step S30 is executed;
[0179] S33, the number of air compressor shutdowns = the number of running air compressors, and then execute step S30.
[0180] S34, start the next air compressor in the sequence, and then execute step S22.
[0181] The establishment of the intelligent model, i.e. the prediction model, is based on the tunnel footage, duct diameter, average air compressor operating current, air temperature, unit operating time, number of operating air compressors, gas supply pressure, number of operating air compressors, atmospheric pressure, etc. read from the database unit operation record table as input fields, and the air compressor operation record as output field, and based on this, a data matrix is compiled (including but not limited to the above fields, which can be transformed based on the above fields), and a neural network intelligent algorithm is used to establish an artificial intelligence model that can meet the use requirements, and the model is calculated in turn for air compressor operation, and the model is saved. The central control system automatically updates the prediction model at fixed time intervals.
[0182] At the beginning of the program, the central control system reads parameters such as the project number, tunnel footage, high-pressure air duct diameter, and cycle sampling time from the database, and records the time when the unit starts supplying air. At the beginning of each sampling cycle, the central control system automatically collects the air supply pressure, the operating current of each air compressor, and the air temperature; at the same time, it organizes the data of this cycle (tunnel footage, air duct diameter, average operating current of the air compressor, air temperature, unit operating time, number of operating air compressors, air supply pressure, number of operating air compressors, and atmospheric pressure), and uses the artificial intelligence model to calculate the air compressor operation (addition, shutdown, and maintenance) that should be performed based on the current working conditions.
[0183] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. An intelligent control method for a tunnel air compressor unit based on artificial intelligence, characterized in that: The following steps are involved: S6, read the system setting parameters, and then execute step S8; S8, determine whether there is a prediction model, if so, execute step S10; If not, proceed to the next step; S9, generating a prediction model, and then jumping to step S8; S10, collects air supply pressure, air compressor operating current, atmospheric pressure, outdoor air temperature, and reads system setting parameters; S11, predicting the operation of the air compressor using the prediction model, and calculating the operation value x; if x is a positive value, executing step S12; if the calculation result is a negative value, executing step S25; if the calculation result is a zero value, executing step S22; S12, the positive counter is incremented by 1 and the corresponding operation value x is recorded; the negative counter is reset to zero; S13, determine whether the positive counter is equal to 3, if so, execute the next step; if not, execute step S22; S14, determining whether the numerical values of the operation values x obtained by the three calculations are equal, if so, executing the next step; if not, executing step S18; S15, determine whether the operation value x + the running value ≤ the total number of air compressors - the number of faulty air compressors. If so, proceed to the next step; if not, proceed to step S19; S16, the number of air compressor starts is x; S17, read the unit startup sequence, query the operation status of each air compressor in turn, if the air compressor is in the "stop" state, start the machine, otherwise, query the next air compressor; then execute step S20; S18, the number of air compressor startups is 1, and then step S17 is executed; S19, the number of air compressor startups = the total number of air compressors - the number of faulty air compressors - the number of running air compressors, and then execute step S17; S20, start the air compressor, close the pressure relief solenoid valve, and open the air supply solenoid valve; and after the x air compressors are started, the positive count is cleared; S21, judging whether the air compressor starts normally by the running current, if so, executing the next step; if not, executing step S34; S22, the air compressor unit operates normally; S23, determining whether the number of air compressors in operation is 0, if so, executing the next step; if not, executing step S10; S24, the program stops; S25, the negative value counter is incremented by 1, and the corresponding operation value x is recorded at the same time; the positive value counter is reset to zero; S26, determine whether the negative value counter is equal to 3, if so, execute the next step; if not, execute step S22; S27, determining whether the numerical values of the operation values x obtained by the three calculations are equal, if so, executing the next step; if not, executing step S32; S28, determine whether the operation value x≤the total number of air compressors. If so, proceed to the next step; if not, proceed to step S33; S29, the number of air compressor shutdowns is -x; S30, read the unit shutdown sequence, query the operation status of each air compressor in turn, if the air compressor is in the "running" state, stop the machine, otherwise query the next air compressor; S31, the air compressor stops and the negative value counter is reset; then step S23 is executed; S32, the number of air compressor shutdowns is 1, and then step S30 is executed; S33, the number of air compressor shutdowns = the number of running air compressors, and then execute step S30; S34, start the next air compressor in the sequence, and then execute step S22.
2. According to the intelligent control method of a tunnel air compressor unit based on artificial intelligence according to claim 1, it is characterized in that: Also includes: The air compressor is controlled by the following judgments: When collecting the gas supply pressure, determine whether the current pressure is lower than the minimum gas supply pressure, higher than the maximum gas supply pressure, or between the minimum gas supply pressure and the maximum gas supply pressure; If the current pressure is lower than the minimum air supply pressure, the system starts one air compressor according to the set air compressor start sequence, and then makes another judgment; If the current air supply pressure is higher than the maximum air supply pressure, the control system stops one air compressor according to the set shutdown sequence, and then makes another judgment; If the air supply pressure is between the minimum air supply pressure and the maximum air supply pressure, the air compressor unit continues to operate normally.
3. According to the intelligent control method of a tunnel air compressor unit based on artificial intelligence in claim 1, it is characterized in that: The S11 further includes: The operation value x obtained by subtracting the current required number of air compressor operations obtained by the prediction model from the number of air compressor operations in the previous sampling cycle is assigned to the air compressor operation record of the previous sampling cycle, and then the sampling data of the previous cycle is stored in the database.
4. The intelligent control method of a tunnel air compressor unit based on artificial intelligence according to claim 1 is characterized in that: Also includes: Verify by entering the password, modify the password or set system parameters or eliminate the air compressor fault status; The collected air compressor unit voltage is used to determine whether the air compressor unit voltage is normal.
5. The intelligent control method of a tunnel air compressor unit based on artificial intelligence according to claim 1 is characterized in that: The prediction model includes: Tunnel footage, duct diameter, average operating current of the air compressor, air temperature, unit operating time, number of operating air compressors, air supply pressure, number of operating air compressors, and atmospheric pressure are read from the unit operation record table in the database as input fields, and air compressor operation records are used as output fields. Based on this, a data matrix is compiled, and a prediction model is established using a neural network. The air compressor operation is calculated based on the established prediction model.
6. The intelligent control method of a tunnel air compressor unit based on artificial intelligence according to claim 1 is characterized in that: Also includes: Upload the air compressor operation status to the equipment terminal, which includes PC and mobile phone; Used to monitor the operation status of the air compressor in real time.
7. The intelligent control method of a tunnel air compressor unit based on artificial intelligence according to claim 1 is characterized in that: The method is implemented by an intelligent control system of a tunnel air compressor unit based on artificial intelligence. The intelligent control system of a tunnel air compressor unit includes: a data acquisition module, a central control calculation module, a database module and a PLC output module. The data output end of the data acquisition module is connected to the data input end of the database module and the data input end of the central control calculation module respectively, the data output end of the database module is connected to the data input end of the central control calculation module, and the data output end of the central control calculation module is connected to the PLC output module.
8. The intelligent control method of a tunnel air compressor unit based on artificial intelligence according to claim 7 is characterized in that: The data acquisition module comprises: The air pressure sensor, atmospheric pressure sensor, temperature sensor, current sensor, and voltage sensor are used to collect information on air supply pressure, atmospheric pressure, air temperature, air compressor operating current, and voltage, respectively, and upload the data to the central control calculation module.
9. The intelligent control method of a tunnel air compressor unit based on artificial intelligence according to claim 7 is characterized in that: The database module includes: Unit operation record sheet: project number, recording time, tunnel footage, high-pressure air duct diameter, air supply pressure, average operating current of the air compressor, unit operating time, number of air compressors in operation, air temperature, atmospheric pressure, and air compressor operation record; Air compressor specification model table: air compressor number, port address, specification model, start sequence, shutdown sequence; System initial setting table: project number, tunnel footage, footage per cycle, high-pressure air duct diameter, cycle sampling time, system password, minimum air supply pressure, maximum air supply pressure; Air compressor status table: air compressor number, status value.
10. The intelligent control method of a tunnel air compressor unit based on artificial intelligence according to claim 9 is characterized in that: The tunnel footage can be updated automatically or manually. Automatic update: when the number of air compressors running at the same time is greater than 3 or 4, the tunnel footage is increased by one cycle footage on the original basis; manual update is performed when the initial setting or the accumulated error after a period of time is large.
Citation Information
Patent Citations
Computer control method for compressor operation remote monitoring
CN101469709A
Monitoring system of Kaeser air compressor
CN103573599A
Air compression station data acquisition and central control device
CN104199418A
Air compressor performance identification and group preference joint control system and method
CN111980898A
Tunnel construction ventilation control system based on artificial intelligence
CN115097778A