Transmission Line Maintenance Method Based on Fuzzy Probabilistic Hybrid Reliability Assessment and Risk Analysis

Through the fuzzy probability mixed reliability assessment and risk analysis method, the problem of traditional power equipment maintenance decisions ignore the impact of grid operation performance is solved, and detailed maintenance priorities and strategies are provided, which can achieve efficient resource utilization and flexible adjustment of maintenance budgets. .

CN115099646BActive Publication Date: 2024-12-03INST OF ENERGY HEFEI COMPREHENSIVE NAT SCI CENT (ANHUI ENERGY LAB) +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210768328.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-01
Publication Date
2024-12-03
Estimated Expiration
2042-07-01

AI Technical Summary

Technical Problem

Traditional power equipment maintenance decision-making methods ignore the impact of equipment maintenance and failure on the power grid operation performance, and the maintenance decision map data obtained by the constant failure rate model is accurate point value, which is not conducive to the detailed maintenance strategy formulation and budget calculation.

Method used

The power line maintenance method based on fuzzy probability mixed reliability assessment and risk analysis is adopted. By collecting historical and current state monitoring data, the fuzzy failure rate model is used to calculate the fuzzy failure rate of the power network, and the system state selection and optimization trend calculation are carried out, combined with Equipment assets and system risks calculate economic risk and systemic importance indicators, determine the maintenance priority of transmission lines, and analyze the maintenance decision diagram through the fuzzy membership function, and formulate detailed maintenance strategies.

Benefits of technology

It realizes a unified quantitative analysis of multi-level impacts of equipment failures, provides more detailed risk assessment information, helps to formulate targeted maintenance strategies, avoid resource waste, and ensures the smooth implementation of maintenance plans through a mobile budget.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115099646B_ABST
    Figure CN115099646B_ABST
Patent Text Reader

Abstract

The present invention provides a transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis, in order to be able to further divide and determine the priority of transmission line maintenance by analyzing the fuzzy interval range distribution and the improved maintenance decision diagram. The most suitable maintenance plan is selected according to different decision criteria to improve the stability and reliability of the power system and avoid unnecessary waste of resources. The present invention comprehensively considers that the failure will cause multi-level impact consequences on the equipment itself, personnel, environment, system, society, etc., and uses risk assessment to unify and quantify these impact consequences. In view of the fuzziness of risk indicators, a fuzzy decision-making method for transmission line maintenance priority based on the criteria of maximum equipment economic risk, maximum system risk, and maximum comprehensive risk is proposed, which is conducive to formulating different maintenance strategies according to different needs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of reliability assessment of electric power equipment, in particular to a transmission line maintenance method based on fuzzy probability hybrid reliability assessment and risk analysis. Background Art

[0002] With the development of the power industry, the scale of the power grid is expanding, and more and more power transmission and transformation equipment is put into use. However, the high-quality demand for power supply has put forward higher requirements for the reliable and stable operation of power equipment. In this case, effective measures need to be taken to ensure the reliability of the power system and improve the operation performance of the power grid.

[0003] In this case, effective measures need to be taken to ensure the reliability of the power system and improve the operating performance of the power grid. The most direct method is to strengthen the construction of the power grid topology, increase the redundancy of equipment, and improve the mutual assistance ability and availability of equipment after equipment failure. This method belongs to the fixed asset investment part of the power enterprise. It is a long-term construction and investment process, which is mainly subject to high costs, long cycles, and occupation of increasingly scarce land resources. On the basis of making full use of existing power assets, making maintenance decisions on power equipment is an effective means to bring about significant improvements in equipment operating performance through a certain degree of economic investment in a relatively short period of time.

[0004] Traditional power equipment maintenance decisions mostly formulate maintenance strategies from the equipment level, focusing more on the equipment's own status or age and equipment maintenance costs, while ignoring the impact of equipment maintenance and failures on the grid's operating performance. In addition, the maintenance decision diagram obtained according to the traditional constant failure rate model contains data in precise point values, which is not conducive to formulating more detailed maintenance strategies and calculating maintenance budgets. Summary of the invention

[0005] In order to overcome the shortcomings of the above-mentioned prior art, the present invention provides a transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis, so as to further divide and determine the priority of transmission line maintenance by analyzing the fuzzy interval range distribution and the improved maintenance decision diagram. The most suitable maintenance plan is selected according to different decision criteria to improve the stability and reliability of the power system and avoid unnecessary waste of resources.

[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme:

[0007] A transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis includes the following steps:

[0008] Step 1: Collect historical and current status monitoring data and reliability data of transmission lines;

[0009] Step 2: Calculate the fuzzy failure rate of the transmission line in the power network by using the fuzzy failure rate model of power transmission and transformation equipment based on state detection;

[0010] Step 3: Using fuzzy failure rate data as input for reliability analysis, the state enumeration method in the system risk assessment method is used to select the system state, and further the optimal power flow calculation analysis is performed to determine whether the failure of each transmission line under the current operation mode will cause load loss, and the fuzzy failure rate of the transmission line that needs maintenance is recorded;

[0011] Step 4: Calculate the economic risk of the transmission line by integrating the equipment assets, equipment asset loss degree and transmission line fuzzy failure rate, and together with the line importance index obtained from the transmission line system risk, calculate the equipment risk value;

[0012] Step 5: By comparing the risk values ​​at different membership levels of the risk indicator fuzzy membership function, the maintenance priority of the transmission line under various equipment maintenance ranking criteria is determined based on the maintenance decision diagram;

[0013] Step 6: After determining the maintenance order of the transmission line according to the maintenance priority of the transmission line, determine whether the maintenance cost of the equipment in the sequential maintenance process exceeds the maintenance budget. If so, determine whether the budget can be increased. If so, continue the sequential maintenance after increasing the budget. If not, proceed to step 7;

[0014] Step 7: Analyze the equipment economic risk and system risk after making maintenance decisions based on maintenance priorities, determine the flexible budget, and the maintenance decision process ends.

[0015] Furthermore, the health status membership of the corresponding transmission line in step 2 and the failure rate sequence corresponding to the comment set are established using equations (1) and (2):

[0016] (1)

[0017] (2)

[0018] In formula (1), n ​​is the number of status comments; M is the number of sections of each overhead line; is the proportion of the k-th line to all lines; is the health status membership of each health line and each comment, is the health status membership of the k-th line corresponding to the n status comments;

[0019] In formula (2), g is the g-th faulty device; For the Devices; For line Length; is the total number of devices; For the The fuzzy membership of the review set of each device; is the fuzzy membership of the comment set of the g-th faulty device; is the failure rate sequence corresponding to the review set.

[0020] Furthermore, the calculation of the economic risk in step 4 is established using equations (3) to (6):

[0021] (3)

[0022] (4)

[0023] (5)

[0024] (6)

[0025] In formula (3), Indicates economic risks. represents the loss risk of device k, It represents the personal and environmental risk loss of device k. represents the social loss caused by the failure of equipment k in the power grid;

[0026] In formula (4), is the fuzzy failure rate of device k, Indicates the equipment maintenance level. Indicates the maintenance level If the maintenance cost is an interval number, the operation property of the above formula becomes a fuzzy number interval operation;

[0027] In formula (5), and They are the personal loss risk and environmental loss risk of equipment k respectively. express The degree of personal injury caused by equipment failure at level k, express The degree of environmental pollution caused by equipment failure at the level;

[0028] In formula (6), Indicates the current electricity price level, represents the load loss value calculated by fault analysis, Indicates the time when the device resumes power supply. Indicates the electricity generation ratio of the current area.

[0029] Furthermore, the different maintenance sequencing criteria in step 5 are:

[0030] (1) Select transmission lines with greater economic risks for maintenance first;

[0031] (2) Select transmission lines with greater system risks for maintenance first;

[0032] (3) Comprehensively consider the maintenance arrangements for transmission lines with greater economic risks and greater system risks, and draw a risk decision diagram based on the risk matrix.

[0033] Furthermore, the determination of the transmission line maintenance priority under various equipment maintenance ranking criteria in step 5 includes: taking the upper and lower limits of the economic risk and system risk indicators at different membership levels, and obtaining the data in the maintenance decision diagram based on the risk matrix to form a rectangular area, wherein the rectangular area represents the economic risk and system risk loss interval area that may be caused by the failure of the equipment to be repaired, and the interval area is at one risk level, or spans two or more risk levels. At this time, the cross-border situation of the equipment economic risk and the system importance index area range is further divided and the priority of transmission line maintenance is determined. When analyzing the cross-border risk area, the relative size of the proportion of the equipment risk area at different risk levels is further combined to make a judgment.

[0034] Furthermore, the maintenance cost in step 6 is confirmed by the maintenance membership function (7):

[0035] (7)

[0036] In formula (7), is the actual maintenance cost of equipment k at different membership levels, is the fuzzy failure rate of device k, Indicates the maintenance level The repair costs specified below.

[0037] Furthermore, in step 7, one membership degree corresponds to two different fuzzy failure rates, and the flexible budget is the upper limit of the maintenance cost under the given membership degree minus the lower limit and then divided by two.

[0038] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0039] (1) The present invention comprehensively considers the multi-level consequences of failures on the equipment itself, personnel, environment, system, society, etc., and uses risk assessment to unify and quantify these consequences. In view of the ambiguity of risk indicators, a fuzzy decision-making method for transmission line maintenance priority based on the criteria of maximum equipment economic risk, maximum system risk, and maximum comprehensive risk is proposed, which is conducive to formulating different maintenance strategies according to different needs.

[0040] (2) The present invention calculates economic risk and system risk based on the fuzzy failure rate model, and takes the upper and lower limits of the economic risk and system risk indicators at different membership levels. The data in the maintenance decision diagram is no longer an accurate point value in the traditional sense, but mainly a rectangular area. This rectangular area represents the economic risk and system risk loss range that may be caused by the failure of the equipment to be repaired. This range is not necessarily at one risk level, and may span two or more risk levels. This provides more detailed risk assessment information, making the subsequent maintenance strategy more targeted and detailed.

[0041] (3) The present invention proposes the probability of a flexible budget. Taking the maintenance cost of the current year as a reference and combining it with the flexible budget, the maintenance budget for the next year can be obtained to fully guarantee the smooth implementation of the maintenance plan. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 It is a flow chart of a transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis of the present invention;

[0043] Figure 2 It is the calculation result of each index of the alternative maintenance transmission line at the selected membership level;

[0044] Figure 3 It is the transmission line maintenance decision diagram when the membership degree is 1;

[0045] Figure 4 It is the transmission line maintenance decision diagram when the membership degree is 0.8;

[0046] Figure 5 It is the transmission line maintenance decision diagram when the membership degree is 0.6;

[0047] Figure 6 It is the result of transmission line maintenance sorting. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0049] The grid of a certain region in East China is used as an analysis example. The topological structure data and operation data in the network are obtained from the regional flow file .dat in the PSD-BPA software. The impact of the distribution system on the reliability of the power grid system is ignored, and the load of the distribution network is directly attributed to the corresponding 110kV and 35kV buses of the upper level. Its active load peak level is 7829MW, with a total of 284 nodes and 397 branches. In the example, only the fault outage analysis of the transmission line is considered, the power grid price is 0.5 yuan / kWh, and the regional power generation ratio is 10 yuan / kWh.

[0050] In order to illustrate the method of the present invention, a transmission line close to the receiving end is mainly selected.

[0051] Depend on Figure 1 As shown, a transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis of the present invention specifically includes the following steps:

[0052] Step 1: Collect historical and current status monitoring data and reliability data of transmission lines.

[0053] Step 2: Utilize the fuzzy failure rate model of power transmission and transformation equipment based on state detection to calculate the fuzzy failure rate of transmission lines in the power network.

[0054] In the specific implementation, the health status membership of the transmission line and the failure rate sequence corresponding to the comment set need to be established using equations (1) and (2):

[0055] (1)

[0056] (2)

[0057] In formula (1), n ​​is the number of status comments; M is the number of sections of each overhead line; is the proportion of the k-th line to all lines; is the health status membership of each health line and each comment, is the health status membership of the k-th line corresponding to the n status comments;

[0058] In formula (2), g is the g-th faulty device; For the Devices; For line Length; is the total number of devices; For the The fuzzy membership of the review set of each device; is the fuzzy membership of the comment set of the g-th faulty device; is the failure rate sequence corresponding to the review set.

[0059] Step 3: Use the fuzzy failure rate data as the input of reliability analysis, use the state enumeration method in the system risk assessment method to select the system state, further perform optimal power flow calculation analysis, determine whether the failure of each transmission line under the current operating mode will cause load loss, and record the fuzzy failure rate of the transmission line and other information.

[0060] In the specific implementation, there are 9 transmission lines near the attention value. These transmission lines have load loss through system fault analysis and are selected as alternative maintenance transmission lines, and are represented by L1~L9 respectively.

[0061] Step 4: Calculate the economic risk of the transmission line by comprehensively considering the equipment assets, the degree of equipment asset loss and the fuzzy failure rate of the transmission line. Together with the line importance index obtained from the transmission line system risk, it constitutes the equipment risk value calculation.

[0062] In the specific implementation, the calculation of economic risk needs to be established using formula (3) to formula (6):

[0063] (3)

[0064] (4)

[0065] (5)

[0066] (6)

[0067] In formula (3), Indicates economic risks. represents the loss risk of device k, It represents the personal and environmental risk loss of device k. It represents the social loss caused by the failure of device k in the power grid.

[0068] In formula (4), is the fuzzy failure rate of device k, Indicates the equipment maintenance level. Indicates the maintenance level If the maintenance cost is an interval number, the operation property of the above formula becomes a fuzzy number interval operation.

[0069] In formula (5), and They are the personal loss risk and environmental loss risk of equipment k respectively. express The degree of personal injury caused by equipment failure at level k, express The degree of environmental pollution caused by equipment failure at the specified level.

[0070] In formula (6), Indicates the current electricity price level, represents the load loss value calculated by fault analysis, Indicates the time when the device resumes power supply. Indicates the electricity generation ratio of the current area.

[0071] In the specific implementation, the calculation results of various indicators of the alternative maintenance transmission line at the selected membership level are as follows: Figure 2 shown.

[0072] Step 5: By comparing the risk values ​​at different membership levels of the risk indicator fuzzy membership function, the maintenance priority of the transmission line under various equipment maintenance sorting criteria is determined based on the maintenance decision diagram.

[0073] In the specific implementation, different maintenance ranking criteria are as follows: (1) transmission lines with greater economic risks are selected for maintenance first, corresponding to a set of maintenance costs, with the expected goal of reducing the total economic risk of the transmission lines as much as possible; (2) transmission lines with greater system risks are selected for maintenance first, corresponding to a set of maintenance costs, with the expected goal of reducing the total system risk of the transmission lines as much as possible; (3) transmission lines with greater economic risks and greater system risks are arranged for maintenance, and the idea based on the risk matrix can be adopted to draw an improved risk decision diagram. After determining the maintenance ranking, a set of cumulative maintenance costs can be obtained, with the expected goal of reducing the total risk of the equipment as much as possible, including economic risk and system risk.

[0074] In specific implementation, Figure 2 When drawing a maintenance decision diagram based on the risk matrix idea according to the third maintenance criterion, it is necessary to draw a risk area diagram based on the fuzziness of the maintenance indicators and the upper and lower limits of the economic risk and system risk indicators at different membership levels. The risk data under membership levels of 1, 0.8, and 0.6 can be taken respectively, and the maintenance decision diagram results are as follows: Figure 3 , Figure 4 , Figure 5 As shown in the figure, the risk matrix is ​​divided into risk levels in the maintenance decision diagram, the scales of the horizontal and vertical coordinates of the maintenance decision diagram are unified, and the risk levels are divided into level I to level IV with the origin as the center according to the risk data range and the sensitivity of the empirical threshold. The maintenance priorities of level I to level IV decrease.

[0075] In the specific implementation, in the confirmation of the priority of the transmission line: Since the calculated economic risk and system risk indicators are fuzzy, it is necessary to adopt the idea of ​​fuzzy number interval analysis. Taking the upper and lower limits of the economic risk and system risk indicators at different membership levels, the data in the maintenance decision diagram based on the risk matrix idea is mainly a rectangular area. This rectangular area represents the economic risk and system risk loss range that may be caused by the failure of the equipment to be repaired. This interval area is not necessarily at one risk level, and may span two or more risk levels. At this time, the cross-border situation of the equipment economic risk and the system importance indicator area can be comprehensively considered to further divide and determine the priority of transmission line maintenance. When analyzing the cross-border risk area, the relative size of the equipment risk area at different risk levels can be further combined.

[0076] In the specific implementation, L represents the sorting by the lower limit value of the risk indicator under a given membership degree, and H represents the sorting by the upper limit value of the risk indicator under a given membership degree. Figure 6 In this paper, the risk ranking results under L are given first, and then the ranking results under H are given.

[0077] Step 6: After determining the maintenance order of the transmission line, determine whether the maintenance cost of the equipment during the sequential maintenance process exceeds the maintenance budget. If so, determine whether the budget can be increased. If so, continue the sequential maintenance after increasing the budget. If not, proceed to step 7.

[0078] In the specific implementation, the actual maintenance cost of equipment k is determined by the maintenance membership function (7):

[0079] (7)

[0080] In formula (7), is the actual maintenance cost of equipment k at different membership levels, is the fuzzy failure rate of device k, Indicates the maintenance level The repair costs specified below.

[0081] Step 7: Analyze the equipment economic risk and system risk after making maintenance decisions based on maintenance priorities, determine the flexible budget, and the maintenance decision process ends.

[0082] In a specific implementation, according to the algorithm of the present invention, one membership degree will correspond to two different fuzzy failure rates. The flexible budget is the upper limit of the maintenance fee under a certain membership degree minus its lower limit and then divided by two. The selection of the membership level determines the amount of the flexible budget. The larger the membership value, the smaller the flexible budget; the smaller the membership value, the larger the flexible budget. When the membership degree is 0, the flexible budget is the largest, and the smooth implementation of the maintenance plan can be basically guaranteed at this time. Therefore, the maintenance budget for the next year = the determined maintenance budget + the flexible budget.

[0083] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis, characterized in that: The following steps are involved: Step 1: Collect historical and current status monitoring data and reliability data of transmission lines; Step 2: Calculate the fuzzy failure rate of the transmission line in the power network by using the fuzzy failure rate model of power transmission and transformation equipment based on state detection; Step 3: Using fuzzy failure rate data as input for reliability analysis, the state enumeration method in the system risk assessment method is used to select the system state, and further the optimal power flow calculation analysis is performed to determine whether the failure of each transmission line under the current operation mode will cause load loss, and the fuzzy failure rate of the transmission line that needs maintenance is recorded; Step 4: Calculate the economic risk of the transmission line by integrating the equipment assets, equipment asset loss degree and transmission line fuzzy failure rate, and together with the line importance index obtained from the transmission line system risk, calculate the equipment risk value; The calculation of the economic risk in step 4 is established using equations (3) to (6): (3) (4) (5) (6) In formula (3), Indicates economic risks. represents the loss risk of device k, It represents the personal and environmental risk loss of device k. represents the social loss caused by the failure of equipment k in the power grid; In formula (4), is the fuzzy failure rate of device k, Indicates the equipment maintenance level. Indicates the maintenance level The maintenance cost under this condition; if the maintenance cost is an interval number, the operation property of the above formula becomes a fuzzy number interval operation; In formula (5), and They are the personal loss risk and environmental loss risk of equipment k respectively; express The degree of personal injury caused by equipment failure at level k, express The degree of environmental pollution caused by equipment failure at the level; In formula (6), Indicates the current electricity price level, represents the load loss value calculated by fault analysis, Indicates the time when the device resumes power supply. Indicates the electricity generation ratio of the current area; Step 5: By comparing the risk values ​​at different membership levels of the risk indicator fuzzy membership function, the maintenance priority of the transmission line under various equipment maintenance ranking criteria is determined based on the maintenance decision diagram; Step 6: After determining the maintenance order of the transmission line according to the maintenance priority of the transmission line, determine whether the maintenance cost of the equipment in the sequential maintenance process exceeds the maintenance budget. If so, determine whether the budget can be increased. If so, continue the sequential maintenance after increasing the budget. If not, proceed to step 7; Step 7: Analyze the equipment economic risk and system risk after making maintenance decisions based on maintenance priorities, determine the flexible budget, and the maintenance decision process ends.

2. The power transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis according to claim 1 is characterized by: In step 2, the health status membership of the corresponding transmission line and the failure rate sequence corresponding to the comment set are established using equations (1) and (2): (1) (2) In formula (1), n ​​is the number of status comments; M is the number of sections of each overhead line; is the proportion of the k-th line to all lines; is the health status membership of each line corresponding to each comment, is the health status membership of the k-th line corresponding to the n status comments; In formula (2), g is the g-th faulty device; For the Devices; For line Length; is the total number of devices; For the The fuzzy membership of the review set of each device; is the fuzzy membership of the comment set of the g-th faulty device; is the failure rate sequence corresponding to the review set.

3. The power transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis according to claim 1 is characterized by: The different maintenance sequencing criteria in step 5 are: (1) Select transmission lines with greater economic risks for maintenance first; (2) Select transmission lines with greater system risks for maintenance first; (3) Comprehensively consider the maintenance arrangements for transmission lines with greater economic risks and greater system risks, and draw a risk decision diagram based on the risk matrix.

4. The power transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis according to claim 1 is characterized by: Determining the maintenance priority of the transmission line under various equipment maintenance sequencing criteria in step 5 includes: The upper and lower limits of the economic risk and system risk indicators at different membership levels are taken to obtain a rectangular area formed by the data in the maintenance decision diagram based on the risk matrix. The rectangular area represents the economic risk and system risk loss interval that may be caused by the failure of the equipment to be repaired. The interval area is at one risk level, or spans two or more risk levels. At this time, the cross-border situation of the equipment economic risk and the system importance indicator area is further divided and the priority of transmission line maintenance is determined. When analyzing the cross-border risk area, the relative size of the equipment risk area at different risk levels is further combined to make a judgment.

5. The power transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis according to claim 4 is characterized by: The maintenance cost in step 6 is determined by the maintenance membership function (7): (7) In formula (7), is the actual maintenance cost of equipment k at different membership levels, is the fuzzy failure rate of device k, Indicates the maintenance level The repair costs specified below.

6. The power transmission line maintenance method based on fuzzy probability hybrid reliability evaluation and risk analysis according to claim 5 is characterized by: In step 7, one membership degree corresponds to two different fuzzy failure rates, and the flexible budget is the upper limit of the maintenance cost under the given membership degree minus the lower limit and then divided by two.