A grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of the liberation

The grouting parameters were determined through drilling coring and grouting tests, and the segmented downward orifice closed static pressure grouting method was adopted, using a mixed slurry of slag Portland cement and fly ash to solve the problem of protecting the coal pillar of the fourth aquifer. The problem of low mining efficiency has been solved, and efficient mining of coal resources and protection of water resources have been achieved.

CN115126506BActive Publication Date: 2024-10-18安徽恒源煤电股份有限公司 +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210827403.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-13
Publication Date
2024-10-18
Estimated Expiration
2042-07-13

AI Technical Summary

Technical Problem

Existing technology cannot effectively improve the mining upper limit and mining efficiency of the fourth aquifer-protected coal pillar in the eastern mining area, resulting in waste of coal resources and water hazards, and there is a lack of scientific liberation methods.

Method used

The structural characteristics of the fourth aquifer and bedrock layer were determined through drilling cores and water pressure tests, and the grouting range and parameters were designed. The segmented downward orifice closed static pressure grouting method was used, using slag Portland cement and powder. The coal ash mixed slurry is used for grouting to control the slurry diffusion range and optimize the grouting section division and material ratio.

Benefits of technology

It increases the mining upper limit of the fourth aquifer-protected coal pillar, reduces the risk of water damage, realizes efficient mining of coal resources and protects water resources, fills the gap in the existing technology, and has important theoretical significance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115126506B_ABST
    Figure CN115126506B_ABST
Patent Text Reader

Abstract

The present invention provides a grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of the liberation. The fourth aquifer is above an overlying loose layer, the fourth aquifer directly covers the bedrock layer, and the protection coal pillar is located in the bedrock layer. The grouting transformation method includes the following steps: S1, determining the scope of the protection coal pillar; S2, drilling and coring, determining the information of the fourth aquifer, the overlying loose layer and the bedrock layer; S3, conducting a water pressure test on the borehole obtained in the step S2; S4, conducting a grouting test on the borehole obtained in the step S2; S5, determining the grouting scope, and arranging grouting holes within the grouting scope; S6, dividing the layer sections of the grouting holes; S7, grouting; S8, stopping grouting. The method can improve the upper limit of the mining of the water-retaining coal pillar and improve the recovery rate of coal under the premise of ensuring the safe production of the working face.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of underground mining methods, and in particular to a grouting transformation method for liberating a shallow fourth aquifer protection coal pillar. Background Art

[0002] Coal measures are well developed in the eastern mining areas of my country, which contain a large amount of high-quality coal resources. However, loose aquifers are developed in the upper part of the coal measures, which are highly water-rich. The mine production process is threatened by water hazards to varying degrees, and most coal seams are deep mining with high water pressure. Therefore, pre-mining water hazard control has become the primary issue of mine safety production in the eastern region, and it is also a technical problem in coal mine safety production and scientific research. In order to prevent the water hazard of the aquifers above the coal seams, a large number of water-retaining coal pillars need to be left in traditional coal mining to ensure the safe production of the working face. In this way, a large amount of coal resources are left underground and cannot be recovered, especially high-quality coal resources, resulting in a huge waste of coal resources. In my country, there are as many as 5 billion tons of loose layer waterproof coal rock pillars left in East China and North China alone. The relief of energy tension and the maximum increase in the recovery rate of coal resources have become urgent tasks for the current coal industry. Therefore, raising the upper limit of coal mining and mining the "three-under" coal under the water body, under the building and under the railway at the upper mining level of the mine are of great significance to promoting coal production efficiency, improving the recovery rate of coal resources and alleviating energy tension.

[0003] Due to the decreasing mining resources in some old mining areas in the east, by the late 1980s, many experts and scholars in the industry were very concerned about the research on increasing the upper limit of mining in coal mines under medium and thick loose aquifers, so as to achieve the goal of liberating as much coal reserves as possible. Although some water-retaining coal pillars have been recovered in mining areas such as Huainan, Huaibei and Yanzhou, the scope of increasing the upper limit of mining of water-retaining coal pillars is limited, the recovery efficiency is low, and the coal under water accounts for about 25% of the total amount of "three-under" coal pressure, and the risk of water damage is still high. At this stage, the main methods of mining water-retaining coal pillars are to adjust the coal mining methods (such as stratified, height-limited, strip and filling mining, etc.) and to seal and grout the top of the water-conducting fracture zone during the mining process. Adjusting the mining method before mining is still a method that sacrifices a large amount of coal resources and does not meet the needs of efficient development of coal resources; grouting to seal the water-conducting fracture zone during the mining process can easily cause a large amount of slurry to flow into the goaf, resulting in a large amount of grouting and poor sealing effect. Moreover, this method is also a passive treatment method that causes damage and disturbance to the overlying aquifer.

[0004] In view of the fact that there is currently no effective, feasible and scientific method for liberating the mining of the bottom protective coal pillar of the "four-containing" aquifer, in order to improve the recovery rate of coal resources under the "four-containing" aquifer, alleviate the coal energy shortage in the eastern mining areas, and further improve the coal mining methods under water bodies in the eastern and western mining areas of the country and achieve the goal of coal mining and water conservation, it is urgent to develop a safe, efficient and practical grouting transformation method for transforming the "four-containing" structure to liberate the shallow fourth aquifer to protect the coal pillar. It has very important significance and application prospects. Summary of the invention

[0005] The purpose of the present invention is to provide a grouting transformation method for liberating the protective coal pillar of the shallow fourth aquifer. In view of a series of problems currently faced in the recovery of the water-retaining coal pillar of the fourth aquifer, in order to overcome the shortcomings of the prior art, the method can increase the upper limit of the mining of the water-retaining coal pillar and the recovery rate of coal while ensuring the safe production of the working face, protect the water resources in the mining area, and rationally utilize industrial solid waste, which is of great significance to the healthy and sustainable development of my country's coal industry and the construction of an ecological society.

[0006] In order to achieve the above object, the present invention provides the following technical solutions:

[0007] A grouting reconstruction method for liberating a shallow fourth aquifer protective coal pillar, wherein the fourth aquifer is above an overlying loose layer, the fourth aquifer directly covers a bedrock layer, and the protective coal pillar is located in the bedrock layer. The grouting reconstruction method comprises the following steps: S1, determining the scope of the protective coal pillar; S2, drilling and coring to determine information of the fourth aquifer, the overlying loose layer and the bedrock layer; S3, conducting a water pressure test on the borehole obtained in step S2; S4, conducting a grouting test on the borehole obtained in step S2; S5, determining the grouting scope and arranging grouting holes within the grouting scope; S6, dividing the layer sections of the grouting holes; S7, grouting; S8, stopping grouting.

[0008] Furthermore, in the above-mentioned grouting transformation method of the protective coal pillar of the fourth aquifer in the shallow part of Jiefang, in the step S1, the range of the protective coal pillar is the area enclosed by the outer ends of the protective coal pillars being connected, and the range of the protective coal pillar is defined as F1. The cross-section of the range of the protective coal pillar is a quadrilateral, and the ground positions corresponding to the four vertices of the quadrilateral are point a, point b, point c and point d, and the ground position corresponding to the center point of the quadrilateral is point O; preferably, the cross-section of the range of the protective coal pillar is a rectangle.

[0009] Furthermore, in the above-mentioned grouting transformation method for the protective coal pillar of the shallow fourth aquifer of Jiefang, in the step S2, cores are drilled at the point a, the point b, the point c, the point d and the point O respectively, and the information of the fourth aquifer includes thickness and initial water level pressure p0, the information of the overlying loose layer includes thickness, and the information of the bedrock layer includes thickness and bedrock top surface depth. Preferably, the coring is coring before grouting, and the coring is coring in the weathering zone above the fourth aquifer and the bedrock layer.

[0010] Furthermore, in the above-mentioned grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang, in the step S3, the water pressure test is a multi-stage water pressure test, and the pressure of each stage of the water pressure test is p wi , pressure of each level of water pressure test p wi are greater than the initial water level pressure p0 of the fourth aquifer, and p wi =1.2*p0, 1.4*p0 and 1.6*p0; the pressure of a certain level of water pressure test is p wi The water flow rate corresponding to the steady state is Q wi The water permeability of a test section within the depth range of each borehole to be grouted under different water pressures is calculated by formula (1):

[0011]

[0012] Among them, q wi is the water permeability, Lu; L is the length of the test section, m, and the test section is selected in the height direction of the borehole; p wi is the pressure value of the water pressure test, MPa; Q wi is the water flow rate of the water pressure test, L / min;

[0013] The permeability coefficient of each test section in each borehole under different water pressures is calculated by formula (2):

[0014]

[0015] Among them, K wi is the permeability coefficient, m / d; r0 is the radius of the borehole,

[0016] Preferably, the injectability of the fourth aquifer and bedrock is evaluated by calculating the water permeability obtained by the water pressure test. The specific evaluation method is as follows: wi When it is above 5Lu, it indicates that the rock mass has good injectability; the permeability q wi When it is between 1 and 5Lu, it indicates that the injectability of the rock mass is general; the permeability q wi When it is less than 1Lu, it indicates that the injectability of the rock mass is poor.

[0017] Furthermore, in the above-mentioned grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang, in the step S4, the grouting starting pressure P1 and the grouting pressure P2 are obtained according to the slurry injectability index, and the actual grouting pressure p si The grouting pressure value of the grouting test is set to x levels, and x is preferably 5-10; the grouting pressure value of the grouting test is between P1 and P2. si are multiples of the initial water level pressure p0; preferably, the grouting pressure p si The sequence is: p0→1.2p0→1.4p0→1.6p0→1.8p0→2p0…; record the grouting pressure value p si The corresponding actual slurry flow Q si ;

[0018] The grouting test results at different grouting pressure values ​​p were obtained by using formula (3). si The penetration rate of the following:

[0019]

[0020] Among them, q si is the slurry penetration rate, Lu; L is the test section length, m; p si is the grouting pressure value of the grouting test, MPa; Q si is the actual slurry flow rate of the grouting test, L / min; preferably, the slurry penetration rate q si Grouting pressure value p when it is greater than 1Lu si As the starting injection pressure P1, the corresponding actual slurry flow rate is Q1. Preferably, during the grouting test, the grouting pressure value when grouting at a certain level of grouting pressure causes grouting in adjacent holes is the grouting pressure P2, and the corresponding actual slurry flow rate is Q2.

[0021] Furthermore, in the above-mentioned grouting transformation method for the protective coal pillar of the fourth aquifer in the shallow part of Jiefang, in the step S5, the grouting range is the area enclosed by connecting the centers of the outermost grouting holes, and the grouting range is defined as F2. The cross-section of the grouting range is a quadrilateral, and the boundary of the grouting range F2 is outside the boundary of the protective coal pillar range F1. The distance between the boundary of the grouting range F2 and the boundary of the protective coal pillar range F1 is 2 to 4 times the grouting diffusion radius R; preferably, the grouting holes include a first type of grouting holes and a second type of grouting holes, a plurality of the first type of grouting holes are arranged in sequence to form a row, and a plurality of the second type of grouting holes are arranged in sequence to form another row, and a row of the first type of grouting holes is first set at the boundary of the grouting range F2, and then a row of the second type of grouting holes is set, and then a row of the The first type of grouting holes are arranged until the midline position of the grouting range F2, and then the settings of the first type of grouting holes and the second type of grouting holes are mirrored until the other side boundary of the grouting range F2, the first type of grouting holes in an adjacent row are staggered with the second type of grouting holes in another row, and the distance between the center of the first type of grouting holes in an adjacent row and the center of the second type of grouting holes in another row is twice the grouting diffusion radius R. During construction, the first type of grouting holes are constructed first, and then the second type of grouting holes are constructed. Preferably, the distance between the centers of two adjacent grouting holes in the same row is twice the grouting diffusion radius R; preferably, the grouting holes are ground straight holes or directional inclined holes. Preferably, the cross-section of the grouting range is rectangular, and the ground position corresponding to the center point of the grouting range is point O.

[0022] Furthermore, in the above-mentioned grouting transformation method for the protection coal pillar of the shallow fourth aquifer of Jiefang, in the step S6, the grouting hole includes two opening sections, namely, the first opening section and the second opening section, the first opening section starts from the ground surface and ends at 5m below the top surface of the fourth aquifer, and the second opening section starts from 5m below the top surface of the fourth aquifer and ends at 10m below the top surface of the bedrock layer; N grouting sections are arranged in the second opening section, and the length of each grouting section is 4 to 8m, and the N grouting sections are divided into three transformation sections, namely, an upper transformation section, a middle transformation section and a lower transformation section, the upper transformation section starts from 5m below the top surface of the fourth aquifer and ends at the bottom surface of the N / 3 grouting section, the middle transformation section starts from the bottom surface of the N / 3 grouting section and ends at the bottom surface of the 2*N / 3 grouting section, and the lower transformation section starts from the bottom surface of the 2*N / 3 grouting section and ends at the bottom surface of the N grouting section.

[0023] Furthermore, in the above-mentioned grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang, in the step S7, the grouting of the second opening section is carried out by a segmented downward type, orifice closed static pressure grouting method; preferably, a grouting process combining continuous and intermittent grouting is adopted during the grouting process;

[0024] During grouting, the two opening sections are regarded as homogeneous formations, and the slurry diffusion radius R under different grouting pressure target values ​​P1 or P2 satisfies formula (3):

[0025]

[0026] Wherein, R is the slurry diffusion radius, m; k is the permeability coefficient of the injected soil layer, m / h, determined by indoor test; t is the time required for slurry diffusion, h, determined by grouting test; h is the grouting pressure expressed by the height of the water column, m, determined by grouting test; r0 is the radius of the grouting pipe, m; n is the effective porosity of the injected coal rock mass, determined by indoor test; μ w is the viscosity of water, mPa·s; μ s0 is the initial viscosity of the slurry, mPa·s; α is the time-varying coefficient of the slurry viscosity; A is the integral parameter related to the time-varying coefficient α of the slurry viscosity; e is a natural constant, and its value is 2.71828.

[0027] Further, in the above-mentioned grouting transformation method for the fourth aquifer protection coal pillar of the shallow part of Jiefang, in the step S7, the grouting material is a mixed slurry of slag silicate cement and fly ash. Preferably, by mass ratio, the amount of fly ash added to the grouting material in the upper transformation section is 40% to 60% of the slag silicate cement, by mass ratio, the amount of fly ash added to the grouting material in the middle transformation section is 20% to 40% of the slag silicate cement, by mass ratio, the grouting material in the lower transformation section is not mixed with fly ash, and pure slag silicate cement slurry is used for grouting. Preferably, a downward sealed static pressure grouting casing is used for grouting. The aperture of the first opening section is Φ216mm, and a Φ177.8×8.05mm grouting casing is inserted. Cement cementing, the aperture of the second opening section is Φ152mm, and preferably, the grouting range F2 is first The outermost grouting hole is grouted, then the other first-type grouting holes are grouted, and finally the second-type grouting holes are grouted; preferably, the other grouting holes except the outermost grouting hole in the grouting area F2 and the middle and lower transformation sections are grouted with normal grouting pressure P, and the outermost grouting holes in the grouting range F2 and the upper transformation section reduce the final grouting pressure to P-△P, and the △P is 0.5-1.0MPa, so as to control the diffusion range of the slurry.

[0028] Furthermore, in the above-mentioned grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang, in the step S8, the double standards of grouting final pressure and grouting volume are used to stop the grouting control; preferably, the grouting final pressure is not less than 1.5 times the hydrostatic pressure of the injected test section; when the grouting pressure reaches the end standard, the pump volume is reduced by shifting gears successively until the pump volume reaches 60L / min, and the water is pressurized after maintaining it for 30 minutes. The unit water absorption rate shall not be greater than 1Lu. When the above two standards are met at the same time, the grouting is stopped.

[0029] Analysis shows that the present invention discloses a grouting transformation method for liberating the shallow fourth aquifer protection coal pillar, which fills the gap of the current lack of effective, feasible and scientific methods for liberating the shallow fourth aquifer protection coal pillar. By drilling and coring surveys in the range of the fourth aquifer protection coal pillar to determine the overburden structure characteristics and the fourth aquifer injectability index, the grouting parameters, grouting materials, grouting sequence scientific design and grouting layer segment division optimization can be achieved, which has important theoretical significance for the subsequent research on the method of retaining the coal pillar under the fourth aquifer and determining the upper limit of coal pillar mining under the fourth aquifer. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:

[0031] Figure 1 The present invention is a flowchart of a grouting transformation method according to an embodiment of the present invention.

[0032] Figure 2 It is a schematic diagram of the principle of an embodiment of the present invention.

[0033] Figure 3 This is a schematic diagram of grouting holes arranged within the grouting range of an embodiment of the present invention.

[0034] Figure 4 Schematic diagram of two opening sections of a grouting hole according to an embodiment of the present invention.

[0035] Figure 5 This is a schematic diagram of dividing N grouting sections according to an embodiment of the present invention.

[0036] Explanation of the reference numerals: 1 overlying loose layer; 2 fourth aquifer; 3 bedrock layer; 4 protective coal pillar; 5 coal seam; 6 transformation area; 8 water-conducting fracture zone before transformation; 9 water-conducting fracture zone after transformation; 10 first type of grouting hole; 11 second type of grouting hole; 12 first opening section; 13 second opening section; 14 grouting section, 15 top of the fourth aquifer, 16 bottom of the fourth aquifer; F1 protective coal pillar range; F2 grouting range. DETAILED DESCRIPTION

[0037] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present invention and does not limit the present invention. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present invention without departing from the scope or spirit of the present invention. For example, a feature shown or described as a part of one embodiment may be used in another embodiment to produce yet another embodiment. Therefore, it is desired that the present invention encompasses such modifications and variations within the scope of the appended claims and their equivalents.

[0038] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention. The terms "connected", "connected" and "set" used in the present invention should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection; it can be a direct connection or an indirect connection through an intermediate component; it can be a wired electrical connection, a radio connection, or a wireless communication signal connection. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0039] One or more examples of the present invention are shown in the accompanying drawings. The detailed description uses numbers and letter labels to refer to features in the drawings. Like or similar labels in the drawings and description have been used to refer to like or similar parts of the present invention. As used herein, the terms "first", "second", "third", etc. are used interchangeably to distinguish one component from another and are not intended to indicate the location or importance of individual components.

[0040] like Figures 1 to 5 As shown, according to an embodiment of the present invention, a grouting transformation method for liberating a shallow fourth aquifer 2 protecting a coal pillar 4 is provided, wherein the fourth aquifer 2 is above an overlying loose layer 1, the fourth aquifer 2 directly covers a bedrock layer 3, and the protective coal pillar 4 is located in the bedrock layer 3. The grouting transformation method comprises the following steps:

[0041] S1, determine the scope of the protective coal pillar 4;

[0042] In step S1, the range of the protective coal pillar 4 is the area enclosed by connecting the outer ends of the protective coal pillars 4, such as Figure 2 and Figure 3As shown, the range of the protective coal pillar 4 is defined as F1, the cross section of the range of the protective coal pillar 4 is a quadrilateral, the ground positions corresponding to the four vertices of the quadrilateral are point a, point b, point c and point d, and the ground position corresponding to the center point of the quadrilateral is point O. Preferably, the cross section of the range of the protective coal pillar 4 is a rectangle. The range of the protective coal pillar 4 is determined according to the existing "Specifications for the Setting and Compression of Coal Pillars in Buildings, Water Bodies, Railways and Main Wells and Lanes" (2017 Edition) and the working face data of the mining area, for example, the vertical section method, the vertical line method, the digital elevation projection method and the deformation prediction method can be used.

[0043] S2, drilling and coring to determine the information of the fourth aquifer 2, the overlying loose layer 1 and the bedrock layer 3;

[0044] In step S2, Figure 3 As shown, cores are drilled at the point a, the point b, the point c, the point d and the point O, respectively. The information of the fourth aquifer 2 includes thickness, initial water level pressure p0,

[0045] The information of the overlying loose layer 1 includes thickness, and the information of the bedrock layer 3 includes thickness and depth of the top surface of the bedrock. Preferably, the coring in the borehole is coring before grouting, and the coring in the borehole is coring in the weathering zone above the fourth aquifer 2 and the bedrock layer 3. The weathering zone of the bedrock layer 3 is the uppermost part of the bedrock layer 3, and the uppermost part of the bedrock layer 3 is not completely diagenetic and belongs to the weathering zone of the bedrock layer 3.

[0046] The thickness of the fourth aquifer 2, the initial water level pressure p0, the thickness of the overlying loose layer 1, the thickness of the bedrock layer 3 and the depth of the top surface of the bedrock are determined by drilling and coring to prepare for the subsequent steps.

[0047] S3, conducting a water pressure test on the borehole obtained in step S2;

[0048] In step S3, a water pressure test is performed on the borehole obtained in step S2 to obtain parameters such as the water pressure test pressure and injection volume, and the permeability characteristics of the weathering zone of the fourth aquifer 2 and the bedrock layer 3 are determined by analysis, and the corresponding injectability indexes are calculated to conduct injectability evaluation.

[0049] The water pressure test is a multi-stage water pressure test, and the pressure of each stage of the water pressure test is p wi ,

[0050] The pressure of each level of water pressure test p wi are greater than the initial water level pressure p0 of the fourth aquifer 2, and p wi =1.2*p0, 1.4*p0 and 1.6*p0;

[0051] The pressure of a certain level of water pressure test is p wiThe water flow rate corresponding to the steady state is Q wi The water permeability of a test section within the depth range of each borehole to be grouted under different water pressures is calculated by formula (1):

[0052]

[0053] Among them, q wi is the water permeability, Lu; L is the length of the test section, m, and the test section is selected in the height direction of the borehole; p wi is the pressure value of the water pressure test, MPa; Q wi is the water flow rate of the water pressure test, L / min;

[0054] The permeability coefficient of each test section in each borehole under different water pressures is calculated by formula (2):

[0055]

[0056] Among them, K wi is the permeability coefficient, m / d; r0 is the radius of the borehole,

[0057] Preferably, the injectability of the fourth aquifer 2 and the bedrock layer 3 is evaluated by calculating the water permeability obtained by the water pressure test. The specific evaluation method is as follows:

[0058] Water permeability q wi When the value is above 5Lu, it indicates that the injectability of the weathering zone of the fourth aquifer 2 and bedrock layer 3 is good;

[0059] Water permeability q wi When the value is between 1 and 5Lu, it indicates that the injectability of the weathering zone of the fourth aquifer 2 and the bedrock layer 3 is average;

[0060] Water permeability q wi When it is less than 1Lu, it indicates that the injectivity of the weathering zone of the fourth aquifer 2 and the bedrock layer 3 is poor.

[0061] According to the above three different situations, the water-cement ratio of the slurry and the grouting pressure are adjusted. When the injectability is good, the water-cement ratio is appropriately reduced; when the injectability is poor, the water-cement ratio is appropriately increased. According to the above three different adjustments, the amount of fly ash added is appropriately increased when the injectability is good; when the injectability is poor, the amount of fly ash added is appropriately reduced.

[0062] S4, conducting a grouting test on the drilling obtained in step S2;

[0063] In step S4, a grouting test is performed on the borehole obtained in step S2 to obtain the corresponding relationship between the grouting test pressure and the grouting pressure injection amount, and the slurry injectability index of the fourth aquifer 2 and the weathering zone of the bedrock layer 3 is determined by analysis to obtain the actual grouting engineering parameters. The injectability index is mainly obtained through the water pressure test in step S3, and the injectability index is more accurate after verification with the grouting test. At the same time, according to the injectability evaluation obtained by the water pressure test in step S3, the grouting test can be optimized. If the water pressure test shows that the injectability is poor, the first-level grouting pressure of the grouting test needs to be increased, and the total grouting pressure level should also be increased.

[0064] According to the slurry injectability index, the grouting starting pressure P1 and slurry flow pressure P2 are obtained, and the actual grouting pressure p si Between the injection pressure P1 and the slurry pressure P2,

[0065] The grouting pressure value of the grouting test is set to x levels, and x is preferably 5-10; the grouting pressure value p of the grouting test is si They are all multiples of the initial water level pressure p0;

[0066] Preferably, the grouting pressure p si They are: p0→1.2p0→1.4p0→1.6p0→1.8p0→2p0…;

[0067] Record the grouting pressure value p si The corresponding actual slurry flow Q si ;

[0068] The grouting test results at different grouting pressure values ​​p were obtained by using formula (3). si The penetration rate of the following:

[0069]

[0070] Among them, q si is the slurry penetration rate, Lu; L is the test section length, m; p si is the grouting pressure value of the grouting test, MPa; Q si is the actual slurry flow rate of the grouting test, L / min;

[0071] Preferably, the pulp penetration rate q si Grouting pressure value p when it is greater than 1Lu si As the starting pressure P1, the corresponding actual slurry flow rate is Q1,

[0072] Preferably, during the grouting test, the grouting pressure value when grouting at a certain level of grouting pressure causes grouting in adjacent holes is the grouting pressure P2, and the corresponding actual slurry flow rate is Q2.

[0073] S5, determining the grouting range, and arranging grouting holes within the grouting range;

[0074] In step S5, the grouting range is the area enclosed by connecting the centers of the outermost grouting holes, and the grouting range is defined as F2. Figure 3 As shown, the cross section of the grouting range can be a quadrilateral.

[0075] The boundary of the grouting range F2 is outside the boundary of the protective coal pillar 4 range F1.

[0076] The distance between the boundary of the grouting range F2 and the boundary of the protection coal pillar 4 range F1 is 2 to 4 times the grouting diffusion radius R;

[0077] Preferably, the grouting holes include a first type of grouting holes 10 and a second type of grouting holes 11.

[0078] A plurality of the first type grouting holes 10 are sequentially arranged to form a row, and a plurality of the second type grouting holes 11 are sequentially arranged to form another row.

[0079] On one side boundary of the grouting range F2, a row of the first-category grouting holes 10 is firstly arranged, and then a row of the second-category grouting holes 11 is arranged, and then another row of the first-category grouting holes 10 is arranged until the center line position of the grouting range F2, and then the arrangement of the first-category grouting holes 10 and the second-category grouting holes 11 is mirrored until the other side boundary of the grouting range F2.

[0080] The first type of grouting holes 10 in one adjacent row are staggered with the second type of grouting holes 11 in another adjacent row. Figure 3 As shown, the horizontal direction is the row and the vertical direction is the column. Starting from the horizontal boundary of the grouting range F2, a row of the first type of grouting holes 10 and a row of the second type of grouting holes 11 are arranged in sequence, ... and the last row is the first type of grouting holes 10. Starting from the longitudinal boundary of the grouting range F2, a column of the first type of grouting holes 10 and a column of the second type of grouting holes 11 are arranged in sequence, ... and the last column is the first type of grouting holes 10. The grouting holes in the same row or column are all the first type of grouting holes 10 or the second type of grouting holes 11, and the centers of the grouting holes in the same row or column are on a straight line. This arrangement is conducive to drilling construction, forming a grouting curtain, ensuring uniform grouting within the grouting range, making full use of adjacent grouting holes to achieve air flow and pressure relief, controlling the grouting amount, and ensuring the grouting effect.

[0081] The distance between the center of the first type of grouting holes 10 in an adjacent row and the center of the second type of grouting holes 11 in another row is twice the grouting diffusion radius R. During construction, the first type of grouting holes 10 are constructed first, and then the second type of grouting holes 11 are constructed. Preferably, the distance between the centers of two adjacent grouting holes in the same row is twice the grouting diffusion radius R; preferably, the grouting holes are straight holes on the ground or directional inclined holes. Preferably, the cross-section of the grouting range is a rectangle, and the ground position corresponding to the center point of the grouting range is point O.

[0082] S6, dividing the layer sections of the grouting holes;

[0083] In step S6, Figure 4 As shown, the grouting hole includes two opening sections, namely, the first opening section 12 and the second opening section 13. The first opening section 12 starts from the ground surface and ends at 5 m below the top surface of the fourth aquifer 2, and the second opening section 13 starts from 5 m below the top surface of the fourth aquifer 2 and ends at 10 m below the top surface of the bedrock layer 3.

[0084] The second opening section 13 is provided with N grouting sections 14, such as Figure 5 As shown, the length of each grouting section 14 is 4 to 8 m. Figure 5 The line pointed at 15 represents the top of the fourth aquifer 2 , and the line pointed at 16 represents the bottom of the fourth aquifer 2 .

[0085] The N grouting sections 14 are divided into three transformation sections, namely, an upper transformation section, a middle transformation section and a lower transformation section. Preferably, N is a multiple of 3. The upper transformation section starts from 5 m below the top surface of the fourth aquifer 2 and ends at the bottom surface of N / 3 grouting sections 14.

[0086] The middle transformation section starts from the bottom surface of the N / 3 grouting section 14 and ends at the bottom surface of the 2*N / 3 grouting section 14.

[0087] The lower transformation section starts from the bottom surface of the 2*N / 3 grouting section 14 and ends at the bottom surface of the N grouting section 14.

[0088] If the grouting sections 14 are divided according to the actual strata (thickness of the overlying loose layer 1), N is not a multiple of 3, and can be adjusted appropriately to an integer. Assuming that N is 10, the upper 3 grouting sections 14 are upper reforming sections, the middle 3 grouting sections 14 are middle reforming sections, and the lower 4 grouting sections 14 are lower reforming sections.

[0089] Dividing the N grouting sections 14 into an upper reforming section, a middle reforming section and a lower reforming section is to prepare for the subsequent grouting steps.

[0090] S7, grouting;

[0091] In step S7,

[0092] The grouting of the second opening section 13 is carried out by adopting a segmented downward type, hole-sealed static pressure grouting method for grouting treatment;

[0093] Preferably, a grouting process combining continuous and intermittent grouting is adopted during the grouting process;

[0094] During grouting, the second opening section 13 is regarded as a homogeneous formation, and the slurry diffusion radius R under different grouting pressure target values ​​P1 or P2 satisfies the formula (3):

[0095]

[0096] Wherein, R is the slurry diffusion radius, m; k is the permeability coefficient of the injected soil layer, m / h, determined by indoor test; t is the time required for slurry diffusion, h, determined by grouting test; h is the grouting pressure expressed by the height of the water column, m, determined by grouting test; r0 is the radius of the grouting pipe, m; n is the effective porosity of the injected coal rock mass, determined by indoor test; μ w is the viscosity of water, mPa·s; μ s0 is the initial viscosity of the slurry, mPa·s; α is the time-varying coefficient of the slurry viscosity; A is the integral parameter related to the time-varying coefficient α of the slurry viscosity; e is a natural constant, and its value is 2.71828.

[0097] In step S7, the grouting material is a mixed slurry of slag silicate cement and fly ash.

[0098] Preferably, the fly ash content in the grouting material in the upper transformation section is 40% to 60% of the slag silicate cement in terms of mass ratio.

[0099] According to the mass ratio, the fly ash content in the grouting material in the middle transformation section is 20% to 40% of the slag silicate cement.

[0100] According to the mass ratio, the grouting material in the lower transformation section does not contain fly ash, and pure slag silicate cement slurry is used for grouting.

[0101] With the increase of fly ash content, the stone rate of slurry increases and the setting time increases. When the fly ash content is below 20% to 30%, the compressive strength of the stone body decreases slowly with the increase of the content. When it is greater than 30%, the compressive strength of the stone body decreases significantly. When the content is the same, the greater the water-cement ratio, the lower the stone rate and the longer the setting time of the slurry. The increase of water in the stone body means the increase of the distance between the solid material particles, which makes it more difficult to form a skeleton structure.

[0102] Preferably, a downward sealed static pressure grouting casing is used for grouting.

[0103] The aperture of the first opening section 12 is Φ216 mm, and a Φ177.8×8.05 mm grouting casing (steel grade J55) is inserted, and cement is used for well cementing. The aperture of the second opening section 13 is Φ152 mm.

[0104] Preferably, the outermost grouting holes of the grouting range F2 are first grouted, and the area of ​​the grouting range F2 is "locked" to reduce ineffective diffusion. Then the other first-type grouting holes 10 are grouted, and finally the second-type grouting holes 11 are grouted; preferably, the other grouting holes of the grouting area F2 except the outermost grouting holes and the middle and lower transformation sections are grouted with normal grouting pressure P, and the outermost grouting holes of the grouting range F2 and the upper transformation section reduce the final grouting pressure to P-△P, and the △P is 0.5-1.0MPa, so as to control the diffusion range of the slurry.

[0105] The inner slurry diffusion range of the outermost grouting hole in the grouting range F2 is constrained by the grouting slurry of the inner grouting hole, and the outer side of the outermost grouting hole is unconstrained; the formation pressure in the upper reformed section is small, the corresponding grouting layer has a large porosity and good injectability. The use of decompression and stop injection for the outermost grouting holes in the grouting range F2 and the upper reformed section can avoid the ineffective diffusion of the slurry, control the amount of slurry, and have significant economic benefits.

[0106] According to the purpose of grouting to transform the aquifer: liberate the shallow fourth aquifer 2 to protect the coal pillar 4, determine the second opening section 13 as the grouting section 14, and perform grouting from 5m below the top surface of the fourth aquifer 2 to 10m below the top surface of the bedrock layer 3. Through pressurized grouting, compact the quicksand in the fourth aquifer 2, squeeze out the water in the pores and fissures of the fourth aquifer 2, split and transform the fourth aquifer 2, form a skeleton structure in the fourth aquifer 2, and reduce the transformation area 6 (such as Figure 2 As shown, the transformation area 6 is a three-dimensional space formed by the grouting range F2 in the plane and the second opening section 13 in the vertical direction. The water-richness of the fourth aquifer 2 in the fourth aquifer 2 is transformed into an effective impermeable layer or a Class III water body close to drainage, liberating the shallow fourth aquifer 2 to protect the coal pillar 4 resources. The water-conducting fracture zone 8 before the transformation and the water-conducting fracture zone 9 after the transformation are shown in FIG. Figure 2 As shown. After the grouting transformation, the strength of the fourth aquifer 2 is improved, the fourth aquifer 2 protective coal pillar 4 can be mined, and the generated water-conducting fracture zone will not affect the fourth aquifer 2. This avoids the fourth aquifer 2 from flooding and sand bursting caused by mining, resulting in production accidents, and liberates the exploitable coal resources covered by the fourth aquifer 2.

[0107] S8, stop grouting;

[0108] In step S8, the grouting stop control is performed using the dual standards of grouting final pressure and grouting volume;

[0109] Preferably, the final grouting pressure is not less than 1.5 times the hydrostatic pressure of the grouting section; when the grouting pressure reaches the end standard, the pump volume is gradually reduced by shifting gears until the pump volume reaches 60L / min, and the water is pressed after maintaining for 30 minutes. The unit water absorption rate shall not be greater than 1Lu, otherwise, it is required to re-inject until it is less than the standard value. That is, grouting is continued until the unit water absorption rate is not greater than 1Lu, otherwise it is necessary to continue grouting. Only when the above two standards are met at the same time, it can be considered that the grouting section has reached the grouting end standard and grouting can be stopped.

[0110] Due to the particularity of grouting projects, considering that grouting in loose layers may cause grouting in adjacent holes and ground deformation, the grouting pressure can be adjusted according to the actual situation on site. In principle, the total pressure should not be less than 1.5 times the hydrostatic pressure of the grouting layer.

[0111] The water-conducting fracture zone generated by the mining of the fourth aquifer protection coal pillar 4, i.e., the water-conducting fracture zone 8 before the transformation, can spread to the fourth aquifer 2. In order to liberate the shallow fourth aquifer protection coal pillar 4 to increase the upper limit of mining, the fourth aquifer 2 is grouting-transformed, and the water-conducting fracture zone generated when the coal seam below the fourth aquifer protection coal pillar 4 is mined after the grouting-transformation, i.e., the water-conducting fracture zone 9 after the transformation, will not spread to the fourth aquifer 2.

[0112] From the above description, it can be seen that the above-mentioned embodiments of the present invention achieve the following technical effects: it fills the gap of the current lack of effective, feasible and scientific methods for liberating the shallow fourth aquifer 2 to protect the coal pillar 4, and through the drilling and coring survey within the range of the fourth aquifer to protect the coal pillar 4 to determine the overburden structure characteristics and the injectability index of the fourth aquifer 2, the grouting parameters, grouting materials, grouting sequence scientific design and grouting layer segment division optimization can be achieved, which has important theoretical significance for the subsequent research on the method of retaining the coal pillar under the fourth aquifer 2 and determining the upper limit of the coal pillar mining below the fourth aquifer 2.

[0113] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of the liberation, wherein the fourth aquifer is above an overlying loose layer, the fourth aquifer directly covers the bedrock layer, and the protection coal pillar is located in the bedrock layer, characterized in that: The grouting transformation method comprises the following steps: S1, determine the range of the protective coal pillar; the range of the protective coal pillar is the area enclosed by the outer ends of the protective coal pillars connected, and the range of the protective coal pillar is defined as F1, S2, drilling and coring to determine the information of the fourth aquifer, the overlying loose layer and the bedrock layer; S3, performing a water pressure test on the borehole obtained in step S2; S4, performing a grouting test on the borehole obtained in step S2; S5, determining the grouting range, and arranging grouting holes within the grouting range; The grouting range is the area enclosed by connecting the centers of the outermost grouting holes. The grouting range is defined as F2. The cross section of the grouting range is a quadrilateral. The boundary of the grouting range F2 is outside the boundary of the protective coal pillar range F1. The distance between the boundary of the grouting range F2 and the boundary of the protective coal pillar range F1 is 2 to 4 times the grouting diffusion radius R; S6, dividing the layer sections of the grouting holes; S7, grouting; S8, stop grouting.

2. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 1 is characterized in that: In step S1, the cross section of the protective coal pillar range is a quadrilateral, the four vertices of the quadrilateral correspond to the ground positions of point a, point b, point c and point d, and the center point of the quadrilateral corresponds to the ground position of point O; The cross section of the protective coal pillar range is rectangular.

3. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 2 is characterized in that: In the step S2, cores are drilled at the point a, the point b, the point c, the point d and the point O respectively. The information of the fourth aquifer includes thickness, initial water level pressure p0, The information of the overlying loose layer includes thickness, The information of the bedrock layer includes thickness, bedrock top depth, The coring in the drilling hole is coring before grouting, and the coring in the drilling hole is coring in the weathering zone above the fourth aquifer and the bedrock layer.

4. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 3 is characterized in that: In step S3, the water pressure test is a multi-stage water pressure test, and the pressure of each stage of the water pressure test is p wi , The pressure of each level of water pressure test p wi are greater than the initial water level pressure p0 of the fourth aquifer, and p wi =1.2*p0, 1.4*p0 and 1.6*p0; The pressure of a certain level of water pressure test is p wi The water flow rate corresponding to the steady state is Q wi The water permeability of a test section within the depth range of each borehole to be grouted under different water pressures is calculated by formula (1): Among them, q wi is the water permeability, Lu; L is the length of the test section, m, and the test section is selected in the height direction of the borehole; p wi is the pressure value of the water pressure test, MPa; Q wi is the water flow rate of the water pressure test, L / min; The permeability coefficient of each test section in each borehole under different water pressures is calculated by formula (2): Among them, K wi is the permeability coefficient, m / d; r0 is the radius of the borehole, The injectability of the fourth aquifer and bedrock is evaluated by calculating the water permeability obtained by the water pressure test. The specific evaluation method is as follows: Water permeability wi When it is above 5Lu, it indicates that the rock mass has good injectability; Water permeability wi When it is between 1 and 5Lu, it indicates that the injectability of the rock mass is average; Water permeability wi When it is less than 1Lu, it indicates that the injectability of the rock mass is poor.

5. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 1 is characterized in that: In step S4, the starting pressure P1 and the grouting pressure P2 of the grouting are obtained according to the grout injectability index, and the actual grouting pressure p si Between the injection pressure P1 and the slurry pressure P2, The grouting pressure value of the grouting test is set to x levels, and x is preferably 5-10; the grouting pressure value p of the grouting test is si They are all multiples of the initial water level pressure p0; Grouting pressure p si They are: p0→1.2p0→1.4p0→1.6p0→1.8p0→2p0…; Record the grouting pressure value p si The corresponding actual slurry flow Q si ; The grouting test results at different grouting pressure values ​​p were obtained by using formula (3). si The penetration rate of the following: Among them, q si is the slurry penetration rate, Lu; L is the test section length, m; p si is the grouting pressure value of the grouting test, MPa; Q si is the actual slurry flow rate of the grouting test, L / min; Take the pulp penetration rate q si Grouting pressure value p when it is greater than 1Lu si As the starting pressure P1, the corresponding actual slurry flow rate is Q1, During the grouting test, the grouting pressure value when grouting at a certain level of grouting pressure causes grouting in adjacent holes is the grouting pressure P2, and the corresponding actual slurry flow rate is Q2.

6. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 1 is characterized in that: In step S5, the grouting holes include first-type grouting holes and second-type grouting holes. A plurality of the first type of grouting holes are sequentially arranged to form a row, and a plurality of the second type of grouting holes are sequentially arranged to form another row. At the boundary of the grouting range F2, a row of the first type of grouting holes is first arranged, and then a row of the second type of grouting holes is arranged, and then a row of the first type of grouting holes is arranged until the center line of the grouting range F2, and then the arrangement of the first type of grouting holes and the second type of grouting holes is mirrored until the other side boundary of the grouting range F2, The first type of grouting holes in one adjacent row are staggered with the second type of grouting holes in another adjacent row. The distance between the center of the first type of grouting holes in one adjacent row and the center of the second type of grouting holes in another adjacent row is twice the grouting diffusion radius R. During construction, the first type of grouting holes are constructed first, and then the second type of grouting holes are constructed. The distance between the centers of two adjacent grouting holes in the same row is twice the grouting diffusion radius R; The grouting hole is a straight hole on the ground or a directional inclined hole. The cross section of the grouting range is a rectangle, and the ground position corresponding to the center point of the grouting range is point O.

7. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 6 is characterized in that: In step S6, the grouting hole includes two opening sections, namely, the first opening section and the second opening section. The first opening section starts from the ground surface and ends at 5 m below the top surface of the fourth aquifer, and the second opening section starts from 5 m below the top surface of the fourth aquifer and ends at 10 m below the top surface of the bedrock layer. The second opening section is provided with N grouting sections, each of which is 4 to 8 meters long. The N grouting sections are divided into three transformation sections, namely the upper transformation section, the middle transformation section and the lower transformation section. The upper transformation section starts from 5 m below the top surface of the fourth aquifer and ends at the bottom surface of the N / 3 grouting section. The middle transformation section starts from the bottom surface of the N / 3 grouting section and ends at the bottom surface of the 2*N / 3 grouting section. The lower transformation section starts from the bottom surface of the 2*N / 3 grouting section and ends at the bottom surface of the N grouting section.

8. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 7 is characterized in that: In step S7, The grouting of the second opening section adopts the segmented downward type and hole-sealed static pressure grouting method for grouting treatment; The grouting process uses a grouting process that combines continuous and intermittent grouting; During grouting, the two opening sections are regarded as homogeneous formations, and the slurry diffusion radius R under different grouting pressure target values ​​P1 or P2 satisfies formula (3): Wherein, R is the slurry diffusion radius, m; k is the permeability coefficient of the injected soil layer, m / h, determined by indoor test; t is the time required for slurry diffusion, h, determined by grouting test; h is the grouting pressure expressed by the height of the water column, m, determined by grouting test; r0 is the radius of the grouting pipe, m; n is the effective porosity of the injected coal rock mass, determined by indoor test; μ w is the viscosity of water, mPa·s; μ s0 is the initial viscosity of the slurry, mPa·s; α is the time-varying coefficient of the slurry viscosity; A is the integral parameter related to the time-varying coefficient α of the slurry viscosity; e is a natural constant, and its value is 2.71828.

9. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 7 is characterized in that: In step S7, the grouting material is a mixed slurry of slag silicate cement and fly ash. According to the mass ratio, the fly ash content in the grouting material in the upper transformation section is 40% to 60% of the slag silicate cement. According to the mass ratio, the fly ash content in the grouting material in the middle transformation section is 20% to 40% of the slag silicate cement. According to the mass ratio, the grouting material in the lower transformation section does not contain fly ash, and pure slag silicate cement slurry is used for grouting. Use downward sealed static pressure grouting casing for grouting. The aperture of the first opening section is Φ216mm, and a Φ177.8×8.05mm grouting casing is inserted and cemented. The aperture of the second opening section is Φ152mm. Firstly, grouting is performed on the outermost grouting holes of the grouting range F2, then grouting is performed on the other grouting holes of the first type, and finally grouting is performed on the second type grouting holes; The grouting holes other than the outermost grouting holes in the grouting range F2 and the middle and lower reformed sections are grouted using normal grouting pressure P. The outermost grouting holes in the grouting range F2 and the upper transformation section reduce the final grouting pressure to P-ΔP, where ΔP is 0.5-1.0 MPa, to control the slurry diffusion range.

10. The grouting transformation method for the fourth aquifer protection coal pillar in the shallow part of Jiefang according to claim 1, characterized in that: In step S8, the grouting stop control is performed using the dual standards of grouting final pressure and grouting volume; The final grouting pressure shall not be less than 1.5 times the hydrostatic pressure of the test section; When the grouting pressure reaches the end standard, gradually change gears to reduce the pump volume until the pump volume reaches 60L / min, and maintain it for 30 minutes before pressing water. The unit water absorption rate shall not be greater than 1Lu. When both of the above criteria are met at the same time, stop grouting.

Citation Information

Patent Citations

  • Method for determining ground high-pressure grouting pressure and grouting diffusion radius of ground of thick unconsolidated formation

    CN112814647A

  • Grouting transformation construction process for loose aquifer of coal mine

    CN114233338A