A method for analyzing cast-in-place pile rock penetration data and determining casing placement
By establishing three-dimensional geological and engineering pile models, analyzing and optimizing the rock inlet data of cast-injected piles and burying casings, the problem of collapsed holes is solved, the construction quality and progress are improved, and the number of tests and costs are reduced.
Patent Information
- Application Number
- CN202210916825.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-01
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-08-01
AI Technical Summary
In the renovation of first-tier cities, the increase in basement depth and poor geological conditions in coastal cities lead to the phenomenon of collapse and threading holes often occur during construction of rotary excavation and infusion piles. The existing solutions are not intuitive and accurate enough, requiring multiple trials and adjustments, and are costly. The ground survey report is difficult to understand, which has affected the construction quality and progress.
By establishing a three-dimensional geological model and engineering pile model, using Civil3D and Revit software for merge and analysis, combining color and material settings to distinguish geological conditions, analyzing the details of empty pile parts, optimizing the design and burying of the casing, providing accurate construction data and predictions , assist in on-site construction.
It realizes a more intuitive and accurate display of geological conditions, reduces the number of tests, improves construction quality and progress, saves engineering costs, and ensures pile hole stability and construction efficiency.
Smart Images

Figure CN115130192B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of subgrade foundation, and in particular to a method for analyzing cast-in-place pile rock penetration data and determining casing embedding. Background Art
[0002] At present, the renovation and renewal of first-tier cities are accelerating, and urban land space is limited. Most new or renovated buildings are developed at high places or deep underground, which results in deep basements of new buildings. During the construction of engineering piles, there are often empty piles with a depth of 10 to 20 meters. In the backfill areas of coastal cities, the engineering geological conditions are poor and the groundwater level is high. In some areas, water begins to appear when only 1 meter is excavated. The rotary excavation and grouting engineering piles are seriously affected by this during construction, which can easily lead to hole collapse and string hole phenomenon during the rotary excavation process or hole cleaning, affecting the quality of the later engineering pile forming.
[0003] The general solutions to the above phenomenon are: 1) Increase the specific gravity of the mud. Use the larger specific gravity of the mud to press the side wall of the pile hole, but this method is not easy to judge the specific ratio and requires multiple tests and adjustments. 2) Use appropriate hole cleaning methods, such as changing the reverse circulation to positive circulation, but this method easily makes it difficult to clean the mud and sand in the pile hole, and the thickness of the sediment at the bottom of the pile is not enough to ensure the design or specification requirements. In addition, when the spacing between adjacent piles is close and dense, the effect of this method gradually decreases. 3) Increase the length of the steel casing of the pile hole, but consistent with the method, it is difficult to judge the increase in length. If the increase in length is too long, the cost will be too high, and if the increase in length is too short, the ideal effect will still not be achieved.
[0004] The above methods require construction personnel to have rich experience and be combined with the survey report of the geological survey unit to make a basic judgment. Geological survey reports are often displayed in two-dimensional drawings or text, which are not easy to understand, and need to be combined with multiple drawings such as engineering pile position maps. The position is not accurate enough and it is easy to cause misjudgment. With the popularization of information-based BIM applications, through the combination of three-dimensional geological models and engineering pile models, the specific empty pile length and the geological conditions of the empty pile location can be judged more intuitively and effectively. Appropriate methods were used to prevent and avoid construction quality defects or accidents. Summary of the invention
[0005] The purpose of the present invention is to provide a method for analyzing the data of cast-in-place piles entering the rock and determining the burial of casings, which can more intuitively display the geological conditions without the need for three-dimensional imagination. Compared with traditional methods, it is more convenient and quicker, and can more accurately adopt appropriate construction methods to ensure the quality of the engineering piles while ensuring the progress of the project.
[0006] The present invention is achieved in that:
[0007] A method for analyzing cast-in-place pile rock penetration data and determining casing burial, comprising the following specific steps:
[0008] Step 1: Establish geological model: Be familiar with geological survey reports and drawings, use detailed survey reports to create geological models through Civil3D software, and establish geological models;
[0009] Step 2: Establish the engineering pile model: Estimate the pile length according to the design drawings, and use Revit software to establish the engineering pile model, including the empty pile part;
[0010] Step 3: Processing the geological model: Import the geological model made by Civil3D software into Revit software, and then use Revit software to set the material and color of the geological model, and distinguish different geological conditions according to the depth;
[0011] Step 4, merge model: after the geological model is converted from Civil3D software format to Revit software format and the settings in step 3 are performed, merge the geological model with the engineering pile model to analyze the details of the empty pile part;
[0012] Step 5: Data analysis: Analyze the causes of hole collapse and hole stringing based on various data, and conduct exploration and analysis of the pile bottom conditions;
[0013] Step 6, design optimization: Provide design based on the pile bottom elevation analysis data in step 5, and optimize the engineering piles by the designer;
[0014] Step 7, data calculation: After the design optimization in step 6, calculate the specific rock penetration data and pile length of each engineering pile to provide prediction during on-site construction and assist on-site construction.
[0015] further;
[0016] In step 3, the geological model prepared in the geological model processing is first converted into the IFG general format and then imported into the Revit software.
[0017] further;
[0018] In step 5, data analysis includes the following specific steps:
[0019] Step 8: Analyze the reasons for hole collapse and hole crossover: Analyze the main reasons for hole collapse and hole crossover of engineering piles using the measured data and mark them in the model;
[0020] Step 9: Analyze the bottom elevation of the pile: obtain and analyze the bottom elevation data of the engineering pile, and then export the data through the Revit software details table;
[0021] Step 10. Analyze the rock layer at the bottom of the pile: obtain and analyze the rock layer data at the bottom of the pile, and then export the data through the Revit software details table.
[0022] further;
[0023] In S8, the specific implementation method of analyzing the causes of hole collapse and hole stringing is to analyze the various geological conditions of the empty pile part, and analyze the main causes of hole collapse and hole stringing in the engineering pile in combination with the construction conditions at the beginning stage of the project.
[0024] A method for determining casing burial includes the following specific steps:
[0025] Step 11, miscellaneous fill layer analysis: after step 5 is completed, the depth and thickness of the miscellaneous fill layer are analyzed;
[0026] Step 12: Casing embedding location: mark the location of the casing in the model;
[0027] Step 13, regional processing: according to the analysis results of step 11, regional processing is performed;
[0028] Step 14: Preset the tilt angle: Analyze the tilt angle that the casing can support during the burial process, and mark the tilt range of the casing in the model;
[0029] Step 15: Data annotation of casing burying process: Analyze the multi-category data and burying process of casing burying process based on the acquired data, and display them in the model in a dynamic way.
[0030] further;
[0031] In step 13, the specific operation method of the regional processing is to calculate the service length of the steel casing and confirm the role of steel casings of different specifications in specific parts of the model.
[0032] further;
[0033] In step 15, the analysis categories in the casing burying process data annotation are orifice diameter, rotation speed and water level pressure maintenance data.
[0034] further;
[0035] In step 12, the casing embedding positioning includes the following specific steps:
[0036] Step 16: Mark reference points: Find fixed reference points according to the geological survey report and drawings, and mark them in the model;
[0037] Step 17: Calculate the buried distance: Calculate the distance between the buried position and the reference point;
[0038] Step 18: Mark the buried location data: mark the detailed measurement results and measurement paths in the model.
[0039] further;
[0040] In step 16, there are at least two control points in the marked control points.
[0041] The beneficial effects of the present invention are:
[0042] The present invention is obtained by the above design:
[0043] 1. Through the creation of a three-dimensional geological model, the geological conditions can be displayed more intuitively, and the geological model can distinguish different geological conditions through color settings, so that the geological conditions can be presented more intuitively in the model, so that the geological conditions can be quickly analyzed and the appropriate construction methods can be adopted more accurately without repeated tests. By merging the geological model with the established engineering pile model and analyzing the details of the empty pile part, the quality of the engineering piles can be guaranteed while ensuring the progress of the project.
[0044] 2. By building a model, accurate data can be provided for design optimization. Through design optimization and annotation of casing burial process data, the burial process can be simulated according to actual conditions, which can save engineering costs and ensure progress more significantly.
[0045] 3. By analyzing the miscellaneous fill soil layer, when burying the steel casing, it is necessary to ensure that the length of the steel casing can ensure that it passes through the geological layer, so that the loose gravel and sand in the surrounding area will not collapse, and the stability of the pile hole will be guaranteed. By analyzing the miscellaneous fill soil layer, the collapse phenomenon can be avoided as much as possible, further ensuring the stability of the pile hole.
[0046] 4. By setting reference points, finding fixed reference points according to the actual environment, and marking the distances between two or more reference points and the casing on the model, during construction, the buried position of the casing can be quickly found through the marked distances, thereby improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0048] Figure 1 It is a flow chart of a method for analyzing cast-in-place pile rock penetration data provided by an embodiment of the present invention;
[0049] Figure 2 is a data analysis flow chart of a method for analyzing cast-in-place pile rock penetration data provided by an embodiment of the present invention;
[0050] Figure 3 It is a flow chart of a casing burying determination method provided by an embodiment of the present invention;
[0051] Figure 4It is a casing embedding positioning flow chart of the casing embedding judgment method provided in an embodiment of the present invention;
[0052] Figure 5 It is a modeling schematic diagram provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0053] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.
[0054] Unless otherwise clearly stipulated and limited, terms such as "installed", "connected", "connected", and "fixed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements.
[0055] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0056] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0057] Example:
[0058] During the construction of engineering piles, there are often empty piles with a depth of 10 to 20 meters. In the backfill areas of coastal cities, the engineering geological conditions are poor and the groundwater level is high. In some areas, water begins to appear when only 1 meter is excavated. The rotary bored cast-in-place engineering piles are seriously affected by this during construction, which can easily lead to hole collapse and string hole phenomenon during the rotary excavation process or hole cleaning, affecting the quality of the later engineering pile forming. The existing solution requires the construction personnel to have rich experience and combine the survey report of the geological survey unit to make a basic judgment, which is easy to cause misjudgment.
[0059] This embodiment provides a method for analyzing the rock penetration data of a bored pile and determining the buried casing.
[0060] Please refer to Figure 1-5 , according to the following steps to analyze the data of cast-in-place piles entering the rock and determine the buried casing:
[0061] 1. Use the detailed survey report to create a geological model using Civil3D software, and then use Revit software to build an engineering pile model, where the engineering pile model includes the empty pile part;
[0062] 2. Process the geological model so that it can distinguish different geological features in the model through color depth and different material labels;
[0063] 3. Combine the geological model and the engineering pile model, such as Figure 5 As shown in the figure, by analyzing the geological conditions of the empty pile part and combining the construction conditions at the beginning of the project, the main reasons for the collapse and stringing of engineering pile holes are analyzed, that is, the collapse and stringing of engineering pile holes mainly occur in the geological interface of miscellaneous fill soil, the geology is loose, and the gaps are filled with clay soil and gravel sand, which is the main reason for the collapse;
[0064] 4. Analysis of the miscellaneous fill layer revealed that the thickness of the geological layer was 1.00-5.2m, with an average thickness of 2.77m. When using steel casing for cast-in-place piles, it is necessary to ensure that the length of the steel casing can ensure that it passes through the geological layer, so that the loose gravel and sand in the surrounding area will not collapse, and the stability of the pile hole can be ensured;
[0065] 5. After analyzing the miscellaneous fill layer, the area is divided into different areas and the required steel casing specifications are calculated to be 10m and 5m in length. The use of the two types of steel casing in specific locations is determined in the model;
[0066] 6. Mark two or more reference points in the model, measure the two or more reference points and the buried position of the casing, and mark them in the model to facilitate the rapid determination of the buried position of the casing during construction;
[0067] 7. The design requires that the bottom elevation of the engineering piles must enter the slightly weathered rock layer 0.5m, and the final pile bottom height difference should not be greater than the clear distance between adjacent piles. However, some projects need to pass through thick medium-weathered rock layers when entering the slightly weathered rock layer, which makes the construction difficult and the progress difficult to guarantee. Therefore, by analyzing the pile bottom elevation data and the pile bottom rock layer data, the pile bottom situation is more intuitive and the construction progress is guaranteed;
[0068] 8. Provide the pile bottom elevation analysis data to the designer, who will optimize the engineering piles. It is analyzed that when the engineering piles are 4m into the medium weathering, the final pile bottom height difference should not be greater than the clear distance between adjacent piles and the bearing capacity requirements can be met. Finally, the engineering pile entry conditions are changed, that is, the piles are slightly weathered 0.5m or medium weathered 4m;
[0069] 9. After design optimization, calculate the specific rock penetration data and pile length of each engineering pile, provide prediction during on-site construction, and assist on-site construction.
[0070] By creating a three-dimensional geological model, the geological conditions can be displayed more intuitively, and the geological model can distinguish different geological conditions through color settings, so that the geological conditions can be presented more intuitively in the model, so that the geological conditions can be quickly analyzed and the appropriate construction methods can be adopted more accurately without repeated experiments. By merging the geological model with the established engineering pile model and analyzing the details of the empty pile part, the quality of the engineering piles can be guaranteed while ensuring the progress of the project.
[0071] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for analyzing cast-in-place pile rock penetration data, characterized in that: The specific steps include: Step 1: Establish geological model: Be familiar with geological survey reports and drawings, use detailed survey reports to create geological models through Civil3D software, and establish geological models; Step 2: Establish the engineering pile model: Estimate the pile length according to the design drawings, and use Revit software to establish the engineering pile model, including the empty pile part; Step 3: Processing the geological model: Import the geological model made by Civil3D software into Revit software, and then use Revit software to set the material and color of the geological model, and distinguish different geological conditions according to the depth; Step 4, merge the models: after the geological model is converted from Civil3D software format to Revit software format and the settings in step 3 are performed, merge the geological model with the engineering pile model to analyze the details of the empty pile part; Step 5: Data analysis: Analyze the causes of hole collapse and hole stringing based on various data, and conduct exploration and analysis of the pile bottom conditions; Step 6, design optimization: Provide design based on the pile bottom elevation analysis data in step 5, and optimize the engineering piles by the designer; Step 7, data calculation: After the design optimization in step 6, calculate the specific rock penetration data and pile length of each engineering pile to provide prediction during on-site construction and assist on-site construction.
2. A method for analyzing bored pile rock penetration data according to claim 1, characterized in that: In step 3, the geological model prepared in the geological model processing is first converted into the IFG general format and then imported into the Revit software.
3. A method for analyzing bored pile rock penetration data according to claim 1, characterized in that: In step 5, data analysis includes the following specific steps: Step 8: Analyze the reasons for hole collapse and hole crossover: Analyze the main reasons for hole collapse and hole crossover of engineering piles using the measured data and mark them in the model; Step 9: Analyze the pile bottom elevation: obtain and analyze the engineering pile bottom elevation data, and then export the data through the Revit software details table; Step 10. Analyze the rock layer at the bottom of the pile: obtain and analyze the rock layer data at the bottom of the pile, and then export the data through the Revit software details table.
4. A method for analyzing bored pile rock penetration data according to claim 3, characterized in that: In step 8, the specific implementation method of analyzing the causes of hole collapse and hole stringing is to analyze the various geological conditions of the empty pile part, combine the construction conditions at the beginning of the project, and analyze the main causes of pile hole collapse and hole stringing.
5. A casing embedding judgment method, applied to the method for analyzing the rock penetration data of a bored pile according to claim 1, comprising the following specific steps: Step 11, miscellaneous fill layer analysis: after step 5 is completed, the depth and thickness of the miscellaneous fill layer are analyzed; Step 12: Casing embedding location: mark the location of the casing in the model; Step 13: Regional processing: Based on the analysis results of step 11, regional processing is performed.
6. A method for determining casing burial according to claim 5, characterized in that: The specific steps include: Step 14: Preset the tilt angle: Analyze the tilt angle that the casing can support during the burial process, and mark the tilt range of the casing in the model; Step 15: Data annotation of casing burying process: Analyze the multi-category data and burying process of casing burying process based on the acquired data, and display them in the model in a dynamic way.
7. A method for determining casing burial according to claim 5, characterized in that: In step 13, the specific operation method of the regional processing is to calculate the service length of the steel casing and confirm the role of steel casings of different specifications in specific parts of the model.
8. A method for determining casing burial according to claim 6, characterized in that: In step 15, the analysis categories in the casing burying process data annotation are orifice diameter, rotation speed and water level pressure maintenance data.
9. A method for determining casing burial according to claim 5, characterized in that: In step 12, the casing embedding positioning includes the following specific steps: Step 16: Mark reference points: Find fixed reference points according to the geological survey report and drawings, and mark them in the model; Step 17: Calculate the buried distance: Calculate the distance between the buried position and the reference point; Step 18: Mark the buried location data: mark the detailed measurement results and measurement paths in the model.
10. A method for determining casing burial according to claim 9, characterized in that: In step 16, there are at least two control points in the marked control points.