A method for active protection, dynamic monitoring and treatment of dangerous rocks on high-speed railway slopes
By determining three-dimensional coordinates, anchoring and installing remote-controlled explosives on dangerous rocks on high-speed railway slopes, and using displacement sensors for remote monitoring and early warning, the problem of safety hazards of dangerous rocks on high-speed railway slopes has been solved, and accurate monitoring and active protection of dangerous rocks have been achieved. , reducing worker safety risks and ensuring the safety of high-speed trains.
Patent Information
- Application Number
- CN202210810159.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-11
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-07-11
AI Technical Summary
Dangerous rocks on the slopes along the mountain section where the high-speed railway passes through pose potential safety hazards. Existing technology requires workers to frequently climb the mountain for marking and blasting, which poses problems of heavy labor and high safety risks.
The three-dimensional coordinates of each dangerous rock are determined through the positioning device, anchored and filled with remotely controlled explosives, and a displacement sensor is installed at the bottom of the dangerous rock to achieve remote dynamic monitoring and early warning. When the risk of falling reaches a high level, remote control blasting is carried out. deal with.
It reduces the labor workload and safety risks of workers, achieves precise dynamic monitoring and active protection of dangerous rocks, and ensures all-weather safety of high-speed trains.
Smart Images

Figure CN115217045B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for treating dangerous rocks, in particular to a method for active protection, dynamic monitoring and treatment of dangerous rocks on high slopes of high-speed railways. Background Art
[0002] Dangerous rocks on the slopes along the sections of the high-speed railway that pass through the mountains pose a great safety hazard. Since the high-speed railway is very fast, if dangerous rocks on the slopes roll down, it will cause great damage to the high-speed railway and cause safety accidents. Therefore, inspection workers need to climb the mountain regularly to mark and blast dangerous rocks that pose safety hazards. Due to the complex terrain of the mountain and the steep rocks in some areas, climbing is difficult. Workers need to wear safety belts and hang safety ropes every time they go up the mountain. These are a challenge to the workers' physical strength and the safety risk is very high. Therefore, there is a need for a method that can remotely monitor the status of dangerous rocks and actively protect against them, so that they can be blasted in time when there is a risk of dangerous rocks rolling down. Summary of the invention
[0003] In view of the above situation, in order to overcome the defects of the prior art, the present invention provides a method for active protection, dynamic monitoring and treatment of dangerous rocks on high slopes of high-speed railways. Workers only need to climb the mountain once to mark and file all dangerous rocks to determine the risk level of the dangerous rocks, and then anchor each dangerous rock and fill it with remote-controlled explosives. In the later stage, they only need to replace the explosives regularly to prevent them from failing, which greatly reduces the workload of the workers and the safety risks of workers climbing the mountain multiple times.
[0004] The technical solution includes the following steps:
[0005] Step 1: Use the positioning device to determine the three-dimensional coordinates (X, Y, Z) of each dangerous rock, assign a fixed number to each dangerous rock and create a corresponding three-dimensional coordinate file, evaluate the size, cracks and falling probability of each dangerous rock to determine the risk level of each dangerous rock and store and record the data;
[0006] Step 2: Use anchors or wire mesh to anchor or protect each dangerous rock;
[0007] Step 3: Drill holes on each dangerous rock, place remote-controlled explosives in the holes, and then seal the holes;
[0008] Step 4: Install a displacement sensor at the bottom of each dangerous rock, with the mobile end of the displacement sensor installed on the dangerous rock and the fixed end of the displacement sensor installed on the slope stability structure;
[0009] Step 5: Use net bags to wrap and fence all the dangerous rocks;
[0010] Step 6: Remotely monitor the displacement and deformation of each dangerous rock in real time and evaluate its risk level. When the data sent back by the displacement sensor corresponding to a dangerous rock indicates that the displacement of the dangerous rock exceeds the critical value, issue a warning. If the risk of the dangerous rock falling reaches a high level, use a remote control device to remotely control the remote-controlled explosives in the dangerous rock to blast it. The dangerous rock is blasted to prevent it from rolling down and posing a huge safety hazard to the high-speed railway running below.
[0011] Preferably, the remote-controlled explosive in step three is a controllable directional blasting explosive and needs to be replaced regularly to prevent the explosive from becoming ineffective. After the explosive is replaced, the hole is still sealed.
[0012] The beneficial effects of the present invention are:
[0013] 1. By establishing a three-dimensional coordinate file for each dangerous rock and installing a displacement sensor at the bottom of each dangerous rock, the "health status" of each dangerous rock can be accurately and dynamically monitored and its risk level can be evaluated;
[0014] 2. Actively protect dangerous rocks by anchoring or protecting each dangerous rock, remotely monitor the displacement and deformation of each dangerous rock, evaluate its rolling risk, and remotely control blasting of dangerous rocks with a high rolling risk level to eliminate the risk of dangerous rocks rolling. This method is also the second level of protection;
[0015] 3. It reduces the workload of patrol workers and the personal safety risks of climbing the mountain multiple times, while realizing uninterrupted safety and health status monitoring of dangerous rocks in severe weather, thus achieving all-weather safety protection for high-speed trains. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the dangerous rock treatment method of the present invention.
[0017] Reference numerals
[0018] 1. Dangerous rocks, 2. Slopes, 3. Anchors, 4. Displacement sensors, 5. Explosive landfill holes, 6. Remotely controlled explosives, 7. Net bags. DETAILED DESCRIPTION
[0019] The following is combined with Figure 1 The specific implementation modes of the present invention are further described in detail.
[0020] Step 1: Use the positioning device to determine the three-dimensional coordinates (X, Y, Z) of each dangerous rock, assign a fixed number to each dangerous rock and create a corresponding three-dimensional coordinate file, evaluate the size, cracks and falling probability of each dangerous rock to determine the risk level of each dangerous rock and store and record the data;
[0021] Workers use satellite positioning devices to determine the three-dimensional Cartesian coordinates (X, Y, Z) of each dangerous rock and create and store a three-dimensional coordinate file for each dangerous rock. Corresponding to the three-dimensional coordinate file of each dangerous rock, workers evaluate the size, cracks and falling probability of the dangerous rock and store the data.
[0022] Step 2: Use anchors or wire mesh to anchor or protect each dangerous rock;
[0023] Workers use tools to anchor the edge of the dangerous rock, and arrange anchor nails or wire mesh along the edge of the dangerous rock and anchor the bottom to the slope to prevent the dangerous rock from rolling down.
[0024] Step 3: Drill holes on each dangerous rock, place remote-controlled explosives in the holes, and then seal the holes;
[0025] Workers use drilling tools to evenly drill multiple explosives holes along the surface of the dangerous rock, place remote-controlled explosives into the holes, and control the remote-controlled explosives via a remote controller. Each hole is then sealed to prevent rainwater from entering the holes and causing the remote-controlled explosives to become ineffective.
[0026] Step 4: Install a displacement sensor at the bottom of each dangerous rock, with the mobile end of the displacement sensor installed on the dangerous rock and the fixed end of the displacement sensor installed on the slope stability structure;
[0027] Workers install displacement sensors at the bottom of each dangerous rock. Fiber optic displacement sensors can be used. The mobile end of the displacement sensor is fixedly connected to the dangerous rock, and the fixed end of the displacement sensor is fixedly connected to the slope stability structure. When the dangerous rock has a slight displacement, the displacement sensor can detect it and send a signal to the remote controller.
[0028] Step 5: Use net bags to wrap and fence all the dangerous rocks;
[0029] After the remote-controlled explosives were placed, workers used net bags to surround all the dangerous rocks to prevent the debris from splashing down the slope when the explosives were blasted later, posing a safety threat to the high-speed rail and pedestrians below.
[0030] Step 6: Remotely monitor the displacement and deformation of each dangerous rock in real time and evaluate its risk level. When the data sent back by the displacement sensor corresponding to a dangerous rock indicates that the displacement of the dangerous rock exceeds the critical value, issue a warning. If the risk of the dangerous rock falling reaches a high level, use a remote control device to remotely control the remote-controlled explosives in the dangerous rock to blast it. The dangerous rock is blasted to prevent it from rolling down and posing a huge safety hazard to the high-speed railway running below.
[0031] After the workers complete a safety inspection of dangerous rocks, they can remotely monitor the risk of dangerous rocks falling. When the data sent back by the displacement sensor corresponding to a dangerous rock shows that the displacement of the dangerous rock exceeds the critical value, it means that the risk of the dangerous rock falling is relatively high. Then the remote control device is used to remotely control the remote-controlled explosives in the dangerous rock to blast. The broken stones after the dangerous rock is blasted will not fall down after being blocked by the outer net bag, preventing the safety threat to the high-speed rail and pedestrians under the slope. In this way, active protection of dangerous rocks is achieved by anchoring each dangerous rock. By remotely monitoring the risk of falling of each dangerous rock and remotely controlling the blasting of dangerous rocks with a higher risk of falling, a method for treating dangerous rocks is achieved, which is also the second layer of protection.
[0032] The remote-controlled explosive in step three is a controllable directional blasting explosive and needs to be replaced regularly to prevent the explosive from becoming ineffective. After the explosive is replaced, the hole is still sealed.
[0033] To prevent the explosives from becoming ineffective over time, workers need to conduct regular inspections and replace the remote-controlled explosives. After the explosives are replaced, the workers still seal the holes to protect the explosives.
Claims
1. A method for active protection, dynamic monitoring and treatment of dangerous rocks on high slopes of high-speed railways, It is characterized in that It includes the following steps: Step 1: Use the positioning device to determine the three-dimensional coordinates (X, Y, Z) of each dangerous rock, assign a fixed number to each dangerous rock and create a corresponding three-dimensional coordinate file, evaluate the size, cracks and falling probability of each dangerous rock to determine the risk level of each dangerous rock and store and record the data; Step 2: Use anchors or wire mesh to anchor or protect each dangerous rock; Step 3: Drill holes on each dangerous rock, place remote-controlled explosives in the holes, and then seal the holes; Step 4: Install a displacement sensor at the bottom of each dangerous rock, with the mobile end of the displacement sensor installed on the dangerous rock and the fixed end of the displacement sensor installed on the slope stability structure; Step 5: Use net bags to enclose all the dangerous rocks to prevent the broken rocks from splashing down the slope during the blasting of explosives and posing a safety threat to the high-speed rail and pedestrians below; Step 6: Remotely monitor the displacement and deformation of each dangerous rock in real time and evaluate its risk level. When the data sent back by the displacement sensor corresponding to a dangerous rock indicates that the displacement of the dangerous rock exceeds the critical value, issue a warning. If the risk of the dangerous rock falling reaches a high level, use a remote control device to remotely control the remote-controlled explosives in the dangerous rock to blast it. The dangerous rock is blasted to prevent it from rolling down and posing a huge safety hazard to the high-speed railway running below.
2. A method for active protection, dynamic monitoring and treatment of dangerous rocks on high slopes of high-speed railways according to claim 1, It is characterized in that The remote-controlled explosive in step three is a controllable directional blasting explosive and needs to be replaced regularly to prevent the explosive from becoming ineffective. After the explosive is replaced, the hole is still sealed.
Citation Information
Patent Citations
Railway side slope crag rockfall monitoring and warning system based on fiber grating sensing technology
CN102354433A
Monitoring device and method for deformation of high and steep dangerous rock mass blocks
CN110672028A
Dangerous rock mass collapse real-time early warning system and method based on multiple monitoring indexes
CN111426373A
Air blasting destruction method for oversized rolling stones
CN111998743A
Tunnel surrounding rock block collapse monitoring method and system based on natural vibration frequency
CN113639849A