A method for predicting the development height of water-conducting fracture zones based on seismic interpretation results

Through a multi-parameter calculation method based on the seismic interpretation results, the problem of insufficient prediction accuracy of water conduction crack zone development in the existing technology is solved, and higher accuracy prediction is achieved, coal mining plans and water control projects are optimized, and coal layers are reduced. The risk of water emitting the roof panel improves the mining efficiency.

CN115236740BActive Publication Date: 2024-11-22BEIJING DADI HI TECH GEOLOGICAL EXPLORATION CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202210915894.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-01
Publication Date
2024-11-22
Estimated Expiration
2042-08-01

AI Technical Summary

Technical Problem

The existing technology cannot predict the development height of the water conduction crack zone during coal seam mining with high precision, resulting in water damage risks in coal resource mining and cannot meet the safety production needs of coal mines.

Method used

Using a method based on seismic interpretation results, the developmental height of the water conduction fracture zone is predicted through hard rock proportional coefficient calculation, multiple regression analysis, lithologic inversion and time-depth conversion, combined with multi-parameter calculation formula, and a variety of influencing factors are considered. Carry out three-dimensional seismic exploration.

Benefits of technology

The prediction accuracy of the development height of the water conduction crack zone is improved, the working face layout and coal mining process are optimized, the risk of water emitting on the top plate of the coal seam is reduced, and the economic benefits of coal resource mining are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115236740B_ABST
    Figure CN115236740B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for predicting the height of water-conducting fractured zones based on seismic interpretation results, including the following steps: S1 hard rock proportion coefficient calculation; S2 multivariate regression analysis; S3 lithology inversion; S4 time-depth conversion; S5 water-conducting fractured zone height calculation. The present invention is applicable to the field of coal water prevention and control technology, taking into account more influencing factors, and avoiding the limitations of using only the thickness of coal seam mining for prediction. At the same time, by applying the results of three-dimensional seismic interpretation, all influencing parameters are digitally expressed so that they can be expressed by the results of seismic interpretation, and the prediction of the height of water-conducting fractured zones based on the results of seismic interpretation is completed. As an exploration method that can reflect the overall situation of the stratum, three-dimensional seismic exploration is applied to the prediction of the height of water-conducting fractured zones, and its prediction accuracy can be greatly improved. According to the prediction results, the working face layout plan and coal mining process as well as the corresponding ground grouting engineering deployment can be optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of coal water prevention and control, and specifically is a method for predicting the development height of a water-conducting fracture zone based on seismic interpretation results. Background Art

[0002] During coal mining, the overlying rock strata on the working face will be greatly deformed and damaged, resulting in collapse zones and fracture zones in the rock strata. If there are cracks connecting the working face with the water-rich area of ​​the overlying rock strata, water damage to the working face will occur. Therefore, high-precision quantitative prediction of the height of the water-conducting fracture zone is of great significance for the safe and efficient mining of coal resources.

[0003] At present, the calculation of the height of water-conducting fracture zones in my country is mainly based on the "Regulations on Coal Pillar Protection and Well Killing for Buildings, Water Bodies, Railways, and Main Shafts and Lanes" (known as the "Three-Down" rule). However, the height of water-conducting fracture zones is affected by many factors, including the mechanical properties of the overlying rock strata, lithology, roof overlay type, water pressure in the aquifer, working face mining height, coal mining technology and roof management, working face size, and mining depth. In view of this, the "Three-Down" rule formula that only considers the influence of coal seam mining thickness to calculate the height of water-conducting fracture zones can no longer meet the safety production needs of coal mines. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the prior art and provide a method for predicting the development height of water-conducting fracture zones based on seismic interpretation results.

[0005] To achieve the above object, the present invention adopts the following technical solutions:

[0006] A method for predicting the height of water-conducting fracture zones based on seismic interpretation results comprises the following steps:

[0007] S1 Calculation of hard rock ratio coefficient: Collect the measured water-conducting fracture zone development height data in the study area, find out the mining height, floor burial depth, working face span at the corresponding position and calculate its hard rock ratio coefficient;

[0008] S2 Multiple regression analysis: Based on the data obtained in step S1, multiple regression analysis is performed to determine the influence weight of each parameter on the height of water-conducting fracture development, and a multi-parameter water-conducting fracture zone development height calculation formula suitable for the study area is summarized;

[0009] S3 Lithology Inversion: Based on seismic inversion, the top and bottom layers of the coal seam to be mined are interpreted. Based on the well-seismic calibration results, the velocity field is constructed and the time-depth conversion is completed to convert the time domain interpretation results into the depth domain, and the buried depth of the coal seam bottom and the thickness of the coal seam are obtained;

[0010] S4 time-depth conversion: based on the interpretation results obtained in step S3, the hard rock thickness within 15 to 20 times the coal seam thickness is counted, and the hard rock ratio coefficient is calculated;

[0011] S5 Calculation of the height of the water-conducting fracture zone: Substitute the coal seam thickness, coal seam floor burial depth and hard rock proportion coefficient obtained by inversion in steps S3 and S4, combined with the working face span given by the mine, into the multi-parameter water-conducting fracture zone development height calculation formula obtained in step S2 to complete the prediction of the height of the water-conducting fracture zone.

[0012] Preferably, in step S1, the hard rock ratio coefficient calculation formula is:

[0013]

[0014] Where b represents the hard rock proportion coefficient, M represents the mining thickness of the coal seam, and ∑h represents the sum of the hard rock thickness within a height of (15-20) M above the coal seam. In this study area, the hard rocks include fine sandstone, medium sandstone and coarse sandstone.

[0015] Preferably, in step S2, the multiple regression analysis includes:

[0016] Taking the height of the water-conducting fracture zone as the dependent variable, and taking the coal seam mining thickness, the mining coal seam floor burial depth, the working face span and the hard rock proportion coefficient as the independent variables, a regression analysis is performed on the data obtained in step S1;

[0017] Under the condition that other independent variables are similar, regression analysis is carried out on the development height of the water-conducting fracture zone and each independent variable, the regression relationship between the development height of the water-conducting fracture zone and each independent variable is analyzed, and finally the comprehensive relationship between the development height of the water-conducting fracture zone and each independent variable is obtained.

[0018] Preferably, in step S3, the lithology inversion includes: combining conventional wave impedance inversion and pseudo-acoustic wave inversion to perform inversion analysis on the strata above the coal seam; which includes the following steps:

[0019] First, based on the characteristics of seismic amplitude response, the coal seam stratigraphy was interpreted, and the seismic calibration of each well in the study area was completed to build a bridge between the time domain and the depth domain.

[0020] Then, various curves are analyzed and logging curves sensitive to lithology are selected to distinguish coal, sandstone, mudstone and limestone;

[0021] Finally, the wave impedance curve and gamma curve were selected as the characteristic curves to distinguish various types of lithology. Conventional wave impedance inversion and pseudo-acoustic inversion through gamma curve changes were carried out. The lithology of the strata above the coal seam was divided in detail, and numbers were used to represent hard rock, coal seam and other lithologies.

[0022] Preferably, in step S4, the time-depth conversion includes:

[0023] Based on the well seismic calibration results of each well in the study area, the time-depth relationship curve is output and the velocity field model is established; the lithology inversion result obtained in step S3 is converted from the time domain to the depth domain, and the coal seam thickness is calculated to determine the buried depth of the coal seam bottom plate, and the thickness of the rock layer numbered 1 within the height of (15-20)M above the coal seam is counted to calculate the hard rock proportion coefficient.

[0024] Preferably, in step S5, the calculation of the height of the water-conducting fracture zone includes:

[0025] Based on the coal seam thickness in the depth domain obtained in step S4, the buried depth of the coal seam floor, the hard rock proportion coefficient and the span of the pre-mining working face provided by the mine, the height of the water-conducting fracture zone obtained in step S2 is substituted into the comprehensive relationship between the height of the water-conducting fracture zone and each independent variable to obtain the height of the water-conducting fracture zone; this value is added to the buried depth of the coal seam floor to obtain the visualization display result of the water-conducting fracture zone in three-dimensional space.

[0026] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0027] In the present invention, more influencing factors are taken into consideration, avoiding the limitations of using only the thickness of coal seam mining for prediction. At the same time, the results of three-dimensional seismic interpretation are used to digitally express all influencing parameters so that they can be expressed by the results of seismic interpretation, completing the prediction of the height of the water-conducting fracture zone based on the seismic interpretation results. Three-dimensional seismic exploration is an exploration method that can reflect the overall situation of the stratum. When it is applied to the prediction of the height of the water-conducting fracture zone, its prediction accuracy can be greatly improved. Based on the prediction results, the working face layout plan, coal mining process and corresponding ground grouting engineering deployment can be optimized. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a flow chart of a method for predicting the development height of a water-conducting fracture zone based on seismic interpretation results of the present invention. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1 , further illustrating a specific implementation of a method for predicting the development height of a water-conducting fracture zone based on seismic interpretation results of the present invention. A method for predicting the development height of a water-conducting fracture zone based on seismic interpretation results of the present invention is not limited to the description of the following embodiments.

[0030] Embodiment 1:

[0031] This embodiment provides a specific implementation method of a method for predicting the height of water-conducting fracture zones based on seismic interpretation results. Figure 1 As shown, the following steps are included:

[0032] S1 Calculation of hard rock ratio coefficient: Collect the measured water-conducting fracture zone development height data in the study area, find out the mining height, floor burial depth, working face span at the corresponding position and calculate its hard rock ratio coefficient;

[0033] S2 Multiple regression analysis: Based on the data obtained in step S1, multiple regression analysis is performed to determine the influence weight of each parameter on the height of water-conducting fracture development, and a multi-parameter water-conducting fracture zone development height calculation formula suitable for the study area is summarized;

[0034] S3 Lithology Inversion: Based on seismic inversion, the top and bottom layers of the coal seam to be mined are interpreted. Based on the well-seismic calibration results, the velocity field is constructed and the time-depth conversion is completed to convert the time domain interpretation results into the depth domain, and the buried depth of the coal seam bottom and the thickness of the coal seam are obtained;

[0035] S4 time-depth conversion: based on the interpretation results obtained in step S3, the hard rock thickness within 15 to 20 times the coal seam thickness is counted, and the hard rock ratio coefficient is calculated;

[0036] S5 Calculation of the height of the water-conducting fracture zone: Substitute the coal seam thickness, coal seam floor burial depth and hard rock proportion coefficient obtained by inversion in steps S3 and S4, combined with the working face span given by the mine, into the multi-parameter water-conducting fracture zone development height calculation formula obtained in step S2 to complete the prediction of the height of the water-conducting fracture zone.

[0037] Furthermore, in step S1, the hard rock ratio coefficient calculation formula is:

[0038]

[0039] Where b represents the hard rock proportion coefficient, M represents the mining thickness of the coal seam, and ∑h represents the sum of the hard rock thickness within a height of (15-20) M above the coal seam. In this study area, the hard rocks include fine sandstone, medium sandstone and coarse sandstone.

[0040] Furthermore, in step S2, the multiple regression analysis includes:

[0041] Taking the height of the water-conducting fracture zone as the dependent variable, and taking the coal seam mining thickness, the mining coal seam floor burial depth, the working face span and the hard rock proportion coefficient as the independent variables, a regression analysis is performed on the data obtained in step S1;

[0042] Under the condition that other independent variables are similar, regression analysis is carried out on the development height of the water-conducting fracture zone and each independent variable, the regression relationship between the development height of the water-conducting fracture zone and each independent variable is analyzed, and finally the comprehensive relationship between the development height of the water-conducting fracture zone and each independent variable is obtained.

[0043] Furthermore, in step S3, lithology inversion includes: combining conventional wave impedance inversion and pseudo-acoustic wave inversion to perform inversion analysis on the strata above the coal seam; it includes the following steps:

[0044] First, based on the characteristics of seismic amplitude response, the coal seam stratigraphy was interpreted, and the seismic calibration of each well in the study area was completed to build a bridge between the time domain and the depth domain.

[0045] Then, various curves are analyzed and logging curves sensitive to lithology are selected to distinguish coal, sandstone, mudstone and limestone;

[0046] Finally, the wave impedance curve and gamma curve were selected as the characteristic curves to distinguish various types of lithology. Conventional wave impedance inversion and pseudo-acoustic inversion through gamma curve changes were carried out. The lithology of the strata above the coal seam was divided in detail, and numbers were used to represent hard rock, coal seam and other lithologies.

[0047] Furthermore, in step S4, the time-depth conversion includes:

[0048] Based on the well seismic calibration results of each well in the study area, the time-depth relationship curve is output and the velocity field model is established; the lithology inversion result obtained in step S3 is converted from the time domain to the depth domain, and the coal seam thickness is calculated to determine the buried depth of the coal seam bottom plate, and the thickness of the rock layer numbered 1 within the height of (15-20)M above the coal seam is counted to calculate the hard rock proportion coefficient.

[0049] Furthermore, in step S5, the calculation of the height of the water-conducting fracture zone includes:

[0050] Based on the coal seam thickness in the depth domain obtained in step S4, the buried depth of the coal seam floor, the hard rock proportion coefficient and the span of the pre-mining working face provided by the mine, the height of the water-conducting fracture zone obtained in step S2 is substituted into the comprehensive relationship between the height of the water-conducting fracture zone and each independent variable to obtain the height of the water-conducting fracture zone; this value is added to the buried depth of the coal seam floor to obtain the visualization display result of the water-conducting fracture zone in three-dimensional space.

[0051] Economic analysis:

[0052] The invention can improve the prediction accuracy of the development height of water-conducting fracture zones, guide the selection of coal mining technology, the layout of working faces and the deployment of ground grouting projects, reduce casualties and economic losses caused by water seepage from coal seam roofs, reduce the waste of coal resources, and improve the economic benefits of coal resource mining.

[0053] Working principle: Figure 1As shown, four parameters, namely coal seam thickness (representing the mining height of the working face), coal seam floor burial depth (representing the mining depth), working face span and hard rock ratio coefficient (representing the mechanical properties, lithology and roof covering type of the overlying rock strata), are selected based on the seismic interpretation results to predict the development height of the water-conducting fracture zone.

[0054] Among them, the greater the mining height of the working face, the larger the range of the plastic zone of the roof, and the greater the height of the water-conducting fracture zone, which is the most important factor affecting the height of the water-conducting fracture zone; within a certain depth range, the deeper the mining depth, the greater the mine pressure, the larger the scale of the overburden movement, and the more developed the water-conducting fracture zone. When the mining depth reaches a certain level, due to the high ground stress, the mining unloading fractures will close in a short time, and the height of the water-conducting fracture zone will basically not change; the larger the span of the coal seam mining working face, the greater the downward bending amplitude of the roof rock beam, the higher the probability of rock beam fracture, and the greater the height of the water-conducting fracture zone.

[0055] The hard rock ratio coefficient refers to the ratio of hard rock to the statistical height within the statistical height above the coal seam roof (the height of the water-conducting fracture zone, which can be expressed by (15-20)*coal thickness). The hard rocks involved in the statistics generally refer to sandstone (fine sandstone, medium sandstone and coarse sandstone), mixed rock and igneous rock. The use of this parameter can effectively avoid the uncertainty of statistical combined rock structure types and rock mechanics tests, and can better reflect the hardness of the coal seam roof and combined rock structure types.

[0056] The present invention is used to predict the height of water-conducting fissures in coal seam roofs, and can quantitatively predict the height of water-conducting fissure zones during coal mining, thus providing a basis for the design of coal mining plans and the design and construction of supporting water prevention and control projects.

[0057] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.

Claims

1. A method for predicting the height of water-conducting fracture zones based on seismic interpretation results, characterized in that: The following steps are involved: S1 Calculation of hard rock ratio coefficient: Collect the measured water-conducting fracture zone development height data in the study area, find out the mining height, floor burial depth, working face span at the corresponding position and calculate its hard rock ratio coefficient; S2 Multiple regression analysis: Based on the data obtained in step S1, multiple regression analysis is performed to determine the influence weight of each parameter on the height of water-conducting fracture development, and a multi-parameter water-conducting fracture zone development height calculation formula suitable for the study area is summarized; S3 Lithology Inversion: Based on seismic inversion, the top and bottom layers of the coal seam to be mined are interpreted. Based on the well-seismic calibration results, the velocity field is constructed and the time-depth conversion is completed to convert the time domain interpretation results into the depth domain, and the buried depth of the coal seam bottom and the thickness of the coal seam are obtained; S4 time-depth conversion: based on the interpretation results obtained in step S3, the hard rock thickness within 15 to 20 times the coal seam thickness is counted, and the hard rock ratio coefficient is calculated; S5: Calculation of height of water-conducting fracture zone: Substitute the coal seam thickness, coal seam floor burial depth and hard rock ratio coefficient obtained by inversion in steps S3 and S4 into the multi-parameter water-conducting fracture zone height calculation formula obtained in step S2 in combination with the working face span given by the mine owner to complete the prediction of the height of water-conducting fracture zone; In step S1, the hard rock ratio coefficient calculation formula is: Where b represents the hard rock ratio coefficient, M represents the mining thickness of the coal seam, ∑ h It represents the total thickness of hard rock within the coal seam (15-20)M height. In this study area, hard rock includes fine sandstone, medium sandstone and coarse sandstone. In step S2, the multiple regression analysis includes: Taking the height of the water-conducting fracture zone as the dependent variable, and taking the coal seam mining thickness, the mining coal seam floor burial depth, the working face span and the hard rock proportion coefficient as the independent variables, a regression analysis is performed on the data obtained in step S1; Under the condition that other independent variables are similar, regression analysis is performed on the development height of the water-conducting fracture zone and each independent variable, the regression relationship between the development height of the water-conducting fracture zone and each independent variable is analyzed, and finally the comprehensive relationship between the development height of the water-conducting fracture zone and each independent variable is obtained; In step S3, the lithology inversion includes: combining conventional wave impedance inversion and pseudo-acoustic wave inversion to perform inversion analysis on the strata above the coal seam; it includes the following steps: First, based on the characteristics of seismic amplitude response, the coal seam stratigraphy was interpreted, and the seismic calibration of each well in the study area was completed to build a bridge between the time domain and the depth domain. Then, various curves are analyzed and logging curves sensitive to lithology are selected to distinguish coal, sandstone, mudstone and limestone; Finally, the wave impedance curve and gamma curve were selected as the characteristic curves to distinguish various lithologies. Conventional wave impedance inversion and pseudo-acoustic inversion through gamma curve changes were performed to divide the lithology of the upper strata of the coal seam in detail, with numbers representing hard rock, coal seam and other lithologies respectively. In step S4, the time-depth conversion includes: Based on the well seismic calibration results of each well in the study area, the time-depth relationship curve is output and the velocity field model is established; the lithology inversion result obtained in step S3 is converted from the time domain to the depth domain, and the coal seam thickness is calculated to determine the buried depth of the coal seam floor, and the thickness of the rock layer numbered 1 within the height of (15-20)M above the coal seam is counted to calculate the hard rock proportion coefficient; In step S5, the calculation of the height of the water-conducting fracture zone includes: Based on the coal seam thickness in the depth domain obtained in step S4, the buried depth of the coal seam floor, the hard rock proportion coefficient and the span of the pre-mining working face provided by the mine, the height of the water-conducting fracture zone obtained in step S2 is substituted into the comprehensive relationship between the development height of the water-conducting fracture zone and each independent variable to obtain the development height of the water-conducting fracture zone; the development height of the water-conducting fracture zone is added to the buried depth of the coal seam floor to obtain the visualization display result of the water-conducting fracture zone in three-dimensional space.

Citation Information

Patent Citations

  • Under-water body mining overlying rock water flowing fractured zone development height prediction method

    CN107728228A

  • Method for dynamically and accurately detecting coal seam overlaying rock fracture development range and degree

    CN111691872A

  • Method for the geological exploration of raw material deposits

    WO2011000755A2