Installation method of an integrated structure of a crane shelf and a hook box with the outer hull plate

By pre-matching the cross pipe and elbow plate of the crane shelf and hook box integrated structure on the ground, and installing stops and support seats on the outer plate of the hull, a solid balance is achieved using threaded pull rods, which solves the problem of center of gravity control in the installation of cantilever crane shelf and hook box, and a fast and convenient installation process is achieved.

CN115258087BActive Publication Date: 2025-07-01CSSC HUANGPU WENCHONG SHIPBUILDING CO LTD

Patent Information

Application Number
CN202211077388.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-05
Publication Date
2025-07-01
Estimated Expiration
2042-09-05

AI Technical Summary

Technical Problem

In the prior art, the center of gravity of the shelves and hook boxes of cantilever cranes are difficult to control, and the use of large gantry crane double hooks is required, which increases the construction difficulty and takes a long time.

Method used

The cross pipe of the integrated structure of the crane shelf and hook box is pre-matched with the elbow plate groove on the ground, and a stop and support seat are installed on the outer plate of the hull. The threaded pull rod and support seat are used to achieve a stable balance, and the installation is completed through horizontal sliding and welding.

Benefits of technology

The stable installation of the integrated structure of the crane shelf and hook box is realized, which simplifies the operation process, shortens construction time, and improves installation efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115258087B_ABST
    Figure CN115258087B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of ships, and particularly to a method for installing an integrated structure of a crane shelf and a hook box on the outer hull of a ship, which includes the following steps: S1. After pre-assembling and matching the horizontal pipe of the integrated structure of the crane shelf and the hook box with the elbow plate by grooving on the ground, move the elbow plate away from the horizontal pipe; S2. Install a stop block on the outer hull of the ship along the direction of the horizontal pipe as an inner support point; S3. Add a support seat on the outside of the integrated structure of the crane shelf and the hook box as an outer support point; S4. Weld the weld between the elbow plate and the outer hull of the ship; S5. Contract the threaded tie rod to make the integrated structure of the crane shelf and the hook box slide to the horizontal pipe to contact the outer hull of the ship; S6. Weld the weld between the horizontal pipe and the main outer hull of the ship, and the weld at the groove of the horizontal pipe and the elbow plate to complete all the welding work of the crane shelf and the hook box main body; S7. Remove the support seat. This application can solve the problems of the stability of the main body installation and the translation in place, and has the characteristics of simple operation, fast and convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ships, and particularly to an installation method of an integrated structure of a crane shelf and a hook box and the outer hull plate of a ship. Background Art

[0002] In the prior art, the cantilever crane shelf and hook box of a ship are of an integrated structure form, and the overall structure is of an irregular shape with a light inner part and a heavy outer part, and a light tail and a heavy head. Specifically, it is installed on the outer hull plate through 6 horizontal pipes and penetrating elbows in a 90-degree horizontal state, showing a cantilever feature. It is extremely difficult to control the center of gravity, and the stability is insufficient. It is necessary to use a large gantry crane with double hooks offset to hoist. During construction, the elbows need to be installed first before hoisting the crane shelf and the hook box body, which increases the construction difficulty and takes a long time for the large gantry crane. Summary of the Invention

[0003] The purpose of the present invention is to provide an installation method of an integrated structure of a crane shelf and a hook box and the outer hull plate of a ship to solve the problems in the installation of the cantilever crane shelf and hook box in the prior art, such as difficult control of the center of gravity, the need to use a large gantry crane with double hooks, which increases the construction difficulty and takes a long time for the large gantry crane.

[0004] To achieve the above purpose, the present invention provides an installation method of an integrated structure of a crane shelf and a hook box and the outer hull plate of a ship.

[0005] An installation method of an integrated structure of a crane shelf and a hook box and the outer hull plate of a ship includes the following steps:

[0006] S1. After pre-assembling and matching the horizontal pipes and elbows of the integrated structure of the crane shelf and the hook box on the ground, move the elbows away from the horizontal pipes by 60 mm to 120 mm.

[0007] S2. Install blocks on the outer hull plate along the direction of the horizontal pipes as the inner fulcrums.

[0008] S3. Add support seats on the outside of the integrated structure of the crane shelf and the hook box as the outer fulcrums.

[0009] S4. Weld the weld between the elbow and the outer hull plate.

[0010] S5. Connect one end of the telescopic threaded tie rod to the main outer hull plate and the other end to the horizontal pipes of the crane shelf and the hook box body.

[0011] When the threaded tie rod shrinks, the integrated structure of the crane shelf and the hook box slides horizontally along the upper edge of the block to contact the outer hull plate at the horizontal pipes.

[0012] S6. Weld the weld between the horizontal pipes and the main outer hull plate, and the weld at the slots of the horizontal pipes and the elbows to complete all the welding work of the crane shelf and the hook box body.

[0013] S7. Demolish the support base.

[0014] As a preferred solution, the support base includes a column vertically arranged on the ground and a screw jack support base detachably arranged on the top of the column. The top of the screw jack support base abuts against the outer bottom of the integral structure of the crane gantry and the hook box.

[0015] As a preferred solution, the screw jack support base includes a base detachably and fixedly connected to the top of the column. A threaded seat is fixedly arranged on the base. A top rod that moves up and down is threadedly installed on the threaded seat. The top of the top rod is fixedly provided with a top plate, and the top plate abuts against the outer bottom of the integral structure of the crane gantry and the hook box.

[0016] As a preferred solution, in step S1, after pre-assembling and matching the horizontal pipe of the integral structure of the crane gantry and the hook box with the elbow plate by grooving on the ground, move the elbow plate 100 mm away from the horizontal pipe.

[0017] As a preferred solution, in step S2, two stoppers fixed on the outer hull plate are respectively arranged at the lower parts of the upper two horizontal pipes of the integral structure of the crane gantry and the hook box. The two stoppers at the lower part of each horizontal pipe are arranged at an angle of 45 degrees with the center of the horizontal pipe as the center.

[0018] As a preferred solution, in step S4, after welding the weld between the elbow plate and the outer hull plate, perform 100% flaw detection.

[0019] As a preferred solution, in step S6, the welding of the weld at the grooved horizontal pipe and the elbow plate specifically includes:

[0020] A groove opposite to the elbow plate is reserved at the end of the horizontal pipe. The elbow plate is inserted into the groove, and the elbow plate and the horizontal pipe are welded.

[0021] As a preferred solution, the threaded tie rod includes a sleeve and threaded rods threadedly installed at both ends of the sleeve. The end parts of the threaded rods are respectively detachably and fixedly connected to the outer hull plate and the horizontal pipe.

[0022] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0023] The installation method of the integrated structure of the crane shelf and the hook box of the present invention and the outer hull plate: After pre-installing and matching the horizontal pipe of the integrated structure of the crane shelf and the hook box with the gusset plate by grooving on the ground, move the gusset plate 60 mm to 120 mm away from the horizontal pipe to reserve space for welding after subsequent overall hoisting; install stoppers on the outer hull plate along the direction of the horizontal pipe as the inner fulcrums, and add support seats on the outside of the integrated structure of the crane shelf and the hook box as the outer fulcrums. By using the support seats and stoppers to bear the force, the purpose of stable balance can be achieved, solving the problem of insufficient stability during the installation process, and achieving the purpose of quickly hoisting in place and shortening the use time of the large gantry crane;; weld the weld between the gusset plate and the outer hull plate; connect one end of the telescopic threaded tie rod to the main outer hull plate, and the other end to the horizontal pipe of the main body of the crane shelf and the hook box. When the threaded tie rod contracts, the integrated structure of the crane shelf and the hook box slides horizontally along the upper edge of the stopper to contact the outer hull plate at the horizontal pipe; finally, weld the weld between the horizontal pipe and the main outer hull plate, and the weld at the grooved opening of the horizontal pipe and the gusset plate to complete all welding work of the crane shelf and the main body of the hook box. The installation method of the integrated structure of the crane shelf and the hook box of the present application solves the problems of the stability of the main body installation and the translation in place, and has the characteristics of simple operation, fast and convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic structural diagram of the installation method of the integrated structure of the crane shelf and the hook box and the outer hull plate in the embodiment of the present invention;

[0025] Figure 2 It is a schematic diagram of step S1;

[0026] Figure 3 It is a schematic diagram of installing the stopper in step S2;

[0027] Figure 4 It is a layout schematic diagram of the stopper;

[0028] Figure 5 It is a top view schematic diagram of step S3;

[0029] Figure 6 It is a schematic diagram of step 5;

[0030] Figure 7 It is a schematic diagram of the rotary jacking support;

[0031] Figure 8 It is a schematic diagram of the threaded tie rod;

[0032] Figure 9 It is a schematic diagram of the grooving position of the horizontal pipe.

[0033] In the figure, 1. Crane shelf, 2. Hook box, 3. Horizontal pipe, 31. Grooving, 4. Gusset plate, 5. Outer hull plate, 6. Stopper, 8. Threaded tie rod, 9. Column, 10. Screw jacking support. Detailed implementation manners

[0034] The following further describes in detail the specific implementation manners of the present invention in conjunction with the accompanying drawings and embodiments. The following embodiments are used to illustrate the present invention, but are not used to limit the scope of the present invention.

[0035] In the description of the present invention, it should be understood that the orientation or positional relationships indicated by the terms "upper", "lower", "left", "right", "top", "bottom", etc. are based on the orientation or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as a limitation to the present invention. It should be understood that the present invention uses the terms "first", "second", etc. to describe various information, but these information should not be limited to these terms, and these terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present invention, "first" information may also be referred to as "second" information, and similarly, "second" information may also be referred to as "first" information.

[0036] A preferred embodiment of the installation method of the integral structure of the crane shelf 1 and the hook box 2 of the present invention with the outer hull plate 5 is as Figures 1-8 shown

[0037] including the following steps:

[0038] S1. After pre-installing and matching the slot 31 of the cross tube 3 of the integral structure of the crane shelf 1 and the hook box 2 with the elbow plate 4 on the ground, then move the elbow plate 4 away from the cross tube 3 by 60 mm to 120 mm. Preferably, move the elbow plate 4 away from the cross tube 3 by 100 mm to reserve a suitable welding space for the elbow plate 4 after the subsequent overall hoisting, to avoid the elbow plate 4 penetrating the cross tube 3 being covered by the tube and unable to be welded inside.

[0039] S2. Install the stoppers 6 on the outer hull plate 5 along the direction of the cross tube 3 as the inner fulcrums. Specifically, two stoppers 6 fixed on the outer hull plate 5 are respectively arranged at the lower parts of the upper two cross tubes 3 of the integral structure of the crane shelf 1 and the hook box 2, and the two stoppers 6 at the lower part of each cross tube 3 are arranged at an angle of 45 degrees with the center of the cross tube 3 as the center to facilitate providing a stable supporting force.

[0040] S3. Add a support seat on the outside of the integral structure of the crane shelf 1 and the hook box 2 as the outer fulcrum; the purpose of making the integral structure of the crane shelf 1 and the hook box 2 stable and balanced can be achieved by using the support seat and the baffle.

[0041] In a specific embodiment of the present application, the support base specifically includes a column 9 vertically arranged on the ground and a screw jack support base 10 detachably arranged on the top of the column 9. The top of the screw jack support base 10 abuts against the outer bottom of the integrated structure of the crane gantry 1 and the hook box 2. The screw jack support base 10 can move up and down to jack up the outer side of the integrated structure of the crane gantry 1 and the hook box 2.

[0042] Further, to achieve the adjustable jacking distance of the screw jack support base 10, the screw jack support base 10 includes a base detachably and fixedly connected to the top of the column 9. A threaded seat is fixedly arranged on the base, and a top rod that moves up and down is threadedly installed on the threaded seat. The top of the top rod is fixedly provided with a top plate, and the top plate abuts against the outer bottom of the integrated structure of the crane gantry 1 and the hook box 2.

[0043] S4. Weld the weld between the welding gusset 4 and the ship's outer plate 5, and conduct 100% flaw detection to avoid the problem of insecure welding.

[0044] S5. Connect one end of the telescopic threaded tie rod 8 to the main ship's outer plate 5, and the other end to the main cross tube 3 of the crane gantry 1 and the hook box 2; based on the slideway formed by the slot 31 in the cross tube 3 and the stop block 6, when the threaded tie rod 8 contracts, the integrated structure of the crane gantry 1 and the hook box 2 slides horizontally along the upper edge of the stop block 6 to contact the ship's outer plate 5 at the cross tube 3, so that the integrated structure of the crane gantry 1 and the hook box 2 is translated in place, avoiding the long-time hooking of the large gantry crane.

[0045] Specifically, the threaded tie rod 8 includes a sleeve and threaded rods threadedly installed at both ends of the sleeve. The end parts of the threaded rods are respectively detachably and fixedly connected to the ship's outer plate 5 and the cross tube 3. By rotating the sleeve, the installation length of the threaded rod can be adjusted to adjust the length of the threaded tie rod 8.

[0046] S6. Weld the weld between the cross tube 3 and the main ship's outer plate 5. There are specifically 6 cross tubes 3, and weld the weld between the slot 31 in the cross tube 3 and the gusset 4 to complete all the welding work of the crane gantry 1 and the main body of the hook box 2.

[0047] Specifically, the weld between the slot 31 in the cross tube 3 and the gusset 4 specifically includes: a slot 31 opposite to the gusset 4 is reserved at the end of the cross tube 3, the gusset 4 is inserted into the slot 31, and the gusset 4 and the cross tube 3 are welded.

[0048] S7. Remove the support base.

[0049] In the present invention, after pre-assembling and matching the crane shelf 1, the horizontal pipe 3 of the hook box 2 and the gusset plate 4 with the slot 31 on the ground, the gusset plate 4 is pulled away from the pipe by 100 mm to reserve a welding space for the gusset plate 4 after the subsequent overall hoisting. At the same time, 4 slideway stoppers 6 are welded on the outer hull plate 5, and a circular pipe of the upright column 9 + a screw jack support base 10 is added on the outside to solve the problem of insufficient stability during the installation process, so as to achieve the purpose of quickly hoisting in place and shortening the use time of the large gantry crane.

[0050] The present invention uses the process forward movement, utilizes the slot 31 of the horizontal pipe 3 to improve the matching of the slot 31, and ingeniously separates the operation modes such as the gusset plate 4. By using the simple stopper 6 and the circular pipe of the column + the screw jack support base 10, the problems of the stability of the main body installation and the translation in place are solved, and it has the characteristics of simple operation, quickness and convenience.

[0051] The above are only the preferred embodiments of the present invention. It should be noted that for those of ordinary skill in the art in the technical field, without departing from the technical principle of the present invention, several improvements and substitutions can still be made, and these improvements and substitutions should also be regarded as the protection scope of the present invention.

Claims

1. An installation method of an integrated structure of a crane shelf and a hook box with the outer hull of a ship, characterized in that: It includes the following steps: S1. After pre-assembling and matching the horizontal pipe and the elbow plate of the integrated structure of the crane shelf and the hook box on the ground, move the elbow plate away from the horizontal pipe by 60 mm to 120 mm; S2. Install blocks on the outer hull plate along the direction of the horizontal pipe as the inner fulcrums; S3. Add support seats on the outside of the integrated structure of the crane shelf and the hook box as the outer fulcrums; S4. Weld the weld between the elbow plate and the outer hull plate; S5. Connect one end of the telescopic threaded tie rod to the main outer hull plate, and the other end to the horizontal pipe of the main body of the crane shelf and the hook box; Shrink the threaded tie rod, and the integrated structure of the crane shelf and the hook box slides horizontally along the upper edge of the block to the horizontal pipe and contacts the outer hull plate; S6. Weld the weld between the horizontal pipe and the main outer hull plate, and the weld at the slot of the horizontal pipe and the elbow plate to complete all welding work of the crane shelf and the main body of the hook box; S7. Remove the support seat; In step S6, welding the weld at the slot of the horizontal pipe and the elbow plate specifically includes: A slot opposite to the elbow plate is reserved at the end of the horizontal pipe, the elbow plate is inserted into the slot, and the elbow plate and the horizontal pipe are welded.

2. The installation method of the integrated structure of the crane shelf and the hook box and the ship's outer plate according to claim 1, characterized in that: The support seat includes a column vertically arranged on the ground and a screw jack support seat detachably arranged on the top of the column, and the top of the screw jack support seat abuts against the outer bottom of the integrated structure of the crane shelf and the hook box.

3. The installation method of the integrated structure of the crane shelf and the hook box and the ship's outer plate according to claim 2, characterized in that, The screw jack support seat includes a base detachably and fixedly connected to the top of the column, a threaded seat is fixedly arranged on the base, a top rod that moves up and down is threadedly installed on the threaded seat, a top plate is fixedly arranged at the top of the top rod, and the top plate abuts against the outer bottom of the integrated structure of the crane shelf and the hook box.

4. The installation method of the integrated structure of the crane shelf and the hook box and the outer hull plate according to claim 1, characterized in that, In step S1, after pre-assembling and matching the horizontal pipe and the elbow plate of the integrated structure of the crane shelf and the hook box on the ground, move the elbow plate away from the horizontal pipe by 100 mm.

5. The installation method of the integrated structure of the crane shelf and the hook box and the ship's outer plate according to claim 1, characterized in that, In step S2, two blocks fixed on the outer hull plate are respectively arranged at the lower parts of the upper two horizontal pipes of the integrated structure of the crane shelf and the hook box, and the two blocks at the lower part of each horizontal pipe are arranged at an angle of 45 degrees with the center of the horizontal pipe as the center.

6. The installation method of the integrated structure of the crane shelf and the hook box and the ship's outer plate according to claim 1, characterized in that, In step S4, after welding the weld between the elbow plate and the outer hull plate, perform 100% flaw detection.

7. The installation method of the integrated structure of the crane shelf and the hook box and the outer hull plate according to claim 1, characterized in that, The threaded tie rod includes a sleeve and threaded rods threadedly installed at both ends of the sleeve, and the end parts of the threaded rods are respectively detachably fixed to the outer hull plate and the horizontal pipe.

Citation Information

Patent Citations

  • Construction method for large-span crossbeam under bridge

    CN110374001A

  • Coupling Guide for Cantilever Type Extended Structure

    KR200488659Y1

Cited By

  • An assembly method for a combined rest device applied to a boom and a hook

    CN119190301B