A universal frame welding tool positioning platform for hangers
By designing a universal frame welding tool positioning platform for hanging tools, using the working positioning platform and components on the platform frame, the hanger frame parts are quickly and accurately assembled, solving the problems of poor welding accuracy and time-consuming in traditional ways, and achieving efficient and accurate welding results.
Patent Information
- Application Number
- CN202210991352.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-18
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2042-08-18
AI Technical Summary
Traditional hangers are prone to deviations during welding, resulting in poor welding accuracy, and the welding master takes a lot of time and labor.
Design a universal frame welding tool positioning platform for hanging tools, quickly assemble the frame parts of hanging tools through the working positioning platform, and use the hoisting clamping positioning blocks on the platform frame, the limit pipes at the bottom of the beam and other components to ensure the precise placement and fixation of the spare parts.
It effectively solves the problem of poor traditional welding accuracy, improves the timeliness of welding frame assembly and ensures consistency and efficiency of welding accuracy.
Smart Images

Figure CN115319376B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tool positioning equipment, in particular to a universal frame welding tool positioning platform for a hanger. Background Art
[0002] Based on the name, it can be intuitively concluded that the hanger is used to fix auto parts. It is mainly used in auto parts production and processing plants to facilitate the fixation of auto parts for centralized processing and production. However, due to the increase in the demand for universal frames for hangers, the traditional method of relying on welding masters to measure welding is far from meeting the production standards of universal frames for hangers.
[0003] As a result, the following deficiencies exist in the prior art: the traditional universal frame of the hanger is very easy to deviate during the welding process, resulting in a large deviation in the welded frame. At the same time, the time spent by a welding master in welding and fixing a universal frame of the hanger is greatly extended, consuming a lot of time and manpower, and thus a universal frame welding tooling positioning platform for the hanger is continued to change the rising status quo. Summary of the invention
[0004] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the description and other drawings of the description.
[0005] The purpose of the present invention is to overcome the above-mentioned shortcomings and provide a universal frame welding tool positioning platform for a hanger. Through the working positioning platform, the hanger frame assembly parts can be quickly fixed, effectively solving the problem of poor accuracy of the traditional hanger frame welded by measurement and fixing, while also improving the timeliness of the hanger frame assembly welding.
[0006] In order to achieve the above-mentioned purpose, the present invention is implemented through the following technical solutions: a universal frame welding tool positioning platform for a hanger, including a tool positioning platform, a platform frame is arranged in the tool positioning platform, a hanger plate clamp is installed on the platform frame, a plurality of hanger frame vertical pipe upper limiters are installed on the platform frame, and a base horizontal clamp is installed on the platform frame; a frame plate is arranged in the platform frame, a plurality of lifting clamping positioning blocks are installed on the frame plate, a hanger limit block is installed on the frame plate, a crossbeam bottom limit tube is respectively arranged on both sides of the hanger limit block, a base horizontal positioning block is installed on the horizontal relative position of the crossbeam bottom limit tube, a plurality of frame base side limit blocks are installed on the frame plate, and crossbeam side limit blocks are arranged next to the crossbeam bottom limit tube, and a vertical pipe positioning guide plate is placed between the crossbeam side limit blocks and the base horizontal positioning block. The universal frame of the hanger can be assembled quickly through the work positioning platform, and the accuracy is correspondingly improved. The operation is simple and convenient. At the same time, the welded universal frame of the hanger has uniform accuracy, and there will be no errors and deviations, which effectively solves the problem of poor accuracy of fixed errors in traditional manual measurement.
[0007] The present invention is further improved, the tool positioning platform is equipped with a hanger frame, a hanger rod is arranged in the hanger frame, a fixed flat plate is installed at one end of the hanger rod, a crossbeam is connected to the other end of the hanger rod, a plurality of vertical pipes are arranged between the horizontal beams, and a frame base is fixed at the end of the vertical pipe. The hanger frame mainly consists of a hanger rod, a fixed flat plate, a crossbeam, a vertical pipe, and a frame base. With the cooperation of the tool positioning platform, it can be quickly assembled into a hanger frame, and the accuracy is much higher than the accuracy of traditional manual measurement welding.
[0008] The present invention is further improved in that a plurality of the hoisting clamping and positioning blocks are placed relative to each other, and two of the hoisting clamping and positioning blocks form a group. After the hoisting clamping and positioning blocks are placed relative to each other, the intervals between them are used to clamp the suspension rod, thereby preventing the suspension rod from being misaligned during welding and preventing the suspension rod from tilting and affecting the shape of the hanger frame.
[0009] The present invention is further improved, the boom is clamped between the hoisting clamping positioning blocks, the fixed flat plate is clamped with the boom flat plate clamp, and the end of the boom cooperates with the boom limit block. The fixed flat plate is fixed to one end of the boom, and during welding and assembly, it will be clamped by the boom flat plate clamp, while the end of the boom will be restricted by the boom limit block and firmly fixed to the frame plate, ensuring that no shape changes will occur during welding, thereby affecting the verticality of the boom.
[0010] The present invention is further improved, the vertical tube is placed on the vertical tube positioning guide plate, the top of the vertical tube is welded to the cross beam, the bottom of the cross beam is placed on the limit tube at the bottom of the cross beam, and the two sides are limited by the limit blocks on both sides of the cross beam, and the upper limiter on the vertical tube of the hanger frame is set at the top of the vertical tube. Two vertical tubes are set on each hanger frame, the top ends are respectively passed through the top cross beam for welding and fixing, and the ends are used for welding and fixing the frame base. At the same time, during the welding process, the bottom of the cross beam is placed on the limit tube at the bottom of the cross beam to keep the cross beam horizontal.
[0011] The present invention is further improved, the two sides of the frame base are engaged with the limit blocks on the two sides of the frame base, the surface of the frame base is in contact with the horizontal positioning block of the base, the bottom of the vertical pipe is welded to the frame base, and the horizontal base clamp is pressed against the frame base. When the vertical pipe is welded to the frame base, the horizontal base clamp is pressed against the frame base, and the frame base is offset before the welding process, thereby causing the welded frame base to be irregularly shaped or tilted.
[0012] The present invention is further improved, the vertical pipe positioning guide plate is a 3mm thick angle steel. Angle steel is commonly known as angle iron, which is a long steel strip with two sides perpendicular to each other and can better provide vertical pipes for placement and fixation.
[0013] The present invention is further improved, wherein a clamp base is provided in the boom flat clamp, a handle is installed on the clamp base, a pressure handle is connected to the handle, and a pressure block is installed below the pressure handle. The boom flat clamp compresses the pressure block to a specified position by cooperating with the pressure handle on the clamp base, and the parts pressed by the pressure block are shifted during the welding process.
[0014] The present invention is further improved, a limiter base is provided in the upper limiter of the vertical tube of the hanger frame, a limiter handle is installed on the limiter base, a transmission block is connected to the limiter handle, a sleeve is installed on the limiter base, a limiter rod runs through the sleeve, and one end of the limiter rod is connected to the transmission block. The upper limiter of the vertical tube of the hanger frame mainly limits the vertical rod through the limiter rod to prevent the displacement of the two ends of the vertical rod during welding, thereby causing the vertical rods to be welded in different lengths. Beneficial Effects
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] 1. The present invention can quickly assemble the universal frame of the hanger through the working positioning platform. During the assembly process, it not only ensures the accuracy of the universal frame of the hanger, but also realizes the rapid fixation of the hanger frame assembly parts and components, and can directly perform welding assembly, effectively solving the problem of poor accuracy of the traditional hanger frame that relies on measurement and fixation welding.
[0017] 2. The present invention, through the coordination of the hoisting clamping positioning blocks installed on the platform frame, the limiting tubes at the bottom of the beam, the limiting blocks on both sides of the frame base and other components, can comprehensively place and fix the hanger frame parts in a one-to-one manner, thereby greatly improving the production efficiency of the hanger frame and effectively shortening the time required for the production of the universal hanger frame. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the general assembly structure of a universal frame welding tool positioning platform for a hanger of the present invention;
[0019] Figure 2 It is a three-dimensional structural schematic diagram of a tool positioning platform in a universal frame welding tool positioning platform for a hanger of the present invention;
[0020] Figure 3 It is a front view structural schematic diagram of a hanger frame in a hanger universal frame welding tool positioning platform of the present invention;
[0021] Figure 4 It is a three-dimensional structural schematic diagram of a hanger plate clamp in a universal frame welding tool positioning platform of the present invention;
[0022] Figure 5 It is a schematic diagram of the three-dimensional structure of an upper limiter of a vertical pipe of a hanger frame in a positioning platform of a hanger universal frame welding tooling of the present invention;
[0023] Figure 6 The present invention is a schematic diagram of the three-dimensional structure of a hanger frame in a hanger universal frame welding tool positioning platform.
[0024] In the figure: tooling positioning platform-1, hanger frame-2, platform frame-11, boom flat plate clamp-12, hanger frame vertical pipe upper limiter-13, base horizontal clamp-14, frame plate-111, lifting clamp positioning block-112, beam bottom limiter tube-113, boom limiter block-114, beam side limiters-115, frame base side limiters-116, base horizontal positioning block-117, vertical pipe positioning guide plate-118, clamp base-121, handle-122, pressure handle-123, pressure block-124, limiter base-131, limiter handle-132, sleeve-133, transmission block-134, limiter rod-135, boom-21, fixed flat plate-22, beam-23, vertical pipe-24, frame base-25. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, but are not used to limit the present invention.
[0026] In addition, in the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0027] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral body; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. However, if it is indicated as a direct connection, it means that the two connected bodies are not connected through a transition structure, but are connected to form a whole through a connecting structure. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0028] In the present invention, unless otherwise clearly specified and limited, the first feature "on" or "under" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in an appropriate manner in any one or more embodiments or examples.
[0029] The present invention is further described below in conjunction with the accompanying drawings: Example 1
[0030] As attached Figure 1 To Attachment Figure 5 As shown: Figure 1It is a schematic diagram of the general assembly structure of a universal frame welding tool positioning platform for a hanger of the present invention; Figure 2 It is a three-dimensional structural schematic diagram of a tool positioning platform in a universal frame welding tool positioning platform for a hanger of the present invention; Figure 3 It is a front view structural schematic diagram of a hanger frame in a hanger universal frame welding tool positioning platform of the present invention; Figure 4 It is a three-dimensional structural schematic diagram of a hanger plate clamp in a universal frame welding tool positioning platform of the present invention; Figure 5 It is a schematic diagram of the three-dimensional structure of an upper limiter on a vertical pipe of a hanger frame in a positioning platform for a universal hanger frame welding tooling of the present invention.
[0031] The present embodiment provides a universal frame welding tool positioning platform for a hanger, a universal frame welding tool positioning platform for a hanger, including a tool positioning platform 1, a platform frame 11 is arranged in the tool positioning platform 1, a suspension rod flat plate clamp 12 is installed on the platform frame 11, a plurality of hanger frame vertical pipe upper limiters 13 are installed on the platform frame 11, and a base horizontal clamp 14 is installed on the platform frame 11; a frame plate 111 is arranged in the platform frame 11, a plurality of lifting clamping positioning blocks 112 are installed on the frame plate 111, a suspension rod limiting block 114 is installed on the frame plate 111, and beam bottom limiting tubes 113 are respectively arranged on both sides of the suspension rod limiting block 114, and a base horizontal positioning block 117 is installed at the horizontal relative position of the beam bottom limiting tube 113, and the frame plate A plurality of limit blocks 116 are installed on both sides of the frame base 111, and limit blocks 115 are arranged on both sides of the beam beside the limit tube 113 at the bottom of the beam. A vertical pipe positioning guide plate 118 is placed between the limit blocks 115 on both sides of the beam and the horizontal positioning block 117 of the base. A clamp base 121 is arranged in the boom flat plate clamp 12, and a handle 122 is installed on the clamp base 121. A pressure handle 123 is connected to the handle 122, and a pressure block 124 is installed under the pressure handle 123. A limiter base 131 is arranged in the upper limiter 13 of the vertical pipe of the hanger frame, and a limiter handle 132 is installed on the limiter base 131. A transmission block 134 is connected to the limiter handle 132, and a sleeve 133 is installed on the limiter base 131, and a limit rod 135 passes through the sleeve 133.
[0032] The specific working principle is as follows:
[0033] The present invention performs positioning welding on the hanger frame 2 during assembly and production through the tool positioning platform 1, and a boom flat plate clamp 12 is installed on the platform frame 11. When in use, it is only necessary to swing the handle 122 on the clamp base 121 to drive the pressing handle 123 to press down, so that the pressing block 124 is pressed against the designated hanger frame 2 parts. At the same time, the base horizontal clamp 14 steps are the same as the above-mentioned boom flat plate clamp 12. After being fixed, the corresponding hanger frame 2 assembly parts are placed on the frame plate 111, and the hanger frame vertical pipe upper limiters 13 on both sides are limited under the cooperation of the limiter base 131. The positioner handle 132 pushes out the limit rod 135 through the cooperation of the transmission block 134 and the sleeve 133, which limits the upper end of the vertical tube, and the whole is fixed by the vertical tube positioning guide plate 118. The limit blocks 115 on both sides of the crossbeams on both sides firmly clamp the crossbeams, and the bottom surface fits with the surface of the limit tube 113 at the bottom of the crossbeam to keep the crossbeam horizontal. The suspension rod is inserted, and the end is pressed against the suspension rod limit block 114. The two sides are clamped by the lifting clamping positioning blocks 112, and the base horizontal positioning block 117 fixes the base. After all are fixed, the spare parts of the hanger frame 2 can be welded to obtain an assembled universal hanger frame. Example 2
[0034] As attached Figure 2 , Figure 3 and Figure 6 As shown: Figure 2 It is a three-dimensional structural schematic diagram of a tool positioning platform in a universal frame welding tool positioning platform for a hanger of the present invention; Figure 3 It is a front view structural schematic diagram of a hanger frame in a hanger universal frame welding tool positioning platform of the present invention; Figure 6 The present invention is a schematic diagram of the three-dimensional structure of a hanger frame in a hanger universal frame welding tool positioning platform.
[0035] Among them, a boom flat plate clamp 12 is installed on the platform frame 11, a plurality of hanger frame vertical pipe upper limiters 13 are installed on the platform frame 11, and a base horizontal clamp 14 is installed on the platform frame 11; a frame plate 111 is arranged in the platform frame 11, a plurality of hoisting clamping positioning blocks 112 are installed on the frame plate 111, a boom limit block 114 is installed on the frame plate 111, and the bottom limit tubes 113 of the cross beam are respectively arranged on both sides of the boom limit block 114, and the base is installed on the horizontal relative position of the bottom limit tube 113 of the cross beam A horizontal positioning block 117, a plurality of limit blocks 116 on both sides of the frame base are installed on the frame plate 111, limit blocks 115 on both sides of the beam are arranged next to the limit tube 113 at the bottom of the beam, a vertical tube positioning guide plate 118 is placed between the limit blocks 115 on both sides of the beam and the horizontal positioning block 117 of the base, a hanging rod 21 is arranged in the hanger frame 2, a fixed flat plate 22 is installed at one end of the hanging rod 21, and a horizontal beam 23 is connected to the other end of the hanging rod 21, a plurality of vertical pipes 24 are arranged between the horizontal beams 23, and a frame base 25 is fixed to the end of the vertical pipe 24.
[0036] The specific working principle is as follows:
[0037] The present invention installs the hanger frame 2 assembly after the platform frame 11 is placed horizontally, and the hanger 21 is placed between the hoisting clamping positioning blocks 112 on the frame plate 111, and the end is fixed with a hanger limit block 114, and the fixed flat plate 22 at the top of the hanger 21 is pressed by the hanger flat plate clamp 12, and the hanger 21 passes through the cross beam 23, and the cross beam 23 is fixed under the engagement of the limit tube 113 at the bottom of the cross beam and the limit blocks 115 on both sides of the cross beam. After fixing, the vertical pipe 24 passes through the cross beam 23, and is limited by the upper limiter 13 of the vertical pipe of the hanger frame, and the pipe body is placed and fixed on the vertical pipe positioning guide plate 118, and finally the frame base 25 is engaged with the bottom of the vertical pipe 24, and is limited and positioned by its base horizontal positioning block 117 and the limit blocks 116 on both sides of the frame base, and is reinforced with the base horizontal clamp 14 after positioning. After the above steps are completed, the spare parts of the hanger frame 2 can be welded.
[0038] It should be understood that the embodiments disclosed in the present invention are not limited to the specific processing steps or materials disclosed herein, but should be extended to equivalent substitutions of such features understood by ordinary technicians in the relevant field. It should also be understood that the terms used herein are only used for the purpose of describing specific embodiments and are not meant to be limiting.
[0039] The "embodiment" mentioned in the specification means that the specific features or characteristics described in conjunction with the embodiment are included in at least one embodiment of the present invention. Therefore, the phrases or "embodiment" appearing in various places throughout the specification do not necessarily refer to the same embodiment.
[0040] In addition, the described features or characteristics may be combined in one or more embodiments in any other suitable manner. In the above description, some specific details, such as thickness, quantity, etc., are provided to provide a comprehensive understanding of the embodiments of the present invention. However, those skilled in the relevant art will understand that the present invention can be implemented without one or more of the above specific details or can also be implemented using other methods, components, materials, etc.
Claims
1. A universal frame welding tool positioning platform for hangers, characterized in that: It includes a tool positioning platform, wherein a platform frame is arranged inside the tool positioning platform, a boom flat plate clamp is installed on the platform frame, a plurality of hanger frame vertical pipe upper limiters are installed on the platform frame, and a base horizontal clamp is installed on the platform frame; A frame plate is provided in the platform frame, a plurality of hoisting clamping positioning blocks are installed on the frame plate, a suspension rod limiting block is installed on the frame plate, a bottom limiting tube of the cross beam is provided on both sides of the suspension rod limiting block, a base horizontal positioning block is installed on the horizontal relative position of the bottom limiting tube of the cross beam, a plurality of limit blocks on both sides of the frame base are installed on the frame plate, limit blocks on both sides of the cross beam are provided next to the bottom limiting tube of the cross beam, and a vertical pipe positioning guide plate is placed between the limit blocks on both sides of the cross beam and the horizontal positioning block of the base; A limiter base is arranged in the upper limiter of the vertical tube of the hanger frame, a limiter handle is installed on the limiter base, a transmission block is connected to the limiter handle, a sleeve is installed on the limiter base, a limiter rod runs through the sleeve, and one end of the limiter rod is connected to the transmission block; A hanger frame is installed on the tool positioning platform, a hanger is arranged inside the hanger frame, a fixed flat plate is installed at one end of the hanger, a crossbeam is connected to the other end of the hanger, a plurality of vertical pipes are arranged between the horizontal beams, and a frame base is fixed to the end of the vertical pipe; The vertical tube is placed on the vertical tube positioning guide plate, the top of the vertical tube is welded to the cross beam, the bottom of the cross beam is placed on the limit tube at the bottom of the cross beam, and the two sides are limited by the limit blocks on both sides of the cross beam, and the upper limiter on the vertical tube of the hanger frame is set at the top of the vertical tube.
2. The universal frame welding tool positioning platform for hangers according to claim 1, characterized in that: The plurality of hoisting, clamping and positioning blocks are placed relatively to each other, and two of the hoisting, clamping and positioning blocks form a group.
3. The universal frame welding tool positioning platform for hangers according to claim 1, characterized in that: The suspension rod is clamped between the hoisting clamping positioning blocks, the fixed flat pressure plate is clamped with the suspension rod flat plate clamp, and the end of the suspension rod is matched with the suspension rod limiting block.
4. The universal frame welding tool positioning platform for hangers according to claim 1, characterized in that: The two sides of the frame base are engaged with the limit blocks on both sides of the frame base, the surface of the frame base is in contact with the horizontal positioning block of the base, the bottom of the vertical pipe is welded to the frame base, and is simultaneously pressed against the frame base by the horizontal presser of the base.
5. The universal frame welding tool positioning platform for hangers according to claim 1, characterized in that: The vertical pipe positioning guide plate is a 3mm thick angle steel.
6. The universal frame welding tool positioning platform for hangers according to claim 1, characterized in that: A presser base is arranged in the boom flat plate presser, a handle is installed on the presser base, a pressure handle is connected to the handle, and a pressure block is installed under the pressure handle.