Tunnel face extrusion deformation control method

By selecting the appropriate excavation method according to the extrusion deformation of the palm surface of the tunnel, combined with the technology of reserving core soil, advanced small conduits, advanced pipe sheds and fiberglass anchors in annular excavation, the deformation control of tunnel under high ground stress is solved. The problem of singleness achieves more accurate deformation control and improves the stability and safety of tunnel excavation.

CN115370387BActive Publication Date: 2024-11-22BEIJING JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210870372.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-22
Publication Date
2024-11-22
Estimated Expiration
2042-07-22

AI Technical Summary

Technical Problem

Under high ground stress conditions, during tunnel excavation, the surrounding rock deformation is large and the deformation rate is fast, resulting in excessive extrusion deformation of the palm surface and frequent local collapses. The existing control method is single and cannot provide comprehensive and accurate deformation control. guide.

Method used

According to the extrusion deformation of the palm surface of the high ground stress soft rock tunnel, the deformation level is determined in a graded manner, and the deformation control is carried out by combining the reserved core soil of the annular excavation, small ahead conduit, advanced tube shed and fiberglass anchor rod. The deformation control is selected separately Deformation control is carried out by reserving core soil and leading small conduits in annular excavation, reserving core soil and leading pipe sheds in annular excavation, reserving core soil and leading pipe sheds in annular excavation, reserving core soil, and leading pipe sheds and fiberglass anchors.

Benefits of technology

It provides more comprehensive and accurate deformation control guidance, effectively reduces the extrusion deformation of the palm surface and improves the stability and safety of tunnel excavation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115370387B_ABST
    Figure CN115370387B_ABST
Patent Text Reader

Abstract

The present application discloses a method for controlling extrusion deformation of a tunnel face, which includes obtaining the extrusion deformation of the face of a high-stress soft rock tunnel; determining the deformation level of the face according to the extrusion deformation of the face; if the deformation level is level one, a method of combining annular excavation with reserved core soil and an advanced small guide tube is selected for deformation control; if the deformation level is level two, a method of combining annular excavation with reserved core soil and an advanced pipe shed is selected for deformation control; if the deformation level is level three, a method of combining annular excavation with reserved core soil, an advanced pipe shed and a glass fiber anchor is selected for deformation control. The present application solves the problem of how to provide more comprehensive and accurate deformation control guidance for extrusion deformation of a tunnel face.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of civil engineering technology, and in particular to a method for controlling extrusion deformation of a tunnel face. Background Art

[0002] With the development of tunnel technology, deep buried tunnels have become an inevitable trend of future development. The deeper the tunnel is, the higher the initial stress of the surrounding rock will be, which will lead to the problem of "high ground stress". Under high ground stress conditions, even rocks with higher strength will show some soft rock characteristics. For high ground stress soft rock tunnels, there are significant characteristics such as soft quality, loose structure, and poor rock stability. As a result, during the tunnel excavation process, there are problems such as large deformation of the surrounding rock and fast deformation rate, severe deformation of the initial support leading to serious intrusion, excessive extrusion deformation of the face leading to local collapse, and frequent design changes. At present, the control of face extrusion deformation generally adopts relatively single methods such as increasing the initial support parameters, using the short step method for construction, and advancing small duct reinforcement. It has failed to systematically control the extrusion deformation of the face, and cannot provide more comprehensive and accurate deformation control guidance in actual construction. Summary of the invention

[0003] The main purpose of the present application is to provide a tunnel face extrusion deformation control method to solve the problem of how to provide more comprehensive and accurate deformation control guidance for the tunnel face extrusion deformation.

[0004] In order to achieve the above-mentioned objective, a tunnel face extrusion deformation control method is provided according to a first aspect of the present application.

[0005] The tunnel face extrusion deformation control method according to the present application includes: obtaining the extrusion deformation amount of the tunnel face of a high-ground stress soft rock tunnel; determining the deformation level of the tunnel face according to the extrusion deformation amount of the tunnel face; if the deformation level is level one, selecting a method of combining circular excavation with reserved core soil and advanced small guide tubes for deformation control; if the deformation level is level two, selecting a method of combining circular excavation with reserved core soil and advanced pipe sheds for deformation control; if the deformation level is level three, selecting a method of combining circular excavation with reserved core soil, advanced pipe sheds and fiberglass anchor rods for deformation control.

[0006] Optionally, obtaining the extrusion deformation of the face of a high-ground stress soft rock tunnel includes: testing the extrusion deformation of the face of a high-ground stress soft rock tunnel using a fiberglass anchor and a total station, wherein the fiberglass anchor is a fiberglass anchor driven into the center of the tunnel along the tunnel axis without contacting the surrounding rock.

[0007] Optionally, determining the deformation level of the tunnel face according to the extrusion deformation of the tunnel face includes: if the extrusion deformation of the tunnel face is greater than or equal to 10 cm and less than 20 cm, the deformation level of the tunnel face will be determined as level one; if the extrusion deformation of the tunnel face is greater than or equal to 20 cm and less than 30 cm, the deformation level of the tunnel face will be determined as level two; if the extrusion deformation of the tunnel face is greater than or equal to 30 cm, the deformation level of the tunnel face will be determined as level three.

[0008] Optionally, the deformation control by combining the reserved core soil with the advance small guide tube selected in the circular excavation includes: constructing the advance small guide tube in the arch before tunnel excavation; excavating the upper step section with an arc-shaped guide pit and carrying out the initial support of the upper step; excavating the core soil of the upper step; excavating and supporting the walls on both sides of the lower step; excavating the core soil of the lower step; and constructing the invert arch.

[0009] Optionally, the deformation control by combining circular excavation with reserved core soil and advanced pipe shed includes: constructing an advanced pipe shed on the arch before tunnel excavation; excavating the upper step section with an arc-shaped pilot pit and performing initial support for the upper step; excavating the core soil of the upper step; excavating and supporting the walls on both sides of the lower step; excavating the core soil of the lower step; and constructing an invert.

[0010] Optionally, the method of selecting a combination of circular excavation with reserved core soil, advanced pipe shed and glass fiber anchor rods for deformation control includes: if the extrusion deformation of the face is greater than or equal to 30 cm and less than or equal to 40 cm, then selecting a combination of circular excavation with reserved core soil, advanced pipe shed and upper step glass fiber anchor rods for deformation control; if the extrusion deformation of the face is greater than 40 cm, then selecting a combination of circular excavation with reserved core soil, advanced pipe shed and full-section glass fiber anchor rods for deformation control.

[0011] Optionally, the deformation control by combining circular excavation with reserved core soil, advance pipe shed and upper step glass fiber anchors includes: constructing an advance pipe shed on the arch before tunnel excavation; constructing glass fiber anchors on the upper step; excavating the upper step section with an arc-shaped guide pit and providing initial support for the upper step; excavating the core soil of the upper step; excavating and supporting the walls on both sides of the lower step; excavating the core soil of the lower step; and constructing an invert arch.

[0012] Optionally, the deformation control by combining circular excavation with reserved core soil, advanced pipe shed and full-section fiberglass anchors includes: constructing an advanced pipe shed on the arch before tunnel excavation; constructing fiberglass anchors on the full section; excavating the upper step section with an arc-shaped guide pit and providing initial support for the upper step; excavating the core soil of the upper step; excavating and supporting the walls on both sides of the lower step; excavating the core soil of the lower step; and constructing an invert.

[0013] Optionally, the test of the extrusion deformation of the tunnel face of high-stress soft rock based on the fiberglass anchor and the total station includes: obtaining the first end coordinates of the fiberglass anchor that is driven into the tunnel center along the tunnel axis and has no contact with the surrounding rock, wherein the first end coordinates are the end coordinates of the fiberglass anchor in front of the tunnel face; obtaining the second end coordinates of the fiberglass anchor before each blasting starting from the second blasting, wherein the second end coordinates are the end coordinates of the fiberglass anchor exposed at the tunnel face; calculating the extrusion deformation of each blasting based on the first end coordinates and the second end coordinates before each blasting; and superimposing the extrusion deformation of each blasting to obtain the extrusion deformation of the tunnel face within the length range of the fiberglass anchor.

[0014] Optionally, the cyclic excavation footage range of the reserved core soil for the annular excavation is greater than or equal to 0.5 meters and less than or equal to 1 meter, the area of ​​the reserved core soil is greater than or equal to 50% of the excavation cross-sectional area, and the height range between the top surface of the reserved core soil and the excavation vault is greater than or equal to 1.5 meters and less than or equal to 2 meters.

[0015] In the tunnel face extrusion deformation control method of the embodiment of the present application, the extrusion deformation of the face of the high ground stress soft rock tunnel is first obtained; the deformation level of the face is determined according to the extrusion deformation of the face; if the deformation level is level one, a combination of annular excavation of reserved core soil and advanced small guide tube is selected for deformation control; if the deformation level is level two, a combination of annular excavation of reserved core soil and advanced pipe shed is selected for deformation control; if the deformation level is level three, a combination of annular excavation of reserved core soil, advanced pipe shed and glass fiber anchor rod is selected for deformation control. It can be seen that the tunnel face extrusion deformation control method in the embodiment of the present application grades the extrusion deformation of the face, and provides different deformation control methods for different levels of deformation, which provides a more accurate comprehensive control method compared to the existing single deformation control method. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:

[0017] Figure 1 is a flow chart of a tunnel face extrusion deformation control method provided according to an embodiment of the present application;

[0018] Figure 2 is a schematic cross-sectional view of a tunnel provided according to an embodiment of the present application;

[0019] Figure 3It is a construction flow chart of a control method combining a ring excavation reserved core soil and an advance small guide tube provided in an embodiment of the present application;

[0020] Figure 4 , Figure 5 It is a schematic diagram of an advanced small catheter support provided according to an embodiment of the present application;

[0021] Figure 6 1 is a construction flow chart of a method of combining annular excavation with reserved core soil and advanced pipe shed provided in an embodiment of the present application;

[0022] Figure 7 , Figure 8 is a schematic diagram of an advanced pipe-roof support provided according to an embodiment of the present application;

[0023] Fig. 9 It is a construction flow chart of a method of combining a ring excavation reserved core soil, an advanced pipe shed and an upper step glass fiber anchor rod according to an embodiment of the present application;

[0024] Fig.10 , Fig.11 It is a transverse cross-sectional view and a longitudinal cross-sectional view corresponding to the installation of a glass fiber anchor rod on an upper step according to an embodiment of the present application;

[0025] Fig.12 It is a construction flow chart of a method of combining annular excavation with reserved core soil, advanced pipe shed and full-section glass fiber anchor rods provided in an embodiment of the present application;

[0026] Fig.13 , Fig.14 It is a transverse cross-sectional view and a longitudinal cross-sectional view corresponding to the full-section application of a glass fiber anchor provided in an embodiment of the present application;

[0027] Fig.15 , Fig.16 It is a schematic diagram of testing the extrusion deformation of a high-stress soft rock tunnel face using a glass fiber anchor and a total station according to an embodiment of the present application. DETAILED DESCRIPTION

[0028] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0029] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0030] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0031] like Figure 1 As shown, it is a flow chart of a tunnel face extrusion deformation control method of an embodiment of the present application, and the specific method includes the following steps S101-S105: S101, obtaining the extrusion deformation amount of the tunnel face of a high ground stress soft rock tunnel; S102, determining the deformation level of the tunnel face according to the extrusion deformation amount of the tunnel face; S103, if the deformation level is level one, selecting a method of combining annular excavation with reserved core soil and an advanced small guide tube for deformation control; S104, if the deformation level is level two, selecting a method of combining annular excavation with reserved core soil and an advanced pipe shed for deformation control; S105, if the deformation level is level three, selecting a method of combining annular excavation with reserved core soil, an advanced pipe shed and glass fiber anchor rods for deformation control.

[0032] In step S101, the extrusion deformation of the tunnel face of the high-in-situ stress soft rock tunnel is obtained in advance through relevant deformation testing methods. The specific relevant deformation testing methods are not limited. Any existing method that can determine the extrusion deformation of the tunnel face of the high-in-situ stress soft rock tunnel can be used, which can be a manual testing method or an intelligent equipment-assisted testing method.

[0033] After obtaining the extrusion deformation of the tunnel face of the high-in-situ stress soft rock tunnel, step S102 is entered, that is, the deformation level of the tunnel face is determined according to the deformation. The specific determination method is: if the extrusion deformation of the tunnel face is greater than or equal to 10 cm and less than 20 cm, the deformation level of the tunnel face will be determined as level one; if the extrusion deformation of the tunnel face is greater than or equal to 20 cm and less than 30 cm, the deformation level of the tunnel face will be determined as level two; if the extrusion deformation of the tunnel face is greater than or equal to 30 cm, the deformation level of the tunnel face will be determined as level three. Among them, level one is ordinary deformation, level two is severe deformation, and level three is extremely severe deformation. After the deformation is graded, a more appropriate deformation control method can be determined according to the degree of deformation.

[0034] For different deformation levels, the embodiments of the present application provide different deformation control methods, which are as follows:

[0035] If the deformation level determined in step S102 is level 1, a combination of circular excavation and reserved core soil and advanced small pipe is selected to control deformation. First, the circular excavation and reserved core soil method is described separately. Figure 2 As shown, it is a schematic diagram of the cross section of the tunnel. In order to illustrate the method of reserving core soil for circular excavation, it is divided into six parts, namely, the arc area 1 of the upper step, the core soil area 2 of the upper step, the left wall area 3 of the lower step, the right wall area 4 of the lower step, the core soil area 5 of the lower step, and the invert area 6. The method of reserving core soil for circular excavation is to first perform arc excavation on the arc area 1 of the upper step and perform initial support on the upper step; after the initial support of the upper step is completed, the core soil area 2 of the upper step is excavated; after the core soil excavation of the upper step is completed, the left wall area 3 and the right wall area 4 of the lower step are excavated and initially supported; then the core soil area 5 of the lower step is excavated; and finally the invert area 6 is constructed. In tunnel construction, the reserved core soil can exert a reverse thrust on the tunnel face, so as not to "squeeze" the surrounding rock of the excavation face, and can effectively control the extrusion deformation of the tunnel face. Preferably, in actual construction, the circular excavation of the reserved core soil has a range of 0.5 meters or more and 1 meter or less, the area of ​​the reserved core soil is not less than 50% of the excavation section area, and the height range from the top surface of the core soil to the excavation vault is 1.5 meters or more and 2 meters or less. It should also be noted that for the initial support mentioned above, the preferred support parameters can be 27 cm shotcrete, 6 m anchor rods, 1.0×1.0 m spacing, and I25b steel frames with a spacing of 0.5 to 0.6 m.

[0036] Combine the following Figure 2 The method of combining the reserved core soil of the circular excavation with the advance small pipe is explained, such as Figure 3The figure shows the construction flow chart of the control method combining the reserved core soil of the circular excavation and the advance small pipe. The specific process includes: after the construction preparation is completed, the advance small pipe is applied in the arch before the tunnel excavation, such as Figure 4 and Figure 5 As shown, it is a schematic diagram of the support of the advanced small catheter 11, Figure 4 Where a is the setting interval, and angle α is the setting range. Figure 5 Where l is the length of the borehole in the longitudinal section and the length of the grouting in the longitudinal section, b is the lap length, and angle β is the set angle. Preferably, this embodiment provides construction parameters for the construction of the advance small conduit in the arch, as shown in Table 1; after the construction of the advance small conduit in the arch, the upper step section is excavated with an arc-shaped guide pit (i.e., the arc-shaped area 1 of the upper step is excavated in an arc shape), and the initial support of the upper step is performed; after the initial support of the upper step is completed, the core soil of the upper step is excavated (i.e., the core soil area 2 of the upper step is excavated); after the core soil of the upper step is excavated, the walls on both sides of the lower step are excavated and supported (i.e., the left wall area 3 of the lower step and the right wall area 4 of the lower step are excavated and initially supported); then the core soil of the lower step is excavated (i.e., the core soil area 5 of the lower step is excavated); finally, the invert construction is performed (i.e., the invert area 6 is constructed), and after the invert construction is completed, the next construction cycle is entered.

[0037] Table 1: Construction parameters of advanced small pipe and advanced pipe shed

[0038] Advanced small catheter Advanced pipe shed Steel pipe diameter 42mm 108mm Setting Range 120° 120° Setting Angle 7°~10° 3°~6° Drilling length in longitudinal direction 3~5m 10~30m Grouting length in longitudinal direction 3~5m 10~30m Overlap length 1.0m 3.5m Set Spacing 300mm 250mm

[0039] If the deformation level determined in step S102 is level 2, a combination of circular excavation and reserved core soil and advanced pipe shed is selected to control deformation. Figure 2 The method of combining the reserved core soil of the circular excavation with the advanced pipe shed is explained, such as Figure 6 The figure shows the construction flow chart of the combination of circular excavation reserved core soil and advanced pipe shed. The specific process includes: after the construction preparation is completed, the advanced pipe shed is constructed on the arch before tunnel excavation. The advanced pipe shed support is along the contour of the tunnel excavation. A series of steel pipes are driven into the surrounding rock in front of the excavation in a certain order along the axis of the tunnel. Then grouting is injected into the pipe to consolidate it, and finally a scaffolding support system is formed. It can exert its beam-arch effect and effectively inhibit the loosening and collapse of the surrounding rock. At the same time, it can improve the physical and mechanical properties of soft rock and enhance its self-bearing capacity, that is, the reinforcement effect. And it can separate the surrounding rock in front of the heading face from the surrounding rock around the tunnel, effectively solving the problem of reducing the extrusion deformation of the heading face. Figure 7 and Figure 8 As shown, it is a schematic diagram of the advanced pipe shed 12 support. Figure 7 a is the setting interval, and angle α is the setting range. Figure 8Where l is the length of the borehole in the longitudinal section and the length of the grouting in the longitudinal section, b is the lap length, and angle β is the set angle. Preferably, this embodiment provides construction parameters for the advanced pipe shed for the arch, as shown in Table 1; after the advanced pipe shed is constructed for the arch, the upper step section is excavated with an arc guide pit (i.e., the arc area 1 of the upper step is excavated in an arc shape), and the initial support of the upper step is performed; after the initial support of the upper step is completed, the core soil of the upper step is excavated (i.e., the core soil area 2 of the upper step is excavated); after the core soil of the upper step is excavated, the walls on both sides of the lower step are excavated and supported (i.e., the left wall area 3 of the lower step and the right wall area 4 of the lower step are excavated and initially supported); then the core soil of the lower step is excavated (i.e., the core soil area 5 of the lower step is excavated); finally, the invert construction is performed (i.e., the invert area 6 is constructed), and after the invert construction is completed, the next construction cycle is entered.

[0040] If the deformation level determined by step S102 is level three, a combination of circular excavation reserved core soil, advanced pipe shed and glass fiber anchor is selected for deformation control. Specifically, if the extrusion deformation of the face is greater than or equal to 30 cm and less than or equal to 40 cm, a combination of circular excavation reserved core soil, advanced pipe shed and upper step glass fiber anchor is selected for deformation control; if the extrusion deformation of the face is greater than 40 cm, a combination of circular excavation reserved core soil, advanced pipe shed and full-section glass fiber anchor is selected for deformation control. The embodiment of the present application distinguishes between glass fiber anchor applied on the upper step and glass fiber anchor applied on the full section according to the amount of deformation. Regardless of the type of glass fiber anchor applied, it has the function of glass fiber anchor application. Glass fiber anchor application, that is, glass fiber anchor grouting reinforcement, grouting reinforcement consists of a number of glass fiber grouting anchors inserted perpendicular to the face, and the glass fiber grouting anchor has the following advantages: 1) It can be quickly excavated. In areas pre-reinforced with glass fiber grouting anchor rods, excavation machinery can quickly excavate and pass through, which is conducive to the mechanized and efficient construction of tunnels; 2) The entire rod body is anchored and grouted. The glass fiber grouting anchor rod not only provides anchoring force for the entire rod body, but also reinforces the rock mass around the rod; 3) High strength and light weight. Under the same specifications, the tensile strength of the glass fiber anchor rod is higher than that of ordinary steel anchor rods, and the weight is lighter, which is conducive to construction and can ensure the construction reinforcement effect; 4) High safety. The glass fiber anchor rod has the advantages of anti-static, flame retardant, high corrosion resistance, acid and alkali resistance, and low temperature resistance, which can meet the requirements of safe construction in practice.

[0041] Combine the following Figure 2 The method of combining the reserved core soil of the circular excavation with the advanced pipe shed is explained, such as Fig. 9The figure shows a construction flow chart of the combination of the ring excavation reserved core soil, the advance pipe shed and the glass fiber anchor rod on the upper step. The specific process includes: after the construction preparation is completed, the advance pipe shed is applied on the arch before the tunnel excavation. For the relevant instructions on the application of the advance pipe shed, please refer to the corresponding instructions in the above-mentioned "deformation control by combining the ring excavation reserved core soil and the advance pipe shed", which will not be repeated here; after the advance pipe shed is applied on the arch, the glass fiber anchor rod is applied on the upper step (that is, the glass anchor rod is applied in the arc area 1 of the upper step and the core soil area 2 of the upper step), as shown in FIG. Fig.10 and Fig.11 As shown, it is a transverse cross-sectional view and a longitudinal cross-sectional view corresponding to the application of the glass fiber anchor rod 13 on the upper step. Fig.10 In the equation, c is the layout spacing, Fig.11 Where d is the length of the anchor rod; after the glass fiber anchor rod is applied to the upper step, the upper step section is excavated with an arc-shaped guide pit (i.e., the arc-shaped area 1 of the upper step is excavated in an arc shape), and the upper step is initially supported; after the initial support of the upper step is completed, the core soil of the upper step is excavated (i.e., the core soil area 2 of the upper step is excavated); after the core soil excavation of the upper step is completed, the walls on both sides of the lower step are excavated and supported (i.e., the left wall area 3 of the lower step and the right wall area 4 of the lower step are excavated and initially supported); then the core soil of the lower step is excavated (i.e., the core soil area 5 of the lower step is excavated); finally, the invert construction is carried out (i.e., the invert area 6 is constructed), and after the invert construction is completed, the next construction cycle is entered.

[0042] like Fig.12 The figure shows a construction flow chart of the combination of ring excavation reserved core soil, advanced pipe shed and full-section glass fiber anchor rod. The specific process includes: after the construction preparation is completed, the advanced pipe shed is applied on the arch before tunnel excavation. For the relevant instructions on the application of the advanced pipe shed, please refer to the corresponding instructions in the above-mentioned "deformation control by combining ring excavation reserved core soil and advanced pipe shed", which will not be repeated here; after the advanced pipe shed is applied on the arch, the glass fiber anchor rod is applied on the full section (that is, the glass fiber anchor rod is applied in all six areas of the tunnel section), as shown in FIG. Fig.13 and Fig.14 As shown, it is a transverse cross-sectional view and a longitudinal cross-sectional view corresponding to the full-section application of the glass fiber anchor 13. Fig.13 In the equation, c is the layout spacing, Fig.14Where d is the length of the anchor rod; after the glass fiber anchor rod is applied to the whole section, the upper step section is excavated with an arc-shaped guide pit (i.e., the arc-shaped area 1 of the upper step is excavated in an arc shape), and the upper step is initially supported; after the initial support of the upper step is completed, the core soil of the upper step is excavated (i.e., the core soil area 2 of the upper step is excavated); after the core soil of the upper step is excavated, the walls on both sides of the lower step are excavated and supported (i.e., the left wall area 3 of the lower step and the right wall area 4 of the lower step are excavated and initially supported); then the core soil of the lower step is excavated (i.e., the core soil area 5 of the lower step is excavated); finally, the invert construction is carried out (i.e., the invert area 6 is constructed), and after the invert construction is completed, the next construction cycle is entered.

[0043] In addition, preferably, when glass fiber grouting is applied, the diameter of the anchor hole is greater than 1.5 cm or more of the glass fiber grouting anchor, and the glass fiber grouting anchor passes through the unfavorable geological section A (such as Fig.11 , Fig.14 The face is reinforced with 30mm diameter fully bonded glass fiber anchor rods. The length of the anchor rods is 15m. The glass fiber grouting anchor rods are arranged in parallel in a plum blossom shape with a spacing of 2m×2m and an overlap length of 5m.

[0044] Furthermore, for the method of obtaining the extrusion deformation of the face of a high-in-situ stress soft rock tunnel, this application provides a preferred solution. Specifically, the extrusion deformation of the face of a high-in-situ stress soft rock tunnel is tested using a fiberglass anchor rod and a total station, wherein the fiberglass anchor rod is a fiberglass anchor rod driven into the center of the tunnel along the tunnel axis without contacting the surrounding rock. Fig.15 and Fig.16 The realization of testing the extrusion deformation of the face of a high-stress soft rock tunnel using glass fiber anchors and a total station is explained.

[0045] First, obtain the first end coordinates of the glass fiber anchor 7 (it should be noted that the glass fiber anchor here is different from the glass fiber anchor in the aforementioned deformation control by selecting circular excavation to reserve core soil, advance pipe shed and glass fiber anchor combination, so different numbers are used to distinguish them) driven into the tunnel center along the tunnel axis without contacting the surrounding rock, wherein the first end coordinates are the end coordinates of the glass fiber anchor 7 in front of the tunnel face 8; obtain the second end coordinates of the glass fiber anchor 7 before each blasting starting from the second blasting, wherein the second end coordinates are the end coordinates of the glass fiber anchor 7 exposed from the tunnel face 8; calculate the extrusion deformation of each blasting according to the first end coordinates and the second end coordinates before each blasting; superimpose the extrusion deformation of each blasting to obtain the extrusion deformation of the tunnel face 8 within the length range of the glass fiber anchor 7.

[0046] It should be noted that the design of the fiberglass anchor rod 7 that is driven into the tunnel without contact with the surrounding rock is to ensure that during the deformation and extrusion of the tunnel face 8, the fiberglass anchor rod 7 will not be affected by the friction caused by contact with the surrounding rock, which can ensure the accuracy of the final test results. In actual construction, in order to fix the fiberglass anchor rod 7 in the tunnel, it is still necessary to anchor it at the head, such as Fig.16 As shown, there is an anchor 9 inside the tunnel. As for how to fix the fiberglass anchor 7 to achieve non-contact with the surrounding rock, specifically, the diameter of the drill hole used to drive the fiberglass anchor 7 is larger than the diameter of the fiberglass anchor 7. Preferably, the diameter of the drill hole can be set to 1.5 times the diameter of the fiberglass anchor 7, and it can also be adaptively adjusted in actual construction. And there is no grouting between the fiberglass anchor 7 and the drill hole, that is, the fiberglass anchor 7 is not grouted, because the local reinforcement effect after grouting will also affect the joint extrusion deformation of the face 8 and the fiberglass anchor 7, which ultimately leads to inaccurate deformation monitoring or even inconsistency with the actual situation of the surrounding rock.

[0047] Further, the coordinates of the first end of the glass fiber anchor 7 are obtained, specifically, the coordinates of the end of the glass fiber anchor 7 in front of the face 8 are obtained, that is, the coordinates of the innermost end of the glass fiber anchor 7 in the tunnel are obtained, and the coordinates are unchanged before and after the deformation measurement, and are an absolute coordinate value. In addition, the acquisition of the coordinates of the first end of the glass fiber anchor 7 is specifically obtained by testing with a total station 10, and the total station 10 is installed behind the face 8, and the specific installation position is set up along the axis of the tunnel, and the length from the face 8 can be determined according to the tunnel excavation width: preferably, the tunnel excavation width three times the distance from the face 8 is determined as the length of the total station 10 from the face 8. It should be noted that during the test, the face 8 will change as the blasting proceeds, but the position of the total station 10 is unchanged, that is, the position of the total station 10 is calculated and determined based on the initial face 8, and in the subsequent measurement process, the position of the total station 10 is unchanged. It should be noted that, during the test, the values ​​of various coordinates are obtained with the total station 10 as the origin coordinates. The purpose of obtaining the coordinates of the second end of the glass fiber anchor 7 before each blast from the second blast is to calculate the extrusion deformation of the face 8 of the previous footage by measuring the coordinates of the end of the glass fiber anchor 7 before the next footage blast. This allows the face 8 to fully undergo extrusion deformation, and the obtained deformation is more reliable. Similar to the way the coordinates of the first end of the glass fiber anchor 7 are obtained, the coordinates of the second end of the glass fiber anchor 7 are also obtained by assuming that the total station 4 is behind the face 8. According to the first end coordinates and the second end coordinates before each blast, the extrusion deformation of each blast is calculated specifically as follows: the footage of each glass fiber anchor 7 is calculated according to the first end coordinates, the second end coordinates before each blast, and the initial length of the glass fiber anchor 7; the difference between the footage of each glass fiber anchor 7 and the blasting footage is determined as the extrusion deformation of each blast. A specific example is given for illustration: Fig.16 As shown, it is assumed that the coordinate of the second end of the glass fiber anchor rod 7 before the second blasting is y 2 , the first end coordinate is y 0 , the blasting footage is l, the initial length of the glass fiber anchor rod 7 is L, then the first blasting footage of the glass fiber anchor rod 7 is calculated as: L-(y 0 –y 2 ) ; then the footage is calculated by difference with the blasting footage to obtain the extrusion deformation s of the first blasting 1 =l-(L- (y 0 –y 2 ))=(y 0 –y 2 )+l–L. Through the above calculation method, the extrusion deformation s of the second explosion can also be obtained 2 =(y 0 –y 3)+2l–L, where y 3 is the coordinate of the second end of the glass fiber anchor rod 7 before the third blasting; and so on, assuming that the coordinate of the second end of the glass fiber anchor rod 7 measured before the i-th blasting is y i , the extrusion deformation expression of the tunnel face 8 at the ith footage (ith blasting) is s i =(y 0 –y i+1 )+il–L. It should be noted that the initial length L of the glass fiber anchor 7 is determined according to the tunnel excavation width and the blasting footage. Specifically, the initial length of the glass fiber anchor 7 is an integer multiple of the blasting footage l, and the initial length of the glass fiber anchor 7 is greater than three times the tunnel excavation width. The blasting footage l is a length value preset according to construction requirements. Finally, the extrusion deformation of each blasting calculated above is superimposed to obtain the extrusion deformation of the face 8 within the length range of the glass fiber anchor 7. Combined with the above example, that is, the extrusion deformation of the face 8 within the length range of the glass fiber anchor 7 Where n is determined by the initial length of the glass fiber anchor rod 7 and the blasting footage.

[0048] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A tunnel face extrusion deformation control method, characterized in that: The method comprises: Obtain the extrusion deformation of the tunnel face in soft rock with high ground stress; Determining a deformation grade of the tunnel face according to the extrusion deformation amount of the tunnel face; If the deformation level is level one, the deformation control is carried out by combining the reserved core soil with the advance small pipe through circular excavation; If the deformation level is level 2, the deformation control is carried out by combining circular excavation with reserved core soil and advanced pipe shed; If the deformation level is level three, the deformation control is carried out by combining circular excavation with reserved core soil, advanced pipe shed and glass fiber anchor rods; The method of obtaining the extrusion deformation of the tunnel face of the high-in-situ stress soft rock tunnel comprises: testing the extrusion deformation of the tunnel face of the high-in-situ stress soft rock tunnel using a fiberglass anchor rod and a total station, wherein the fiberglass anchor rod is a fiberglass anchor rod driven into the tunnel center along the tunnel axis without contacting the surrounding rock; The method of testing the extrusion deformation of the tunnel face of a high-stress soft rock tunnel based on the fiberglass anchor and the total station includes: obtaining the coordinates of the first end of the fiberglass anchor driven into the tunnel center along the tunnel axis without contact with the surrounding rock, wherein the first end coordinates are the coordinates of the end of the fiberglass anchor in front of the tunnel face; obtaining the coordinates of the second end of the fiberglass anchor before each blasting starting from the second blasting, wherein the second end coordinates are the coordinates of the end of the fiberglass anchor exposed from the tunnel face; calculating the extrusion deformation of each blasting based on the first end coordinates and the second end coordinates before each blasting; and superimposing the extrusion deformation of each blasting to obtain the extrusion deformation of the tunnel face within the length range of the fiberglass anchor; Determining the deformation level of the tunnel face according to the extrusion deformation of the tunnel face includes: if the extrusion deformation of the tunnel face is greater than or equal to 10 cm and less than 20 cm, the deformation level of the tunnel face is determined to be level one; if the extrusion deformation of the tunnel face is greater than or equal to 20 cm and less than 30 cm, the deformation level of the tunnel face is determined to be level two; if the extrusion deformation of the tunnel face is greater than or equal to 30 cm, the deformation level of the tunnel face is determined to be level three; The method of selecting a combination of annular excavation reserved core soil, an advanced pipe shed and a glass fiber anchor rod for deformation control includes: if the extrusion deformation of the tunnel face is greater than or equal to 30 cm and less than or equal to 40 cm, the method of selecting a combination of annular excavation reserved core soil, an advanced pipe shed and an upper step glass fiber anchor rod for deformation control; if the extrusion deformation of the tunnel face is greater than 40 cm, the method of selecting a combination of annular excavation reserved core soil, an advanced pipe shed and a full-section glass fiber anchor rod for deformation control; The cyclic excavation advance range of the reserved core soil for the circular excavation is greater than or equal to 0.5 meters and less than or equal to 1 meter, the area of ​​the reserved core soil is greater than or equal to 50% of the excavation cross-sectional area, and the height range between the top surface of the reserved core soil and the excavation arch is greater than or equal to 1.5 meters and less than or equal to 2 meters.

2. The tunnel face extrusion deformation control method according to claim 1, characterized in that: The method of selecting a combination of annular excavation reserved core soil and an advance small pipe to control deformation includes: Before tunnel excavation, a small advance guide tube is constructed in the arch; the upper step section is excavated with an arc-shaped pilot pit, and initial support is provided for the upper step; the core soil of the upper step is excavated; the walls on both sides of the lower step are excavated and supported; the core soil of the lower step is excavated; and the invert is constructed.

3. The tunnel face extrusion deformation control method according to claim 1, characterized in that: The method of selecting a combination of annular excavation to reserve core soil and advanced pipe shed to control deformation includes: Before tunnel excavation, an advance pipe shed is constructed on the arch; the upper step section is excavated with an arc-shaped pilot pit, and initial support is provided for the upper step; the core soil of the upper step is excavated; the walls on both sides of the lower step are excavated and supported; the core soil of the lower step is excavated; and the invert is constructed.

4. The tunnel face extrusion deformation control method according to claim 1, characterized in that: The deformation control by selecting a combination of annular excavation to reserve core soil, an advanced pipe shed and an upper step glass fiber anchor rod includes: Before tunnel excavation, an advance pipe shed is constructed on the arch; fiberglass anchors are constructed on the upper step; the upper step section is excavated with an arc-shaped pilot pit, and initial support is provided for the upper step; the core soil of the upper step is excavated; the walls on both sides of the lower step are excavated and supported; the core soil of the lower step is excavated; and the invert is constructed.

5. The tunnel face extrusion deformation control method according to claim 1, characterized in that: The deformation control by selecting a combination of annular excavation to reserve core soil, advanced pipe shed and full-section glass fiber anchor rods includes: Before tunnel excavation, an advanced pipe shed is constructed on the arch; fiberglass anchors are installed on the entire section; the upper step section is excavated with an arc-shaped pilot pit, and initial support is provided for the upper step; the core soil of the upper step is excavated; the walls on both sides of the lower step are excavated and supported; the core soil of the lower step is excavated; and the invert is constructed.