A high-strength lined stainless steel pipe elbow and preparation method thereof

By introducing structures such as inner reinforcement tubes and tapered positioning pins into high-strength lined stainless steel pipe elbows, the problems of bending deformation and welding burrs are solved, the stability and connection stability of the elbow are improved, and the elbow is realized Detachability and ease of maintenance.

CN115382961BActive Publication Date: 2024-10-22JIANGSU XINYANGGUANGGUANYE SCI & TECH CO LTD
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202211015817.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-23
Publication Date
2024-10-22
Estimated Expiration
2042-08-23

AI Technical Summary

Technical Problem

Existing high-strength lined stainless steel pipe elbows are prone to extrusion deformation and welding burrs at the bending part after heating and bending, making it difficult to disassemble and repair.

Method used

The inner reinforcement pipe is installed after being heated in the middle of the first bending pipe. The bending part is reinforced by the bending device, and structures such as tapered positioning pins and sealing sleeves are used to improve the connection stability and avoid excessive pressure and welding burrs at the bending part. problem.

Benefits of technology

It effectively avoids deformation and welding burrs in the bending part, increases the stability of the elbow and connection stability, and facilitates later disassembly and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115382961B_ABST
    Figure CN115382961B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of steel pipe elbows, and discloses a high-strength lined stainless steel pipe elbow, comprising a first bending pipe, an inner reinforcing pipe fixedly connected to the interior of the first bending pipe, a first connecting plate installed on one side of the first bending pipe, a latch installed inside the first connecting plate, and a conical positioning pin fixedly connected to the outer side of the latch. The high-strength lined stainless steel pipe elbow and its preparation method are as follows: after the middle of the first bending pipe is heated to 900-1000°C, an inner reinforcing pipe is installed inside the first bending pipe, and the inner reinforcing pipe reinforces the inner bending part of the second bending pipe. When the middle part of the first bending pipe is bent, the problem of collapse of the middle part of the first bending pipe due to excessive bending force is avoided. At the same time, after the inner reinforcing pipe is installed in the middle part of the first bending pipe, the stability of the elbow of the first bending pipe can be increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel pipe elbows, in particular to a high-strength lined stainless steel pipe elbow and a preparation method thereof. Background Art

[0002] Stainless steel pipe fittings are a type of pipe fittings. They are made of stainless steel, so they are called stainless steel pipe fittings. Lined stainless steel pipe elbows are the center of lined pipes, and are the main pipe bending and turning. It is common to use press bending to form the pipe when processing high-strength lined stainless steel pipe elbows. A high-strength lined stainless steel pipe elbow and its preparation method have been developed.

[0003] In the existing high-strength lined stainless steel pipe elbow and its preparation method, the steel pipe is heated to the bending temperature and then moved to the upper part of the bending device. The bending device heats both sides of the steel pipe and bends it, causing pressure on the bending part of the steel pipe. At the same time, the strength of the bending part of the steel pipe decreases. When the steel pipe is heated and bent, the bending part will be squeezed and deformed. When the steel pipe is installed and spliced ​​at the later stage, the two sections of steel pipe are installed by welding, which will cause welding burrs at the connection part. The welding burrs will affect the quality of the pipeline. At the same time, the steel pipe elbow is welded and fixed at the connection between the steel pipe elbow and the connecting pipe, which makes it impossible to disassemble the steel pipe elbow from another steel pipe, making it difficult to disassemble the steel pipe elbow during later maintenance.

[0004] Based on this, the present invention designs a high-strength lined stainless steel pipe elbow and a preparation method thereof to solve the above problems. Summary of the invention

[0005] In view of the shortcomings of the existing high-strength lined stainless steel pipe elbows and preparation methods thereof, the present invention provides a high-strength lined stainless steel pipe elbow and a preparation method thereof. When the steel pipe is produced, after the first bending pipe is heated until the bending is stable, the inner reinforcement pipe is moved to the middle of the first bending pipe, and moved between the first bending pipe and the inner reinforcement pipe to the bending device. When the first bending pipe is bent by the bending device, the inner reinforcement pipe reinforces the bending part of the first bending pipe to avoid the problem of deformation of the first bending pipe due to excessive pressure. At the same time, the inner reinforcement pipe is installed inside the first bending pipe, which can increase the stability of the first bending pipe after bending, thereby solving the problems raised in the above-mentioned background technology.

[0006] The present invention provides the following technical solution: a high-strength lined stainless steel pipe elbow, comprising a first bent tube, the interior of the first bent tube is fixedly connected to an inner reinforcement tube, a first connecting plate is installed on one side of the first bent tube, a latch is installed inside the first connecting plate, a conical locating pin is fixedly connected to the outer side of the latch, the outer side of the conical locating pin is conical, a groove is provided on the inner side of the conical locating pin, a second bent tube is movably sleeved on the outer side of the first connecting plate, a groove is provided inside the outer sides of the first bent tube and the second bent tube, the middle parts of the first bent tube and the second bent tube are bent at ninety degrees, a second connecting plate is installed on the other side of the second bent tube, a fastening bolt is installed inside one side of the second connecting plate, a third sealing sleeve is fixedly connected to the inner side of the second connecting plate, one side of the outer sides of the two second connecting plates is connected to a high-pressure water pipe, and a sealing cover is installed on the outer side of the other second connecting plate.

[0007] Preferably, a first sealing sleeve is fixedly connected to the outer side of the first connecting plate, and a second sealing sleeve is fixedly connected to the inner side of the first connecting plate. The first sealing sleeve and the second sealing sleeve are movably sleeved inside the first bent tube and the second bent tube respectively.

[0008] Preferably, the outer movable sleeve of the second sealing sleeve is connected with a telescopic extrusion plate, the outer side of the telescopic extrusion plate is installed with a spring, the inner side of the telescopic extrusion plate contacts the outer side of the inner reinforcement tube, and the spring is clamped between the second sealing sleeve and the telescopic extrusion plate.

[0009] Preferably, the inner reinforcing tube is installed in the middle of the first bending tube and the second bending tube, and the diameter difference between the inner reinforcing tube and the first bending tube and the second bending tube does not exceed two millimeters.

[0010] Preferably, the latch is movably sleeved inside the first connecting plate, and two conical positioning pins installed outside the latch are movably sleeved inside the grooves respectively.

[0011] Preferably, the second connecting plate is installed on the outer sides of the first bent tube and the second bent tube, and the fastening bolt passes through the second connecting plate and is threadedly limited inside the outer side of the second bent tube.

[0012] A method for preparing a high-strength lined stainless steel pipe elbow, the preparation method comprising the following steps:

[0013] S1: Select a first bent tube of the same diameter, heat the middle of the first bent tube to 900-1000°C, and at the same time move the inner reinforcement tube to the middle of the first bent tube;

[0014] S2: The heated first bending tube moves to the inside of the bending device, the bending device passes through the inside of both sides of the first bending tube and extends to the inside of the inner reinforcement tube, and at the same time, a circular baffle is placed on one side of the middle of the first bending tube, and the bending device is squeezed to one side at the same time;

[0015] S3: After the first bent tube is bent, the first bent tube is taken out and placed inside the slow cooling device. The first bent tube is cooled to 60°C at 3°C / S, and the inner and outer walls of the cooled first bent tube are polished;

[0016] S4: A first connecting plate and a second sealing sleeve are installed on one side of the first bent tube, and a sealing tape is installed inside the first bent tube and the second sealing sleeve, and the telescopic extrusion plate is pushed to contact the outer side of the inner reinforcement tube under the action of the spring elasticity;

[0017] S5: When multiple bending pipes need to be installed, the second bent pipe that has been bent is movably sleeved on the outside of the first sealing sleeve, and a latch is installed inside the first connecting plate. The conical positioning pins installed on both sides of the latch are inserted into the grooves provided inside the first bent pipe and the second bent pipe. At the same time, the conical positioning pins are pressed inwards and moved to the inside of the grooves, and the conical positioning pins are movably sleeved inside the grooves.

[0018] S6: A second connecting plate is movably installed inside the other side of the first bending tube and the second bending tube, and a fastening bolt is threadedly connected at the connection between the second connecting plate and the second bending tube, and a thread groove is opened on the outside of the second connecting plate.

[0019] Preferably, a second connecting plate and a third sealing sleeve are installed at the ends of the first bent tube and the second bent tube.

[0020] Compared with the existing high-strength lined stainless steel pipe elbow and its preparation method, the present invention has the following beneficial effects:

[0021] 1. The high-strength lined stainless steel pipe elbow and its preparation method are as follows: after the middle part of the first bent pipe is heated to 900-1000°C, an inner reinforcing pipe is installed inside the first bent pipe, and the inner reinforcing pipe reinforces the bending part inside the second bent pipe. When the middle part of the first bent pipe is bent, the bending force is too large, which may cause the middle part of the first bent pipe to collapse. At the same time, after the inner reinforcing pipe is installed in the middle part of the first bent pipe, the stability of the elbow of the first bent pipe can be increased.

[0022] 2. The high-strength lined stainless steel pipe elbow and its preparation method are characterized in that a groove is opened inside the outer sides of the first bent pipe and the second bent pipe, and when the first bent pipe and the second bent pipe are spliced, a first connecting plate can be installed between the first bent pipe and the second bent pipe, and the first sealing sleeve and the second sealing sleeve are connected to the inside of the first bent pipe and the second bent pipe, and at the same time, a latch is installed on the outside of the first connecting plate to drive the conical positioning pin to be movably sleeved inside the groove, so as to limit the position between the first bent pipe and the second bent pipe, and when the vertical pipe is installed, a fastening bolt is installed on the inside of the outer side of the first connecting plate to limit the first connecting plate and the first bent pipe, thereby increasing the stability of the connection when installing between curved pipes or vertical pipes. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the main structure of the present invention;

[0024] Figure 2 It is a schematic cross-sectional view of the main structure of the present invention;

[0025] Figure 3 It is a partial enlarged schematic diagram of the structural elbow connection port device of the present invention;

[0026] Figure 4 It is an enlarged schematic diagram of structure A of the present invention;

[0027] Figure 5 It is an enlarged schematic diagram of structure B of the present invention.

[0028] In the figure: 1. first bending tube; 2. inner reinforcing tube; 3. first connecting plate; 4. first sealing sleeve; 5. second sealing sleeve; 6. telescopic extrusion plate; 7. spring; 8. latch; 9. conical positioning pin; 10. second bending tube; 11. second connecting plate; 12. fastening bolt; 13. third sealing sleeve. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5A high-strength lined stainless steel pipe elbow comprises a first bending pipe 1, the interior of the first bending pipe 1 is fixedly connected with an inner reinforcing pipe 2, the inner reinforcing pipe 2 is installed inside the first bending pipe 1, and can be protected when bending. At the same time, when the first bending pipe 1 is in use, the inner reinforcing pipe 2 can reinforce the bending part inside the first bending pipe 1 to avoid damage to the bending part. A first connecting plate 3 is installed on one side of the first bending pipe 1, and the first connecting plate 3 protects the first bending pipe 1 and the second bending pipe 10 when splicing. A latch 8 is installed inside the first connecting plate 3, and a conical positioning pin 9 is fixedly connected to the outer side of the latch 8. The outer side of the conical positioning pin 9 is conical, and a groove is provided on the inner side of the conical positioning pin 9. The conical positioning pin 9 moves outward, and the conical positioning pin 9 is movably sleeved on The interior of the first bending tube 1 and the second bending tube 10 can be stretched and limited between the first bending tube 1 and the second bending tube 10, the second bending tube 10 is movably sleeved on the outside of the first connecting plate 3, and grooves are provided inside the outsides of the first bending tube 1 and the second bending tube 10. The middle parts of the first bending tube 1 and the second bending tube 10 are bent at ninety degrees, and a second connecting plate 11 is installed on the other side of the second bending tube 10. A fastening bolt 12 is installed inside one side of the second connecting plate 11. The fastening bolt 12 facilitates the splicing and limiting of the position between the second bending tube 10 and the second connecting plate 11. A third sealing sleeve 13 is fixedly connected to the inner side of the second connecting plate 11, one side of the outer sides of the two second connecting plates 11 is connected to a high-pressure water pipe, and a sealing cover is installed on the outer side of the other second connecting plate 11.

[0031] refer to Figure 4 A first sealing sleeve 4 is fixedly connected to the outer side of the first connecting plate 3, and a second sealing sleeve 5 is fixedly connected to the inner side of the first connecting plate 3. The first sealing sleeve 4 and the second sealing sleeve 5 are movably sleeved inside the first bending tube 1 and the second bending tube 10 respectively. The first sealing sleeve 4 and the second sealing sleeve 5 are installed on both sides of the first connecting plate 3 respectively, and when splicing the first bending tube 1 and the second bending tube 10, the first sealing sleeve 4 and the second sealing sleeve 5 can be installed to fit the position between the first bending tube 1 and the second bending tube 10, so as to limit the splicing between the pipes.

[0032] refer to Figure 4The second sealing sleeve 5 is movably sleeved with a telescopic extrusion plate 6 on the outside, and a spring 7 is installed on the outside of the telescopic extrusion plate 6. The inner side of the telescopic extrusion plate 6 contacts the outer side of the inner reinforcement tube 2, and the spring 7 is clamped between the second sealing sleeve 5 and the telescopic extrusion plate 6. The telescopic extrusion plate 6 moves to the inside of the first bending tube 1 or the second bending tube 10 when the first sealing sleeve 4 and the second sealing sleeve 5 are installed, and the telescopic extrusion plate 6 is in contact with the outer side of the inner reinforcement tube 2 under the elastic action of the spring 7, so that when the distance between the inner reinforcement tube 2 and the outer side of the first bending tube 1 is different, extrusion limitation can be performed, and looseness between the inner reinforcement tube 2 and the first bending tube 1 can be avoided during installation, which leads to the problem of shaking and noise inside the first bending tube 1 of the inner reinforcement tube 2 during later use.

[0033] refer to Figure 2 The inner reinforcing tube 2 is installed in the middle of the first bending tube 1 and the second bending tube 10, and the diameter difference between the inner reinforcing tube 2 and the first bending tube 1 and the second bending tube 10 does not exceed two millimeters. By heating the first bending tube 1 and installing the inner reinforcing tube 2 in the middle of the first bending tube 1, the position between the inner reinforcing tube 2 and the first bending tube 1 can be fitted, and the diameter difference between the inner reinforcing tube 2 and the first bending tube 1 and the second bending tube 10 does not exceed two millimeters, which can facilitate the inner reinforcing tube 2 to be installed in the first bending tube 1 and the second The inside of the bending tube 10, that is, the first bending tube 1 and the second bending tube 10, can be installed inside the first bending tube 1 and the second bending tube 10 when they are extruded and shaped, so as to facilitate the reinforcement of the inside of the bending part of the first bending tube 1 and the second bending tube 10, and avoid the problem of extrusion damage to the bending groove part when the first bending tube 1 and the second bending tube 10 are bent. At the same time, the inner reinforcing tube 2 of the device is installed inside the first bending tube 1 and the second bending tube 10, which can increase the stability of the first bending tube 1 and the second bending tube 10 when in use.

[0034] refer to Figure 4 The latch 8 is movably sleeved inside the first connecting plate 3, and the two conical locating pins 9 installed on the outside of the latch 8 are movably sleeved inside the grooves respectively. A groove is provided inside the outside of the first bending tube 1 and the second bending tube 10, and the conical locating pins 9 are movably sleeved inside the circular grooves provided inside the first bending tube 1 and the second bending tube 10 respectively, and the outer side of the conical locating pins 9 are conical, so that the conical locating pins 9 at both ends of the latch 8 can be conveniently installed and movably sleeved inside the first bending tube 1 and the second bending tube 10 respectively, so that the position between the first bending tube 1 and the second bending tube 10 can be installed to limit the splicing.

[0035] refer to Figure 2The second connecting plate 11 is installed on the outside of the first bending tube 1 and the second bending tube 10, and the fastening bolt 12 passes through the second connecting plate 11 and is threadedly limited inside the outside of the second bending tube 10. By installing the second connecting plate 11 on the outside of the first bending tube 1 and the second bending tube 10, the second connecting plate 11 can be installed to seal and limit the other side of the first bending tube 1 and the second bending tube 10. At the same time, the outer side of the second connecting plate 11 is provided with a thread, which can facilitate the splicing and limiting function between the outer side of the second connecting plate 11 and the vertical pipe. The fastening bolt 12 passes through the second connecting plate 11 and is threadedly sleeved on the inside of the groove opened on the outer side of the first bending tube 1 or the second bending tube 10, which can increase the tightness when installing between the first bending tube 1 and the second connecting plate 11.

[0036] A method for preparing a high-strength lined stainless steel pipe elbow, the preparation method comprising the following steps:

[0037] Select the first bending tube 1 of the same diameter, heat the middle part of the first bending tube 1 to 900-1000°C, and at the same time move the inner reinforcing tube 2 to the middle part of the first bending tube 1. By rotating the first bending tube 1 of the same diameter, the accuracy of processing can be increased, and the middle part of the first bending tube 1 is heated to 900-1000°C, so that the first bending tube 1 can be bent as a whole. At the same time, the inner reinforcing tube 2 is pushed to the inside of the first bending tube 1. By installing the inner reinforcing tube 2 inside the first bending tube 1, the overall strength of the first bending tube 1 can be increased when it is bent;

[0038] The heated first bending tube 1 moves to the inside of the bending device, the bending device passes through the inside of both sides of the first bending tube 1, and extends to the inside of the inner reinforcement tube 2, and at the same time, a circular baffle is placed on one side of the middle part of the first bending tube 1, and the bending device is squeezed to one side at the same time, extending to the inside of the first bending tube 1 and the inner reinforcement tube 2 through the bending device, and a circular baffle is placed on the outside of the first bending tube 1, that is, when the bending device performs the bending process, the circular baffle protects the bending part of the first bending tube 1;

[0039] After the first bent tube 1 is bent, the first bent tube 1 is taken out and placed inside the slow cooling device. The first bent tube 1 is cooled to 60°C at 3°C / S, and the inner and outer walls of the cooled first bent tube 1 are polished. By placing the bent first bent tube 1 inside the slow cooling device, the overall stable downward adjustment speed of the first bent tube 1 can be controlled to avoid the problem of brittle damage to the outer surface of the first bent tube 1 caused by too fast stable descent. After the temperature of the first bent tube 1 of the device drops, the outer and inner parts of the first bent tube 1 can be polished to avoid the problem of defects on the surface of the first bent tube 1.

[0040] A first connecting plate 3 and a second sealing sleeve 5 are installed on one side of the first bending tube 1, and a sealing tape is installed inside the first bending tube 1 and the second sealing sleeve 5. The telescopic extrusion plate 6 is pushed to contact with the outer side of the inner reinforcement tube 2 under the elastic action of the spring 7. The first connecting plate 3 and the second sealing sleeve 5 are installed on one side of the first bending tube 1, and a sealing tape is installed between the first bending tube 1 and the second sealing sleeve 5. The sealing performance can be increased when the first bending tube 1 and the second sealing sleeve 5 are installed. At the same time, the telescopic extrusion plate 6 is pushed to contact with the outer side of the inner reinforcement tube 2 under the elastic action of the spring 7, so as to avoid the problem of loosening of the inner reinforcement tube 2 during use.

[0041] When multiple bending pipes need to be installed, the second bent pipe 10 that has been bent is movably sleeved on the outside of the first sealing sleeve 4, and a latch 8 is installed inside the first connecting plate 3. The conical positioning pins 9 installed on both sides of the latch 8 are inserted into the grooves provided inside the first bent pipe 1 and the second bent pipe 10. At the same time, the conical positioning pins 9 are pressed inwards and moved to the inside of the grooves, and the conical positioning pins 9 are movably sleeved inside the grooves.

[0042] A second connecting plate 11 is movable inside the other side of the first bending tube 1 and the second bending tube 10, and a fastening bolt 12 is threadedly connected at the connection between the second connecting plate 11 and the second bending tube 10, and a threaded groove is cut on the outside of the second connecting plate 11. The second connecting plate 11 is installed inside the other side of the first bending tube 1 and the second bending tube 10 through the device, and can be installed on the outside of another second bending tube 10 through the second connecting plate 11, and a threaded pipe can be threadedly installed on the outside of the second connecting plate 11, which can facilitate the splicing, installation and discharge of materials between the other side of the second bending tube 10 and the vertical pipe or the curved pipe.

[0043] refer to Figure 1 A second connecting plate 11 and a third sealing sleeve 13 are installed at the ends of the first bent tube 1 and the second bent tube 10, and a sealing cover is installed on the outer side of another second connecting plate 11. The second connecting plate 11 and the third sealing sleeve 13 are installed at the ends of the first bent tube 1 and the second bent tube 10 by means of the device, and a sealing tube and a high-pressure water pipe are installed on the outside of the second connecting plate 11. High-pressure liquid is transported to the inside of the first bent tube 1 and the second bent tube 10 through the high-pressure water pipe. By observing whether there is a water leakage problem at the connection, the safety of post-production pipeline inspection can be increased.

[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A high-strength lined stainless steel pipe elbow, comprising a first bent pipe (1), characterized in that: The first bent tube (1) is fixedly connected to an inner reinforcing tube (2) on its interior; a first connecting plate (3) is installed on one side of the first bent tube (1); a latch (8) is installed on the interior of the first connecting plate (3); a conical positioning pin (9) is fixedly connected to the outer side of the latch (8); the outer side of the conical positioning pin (9) is conical; a groove is provided on the inner side of the conical positioning pin (9); a second bent tube (10) is movably sleeved on the outer side of the first connecting plate (3); the first bent tube (1) and the second bent tube ( 10) is provided with a groove inside the outer side, the middle parts of the first bent tube (1) and the second bent tube (10) are bent at 90 degrees, a second connecting plate (11) is installed on the other side of the second bent tube (10), a fastening bolt (12) is installed inside one side of the second connecting plate (11), a third sealing sleeve (13) is fixedly connected to the inner side of the second connecting plate (11), one side of the outer side of the two second connecting plates (11) is connected to a high-pressure water pipe, and a sealing cover is installed on the outer side of the other second connecting plate (11); A first sealing sleeve (4) is fixedly connected to the outer side of the first connecting plate (3), and a second sealing sleeve (5) is fixedly connected to the inner side of the first connecting plate (3); the first sealing sleeve (4) and the second sealing sleeve (5) are movably sleeved inside the first bent tube (1) and the second bent tube (10), respectively; The second sealing sleeve (5) is movably sleeved with a telescopic extrusion plate (6), the outside of which is provided with a spring (7), the inner side of which is in contact with the outer side of the inner reinforcing tube (2), and the spring (7) is clamped between the second sealing sleeve (5) and the telescopic extrusion plate (6); The inner reinforcing tube (2) is installed in the middle of the first bent tube (1) and the second bent tube (10), and the diameter difference between the inner reinforcing tube (2) and the first bent tube (1) and the second bent tube (10) is no more than two millimeters; The latch (8) is movably sleeved inside the first connecting plate (3), and two conical positioning pins (9) installed outside the latch (8) are movably sleeved inside the grooves respectively; The second connecting plate (11) is installed on the outside of the first bent tube (1) and the second bent tube (10), and the fastening bolt (12) passes through the second connecting plate (11) and is threadedly confined inside the outside of the second bent tube (10).

2. The method for preparing a high-strength lined stainless steel pipe elbow according to claim 1, characterized in that: The preparation method comprises the following steps: S1: Selecting a first bent tube (1) of the same diameter, heating the middle of the first bent tube (1) to 900-1000° C., and at the same time moving the inner reinforcing tube (2) to the middle of the first bent tube (1); S2: The heated first bending tube (1) moves to the inside of the bending device, the bending device passes through the inside of both sides of the first bending tube (1) and extends to the inside of the inner reinforcement tube (2), and at the same time, a circular baffle is placed on one side of the middle of the first bending tube (1), and the bending device is squeezed to one side at the same time; S3: After the first bent tube (1) is bent, the first bent tube (1) is taken out and placed inside a slow cooling device, the first bent tube (1) is cooled to 60° C. at 3° C. / s, and the inner wall and outer wall of the first bent tube (1) after cooling are polished; S4: A first connecting plate (3) and a second sealing sleeve (5) are installed on one side of the first bent tube (1), and a sealing tape is installed inside the first bent tube (1) and the second sealing sleeve (5), and the telescopic extrusion plate (6) is pushed by the elasticity of the spring (7) to contact the outer side of the inner reinforcement tube (2); S5: When it is necessary to install a multi-bend pipe, the second bent pipe (10) that has been bent is movably sleeved on the outside of the first sealing sleeve (4), and a latch (8) is installed inside the first connecting plate (3). The conical positioning pins (9) installed on both sides of the latch (8) are inserted into the inside of the grooves provided inside the first bent pipe (1) and the second bent pipe (10). At the same time, the conical positioning pins (9) are pressed inwards and moved to the inside of the grooves. Then, the conical positioning pins (9) are movably sleeved inside the grooves. S6: A second connecting plate (11) is movable inside the other side of the first bending tube (1) and the second bending tube (10), and a fastening bolt (12) is threadedly connected at the connection between the second connecting plate (11) and the second bending tube (10), and a threaded groove is opened on the outside of the second connecting plate (11).

3. The method for preparing a high-strength lined stainless steel pipe elbow according to claim 2, characterized in that: A second connecting plate (11) and a third sealing sleeve (13) are installed at the ends of the first bent tube (1) and the second bent tube (10).

Citation Information

Patent Citations

  • Connecting bend

    CN110985796A

  • High-pressure movable elbow structure convenient to mount and dismount

    CN113187980A

  • Anti-wrinkle machining method for aluminum alloy bent pipe fitting

    CN113399517A

  • BIM-based assembly type smoke-exhaust-prevention, fire-prevention and cold-bridge-prevention air pipe and preparation and assembly method

    CN113983261A

  • 90-degree elbow pipe fitting

    CN201706121U